- KR101185079B1 KR101185079B1 KR1020100135271A KR20100135271A KR101185079B1 KR 101185079 B1 KR101185079 B1 KR 101185079B1 KR 1020100135271 A KR1020100135271 A KR 1020100135271A KR 20100135271 A KR20100135271 A KR 20100135271A KR 101185079 B1 KR101185079 B1 KR 101185079B1
- Authority
- KR
- South Korea
- Prior art keywords
- information
- train
- track
- unit
- camera
- Prior art date
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 18
- 238000000034 method Methods 0.000 title claims description 21
- 230000005540 biological transmission Effects 0.000 claims description 13
- 238000012806 monitoring device Methods 0.000 claims description 6
- 230000009183 running Effects 0.000 claims description 2
- 230000000007 visual effect Effects 0.000 abstract 1
- 238000001514 detection method Methods 0.000 description 13
- 238000010586 diagram Methods 0.000 description 4
- 238000003384 imaging method Methods 0.000 description 4
- 239000002131 composite material Substances 0.000 description 3
- 238000006243 chemical reaction Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 230000007257 malfunction Effects 0.000 description 2
- 238000004092 self-diagnosis Methods 0.000 description 2
- 230000015556 catabolic process Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 238000010191 image analysis Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000002604 ultrasonography Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/04—Control, warning or like safety means along the route or between vehicles or trains for monitoring the mechanical state of the route
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/04—Control, warning or like safety means along the route or between vehicles or trains for monitoring the mechanical state of the route
- B61L23/041—Obstacle detection
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/06—Control, warning or like safety means along the route or between vehicles or trains for warning men working on the route
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L25/00—Recording or indicating positions or identities of vehicles or trains or setting of track apparatus
- B61L25/02—Indicating or recording positions or identities of vehicles or trains
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L25/00—Recording or indicating positions or identities of vehicles or trains or setting of track apparatus
- B61L25/02—Indicating or recording positions or identities of vehicles or trains
- B61L25/025—Absolute localisation, e.g. providing geodetic coordinates
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/50—Trackside diagnosis or maintenance, e.g. software upgrades
- B61L27/53—Trackside diagnosis or maintenance, e.g. software upgrades for trackside elements or systems, e.g. trackside supervision of trackside control system conditions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/70—Details of trackside communication
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L2205/00—Communication or navigation systems for railway traffic
- B61L2205/04—Satellite based navigation systems, e.g. global positioning system [GPS]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N23/00—Cameras or camera modules comprising electronic image sensors; Control thereof
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Health & Medical Sciences (AREA)
- Biomedical Technology (AREA)
- General Health & Medical Sciences (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
본 발명은 상기 종래 기술의 제반 문제점을 해결하고자 발명한 것으로,
선로변상에 일정한 간격으로 설치되고 있는 다수의 카메라로부터의 영상정보를 이용하여 열차운행 구간 전반에서 발생하고 있는 상황을 전송하여 관리본부의 관리자에게 특히 열차가 현재 진행중인 구간에 대한 정확한 영상정보를 실시간으로 모니터링할 수 있도록 제공하고 열차운행원이나 선로상의 작업자들이 보다 정확한 상황에 적절하게 대처할 수 있도록 하는 철도차량과 선로 전반을 감시하는 영상안전 시스템을 제공하고자 함에 목적이 있다.
상술한 바와 같이 본 발명에 의하면 열차운행 구간의 각 선로변상에 설치된 카메라로부터 영상정보를 확보하여 철도역사나 건널목과 같은 특정지점외의 열차운행 구간 전반에 대한 상황을 모니터링함으로써 고속 열차의 긴 제동거리에 의한 위험을 관리자의 측면에서 관리본부에서 미리 보다 정확한 선로변의 상황을 파악하여 운행상의 안전을 보장하고 열차 내 열차운행원의 측면에서 선행 열차 및 운행할 구간의 선로상의 장애물 및 선행열차의 정보를 단순한 신호가 아닌 정확한 영상정보를 통해 미리 적절하게 대처할 수 있으며, 선로변상의 작업관리자의 측면에서 선로에서의 작업 중 발생하는 위험에 대하여 효율적으로 대처할 수 있는 효과가 있다.The present invention is invented to solve the above problems of the prior art,
By using the image information from a plurality of cameras installed at regular intervals on the track, it transmits the situation occurring throughout the train operation section to give the managers of the management headquarters the accurate image information of the section currently in progress. The aim is to provide a visual safety system that monitors railroad cars and the entire track to provide monitoring and to enable train operators and workers on track to respond to more accurate situations.
As described above, according to the present invention, by securing the image information from the camera installed on each track of the train operation section by monitoring the situation of the entire train operation section other than a specific point such as railway station or crossing, due to the long braking distance of the high-speed train From the manager's point of view, the management headquarters grasps the more accurate situation of the track side to ensure the safety of the operation, and the signal of the obstacles and the preceding train on the track of the preceding train and the section to be operated in terms of the train operator in the train. It is possible to cope appropriately in advance through accurate image information, not to correct the risks.
Description
본 발명은 고속의 열차가 운행되는 선로상의 안전을 위한 선로에 관한 모니터링 방법 및 장치에 관한 것으로,The present invention relates to a monitoring method and apparatus for a track for safety on a track on which a high-speed train operates.
