DK2611968T3 - PROCEDURE AND APPARATUS FOR PREPARING AN ENLARGED BASE - Google Patents

PROCEDURE AND APPARATUS FOR PREPARING AN ENLARGED BASE Download PDF

Info

Publication number
DK2611968T3
DK2611968T3 DK11822652.1T DK11822652T DK2611968T3 DK 2611968 T3 DK2611968 T3 DK 2611968T3 DK 11822652 T DK11822652 T DK 11822652T DK 2611968 T3 DK2611968 T3 DK 2611968T3
Authority
DK
Denmark
Prior art keywords
aggregate
concrete
spindle
mandrel
stamping head
Prior art date
Application number
DK11822652.1T
Other languages
Danish (da)
Inventor
Kord J Wissmann
Original Assignee
Geopier Found Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Geopier Found Co Inc filed Critical Geopier Found Co Inc
Application granted granted Critical
Publication of DK2611968T3 publication Critical patent/DK2611968T3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes

Abstract

A system for constructing a support column includes a mandrel with an upper portion and a tamper head. A feed tube extends through the mandrel for feeding flowable material to the head. The tamper head includes a lower enlarged chamber with a reducing surface at an upper portion for compacting material and restricting upward flow of aggregate. The tamper head is of a size providing an enclosed region for allowing cementitious materials to be placed therein. The system allows a support column including a cementitious inclusion on top of an expanded base to be built.

