JPH1046580A - Earth retaining temporarily arranged form and underground piping execution work method using it - Google Patents

Earth retaining temporarily arranged form and underground piping execution work method using it

Info

Publication number
JPH1046580A
JPH1046580A JP22436096A JP22436096A JPH1046580A JP H1046580 A JPH1046580 A JP H1046580A JP 22436096 A JP22436096 A JP 22436096A JP 22436096 A JP22436096 A JP 22436096A JP H1046580 A JPH1046580 A JP H1046580A
Authority
JP
Japan
Prior art keywords
frames
frame
panel
temporary
retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP22436096A
Other languages
Japanese (ja)
Other versions
JP2969151B2 (en
Inventor
Kazuo Taguchi
一男 田口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHINKO ENTERPRISE CO Ltd
SHINKO KIGYO KK
Original Assignee
SHINKO ENTERPRISE CO Ltd
SHINKO KIGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHINKO ENTERPRISE CO Ltd, SHINKO KIGYO KK filed Critical SHINKO ENTERPRISE CO Ltd
Priority to JP22436096A priority Critical patent/JP2969151B2/en
Publication of JPH1046580A publication Critical patent/JPH1046580A/en
Application granted granted Critical
Publication of JP2969151B2 publication Critical patent/JP2969151B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a work form and a work method by which a collapse of sediment can be reliably prevented and a movement can be smoothly performed in lightweight and underground piping work of a prescribed section can be extremely efficiently and safely performed and piping work can be performed with every short section without taking a place so much. SOLUTION: An earth retaining temporarily arranged form vertically moves along the inside of panel groups 10 whose plural panels 2 are erected on the left and right both sides of a long groove by excavating the ground surface for piping, and holds an interval between these left and right panel groups 10. In that case, hinge parts 19 are respectively arranged in a pair of left and right lower frames 3 and 3 extending in the longitudinal direction, a pair of left and right upper frames 3 and 3 vertically arranged at intervals from these respective frames 3 and either of these upper or lower left and right frames 3, and left and right-front and rear respective joints 4 whose one ends are joined to the hinge parts 19 and other ends are joined to either of other upper or lower left and right frames 3, respectively, lower jacks 5 and 5 which extend and contract the mutual left and right lower frames 3 and 3 and are arranged in front-rear positions and upper jacks 5 and 5 which extend and contract the mutual left and right upper frames 3 and 3 and are arranged in front-rear positions, are integrally assembled in a block shape, and are made freely suspendible. Underground piping is also laid by using this form.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は上下水道管等の配管
用の掘削溝に対し作業中における土砂崩壊による溝の崩
落を防止するために使用する土留め用仮設枠型及びその
土留め用仮設枠型を用いた埋設配管施工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary retaining frame and a temporary retaining frame used for preventing a collapse of a trench due to a collapse of earth and sand during a work in an excavation trench for pipes such as water supply and sewerage pipes. The present invention relates to a buried pipe construction method using a frame type.

【0002】[0002]

【従来の技術】従来のこの種の配管を地中に埋設するに
は先ず、配管設置箇所を掘削機械等で掘り起こし予め所
定の溝を設け、この溝の両側に複数のパネルによるパネ
ル群を順次埋め込み更に深く掘り下げた深溝を形成し、
この深溝の最深部に砂利等を敷き詰めた後配管し、この
配管上に配管固定用の土砂を被せた後パネル群を引き上
げてこの溝を埋設する施工法が行われていた。しかし、
この施工法では深溝とした左右のパネル群間は左右の耐
圧に非常に弱く、しばしばこのパネル群が深溝中央に向
けて変形して周りの土砂を深溝内に入れ、作業者を埋め
込むという恐れがあった。そこでこのパネル群間の深溝
側の左右に横木を通し、この横木間に更に梁を通して深
溝内の土砂崩壊を防ぐ方法がとられていた。
2. Description of the Related Art In order to bury a conventional pipe of this kind in the ground, first, a pipe installation site is dug up by an excavating machine or the like, a predetermined groove is provided in advance, and a panel group of a plurality of panels is sequentially arranged on both sides of the groove. Embedding to form a deep groove deeper,
There has been a construction method in which gravel or the like is spread over the deepest portion of the deep groove, piping is carried out, earth and sand for pipe fixing are placed on the piping, and then a panel group is pulled up to bury the groove. But,
With this construction method, the left and right panel groups that are deep trenches are very weak in the left and right pressure resistance, and often this panel group is deformed toward the center of the deep trench and the surrounding earth and sand is put into the deep trench, and there is a risk that the worker will be buried. there were. Therefore, a method has been adopted in which a crosspiece is passed on the left and right sides of the deep groove between the panel groups, and a beam is further inserted between the crosspieces to prevent collapse of earth and sand in the deep groove.

【0003】[0003]

【発明が解決しようとする課題】このような従来の方法
では横木、梁の取り付けが難しくまた長い距離の配管が
終わるまで左右のパネル群、横木、梁は取り除くことが
できず、しかも特に道路を掘削して配管を行なう場所で
は配管工事が終了するまで交通の大きな弊害となってい
た。それゆえ、非常におおきな一枚板の金属製のパネル
を左右に設け、この左右間にジャッキを固定した土留め
用仮設枠を設け、この土留め用仮設枠を順次並設し更に
積み重ね、土留め用仮設枠内の土を掘削した後配管する
方法もあるが、この方法では土留め用仮設枠の重量が非
常にかさ張り、配管埋設後にこの土留め用仮設枠を引き
上げることが困難であり、移動もできず、特に狭い道路
や交通量の多い道路では対応することができないという
問題があった。又、土留め用仮設枠のパネルが非常に重
くて、組立作業が煩わしく、作業効率が大幅に低いとい
う問題があった。
In such a conventional method, it is difficult to attach the crossbars and beams, and the left and right panel groups, crossbars and beams cannot be removed until a long piping is completed. In places where excavation and plumbing are performed, traffic was a major obstacle until the plumbing work was completed. Therefore, a very large one-piece metal panel is provided on the left and right, temporary retaining frames for fixing the jacks are provided between the left and right, and the temporary retaining frames are sequentially arranged side by side, and further stacked. There is also a method of piping after excavating the soil in the retaining temporary frame, but in this method, the weight of the retaining temporary frame is very bulky, and it is difficult to pull up the temporary retaining frame after burying the pipe, There is a problem that it cannot be moved, and it cannot cope especially on narrow roads or roads with heavy traffic. In addition, there is a problem that the panel of the temporary retaining frame is very heavy, the assembling work is troublesome, and the working efficiency is significantly low.