보다 상세하게는 고속화된 열차의 경우 그 운행에 있어 인명적 물질적으로 대형화된 사고 및 열차가 운행 중에 발생하는 선로상의 작업, 선행 열차의 지연 또는 고장 등에 의하여 열차의 정차가 필요한 경우에 열차운행원이나 선로작업자는 전송된 정차 신호나 경고만을 인식하게 되나 전방에서 발생한 상황에 대하여 보다 정확하게 식별하기 위해서는 그 상황에 대한 영상 정보를 직접 전송하여 영상을 통해 보다 적절하게 조치할 수 있도록 하기 위하여 선로에 관한 모든 정보를 수집하고 전송하여 적절한 시기에 모니터링 할 수 있는 선로에 관한 모니터링 방법 및 장치에 관한 것이다.More specifically, in the case of high-speed trains, when the train is required to stop due to human and materialized accidents in its operation, work on the track that occurs while the train is running, delays or breakdowns of the preceding trains, The track operator recognizes only the transmitted stop signals or warnings, but in order to identify more precisely the situation that occurred in front, all the information related to the track can be sent directly so that the image information about the situation can be directly transmitted. The present invention relates to a monitoring method and apparatus for a track that can collect and transmit information so that it can be monitored at an appropriate time.
열차가 점점 더 고속화됨에 따라 제동거리가 점점 더 길어져 열차 운행자가 선로에 다른 열차나 사람, 장애물이 있는 경우 이를 시각적으로 발견하더라도 어쩔 수 없이 사고가 발생할 수밖에 없는 경우가 많고 사고 발생 시에는 인적 물질적으로 큰 피해가 발생한다. 특히 역사내에서는 많은 사람들이 있어 열차의 길이가 길거나 선로가 곡선인 경우에 열차운행원의 눈에 차량의 후측은 전혀 보이지 않아 선로상에서나 열차 출발 및 정차 시에 발생할 수 있는 인명사고 그리고 선로상에 차량이나 사람들이 출입하는 건널목에서의 인명사고가 발생하여 이에 대한 감시시스템이 필요하다.As trains become faster and faster, the braking distance becomes longer and longer, so even if the train operator visually detects other trains, people, or obstacles on the track, it is inevitable that an accident will inevitably occur. Great damage occurs. There are many people in history, especially when the train is long or the track is curved so that the back of the vehicle is not visible to the train operator. There is a need for a surveillance system for personal accidents at crossings where vehicles or people enter and exit.
이러한 문제점을 해결하기 위하여 종래 발명(공개특허 10-2007-0120311)은 도 1, 도 2에 도시된 바와 같이,In order to solve this problem, the prior art (Patent Publication 10-2007-0120311) is shown in Figure 1, 2,
역사내의 선로(2)와 플랫폼(4)을 따라 설치된 다수의 카메라(12)와 상기 각 카메라(12)의 출력신호를 무선네트워크신호로 변환하여 각 카메라(12)별로 별도의 아이피어드레스를 부가하거나 송신부(14)에 하나의 아이피어드레스를 부가하여 출력하는 송신부(14) 그리고 상기 송신부(14)에 촬영된 영상을 정해진 포맷(예를 들면 MPEG4등)으로 인코딩하여 출력하는 영상처리장치로 구성된 역사촬영부(10)와 철도차량의 객실내 또는 철도차량의 정면과 후면 그리고 측면에 다수개의 카메라(22)와 상기 각 카메라(22)들은 촬영된 영상 신호를 무선네트워크신호로 변경되어 전송하는 송신부(24)로 구성된 철도차량촬영부(20) 그리고 상기 역사촬영부(10)와 철도차량촬영부(20)에서 전송하는 무선네트워크 신호를 전달받은 후 후술하는 영상제어부(40)측으로 전송하기 위하여 철도차량이 역사에 진입하면서 역사내의 송신부(14)와 네트워크로 연결하는 차량무선부(30)와 상기 차량무선부(30)를 통해 전달받은 영상들을 화면(50)에 표시하기 위해 전송받은 영상을 디코딩하게 되며 다수개의 영상을 하나의 화면(50)에 표시하기 위해 화면(50)을 분할하여 표시하는 영상제어부(40)와 상기 영상신호를 전달받은 후 상기 영상신호와 기존의 영상신호를 비교하여 선로(2)위에 장애물이나 사람이 있는지 확인하여 이를 감지하게 되면 열차운행원이나 중앙통제실에 통지하는 감지부를 포함하는 것을 특징으로 하여 철도차량과 역사의 선로상의 안전을 감시한다.A plurality of
종래의 또 다른 발명(공개특허10-2005-0120214)은 철도 건널목 돌발 상황 자동감지 영상처리경보장치에 관한 것으로, 도 3은 철도 건널목 돌발 상황 자동감지 영상처리경보장치의 블록구성도이고, 도 4는 철도 건널목내 촬상장치 배치도이다.Another conventional invention (Patent No. 10-2005-0120214) relates to a railroad crossing accident situation automatic detection image processing alarm device, Figure 3 is a block diagram of a railroad crossing accident situation automatic detection image processing alarm device, Figure 4 Is a layout view of an imaging device in a railroad crossing.
도 3에 도시된 바와 같이 자동감지 영상처리경보장치의 동작을 전반적으로 제어하며, 영상처리장치(140)에서 분석한 영상분석결과를 토대로 촬상부(110)를 제어하며, 상기 복합검지수집장치(160)를 통하여 연동하는 각종 검지기의 상태를 감시하고, 관리자의 I/O포트를 통하여 그 상태를 표시한 도 4의 제어부(100)와;As shown in FIG. 3, the overall operation of the automatic sensing image processing alarm apparatus is controlled, and the
상기 제어부(100)의 제어에 따라 설정된 복합검지존의 영상을 촬영하여 도3의 영상분배장치(120)에 입력을 주는 촬상장치(110);와 상기 촬상장치(110)로부터 수신한 영상신호를 관리실/상황 지령실(10)과 영상변환장치(130) 그리고 차상장치(180)로 전송할 수 있도록 무선전송장치(170)로 전송하는 영상분배장치(120); 와 상기 영상분배장치(120)로부터 인가받은 영상신호를 디지털 신호로 변환하여 영상처리장치(140)의 감지모듈 메모리에 저장하는 영상변환장치(130);와 상기 감지모듈을 통하여 상기 메모리에 저장된 영상을 로드하여 적절한 영상처리를 수행한 후 감지 알고리즘을 통하여 감지대상을 감지한 후 다양한 이동경로 정보를 추출하여, 돌발상황 발생 시 경보제어기(150)로 전송하는 영상처리장치(140);와 An imaging device (110) for taking an image of the composite detection zone set under the control of the controller (100) and inputting the image distribution device (120) of FIG. 3; and an image signal received from the imaging device (110). An
또한, 건널목 폐쇄 이후의 유입 및 유출정보의 논리를 수집하여 분석하는 논리 수집기, 보행자 및 차량의 유입/유출을 검지하는 적외선 광축 검지기, 건널목내에서의 점유 물체를 감지하는 초고주파/초음파/지자기/루프 차량 검지기, 건널목내의 수집되는 검지정보의 보정 및 운행열차의 안전운행 정보 수집을 위한 시정계(안개 검지기) 등을 포함하는 검지장치(30)로부터 생성되는 1차 자료를 수집하여 상기 경보제어기(150)에 복합검지신호를 전송하는 복합검지수집장치(160);In addition, a logic collector that collects and analyzes the logic of inflow and outflow information after the crossing has been closed, an infrared optical axis detector that detects the inflow / outflow of pedestrians and vehicles, and ultra-high frequency / ultrasound / geomagnetic / loop for detecting occupied objects in the crossing. The
상기 영상처리장치(140)로부터 인가받은 돌발상황 발생에 따른 정보로부터 경보연동제어신호를 발생하여 상기 관리실/상황지령실(10) 및 기존 제어기(20)로 전송함으로써 상기 관리실/상황 지령실(10) 및 기존 제어기(20)에서 상기 경보연동제어신호와 연동하여 경보를 발생하고 상기 영상분배장치(120)로부터 차상장치로 전송되는 영상신호 중 돌발상황이 발생한 지역의 영상신호를 선택, 확대하여 디스플레이 할 수 있는 상기 경보제어기(150)를 포함하여 철도 건널목에서의 돌발상황을 자동으로 감지하여 경고하는 영상처리경보장치이다.By generating an alarm interlocking control signal from the information according to the occurrence of the accident situation received from the
상기의 발명들은 철도역사의 선로나 플랫폼 및 건널목과 같은 특정 지점에서 발생하는 사고 및 상황이외의 열차운행 구간 전반에서 발생할 수 있는 선로상의 장애물이나 사람의 출현, 열차사고 및 열차의 기관고장 또는 선로상의 작업의 경우에는 중앙의 관리실/상황지령실 또는 선행열차의 열차운행원 및 선로작업자로부터의 경고신호에 의해 후행 열차가 정차되거나 또는 작업자들이 자신들의 작업을 중지하는 상황이 발생하는 문제점이 있으며,The inventions described above are the occurrence of obstacles or people on the track that can occur throughout the train section other than accidents and situations that occur at specific points such as railroad tracks or platforms and railroad crossings of railway stations, train accidents and engine failure or In the case of work, there is a problem that a trailing train is stopped or workers stop their work by warning signals from the central management office / situation command room or train operator and track worker of the preceding train.
또한 상기의 상황에서 후행 열차의 열차운행원, 중앙통제실 또는 선로상의 작업자들은 사고 발생 선로 상에서 일어난 상황에 대하여 경고신호에 의한 지령에 의존하게 되어 기계 상의 오류로 인한 상기의 경고신호의 오작동에 대하여 잘못된 판단을 수행할 수 있고 또한 상기의 돌발상황에 대하여 정확한 정보를 얻지 못하여 적절한 대처를 수행하지 못하여 열차운행 구간 전반에서 발생할 수 있는 여러 돌발상황 및 위험으로 인한 사고에 대하여는 방지하지 못하는 문제점이 있었다.In addition, in the above situation, the train operator, the central control room or the worker of the trailing train relies on the command by the warning signal for the situation on the track where the accident occurred, so that the error of the above warning signal due to the mechanical error is wrong. There is a problem that can not be prevented against accidents due to various accidents and dangers that can occur in the entire train operation section because it can not perform the correct response because it can not perform accurate judgment about the above-mentioned accident situation.
본 발명은 상기 종래 기술의 제반 문제점을 해결하고자 발명한 것으로,The present invention is invented to solve the above problems of the prior art,
철도운행 구간의 선로변상에 일정한 간격으로 현재 설치되고 있는 다수의 카메라로부터의 얻어진 영상정보를 이용하여 열차운행 구간 전반에서 발생하고 있는 상황, 특히 현재 열차가 운행되고 있는 구간에 대한 정확한 영상정보를 실시간으로 관제실에서 모니터링할 수 있도록 다수의 영상정보를 제공하고 현재 운행 중인 열차의 열차운행이나 선로상의 작업자들에게는 현재의 위치에서 발생할 수 있는 단순한 경고신호가 아닌 영상정보를 전송할 수 있도록 하여 열차 및 선로에 대한 정확한 정보를 전송함으로써 위험상황에 보다 더 적절하게 대처할 수 있도록 하는 철도 차량과 선로에 관한 모니터링 방법 및 장치를 제공하고자 함에 목적이 있다.By using the image information obtained from a plurality of cameras that are currently installed at regular intervals on the track of the railway section, accurate image information about the situation occurring throughout the train section, in particular, the section where the train is currently operating It provides a large number of video information for monitoring in the control room, and transmits the video information to train operators or train workers of the train currently in operation, rather than a simple warning signal that can occur at the current location. It is an object of the present invention to provide a monitoring method and apparatus for railroad cars and tracks that can accurately respond to risk situations by transmitting accurate information.
상기한 기술적 과제를 달성하기 위한 철도 차량과 선로에 관한 모니터링 장치에 있어서,In the monitoring device for railroad cars and tracks for achieving the above technical problem,
열차운행 전 구간 선로상의 상황 정보를 획득하기 위하여 선로 상에 일정한 간격으로 설치된 카메라와 촬영된 영상 및 카메라 상태정보를 송신하는 송신기를 포함하는 촬영부;와A photographing unit including a camera installed at a predetermined interval on the track and a transmitter for transmitting photographed images and camera state information in order to obtain situation information on the track before the train operation; and
상기 각 카메라로부터 영상정보을 디지털로 변화한 디지털영상정보와 각 카메라 상태정보 그리고 운행 중인 열차의 위치 정보, 선로 작업자의 위치 정보를 수집하는 정보수집부;와 상기 정보수집부의 저장된 디지털 영상을 통하여 위험인식알고리즘에 의하거나 중앙통제실원의 판단에 의하여 위험상황을 인식하는 지능형상황인지부;와 상기 상태정보수집부의 정보로부터 현재 각 카메라의 작동유무 및 작동상의 오류를 검토하여 관리하는 카메라상태관리부;와 상기 지능형상황인지부 및 상기 카메라상태관리부로부터 전송된 정보를 통해 중앙통제실원에게 상황에 따른 경고신호 및 디지털영상정보를 제공하는 상황정보관리부;와 현재 운행중인 열차내 열차운행원이나 선로상의 작업자가 수동으로 요구하거나 열차내 열차운행원 및 작업자에게 필요한 영상정보를 전송하는 정보전송부;와 상기 정보전송부로부터 전송된 영상 정보를 수신하는 수신하여 중앙통제실, 열차 운행자, 선로상의 작업자의 모니터에 출력하는 출력부;를 포함하는 것으로,An information collector configured to collect digital image information, each camera state information, position information of a train in operation, and position information of a track worker, which are digitally changed from image information from each camera; and risk recognition through stored digital images of the information collector. Intelligent situation recognition unit for recognizing a dangerous situation by the algorithm or the judgment of the central control room; and Camera status management unit for reviewing and managing the operation status and operational errors of each camera from the information of the state information collection unit; The situation information management unit provides warning signals and digital image information according to the situation to the central control room through the information transmitted from the intelligent situation recognition unit and the camera state management unit; Required by train operators and train operators and workers And an information transmission unit for transmitting one image information, and an output unit for receiving the image information transmitted from the information transmission unit and outputting the received image information to a central control room, a train operator, and a monitor of a worker on a track.
상기 촬영부내의 고정된 카메라는 일정한 각도의 범위내에서 회전이 가능하며, 상기 각 철도 차량과 작업관리자의 위치를 GPS를 이용하며 상기 촬영부와 정보전송부는 전송상의 신뢰성을 확보할 수 있는 범위내에서의 유선 또는 무선으로 전송이 가능한 것으로 상기 지능형상황인지부에서 위험인식에 있어 디지털영상의 픽셀단위의 비교에 의하거나 철도선로상의 사물 인식에 의한 변화를 통하여 위험을 인식하는 것을 특징으로 하며,The fixed camera in the photographing unit can rotate within a certain angle range, the position of each railway vehicle and the task manager using GPS, the photographing unit and the information transmitting unit within the range to ensure the reliability of transmission It is possible to transmit by wire or wirelessly in the intelligent situation recognition unit to recognize the risk by comparing the pixel unit of the digital image in risk recognition by changing the object recognition on the railroad track,
철도차량을 모니터링하는 방법에 있어서,In the method of monitoring railroad cars,
열차의 위치 정보 및 카메라의 위치 정보, 작업자의 위치정보를 수집하는 단계;를 수행한 후 상기 선로변에 일정한 간격으로 설치된 카메라로부터 선로의 영상정보를 디지털로 변환하여 저장하는 단계;를 거쳐 상기 각 카메라의 상태정보를 수집하여 저장한 후 상기 저장된 디지털영상정보를 분석하여 위험여부를 판단하는 단계;를 수행하여 상기 판단된 위험여부 및 디지털영상정보를 열차운행원, 중앙통제실, 선로상의 작업자 중 전송할 자를 결정하여 전송하는 단계;와 상기 전송된 경고 및 디지털영상정보를 모니터에 출력하는 단계;를 포함하는 것으로,Collecting the location information of the train, the location information of the camera, and the location information of the operator; and converting and storing the image information of the track digitally from the cameras installed at regular intervals on the track side. Collecting and storing the state information of the camera and analyzing the stored digital image information to determine whether there is a risk; transmitting the determined risk and digital image information to a train operator, a central control room, and a worker on a track. Determining and transmitting a ruler; and outputting the transmitted warning and digital image information to a monitor.
상기 위치정보를 수집하는 방법에 있어 열차, 카메라, 선로상의 작업자 각각에 설치된 GPS를 이용하여 정확한 위치를 수집하는 것을 특징으로 하며, 상기 전송단계에 있어 열차운행원, 중앙통제실원, 선로상의 작업자 중 수동으로 요구하는 자에게 상기 판단된 위험 정보 및 디지털영상정보를 전송하는 것으로 위험여부의 판단에 있어 디지털영상의 픽셀단위의 비교에 의하거나 철도선로상의 사물 인식에 의한 변화를 통하여 위험을 인식하는 것을 특징으로 한다.In the method of collecting the location information, characterized in that to collect the correct position using the GPS installed on each of the train, camera, the worker on the track, and in the transmission step of the train operator, the central control room, the worker on the track The risk information and the digital image information are transmitted to the person who manually requests the risk information. The risk is determined by comparing the pixel unit of the digital image or by changing the object recognition on the railroad. It features.
상술한 바와 같이 본 발명에 의하면 열차운행 구간의 각 선로변상에 설치된 카메라로부터 영상정보를 확보하여 철도역사내 플랫폼이나 건널목과 같은 특정지점외의 열차운행 구간 전반에 대한 상황이나 차량을 연결시키는 상황을 모니터링함으로써 고속 열차의 긴 제동거리에 의한 위험을 중앙통제실원의 측면에서 중앙통제실에서 보다 정확한 선로변의 상황을 조기에 파악하여 운행상의 안전을 보장하고 열차의 열차운행원의 측면에서 선행 열차 및 운행할 구간의 선로상의 장애물 및 선행열차의 정보를 단순한 신호가 아닌 정확한 영상정보를 통해 미리 적절하게 대처할 수 있으며, 선로상의 작업자의 측면에서 선로에서의 작업 중 발생하는 위험에 대하여 효율적으로 대처할 수 있는 효과가 있다.As described above, according to the present invention, by securing the image information from the camera installed on each track of the train operation section by monitoring the situation or connecting the vehicle for the overall train operation section other than a specific point such as a platform or crossing in the railway station The risk of the long braking distance of high-speed trains is identified earlier in the central control room from the side of the central control room to ensure the safety of the operation, and in advance of the train and the section to be operated in terms of the train operator. Obstacles on the track and information of the preceding trains can be appropriately handled in advance through accurate image information rather than a simple signal, and can effectively cope with the dangers occurring during the operation on the track in terms of workers on the track.
도 1은 종래 철도차량과 역사의 선로를 감시하는 영상안전 시스템이 설치된 역사의 평면도,
도 2는 종래 철도차량과 역사의 선로를 감시하는 영상안전 시스템의 개념도, 도 3은 종래 철도 건널목 돌발상황 자동감지 영상처리경보장치의 블록구성도,
도 4는 종래 철도 건널목 내 촬영장치 배치도,
도 5은 본 발명에 따른 철도 차량과 선로에 관한 모니터링 장치의 블럭구성도.1 is a plan view of a history in which a video safety system for monitoring a railroad and a track of a conventional railway vehicle is installed;
2 is a conceptual diagram of a video safety system for monitoring a railway track and a conventional railway vehicle, Figure 3 is a block diagram of a conventional automatic railway crossing automatic detection image processing alarm system,
4 is a layout view of a conventional railroad crossing photographing apparatus,
5 is a block diagram of a monitoring device for a railway vehicle and a track according to the present invention.
이하, 예시도면을 참조하여 본 발명에 따른 철도 차량과 선로에 관한 모니터링 방법 및 장치의 일실시예에 대한 구성 및 작용을 상세하게 설명한다.Hereinafter, with reference to the exemplary drawings will be described in detail the configuration and operation of the embodiment of the monitoring method and apparatus for a railway vehicle and track according to the present invention.
본 발명의 핵심은 종래의 철도역의 플랫폼 및 건널목의 선로와 같은 특정 지점에서의 철도운행상 위험요소에 대하여 한정하지 않고 철도역에서의 차량연결시에나 철도가 운행되고 있는 구간에 대하여 종래의 경고신호에 의하여 정차시키는 것을 향상시킬 수 있도록 최근에 설치되고 있는 열차운행 구간의 선로 주위의 카메라를 이용하여 열차 운행상에 발생한 상황에 대해 보다 정확한 영상을 통하여 열차 운행원이나 선로상의 작업관리자에게 적절한 조치를 강구할 수 있는 철도 차량과 선로에 관한 모니터링 방법 및 장치라는 점이다.The core of the present invention is not limited to risk factors of railway operation at a specific point such as a platform of railroad station and a railroad crossing of a conventional railway station, but by a conventional warning signal for a section in which a railway is connected or when a vehicle is connected at a railway station. In order to improve the stopping, the cameras around the tracks of the recently installed trains can be used to take appropriate measures to train operators or on-track operations managers through a more accurate image of the situation on the train. It is a method and apparatus for monitoring rail vehicles and tracks.
도 5에 도시된바와 같이, 본 발명의 실시예에 따른 열차운행 구간 및 역사인근에서 발생하는 상황에 대하여 보다 정확한 영상을 제공하는 철도 차량과 선로에 관한 모니터링 방법 및 장치는 촬영부(200), 정보수집부(210), 지능형상황인지부(220), 카메라상태관리부(230), 상황정보관리부(240), 정보전송부(250), 출력부(260)로 이루어진다.As shown in FIG. 5, a monitoring method and apparatus for a railroad vehicle and a track which provides a more accurate image of a situation occurring in a train operation section and a historical neighborhood according to an embodiment of the present invention include a photographing unit 200, The information collecting unit 210, the intelligent situation recognition unit 220, the camera state management unit 230, the situation information management unit 240, the information transmission unit 250, the output unit 260.
상기 촬영부(200)는 열차운행 구간에 일정한 간격으로 설치되어 선로변 상황을 일정한 각도범위에서 촬영하는 카메라와 상기 카메라로부터 촬영된 영상을 상기 정보수집부(210)에 전송하는 송신기를 포함한다.The photographing unit 200 is installed at regular intervals in the train operation section includes a camera for photographing the track side situation in a certain angle range and a transmitter for transmitting the image taken from the camera to the information collecting unit 210.
상기 촬영부(200)내 카메라는 상시적으로 작동하는 것이 바람직하나, 카메라의 수명연장 및 전력소모를 방지하기 위하여 열차가 운행되는 구간 및 진행방향의 일정 범위내의 카메라만 작동할 수 있으며, 또한 원거리에 위치한 당해 카메라를 유지?보수할 수 있도록 하기 위하여 카메라내의 상태를 진단하는 자체진단기능을 가지고 있다.Preferably, the camera in the photographing unit 200 operates at all times, but only the camera within a predetermined range of a section and a traveling direction in which the train is operated may be operated to prevent prolonging the life of the camera and power consumption. It has a self-diagnosis function that diagnoses the condition in the camera in order to be able to maintain and repair the camera located at.
상기 정보수집부(210)는 상기 촬영부(200)로부터의 영상을 아날로그/디지털 변환기에 의하여 변환한 디지털영상정보, 카메라의 자체진단기능에 의하여 진단된 카메라 상태 정보 그리고 운행되고 있는 열차와 각 카메라, 선로 작업자로부터 위치정보를 수집하여 각각을 구분하여 메모리에 저장한다.The information collecting unit 210 converts the image from the photographing unit 200 by analog / digital converter, digital image information, camera status information diagnosed by a camera's self-diagnostic function, and trains and cameras in operation. In addition, each location information is collected from the track operator and stored in memory.
상기 지능형상황인지부(220)는 상기 정보수집부(210)의 메모리에 저장된 디지털영상정보를 이용하여 이를 각각 분석하여 열차운행 구간선로에 사람이나 장애물과 같은 위험상황을 감지하여 경고 및 위험정보를 상황정보관리부에 전송한다.The intelligent situation recognition unit 220 analyzes each of the digital image information stored in the memory of the information collecting unit 210, detects a dangerous situation such as a person or an obstacle on a train section line, and provides warning and danger information. Send it to the situation information management unit.
상기 지능형상황인지부에서는 위험을 감지함에 있어 상기 각 카메라로부터 연속적으로 전송되어 디지털영상으로 저장된 정보수집부로부터 일정 시간단위로 구분하여 현재를 기준으로 이전에 얻어진 두 개의 디지털영상을 픽셀 단위로 비교하여 색채의 변화에 따른 장애물 및 움직이는 물체를 확인할 수 있으며, The intelligent situation recognition unit detects a danger and compares the two digital images previously acquired based on the present by pixel unit by dividing the information collection unit which is continuously transmitted from each camera and stored as a digital image in a predetermined time unit. Obstacles and moving objects can be checked according to the color change.
또한 디지털 영상의 사물 인식 알고리즘을 통하여 종래의 디지털영상에서의 사물을 구분하여 저장한 후 촬영되어 온 디지털영상들의 개체 단위로 구분하여 종래의 개체와의 차이를 통하여 장애물 및 움직이는 물체를 감지할 수 있다. The object recognition algorithm of the digital image classifies and stores objects in the digital image and then classifies them into individual units of photographed digital images to detect obstacles and moving objects through differences from conventional objects. .
이는 열차가 운행되고 있는 철로상에서는 비교적 영상의 변화가 없어 특정 장애물의 출현이나 사람과 같은 움직이는 물체의 출현은 비교적 쉽게 판단할 수 있다.It is relatively easy to determine the appearance of a specific obstacle or the appearance of a moving object such as a person because there is no change of image on the railroad on which the train is operating.
상기 카메라상태관리부(230)는 상기 정보수집부(210)의 메모리에 저장된 선로변상에 설치된 각 카메라의 정상적인 작동유무 및 카메리의 중요 장치로부터 확인할 수 있는 자체진단결과에 따른 각 카메라의 오작동여부를 판단하여 카메라의 수리 및 교체여부를 확인하여 전송된 영상정보의 신뢰성여부를 판단한다.The camera state management unit 230 is a malfunction of each camera according to the self-diagnosis results that can be confirmed from the normal operation of each camera installed on the track change stored in the memory of the information collecting unit 210 and the important device of the camera By judging whether the camera is repaired or replaced, it is determined whether the transmitted image information is reliable.
상기 상황정보관리부(240)는 상기 지능형상황인지부(220)와 상기 카메라상태관리부(230)로부터 판단된 위험상황 및 각 카메라의 상태정보로부터 설정된 절차 또는 수동으로 상기의 정보가 필요한 사람에게 어떠한 정보를 전달할 지를 수행한다. 예를 들어 상기 지능형상황인지부(220)의 위험상황 감지 알고리즘에 의해 위험상황이 인지되면 상황정보관리부(240)는 위험상황에 대한 경고 및 당해 영상을 후행하는 열차의 열차운행원, 중앙통제실원 또는 선로작업자 중 선택하여 전송하며 선로상에 설치된 각 카메라의 상태로부터 오작동의 문제가 발생한 경우에는 이를 중앙의 통제실원이나 해당 서비스업체에 그 정보를 전송한다.The situation information management unit 240 is a situation set by the intelligent situation recognition unit 220 and the camera state management unit 230 and the state information of each camera or a set of information to the person who needs the information manually Whether or not to pass. For example, when a dangerous situation is recognized by the dangerous situation detection algorithm of the intelligent situation recognition unit 220, the situation information management unit 240 warns of a dangerous situation and trains of the train operator and the central control room of the train following the image. Alternatively, it selects and transmits it among the track workers, and transmits the information to the central control room or the service provider when a malfunction problem occurs from the state of each camera installed on the track.
상기 정보전송부(250)는 상기 상황정보관리부(240)로부터 선택된 열차의 열차운행원, 중앙통제실원 또는 업체에 유선 또는 무선을 이용하여 당해 정보를 전송한다.The information transmitting unit 250 transmits the information by wire or wireless to the train operator, the central control room or the company of the selected train from the situation information management unit 240.
상기 출력부(260)는 상기 정보전송부(250)로부터 전송된 영상정보를 수신하는 수신기와 상기 수신기로부터 전송된 영상정보를 수신하여 각 사용자의 출력시스템상의 디스플레이에 수신된 영상정보를 출력한다.The output unit 260 receives the image information transmitted from the information transmission unit 250 and the image information transmitted from the receiver and outputs the received image information to the display on the output system of each user.
본 명세서에는 본 발명에 따른 철도 차량과 선로에 관한 모니터링 방법 및 장치의 바람직한 실시예를 설명하였으나, 본 발명이 이에 한정되는 것은 아니다. 본 발명은 특허청구범위 및 첨부도면의 범위 내에서 다양하게 변형되어 실시될 수 있으며, 이것 또한 본 발명의 권리범위에 속한다.In the present specification, a preferred embodiment of a monitoring method and apparatus for a railroad vehicle and a track according to the present invention has been described, but the present invention is not limited thereto. The invention may be practiced in various ways within the scope of the claims and the accompanying drawings, which also belong to the scope of the invention.
200 촬영부 210 정보수집부
220 지능형상황인지부 230 카메라상태관리부
240 상황정보관리부 250 정보전송부
260 출력부200 Cinema 210 Information collector
220 Intelligent situation recognition unit 230 Camera status management unit
240 Information Management Unit 250 Information Transmission Unit
260 outputs
Claims (9)
열차운행 전 구간 선로상의 상황 정보를 획득하기 위하여 선로상에 일정한 간격으로 설치된 카메라와 촬영된 영상 및 카메라 상태정보를 송신하는 송신기를 포함하는 촬영부;
상기 각 카메라로부터 아날로그 신호인 영상정보를 디지털 신호로 변환한 디지털영상정보와 각 카메라 상태정보 그리고 운행중인 열차의 위치 정보, 선로 작업자의 위치 정보를 수집하는 정보수집부;
상기 정보수집부의 저장된 디지털 영상을 통하여 위험인식알고리즘에 의하거나 중앙통제실원의 판단에 의하여 위험상황을 인식하는 지능형상황인지부;
상기 정보수집부의 정보로부터 현재 각 카메라의 작동유무 및 작동상의 오류를 검토하여 관리하는 카메라상태관리부;
상기 지능형상황인지부 및 상기 카메라상태관리부로부터 전송된 정보를 통해 중앙통제실원에게 상황에 따른 경고신호 및 디지털영상정보를 제공하는 상황정보관리부;
현재 운행중인 열차내 열차운행원이나 선로상의 작업자가 수동으로 요구하거나 열차내 열차운행원 및 작업자에게 필요한 영상정보를 전송하는 정보전송부;및
상기 정보전송부로부터 전송된 영상 정보를 수신하는 수신하여 중앙통제실, 열차 운행자, 선로상의 작업자의 모니터에 출력하는 출력부;를 포함하는 것을 특징으로 하는 철도 차량 및 선로에 관한 모니터링 장치.In the monitoring device relating to railroad cars and tracks,
A photographing unit including a camera installed at a predetermined interval on the track and a transmitter for transmitting photographed images and camera state information in order to obtain situation information on the track before the train operation;
An information collecting unit for collecting digital image information obtained by converting image information, which is an analog signal from each camera, into a digital signal, each camera state information, location information of a running train, and location information of a track operator;
An intelligent situation recognition unit for recognizing a risk situation by a risk recognition algorithm or by the central control room through the stored digital image of the information collecting unit;
A camera state management unit which examines and manages the current operation of each camera from the information collecting unit and errors in operation;
A situation information management unit for providing a warning signal and digital image information according to a situation to a central control room member through the information transmitted from the intelligent situation recognition unit and the camera state management unit;
Information transmitting unit for transmitting the video information required by the train operator in the train or the operator on the train manually or necessary for the train operator and the operator in the train; And
And an output unit for receiving the image information transmitted from the information transmission unit and outputting the received image information to a monitor of a central control room, a train operator, and a worker on a track.
상기 촬영부내의 고정된 카메라는 일정한 각도의 범위내에서 회전이 가능한 것을 특징으로 하는 철도 차량 및 선로에 관한 모니터링 장치.The method of claim 1,
The fixed camera in the photographing unit is a monitoring device for railroad cars and tracks, characterized in that the rotation is possible within a certain angle range.
상기 각 철도 차량과 작업관리자의 위치를 GPS를 이용하여 수집하는 것을 특징으로 하는 철도 차량 및 선로에 관한 모니터링 장치.The method according to claim 1 or 2,
Monitoring device for a railway vehicle and track, characterized in that for collecting the location of each railway vehicle and the task manager using a GPS.
상기 촬영부와 정보전송부는 전송상의 신뢰성을 확보할 수 있는 범위내에서의 유선 또는 무선으로 전송이 가능한 것을 특징으로 하는 철도 차량 및 선로에 관한 모니터링 장치.The method according to claim 1 or 2,
And the photographing unit and the information transmitting unit are capable of transmitting by wire or wireless within a range capable of securing transmission reliability.
상기 지능형상황인지부에서 위험인식에 있어 디지털영상의 픽셀단위의 비교에 의하거나 철도선로상의 사물 인식에 의한 변화를 통하여 위험을 인식하는 것을 특징으로 하는 철도 차량 및 선로에 관한 모니터링 장치.The method according to claim 1 or 2,
The monitoring device for a railway vehicle and a track, characterized in that the intelligent situation recognition unit recognizes the risk by changing the pixel unit of the digital image in the risk recognition or by changing the object recognition on the railroad track.
열차의 위치 정보 및 카메라의 위치 정보, 작업자의 위치정보를 수집하는 단계;
선로변에 일정한 간격으로 설치된 카메라로부터 선로의 영상정보를 디지털로 변환하여 저장하는 단계;
상기 각 카메라의 상태정보를 수집하여 저장하는 단계;
상기 저장된 디지털영상정보를 분석하여 위험여부를 판단하는 단계;
상기 판단된 위험여부 및 디지털영상정보를 열차운행원, 중앙통제실, 선로상의 작업자 중 전송할 자를 결정하여 전송하는 단계;및
상기 전송된 경고 및 디지털영상정보를 모니터에 출력하는 단계;를 포함하는 것을 특징으로 하는 철도 차량의 모니터링 방법.In the method of monitoring railroad cars,
Collecting location information of a train, location information of a camera, and location information of an operator;
Digitally converting and storing image information of a track from a camera installed at a predetermined interval on the track side;
Collecting and storing state information of each camera;
Analyzing the stored digital image information to determine whether there is a risk;
Determining and transmitting the determined risk status and digital image information of a train operator, a central control room, and a worker on a track; and
And outputting the transmitted warning and digital image information to a monitor.
위치정보를 수집하는 방법에 있어 열차, 카메라, 선로상의 작업자 각각에 설치된 GPS를 이용하여 정확한 위치를 수집하도록 하는 것을 특징으로 하는 철도 차량의 모니터링 방법.The method according to claim 6,
In the method of collecting location information, the method of monitoring a railway vehicle, characterized in that to collect the exact position using the GPS installed on each of the train, camera, the worker on the track.
전송단계에 있어 열차운행원, 중앙통제실원, 선로상의 작업자 중 수동으로 요구하는 자에게 상기 판단된 위험 정보 및 디지털영상정보를 전송하는 것을 특징으로 하는 철도 차량의 모니터링 방법.The method according to claim 6 or 7,
And transmitting the determined risk information and digital image information to a train operator, a central control room, and a worker on a track, who manually requires the transmission.
위험여부의 판단에 있어 디지털영상의 픽셀단위의 비교에 의하거나 철도선로상의 사물 인식에 의한 변화를 통하여 위험을 인식하는 것을 특징으로 하는 철도 차량의 모니터링 방법.
The method according to any one of claims 6 to 7,
A method for monitoring a railway vehicle, characterized in that the risk is recognized by comparing a pixel unit of a digital image or changing the object by a recognition of an object on a railway track.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100135271A KR101185079B1 (en) | 2010-12-27 | 2010-12-27 | The Method And Apparatus For Monitoring a Train And Railway Line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100135271A KR101185079B1 (en) | 2010-12-27 | 2010-12-27 | The Method And Apparatus For Monitoring a Train And Railway Line |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20120073490A KR20120073490A (en) | 2012-07-05 |
KR101185079B1 true KR101185079B1 (en) | 2012-09-21 |
Family
ID=46707822
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020100135271A KR101185079B1 (en) | 2010-12-27 | 2010-12-27 | The Method And Apparatus For Monitoring a Train And Railway Line |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101185079B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200090463A (en) | 2019-01-21 | 2020-07-29 | 에피텍(주) | System for monitoring state of train and railway using optical cable and method thereof |
KR102596183B1 (en) * | 2022-07-31 | 2023-11-01 | 주식회사 솔트 | In-track train entry detection system and detection method using camera module and radar sensor module |
KR102688965B1 (en) | 2023-01-31 | 2024-07-29 | 서길원 | Monitoring system of railroad and method for control of that |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101577891B1 (en) * | 2014-02-12 | 2015-12-16 | 목포대학교산학협력단 | System and method for providing line obstruction processing video |
CN110751822A (en) * | 2019-10-30 | 2020-02-04 | 河北冀胜轨道科技股份有限公司 | Outdoor intelligent monitoring system for railway signal equipment |
KR102705439B1 (en) * | 2022-06-24 | 2024-09-11 | 주식회사 한국코아엔지니어링 | Monitoring device of railroad switch point for railway |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002042114A (en) | 2000-07-31 | 2002-02-08 | Matsushita Electric Ind Co Ltd | Collapse detecting system |
JP2004291935A (en) | 2003-03-28 | 2004-10-21 | Railway Technical Res Inst | Railroad monitoring/display system |
JP2009255654A (en) | 2008-04-14 | 2009-11-05 | Toshiba Corp | Train operation monitoring system |
-
2010
- 2010-12-27 KR KR1020100135271A patent/KR101185079B1/en active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002042114A (en) | 2000-07-31 | 2002-02-08 | Matsushita Electric Ind Co Ltd | Collapse detecting system |
JP2004291935A (en) | 2003-03-28 | 2004-10-21 | Railway Technical Res Inst | Railroad monitoring/display system |
JP2009255654A (en) | 2008-04-14 | 2009-11-05 | Toshiba Corp | Train operation monitoring system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200090463A (en) | 2019-01-21 | 2020-07-29 | 에피텍(주) | System for monitoring state of train and railway using optical cable and method thereof |
KR102596183B1 (en) * | 2022-07-31 | 2023-11-01 | 주식회사 솔트 | In-track train entry detection system and detection method using camera module and radar sensor module |
KR102688965B1 (en) | 2023-01-31 | 2024-07-29 | 서길원 | Monitoring system of railroad and method for control of that |
Also Published As
Publication number | Publication date |
---|---|
KR20120073490A (en) | 2012-07-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101185079B1 (en) | The Method And Apparatus For Monitoring a Train And Railway Line | |
JP5096959B2 (en) | Automatic train notification system | |
JP7153000B2 (en) | train control system | |
CN109398424B (en) | Detection system for intrusion of non-communication vehicle | |
KR100916960B1 (en) | Monitoring system in railway station | |
KR100876661B1 (en) | Vision based monitoring system in railway station | |
CN216467864U (en) | Railway monitoring system | |
KR101654354B1 (en) | Railway signaling system using the Railway sensing unit | |
CN113859331A (en) | Railway monitoring system and monitoring method thereof | |
KR20050062889A (en) | Train emergency control system and method using unexpected accident image detector | |
KR20190015868A (en) | Response System For a Fall From Railroad Platform | |
KR100869835B1 (en) | Multi sensor based railway platform monitoring system | |
AU2021244131A1 (en) | Systems and methods for identifying potential deficiencies in railway environment objects | |
KR102008924B1 (en) | Safety System for Track Crossing Worker | |
KR20130033589A (en) | Monitoring system for safety line and railroad track of platform | |
CN113120042A (en) | Intelligent monitoring system for unmanned railway crossing and control method thereof | |
KR100573727B1 (en) | Safety accident preventing system for railroad platform | |
KR101071206B1 (en) | train station control system for train emergency stop using Platform vision information | |
EP3936408B1 (en) | Train monitoring system | |
KR100497311B1 (en) | Method for automatically detecting and alarming unexpected accident while boarding or alighting from subway and train at platform | |
CN114426044A (en) | Image-based train safe operation control system and method | |
KR100644225B1 (en) | Telemetering train protector using cbtc | |
CN113409537A (en) | Rail transport safety guarantee system | |
KR101063912B1 (en) | center control system for train emergency stop using Platform vision information | |
KR20170133592A (en) | Fall protection system on Platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20150813 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20160811 Year of fee payment: 5 |