Description

DESCRIPTION
CROSS REFERENCE TO RELATED APPLICATIONS
[0001] This application is related to and claims the priority of U.S. Utility Patent Application Serial No. 12/875,986, filed September 3, 2010.
FIELD OF THE INVENTION
[0002] The present invention relates to construction of a structural support column. More specifically, the present invention relates to a method and apparatus for building an expanded base pier to bypass weak soils and transfer structural loads to underlying strong soils.
BACKGROUND OF INVENTION
[0003] Heavy or settlement-sensitive facilities that are located in areas containing soft or weak soils are often supported on deep foundations, consisting of driven piles or drilled concrete columns. The deep foundations are designed to transfer the structure loads through the soft soils to more competent soil strata.
[0004] In recent years, aggregate columns have been increasingly used to support structures located in areas containing soft soils. The columns are designed to reinforce and strengthen the soft layer and minimize resulting settlements. The columns are constructed using a variety of methods including the drilling and tamping method described in U.S. Patent Nos. 5,249,892 and 6,354,766; the driven mandrel method described in U.S. Patent No. 6,425,713; the tamper head driven mandrel method described in U.S. Patent No. 7,226,246; and the driven tapered mandrel method described in U.S. Patent No. 7,326,004.
[0005] The short aggregate column method (U.S. Patent Nos. 5,249,892 and 6,354,766), which includes drilling or excavating a cavity, is an effective foundation solution when installed in cohesive soils where the sidewall stability of the hole is easily maintained. The method generally consists of: a) drilling a generally cylindrical cavity or hole in the foundation soil (typically around 30 inches); b) compacting the soil at the bottom of the cavity; c) installing a relatively thin lift of aggregate into the cavity (typically around 12-18 inches); d) tamping the aggregate lift with a specially designed beveled tamper head; and e) repeating the process to form an aggregate column generally extending to the ground surface. Fundamental to the process is the application of sufficient energy to the beveled tamper head such that the process builds up lateral stresses within the matrix soil up along the sides of the cavity during the sequential tamping. This lateral stress build up is important because it decreases the compressibility of the matrix soils and allows applied loads to be efficiently transferred to the matrix soils during column loading.
[0006] The tamper head driven mandrel method (U.S. Patent No. 7,226,246) is a displacement form of the short aggregate column method. This method generally consists of driving a hollow pipe (mandrel) into the ground without the need for drilling. The pipe is fitted with a tamper head at the bottom which has a greater diameter than the pipe and which has a flat bottom and beveled sides. The mandrel is driven to the design bottom of column elevation, filled with aggregate and then lifted, allowing the aggregate to flow out of the pipe and into the cavity created by withdrawing the mandrel. The tamper head is then driven back down into the aggregate to compact the aggregate. The flat bottom shape of the tamper head compacts the aggregate; the beveled sides force the aggregate into the sidewalls of the hole thereby increasing the lateral stresses in the surrounding ground.
[0007] The driven tapered mandrel method (U.S. Patent No. 7,326,004) is another means of creating an aggregate column with a displacement mandrel. In this case, the shape of the mandrel is a truncated cone, larger at the top than at the bottom, with a taper angle of about 1 to about 5 degrees from vertical. The mandrel is driven into the ground, causing the matrix soil to displace downwardly and laterally during driving. After reaching the design bottom of the column elevation, the mandrel is withdrawn, leaving a cone shaped cavity in the ground. The conical shape of the mandrel allows for temporarily stabilizing of the sidewalls of the hole such that aggregate may be introduced into the cavity from the ground surface. After placing a lift of aggregate, the mandrel is re-driven downward into the aggregate to compact the aggregate and force it sideways into the sidewalls of the hole. Sometimes, a larger mandrel is used to compact the aggregate near the top of the column.
[0008] U.S. Patent No. 7,604,437 is related to a mandrel for making aggregate support columns wherein flow restrictors are provided to prevent upward movement of aggregate through the mandrel during driving of the mandrel. The mandrel contemplated in this art relates to formation of an aggregate support column such as described in U.S. Patent Nos. 6,425,713 and 7,226,246 discussed above.
[0009] U.S. Patent Nos. 4,992,002 and 6,773,208 relate to methods for casting a partially reinforced concrete pier in the ground. One method involves the use of an elongate mandrel with a cupped foot having a larger cross-sectional area than the mandrel, wherein flowable grout that is placed in the mandrel flows through openings located near the bottom of the mandrel into the space between the mandrel and the foot. The other method involves the installation of an elongate hollow tubular casing that is then filled with fluid concrete that is allowed to set while the casing remains in the ground. Each of these references is merely to concrete hardened inclusions and does not allow for the additional stability and strength provided by a pier that has an expanded base.
[0010] U.S. Patent No. 3,568,452 relates to a method and apparatus for forming bulbular base piles.
[0011] In the area of soil improvement, it is often desirable to install a stiff inclusion into the ground to transfer loads through a soft or weak soil layer. Although these soil layers may also be treated by non-cementitious aggregate columns, non-cementitious columns are typically confining-stress dependent (i.e., they rely on the strength of the sidewall soils to prevent bulging). Occasionally, it is desirable to utilize cementitious inclusions to bypass weak soils and transfer loads to underlying strong soils. The object of the present invention is to efficiently form a strong and stiff expanded base (either cementitious or non-cementitious) at the bottom of the column and to provide an efficient means for the introduction of grout, concrete, post-grouted aggregate, or other cementitious material through the upper portions of the column to form a cementitious inclusion.
BRIEF DESCRIPTION OF INVENTION
[0012] The present invention relates to a system for constructing a support column. A mandrel has an upper portion and a tamper head. A feed tube extends through the mandrel for feeding aggregate, concrete, grout, or other flowable materials to the tamper head. The tamper head includes a lower enlarged chamber with a reducing surface at an upper portion thereof for compacting aggregate or concrete and restricting upward flow of aggregate or concrete during compaction. The tamper head is of a size providing an enclosed region for allowing cementitious materials to be placed therein. A closure cap is on an end of the feed tube opposite the tamper head. A concrete supply tube is connected to the feed tube, and an air pressure source is connected to the feed tube for evacuating concrete from the feed tube through air pressure supplied thereto.
[0013] The invention may comprise a valve mechanism movable between an open position and a closed position for closing off the feed tube from communication with the tamper head during tamping operations and may comprising stiffening members secured between the reducing surface and the mandrel for providing load support during tamping operations. The invention may further comprise chains attached or notches within the interior of the tamper head for restricting upward flow of material into the feed tube during downward movement of the mandrel. A second tube may extend through the mandrel on the side of the feed tube for allowing cementitious material to flow upward through the second tube for inspection of the cementitious material during pumping. A hopper may be located at the top of the mandrel for feeding aggregate into the feed tube of the mandrel.
[0014] A second aspect of the invention relates to a method of constructing a support column comprising use of a mandrel assembly having a feed tube connected to a tamper head at an opening thereof for allowing aggregate, concrete, grout, or other flowable material to flow into the tamper head. The method comprises providing the tamper head of a shape with a defined lower enlarged chamber having a reducing surface at an upper portion thereof for compaction and for restricting upward flow of material into the feed tube during tamping, the tamper head further sized to provide an enclosed region for allowing cementitious material to be placed therein; providing a closure cap on an end of the feed tube opposite the tamper head and a concrete supply tube connected to the feed tube, and an air pressure source connected to the feed tube for evacuating concrete from the feed tube through air pressure supplied thereto; driving the mandrel assembly into a ground surface to a given depth thereby forming a cavity; lifting the mandrel assembly to release an initial charge of aggregate or concrete from the tamper head into a bottom of the cavity; re-driving the mandrel assembly to compact the aggregate or concrete at a bottom of the cavity and to form an expanded base, the expanded base having a width greater than the tamper head; and withdrawing the mandrel assembly while continuously feeding cementitious material or aggregate to be subsequently fully or partially treated with grout through the feed tube, thereby forming a cementitious inclusion at least partially within the cavity, the cementitious inclusion having a width of the cavity and being formed on top of the expanded base.
[0015] The method may further comprise introducing a pipe through the feed tube and tamper head after formation of the expanded base, placing aggregate during the withdrawing step to partially surround the pipe, and introducing cementitious material into the pipe following aggregate placement to treat the aggregate.
BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The invention will be better understood from the following detailed description made with reference to the drawings, wherein:
Figure 1 is a side cross-section view of a first embodiment of a mandrel;
Figure 2 is a side cross-section view of a second embodiment of the mandrel with a valve;
Figure 3 is a side cross-section view of a third embodiment of the mandrel with internal upward flow restrictors;
Figure 4 is a side cross-section view of a fourth embodiment of the mandrel with a grout return pipe;
Figures 5A-5E illustrate a method of constructing a pier with the mandrel of Figure 1;
Figures 6A-6F illustrate an alternate method of constructing a pier with one embodiment of the mandrel of the invention;
Figure 7 is a side cross-section view of an alternative embodiment of the mandrel using a closed top system to allow air pressure to build;
Figure 8 is a more detailed view of the operation of a closed top system including use of an external air source;
Figure 9 is a graph showing results of load tests performed on columns made according to Example I as compared to reference piers; and
Figures 10 and 11 are graphs showing results of load tests performed on columns made according to Example III.
DETAILED DESCRIPTION OF THE INVENTION
[0017] With reference to the attached figures, various embodiments of a new and novel mandrel for forming an expanded base pier, as part of a hardened inclusion, is provided.
[0018] Figure 1 illustrates an embodiment of a base mandrel assembly (1) contemplated herein. In this embodiment, a tamper head (2) is formed as a unitary structure attached to one end of a feed tube or pipe (4) to form the mandrel assembly (1). The feed pipe (4) can typically be 4" to 12" in diameter and has an upper end (not shown) opposite the tamper head (2) in which aggregate, concrete, grout, and other flowable material can be fed. The tamper head (2) typically comprises an enlarged lower chamber (3), typically 10" to 24" in diameter. The reducing surface (5) from the lower chamber walls to the feed pipe walls serves the function as a compaction plate for compacting aggregate or concrete as described hereinbelow, as well as serving as an upward flow restrictor while the initial aggregate is being driven such that the aggregate or concrete forms a "plug" within the chamber (3) and does not flow back up into the feed pipe (4). The reducing surface (5) may be angled as shown in Figure 2. The lower chamber (3) at the bottom of the head allows for formation of a densified bottom expanded base and provides an enclosed area for the placement of grout or concrete. Stiffeners (6) can also be placed between the feed pipe (4) and lower chamber (3) to assist in load transfer during driving.
[0019] Figure 2 illustrates an embodiment of a base mandrel similar to Figure 1, but includes a special valve mechanism (7) that may be used to further block the flow of aggregate or concrete from the lower chamber (3) into the feed pipe (4). The valve mechanism (7) seats against the reducing surface (5) of the feed pipe (4) and physically restricts the flow of aggregate, or concrete, back up into the feed pipe during downward driving (as opposed to the "plug" formed as described above with reference to Figure 1). When the feed pipe (4) is lifted, the valve mechanism (7) opens to allow the downward flow of grout, concrete, or other flowable material through the feed pipe (4) and into the lower chamber (3). The valve mechanism (7) may be manipulated by a pipe extending to the top of the mandrel or by a mechanism that pins the valve mechanism (7) to the sidewalls of the feed pipe (4).
[0020] The purpose of the valve mechanism (7) envisioned with reference to Figure 2 is to allow subsequent compaction of the bottom aggregate or concrete expanded base initially placed and formed. For instance, the mandrel would first be driven in the ground with the lower chamber (3) charged with aggregate or concrete. The feed pipe (4) would then be lifted, and the valve mechanism (7) would open. Grout or concrete would then be added through the feed pipe (4). The mandrel assembly (1) would then be driven back down, thereby allowing for further compaction of the aggregate or concrete at the bottom to form an expanded base.
[0021] Figure 3 illustrates another variation of the embodiment of Figure 1. More specifically, chain links (8) are attached within the tamper head (2) so that upon tamping, the chain links (8) move inward to constrict the aggregate or concrete in the lower chamber (3) and restrict aggregate or concrete from flowing upward into the feed tube (4). It is also envisioned that internal notches may be provided in lieu of chains in order to provide non-mechanical (or passive) upward flow restriction.
[0022] Figure 4 illustrates a further embodiment of a mandrel similar to that shown in Figure 1 but which includes a special provision for ensuring grout placement. Instead of having only a single chute feed pipe or tube (4) as shown in Figure 1, the embodiment contemplated with reference to Figure 4 has a feed pipe including a primary feed pipe (4) and a grout return pipe (9) that is used to ensure that a continuous column of grout is installed. Positive flow of grout from the top of the grout return pipe (9) demonstrates that the mandrel is full of grout before or during mandrel extraction (lifting) operations.
[0023] A method of use is shown with reference to Figures 5A-5E, which shows an installation sequence with the base mandrel depicted in Figure 1. Step A (Figure 5A) shows placing a mound (10) of the aggregate on the ground surface. Step B (Figure 5B) shows driving the mandrel assembly (1) through the mound (10) of aggregate (to form an initial charge of aggregate) and to the final driving elevation. During the driving process, the aggregate in the lower chamber (3) forms a plug (11) in the neck of the feed pipe (4) at the bottom of the tamper head (2). The valve mechanism (7) shown in Figure 2 or the chain links (8) shown in Figure 3 may be used within the tamper head (2) to facilitate plugging. Step C (Figure 5C) shows lifting of the mandrel assembly (1) wherein the aggregate plug (11) or initial charge remains in place at the bottom of the hole (it is understood that the initial charge may also be added after driving of a closed tamper head, such as with a sacrificial cap covering the bottom opening of the tamper head). Step D (Figure 5D) shows re-driving the mandrel assembly (1) one or more times to compact the aggregate at the bottom of the hole and to form an expanded base (12). Grout or concrete (13) may then be pumped through the feed pipe as shown. Step E (Figure 5E) shows placing grout or concrete (13) from the element up from the bottom while removing the mandrel. When the grout return pipe (9) as shown in Figure 4 is used in conjunction with Step E of the construction process, grout continuity within the mandrel shaft is determined if grout continues to flow out of the grout return pipe (9) during extraction. The finished support column comprises an expanded base with a cementitious inclusion located thereon.
[0024] An alternative method of use can also be used with reference to Figures 5A-5E. Step A consists of filling the lower chamber (3) of the tamper head (2) with concrete. This may be achieved by driving the tamper head (2) through a mound (10) of concrete as shown in Figure 5A or by pumping concrete through the feed tube (4) while the tamper head (2) is resting on the ground surface. In this case, the ground surface seals the concrete from flowing out of the bottom of the lower chamber (3). As shown in Figure 5B, the tamper head (2) is then driven to design elevation with the concrete at the bottom of the tamper head (2) forming a plug (11) at the bottom of the assembly mandrel (1). The valve mechanism (7) shown in Figure 2 or the chain links (8) shown in Figure 3 may be used within the tamper head (2) to facilitate plugging. Step C shows the retraction (lifting) of the assembly (2) to allow the concrete to flow out of the bottom of the tamper head (2). Step D shows the placement of additional concrete (13) through the feed pipe (4) and the subsequent or simultaneous lowering of the mandrel assembly (1) onto the previously placed concrete to force the concrete outward thus forming an expanded base (12). Step E shows the simultaneous placement of grout or concrete (13) through the feed tube (4) while extracting the mandrel assembly (1) to the ground surface. This technique forms an expanded base pier comprised of concrete at the expanded base (12) and concrete within the pier shaft (or inclusion) on top of the expanded base (12).
[0025] The benefits of the system contemplated herein are the efficient formation of an expanded base (12) that allows load to be transferred to the bottom of the pier and the very quick and efficient formation of the grouted inclusion by rapidly raising the mandrel while placing grout or concrete (13). While the method sequence of Figures 5A-5E depicts the use of the base mandrel shown in Figure 1, it is envisioned that the method could principally be used with any of the mandrels shown in Figures 1 - 4.
[0026] Figures 6A-6F shows an alternative construction sequence where Steps A through C (Figures 6A-6C) are generally as described above with reference to the initial charge of aggregate being in the lower chamber (see Figures 5A-5C). In Step D (Figure 6D) of this sequence, the mandrel assembly (1) is lowered to compact the aggregate and a secondary disposable pipe (14) is inserted into the mandrel assembly (1) to rest on the expanded base (12). In Step E (Figure 6E) the mandrel assembly (1) is raised and additional aggregate (15) is allowed to fill the annular space between the disposable pipe (14) and the sidewall of the cavity (16). A hopper (17) can be used to place the aggregate (15) within the feed pipe (4). The aggregate (15) placed in this step is not compacted. In Step F (Figure 6F) the disposable pipe (14) is then used as a conduit to place grout into the inclusion by filling the voids in the loose aggregate (15) around the disposable pipe (14). Typically, the disposable pipe (14) is not removed but can be cut at ground level or just below ground level and made part of the permanent inclusion. Additionally, while Figures 6D-6F depict representative grout ports at the bottom end of disposable pipe (14), it is understood that such ports or other openings can be located partially or fully along the length of disposable pipe (14).
[0027] Figure 7 illustrates a further embodiment of a mandrel similar to that shown in Figure 1 but which includes a closed system for the placement of concrete, grout, or other flow able materials. The mandrel of this embodiment includes an external feed tube (18) that enters the mandrel feed tube (4) near the top of the mandrel to allow for the passage of a flowable material (19). The external feed tube (18) is used to pump concrete, grout, or other flowable materials into the primary feed tube (4). The top of the mandrel is sealed with a top plate (21) making this a closed system. An air pressure gage (20) may optionally be installed to measure the internal air pressure within the mandrel and allow for the use of a pressure release valve (22) to facilitate removal of excess internal pressure during pumping. The mandrel system of
Figure 7 may be used in conjunction with the construction sequences shown in Figures 5A-5E.
[0028] Figure 8 illustrates yet another embodiment of the mandrel similar to that shown in Figure 7. In this embodiment, an air source, such as compressor (24), may optionally be used to apply elevated air pressure to trapped air (23) within the mandrel feed pipe (4) to evacuate concrete (13) from the mandrel.
[0029] The following examples illustrate further aspects of the invention.
Example I
[0030] As an example, an embodiment of the system of the present invention was used to install a support column, also described herein as an expanded base pier ("EBP"), at a test site in Iowa. The test site was characterized by 4 feet of sandy lean clay underlain by sand. This testing program was designed to compare the load versus deflection characteristics of this embodiment of the EBP to reference piers constructed in successive lifts, such as a pier constructed by the tamper head driven mandrel method. The reference piers of this example had a nominal diameter of 20 inches and an installed length of 23 feet. One reference pier was constructed of aggregate only to a diameter of 20 inches. Another reference pier was constructed with a grout additive, commonly referred to as grouted pier, to a diameter of 14 inches.
[0031] In this embodiment of the invention, the EBP was formed by filling the extractable mandrel (Figure 1) with a combination of open graded aggregate and fluid grout. The mandrel had a lower chamber (3) outside diameter of 14 inches and a feed pipe (4) outside diameter of 12 inches. The mandrel of this embodiment was connected at its open end (opposite the tamper head) to an open hopper for filling and was attached to a high frequency hammer which is often associated with driving sheet piles. The hammer is capable of providing both downward force and vibratory energy. The full mandrel was advanced to a depth of 23 feet below the ground surface. The mandrel assembly was then raised 3 feet and lowered 3 feet a total of 3 times to form a bottom expanded base. Each raising and lowering of the mandrel is referred to as a "stroke." The mandrel was then raised 3 feet, lowered 2 feet, and then slowly extracted to the ground surface allowing a column of grout and aggregate to be placed in the cavity created during mandrel installation. The EBP was constructed with a base diameter of 20 inches, and a shaft diameter of 14 inches. Once the mandrel was fully extracted, a 1 inch diameter reinforcing steel rod was inserted the full length of the EBP. A concrete cap was then poured above the EBP to facilitate load testing.
[0032] The reference piers and the EBP were load tested using a hydraulic jack pushing against a test frame. Figure 9 shows the results of the load test of the EBP compared with the reference piers. At a top of pier deflection of 0.5 inches, the reference pier with aggregate supported a load of about 23,300 pounds, the reference pier with grout supported a load of about 50,000 pounds, and the EBP supported a load of about 70,300 pounds. At a top of pier deflection of 1 inch, the reference pier with aggregate supported a load of about 38,800 pounds, the reference pier with grout supported a load of about 62,700 pounds, and the EBP supported a load of about 97,000 pounds. The load carrying capacity of the pier constructed in accordance with this embodiment of the present invention showed a 2.5 to 3 fold improvement when compared to a reference pier with aggregate, and a 1.4 to 1.5 fold improvement when compared to a reference pier with grout. The difference in the behavior relative to the grouted pier is caused by the formation of the bottom expanded base during the construction of the EBP according to the invention.
Example II
[0033] As another example, the system of another embodiment of the present invention was used to install five EBP elements at a test site in Virginia. The test site was characterized by hard clay. Prior to installation of the EBP, 30 inch diameter drill holes were excavated to a depth of 8 feet below the ground surface. The voids were then loosely backfilled with sand. The EBP elements of this example were formed within the backfilled holes.
[0034] In this embodiment of the invention, the EBP was formed by filling the mandrel described in Figure 7 with concrete. The mandrel of this embodiment featured a "closed top" as opposed to the "open hopper" configuration as described with reference to Example I. The mandrel in this embodiment was attached to a similar hammer as in the embodiment of Example I. The full mandrel was advanced to a depth of 8 feet below the ground surface. The mandrel was then raised 3 feet, and then lowered 2 feet for three repetitions to create the expanded base. A process of raising the mandrel 3 feet, and then lowering 1 foot was then used to complete the full length of the pier. Once the concrete had cured, each of the piers was excavated and the pier base and shaft diameters were measured.
[0035] The lower chamber in this embodiment had a nominal 12 inch diameter outer dimension. The excavated and measured piers had an average nominal diameter of 18 inches. Expanded bases at the bottoms of the piers exceeded 24 inches demonstrating the effectiveness of this construction technique.
Example III
[0036] As yet another example, the embodiment of the present invention from Example II was used on a site in Washington, D.C. The site was characterized by 20 to 30 feet of soft clay and clayey sand underlain by dense sand or hard clay. The embodiment of the present invention at the site was used to support mechanically stabilized earth (MSE) walls and embankments. The mandrel used for this project was similar to that used in Example II. The lower chamber in this embodiment had a nominal 18 inch diameter outer dimension. In this example, two fully concrete EBP were constructed and subsequently load tested. In this example of the embodiment, the EBP were constructed with a 24 inch diameter expanded base, and an 18 inch diameter shaft.
[0037] In this embodiment of the invention, the EBP was formed by filling the mandrel (such as in Figures 7 or 8) with concrete. The full mandrel was then advanced to a depth of 26 feet below the ground surface for Test Pier 1 and to a depth of 36.5 feet below the ground surface for Test Pier 2. The mandrel was then raised 4 feet, and then lowered 3 feet. The process of raising the mandrel 4 feet, and then lowering 3 feet was completed for a total of 4 cycles at the test piers to create an expanded base. After the expanded base was created, the mandrel was extracted at a constant rate while pumping concrete into the mandrel. Once the concrete had cured, each of the piers was load tested.
[0038] The load tests were performed using Statnamic load test methods. Figure 10 shows the results of the load test on Test Pier 1 (26 feet below ground surface) and Figure 11 shows the results of the load test on Test Pier 2 (36.5 feet below the ground surface - two test load cycles on this test pier). Both Test Pier 1 and Test Pier 2 supported a test load of approximately 425 kips at 1 inch of top of pier deflection, with a maximum supported load of approximately 575 kips.
[0039] The foregoing detailed description of embodiments refers to the accompanying drawings, which illustrate specific embodiments of the invention. The term "the invention" or the like is used with reference to certain specific examples of the many alternative aspects or embodiments of the applicant's invention set forth in this specification, and neither its use nor its absence is intended to limit the scope of the applicant's invention or the scope of the claims. This specification is divided into sections for the convenience of the reader only. Headings should not be construed as limiting of the scope of the invention. The definitions are intended as a part of the description of the invention. It will be understood that various details of the invention may be changed without departing from the scope of the claims.
REFERENCES CITED IN THE DESCRIPTION
This list of references cited by the applicant is for the reader's convenience only. It does not form part of the European patent document. Even though great care has been taken in compiling the references, errors or omissions cannot be excluded and the EPO disclaims all liability in this regard.
Patent documents cited in the description • US87598610A [0001] • US5249892A [00041 i00051 • US6354766B ί00041 ί00051 • US6425713Β ί00041 Γ00681 • US7326004B |0004] |000?1 • US7604437B ίΟΟΟΒΙ • US4992002A ίΟΟΟΘΙ • US6773208B Γ06091 • US3568452Å Γ0010Ί

Claims (15)

1. System til konstruktion af en støttesøjle omfattende: (a) en spindel (1) med en øvre del og et stampehoved (2) og et tilførselsrør (4), der strækker sig derigennem til tilførsel af aggregat, beton, mørtel eller andre flydende materialer gennem spindlen til stampehovedet; (b) stampehovedet, der definerer et nedre forstørret kammer (3) med en reducerende overflade (5) ved en øvre del deraf for komprimering af aggregat eller beton og til at begrænse opadgående strømning af aggregat eller beton ind i spindlen under komprimering, og hvor stampehovedet er af tilstrækkelig størrelse til at tilvejebringe et indesluttet område, hvori der kan anbringes cementbaseret materiale; hvilket system er kendetegnet ved, at det omfatter (c) en lukkekappe (21) på en ende af tilførselsrøret modsat stampehovedet, et betontilførselsrør (18) forbundet med tilførselsrøret og en lufttrykskilde (24) forbundet med tilførselsrøret til udledning af beton fra tilførselsrøret ved lufttryk tilført dertil.A support column construction system comprising: (a) a spindle (1) having an upper part and a stamping head (2) and a supply pipe (4) extending therethrough for supply of aggregate, concrete, mortar or other liquid materials through the stem to the stamping head; (b) the stamping head defining a lower enlarged chamber (3) having a reducing surface (5) at an upper portion thereof for compressing aggregate or concrete and for limiting upward flow of aggregate or concrete into the mandrel during compaction, and wherein the stamping head is of sufficient size to provide an enclosed area in which cement-based material can be placed; which system is characterized in that it comprises (c) a closure cap (21) at one end of the feed pipe opposite the stamping head, a concrete feed pipe (18) connected to the feed pipe and an air pressure source (24) connected to the feed pipe for discharge of concrete from the supply pipe at air pressure. added thereto. 2. System ifølge krav 1, der endvidere omfatter en ventilmekanisme (7), der kan bevæges mellem en åben position og en lukket position for aflukning af tilførselsrøret mod forbindelse med stampehovedet under stampning.A system according to claim 1, further comprising a valve mechanism (7) movable between an open position and a closed position for closing the supply tube against connection to the stamping head during stamping. 3. System ifølge krav 1, der endvidere omfatter afstivningselementer (6), der er fastgjort mellem den reducerende overflade og spindlen for at tilvejebringe laststøtte under stampning.The system of claim 1, further comprising bracing elements (6) secured between the reducing surface and the spindle to provide load support during stamping. 4. System ifølge krav 1, der endvidere omfatter kæder (8), der er fastgjort i det indre af stampehovedet til begrænsning af opadgående strømning af materiale ind i tilførselsrøret under nedadgående bevægelse af spindlen.The system of claim 1, further comprising chains (8) secured within the interior of the stamping head to limit upward flow of material into the feed tube during downward movement of the spindle. 5. System ifølge krav 1, der endvidere omfatter indskæringer i det indre af stampehovedet til begrænsning af opadgående strømning af materiale ind i tilførselsrøret under nedadgående bevægelse af spindlen.The system of claim 1, further comprising cuts in the interior of the plunger head for limiting upward flow of material into the supply tube during downward movement of the spindle. 6. System ifølge krav 1, der endvidere omfatter et andet rør (9), der strækker sig gennem spindlen på siden af tilførselsrøret til at gøre det muligt for cementbaseret materiale at strømme op gennem det andet rør for inspektion af det cementbaserede materiale under pumpning, eller som endvidere omfatter en tragt placeret ved toppen af spindlen til tilførsel af aggregat i spindlens tilførselsrør.The system of claim 1, further comprising a second tube (9) extending through the spindle on the side of the feed tube to allow cement-based material to flow up through the second tube for inspection of the cement-based material during pumping. or further comprising a hopper located at the top of the spindle for supply of aggregate in the spindle feed tube. 7. Fremgangsmåde til konstruktion af en støttesøjle, der omfatter anvendelse af en spindelenhed (1) med et tilførselsrør (4) forbundet med et stampehoved (2) ved en åbning deraf for at gøre det muligt for aggregat, beton, mørtel eller andet flydende materiale at strømme ind i stampehovedet, hvilken fremgangsmåde omfatter: (a) tilvejebringelse af stampehovedet af en form med et defineret nedre forstørret kammer (3) med en reducerende overflade (5) ved en øvre del deraf til komprimering og til begrænsning af opadgående strømning af materiale ind i tilførselsrøret under stampning, hvor stampehovedet endvidere er dimensioneret til at tilvejebringe et aflukket område for at gøre det muligt at anbringe cementbaseret materiale deri; (b) tilvejebringelse af en lukkekappe (21) på en ende af tilførselsrøret modsat stampehovedet og et betontilførselsrør forbundet med tilførselsrøret, og en lufttrykskilde (24) forbundet med tilførselsrøret til udledning af beton fra tilførselsrøret ved lufttryk tilført dertil; (c) drivning af spindelenheden ned i en jordoverflade til en given dybde, hvorved der dannes et hulrum; (d) løftning af spindelenheden for at frigive en udgangsladning af aggregat eller beton fra stampehovedet i bunde af hulrummet; (e) drivning igen af spindelenheden for at komprimere aggregatet eller betonen ved bunden af hulrummet og for at danne en forstørret base, hvilken forstørret base har en bredde, der er større end stampehovedet; og (f) tilbagetrækning af spindelenheden, mens der kontinuerligt tilføres cementbaseret materiale eller aggregat, der efterfølgende skal helt eller delvist behandles med mørtel, gennem tilførselsrøret, hvorved der dannes en cementbaseret inklusion mindst delvist inde i hulrummet, hvilken cementbaseret inklusion har en bredde af hulrummet og er dannet oven på den forstørrede base.A method of constructing a support column comprising the use of a spindle assembly (1) with a supply pipe (4) connected to a stamping head (2) at an opening thereof to enable aggregate, concrete, mortar or other liquid material flowing into the stamping head, which method comprises: (a) providing the stamping head of a mold having a defined lower enlarged chamber (3) having a reducing surface (5) at an upper portion thereof for compression and for limiting upward flow of material; into the supply tube during stamping, wherein the stamping head is further sized to provide a closed area to allow cement-based material to be placed therein; (b) providing a closure cap (21) at one end of the feed pipe opposite the stamping head and a concrete feed pipe connected to the feed pipe, and an air pressure source (24) connected to the feed pipe for discharge of concrete from the feed pipe by air pressure applied thereto; (c) driving the spindle unit down into a ground surface to a given depth, thereby forming a cavity; (d) lifting the spindle assembly to release an output charge of aggregate or concrete from the stamping head into the bottom of the cavity; (e) driving again the spindle assembly to compress the aggregate or concrete at the bottom of the cavity and to form an enlarged base, said enlarged base having a width greater than the stamping head; and (f) retracting the spindle assembly while continuously adding cement-based material or aggregate, which must subsequently be wholly or partially treated with mortar, through the feed tube, thereby forming a cement-based inclusion at least partially within the cavity, said cement-based inclusion having a width of the cavity. and is formed on top of the enlarged base. 8. Fremgangsmåde ifølge krav 7, hvor stampehovedet fyldes med udgangsladningen af aggregat eller beton inden drivning.The method of claim 7, wherein the stamping head is filled with the initial charge of aggregate or concrete prior to operation. 9. Fremgangsmåde ifølge krav 7, hvor det cementbaserede materiale er et, der er udvalgt fra gruppen bestående af beton, mørtel eller aggregat, der efterfølgende helt eller delvist behandles med mørtel.A method according to claim 7, wherein the cement-based material is one selected from the group consisting of concrete, mortar or aggregate, which is subsequently fully or partially treated with mortar. 10. Fremgangsmåde ifølge krav 7, der endvidere omfatter tilvejebringelse af en ventilmekanisme (7), der kan bevæges mellem en åben position og en lukket position ved åbningen mellem tilførselsrøret og stampehovedet for at begrænse passagen mod strømning ind i stampehovedet, og bevægelse af lukkeelementet til en åben position for indføring af cementbaseret materiale i stampehovedet, og ind i en lukket position under nedadgående komprimering.The method of claim 7, further comprising providing a valve mechanism (7) movable between an open position and a closed position at the opening between the supply tube and the plunger head to restrict passage to flow into the plunger head, and movement of the closure member to an open position for introducing cement-based material into the stamping head, and into a closed position during downward compression. 11. Fremgangsmåde ifølge krav 7, der endvidere omfatter indføring af cementbaseret materiale i det indesluttede område.The method of claim 7, further comprising introducing cement-based material into the enclosed area. 12. Fremgangsmåde ifølge krav 7, der endvidere omfatter indføring af et rør (14) gennem tilførselsrøret og stampehovedet efter dannelse af den forstørrede base, anbringelse af aggregat under tilbagetrækningstrinnet for delvist at omgive røret og indføring af cementbaseret materiale i røret efter anbringelse af aggregat til at behandle aggregatet.The method of claim 7, further comprising introducing a tube (14) through the feed tube and stamping head after forming the enlarged base, placing aggregate during the withdrawal step to partially surround the tube, and introducing cement-based material into the tube after applying aggregate to to process the aggregate. 13. Fremgangsmåde ifølge krav 7, der endvidere omfatter kæder (8), der er fastgjort i det indre af stampehovedet til begrænsning af opadgående strømning af materiale ind i tilførselsrøret under nedadgående bevægelse af spindlen.The method of claim 7, further comprising chains (8) secured within the interior of the stamping head to limit upward flow of material into the feed tube during downward movement of the spindle. 14. Fremgangsmåde ifølge krav 7, der endvidere omfatter indskæringer i det indre af stampehovedet til begrænsning af opadgående strømning af materiale ind i tilførselsrøret under nedadgående bevægelse af spindlen.The method of claim 7, further comprising cuts in the interior of the stamping head to limit upward flow of material into the feed tube during downward movement of the spindle. 15. Fremgangsmåde ifølge krav 7, der endvidere omfatter at forsyne spindlen med et andet rør (9) stødende op til tilførselsrøret for at muliggøre inspektion af cementbaseret materiale under pumpning, eller som endvidere omfatter en tragt placeret ved toppen af spindlen til tilførsel af aggregat i spindlens tilførselsrør.The method of claim 7, further comprising providing the spindle with a second tube (9) adjacent to the feed tube to allow inspection of cement-based material during pumping, or further comprising a hopper located at the top of the spindle for supplying aggregate in spindle supply tube.
DK11822652.1T 2010-09-03 2011-09-01 PROCEDURE AND APPARATUS FOR PREPARING AN ENLARGED BASE DK2611968T3 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US12/875,986 US20110052330A1 (en) 2009-09-03 2010-09-03 Method and Apparatus for Making an Expanded Base Pier
PCT/US2011/050172 WO2012031094A2 (en) 2010-09-03 2011-09-01 Method and apparatus for making an expanded base pier

Publications (1)

Publication Number Publication Date
DK2611968T3 true DK2611968T3 (en) 2018-06-14

Family

ID=43625188

Family Applications (1)

Application Number Title Priority Date Filing Date
DK11822652.1T DK2611968T3 (en) 2010-09-03 2011-09-01 PROCEDURE AND APPARATUS FOR PREPARING AN ENLARGED BASE

Country Status (11)

Country Link
US (1) US20110052330A1 (en)
EP (1) EP2611968B1 (en)
BR (1) BR112013005081B1 (en)
CA (1) CA2809673C (en)
CO (1) CO6680724A2 (en)
DK (1) DK2611968T3 (en)
ES (1) ES2671921T3 (en)
MX (1) MX2013002471A (en)
PT (1) PT2611968T (en)
TR (1) TR201807800T4 (en)
WO (1) WO2012031094A2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8920077B2 (en) 2011-08-22 2014-12-30 Darin Kruse Post tensioned foundations, apparatus and associated methods
US9207000B2 (en) 2011-08-22 2015-12-08 Darin Kruse Solar apparatus support structures and systems
CR20160149A (en) * 2013-09-05 2017-11-22 Geopier Found Co Inc APPLIANCES FOR BUILDING PILLARS OF AID DISPLACEMENT
US11773555B2 (en) 2013-09-05 2023-10-03 Geopier Foundation Company, Inc. Methods and apparatuses for compacting soil and granular materials
BR112016005019B1 (en) * 2013-09-05 2022-03-29 Geopier Foundation Company Inc APPLIANCES AND METHODS TO DENSIFY AND COMPACT GRANULAR MATERIALS
JP6150289B2 (en) * 2013-09-24 2017-06-21 株式会社不動テトラ Construction management method in compacted sand pile method
WO2016011060A1 (en) * 2014-07-15 2016-01-21 Uretek Usa, Inc. Rapid pier

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3568452A (en) 1968-08-08 1971-03-09 Shell Oil Co Method and apparatus for forming bulbular base piles
US3832857A (en) * 1973-05-07 1974-09-03 Nelson C Shields Pressure grouting
US4158518A (en) * 1977-09-13 1979-06-19 Fredric Rusche In situ pile forming method
DE2949938A1 (en) * 1979-12-12 1981-06-19 Brown, Boveri & Cie Ag, 6800 Mannheim Foundation pile for building - has injection outlets above flat transverse component near bottom end
GB8418991D0 (en) * 1984-07-25 1984-08-30 Cementation Piling & Found Ground treatment
JP2690361B2 (en) * 1989-06-26 1997-12-10 日特建設株式会社 Pile construction method
US4992002A (en) * 1989-07-11 1991-02-12 Dewitt Wayne Apparatus for forming in-ground concrete pilings
US5217320A (en) * 1991-12-16 1993-06-08 Cioffi Dominic A Vehicle mounted vibrating tamper
NL9301176A (en) * 1993-07-05 1995-02-01 Verstraeten Beheersmij Bv Method for forming a foundation pile in the ground using a prefabricated pile shaft.
US7226246B2 (en) * 2000-06-15 2007-06-05 Geotechnical Reinforcement, Inc. Apparatus and method for building support piers from one or successive lifts formed in a soil matrix
US7326004B2 (en) * 2004-10-27 2008-02-05 Geopier Foundation Company, Inc. Apparatus for providing a rammed aggregate pier
DK2126224T3 (en) * 2007-02-22 2017-03-06 Geopier Found Co Inc METHOD AND APPARATUS FOR CREATING AIR PILLets USING A HOLE THORN WITH UPDATING FLOW LIMITERS

Also Published As

Publication number Publication date
BR112013005081B1 (en) 2021-07-06
EP2611968B1 (en) 2018-03-14
WO2012031094A2 (en) 2012-03-08
PT2611968T (en) 2018-06-08
US20110052330A1 (en) 2011-03-03
MX2013002471A (en) 2014-05-27
EP2611968A2 (en) 2013-07-10
CA2809673A1 (en) 2012-03-08
WO2012031094A3 (en) 2012-08-16
EP2611968A4 (en) 2016-04-27
CO6680724A2 (en) 2013-05-31
ES2671921T3 (en) 2018-06-11
BR112013005081A2 (en) 2020-05-26
TR201807800T4 (en) 2018-06-21
CA2809673C (en) 2018-08-07

Similar Documents

Publication Publication Date Title
DK2611968T3 (en) PROCEDURE AND APPARATUS FOR PREPARING AN ENLARGED BASE
US10513831B2 (en) Open-end extensible shells and related methods for constructing a support pier
EP2616591A2 (en) Extensible shells and related methods for constructing a support pier
US10844567B2 (en) Soil densification system and method
US9637882B2 (en) Method and apparatus for making an expanded base pier
US11479935B2 (en) Extensible shells and related methods for constructing a ductile support pier
DK3041998T3 (en) METHODS AND APPLIANCES FOR COMPRESSING SOIL AND CORN MATERIALS
AU2018285912B2 (en) Extensible shells and related methods for constructing a ductile support pier
US20230041358A1 (en) Extensible shells and related methods for constructing a ductile support pier
AU2016298233B2 (en) Open-bottom extensible shells and related methods for constructing a support pier
CA3210951A1 (en) Methods and apparatuses for compacting soil and granular materials