【0004】本発明はこのような従来技術が有していた
問題点を解決するためのものであって、構造簡単にして
確実に土砂の崩壊を防ぎ、軽量で移動が非常にスムーズ
に行え、所定区間の地中配管作業を極めて効率よく行う
ことができるようにしたものである。また、配管作業を
管体1本または2,3本を各単位ブロックとして順次的
に配管できるので、場所をとらずに作業できて容易に管
を埋設できる土留め用仮設枠型及びそれを用いた埋設配
管施工法を提供するにある。
The present invention has been made to solve the above-mentioned problems of the prior art, and has a simple structure and reliably prevents the collapse of earth and sand. Underground piping work in a predetermined section can be performed extremely efficiently. In addition, since one or two or three pipes can be sequentially piped for each unit block in the pipe work, a temporary retaining frame type for earth retaining, which can be installed without taking up space, and which can easily embed the pipes, and the use thereof. To provide a buried piping method.

【0005】[0005]

【課題を解決するための手段】本発明に係る土留め用仮
設枠型1は、配管用に地面を掘削した長溝の左右両側に
複数のパネル2を立設したパネル群10の内側に沿って
上下動し、これら左右のパネル群10の間隔を保持する
土留め用仮設枠型であって、前後方向に延びた左右一対
の下部フレーム3,3と、この各フレームと上下に間隔
を隔てた左右一対の上部フレーム3,3と、これら上下
何れかの左右のフレームにそれぞれヒンジ部19を設
け、該ヒンジ部に一端を結合し、他端を上下何れか他の
左右のフレームにそれぞれ結合した左右・前後の各ジョ
イント4と、左右の下部フレーム3,3間を伸縮させる
前後位置に配設された下部ジャッキ5,5と、左右の上
部フレーム3,3間を伸縮させる前後位置に配設された
上部ジャッキ5,5とをブロック状に組み立てて一体化
し、吊り下げ自在に構成したものである。
A temporary retaining frame mold 1 according to the present invention is provided along a panel group 10 in which a plurality of panels 2 are erected on both right and left sides of a long groove excavated for piping. It is a temporary retaining frame type for retaining the earth, which moves up and down to maintain the space between the left and right panel groups 10, and a pair of left and right lower frames 3, 3 extending in the front-rear direction, and vertically spaced from each frame. A pair of left and right upper frames 3, 3 and a hinge portion 19 is provided on each of the upper and lower left and right frames, one end is connected to the hinge portion, and the other end is connected to any of the upper and lower other left and right frames. Left and right joints 4, lower jacks 5, 5 arranged at front and rear positions to extend and contract between left and right lower frames 3, 3, and front and rear positions arranged at right and left upper frames 3, 3 to extend and contract Upper jack 5,5 The integrated assembled into blocks, which is constituted freely suspended.

【0006】また、土留め用仮設枠型を用いた埋設配管
施工法は、土留め用仮設枠型1の長手方向両側に、複数
のパネル2…の一側を順次重ね合わせて並設立設した左
右のパネル群10,10を形成して枠型1と一体化する
工程と、予め掘削した浅い溝7a内にこの土留め用仮設
枠型と左右のパネル群10,10とを上方より納める工
程と、これら左右のパネル群10と枠型1との連結を解
除してパネル群10,10を地中に打込む工程と、これ
ら打込みパネル群10,10の間に位置し土留め用仮設
枠型1の下方に位置する土を掘り下げ順次深溝7とする
工程と、各パネル群10,10をさらに深く打ち込む工
程と、土留め用仮設枠型1の左右のフレーム間を左右の
パネル群に向かって張った状態とする工程と、掘削した
深溝7への配管と配管固定用の盛り土とを行う工程と、
土留め用仮設枠型1の左右のフレーム3,3間を緩めパ
ネル群10を盛り土の上方まで引き上げる工程と、土留
め用仮設枠型1を所要高さ位置まで引き上げる工程と、
各パネル2…と土留め用仮設枠型1とを再び連結結合す
る工程と、この結合したパネル群と土留め用仮設枠型と
を次作業位置の浅い溝内へ移動する工程と、前記配管済
みの溝を埋設する工程とを順次繰り返しながら所定長さ
区間の配管を行うようにしたものである。
In the buried piping method using the temporary retaining frame mold, one side of a plurality of panels 2... Is sequentially installed on both sides of the temporary retaining frame mold 1 in the longitudinal direction. A step of forming the left and right panel groups 10 and 10 and integrating them with the frame die 1 and a step of placing the soil retaining temporary frame die and the left and right panel groups 10 and 10 from above in a shallow groove 7a excavated in advance. A step of releasing the connection between the left and right panel groups 10 and the frame die 1 and driving the panel groups 10 and 10 into the ground; and a temporary retaining frame located between the driven panel groups 10 and 10. A step of digging down the soil located below the mold 1 to sequentially form the deep groove 7, a step of driving each panel group 10, 10 deeper, and a step between the left and right frames of the temporary retaining frame mold 1 toward the left and right panel groups. The process of making it stretched and the piping to the excavated deep groove 7 And performing a fill for the tube fixed,
A step of loosening the space between the left and right frames 3 and 3 of the retaining frame temporary mold 1 to raise the panel group 10 above the embankment, and a step of lifting the retaining frame temporary frame mold 1 to a required height position;
Connecting each panel 2 to the temporary retaining frame mold 1 again; moving the combined panel group and the temporary retaining frame mold into a shallow groove at the next work position; The piping of a predetermined length section is performed while sequentially repeating the step of burying the already-formed groove.

【0007】[0007]

【発明の実施の形態】本発明を実施するに当っては、前
記の各パネル2…を上下方向に伸びる連結用の縦溝8を
備えたものとし、前記上下の各フレーム3…が長手方向
に伸びる連結用の横溝11を備えたものとして、これら
の両溝8,11を介して各パネル2と各フレーム3とを
連結固定して使用するようにしたり、前記土留め用仮設
枠型における左右一対とした上部フレーム3,3に対し
て、棒・ポール等の桿材61…を四方から立設し、これ
らの桿材61にパネル群10の上方を通って横外方に延
び、下方にキャスター22を固設した支持脚6を取り付
けて前後方向に仮設枠型1の全体を移動できるようにし
ておくと、配管作業後における仮設枠型の移動を円滑迅
速に行なうことができる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS In carrying out the present invention, each of the panels 2 is provided with a connecting vertical groove 8 extending vertically, and each of the upper and lower frames 3 is formed in a longitudinal direction. The panel 2 and each frame 3 are connected and fixed through the two grooves 8 and 11 for use in the temporary retaining frame mold. A pair of rods 61, such as rods and poles, is erected from the four sides with respect to the upper frame 3, 3 which is a pair of right and left. By attaching the support legs 6 on which the casters 22 are fixed to the temporary frame die 1 so that the entire temporary frame die 1 can be moved in the front-rear direction, the temporary frame die can be moved smoothly and quickly after the piping work.

【0008】[0008]

【実施例】以下、本発明の実施例を図面に基づいて説明
する。図1に示した土留め用仮設枠型1は配管用の溝の
左右両側に複数のパネル2…の一側を順次重ね合わせて
並設立設したパネル群10,10を形成して、これら左
右のパネル群10,10間に沿って上下動する、左右一
対の下部フレーム3,3と、左右一対の上部フレーム
3,3と、これらの下部フレームと上部フレームとの上
下間を結合する左右・前後の4か所に配置された4つの
ジョイント4,4,4,4と、左右のフレームの間隔幅
を伸縮させる上下・前後の4か所に配置された4つのジ
ャッキ5,5,5,5と、左右の上部フレーム3,3の
長手方向の両端近くの上面に溶接して突出させた4つの
小突起62…によって構成してある。
Embodiments of the present invention will be described below with reference to the drawings. The temporary retaining frame mold 1 shown in FIG. 1 forms panel groups 10, 10 in which one side of a plurality of panels 2... And a pair of left and right lower frames 3, 3 that move up and down along the panel groups 10, 10, and a pair of left and right upper frames 3, 3, and a pair of left and right connecting upper and lower portions of the lower and upper frames. Four joints 4,4,4,4 arranged in four places in front and back and four jacks 5,5,5 arranged in four places in up, down, front and back to expand and contract the interval width of the left and right frames 5 and four small projections 62 welded to the upper surfaces near both ends in the longitudinal direction of the left and right upper frames 3 and 3.

【0009】而して、これら4つの小突起62…には、
ピン穴が横方向に穿設してあり、このピン穴に吊り下げ
チエンなり吊り下げワイヤーなりの下端のフックを差し
込み連結して土留め用仮設枠型1の全体を吊り上げ吊り
下げできるようにしてある。
[0009] The four small projections 62 ...
A pin hole is bored in the lateral direction, and a hook at the lower end of a hanging chain or a hanging wire is inserted into the pin hole and connected so that the entire temporary retaining frame mold 1 can be lifted and suspended. is there.

【0010】該実施例に示した土留め用仮設枠型1の支
持手段は、これらの小突起62…のそれぞれに、パイプ
材からなる桿材61の下端をピン連結して上方に向かっ
て突出させ、この桿材61の上部に、この桿材61にピ
ン連結する筒体63と、下方に設けたキャスター22と
上下伸縮調整ハンドル23とを備えた外枠64と、これ
らの筒体63と外枠64とをパネル群10の上方を通っ
て横外方に連結する横枠65とからなる支持脚6を連結
して、この支持脚6と前記桿材61とで枠型1を支持す
るようにしたものである。
The supporting means of the temporary retaining frame mold 1 shown in the embodiment is constructed by connecting the lower end of a rod 61 made of a pipe to each of these small projections 62 and projecting upward. A cylindrical body 63 connected to the rod member 61 with a pin, an outer frame 64 provided with a caster 22 and a vertical expansion / contraction adjustment handle 23 provided below, and a cylindrical body 63 A support leg 6 composed of a horizontal frame 65 connecting the outer frame 64 to the outside of the panel group and passing it laterally outward is connected, and the frame die 1 is supported by the support leg 6 and the rod 61. It is like that.

【0011】ここにいう配管用の溝7内に立設するパネ
ル2は鉄、アルミニウム等の金属材料にて成形されてお
り、図7及び図8に示したように、内面側の長手方向に
沿って上下方向にスライド溝8を有する横断面チャンネ
ル型のカード部9を備えている。該パネル2は一側端を
次の同一形状のパネル2の他側端と重ね合わせて順次並
設し、パネル群10を構成している。
The panel 2 erected in the pipe groove 7 is formed of a metal material such as iron, aluminum or the like. As shown in FIG. 7 and FIG. A channel section 9 having a channel shape in cross section having a slide groove 8 in the vertical direction is provided. The panel 2 is arranged side by side with one side end thereof superimposed on the other side end of the next panel 2 of the same shape to form a panel group 10.

【0012】土留め用仮設枠型1の左右上下の各フレー
ム3は、図7及び図8に示したように、前後方向(パネ
ル群の幅方向)に延びており、相対する前端部及び後端
部にそれぞれ下部ジャッキ5,5及び上部ジャッキ5,
5を連結して、左右のフレーム3、3間の間隔を伸縮調
整するようにしてある。また、これらの各フレーム3…
は、図8に示したように、上面のパネル群10に近い面
(外側面)に片寄った位置に後述するスライド用ロック
ボルトの先端を貫通させる長孔11を保持する側壁板1
2をフレームの長手方向に沿って設けてある。これら左
右の下部フレーム3と左右の上部フレーム3とは同一形
状のものである。これらのフレーム3とパネル群10と
を結合するスライド用ロックボルト13は、図8に示す
ように軸部14の中央にクサビ用孔15を形成し、先端
部にパネル2のスライド溝8の中に位置してスライドす
るスライドプレート16を備えている。
As shown in FIGS. 7 and 8, each of the left, right, upper and lower frames 3 of the retaining frame mold 1 extends in the front-rear direction (the width direction of the panel group). Lower jacks 5 and 5 and upper jacks 5
5, the distance between the left and right frames 3, 3 is adjusted to expand and contract. Each of these frames 3 ...
As shown in FIG. 8, a side wall plate 1 holding an elongated hole 11 for penetrating the tip of a slide lock bolt to be described later at a position deviated from a surface (outside surface) near the panel group 10 on the upper surface.
2 are provided along the longitudinal direction of the frame. The left and right lower frames 3 and the left and right upper frames 3 have the same shape. As shown in FIG. 8, a slide lock bolt 13 for connecting the frame 3 and the panel group 10 has a wedge hole 15 formed at the center of a shaft portion 14 and a slide groove 8 of the panel 2 at a tip portion. And a slide plate 16 that slides.

【0013】該スライド用ロックボルト13の取り付け
は、パネル2のスライド溝8内にスライドプレート16
挿通後、フレーム3の長孔11を貫通した軸部14の先
端に座金17を通して、この座金を側壁板12に接当さ
せた状態で、スライド用ロックボルト13のクサビ用孔
15にクサビ18を打ち込む。このようにして、各パネ
ル2…と各フレーム3とを連結固定する。
The slide lock bolt 13 is mounted on the slide plate 16 in the slide groove 8 of the panel 2.
After the insertion, a wedge 18 is inserted into the wedge hole 15 of the slide lock bolt 13 in a state where the washer 17 is passed through the washer 17 at the tip of the shaft portion 14 penetrating the elongated hole 11 of the frame 3 and the washer is brought into contact with the side wall plate 12. Drive in. Thus, each panel 2... And each frame 3 are connected and fixed.

【0014】このようにして、それぞれのパネル2…に
対してスライド用ロックボルト13を取り付けクサビ1
8を打ち込み固定することによって、個々のパネル2と
フレーム3とを連結固定し、スライド用ロックボルト1
3のクサビ18を緩めることによって、各フレーム3と
各パネル2とがその相対摺接面に沿って上下動すること
ができるようになっている。このパネル2と各フレーム
3とを結合するスライド用ロックボルト13と座金17
とクサビ18とは各パネルごとにそして各フレームごと
にそれぞれ配置されている。このロックボルト13は、
クサビ18に代えてスライド用ロックボルト13の軸部
にネジを形成し、締め付けナットで螺着するようにして
もよい。
In this manner, the slide lock bolts 13 are attached to the respective panels 2.
8, the individual panels 2 and the frame 3 are connected and fixed, and the slide lock bolts 1 are fixed.
By loosening the wedge 18 of each of the frames 3, each frame 3 and each panel 2 can move up and down along the relative sliding contact surface. A lock bolt 13 for sliding and a washer 17 for connecting the panel 2 to each frame 3.
The wedges 18 are arranged for each panel and for each frame. This lock bolt 13
Instead of the wedge 18, a screw may be formed on the shaft of the slide lock bolt 13 and screwed with a fastening nut.

【0015】該実施例に示した左右上下の各フレーム3
…間に配設してある各ジャッキ5…は、全て同一のター
ンバックル式のジャッキであって、下部フレームの前後
位置間及び上部フレームの前後位置間をそれぞれ別個に
伸縮させることができるようにしてある。したがって、
土留め用仮設枠型1はこの上下前後の各ジャッキ5の伸
縮によって掘削される溝7の左右間幅に伴って左右のフ
レーム間の間隔を広狭調整することができるようにして
ある。このジャッキ5は、油圧式・水圧式または空圧式
のジャッキを採用してもよいことは言うまでもない。
Each of the left, right, upper and lower frames 3 shown in the embodiment
The jacks 5 arranged in between are all the same turnbuckle type jacks, which can be separately extended and retracted between the front and rear positions of the lower frame and the front and rear positions of the upper frame. It is. Therefore,
The temporary retaining frame mold 1 can adjust the interval between the left and right frames in accordance with the width between the left and right of the groove 7 excavated by the expansion and contraction of the jacks 5 at the front and rear and the front and rear. It goes without saying that the jack 5 may employ a hydraulic, hydraulic or pneumatic jack.

【0016】上下の各フレーム3,3間を連結する各ジ
ョイント4は、全て同一構造としてある。このジョイン
ト4は、図1,図7に示したように、それぞれの下部フ
レーム3の上面に突出したヒンジ部材19にヒンジ結合
した下部ジョイント部材20とこの下部ジョイント部材
20との間で上下伸縮自在で上部フレーム3の下面に連
結した上部ジョイント部材21とからなっている。土留
め用仮設枠型1はこれらの各伸縮調整ジョイント4によ
って下部フレーム3と上部フレーム3との間隔を調整す
ると共に前記各ジャッキ5の伸縮により各フレーム3…
をパネル側に向けて張り出させたり、溝7の中央側に向
けて傾斜させてパネル側より引き離したりすることがで
きるようになっている。
The joints 4 connecting the upper and lower frames 3 have the same structure. As shown in FIGS. 1 and 7, the joint 4 is vertically movable between a lower joint member 20 hinged to a hinge member 19 projecting from the upper surface of each lower frame 3 and the lower joint member 20. And an upper joint member 21 connected to the lower surface of the upper frame 3. The temporary retaining frame mold 1 adjusts the distance between the lower frame 3 and the upper frame 3 by means of these telescopic adjustment joints 4 and expands and contracts the jacks 5 so that each frame 3.
Can be protruded toward the panel side, or can be inclined toward the center side of the groove 7 to be separated from the panel side.

【0017】上部フレーム3の上面から上方に向けて突
出させた桿材61の上部に連結したキャスター22付き
の支持脚6も全て同一の形状である。各ジャッキ5を伸
長させて各フレーム3をパネル側向けて突っ張らせる場
合は、各キャスター22を図4に示すようにパネル29
から離れるように溝の外側に向けて移動させ、また、ジ
ャッキ5を縮めて土留め用仮設枠型1の全体を次作業の
前方に向けて移動させる場合は、キャスター22を図
1,図6に示すように前後方向に向けて移動するように
して使用する。
The support legs 6 with the casters 22 connected to the upper portions of the rods 61 projecting upward from the upper surface of the upper frame 3 are all of the same shape. When each jack 5 is extended and each frame 3 is stretched toward the panel side, each caster 22 is connected to a panel 29 as shown in FIG.
To move the entire temporary retaining frame mold 1 toward the front of the next operation by moving the caster 5 toward the outside of the groove so as to move away from the groove, and moving the caster 22 toward the front of the next operation, FIG. It is used by moving in the front-rear direction as shown in FIG.

【0018】この土留め用仮設枠型1を用いた配管施工
法は、予め各パネル2のスライド溝8内にスライド用ロ
ックボルト13のスライドプレート16を挿通し、スラ
イド用ロックボルトの先端をフレーム3の側壁板12の
長孔11に貫通させて座金17とクサビ18とにてパネ
ルとフレームとを結合し 各ジャッキ5を張ってパネル
とフレームとが離れないように連結し、図1に示すよう
に掘削した浅い溝7a内にクレーン等によりパネル群1
0と共に土留め用仮設枠型1を納める。また先に掘削し
た浅い溝7a内の左右にパネル群10をぞれぞれ打ち込
んだ後土留め用仮設枠型1をパネル群間に入れてスライ
ド用ロックボルトにてパネルとフレームとを結合するよ
うにしてもよい。
In the piping method using the temporary retaining frame mold 1, a slide plate 16 of a lock bolt 13 for slide is inserted into a slide groove 8 of each panel 2 in advance, and a tip of the lock bolt for slide is connected to a frame. 3, the panel and the frame are connected to each other by a washer 17 and a wedge 18 through the long hole 11 of the side wall plate 12, and each jack 5 is stretched and connected so that the panel and the frame are not separated from each other, as shown in FIG. Group 1 with a crane etc. in the shallow groove 7a excavated as
Place the temporary retaining frame mold 1 together with 0. After the panel group 10 is driven into each of the left and right sides of the shallow groove 7a excavated earlier, the temporary retaining frame mold 1 is inserted between the panel groups, and the panel and the frame are joined by the lock bolts for sliding. You may do so.

【0019】次に、浅い溝7aを更に深く掘り下げ深溝
7とした後に土留め用仮設枠型1の上部の各フレーム3
の各クサビ18を抜き取る(図2)。このクサビ18を
抜き取り、上部のジャッキ5を縮めることによって図3
に示すように左右フレーム、左右ジョイントが左右より
中央に向けて傾斜することとなり、フレームとパネルと
が離れてパネルをよりスムーズに打ち込みやすくするこ
とができる。
Next, after the shallow groove 7a is dug deeper to form the deep groove 7, each of the frames 3 above the temporary retaining frame 1
Of each wedge 18 (FIG. 2). By removing the wedge 18 and contracting the upper jack 5, FIG.
As shown in (2), the left and right frames and the left and right joints are inclined toward the center from the left and right, so that the frame and the panel are separated from each other, and the panel can be more easily driven.

【0020】次に、パネルを更に深く順次打ち込んだ
後、各キャスターを溝7の左右より離した方向に引っ張
った状態にし、各ジャッキ5を伸ばして各フレーム3を
パネル2と共に溝7の左右側壁に張る(図4)。この操
作によりパネルを溝より外側に向けて押圧するために外
側の土砂が溝に入り埋まることはない。更にこの状態
で、溝7内の最深部に敷設用の管体Pを安定させるため
に土砂を敷き詰めて加圧した後配管し、その上に敷設配
Pを固定させる土砂を敷き詰める。
Next, after the panels are sequentially driven deeper, each caster is pulled in a direction away from the left and right sides of the groove 7, and each jack 5 is extended to extend each frame 3 together with the panel 2 to the left and right side walls of the groove 7. (Fig. 4). By this operation, since the panel is pressed outward from the groove, the outside earth and sand does not enter the groove and is buried. Further, in this state, in order to stabilize the pipe P for laying at the deepest portion in the groove 7, the earth and sand are spread and pressurized, and then the pipe is laid thereon, and the earth and sand for fixing the laying arrangement P is spread thereon.

【0021】この作業後土留め用仮設枠型1の各ジャッ
キ5をわずかに緩めて土留め用仮設枠型とパネルとの結
合を緩和し、各パネルを溝7内の土砂の上方まで引き抜
いた状態とした後土留め用仮設枠型1の上部の各フレー
ム3のスライド用ロックボルト13のクサビ用孔15に
クサビ18を打ち込めば、パネルとフレームとが結合す
る。そして各キャスター22の位置を前後方向に軌道修
正する(図5)。
After this operation, each jack 5 of the temporary retaining frame mold 1 was slightly loosened to ease the connection between the temporary retaining frame mold and the panel, and each panel was pulled out above the soil in the groove 7. When the wedge 18 is driven into the wedge hole 15 of the sliding lock bolt 13 of each frame 3 on the upper part of the temporary soil retaining frame mold 1 in the state, the panel and the frame are joined. Then, the trajectory of the position of each caster 22 is corrected in the front-rear direction (FIG. 5).

【0022】次いで、前後方向のキャスターに沿って土
留め用仮設枠型1と共にパネル群10,10とを一体と
して前方の次作業位置に移動し、次ぎの浅い溝7a内に
水平移動させる(図6)。このようにして配管を完了し
た前作業個所を埋め戻す。このようにして、順次所定の
長さ区間に配管を行う。
Next, the panel groups 10 and 10 are moved together with the temporary retaining frame mold 1 along the casters in the front-rear direction to the next work position in front, and horizontally moved into the next shallow groove 7a (FIG. 6). In this way, the previous work site where the piping is completed is backfilled. In this way, piping is sequentially performed in a predetermined length section.

【0023】以上の実施例において、フレーム3を強固
な角管体とし、その上面にパネル連結用の横長孔11を
形成するための側壁板12をフレームの長手方向に沿っ
て設けてある構造としてあるのは、バックホウやショベ
ルによる土砂の掘削作業時に、スライド用ロックボルト
13がフレーム3から掘削溝7内に向けて突出している
と、ショベル等がボルト13に引っ掛かって作業の支障
となることを防止するための配慮である。
In the above embodiment, the frame 3 is made of a rigid rectangular tube, and the side wall plate 12 for forming the horizontally long hole 11 for panel connection is provided on the upper surface thereof along the longitudinal direction of the frame. The reason is that, when excavating earth and sand with a backhoe or excavator, if the slide lock bolt 13 protrudes from the frame 3 toward the inside of the excavation groove 7, the excavator or the like may be caught by the bolt 13 and hinder the work. This is a consideration for prevention.

【0024】図9に示した実施例は、フレーム3の別実
施例を示したもので、該実施例のフレーム3は、2本の
角管体31,31を所定の間隔を隔てて上下に配置し、
これらを長手方向の両端で連結板32で連結して一体化
し、ロックボルト13用の座金17をこの間隔内に入り
込む凹入部をもった側面視変形コの字形のものとし、こ
の間隔内においてナット締め付けができるようにしたも
のである。
The embodiment shown in FIG. 9 shows another embodiment of the frame 3. In the embodiment, the frame 3 is composed of two rectangular tubes 31, 31 vertically separated by a predetermined interval. Place,
These are connected by a connecting plate 32 at both ends in the longitudinal direction to be integrated, and the washer 17 for the lock bolt 13 is formed into a U-shape having a concave portion into which the recess is inserted into the space. It is designed to be able to be tightened.

【0025】また、図10に示した実施例は、フレーム
3の更に別の実施例について示したもので、該実施例の
フレーム3は、前記図9の実施例の場合と同様に、2本
の角管体31,31を所定の間隔を隔てて上下に配置
し、これらを長手方向の両端で連結板32で連結して一
体化するとともに、下部管体31の下面側に別の長尺板
33を一体的に連結して、下部管体31の内面側に所要
幅だけ突出している構造としたものである。このように
して、該長尺板33の突出幅の範囲内においてロックボ
ルト13のナット締めを行うようにしたものである。
The embodiment shown in FIG. 10 shows another embodiment of the frame 3. The frame 3 of this embodiment has two frames as in the case of the embodiment shown in FIG. Are vertically arranged at predetermined intervals, and are connected and integrated by connecting plates 32 at both ends in the longitudinal direction, and another long tube is provided on the lower surface side of the lower tubular body 31. The plates 33 are integrally connected to each other so as to project from the inner surface of the lower tube 31 by a required width. Thus, the nut of the lock bolt 13 is tightened within the range of the protruding width of the long plate 33.

【0026】[0026]

【発明の効果】以上のように、本発明にいうところの土
留め用仮設枠型は、配管のために掘削した長溝の左右両
側にパネルを立設し、この左右のパネル群の間を保持す
る土留め用仮設枠型であって、パネル群の内側に沿って
上下動し前後方向に延びた左右一対の下部のフレーム
と、その各フレームと上下の間隔を隔てた左右一対の上
部のフレームと、左右下部の各フレームに各ヒンジ部を
設け、該ヒンジ部に一端を結合し、他端を左右上部の各
フレームにそれぞれ結合した左右、前後の各ジョイント
と、左右下部のフレーム間を伸縮させる前後下部の各ジ
ャッキと、左右上部のフレーム間を伸縮させる前後上部
の各ジャッキとを一体的に有する構造としたので、土留
め用仮設枠型の全体をパネル群とは別に、または、パネ
ル群とともに任意に移動させることができ、使用時にあ
っても、各パネルとの連結を解いて個々にパネルのみを
地中に打ち込み、地中より引き抜くことができ、パネル
群とは別に、フレーム間の上下間隔調整並びに幅方向間
隔調整・角度調整等を自由に行うことができるので、管
体の埋設工事を効率よく円滑に行うことができるという
顕著な効果を有するものである。
As described above, the temporary frame type for retaining the soil according to the present invention has panels erected on both left and right sides of a long groove excavated for piping, and holds between the left and right panel groups. A pair of left and right lower frames that move up and down along the inside of the panel group and extend in the front-rear direction, and a pair of left and right upper frames separated from each other by up and down. And left and right, front and rear joints with one end connected to each hinge at the lower left and right frames, and one end connected to the hinges, and the other end connected to each upper left and right frame, and between the left and right lower frames The front and rear lower jacks to be made and the front and rear upper jacks that expand and contract between the left and right upper frames are integrated into one structure, so the entire temporary retaining frame type for earth retaining is separate from the panel group, or the panel Optionally with a group It can be moved, and even when in use, it can be disconnected from each panel and only the panels can be driven into the ground individually and pulled out from the ground, and apart from the panel group, the vertical spacing between frames can be adjusted In addition, since it is possible to freely adjust the interval in the width direction and the angle, etc., there is a remarkable effect that the burying work of the pipe can be performed efficiently and smoothly.

【0027】また、この土留め用仮設枠型を用いた埋設
配管施工法にあっては、複数のパネルの一側を順次重ね
合わせて並設した左右のパネル群を形成して土留め用仮
設枠型と一体化する工程と、予め掘削した浅い溝内にこ
の土留め用仮設枠型と左右のパネル群とを上方より納め
る工程と、土留め用仮設枠型内の土を掘り下げ深溝とす
る工程と、パネル群をさらに深く打ち込む工程と、土留
め用仮設枠型の左右のフレーム間を左右のパネル群に向
かって張った状態とする工程と、深溝に配管し配管固定
用の盛り土する工程と、土留め用仮設枠型の左右のフレ
ーム間を緩めパネル群を盛り土上方まで引き上げる工程
と、各パネルと土留め用仮設枠型とを結合する工程と、
この結合したパネル群と土留め用仮設枠型とを前方の浅
い溝内へ前方移動し、後方の配管済みの深溝を埋設する
工程とを繰り返し所定の配管を行うこととしているの
で、掘削溝内の土砂の埋設を確実に防ぎ安全な状態下に
おいて効率よく配管作業を行うことができ、特に狭い道
路や交通量の多い道路での配管作業にあっても長区間の
工事場所を必要とすることなく、短区間毎に順次的に配
管作業を行うことができる利点がある。
Further, in the method of burying piping using the temporary retaining frame type, the left and right panel groups in which one side of a plurality of panels are sequentially overlapped to form a side-by-side panel are formed. A step of integrating with the frame form, a step of placing the retaining frame temporary frame form and the left and right panel groups from above in a shallow groove excavated in advance, and digging down the soil in the retaining form temporary frame form into a deep groove. Process, a step of driving the panel group further deeply, a step of stretching the left and right frames of the temporary retaining frame mold toward the left and right panel groups, and a step of piping in a deep groove and embedding for pipe fixing. And a step of loosening the space between the left and right frames of the retaining frame temporary frame mold and lifting the panel group above the embankment, and a step of combining each panel with the retaining frame temporary frame mold,
The step of moving the combined panel group and the temporary retaining frame mold into the shallow groove in the front and burying the deep pipe already formed in the rear is repeated to perform predetermined piping, so that the inside of the excavation groove is That the burial of earth and sand can be reliably prevented and plumbing can be performed efficiently in a safe condition, and especially when plumbing on narrow roads or roads with heavy traffic, a long section of construction work is required. Therefore, there is an advantage that the piping work can be sequentially performed for each short section.

【図面の簡単な説明】[Brief description of the drawings]

【図1】土留め用仮設枠型とパネルとを溝内に入れた状
態を示す正面図。
FIG. 1 is a front view showing a state in which a temporary retaining frame mold and a panel are put in a groove.

【図2】土留め用仮設枠型内の溝を掘削し深溝とした状
態を示す正面図。
FIG. 2 is a front view showing a state in which a trench in a temporary retaining frame mold is excavated to be a deep trench.

【図3】土留め用仮設枠型のジャッキを縮めた状態を示
す正面図。
FIG. 3 is a front view showing a state where a temporary retaining frame type jack for earth retaining is contracted.

【図4】土留め用仮設枠型のジャッキを伸ばした状態を
示す正面図。
FIG. 4 is a front view showing a state where a temporary retaining frame type jack for earth retaining is extended.

【図5】土留め用仮設枠型の溝内に配管した状態を示す
正面図。
FIG. 5 is a front view showing a state in which piping is provided in a groove of a temporary retaining frame type.

【図6】土留め用仮設枠型とパネルとを前方へ移動させ
た状態を示す側面図。
FIG. 6 is a side view showing a state in which the temporary retaining frame and the panel are moved forward.

【図7】土留め用仮設枠型とパネルとを示す斜視図。FIG. 7 is a perspective view showing a temporary retaining frame mold and a panel.

【図8】土留め用仮設枠型のフレームとパネルとを示す
要部の斜視図。
FIG. 8 is a perspective view of a main part showing a temporary frame type frame for retaining the earth and a panel.

【図9】別実施例を示す図8相当部分の斜視図。FIG. 9 is a perspective view of a portion corresponding to FIG. 8 showing another embodiment.

【図10】更に別の実施例を示す図8相当部分の斜視
図。
FIG. 10 is a perspective view of a portion corresponding to FIG. 8 showing still another embodiment.

【符号の説明】[Explanation of symbols]

1 土留め用仮設枠型 2 パネル 3 フレーム 4 ジョイント 5 ジャッキ 6 支持脚 7 溝 7a 浅い溝 8 スライド溝 9 ガード部 10 パネル群 11 長孔 19 ヒンジ部 DESCRIPTION OF SYMBOLS 1 Temporary frame type for earth retaining 2 Panel 3 Frame 4 Joint 5 Jack 6 Support leg 7 Groove 7a Shallow groove 8 Sliding groove 9 Guard part 10 Panel group 11 Long hole 19 Hinge part

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 配管用に地面を掘削した長溝の左右両側
に複数のパネル(2)…を立設したパネル群(10)の内側に
沿って上下動し、これら左右のパネル群(10)の間隔を保
持する土留め用仮設枠型であって、上記前後方向に延び
た左右一対の下部フレーム(3),(3)と、この各フレーム
と上下に間隔を隔てた左右一対の上部フレーム(3),(3)
と、これら上下何れかの左右のフレームにそれぞれヒン
ジ部(19)…を設け、該ヒンジ部に一端を結合し、他端を
上下何れか他の左右のフレームにそれぞれ結合した左右
・前後のジョイント(4)…と、左右の下部フレーム(3),
(3)間を伸縮させる前後位置に配設された下部ジャッキ
(5),(5)と、左右の上部フレーム間を伸縮させる前後位
置に配設された上部ジャッキ(5),(5)とをブロック状に
組み立てて一体化し、吊り下げ自在に構成したことを特
徴とする土留め用仮設枠型。
1. A panel group (10) in which a plurality of panels (2)... Are erected on both left and right sides of a long groove excavated for a pipe, and move up and down along the inside of the panel group (10). A pair of left and right lower frames (3), (3) extending in the front-rear direction, and a pair of right and left upper frames vertically spaced from each other. (3), (3)
Left and right and front and rear joints having one end connected to the hinge portion and the other end connected to the other upper or lower left or right frame, respectively. (4) ... and the left and right lower frames (3),
(3) Lower jack located at the front and rear position to expand and contract the space
(5), (5) and upper jacks (5), (5) arranged at the front and rear positions to extend and contract between the left and right upper frames are assembled into a block shape, integrated, and configured to be freely suspended. Temporary frame type for earth retaining.
【請求項2】 配管用に地面を掘削した長溝の左右両側
に複数のパネル(2)…を立設したパネル群(10)の内側に
沿って上下動し、これら左右のパネル群(10)の間隔を保
持する土留め用仮設枠型であって、上記前後方向に延び
た左右一対の下部フレーム(3),(3)と、この各フレーム
と上下に間隔を隔てた左右一対の上部フレーム(3),(3)
と、これら上下何れかの左右のフレームにそれぞれヒン
ジ部(19)…を設け、該ヒンジ部に一端を結合し、他端を
上下何れか他の左右のフレームにそれぞれ結合した左右
・前後のジョイント(4)…と、左右の下部フレーム(3),
(3)間を伸縮させる前後位置に配設された下部ジャッキ
(5),(5)と、左右の上部フレーム間を伸縮させる前後位
置に配設された上部ジャッキ(5),(5)とをブロック状に
組み立てて一体化して吊り下げ自在に構成し、前記パネ
ル(2)を上下方向に伸びる連結用縦溝(8)を備えたものと
し、前記上下の各フレーム(3)…が長手方向に伸びる連
結用横溝(11)を備えたものとし、これらの両溝(8),(1
1)を介して各パネル(2)と上下左右の各フレーム(3)とを
連結固定することを特徴とする土留め用仮設枠型。
2. A panel group (10) in which a plurality of panels (2)... Are erected on both left and right sides of a long groove excavated from the ground for piping, and move up and down along the inside of the panel group (10). A pair of left and right lower frames (3), (3) extending in the front-rear direction, and a pair of right and left upper frames vertically spaced from each other. (3), (3)
Left and right and front and rear joints having one end connected to the hinge portion and the other end connected to the other upper or lower left or right frame, respectively. (4) ... and the left and right lower frames (3),
(3) Lower jack located at the front and rear position to expand and contract the space
(5), (5) and the upper jacks (5), (5) arranged at the front and rear positions to expand and contract between the left and right upper frames are assembled in a block shape and integrated to be freely suspended, The panel (2) is provided with connecting vertical grooves (8) extending vertically, and the upper and lower frames (3) are provided with connecting horizontal grooves (11) extending longitudinally. Grooves (8), (1
A temporary frame type for earth retaining, wherein each panel (2) and each of the upper, lower, left and right frames (3) are connected and fixed via 1).
【請求項3】 配管用に地面を掘削した長溝の左右両側
に複数のパネル(2)…を立設したパネル群(10)の内側に
沿って上下動し、これら左右のパネル群(10)の間隔を保
持する土留め用仮設枠型であって、上記前後方向に延び
た左右一対の下部フレーム(3),(3)と、この各フレーム
と上下に間隔を隔てた左右一対の上部フレーム(3),(3)
と、これら上下何れかの左右のフレームにそれぞれヒン
ジ部(19)…を設け、該ヒンジ部に一端を結合し、他端を
上下何れか他の左右のフレームにそれぞれ結合した左右
・前後のジョイント(4)…と、左右の下部フレーム(3),
(3)間を伸縮させる前後位置に配設された下部ジャッキ
(5),(5)と、左右の上部フレーム間を伸縮させる前後位
置に配設された上部ジャッキ(5),(5)とをブロック状に
組み立てて一体化して吊り下げ自在に構成し、前記パネ
ル(2)を上下方向に伸びる連結用縦溝(2a)を備えたもの
とし、前記上部フレーム(3),(3)に上方に突出する桿材
(61)を立設し、この桿材(61)に前記パネル群(10)の上方
を通って横外方に延び下部に接地支持用のキャスター(2
2)を固設した支持脚6を連結固定したことを特徴とする
土留め用仮設枠型。
3. A panel group (10) in which a plurality of panels (2)... Are erected on both left and right sides of a long groove excavated for the piping, and move up and down along the inside of the panel group (10). A pair of left and right lower frames (3), (3) extending in the front-rear direction, and a pair of right and left upper frames vertically spaced from each other. (3), (3)
Left and right and front and rear joints having one end connected to the hinge portion and the other end connected to the other upper or lower left or right frame, respectively. (4) ... and the left and right lower frames (3),
(3) Lower jack located at the front and rear position to expand and contract the space
(5), (5) and the upper jacks (5), (5) arranged at the front and rear positions to expand and contract between the left and right upper frames are assembled in a block shape and integrated to be freely suspended, The panel (2) is provided with a connecting vertical groove (2a) extending vertically, and the upper frame (3), (3) has a rod member protruding upward.
(61) is erected, and the rod (61) extends laterally and outwardly above the panel group (10), and a caster (2
A temporary retaining frame type for retaining a ground, wherein a supporting leg 6 to which 2) is fixed is connected and fixed.
【請求項4】 土留め用仮設枠型(1)の長手方向両側
に、複数のパネル(2)…の一側を順次重ね合わせて並設
立設したパネル群(10),(10)を形成して枠型(1)と一体
化する工程と、予め掘削した浅い溝(7a)内にこの土留め
用仮設枠型(1)と左右のパネル群(10),(10)とを上方よ
り納める工程と、これら左右の各パネル(2)…と枠型(1)
との連結を解除してパネル群(10),(10)を地中に打込む
工程と、これら打込みパネル群(10),(10)の間に位置し
土留め用仮設枠型(1)の下方に位置する土を掘り下げ順
次深溝(7)とする工程と、各パネル群(10),(10)をさら
に深く打ち込む工程と、土留め用仮設枠型(1)の左右の
フレーム間を左右のパネル群に向かって張った状態とす
る工程と、掘削した深溝(7)への配管と配管固定用の盛
り土とを行う工程と、土留め用仮設枠型(1)の左右のフ
レーム(3),(3)間を緩めパネル群(10)を盛り土の上方ま
で引き上げる工程と、土留め用仮設枠型(1)を所要高さ
位置まで引き上げる工程と、各パネル(2)…と土留め用
仮設枠型(1)とを再び連結結合する工程と、この結合し
たパネル群と土留め用仮設枠型とを次作業位置の浅い溝
内へ移動する工程と、前記配管済みの溝を埋設する工程
とを順次繰り返しながら所定長さ区間の配管を行うこと
を特徴とする埋設配管施工法。
4. A panel group (10) is formed on both sides of the temporary retaining frame mold (1) in the longitudinal direction in such a manner that one side of a plurality of panels (2)... And a step of integrating the frame type (1) with the temporary frame type (1) for retaining the soil and the left and right panel groups (10) and (10) from above in a shallow groove (7a) excavated in advance. The process of placing, these left and right panels (2) ... and the frame type (1)
A step of driving the panel groups (10) and (10) into the ground by disconnecting the connection with the ground, and a temporary retaining frame mold (1) located between the driven panel groups (10) and (10). Excavating the soil located below the bottom and sequentially forming a deep groove (7), driving each panel group (10), (10) further deeply, and removing the space between the left and right frames of the temporary retaining frame mold (1). A step of stretching toward the left and right panel groups, a step of performing piping to the excavated deep groove (7) and embankment for pipe fixing, and a left and right frame (1) of a retaining frame temporary frame type (1) 3) and (3) to loosen the panel group (10) above the embankment, and to raise the retaining frame temporary mold (1) to the required height position. The step of connecting and coupling the fastening temporary frame mold (1) again, the step of moving the joined panel group and the soil retaining temporary frame mold into the shallow groove of the next work position, and Bury Buried piping construction method, wherein the piping of a predetermined length section is performed while sequentially repeating the above steps.
JP22436096A 1996-08-06 1996-08-06 Temporary frame type for earth retaining Expired - Fee Related JP2969151B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22436096A JP2969151B2 (en) 1996-08-06 1996-08-06 Temporary frame type for earth retaining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22436096A JP2969151B2 (en) 1996-08-06 1996-08-06 Temporary frame type for earth retaining

Publications (2)

Publication Number Publication Date
JPH1046580A true JPH1046580A (en) 1998-02-17
JP2969151B2 JP2969151B2 (en) 1999-11-02

Family

ID=16812546

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22436096A Expired - Fee Related JP2969151B2 (en) 1996-08-06 1996-08-06 Temporary frame type for earth retaining

Country Status (1)

Country Link
JP (1) JP2969151B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100808109B1 (en) 2006-09-06 2008-03-04 고려개발 주식회사 Supporting structure for being used to excavated ground
KR20180025580A (en) * 2016-09-01 2018-03-09 정진덕 Soil guard installing structure
CN109914571A (en) * 2019-03-20 2019-06-21 湖南建工集团有限公司 A kind of basement drainage ditch formwork system, casting system and construction method
GB2590359A (en) * 2019-12-02 2021-06-30 Trenchsafe Ltd A system and method for erecting a temporary retainer in a trench
CN114277809A (en) * 2021-12-08 2022-04-05 长江生态环保集团有限公司 Movable groove supporting device for agricultural sewage pipe network engineering and construction method thereof
KR20220093759A (en) * 2020-12-28 2022-07-05 (주)태화이엔지 Prefabricated retaining of earth frame and construction method thereof
CN114960688A (en) * 2022-06-23 2022-08-30 北京诺和兴建设工程有限公司 Quick supporting device of pipeline slot
CN115680097A (en) * 2022-11-21 2023-02-03 江阴新城建设工程有限公司 Municipal rainwater pipeline construction method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100808109B1 (en) 2006-09-06 2008-03-04 고려개발 주식회사 Supporting structure for being used to excavated ground
KR20180025580A (en) * 2016-09-01 2018-03-09 정진덕 Soil guard installing structure
CN109914571A (en) * 2019-03-20 2019-06-21 湖南建工集团有限公司 A kind of basement drainage ditch formwork system, casting system and construction method
GB2590359A (en) * 2019-12-02 2021-06-30 Trenchsafe Ltd A system and method for erecting a temporary retainer in a trench
GB2590359B (en) * 2019-12-02 2023-07-05 Trenchsafe Ltd A system and method for erecting a temporary retainer in a trench
KR20220093759A (en) * 2020-12-28 2022-07-05 (주)태화이엔지 Prefabricated retaining of earth frame and construction method thereof
CN114277809A (en) * 2021-12-08 2022-04-05 长江生态环保集团有限公司 Movable groove supporting device for agricultural sewage pipe network engineering and construction method thereof
CN114960688A (en) * 2022-06-23 2022-08-30 北京诺和兴建设工程有限公司 Quick supporting device of pipeline slot
CN115680097A (en) * 2022-11-21 2023-02-03 江阴新城建设工程有限公司 Municipal rainwater pipeline construction method
CN115680097B (en) * 2022-11-21 2023-11-24 江阴新城建设工程有限公司 Municipal rainwater pipeline construction method

Also Published As

Publication number Publication date
JP2969151B2 (en) 1999-11-02

Similar Documents

Publication Publication Date Title
JP2969151B2 (en) Temporary frame type for earth retaining
JP2923498B1 (en) Drainage method and earth retaining support used for it
KR101255515B1 (en) The tunel execution method
JP2001520340A (en) Arch support structure
KR100837340B1 (en) Length Control Type Steel Pipe Strut
JPH07103563B2 (en) Pile press machine
CN211873031U (en) Adjustable support connecting piece
JP2835571B2 (en) Earth retaining sheet pile support method
JP3761173B2 (en) Connecting device for pipes in excavation grooves
JP2966765B2 (en) Underground construction members burying method
JP3782180B2 (en) Support structure using sheet piles for earth retaining bells
JPH08319618A (en) Civil engineering work device, excavator, sheathing device and civil engineering work method
JP3183635U (en) Square frame for earth retaining
JPH0529248Y2 (en)
KR101483939B1 (en) Excavation Propulsion Apparatus of Underground Concrete Structure on Segement Construction Base
JP3673921B2 (en) Preload panel retaining ring
JPH08109634A (en) Earth retaining method and earth retaining timbering device
JPH1136307A (en) Earth retaining method and device therefor
JPH0360975B2 (en)
JPH0230509Y2 (en)
KR20220012119A (en) Tunnel Structure Construction Method by Steel Pipe Installed Lead Steel Pipe
JP3053270U (en) Support member receiving piece used for simple earth retaining method
KR20230011069A (en) Pipe laying method using the earth frame
JPH0469681B2 (en)
KR20230011082A (en) Earth frame for the pipe laying

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees