KR101167475B1 - Strut - Google Patents

Strut Download PDF

Info

Publication number
KR101167475B1
KR101167475B1 KR1020110120391A KR20110120391A KR101167475B1 KR 101167475 B1 KR101167475 B1 KR 101167475B1 KR 1020110120391 A KR1020110120391 A KR 1020110120391A KR 20110120391 A KR20110120391 A KR 20110120391A KR 101167475 B1 KR101167475 B1 KR 101167475B1
Authority
KR
South Korea
Prior art keywords
cap
actuator
jungle
housing
strip
Prior art date
Application number
KR1020110120391A
Other languages
Korean (ko)
Inventor
허원종
Original Assignee
허원종
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 허원종 filed Critical 허원종
Priority to KR1020110120391A priority Critical patent/KR101167475B1/en
Application granted granted Critical
Publication of KR101167475B1 publication Critical patent/KR101167475B1/en
Priority to PCT/KR2012/009732 priority patent/WO2013073891A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

PURPOSE: A strut is provided to remarkably reduce construction time by simply separating the strut from the gap between first and second wales. CONSTITUTION: A strut(100) comprises a first beam, a second beam, an actuator, a thrust prevention unit, and a connection cap. The first and second beams are located between first and second wales(20,30) facing each other. The actuator is located between the first and second beams and connects the first and second beams. One side of the thrust prevention unit is connected to the first beam, and the other side is connected to the second beam. The thrust prevention unit prevents the second beam moved to the second wale from becoming thrust to the first beam. The connection cap protects the actuator.

Description

버팀보{strut}Brace {strut}

본 발명은 버팀보에 관한 것이다.The present invention relates to a brace.

일반적으로, 건설현장에서 지하구조물을 시공하는 경우 해당 지반을 굴토한 후 굴토면이 토압에 의해 붕괴되는 것을 방지하기 위하여 흙막이 공사를 하게 된다.In general, when constructing underground structures at the construction site, after the soil is excavated, the earthen block construction is performed to prevent the collapse of the excavated surface by earth pressure.

이러한 흙막이는 소정 간격으로 지반에 설치되는 H 파일에 굴토면을 받치는 토류벽을 형성하고, H 파일의 일측면에 상하로 일정 간격을 가지면서 수평되게 복수의 띠장이 설치되며, 서로 마주보는 띠장과 띠장 사이에 일정간격의 버팀보 와 잭이 설치된다.These mudguards form earth walls that support the pit soil surface on the H piles installed on the ground at predetermined intervals, and a plurality of bands are horizontally installed at regular intervals on one side of the H piles and face each other. Between the props and jacks at regular intervals.

상기 띠장과 띠장 사이에 설치되는 상기 버팀보의 길이가 길면 상기 띠장과 띠장 사이 간격에 맞게 절단해야 하는 불편한 점이 있었다. 이와 반대로, 버팀보의 길이가 짧으면 상기 잭을 이용하여 길이를 조절해야 했다. 상기 잭의 길이 조절에 따라 버팀보는 상기 띠장과 띠장 사이에 밀착된다.If the length of the support beam installed between the strip and the strip is long, there was an inconvenience to cut to fit the gap between the strip and the strip. On the contrary, if the length of the brace is short, it was necessary to adjust the length using the jack. As the length of the jack is adjusted, the prop is closely contacted between the strip and the strip.

아울러, 상기 잭 장치를 상기 버팀보에 연결할 경우 체결 수단 또는 용접 따위의 방법으로 연결이 이루어져 잭 장치의 연결이 다소 불편하였다.In addition, when the jack device is connected to the brace, the connection is made by a fastening means or a welding method, which makes the connection of the jack device somewhat inconvenient.

등록실용신안공보 제 20-0399888 호 (버팀보의 연결구조) 2005.10.24.Utility Model Registration No. 20-0399888 (Connecting Structure of Vertico) 2005.10.24. 등록특허공보 제 10-0595965 호 (버팀보의 연결구조) 2008.06.26.Registered Patent Publication No. 10-0595965 (Connecting Structure of Vertico) 2008.06.26. 공개특허공보 제 10-2007-0003222 호 (잭 장치) 2007.01.05.Publication No. 10-2007-0003222 (Jack device) 2007.01.05. 등록특허공보 제 10-0937643 호 (강관 버팀보 연결구조) 2010.01.12.Patent Registration No. 10-0937643 (Steel pipe support structure) 2010.01.12.

본 발명은 길이를 조절할 수 있는 버팀보를 제공한다.The present invention provides a brace that can adjust the length.

본 발명의 한 실시예에 따른 버팀보는 서로 마주하는 제1 띠장과 제2 띠장 사이에 설치되어 흙막이 벽에 걸리는 토압을 상기 제1 및 제2 띠장을 이용하여 받는 것으로, 일측이 상기 제1 띠장에 연결될 수 있는 제1 보, 상기 제1 보와 상기 제2 띠장 사이에 위치하는 제2 보, 그리고 상기 제1 보와 상기 제2 보 사이에 배치되어 있고 상기 제2 띠장 방향으로 상기 제2 보를 이동시키는 적어도 하나의 액추에이터를 포함한다.The brace according to an embodiment of the present invention is installed between the first and second bands facing each other to receive earth pressure applied to the earth wall using the first and second bands, one side of which is connected to the first band. A first beam that can be connected, a second beam positioned between the first beam and the second band, and the second beam disposed between the first beam and the second beam and moving in the direction of the second band. At least one actuator to make.

상기 버팀보는 상기 제1 보의 일부분과 상기 제2 보의 일부분을 감싸고 상기 액추에이터가 내부에 위치하는 연결 캡을 더 포함할 수 있다.The brace may further include a connection cap surrounding a portion of the first beam and a portion of the second beam and the actuator located therein.

상기 연결 캡은, 제1 캡, 상기 제1 캡과 마주하는 제2 캡을 포함할 수 있고, 상기 제1 캡과 상기 제2 캡의 양측 가장자리는 서로 접하며, 가장자리에는 각각 플랜지가 형성될 수 있다.The connection cap may include a first cap and a second cap facing the first cap, and both edges of the first cap and the second cap may be in contact with each other, and flanges may be formed at the edges, respectively. .

상기 제1 보와 상기 제2 보는 에이치 빔일 수 있다.The first beam and the second beam may be H beams.

상기 제1 보와 상기 제2 보는 내부가 관통되어 있는 강관일 수 있다.The first beam and the second beam may be a steel pipe penetrated inside.

상기 제2 보의 일측은 상기 제2 띠장에 연결될 수 있고 타측은 상기 제1 보에 직선 이동 가능하게 연결될 수 있다.One side of the second beam may be connected to the second strip, and the other side may be connected to the first beam so as to be linearly movable.

상기 제1 보의 내부와 상기 제2 보의 내부에는 격벽이 각각 배치되어 있고, 상기 격벽 사이에 상기 액추에이터가 고정될 수 있다.Partition walls are disposed in the first beam and the second beam, respectively, and the actuator may be fixed between the partition walls.

상기 버팀보는 상기 적어도 하나의 액추에이터와 이웃하고, 일측이 상기 제1 보에 연결되어 있고 타측이 상기 제2 보에 연결되어 있으며, 상기 제2 띠장 방향으로 이동한 상기 제2 보가 상기 제1 보 방향으로 밀리는 것을 방지하는 밀림 방지부를 더 포함할 수 있다.The prop beam is adjacent to the at least one actuator, one side is connected to the first beam, the other side is connected to the second beam, and the second beam moved in the second band direction is the first beam direction. It may further include a rolling prevention unit for preventing the push.

상기 밀림 방지부는, 상기 제1 보에 연결되어 있고 내부가 길이 방향을 따라 관통된 밀림 하우징, 일측이 상기 밀림 하우징 내부에 직선 이동 가능하게 결합되어 있고 타측이 상기 제2 보에 연결되어 있으며, 복수의 핀 홀이 간격을 두고 형성되어 있는 밀림 로드, 그리고 상기 복수의 핀 홀 중 상기 밀림 하우징에 근접한 핀 홀에 분리 가능하게 결합된 핀을 포함할 수 있으며, 상기 핀은 상기 밀림 하우징에서 인출된 상기 밀림 로드가 상기 밀림 하우징 내부로 이동하는 것을 방지할 수 있다.The rolling prevention part is connected to the first beam and the inside of the jungle housing penetrated along the longitudinal direction, one side is coupled to the linear housing so as to be movable linearly and the other side is connected to the second beam, A pin rod of which is formed at intervals, and a pin that is detachably coupled to a pin hole adjacent to the jungle housing among the plurality of pin holes, wherein the pin is drawn out of the jungle housing. It is possible to prevent the jungle rod from moving into the jungle housing.

본 발명의 실시예에 따르면, 제1 보와 제2 보 사이에 위치한 액추에이터의 작동로드가 전진행정을 하게 되면 제2 보가 제2 띠장 방향으로 인출되면서 직선 이동을 한다. 제2 보가 제2 띠장 방향으로 직선 이동하면 버팀보의 전체적인 길이는 길어지게 된다. 제2 띠장의 직선 이동으로 버팀보의 길이가 조절되므로 제1 띠장과 제2 띠장의 사이 간격에 맞추어 버팀보를 현장에서 절단해야 하는 공정이 생략된다. 절단 공정 생략으로 공사기간을 단축할 수 있으며 절단 공정에 따른 인력을 감축할 수 있다.According to an embodiment of the present invention, when the actuating rod of the actuator located between the first beam and the second beam advances, the second beam is linearly moved while being drawn out in the direction of the second band. If the second beam moves linearly in the second band direction, the overall length of the brace becomes longer. Since the length of the brace is adjusted by the linear movement of the second strip, the process of cutting the brace in the field in accordance with the distance between the first strip and the second strip is omitted. Omission of the cutting process can shorten the construction period and reduce the manpower associated with the cutting process.

본 발명의 실시예에 따르면, 작동로드가 후진행정을 하게 되면 제2 보가 제1 보 방향으로 직선 이동하게 되면서 제1 보와 제2 보의 사이 간격이 좁혀진다. 제1 보와 제2 보 사이 간격이 좁혀지므로 제1 띠장과 제2 띠장 사이에서 버팀보를 간편하게 분리할 수 있다. 이에 따라 버팀보 분리에 따른 시간을 최소화 할 수 있어 공사 기간을 단축할 수 있다.According to the exemplary embodiment of the present invention, when the driving rod moves backward, the distance between the first beam and the second beam is narrowed while the second beam moves linearly in the first beam direction. Since the distance between the first beam and the second beam is narrowed, it is possible to easily separate the brace between the first and second belt lengths. As a result, the time required to separate the braces can be minimized, thus shortening the construction period.

본 발명의 실시예에 따르면, 띠장에 토압이 가해져도 제1 보와 제2 보 사이에 위치한 밀림 방지부의 밀림 로드가 핀에 의하여 밀림 하우징에 걸리게 되면서 밀림 로드가 하우징 내부로 이동하지 못한다. 이에 따라 띠장에 토압이 가해져도 밀림 방지부에 의하여 액추에이터의 작동로드가 하우징 내부로 밀리지 않아 안전성이 향상된다.According to an embodiment of the present invention, even when earth pressure is applied to the strip, the rolling rod of the rolling prevention portion located between the first beam and the second beam is caught by the pin housing by the pin, and thus the slide rod does not move inside the housing. Accordingly, even if earth pressure is applied to the strip, the operation rod of the actuator is not pushed into the housing by the anti-rolling portion, thereby improving safety.

본 발명은 실시예에 따르면, 버팀보를 띠장과 띠장으로 밀착 시키는 잭 설치에 대한 공정이 생략되므로 버팀보 제작 및 설치에 따른 시간을 최소화 할 수 있다.According to an embodiment of the present invention, the process for installing the jack for closely contacting the brace with the girdle and the girdle may be omitted, thereby minimizing the time required for making and installing the brace.

도 1은 본 발명의 한 실시예에 따른 버팀보가 설치된 상태를 나타낸 평면도.
도 2는 도 1에 도시한 버팀보를 나타낸 반단면 사시도.
도 3은 도 2에 도시한 버팀보 분해 사시도.
도 4는 도 2에 도시한 버팀보 길이 조절 상태도.
도 5는 도 3에 도시한 밀림 방지부를 나타낸 단면도.
도 6은 본 발명의 다른 실시예에 따른 버팀보가 설치된 상태를 나타낸 평면도.
도 7은 본 발명의 다른 실시예에 따른 버팀보를 나타낸 반단면 사시도.
도 8은 도 7에 도시한 버팀보 분해 사시도.
도 9는 도 8에 도시한 버팀보 길이 조절 상태도.
도 10은 도 8에 도시한 밀림 방지부를 나타낸 단면도.
1 is a plan view showing a state in which the brace is installed according to an embodiment of the present invention.
Figure 2 is a half sectional perspective view showing the brace shown in FIG.
3 is an exploded perspective view of the brace shown in FIG. 2.
Figure 4 is a brace length adjustment state diagram shown in FIG.
FIG. 5 is a cross-sectional view illustrating a rolling prevention unit illustrated in FIG. 3. FIG.
Figure 6 is a plan view showing a state in which the support is installed in accordance with another embodiment of the present invention.
Figure 7 is a half sectional perspective view showing a brace according to another embodiment of the present invention.
8 is an exploded perspective view of the brace shown in FIG. 7;
9 is a length adjustment state diagram shown in FIG.
FIG. 10 is a cross-sectional view illustrating a rolling prevention unit illustrated in FIG. 8. FIG.

이하, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예에 대하여 첨부한 도면을 참고로 하여 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 명세서 전체를 통하여 유사한 부분에 대해서는 동일한 도면 부호를 붙였다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art can easily carry out the present invention. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Like parts are designated by like reference numerals throughout the specification.

그러면 본 발명의 한 실시예에 따른 버팀보에 대하여 도 1 내지 도 4를 참고하여 설명한다.Next, the brace according to an embodiment of the present invention will be described with reference to FIGS. 1 to 4.

도 1은 본 발명의 한 실시예에 따른 버팀보가 설치된 상태를 나타낸 평면도이고, 도 2는 도 1에 도시한 버팀보를 나타낸 반단면 사시도이며, 도 3은 도 2에 도시한 버팀보 분해 사시도이고, 도 4는 도 2에 도시한 버팀보 길이 조절 상태도이다.1 is a plan view showing a state in which the brace according to an embodiment of the present invention is installed, Figure 2 is a half cross-sectional perspective view showing the brace shown in Figure 1, Figure 3 is an exploded perspective view shown in Figure 2, 4 is a length adjustment state diagram shown in FIG.

도 1 내지 도 4를 참고하면, 본 실시예에 따른 버팀보(100)는 서로 마주하는 제1 띠장(20)과 제2 띠장(30) 사이에 설치되어 흙막이 벽(10a, 10b)에 걸리는 토압을 띠장(20, 30)을 이용하여 받는 것으로, 제1 보(110), 제1 보(110)와 떨어져 있는 제2 보(120), 제1 보(110)와 제2 보(120)를 연결하는 액추에이터(130), 연결 캡(140), 그리고 밀림 방지부(150)를 포함한다. 그러나 연결 캡(140)과 밀림 방지부(150)는 생략될 수 있다.1 to 4, the brace 100 according to the present embodiment is installed between the first strip 20 and the second strip 30 that face each other, so that the earth pressure applied to the retaining walls 10a and 10b is fixed. It is received using the bands 20 and 30, and connects the first beam 110, the second beam 120, and the first beam 110 and the second beam 120 that are separated from the first beam 110. It includes an actuator 130, the connection cap 140, and the anti-roll 150. However, the connection cap 140 and the anti-roll 150 may be omitted.

제1 보(110)와 제2 보(120)는 간격을 두고 마주하는 제1 띠장(20)과 제2 띠장(30) 사이에 위치한다. 제1 보(110)와 제2 보(120)는 에이치 빔(H-beam)으로 형성되어 있다.The first beam 110 and the second beam 120 are positioned between the first and second strips 20 and 30 facing each other at intervals. The first beam 110 and the second beam 120 are formed of an H-beam.

제1 보(110)는 제2 보(120)다 길이가 길다. 제1 보(110)와 제2 보(120)의 길이는 제1 띠장(20)과 제2 띠장(30)이 서로 떨어져 있는 간격에 따라 다르다. 제1 보(110)는 일측이 제1 띠장(20)에 볼트 따위의 체결 수단으로 분리 가능하게 연결될 수 있다. 제1 보(110)의 타측은 제2 띠장(30)과 간격을 두고 마주한다.The first beam 110 is longer than the second beam 120. The length of the first beam 110 and the second beam 120 is different depending on the distance from which the first strip 20 and the second strip 30 are separated from each other. One side of the first beam 110 may be detachably connected to the first belt 20 by a fastening means such as a bolt. The other side of the first beam 110 faces the second strip length 30 at intervals.

제2 보(120)는 제1 보(110) 보다 길이가 짧다. 제2 보(120)는 제1 보(110)와 제2 띠장(30) 사이의 간격을 보상한다. 제2 보(120)의 일측은 제2 띠장(30)에 볼트 따위의 체결 수단으로 분리 가능하게 연결될 수 있고, 타측은 액추에이터(130)로 제1 보(110)의 타측에 연결되어 있다.The second beam 120 is shorter in length than the first beam 110. The second beam 120 compensates for the gap between the first beam 110 and the second strip 30. One side of the second beam 120 may be detachably connected to the second belt 30 by a fastening means such as a bolt, and the other side of the second beam 120 is connected to the other side of the first beam 110 by an actuator 130.

액추에이터(130)는 다수개로 이루어져 제1 보(110)와 제2 보(120) 사이에 위치하여 제1 보(110)와 제2 보(120)를 연결한다. 그러나, 액추에이터(130)는 하나만 위치할 수도 있다. 액추에이터(130)는 하우징(131) 및 작동로드(132)를 포함한다.The actuator 130 is composed of a plurality of actuators positioned between the first beam 110 and the second beam 120 to connect the first beam 110 and the second beam 120. However, only one actuator 130 may be located. The actuator 130 includes a housing 131 and an actuating rod 132.

액추에이터(130)의 하우징(131)은 일측이 개방되어 있으며, 제1 보(110)의 타측에 연결되어 있다. 하우징(131)의 내부로 외부에서 공급되는 작동유체가 유입될 수 있다. 작동유체는 동력 전달의 매체로 쓰이는 점성이 낮은 유압유이다. 본 발명은 작동유체를 유압유로 한정하는 것은 아니다.The housing 131 of the actuator 130 is open at one side and is connected to the other side of the first beam 110. The working fluid supplied from the outside into the housing 131 may be introduced. The working fluid is a low viscosity hydraulic oil used as a medium for power transmission. The present invention is not limited to hydraulic fluid.

액추에이터(130)의 작동로드(132)는 일측이 하우징(131)의 개방된 일측을 통하여 하우징(131) 내부에 직선 이동 가능하게 결합되어 있다. 작동로드(132)의 타측은 제2 보(120)의 타측에 연결되어 있다. 작동로드(132)의 일측에는 하우징(131) 내부로 유입된 작동유체로부터 압력을 받는 피스톤(도시하지 않음)이 설치되어 있다. 피스톤을 기준으로 하우징(131) 내부로 유입되는 작동유체의 유입 위치에 따라 전진행정을 하거나 후진행정을 하게 된다.One side of the actuator rod 132 of the actuator 130 is coupled to the linear movement within the housing 131 through an open side of the housing 131. The other side of the actuating rod 132 is connected to the other side of the second beam 120. One side of the operating rod 132 is provided with a piston (not shown) that receives pressure from the working fluid introduced into the housing 131. The forward stroke or the reverse stroke is performed according to the inflow position of the working fluid flowing into the housing 131 based on the piston.

작동로드(132)가 전진행정을 하게 되면 제2 보(120)는 제2 띠장(30) 방향으로 직선 이동할 수 있다. 제2 보(120)가 제2 띠장(30) 방향으로 직선 이동하면 버팀보(100)의 전체적인 길이는 길어지게 된다. 제2 띠장(30)의 직선 이동으로 버팀보(100)의 길이가 조절되므로 제1 띠장(20)과 제2 띠장(30)의 사이 간격에 맞추어 버팀보를 현장에서 절단해야 하는 공정이 생략된다. 절단 공정 생략으로 공사기간을 단축할 수 있으며 절단 공정에 따른 인력을 감축할 수 있다.When the operating rod 132 moves forward, the second beam 120 may linearly move in the direction of the second strip 30. When the second beam 120 linearly moves in the direction of the second strip 30, the overall length of the brace 100 is lengthened. Since the length of the brace 100 is adjusted by the linear movement of the second strip 30, the process of cutting the brace in the field in accordance with the interval between the first strip 20 and the second strip 30 is omitted. Omission of the cutting process can shorten the construction period and reduce the manpower associated with the cutting process.

액추에이터(130)의 작동로드(132)가 전진 행정을 하게 되면 제1 보(110)와 제2 보(120)의 간격이 서로 멀어지게 되면서 제1 보(110)는 제1 띠장(20)에 밀착되고 제2 보(120)는 제2 띠장(30)에 밀착될 수 있다.When the operating rod 132 of the actuator 130 is moved forward, the distance between the first beam 110 and the second beam 120 is far from each other, and the first beam 110 is connected to the first belt 20. The second beam 120 may be in close contact with the second strip 30.

작동로드(132)의 후진행정으로 제2 보(120)는 제1 보(110) 방향으로 직선 이동하게 된다. 이때 제1 보(110)와 제2 보(120)의 사이 간격이 좁혀진다. 제1 보(110)와 제2 보(120) 사이 간격이 좁혀지므로 제1 띠장(20)과 제2 띠장(30) 사이에서 버팀보(100)를 간편하게 분리할 수 있다. 이에 따라 버팀보(100) 분리에 따른 시간을 최소화 할 수 있어 공사 기간을 단축할 수 있다.The second beam 120 is linearly moved in the direction of the first beam 110 by the backward stroke of the operating rod 132. At this time, the interval between the first beam 110 and the second beam 120 is narrowed. Since the spacing between the first beam 110 and the second beam 120 is narrowed, the brace 100 can be easily separated between the first strip 20 and the second strip 30. Accordingly, it is possible to minimize the time due to the separation of the brace 100 can shorten the construction period.

한편, 액추에이터(130)가 다수개인 경우 액추에이터(130)들은 하나의 펌프(도시하지 않음)와 하나의 탱크(도시하지 않음)에 연결되어 있다. 이에 따라 펌프가 구동하면 액추에이터(130)들의 작동로드(132)는 동시에 전진행정을 하거나 후진행정을 한다. 작동로드(132)들의 행정이 동시에 이루어지므로 제2 보(120)가 반듯하게 직선 이동할 수 있다.On the other hand, when there are a plurality of actuators 130, the actuators 130 are connected to one pump (not shown) and one tank (not shown). Accordingly, when the pump is driven, the actuating rod 132 of the actuators 130 simultaneously moves forward or backwards. Since the strokes of the operating rods 132 are made at the same time, the second beam 120 may move straight.

밀림 방지부(150)는 띠장(20, 30)에 가해지는 토압에 의하여 액추에이터(130)가 작동로드(132)가 하우징(131) 내부로 이동하는 것을 방지한다. 밀림 방지부(150)는 제1 보(110)와 제2 보(120) 사이 중앙에 위치하여 액추에이터(130)와 이웃한다. 밀림 방지부(150)는 밀림 하우징(151), 밀림 로드(152), 그리고 핀(153)을 포함한다.The anti-rolling part 150 prevents the actuator 130 from moving the operation rod 132 into the housing 131 by the earth pressure applied to the strips 20 and 30. The anti-roll 150 is located at the center between the first beam 110 and the second beam 120 and is adjacent to the actuator 130. The anti-roll 150 includes a jungle housing 151, a jungle rod 152, and a pin 153.

밀림 하우징(151)의 내부는 길이 방향을 따라 관통되어 있으며, 일측이 제1 보(110)에 연결되어 있다. 이때 밀림 하우징(151)는 볼트 따위로 분리 가능하게 연결되어 있다. 그러나 밀림 하우징(151)는 용접 따위의 방식으로 제1 보(110)에 견고히 고정될 수 있다. 밀림 하우징(151)와 제1 보(110)는 다양한 방식으로 연결될 수 있다.The interior of the jungle housing 151 penetrates along the length direction, and one side thereof is connected to the first beam 110. At this time, the jungle housing 151 is detachably connected to the bolt. However, the jungle housing 151 may be firmly fixed to the first beam 110 by welding or the like. The jungle housing 151 and the first beam 110 may be connected in various ways.

밀림 로드(152)는 일측이 밀림 하우징(151) 내부에 직선 이동 가능하게 결합되어 있으며, 타측은 제2 보(120)에 연결되어 있다. 밀림 로드(152)는 제2 보에 볼트 따위로 분리 가능하게 연결되어 있다. 그러나 밀림 로드(152)는 용접 따위의 방식으로 제2 보(120)에 견고히 고정될 수 있다. 밀림 로드(152)와 제2 보(120)는 다양한 방식으로 연결될 수 있다.One side of the jungle rod 152 is coupled to the inside of the jungle housing 151 so as to be linearly movable, and the other side thereof is connected to the second beam 120. The jungle rod 152 is detachably connected to the second beam by bolts. However, the push rod 152 may be firmly fixed to the second beam 120 by welding or the like. The jungle rod 152 and the second beam 120 may be connected in various ways.

밀림 로드(152)에는 복수의 핀 홀(152a)이 길이 방향으로 간격을 두고 형성되어 있다.The plurality of pin holes 152a are formed in the slide rod 152 at intervals in the longitudinal direction.

핀(153)은 복수의 핀 홀(152a) 중 밀림 하우징(151)와 가장 근접한 위치의 핀 홀(152a)에 결합된다. 이때 핀(153)의 양단부는 밀림 로드(152) 양측으로 돌출된다. 돌출된 밀림 로드(152)의 양단부는 밀림 하우징(151)에 접한다. 핀(153)의 양단부가 밀림 하우징(151)에 접하면 핀(153)이 밀림 하우징(151)에 걸리게 되면서 밀림 로드(152)는 밀림 하우징(151) 내부로 이동하지 못한다.The pin 153 is coupled to the pin hole 152a at the position closest to the jungle housing 151 of the plurality of pin holes 152a. At this time, both ends of the pin 153 protrude to both sides of the push rod 152. Both ends of the protruding jungle rod 152 abut the jungle housing 151. When both ends of the pin 153 contact the jungle housing 151, the pin 153 is caught by the jungle housing 151, and thus the jungle rod 152 does not move into the jungle housing 151.

한편, 제1 보(110)와 제2 보(120)를 띠장 사이에서 분리 할 경우 밀림 로드(152)에서 핀(153)을 제거한 후에 액추에이터(130)의 작동로드(132)가 후진 행정이 이루어진다.On the other hand, when the first beam 110 and the second beam 120 is separated between the band, after removing the pin 153 from the slide rod 152, the operating rod 132 of the actuator 130 is a reverse stroke. .

연결 캡(140)은 액추에이터(130)를 보호하는 것으로 제1 캡(141)과 제2 캡(142)을 포함한다. 제1 캡(141)과 제2 캡(142)은 액추에이터(130)를 사이에 두고 서로 마주한다. 이때 제1 캡(141)과 제2 캡(142)의 일측은 제1 보(110)의 타측 적어도 일부분을 감싸고 있다. 제1 캡(141)과 제2 캡(142)의 타측은 제2 보(120)의 일측 적어도 일부분을 감싸고 있다.The connection cap 140 protects the actuator 130 and includes a first cap 141 and a second cap 142. The first cap 141 and the second cap 142 face each other with the actuator 130 interposed therebetween. In this case, one side of the first cap 141 and the second cap 142 surrounds at least a portion of the other side of the first beam 110. The other sides of the first cap 141 and the second cap 142 surround at least a portion of one side of the second beam 120.

제1 캡(141)과 제2 캡(142)의 폭 방향 가장자리는 서로 마주한다. 제1 캡(141)과 제2 캡(142)의 가장자리에는 외측 방향으로 돌출된 플랜지(141a, 142a)가 형성되어 있다. 제1 캡(141)의 플랜지(141a)와 제2 캡(142)의 플랜지(142a)는 서로 접한다. 볼트 따위의 체결 수단이 플랜지(141a, 142a)에 결합되어 제1 캡(141)과 제2 캡(142)이 제1 보(110)와 제2 보(120)에 결합될 수 있다.The widthwise edges of the first cap 141 and the second cap 142 face each other. Flanges 141a and 142a protruding outward are formed at the edges of the first cap 141 and the second cap 142. The flange 141a of the first cap 141 and the flange 142a of the second cap 142 contact each other. Fastening means such as bolts may be coupled to the flanges 141a and 142a so that the first cap 141 and the second cap 142 may be coupled to the first beam 110 and the second beam 120.

이와 같은 연결 캡(140)은 액추에이터(130)의 작동로드(132)가 전진행정으로 제1 보(110)와 제2 보(120)가 제1 띠장(20)과 제2 띠장(30)에 밀착된 상태에서 설치된다.The connecting cap 140 has the first rod 110 and the second beam 120 connected to the first strip 20 and the second strip 30 with the operation rod 132 of the actuator 130 moving forward. It is installed in close contact.

이와 같이 제1 띠장(20)과 제2 띠장(30) 사이에 제1 보(110)와 제2 보(120)가 설치되면 버팀보(100)는 흙막이 벽(10a, 10b)에 걸리는 토압을 띠장(20, 30)을 이용하여 지지하게 된다. 그리고 밀림 방지부(150)에 의하여 띠장(20, 30)에 토압이 가해져도 액추에이터(130)의 작동로드(132)는 하우징(131) 내부로 밀리지 않는다.As such, when the first beam 110 and the second beam 120 are installed between the first strip 20 and the second strip 30, the support beam 100 has a strip of earth pressure applied to the retaining walls 10a and 10b. It is supported using (20, 30). In addition, even if earth pressure is applied to the strips 20 and 30 by the anti-rolling part 150, the operation rod 132 of the actuator 130 is not pushed into the housing 131.

한편, 제1 캡(141)과 제2 캡(142)의 가운데 부분에는 끊어져 있을 수 있다. 제1 캡(141)과 제2 캡(142)의 끊어진 부분에는 주름관(도시하지 않음)이 설치될 수 있다. 주름관은 제2 보(120) 직선 이동 시 접히고 펼쳐질 수 있다. 제1 캡(110)과 제2 캡(120)에 주름관이 설치된 경우 제1 및 제2 보(110, 120)에 연결 캡(140)을 고정한 상태에서 액추에이터(130)의 작동로드(132)를 전진 또는 후진행정을 실시하여 제2 보(120)를 직선 이동시킬 수 있다.Meanwhile, the middle portions of the first cap 141 and the second cap 142 may be broken. Corrugated pipes (not shown) may be installed at the broken portions of the first cap 141 and the second cap 142. The corrugated pipe may be folded and unfolded when the second beam 120 is linearly moved. When the corrugated pipes are installed in the first cap 110 and the second cap 120, the operating rod 132 of the actuator 130 is fixed while the connection cap 140 is fixed to the first and second beams 110 and 120. The second beam 120 may be linearly moved by moving forward or backward.

다음으로, 본 발명의 다른 실시예에 따른 버팀보에 대하여 도 6 내지 도 10를 참고하여 설명한다.Next, a brace according to another embodiment of the present invention will be described with reference to FIGS. 6 to 10.

도 6은 본 발명의 다른 실시예에 따른 버팀보가 설치된 상태를 나타낸 평면도이고, 도 7은 본 발명의 다른 실시예에 따른 버팀보를 나타낸 반단면 사시도이며, 도 8은 도 7에 도시한 버팀보 분해 사시도이고, 도 9는 도 7에 도시한 버팀보 길이 조절 상태도이다.6 is a plan view showing a state in which the brace according to another embodiment of the present invention is installed, Figure 7 is a half cross-sectional perspective view showing a brace according to another embodiment of the present invention, Figure 8 is an exploded perspective view shown in Figure 7 9 is a brace length adjustment state diagram shown in FIG. 7.

도 6 내지 도 10을 참고하면, 본 실시예에 따른 버팀보(200)는 서로 마주하는 제1 띠장(20)과 제2 띠장(30) 사이에 설치되어 흙막이 벽(10a, 10b)에 걸리는 토압을 띠장(20, 30)을 이용하여 받는 것으로, 제1 보(210), 제1 보(210)와 떨어져 있는 제2 보(220), 제1 보(210)와 제2 보(220)를 연결하는 액추에이터(230), 연결 캡(240), 그리고 밀림 방지부(250)를 포함한다. 그러나 밀림 방지부(250)와 연결 캡(240)은 생략될 수 있다.6 to 10, the brace 200 according to the present embodiment is installed between the first strip 20 and the second strip 30 facing each other to the earth pressure applied to the earth wall (10a, 10b) It is received using the bands 20 and 30, and connects the first beam 210, the second beam 220, and the first beam 210 and the second beam 220 that are separated from the first beam 210. The actuator 230, the connection cap 240, and the anti-roll 250 is included. However, the anti-roll 250 and the connection cap 240 may be omitted.

제1 보(10, 20)와 제2 보(220)는 간격을 두고 마주하는 제1 띠장(20)과 제2 띠장(30) 사이에 위치한 것으로, 본 실시예의 제1 보(210)와 제2 보(220)는 형상에 있어 도 1 내지 도 4에 도시한 실시예와 다소 차이가 있다. 본 실시예에 따른 제1 보(210)와 제2 보(220)는 내부가 비어 있는 강관으로 형성되어 있다. 제1 보(210)와 제2 보(220)는 금속 따위로 만들어질 수 있다. 본 발명은 제1 보(210)와 제2 보(220)를 금속으로 한정하지 않는다.The first beams 10 and 20 and the second beams 220 are located between the first and second bands 20 and 30 facing each other at intervals. The first beams 210 and the second beams of the present embodiment are formed. The two beams 220 are somewhat different in shape from the embodiment shown in FIGS. 1 to 4. The first beam 210 and the second beam 220 according to the present embodiment is formed of a steel pipe empty inside. The first beam 210 and the second beam 220 may be made of metal. The present invention does not limit the first beam 210 and the second beam 220 to a metal.

제1 보(210)는 제2 보(220)다 길이가 길다. 제1 보(210)와 제2 보(220)의 길이는 제1 띠장(20)과 제2 띠장(30)이 서로 떨어져 있는 간격에 따라 다르다. 제1 보(210)는 일측이 제1 띠장(20)에 볼트 따위의 체결 수단으로 분리 가능하게 연결될 수 있다. 제1 보(210)의 타측은 제2 띠장(30)과 간격을 두고 마주한다.The first beam 210 is longer than the second beam 220. The lengths of the first beams 210 and the second beams 220 vary depending on the distance between the first strip 20 and the second strip 30. One side of the first beam 210 may be detachably connected to the first belt 20 by a fastening means such as a bolt. The other side of the first beam 210 faces the second belt 30 at an interval.

제1 보(210)의 타측 내부에는 격벽(211)이 형성되어 있다. 격벽(211)은 제1 보(210)의 내부에 용접 따위의 방법으로 고정되어 있다.The partition 211 is formed inside the other side of the first beam 210. The partition 211 is fixed to the inside of the first beam 210 by a method such as welding.

제2 보(220)는 제1 보(210) 보다 길이가 짧다. 제2 보(220)는 제1 보(210)와 제2 띠장(30) 사이의 간격을 보상한다. 제2 보(220)의 직경은 제1 보(210)의 직경보다 작다. 이에 따라 제2 보(220)의 일측 적어도 일부분은 제1 보(210) 내부로 삽입될 수 있다. 제2 보(220)가 제1 보(210) 내부로 삽입될 때 제2 보(220)가 직선 이동할 수 있도록 제2 보(220)는 제1 보(210)에 중간 끼워맞춤 또는 헐거운 끼워맞춤 형태로 결합된다. 제2 보(220)의 내부에는 제1 보(210)의 격벽(211)과 마주하는 격벽(221)이 형성되어 있다. 격벽(221)은 용접 따위의 방법으로 제2 보(220) 내부에 고정되어 있다.The second beam 220 is shorter in length than the first beam 210. The second beam 220 compensates for the gap between the first beam 210 and the second strip 30. The diameter of the second beam 220 is smaller than the diameter of the first beam 210. Accordingly, at least a portion of one side of the second beam 220 may be inserted into the first beam 210. The second beam 220 is interfitted or loosely fitted to the first beam 210 so that the second beam 220 can move linearly when the second beam 220 is inserted into the first beam 210. Combined in form. Inside the second beam 220, a partition 221 facing the partition 211 of the first beam 210 is formed. The partition wall 221 is fixed inside the second beam 220 by welding or the like.

그리고 제2 보(220)의 타측은 제2 띠장(30)에 볼트 따위의 체결 수단으로 분리 가능하게 연결될 수 있다.The other side of the second beam 220 may be detachably connected to the second belt 30 by a fastening means such as a bolt.

액추에이터(230)는 도 1 내지 도 5에 도시한 실시예와 대체로 동일하다. 즉, 다수개로 이루어져 제1 보(210)의 격벽(211)과 제2 보(220)의 격벽(221) 사이에 위치하여 제1 보(210)와 제2 보(220)를 연결한다.Actuator 230 is generally the same as the embodiment shown in FIGS. That is, the plurality of beams are formed between the partition wall 211 of the first beam 210 and the partition wall 221 of the second beam 220 to connect the first beam 210 and the second beam 220.

액추에이터(230)는 작동유체가 유입될 수 있고 격벽(121)에 결합되는 하우징(231) 및 일측이 하우징(231)에 직선 이동 가능하게 결합되어 작동유체의 유입 방향에 따라 하우징(231)에서 전진행정을 하거나 후진행정을 하며, 격벽(221)에 결합되는 작동로드(232)를 포함한다. Actuator 230 is a housing 231 and the one side is coupled to the partition wall 121 and the working fluid can be introduced into the housing 231 is linearly movable to move forward in the housing 231 according to the inflow direction of the working fluid A stroke or a reverse stroke, and includes a working rod 232 coupled to the partition 221.

액추에이터(230)의 작동로드(232)가 전진 행정을 하게 되면 제1 보(210)와 제2 보(220)의 간격이 서로 멀어지게 되면서 제1 보(210)는 제1 띠장(20)에 밀착되고 제2 보(220)는 제2 띠장(30)에 밀착될 수 있다.When the actuating rod 232 of the actuator 230 is moved forward, the distance between the first beam 210 and the second beam 220 is far from each other, and the first beam 210 is connected to the first belt 20. The second beam 220 may be in close contact with the second strip 30.

액추에이터(230)의 작동로드(232)가 후진 행정을 하게 되면 제1 보(210)와 제2 보(220)의 간격이 좁혀지면서 제1 보(210)와 제2 보(220)는 띠장(20, 30) 사이에서 분리될 수 있다.When the actuating rod 232 of the actuator 230 performs the reverse stroke, the interval between the first beam 210 and the second beam 220 is narrowed, and the first beam 210 and the second beam 220 are formed in a band ( 20, 30).

밀림 방지부(250)는 도 1 내지 도 5에 도시한 실시예와 대체로 동일하다. 즉, 는 띠장(20, 30)에 가해지는 토압에 의하여 액추에이터(230)의 작동로드(232)가 하우징(231) 내부로 이동하는 것을 방지한다. 밀림 방지부(250)는 제1 보(210)와 제2 보(220) 사이 중앙에 위치하여 액추에이터(230)와 이웃한다. 밀림 방지부(250)는 내부가 길이 방향을 따라 관통되어 있고 제1 보(210)에 결합된 밀림 하우징(251), 일측이 밀림 하우징(251)에 직선 이동 가능하게 결합되어 있고 타측이 제2 보(220)에 결합되어 있고 복수의 핀 홀(252a)이 간격을 두고 형성된 밀림 로드(252), 그리고 핀 홀(252a)에 결합되어 양단부가 밀림 하우징(251)에 걸리는 핀(253)을 포함한다.The anti-roll 250 is substantially the same as the embodiment shown in FIGS. 1 to 5. That is, is to prevent the operating rod 232 of the actuator 230 to move into the housing 231 by the earth pressure applied to the strips (20, 30). The anti-roll 250 is located at the center between the first beam 210 and the second beam 220 and is adjacent to the actuator 230. The anti-rolling part 250 has a inside penetrated along the longitudinal direction and is coupled to the first housing 210 in a jungle housing 251, one side of which is linearly movable to the jungle housing 251, and the other side of the second housing is second-sided. A plurality of pin holes 252a coupled to the beam 220 and having a plurality of pin holes 252a spaced apart from each other, and pins 253 coupled to the pin holes 252a to both ends of the pin housings 251. do.

핀(153)의 양단부가 밀림 하우징(151)에 접하면 핀(153)이 밀림 하우징(151)에 걸리게 되면서 밀림 로드(152)는 밀림 하우징(151) 내부로 이동하지 못한다.When both ends of the pin 153 contact the jungle housing 151, the pin 153 is caught by the jungle housing 151, and thus the jungle rod 152 does not move into the jungle housing 151.

연결 캡(240)은 도 1 내지 도 4에 도시한 실시예와 대체로 동일 하다. 다만 형상에 있어 차이가 있다. 본 실시예에 따른 연결 캡(240)은 강관인 제1 보(210)와 제2 보(220)와 동일한 원통형으로 형성되어 있다. 원통형의 연결 캡(240)은 분할되어 제1 캡(241)과 제2 캡(242)으로 이루어져 있다.The connection cap 240 is generally the same as the embodiment shown in FIGS. 1 to 4. However, there is a difference in shape. The connection cap 240 according to the present embodiment is formed in the same cylindrical shape as the first beam 210 and the second beam 220, which is a steel pipe. The cylindrical connection cap 240 is divided into a first cap 241 and a second cap 242.

연결 캡(240)은 액추에이터(230)의 작동로드(231)가 전진행정한 상태에서 작동로드(232)를 사이에 두고 서로 마주한다. 이때 제1 캡(241)과 제2 캡(242)의 일측은 제1 보(210)의 타측 적어도 일부분을 감싸고 있다. 제1 캡(241)과 제2 캡(242)의 타측은 제2 보(220)의 일측 적어도 일부분을 감싸고 있다.The connection cap 240 faces each other with the operation rod 232 interposed therebetween in the state in which the operation rod 231 of the actuator 230 moves forward. At this time, one side of the first cap 241 and the second cap 242 surrounds at least a portion of the other side of the first beam (210). The other sides of the first cap 241 and the second cap 242 surround at least a portion of one side of the second beam 220.

제1 캡(241)과 제2 캡(442)의 폭 방향 가장자리는 서로 마주한다. 제1 캡(241)과 제2 캡(242)의 가장자리에는 외측 방향으로 돌출된 플랜지(241a, 242a)가 형성되어 있다. 제1 캡(241)의 플랜지(241a)와 제2 캡(242)의 플랜지(242a)는 서로 접한다. 볼트 따위의 체결 수단이 플랜지(241a, 242a)에 결합되어 제1 캡(241)과 제2 캡(242)이 제1 보(210)와 제2 보(220)에 결합된다.The widthwise edges of the first cap 241 and the second cap 442 face each other. At the edges of the first cap 241 and the second cap 242, flanges 241a and 242a protruding outward are formed. The flange 241a of the first cap 241 and the flange 242a of the second cap 242 contact each other. Fastening means such as bolts are coupled to the flanges 241a and 242a so that the first cap 241 and the second cap 242 are coupled to the first beam 210 and the second beam 220.

이와 같은 연결 캡(240)은 액추에이터(240)의 작동로드(232)가 전진행정으로 제1 보(210)와 제2 보(220)가 제1 띠장(20)과 제2 띠장(30)에 밀착된 상태에서 설치된다.The connection cap 240 has a first rod 210 and a second beam 220 to the first strip 20 and the second strip 30 in the forward movement of the actuator rod 232 of the actuator 240. It is installed in close contact.

이와 같이 제1 띠장(20)과 제2 띠장(30) 사이에 제1 보(210)와 제2 보(220)가 설치되면 버팀보(200)는 흙막이 벽(10a, 10b)에 걸리는 토압을 띠장(20, 30)을 이용하여 지지하게 된다. 그리고 밀림 방지부(250)에 의하여 띠장(20, 30)에 토압이 가해져도 액추에이터(230)의 작동로드(232)는 하우징(231) 내부로 밀리지 않는다.As such, when the first beam 210 and the second beam 220 are installed between the first strip 20 and the second strip 30, the support beam 200 has a strip of earth pressure applied to the retaining walls 10a and 10b. It is supported using (20, 30). In addition, even if earth pressure is applied to the strips 20 and 30 by the rolling preventing unit 250, the operation rod 232 of the actuator 230 is not pushed into the housing 231.

한편, 제1 캡(241)과 제2 캡(242)의 가운데 부분에는 끊어져 있을 수 있다. 제1 캡(241)과 제2 캡(242)의 끊어진 부분에는 주름관(도시하지 않음)이 설치될 수 있다. 주름관은 제2 보(220) 직선 이동 시 접히고 펼쳐질 수 있다. 제1 캡(241)과 제2 캡(242)에 주름관이 설치된 경우 연결 캡(240)을 제1 및 제2 보(210, 220)에 설치한 상태에서 제2 보(220)를 직선 이동시킬 수 있다.Meanwhile, the center portions of the first cap 241 and the second cap 242 may be broken. Corrugated pipes (not shown) may be installed at the broken portions of the first cap 241 and the second cap 242. The corrugated pipe may be folded and unfolded when the second beam 220 is linearly moved. When the corrugated pipes are installed in the first cap 241 and the second cap 242, the second beam 220 is linearly moved in a state in which the connection cap 240 is installed in the first and second beams 210 and 220. Can be.

도 1 내지 도 4에 도시한 실시예에서 살펴본 많은 특징들이 본 실시예에 적용될 수 있다.Many of the features described in the embodiment shown in FIGS. 1 to 4 may be applied to the present embodiment.

참고로 위 설명과 도면에서는 본 발명의 버팀보가 마주하는 서로 마주하는 제1 띠장과 제2 띠장 사이에 설치되는 것으로 설명하였지만, 본 발명의 버팀보는 대각선 방향에서 마주하는 띠장과 띠장 사이에 설치될 수도 있다. 또한, 본원 발명의 제1 및 제2 보가 에이치 빔 또는 강관 형태로 형성된 것으로 설명하였지만, 본 발명의 제1 및 제2 보의 형상은 다양하게 형성될 수도 있다.For reference, in the above description and the drawings, it has been described as being installed between the first and second bands facing each other facing the braces of the present invention, but the braces of the present invention may be installed between the belts and the belts facing in the diagonal direction. have. In addition, although the first and second beams of the present invention have been described as being formed in the form of an H beam or a steel pipe, the shapes of the first and second beams of the present invention may be variously formed.

이상에서 본 발명의 바람직한 실시예에 대하여 상세하게 설명하였지만 본 발명의 권리범위는 이에 한정되는 것은 아니고 다음의 청구범위에서 정의하고 있는 본 발명의 기본 개념을 이용한 당업자의 여러 변형 및 개량 형태 또한 본 발명의 권리범위에 속하는 것이다.Although the preferred embodiments of the present invention have been described in detail above, the scope of the present invention is not limited thereto, and various modifications and improvements of those skilled in the art using the basic concepts of the present invention defined in the following claims are also provided. It belongs to the scope of rights.

100, 200: 버팀보
110, 210: 제1 보 120, 220: 제2 보 211, 221: 격벽
130, 230: 액추에이터 131, 231: 하우징 132, 232: 작동로드
140, 240: 연결 캡 141, 241: 제1 캡 142, 242: 제2 캡 141a, 142a, 241a, 242a: 플랜지
150, 250: 밀림 방지부
151, 251: 밀림 하우징
152, 252: 밀림 로드 152a, 252a: 핀 홀
153, 253: 핀
100, 200: brace
110, 210: First Report 120, 220: Second Report 211, 221: Bulkhead
130, 230: actuators 131, 231: housings 132, 232: working rod
140, 240: connection cap 141, 241: first cap 142, 242: second cap 141a, 142a, 241a, 242a: flange
150, 250: anti-roll
151, 251: jungle housing
152, 252: jungle road 152a, 252a: pinhole
153, 253: pin

Claims (9)

서로 마주하는 제1 띠장과 제2 띠장 사이에 설치되어 흙막이 벽에 걸리는 토압을 상기 제1 및 제2 띠장을 이용하여 받는 것으로,
일측이 상기 제1 띠장에 연결될 수 있는 제1 보,
상기 제1 보와 상기 제2 띠장 사이에 위치하는 제2 보,
상기 제1 보와 상기 제2 보 사이에 배치되어 있고 상기 제2 보를 상기 제2 띠장 방향으로 이동시키는 적어도 하나의 액추에이터, 그리고
상기 적어도 하나의 액추에이터와 이웃하고, 일측이 상기 제1 보에 연결되어 있고 타측이 상기 제2 보에 연결되어 있으며, 상기 제2 띠장 방향으로 이동한 상기 제2 보가 상기 제1 보 방향으로 밀리는 것을 방지하는 밀림 방지부를 포함하고,
상기 밀림 방지부는,
상기 제1 보에 연결되어 있고 내부가 길이 방향을 따라 관통된 밀림 하우징,
일측이 상기 밀림 하우징 내부에 직선 이동 가능하게 결합되어 있고 타측이 상기 제2 보에 연결되어 있으며, 복수의 핀 홀이 간격을 두고 형성되어 있는 밀림 로드, 그리고
상기 복수의 핀 홀 중 상기 밀림 하우징에 근접한 핀 홀에 분리 가능하게 결합된 핀
을 포함하는
버팀보.
It is installed between the first and second bands facing each other to receive the earth pressure applied to the wall of the earthen wall using the first and second bands,
A first beam having one side connected to the first strip,
A second beam positioned between the first beam and the second band,
At least one actuator disposed between the first beam and the second beam and configured to move the second beam in the second band direction, and
Adjacent to the at least one actuator, one side of which is connected to the first beam and the other side of which is connected to the second beam, wherein the second beam moved in the second band direction is pushed in the first beam direction It includes a jungle prevention part to prevent,
The rolling prevention part,
A jungle housing connected to the first beam and penetrating therein in a longitudinal direction,
A jungle rod having one side coupled to the jungle housing so as to be linearly movable and the other side connected to the second beam, and having a plurality of pin holes spaced apart from each other; and
A pin detachably coupled to a pin hole close to the jungle housing among the plurality of pin holes
Containing
Braces.
제1항에서,
상기 제1 보의 일부분과 상기 제2 보의 일부분을 감싸고 내부에 상기 액추에이터가 위치하는 연결 캡을 더 포함하는 버팀보.
In claim 1,
And a connection cap surrounding a portion of the first beam and a portion of the second beam and having the actuator positioned therein.
제2항에서,
상기 연결 캡은
제1 캡,
상기 제1 캡과 마주하는 제2 캡
을 포함하고,
상기 제1 캡과 상기 제2 캡의 양측 가장자리는 서로 접하며, 가장자리에는 각각 플랜지가 형성되어 있는
버팀보.
In claim 2,
The connecting cap
First cap,
A second cap facing the first cap
Including,
Both edges of the first cap and the second cap are in contact with each other, and flanges are formed at the edges, respectively.
Braces.
제1항에서,
상기 제1 보와 상기 제2 보는 에이치 빔(H-beam)인 버팀보.
In claim 1,
The first beam and the second beam is an H-beam (H-beam).
제1항에서,
상기 제1 보와 상기 제2 보는 내부가 관통되어 있는 강관인 버팀보.
In claim 1,
The prop beam is a steel pipe through which the first beam and the second beam penetrates.
제5항에서,
상기 제2 보의 일측은 상기 제2 띠장에 연결될 수 있고 타측은 상기 제1 보에 직선 이동 가능하게 연결되어 있는 버팀보.
The method of claim 5,
One side of the second beam may be connected to the second strip and the other side is connected to the first beam so that the straight beam.
제6항에서,
상기 제1 보의 내부와 상기 제2 보의 내부에는 격벽이 각각 배치되어 있고, 상기 격벽 사이에 상기 액추에이터가 고정되는 버팀보.
The method of claim 6,
A partition wall is disposed in the interior of the first beam and the second beam, respectively, wherein the actuator is fixed between the partition walls.
삭제delete 삭제delete
KR1020110120391A 2011-11-17 2011-11-17 Strut KR101167475B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020110120391A KR101167475B1 (en) 2011-11-17 2011-11-17 Strut
PCT/KR2012/009732 WO2013073891A1 (en) 2011-11-17 2012-11-16 Strut and construction method using the strut

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110120391A KR101167475B1 (en) 2011-11-17 2011-11-17 Strut

Publications (1)

Publication Number Publication Date
KR101167475B1 true KR101167475B1 (en) 2012-07-19

Family

ID=46717181

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110120391A KR101167475B1 (en) 2011-11-17 2011-11-17 Strut

Country Status (2)

Country Link
KR (1) KR101167475B1 (en)
WO (1) WO2013073891A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019172587A1 (en) * 2018-03-07 2019-09-12 (주)핸스 Cover band of steel pipe strut connector, steel pipe strut connector having same, and steel pipe strut assembly

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4256134A1 (en) * 2021-05-27 2023-10-11 RMD Kwikform Limited A shoring arrangement
CN114182735A (en) * 2021-11-17 2022-03-15 中国一冶集团有限公司 Force transmission device and construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100582989B1 (en) * 2004-08-09 2006-05-25 주식회사 스마텍엔지니어링 Strut Preloading Jack
KR100777212B1 (en) 2007-03-13 2007-11-21 김찬수 A h-beam joint
KR100838736B1 (en) * 2007-02-27 2008-06-16 주식회사 포스코 Connection and junction apparatus of steel pipe for strut

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08144283A (en) * 1994-11-17 1996-06-04 Nishimatsu Constr Co Ltd Landslide protection wall timbering material
KR200172781Y1 (en) * 1999-09-10 2000-03-15 주식회사스마텍엔지니어링 Separate type preload jack

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100582989B1 (en) * 2004-08-09 2006-05-25 주식회사 스마텍엔지니어링 Strut Preloading Jack
KR100838736B1 (en) * 2007-02-27 2008-06-16 주식회사 포스코 Connection and junction apparatus of steel pipe for strut
KR100777212B1 (en) 2007-03-13 2007-11-21 김찬수 A h-beam joint

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019172587A1 (en) * 2018-03-07 2019-09-12 (주)핸스 Cover band of steel pipe strut connector, steel pipe strut connector having same, and steel pipe strut assembly
US11255065B2 (en) 2018-03-07 2022-02-22 Gyeong Sik SEO Cover band of steel pipe strut connector, steel pipe strut connector having same, and steel pipe strut assembly

Also Published As

Publication number Publication date
WO2013073891A1 (en) 2013-05-23

Similar Documents

Publication Publication Date Title
KR101344096B1 (en) Apparatus of guide casing for a ground excavator
KR101167475B1 (en) Strut
KR101179770B1 (en) Soil protection against build structure and the method
US4173421A (en) Shield apparatus for use in tunnelling or mining
KR20180061630A (en) Propelling jack’s installation method which expands repair hole space of semishield method
CN103912786A (en) Platform grating
JP4932358B2 (en) Drilling method of hole and construction method of drainage well
KR101479267B1 (en) Method for constructing tunnel by using pipe
KR101457877B1 (en) Assembled push pipe and underground structure construction method therewith
KR101227860B1 (en) Steel Pipe propulsion method using steel beam
JP6178030B1 (en) Prior construction method for earth retaining of excavation groove and supporting device used for the construction method
KR101318667B1 (en) The steel pipe propulsion system and method for the a movable reaction force member for agriculture waterway
KR20100055650A (en) Narrowness space diastole
KR102099282B1 (en) Partially enlarging apparatus for underground pipe and composite cast in place pile method using the same
CN109723453B (en) Method for reforming pipe jacking machine in tunnel
KR102134603B1 (en) Apparatus and method for constructing non-open cut structure
KR101548250B1 (en) Underground push box pipe and underground structure construction method therewith
CN114033477B (en) Rapid labor-saving safety rescue method
JPH1046580A (en) Earth retaining temporarily arranged form and underground piping execution work method using it
KR101022383B1 (en) Octopus tubular roof method
KR102298093B1 (en) Pre-loading jack to fill the gap between the wale and the retaining wall
JP2019094697A (en) Construction method of large cross section tunnel and excavation device for large cross section tunnel
KR101042556B1 (en) Fence supporting device for water works
KR200436405Y1 (en) Structure for constructing bracing for reinforcing support
KR102705934B1 (en) Mehtod of inserting a steel pipe into the ground

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee