KR20230011082A - Earth frame for the pipe laying - Google Patents

Earth frame for the pipe laying Download PDF

Info

Publication number
KR20230011082A
KR20230011082A KR1020210091670A KR20210091670A KR20230011082A KR 20230011082 A KR20230011082 A KR 20230011082A KR 1020210091670 A KR1020210091670 A KR 1020210091670A KR 20210091670 A KR20210091670 A KR 20210091670A KR 20230011082 A KR20230011082 A KR 20230011082A
Authority
KR
South Korea
Prior art keywords
frame
pipe
earth
vertical
panel
Prior art date
Application number
KR1020210091670A
Other languages
Korean (ko)
Other versions
KR102571807B1 (en
Inventor
공강주
류선영
Original Assignee
주식회사 건영엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 건영엔지니어링 filed Critical 주식회사 건영엔지니어링
Priority to KR1020210091670A priority Critical patent/KR102571807B1/en
Publication of KR20230011082A publication Critical patent/KR20230011082A/en
Application granted granted Critical
Publication of KR102571807B1 publication Critical patent/KR102571807B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to an earth frame for pipe laying. In the earth frame for pipe laying, which supports a pipe to be seated on an excavated bottom, the earth frame is provided so that the upper end of a vertical frame erected downward is in contact with both ends of a horizontal frame, and a reinforcing frame is provided to be in contact on the inside of the horizontal frame and the vertical frame. Therefore, the present invention allows the earth frame to be inserted at the same depth as the evacuation by its own weight or load, thereby easily installing steel earth plates, anti-rise panels, pipes, and pipe supports while heaving and boiling are prevented so that the pipes can be easily laid.

Description

관매설용 토류 프레임{EARTH FRAME FOR THE PIPE LAYING}Earth frame for pipe burial {EARTH FRAME FOR THE PIPE LAYING}

이 건 발명은 관매설용 토류 프레임에 관한 것으로서 특히, 항타 또는 천공작업의 선시공 없이 굴착과 동시에 자중 또는 하중재하부에 의하여 굴착 깊이와 동일하게 토류 프레임이 인입되어지도록 함으로써, 이어지는 강재토류판, 상승방지패널, 관 및 관지지구가 용이하게 설치될수 있도록 하는 가운데 히빙, 보일링이 방지되어 관이 용이하게 매설하는 흙막이 가시설에 대한 것이다.This invention relates to an earth frame for pipe burial, and in particular, without pre-construction of driving or drilling work, the earth frame is introduced at the same depth as the excavation depth by its own weight or under a load at the same time as excavation, thereby preventing the subsequent steel earth plate from rising. It relates to temporary earth retaining facilities in which heaving and boiling are prevented and pipes are easily buried while enabling panels, pipes, and pipe supports to be easily installed.

관은 주로 도로 하천 등 지장물이 적은 곳에 설치하게 되는 과정에서 지장물의 규모와 설치 후 관의 보호적 차원에서 관의 묻힘 깊이가 결정된다. 관을 도로에 매설하는 경우, 관을 매설한 후 관상단의 토피고는 1.0m 정도됨으로써, 도로 차량 통행시 하중재하에 대하여 관의 안정성을 확보할 수 있게 된다.In the process of installing a pipe in a place with few obstacles such as roads and rivers, the size of the obstacle and the burial depth of the pipe are determined in terms of the protection of the pipe after installation. When the pipe is buried in the road, the cover height at the end of the pipe after the pipe is buried is about 1.0 m, so that the stability of the pipe can be secured against the load during the passage of road vehicles.

따라서 굴착 깊이는 관의 직경과 토피고 1.0m를 더한 깊이가 굴착 깊이가 되는데 도로의 다짐상태가 건전하여 규모가 적은 경우, 가시설을 설치하지 않고 직접 터파기 한 후 관을 매설하고 있다.Therefore, the excavation depth is the diameter of the pipe and the depth of 1.0 m of cover height. When the compaction of the road is sound and the scale is small, the pipe is buried after excavating directly without installing temporary facilities.

그러나 관의 규모가 커지면 굴착면의 붕괴를 방지하기 위해 흙막이 가시설을 설치하게 되는데 대체적으로 지반이 단단하여 토압이 적어 간단한 부재를 설치하는 가시설 공법이 적용되고 있다.However, when the size of the pipe increases, temporary retaining facilities are installed to prevent collapse of the excavation surface. Generally, temporary construction methods for installing simple members are applied because the ground is hard and the earth pressure is low.

한편, 이러한 종래기술로 등록특허공보 제10-1656367호(2016.09.05.)의 도로 지하에 관을 매설하기 위한 흙막이 가시설 시공방법이 제안되었으나, 이러한 흙막이 가시설 시공방법은 하천고수부지나 매립지, 해안지역, 섬지역 등 지반 강도가 단단하지 않은 경우, 관을 부설하는데 어려움이 많고, 비경제적인 비용이 증가되고, 공사기간이 장기화되는 문제점이 있었다.On the other hand, as such a prior art, a method for constructing a retaining facility for burying a pipe under a road in Registered Patent Publication No. 10-1656367 (2016.09.05.) has been proposed, but this method for constructing a temporary retaining facility has been proposed in a river high water site, a landfill, or a coastal area However, in cases where the ground strength is not solid, such as in island areas, there are problems in that there are many difficulties in laying pipes, uneconomical costs increase, and the construction period is prolonged.

또한, 중장비 중량에 의한 시공지반(가설도로 등)을 별도로 조성해야되는 문제점이 있었다.In addition, there was a problem in that the construction ground (temporary road, etc.) by the weight of heavy equipment had to be created separately.

등록특허공보 제10-1656367호(2016.09.05.)Registered Patent Publication No. 10-1656367 (2016.09.05.)

이 건 발명은 공정이 단순하며, 시공관리가 편리하고, 안전사고를 방지하여 토목 구조물, 해양 구조물, 상수도 구조물, 수리 및 배수구 구조물에 적합하도록 하는 가운데 하천의 고수부지와 같은 지반이 연약한 곳, 공장과 아파트 단지와 같이 부지나 길이가 긴 곳에 연속시공이 편리하게 이루어질 수 있도록 한 것이다.This invention has a simple process, convenient construction management, and prevents safety accidents to be suitable for civil engineering structures, offshore structures, waterworks structures, irrigation and drain structures, and places where the ground is soft, such as high water areas in rivers, factories and apartment complexes, so that continuous construction can be conveniently carried out on sites with a long length.

이 건 발명은 굴착된 바닥에 관이 안착되게 지지되는 관매설용 토류 프레임(A)에 있어서, 상기 토류 프레임(A)은 수평 프레임(10)의 양측 단부에 하부로 직립된 수직 프레임(20)의 상단이 맞대어지게 결합되어지고, 상기 수평 프레임(10)과 수직 프레임(20)의 내측에 보강 프레임(30)이 맞대어지게 구비됨을 특징으로 한다.In this invention, in the earth frame (A) for pipe burial in which the pipe is supported so that the pipe is seated on the excavated floor, the earth frame (A) is a vertical frame (20) erected downward at both ends of the horizontal frame (10) It is characterized in that the upper end of is coupled to butt, and the reinforcing frame 30 is provided to the inside of the horizontal frame 10 and the vertical frame 20 to be butted.

또한, 상기 수평 프레임(10)과 수직 프레임(20) 및 보강 프레임(30)은 I형태를 갖도록 구비됨을 특징으로 한다.In addition, the horizontal frame 10, the vertical frame 20 and the reinforcing frame 30 are characterized in that they are provided to have an I shape.

또한, 상기 수평 프레임(10)은 하단에 하부 내측을 향하여 경사진 형태를 갖는 삽입 가이드(110)가 구비됨을 특징으로 한다.In addition, the horizontal frame 10 is characterized in that the insertion guide 110 having an inclined shape toward the lower inner side is provided at the lower end.

또한, 상기 토류 프레임(A)은 수평 프레임(10)의 상부에 하중재하부(40)가 구비되어지되, 상기 하중재하부(40)는 상부가 개방된 저류조(410)로 구비되어지고, 상기 저류조(410)에 배출밸브(420)가 구비됨을 특징으로 한다.In addition, the earth frame (A) is provided with a lower load portion 40 on the upper portion of the horizontal frame 10, and the lower load portion 40 is provided as a storage tank 410 with an open top, It is characterized in that the discharge valve 420 is provided in the storage tank 410.

또한, 상기 토류 프레임(A)은 일정 간격으로 배열된 수직 프레임(20) 사이에 강재 토류판(50)이 구비됨을 특징으로 한다.In addition, the earth frame (A) is characterized in that the steel earth plate 50 is provided between the vertical frames 20 arranged at regular intervals.

또한, 상기 토류 프레임(A)은 수직 프레임(20)의 하단에서 상부를 향하여 일정 간격 이격된 곳에 패널 지지구(60)가 구비되어 굴착된 바닥에 안착된 상승방지패널(70)이 눌려지게 구비됨을 특징으로 한다.In addition, the earth frame (A) is provided with a panel support 60 spaced apart at a predetermined interval from the bottom of the vertical frame 20 toward the top, so that the anti-rise panel 70 seated on the excavated floor is pressed characterized by being

또한, 상기 토류 프레임(A)은 수직 프레임(20)의 하단에서 상부를 향하여 일정 간격으로 이격된 곳에 관지지구(80)가 구비되어 상승방지패널(70)에 안착된 관(P) 상부가 눌려지게 구비됨을 특징으로 한다.In addition, the soil frame (A) is provided with a pipe support 80 spaced apart from the bottom of the vertical frame 20 toward the top at regular intervals, and the top of the pipe P seated on the anti-rise panel 70 is pressed It is characterized in that it is provided.

또한, 상기 패널 지지구(60)는 수직 프레임(20)의 내측에 구비된 결합홀(610)에 끼워지게 결합되는 결합핀(620)을 갖는 지지편(630)으로 구비되어지되, 상기 결합홀(610)은

Figure pat00001
형태를 갖도록 구비되어지고, 상기 지지편(630)은
Figure pat00002
형태를 갖도록 구비됨을 특징으로 한다.In addition, the panel support 60 is provided as a support piece 630 having a coupling pin 620 fitted into a coupling hole 610 provided inside the vertical frame 20, the coupling hole (610) is
Figure pat00001
It is provided to have a shape, and the support piece 630 is
Figure pat00002
It is characterized in that it is provided to have a shape.

또한, 상기 관지지구(80)는 관 지지로드(810)와 로드 결합편(820)으로 구비되어지되, 상기 관 지지로드(810)은 양측단부에

Figure pat00003
형 로드 고정편(811)이 구비되어지고, 상기 로드 결합편(820)은
Figure pat00004
형 결합홈(821)을 갖는 결합편 몸체(822)로 구비됨을 특징으로 한다.In addition, the pipe support 80 is provided with a pipe support rod 810 and a rod coupling piece 820, the pipe support rod 810 is at both ends
Figure pat00003
A mold rod fixing piece 811 is provided, and the rod coupling piece 820
Figure pat00004
It is characterized in that it is provided with a coupling piece body 822 having a mold coupling groove 821.

또한, 상기 결합홈(821)은 타원형태를 갖도록 구비됨을 특징으로 한다.In addition, the coupling groove 821 is characterized in that it is provided to have an oval shape.

또한, 상기 상승방지패널(70)은 직사각형태를 갖는 패널부재(710)의 하부에 보강테두리부재(720)의 상부가 맞대어지게 구비되어지고, 상기 보강테두리부재(720)의 내부에 보강리브(730)가 일정 간격을 갖도록 구비되어지고, 길이 방향의 양측단부에 이동 연결구홀(701)이 구비됨을 특징으로 한다.In addition, the anti-rise panel 70 is provided so that the upper portion of the reinforcing rim member 720 is buttted to the lower portion of the panel member 710 having a rectangular shape, and the reinforcing ribs are provided inside the reinforcing rim member 720 ( 730) are provided at regular intervals, and movable connector holes 701 are provided at both ends in the longitudinal direction.

또한, 상기 보강리브(730)는

Figure pat00005
,
Figure pat00006
,
Figure pat00007
중 어느 하나의 형태를 갖도록 구비되어 맞대어지게 결합됨을 특징으로 한다.In addition, the reinforcing rib 730
Figure pat00005
,
Figure pat00006
,
Figure pat00007
It is provided to have any one of the shapes and is characterized in that it is coupled to face.

또한, 상기 토류 프레임(A)은 수직 프레임(20)의 상부에 걸이홀(201)이 구비되어 인발부(90)의 와이어(930)가 걸려지게 구비되어지되, 상기 인발부(90)는 찬넬형태를 갖는 인발 프레임(910)의 하부에 지지 프레임(920)이 구비되어지고, 상기 인발 프레임(910)의 상부에 와이어(930)가 귄취된 와이어 권취부(940)가 구비됨을 특징으로 한다.In addition, the earth frame (A) is provided with a hanging hole 201 on the upper part of the vertical frame 20 to hang the wire 930 of the drawing part 90, and the drawing part 90 is a channel It is characterized in that the support frame 920 is provided at the lower part of the drawn frame 910 having a shape, and the wire winding part 940 in which the wire 930 is wound is provided at the upper part of the drawn frame 910.

이 건 발명은 수평 프레임의 양측단부에 구비된 수평 프레임의 하부가 굴착과 동시에 자중에 의하여 굴착 깊이와 동일하게 인입되어지도록 함으로써, 하천의 고수부지와 같은 지반이 연약한 곳, 공장과 아파트 단지와 같이 부지나 길이가 긴 곳에 연속 시공이 이루어질 수 있는 효과를 얻을 수 있다.This invention allows the lower part of the horizontal frame provided at both ends of the horizontal frame to be pulled in at the same time as the depth of the excavation by its own weight at the same time as excavation, so that the ground is soft, such as the high water area of a river, such as factories and apartment complexes. It is possible to obtain the effect of continuous construction in a site or a long site.

또한, 수평 프레임과 수직 프레임으로 이루어진 토류 프레임의 자중 이외에 별도의 하중재하부에 의하여 하중이 하부로 작용하게 됨에 따라 굴착된 바닥을 향하여 더 용이하게 인입될 수 있는 효과를 얻을 수 있다.In addition, as the load acts downward by a separate loader in addition to the weight of the earth frame composed of a horizontal frame and a vertical frame, it is possible to obtain an effect that can be more easily introduced toward the excavated floor.

또한, 이를 통해 별도의 항타 또는 천공작업의 선시공이 없음으로써, 공정을 단순화시켜 시공관리가 편리하게 이루어질 수 있는 효과를 얻을 수 있다.In addition, through this, there is no pre-construction of separate driving or drilling work, so that the process can be simplified and the effect of convenient construction management can be obtained.

또한, 이를 통해 이어지는 강재토류판, 상승방지패널, 관 및 관지지구가 용이하게 시공될 수 있는 효과를 얻을 수 있다.In addition, through this, it is possible to obtain an effect in which the steel soil plate, the anti-rise panel, the pipe and the pipe support can be easily constructed.

또한, 이를 통해 히빙, 보일링이 방지되어 관이 용이하게 매설될 수 있는 효과를 얻을 수 있다.In addition, through this, it is possible to obtain an effect that the pipe can be easily buried by preventing heaving and boiling.

또한, 이를 통해 토목 구조물, 해양 구조물, 상수도 구조물, 수리 및 배수구 구조물에 적합하도록 한 효과를 얻을 수 있다.In addition, through this, it is possible to obtain an effect suitable for civil structures, offshore structures, waterworks structures, irrigation and drainage structures.

그리고 이러한 것을 통해 작업중 발생되는 안전사고를 방지할 수 있는 효과를 얻을 수 있다.And through this, it is possible to obtain the effect of preventing safety accidents occurring during work.

도1은 이 건 발명에 따른 관매설용 토류 프레임의 시공상태를 도시한 사시도.
도2는 이 건 발명에 따른 관매설용 토류 프레임의 시공에 있어 강재토류판을 제거하여 상승방지패널에 관이 얹혀지고, 관이 관지지구에 의하여 지지된 상태를 도시한 사시도.
도3은 이 건 발명에 따른 관매설용 토류 프레임의 시공상태를 분리하여 도시한 사시도.
도4는 이 건 발명에 따른 관매설용 토류 프레임의 시공상태 중 하중재하부가 구비된 상태를 도시한 사시도.
도5는 이 건 발명에 따른 관매설용 토류 프레임의 시공상태 중 토류 프레임이 인발부의 와이어에 결합된 상태를 도시한 사시도.
도6은 이 건 발명에 따른 관매설용 토류 프레임의 시공상태를 순서적으로 도시한 예시도.
도7은 이 건 발명에 따른 관매설용 토류 프레임의 다른 실시예를 도시한 정면도.
Figure 1 is a perspective view showing the construction state of the earth frame for pipe burial according to this invention.
Figure 2 is a perspective view showing a state in which the steel soil plate is removed in the construction of the earth frame for pipe installation according to the present invention, the pipe is placed on the anti-rise panel, and the pipe is supported by the pipe support.
Figure 3 is a perspective view separately showing the construction state of the earth frame for pipe burial according to the present invention.
Figure 4 is a perspective view showing a state in which the lower load is provided in the construction state of the earth frame for pipe burial according to the present invention.
Figure 5 is a perspective view showing a state in which the earth frame is coupled to the wire of the drawing part among the construction states of the earth frame for pipe burial according to this invention.
Figure 6 is an exemplary view sequentially showing the construction state of the earth frame for pipe burial according to the present invention.
Fig. 7 is a front view showing another embodiment of the earth frame for pipe burial according to the present invention.

이 건 발명의 실시예를 첨부 도면을 참조하여 설명하면 다음과 같다.An embodiment of the present invention will be described with reference to the accompanying drawings.

도1은 이 건 발명에 따른 관매설용 토류 프레임의 시공상태를 도시한 사시도이고, 도2는 이 건 발명에 따른 관매설용 토류 프레임의 시공에 있어 강재토류판을 제거하여 상승방지패널에 관이 얹혀지고, 관이 관지지구에 의하여 지지된 상태를 도시한 사시도이고, 도3은 이 건 발명에 따른 관매설용 토류 프레임의 시공상태를 분리하여 도시한 사시도이고, 도4는 이 건 발명에 따른 관매설용 토류 프레임의 시공상태 중 하중재하부가 구비된 상태를 도시한 사시도이고, 도5는 이 건 발명에 따른 관매설용 토류 프레임의 시공상태 중 토류 프레임이 인발부의 와이어에 결합된 상태를 도시한 사시도이고, 도6은 이 건 발명에 따른 관매설용 토류 프레임의 시공상태를 순서적으로 도시한 예시도이다.Figure 1 is a perspective view showing the construction state of the earth frame for pipe burial according to the present invention, and Figure 2 is a perspective view showing the construction state of the earth frame for pipe embedment according to this invention, by removing the steel earth plate and connecting the pipe to the anti-rise panel. It is a perspective view showing a state in which the pipe is placed and the pipe is supported by the pipe support. It is a perspective view showing a state in which a lower load is provided among the construction states of the earth frame for pipe installation, and FIG. 5 shows a state in which the earth frame is coupled to the wire of the drawing part during the construction state of the earth frame for pipe installation according to the present invention. It is a perspective view, and FIG. 6 is an exemplary view sequentially showing the construction state of the earth frame for pipe burial according to the present invention.

관매설은 지하수의 지반조건에 따라 히빙이나 보일링이 발생되는 것을 방지하기 위해 근입깊이 만큼 하단에서 추가로 말뚝을 항타하여야 안전성을 확보할 수 있다. 근입 깊이는 안전성을 확보하기 위한 매우 중요한 결정사항이므로 공사의 성패를 좌우하는데 근입 깊이가 깊어지면 공사비가 기하급수적으로 증가된다. 종래 기술의 근입 깊이는 최저 2.5m, 통상적인 지반조건이면 2.1m, 연약한 지반 조건이면 5~6m가 소요되어 공사의 변별력을 표현하는 사항이다. 이 건 발명에 따른 관매설용 토류 프레임은 근입 깊이가 불필요한 장점이 있다.In pipe burial, safety can be ensured by additionally driving piles from the bottom as much as the penetration depth to prevent heaving or boiling from occurring depending on the ground conditions of groundwater. Since the depth of penetration is a very important decision to secure safety, it determines the success or failure of construction. As the depth of penetration increases, the construction cost increases exponentially. The penetration depth of the prior art is a minimum of 2.5 m, 2.1 m for normal ground conditions, and 5 to 6 m for soft ground conditions, which expresses the discrimination of construction. The soil frame for pipe burial according to this invention has the advantage of not requiring an embedding depth.

이 건 발명에 따른 관매설용 토류 프레임(A)은 지반이 연약하고, 점착력이 적은 하천내 관설 공사는 굴착 깊이가 깊어질 수록 토압과 수압에 의해 흙막이 가시설부재에 발생하는 하중 증가로 공사의 신뢰성이 저하되고, 시공속도가 늦고 안전성이 취약한 조건으로 인하여 공정을 단순화하고, 시공속도를 향상시키고, 안전사고를 방지하기 위한 것으로, 도1 내지 도5에 도시된 바와 같이, 굴착된 바닥에 관이 안착되게 지지되도록 하여 안정되게 매설될 수 있게 구비되어 있다.The soil frame (A) for pipe burial according to the present invention has a soft ground and low adhesiveness, and the deeper the excavation depth, the more the load generated on the earth retaining temporary facility member due to the earth pressure and water pressure increases the reliability of the construction This is to simplify the process, improve the construction speed, and prevent safety accidents due to the low construction speed and poor safety conditions, as shown in Figs. It is provided so that it can be stably buried by being supported to be seated.

이를 위해, 상기 토류 프레임(A)은 수평 프레임(10), 수직 프레임(20) 및 보강 프레임(30)으로 구비되어 있다.To this end, the earth frame (A) is provided with a horizontal frame 10, a vertical frame 20 and a reinforcing frame 30.

여기에서, 상기 수평 프레임(10)은 소정 길이를 갖는 양측 단부에 하부로 직립된 형태를 갖는 수직 프레임(20)의 상단이 맞대어져 용접이음 또는 볼팅이음으로 구비됨으로써, 전체적으로 하부가 개방된 찬넬형태를 갖도록 구비되어 내측 하부로 작업 공간이 확보될 수 있게 구비되어 있고, 상기 수평 프레임(10)과 수직 프레임(20)의 내측에는 상기 보강 프레임(30)이 구비되어 수평 프레임(10)의 하단부 사이의 간격이 변화되는 것을 방지할 수 있게 구비되어 있다. 이때, 상기 수직 프레임(20)은 하단에 하부 외측에서 내측을 향하여 경사지게 구비된 삽입 가이드(110)가 구비됨에 따라 굴착이 이루어지는 과정에서 상재하중에 의하여 더 용이하게 굴착된 바닥에 안착 내지는 파고 들어 갈 수 있게 된다.Here, the horizontal frame 10 is provided with a welded joint or a bolted joint in which the upper end of the vertical frame 20 having a form of being upright downward at both ends having a predetermined length is buttted, so that the bottom is opened as a whole in the form of a channel. It is provided to have a working space to be secured to the inner lower part, and the reinforcing frame 30 is provided inside the horizontal frame 10 and the vertical frame 20 so as to be provided between the lower ends of the horizontal frame 10 It is provided to prevent the interval of the change. At this time, as the vertical frame 20 is provided with an insertion guide 110 inclined from the outside to the inside at the lower end, it can be more easily seated or dug into the excavated floor by the surcharge in the process of excavation. be able to

이러한 상기 수평 프레임(10)과 수직 프레임(20) 및 보강 프레임(30)은 소재의 사용량을 줄이는 가운데 충분한 강성이 유지되도록 하기 위한 방안으로 I형태를 갖도록 하는 것이 바람직하다. 즉, I형강이나 H형강으로 구비되도록 하는 것이 바람직하다.The horizontal frame 10, the vertical frame 20, and the reinforcing frame 30 preferably have an I shape as a way to maintain sufficient rigidity while reducing the amount of material used. That is, it is preferable to be provided with I-beams or H-beams.

상기 토류 프레임(A)은 일정 간격이 유지되게 배열된 일측과 타측의 수평 프레임(10)의 상부에 소정 공간을 갖는 하중재하부(40)가 구비되어 굴착 과정에서 용이하게 하부 즉, 굴착된 바닥으로 파고들어갈 수 있게 구비되어 있다.The earth frame (A) is provided with a lower load member 40 having a predetermined space on the upper part of one side and the other side of the horizontal frame 10 arranged to maintain a certain distance, so that the lower part, that is, the excavated floor, is easily used in the excavation process. It is equipped to dig into.

이러한 상기 하중재하부(40)는 상부만이 개방된 저류조(410)로 구비됨으로써, 토류 프레임(A)이 설치된 상태에서 외부로부터 미도시한 물공급부를 통해 물이 공급되어 채워진 상태가 유지됨에 따라 그 무게에 의하여 토류 프레임(A)의 하단이 굴삭된 하부로 더 용이하게 파고들어 갈 수 있게 된다.The lower loading portion 40 is provided as a storage tank 410 with only the top open, so that water is supplied from the outside through a water supply unit (not shown) in the state where the earth frame A is installed, and the filled state is maintained. Due to the weight, the lower end of the earth frame A can be more easily penetrated into the excavated lower part.

상기 저류조(410)의 하부에는 외측 하부를 향하는 배출밸브(420)가 구비되어 관(P)이 매설된 후 토류 프레임(A)을 인발시키는 과정에서 하중재하부(40)가 가볍게 유지되도록 함으로써, 적은 동력을 이용하여 인발이 가능하게 이루어질 수 있게 구비되어 있다.A discharge valve 420 is provided at the lower part of the storage tank 410 so that the load lower part 40 is kept light in the process of pulling out the earth frame A after the pipe P is buried. It is provided so that drawing can be made possible using little power.

상기 일정 간격이 유지되게 배열된 일측과 타측의 수직 프레임(20) 사이에는 강재 토류판(50)이 구비됨으로써, 굴착 과정에서 주변에 있는 토사가 흘러 내리는 것을 방지할 수 있게 된다.Since a steel soil plate 50 is provided between the vertical frames 20 on one side and the other side arranged to maintain the predetermined distance, it is possible to prevent the soil from flowing down in the vicinity during the excavation process.

상기 토류 프레임(A)은 수직 프레임(20)의 하단에서 상부를 향하여 일정 간격 이격된 곳에 패널 지지구(60)가 구비됨으로써, 굴착된 바닥에 안착된 상승방지패널(70)이 눌려지게 구비되어 있다. 이는 사질지반에서는 강재 토류판(50) 배면의 수위와 굴착내의 수위차에 의하여 굴착내에서 상향의 침투류가 발생되는 보일링 현상을 방지할 수 있도록 하기 위함이고, 이는 보일링에 의하여 흙의 전단저항이 상실되고, 가시설 전면의 저항토압이 손실됨으로써, 붕괴사고가 발생되는 것을 방지할 수 있도록 하기 위함이다.The earth frame (A) is provided with a panel support 60 spaced apart from the bottom of the vertical frame 20 at a predetermined interval toward the top, so that the anti-rise panel 70 seated on the excavated floor is pressed there is. This is to prevent the boiling phenomenon in which upward seepage flow occurs in the excavation due to the water level difference between the water level on the back of the steel soil plate 50 and the excavation in the sandy ground, which is due to the shear resistance of the soil by boiling. This is to prevent a collapse accident from occurring due to loss of this loss and loss of resistance earth pressure on the front of the temporary facility.

또한, 연약한 점토지반에서는 굴착배면의 토사중량이 굴착저면 이하의 지반지지력보다 크게 되면 지반내의 흙이 미끄러져 내려 굴착저면이 부풀어 오르는 해빙현상을 방지할 수 있도록 하기 위함이다.In addition, in the soft clay ground, when the soil weight of the excavation back surface is greater than the ground bearing capacity below the excavation bottom surface, the soil in the ground slides down to prevent the thawing phenomenon in which the excavation bottom surface swells.

이를 위해, 상기 패널 지지구(60)는 수직 프레임(20)의 내측에 구비된 결합홀(610)에 끼워지게 결합되는 결합핀(620)을 갖는 지지편(630)으로 구비되어있다.To this end, the panel support 60 is provided as a support piece 630 having a coupling pin 620 fitted into a coupling hole 610 provided inside the vertical frame 20 .

이때, 상기 결합홀(610)은 지지편(630)에 구비된 결합핀(620)이 용이하게 끼워진 상태에서 역방향으로 분리되는 것을 방지할 수 있도록 하기 위한 방안으로

Figure pat00008
형태를 갖도록 구비되어 있다.At this time, the coupling hole 610 is a method for preventing the coupling pin 620 provided in the support piece 630 from being separated in the reverse direction in a state where it is easily inserted.
Figure pat00008
It is equipped to have a shape.

이는 결합핀(620)이 스터드 볼트의 형태를 가짐에 따라 하부의 직경이 넓은 부분을 통해 용이하게 삽입되도록 한 후 상부로 이동시켜 폭이 좁은 부분에 결합핀(620)이 끼워짐으로써, 역방향으로 분리되는 것을 방지할 수 있도록 하기 위함이다.This is because the coupling pin 620 has the form of a stud bolt so that it is easily inserted through the wide part of the lower diameter and then moved to the upper part so that the coupling pin 620 is inserted into the narrow part, in the reverse direction This is to prevent separation.

이는 상승방지패널(70)이 보일링 현상에 의하여 상부로 이동되는 힘이 작용하게 될 경우, 동일하게 상부로 이동됨에 따라 지지편(630)에 의하여 상승방지패널(70)이 굴착내 바닥으로부터 상부로 들뜨는 것을 방지할 수 있게 된다.This is when the anti-rise panel 70 is moved upward by the boiling phenomenon, as it moves upward, the anti-rise panel 70 is moved from the bottom in the excavation to the top by the support piece 630. can be prevented from floating.

상기 지지편(630)은 일측이 수직 프레임(20)의 수직인 내측면에 밀착되는 가운데 상승방지패널(70)의 상부측 가장자리가 걸려지도록 하기 위한 방안으로

Figure pat00009
형태를 갖도록 구비되어 있다.The support piece 630 is a method for hanging the upper edge of the anti-lift panel 70 while one side is in close contact with the vertical inner surface of the vertical frame 20.
Figure pat00009
It is equipped to have a shape.

상기 상승방지패널(70)은 직사각형태를 갖는 패널부재(710)의 하부에 보강테두리부재(720)의 상부가 맞대어져 볼팅 또는 용접이음으로 구비되어지는 가운데 상기 보강테두리부재(720)의 내부에 보강리브(730)가 일정 간격을 갖도록 구비되어짐으로써, 충분한 강도가 유지될 수 있게 구비되어 있다.The rise-preventing panel 70 is provided with a bolting or welding joint in which the upper portion of the reinforcing border member 720 is butted to the lower portion of the panel member 710 having a rectangular shape, and inside the reinforcing border member 720. As the reinforcing ribs 730 are provided at regular intervals, they are provided so that sufficient strength can be maintained.

상기 상승방지패널(70)은 길이 방향의 양측단부에 이동 연결구홀(701)이 구비되어 설치 및 이를 해체하는 과정에서 와이어 또는 별도의 걸이구를 이용하여 길이방향으로 끌어 이동시킬 수 있도록 구비되어 있다.The anti-rise panel 70 is provided with a movable connector hole 701 at both ends in the longitudinal direction so that it can be moved in the longitudinal direction by using a wire or a separate hook during installation and disassembly. .

상기 보강리브(730)는 소재의 사용량을 줄여 무게를 가볍게 하는 가운데 충분한 강도가 유지될 수 있도록 하기 위한 방안으로 각관의 형태인 "

Figure pat00010
"형태를 갖도록 하는 것이 바람직하다.The reinforcing rib 730 is a square-shaped "reinforcing rib" as a way to maintain sufficient strength while lightening the weight by reducing the amount of material used.
Figure pat00010
“It is desirable to have a shape.

이 건 발명에서 상기 보강리브(730)가 각관의 형태를 갖도록 하였으나, 이러한 형태 이외에 상부가 개방된 찬넬인 "

Figure pat00011
" 및 "
Figure pat00012
" 중 어느 하나의 형태를 갖도록 하는 것이 바람직하다.In this invention, the reinforcing rib 730 has a square tube shape, but in addition to this shape, a channel with an open top "
Figure pat00011
" and "
Figure pat00012
"It is desirable to have any one of the forms.

상기 관(P)은 패널 지지구(60)에 의하여 지지된 상승방지패널(70)의 상부에 얹혀지게 구비된 것으로, 미도시한 관연결구에 의하여 길이 방향으로 연속된 형태를 갖도록 구비되어 있다.The pipe (P) is provided to be placed on top of the anti-lift panel 70 supported by the panel support 60, and is provided to have a continuous form in the longitudinal direction by a pipe connector not shown.

이러한 관(P)은 보일링 현상이 상승방지패널(70)에 의하여 어느 정도 방지되나, 과도한 수압에 의하여 바닥으로부터 들뜨는 것을 방지할 수 있도록 하기 위한 방안으로 수직 프레임(20)의 하단에서 상부를 향하여 일정 간격으로 이격된 곳에 관지지구(80)가 구비되어 상승방지패널(70)에 안착된 관(P)의 상부가 눌려질 수 있게 구비되어 있다.Although the boiling phenomenon is prevented to some extent by the anti-rise panel 70, the tube P is directed upward from the bottom of the vertical frame 20 as a way to prevent it from being lifted from the bottom due to excessive water pressure. The pipe support 80 is provided at a spaced apart at regular intervals so that the upper part of the pipe P seated on the anti-rise panel 70 can be pressed.

이러한 상기 관지지구(80)는 관 지지로드(810)와 로드 결합편(820)으로 구비된 것으로, 상기 관 지지로드(810)은 양측단부에

Figure pat00013
형 로드 고정편(811)이 구비되어있고, 상기 로드 결합편(820)은
Figure pat00014
형 결합홈(821)을 갖는 결합편 몸체(822)로 구비되어 수직 프레임(20)의 내측에 맞대어져 볼팅 또는 용접이음으로 결합된 상태가 유지될 수 있게 구비되어 있다.The pipe support 80 is provided with a pipe support rod 810 and a rod coupling piece 820, and the pipe support rod 810 is at both ends.
Figure pat00013
A mold rod fixing piece 811 is provided, and the rod coupling piece 820
Figure pat00014
It is provided as a coupling piece body 822 having a mold coupling groove 821 and is provided so that it can be maintained in a coupled state by bolting or welding joint by facing the inside of the vertical frame 20.

상기 관 지지로드(810)의 양측단부에 구비된 로드 고정편(811)이 결합편 몸체(822)의 개방된 부분을 통해 끼워지도록 한 상태에서 관 지지로드(810)를 90°회전시킬 경우, 결합홈(821)에 삽입하는 형태로 결합된 상태가 유지될 수 있게 된다.When the tube support rod 810 is rotated by 90° in a state in which the rod fixing pieces 811 provided at both ends of the pipe support rod 810 are inserted through the open portion of the coupling piece body 822, The coupled state can be maintained in the form of being inserted into the coupling groove 821 .

이를 위해, 상기 결합홈(821)은 타원형태를 갖도록 구비되도록 하는 것이 바람직하다. 즉, 상기 결합홈(821)의 개방된 부분은 로드 고정편(811)의

Figure pat00015
가로 길이와 동일하거나, 약간 크도록 하여 삽입이 용이하게 이루어질 수 있도록 하는 가운데 결합홈(821)의 개방된 부분에 인접된 상하부는 로드 고정편(811)의 세로 길이 보다 작게 구비되도록 하여 관 지지로드(810)가 90°회전될 경우, 로드 고정편(811)이
Figure pat00016
형태가 됨으로써, 상부와 하단이 결합홈(821)의 내부에서 삽입하는 형태로 결합될 수 있게 된다.To this end, it is preferable that the coupling groove 821 is provided to have an elliptical shape. That is, the open portion of the coupling groove 821 is the rod fixing piece 811
Figure pat00015
The upper and lower parts adjacent to the open part of the coupling groove 821, which are equal to or slightly larger than the horizontal length so that insertion can be easily performed, are provided smaller than the vertical length of the rod fixing piece 811, so that the pipe support rod When 810 is rotated 90°, the rod fixture 811
Figure pat00016
By being in the form, the upper and lower ends can be coupled in a form inserted into the coupling groove 821.

한편, 상기 토류 프레임(A)은 관(P)의 설치가 완료된 후 인발시키기 위한 방안으로 수직 프레임(20)의 상부에 걸이홀(201)이 구비되어 인발부(90)의 와이어(930)가 걸려지게 구비되어 있다.On the other hand, the earth frame (A) is provided with a hanging hole 201 at the top of the vertical frame 20 as a way to draw it out after the installation of the pipe (P) is completed, so that the wire 930 of the drawing part 90 It is provided for hanging.

이러한 상기 인발부(90)는 찬넬형태를 갖는 인발 프레임(910)의 하부에 지지 프레임(920)이 구비되어지고, 상기 인발 프레임(910)의 상부에 와이어(930)가 귄취된 와이어 권취부(940)가 구비됨으로써, 미도시한 전원이 인가 여부에 따라 와이어 권취부(940)가 정역회전되어 토류 프레임(A)을 인발시킬 수 있게 된다.In the drawing part 90, the support frame 920 is provided under the drawing frame 910 having a channel shape, and the wire winding part in which the wire 930 is wound on the top of the drawing frame 910 ( 940) is provided, the wire winding unit 940 is rotated forward and reverse depending on whether power (not shown) is applied, thereby drawing out the earth frame A.

이와 같은 관매설용 토류 프레임을 이용하여 관이 매설되는 과정은 다음과 같다.The process of burying a pipe using such an earth frame for pipe burial is as follows.

먼저, 도6의(a)에 도시된 바와 같이, 관이 매설될 지면의 상부에 도1 내지 도4에 도시된 바와 같이, 간격유지 프레임(SF)에 의하여 토류 프레임(A)이 일정한 간격이 유지되도록 안착되도록 한 후 굴착기를 이용하여 굴착을 하게 되면 굴착되는 깊이에 따라 토류 프레임(A)이 도6의(b)에 도시된 바와 같이, 하부로 이동하게 된다. 이때, 토류 프레임(A)의 자체 하중에 의하여 굴착이 이루어지는 바닥까지 이동되는 과정에서 토류 프레임(A)의 상부에 일점쇄선으로 도시된 하중재하부(40)에 물이 채워져 있을 경우, 토류 프레임(A)의 자중에 하중재하부(40)의 하중이 더 작용하게 됨에 따라 용이하게 하부로 이동될 수 있게 된다.First, as shown in (a) of FIG. 6, as shown in FIGS. 1 to 4 on the upper part of the ground where the pipe is to be buried, the earth frame A is spaced at regular intervals by the space maintaining frame SF After being seated so as to be maintained, when excavation is performed using an excavator, the earth frame (A) moves downward according to the depth to be excavated, as shown in FIG. 6 (b). At this time, in the process of moving to the floor where the excavation is performed by the load of the earth frame (A) itself, when water is filled in the lower loading portion 40 shown in a dotted line on the upper part of the earth frame (A), the earth frame ( As the weight of the load member lower part 40 acts more on the weight of A), it can be easily moved to the lower part.

다음, 보일링 현상을 방지하기 위한 방안으로 도6의(c)에 도시된 바와 같이, 상승방지패널(70)의 양측이 패널지지구(60)에 의하여 눌려지도록 한 후 이어 도6의(d)에 도시된 바와 같이, 상승방지패널(70)의 상부에 관(P)이 미도시한 플랜지 등에 결합된 상태로 얹혀지도록 한다.Next, as a method for preventing the boiling phenomenon, as shown in (c) of FIG. 6, both sides of the anti-rise panel 70 are pressed by the panel support 60, and then in (d) of FIG. As shown in ), the tube P is placed on top of the anti-lift panel 70 while being coupled to a flange not shown.

다음, 상승방지패널(70)에 얹혀진 관(P)이 유동되는 것을 방지할 수 있도록 하기 위한 방안으로 도6의(e)에 도시된 바와 같이, 상승방지패널(70)의 상부로 얹혀진 관(P)에 관지지구(80)의 관지지로드(810)가 눌려질 수 있게 한다. 이때, 관지지로드(810)의 양측단부에 구비된 로드고정편(811)이 결합편 몸체(822)에 구비된 결합홈(821)에 끼워진 상태에서 관지지로드(810)를 90°회전시킴으로써, 관지지로드(810)가 유동됨이 없이 억지끼워맞춤형태로 결합, 고정된 상태가 유지된다. Next, as shown in (e) of FIG. 6 as a way to prevent the pipe P placed on the anti-lift panel 70 from flowing, the pipe placed on the top of the anti-lift panel 70 ( P) allows the tube support rod 810 of the tube support 80 to be pressed. At this time, by rotating the pipe support rod 810 by 90 ° in a state where the rod fixing pieces 811 provided at both ends of the pipe support rod 810 are fitted into the coupling grooves 821 provided in the coupling piece body 822. , The tube support rod 810 is coupled in an interference fit form without movement, and the fixed state is maintained.

다음, 관(P)의 설치가 마무리된 상태에서 관지지로드(810)와 상승방지패널(70)이 분리되도록 한 후 도6의(f)에 도시된 바와 같이, 되메우기 및 다짐질이 이루어지도록 하고, 하중재하부(40)의 배출밸브(420)를 열어 저류조(410)에 있는 물이 외부로 배수되도록 하여 전체적으로 하중이 줄어들도록 하고, 이어 도6의(g)에 도시된 바와 같이, 토류 프레임(A)이 인발되어질 직상부에 인발부(90)가 위치되도록 한 후 와이어(930)를 수직 프레임(20)의 상부에 구비된 걸이홀(201)에 걸고, 이어 와이어 권취부(940)를 구동하게 됨으로써, 와이어(930)가 와이어 권취부(940)에 감겨지면서 토류 프레임(A)의 수직 프레임(20)이 지면속에서 지면밖으로 인발되고, 이어 포장공사를 하게 되는 것으로 관의 매설작업이 마무리된다.Next, after the pipe support rod 810 and the anti-lift panel 70 are separated in the state in which the installation of the pipe P is completed, as shown in (f) of FIG. 6, backfilling and compaction are performed. And, by opening the discharge valve 420 of the lower load unit 40, the water in the storage tank 410 is drained to the outside so that the overall load is reduced, and then, as shown in FIG. After the drawing part 90 is positioned directly above where the frame A is to be drawn, the wire 930 is hooked to the hanging hole 201 provided at the top of the vertical frame 20, and then the wire winding part 940 By driving the wire 930 is wound around the wire winding unit 940, the vertical frame 20 of the earth frame A is drawn from the ground out of the ground, and then the paving work is performed, and the pipe burial work this is finished

도7은 이 건 발명에 따른 관매설용 토류 프레임의 다른 실시예를 도시한 정면도이다.7 is a front view showing another embodiment of the earth frame for pipe burial according to the present invention.

이 건 발명에서는 토류 프레임(A)의 수직 프레임(20)이수평 프레임(10)의 길이와 비슷하게 하였으나, 이러한 형태 이외에 도7에 도시된 바와 같이, 수직 프레임(20)의 길이를 길게 한 상태에서 수직 프레임(20) 사이에 일정 간격을 갖는 수평 프레임(10)과 보강 프레임(30)이 구비되도록 할 수 있다. 이는 깊이가 더 깊은 곳 까지 관(P)이 매설될 수 있도록 하기 위함이다.In this invention, the vertical frame 20 of the earth frame A is similar in length to the horizontal frame 10, but in addition to this form, as shown in FIG. 7, in a state where the length of the vertical frame 20 is increased The horizontal frame 10 and the reinforcing frame 30 having a predetermined interval between the vertical frames 20 may be provided. This is to allow the pipe (P) to be buried to a deeper place.

10:수평 프레임 20:수직 프레임
30:보강 프레임 40:하중재하부
50:강재 토류판 60:패널 지지구
70:상승방지패널 80:관지지구
110:삽입 가이드 410:저류조
420:배출밸브
10: horizontal frame 20: vertical frame
30: reinforcement frame 40: lower load load
50: steel soil plate 60: panel support
70: rise prevention panel 80: tube support
110: Insertion guide 410: Retention tank
420: discharge valve

Claims (7)

굴착된 바닥에 관이 안착되게 지지되는 관매설용 토류 프레임(A)에 있어서,
상기 토류 프레임(A)은 수평 프레임(10)의 양측 단부에 하부로 수직 프레임(20)의 상단이 맞대어지게 구비되어지고, 상기 수평 프레임(10)과 수직 프레임(20)의 내측에 보강 프레임(30)이 맞대어지게 구비됨을 특징으로 하는 관매설용 토류 프레임.
In the soil frame (A) for pipe installation in which the pipe is supported so that the pipe is seated on the excavated floor,
The soil frame (A) is provided so that the upper end of the vertical frame 20 is abutted to the lower end of both ends of the horizontal frame 10, and the reinforcing frame inside the horizontal frame 10 and the vertical frame 20 ( 30) earth frame for pipe burial, characterized in that provided abutted.
제1항에 있어서,
상기 수평 프레임(10)과 수직 프레임(20) 및 보강 프레임(30)은 I형태를 갖도록 구비됨을 특징으로 하는 관매설용 토류 프레임.
According to claim 1,
The horizontal frame (10), the vertical frame (20) and the reinforcing frame (30) are provided to have an I shape.
제1항에 있어서,
상기 수평 프레임(10)은 하단에 하부 내측을 향하여 경사진 형태를 갖는 삽입 가이드(110)가 구비됨을 특징으로 하는 관매설용 토류 프레임.
According to claim 1,
The horizontal frame 10 is an earth frame for pipe burial, characterized in that the insertion guide 110 having a shape inclined toward the lower inner side is provided at the lower end.
제1항에 있어서,
상기 토류 프레임(A)은 수평 프레임(10)의 상부에 하중재하부(40)가 구비되어지되, 상기 하중재하부(40)는 상부가 개방된 저류조(410)로 구비되어지고, 상기 저류조(410)에 배출밸브(420)가 구비됨을 특징으로 하는 관매설용 토류 프레임.
According to claim 1,
The earth frame (A) is provided with a lower load portion 40 on the upper portion of the horizontal frame 10, and the lower load portion 40 is provided as a storage tank 410 with an open top, and the storage tank ( 410) earth frame for pipe burial, characterized in that the discharge valve 420 is provided.
제1항에 있어서,
상기 토류 프레임(A)은 일정 간격으로 배열된 수직 프레임(20) 사이에 강재 토류판(50)이 구비됨을 특징으로 하는 관매설용 토류 프레임.
According to claim 1,
The earth frame (A) is an earth frame for pipe burial, characterized in that a steel earth plate 50 is provided between vertical frames 20 arranged at regular intervals.
제1항에 있어서,
상기 토류 프레임(A)은 수직 프레임(20)의 하단에서 상부를 향하여 일정 간격 이격된 곳에 패널 지지구(60)가 구비되어 굴착된 바닥에 안착된 상승방지패널(70)이 눌려지게 구비됨을 특징으로 하는 관매설용 토류 프레임.
According to claim 1,
The soil frame (A) is provided with a panel support 60 spaced apart from the bottom of the vertical frame 20 at a predetermined interval toward the top, and the anti-rise panel 70 seated on the excavated floor is provided to be pressed. earth frame for pipe burial.
제1항에 있어서,
상기 토류 프레임(A)은 수직 프레임(20)의 하단에서 상부를 향하여 일정 간격으로 이격된 곳에 관지지구(80)가 구비되어 상승방지패널(70)에 안착된 관(P)의 상부가 눌려지게 구비됨을 특징으로 하는 관매설용 토류 프레임.
According to claim 1,
The soil frame (A) is provided with a pipe support 80 spaced apart at regular intervals from the bottom of the vertical frame 20 toward the top, so that the top of the pipe P seated on the anti-rise panel 70 is pressed An earth frame for pipe burial, characterized in that provided.
KR1020210091670A 2021-07-13 2021-07-13 Earth frame for the pipe laying KR102571807B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210091670A KR102571807B1 (en) 2021-07-13 2021-07-13 Earth frame for the pipe laying

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210091670A KR102571807B1 (en) 2021-07-13 2021-07-13 Earth frame for the pipe laying

Publications (2)

Publication Number Publication Date
KR20230011082A true KR20230011082A (en) 2023-01-20
KR102571807B1 KR102571807B1 (en) 2023-08-29

Family

ID=85108718

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210091670A KR102571807B1 (en) 2021-07-13 2021-07-13 Earth frame for the pipe laying

Country Status (1)

Country Link
KR (1) KR102571807B1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130003919A (en) * 2011-07-01 2013-01-09 조선대학교산학협력단 Damping system and construction method of that
KR101656367B1 (en) 2015-06-18 2016-09-09 주식회사 신암이앤씨 Temporary Construction Method of Soil Arresting Structure for Laying Pipe Below Rood
KR101818669B1 (en) * 2017-06-13 2018-01-16 이에스피 주식회사 Soil Guard Structure
KR101856672B1 (en) * 2017-12-28 2018-05-14 유라이닝(주) Method for Reparing the Pipe using a Protect Guard and Thermostat in Work Zone
KR20190047862A (en) * 2017-10-30 2019-05-09 김윤상 A construction method of buried arch structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130003919A (en) * 2011-07-01 2013-01-09 조선대학교산학협력단 Damping system and construction method of that
KR101656367B1 (en) 2015-06-18 2016-09-09 주식회사 신암이앤씨 Temporary Construction Method of Soil Arresting Structure for Laying Pipe Below Rood
KR101818669B1 (en) * 2017-06-13 2018-01-16 이에스피 주식회사 Soil Guard Structure
KR20190047862A (en) * 2017-10-30 2019-05-09 김윤상 A construction method of buried arch structure
KR101856672B1 (en) * 2017-12-28 2018-05-14 유라이닝(주) Method for Reparing the Pipe using a Protect Guard and Thermostat in Work Zone

Also Published As

Publication number Publication date
KR102571807B1 (en) 2023-08-29

Similar Documents

Publication Publication Date Title
CN103306289B (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN107090851B (en) The inverted side-wall construction method of downtown area open cut groove
KR101612521B1 (en) Method for constructing underground structures restraining transformation and using external wall
CN109371980B (en) Deep foundation pit enclosure construction method combining spray anchor reverse construction and punched pile
CN110219359A (en) A kind of Submersed type inspection well and its construction method
CN112064751A (en) Deep groove construction method for drainage pipeline
CN206428707U (en) A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation
CN113152518A (en) Water-rich stratum foundation pit pile plate wall inter-pile gravel reverse-filtration seepage-proofing structure and construction method
KR20140096731A (en) Underground water drainage system of excavated ground and pipeline construction method using the same
CN112627840A (en) Leading guiding mechanism of pipe jacking engineering
KR102571807B1 (en) Earth frame for the pipe laying
CN113266362B (en) Top pipe cover excavation construction method for penetrating through existing dense anchor cable area
KR102571803B1 (en) Pipe laying method using the earth frame
JPH11166231A (en) Bottom widening existing pile and embedding machine
CN209923935U (en) Co-location combined pile wall supporting structure in upper-soft and lower-hard stratum
CN106567381B (en) Construction process of large U-shaped steel sheet pile
CN218969976U (en) Pushing structure suitable for pushing method construction continuous wall
KR102149709B1 (en) Deformation prevention method of files for retaining wall of underground
CN214784160U (en) Gravel reverse-filtering anti-seepage structure between piles of pile plate wall of foundation pit in water-rich stratum
CN218148481U (en) Temporary support structure for trestle pile and trestle pile group
CN218373954U (en) Floating pebble stratum cofferdam device
JPS5847092Y2 (en) Earth retention shoring device for excavated trenches
CN103669370B (en) Recoverable combined groove excavation foundation fit supporting device and construction method
CN218540761U (en) Assembled foundation auxiliary supporting device for drainage pipeline of soft soil foundation of road
CN115492161B (en) Construction method for building basement storey-adding three-side surrounding pipe curtain of existing building

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant