JPH08144283A - Landslide protection wall timbering material - Google Patents

Landslide protection wall timbering material

Info

Publication number
JPH08144283A
JPH08144283A JP28326894A JP28326894A JPH08144283A JP H08144283 A JPH08144283 A JP H08144283A JP 28326894 A JP28326894 A JP 28326894A JP 28326894 A JP28326894 A JP 28326894A JP H08144283 A JPH08144283 A JP H08144283A
Authority
JP
Japan
Prior art keywords
jack
outer box
hydraulic jack
adjusting
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP28326894A
Other languages
Japanese (ja)
Inventor
Kazuo Akiyama
和雄 秋山
Toshizo Yoshida
利三 吉田
Naohito Fujiwara
猶仁 藤原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nishimatsu Construction Co Ltd
Original Assignee
Nishimatsu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nishimatsu Construction Co Ltd filed Critical Nishimatsu Construction Co Ltd
Priority to JP28326894A priority Critical patent/JPH08144283A/en
Publication of JPH08144283A publication Critical patent/JPH08144283A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE: To conduct the assembly of a length-adjusting member mainly on the ground, to remove high-place operation and improve safety, to economize jack hire because a Jack is removed and a hydraulic jack can be diverted on its midway even when the hydraulic jack is used as a pre-load jack, to utilize the jack as one having large stroke width by previously combining the jack and an adjusting material and to introduce sufficient pre-load. CONSTITUTION: A landslide protection wall timbering material consists of an outer box material 11 and an extension material 12 inserted into the outer box material 11 from an end section as an expansion member previously bonded with a landslide protection wall timbering main material on the ground, and an opening 17 is formed to the top face of the end section in the outer box 11. A hydraulic jack 20, which is taken in and out freely from the opening 17, and adjusting materials 21a-21c are disposed in a clearance between the end of the extension material 12 and another end of the opening 17 in the outer box material 11, and the extension material 12 after movement by the hydraulic jack 20 and the outer box material 11 are fixed by temporary assembling bolts 23.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建物の地下階部分の構
築や地下構造物の構築などで、基礎工事としての開削工
事を行う場合の山留め支保工材に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a mountain retaining material for excavation work as a foundation work for construction of a basement floor of a building or construction of an underground structure.

【0002】[0002]

【従来の技術】山留め支保工材としては、図12に示すよ
うに山留め壁1に沿わせる腹起し主材2とこの腹起し主
材2に直交する切梁り主材3などからなるが、切梁り主
材3は最終段階で長さを調整の上、土圧に対抗するため
のプレロード等を行っている。
2. Description of the Related Art As a mountain retaining material, as shown in FIG. 12, an agitated main material 2 along a mountain retaining wall 1 and a beamed main material 3 orthogonal to the agitated main material 2 are provided. However, the length of the main beam 3 for cutting is adjusted at the final stage, and preloading or the like for counteracting earth pressure is performed.

【0003】図13にも示すように長さの調整は調整材4
を配設することで行い、プレロードはキリンジャッキ5
や油圧ジャッキなどによるプレロードジャッキを組み込
み、その推進力を付加することで行う。
As shown in FIG. 13, the length is adjusted by adjusting member 4.
It is done by arranging, and the preload is the giraffe jack 5.
This is done by incorporating a preload jack such as a hydraulic jack or a hydraulic jack and adding its propulsion force.

【0004】図中6は火打主材、7は火打受ピース、8
は隅部ピース、9はジャッキ補強ピース、10は交差部ピ
ースである。なお、山留め壁1の構成は図示のごとくH
型鋼・横矢板やシートパイル方式の場合の他、鋼管杭や
コンクリート柱列杭の場合など種々である。
In the drawing, 6 is a main material for smashing, 7 is a piece for receiving smashing, and 8
Is a corner piece, 9 is a jack reinforcement piece, and 10 is an intersection piece. The structure of the mountain retaining wall 1 is H as shown in the figure.
There are various types such as steel pipe piles and sheet pile systems, as well as steel pipe piles and concrete column piles.

【0005】[0005]

【発明が解決しようとする課題】前記調整材4は巾100
〜500mm 程度のもので、これはプレロードジャッキであ
るキリンジャッキ5とは別体のものとして組み込む。ま
た、この組み込み作業も高所作業となるが、キリンジャ
ッキ5を操作するプレロード作業も切梁り仮設の最終段
階で行う高所作業となる。
The adjusting material 4 has a width of 100.
It is about 500 mm, and it is installed separately from the Kirin jack 5, which is a preload jack. Further, this assembling work also becomes an aerial work, but the preloading work for operating the giraffe jack 5 also becomes an aerial work at the final stage of the temporary construction of the beam.

【0006】さらに、キリンジャッキ5ではそのストロ
ークが短いために充分なプレロードが導入できないこと
もあり、また、撤去の際にも土圧がかかっているため、
このキリンジャッキ5を緩めることができず、ジャッキ
取手を大ハンマーで破損するなどの不具合もある。
Furthermore, since the giraffe jack 5 has a short stroke, it may not be possible to introduce a sufficient preload, and since earth pressure is applied during removal,
The giraffe jack 5 cannot be loosened and there is a problem that the jack handle is damaged by a large hammer.

【0007】一方、キリンジャッキ5でなく油圧ジャッ
キを用いた場合でも、調整材を現場で切梁り主材3を架
設する段階で合わせなければならないことに変わりはな
く、また、最後までこの油圧ジャッキを撤去することが
できないので損料も高くなる。
On the other hand, even when the hydraulic jack is used instead of the giraffe jack 5, the adjusting material still has to be adjusted at the stage of erection of the main beam 3 with the beam, and this hydraulic pressure is applied to the end. The loss is high because the jack cannot be removed.

【0008】本発明の目的は前記従来例の不都合を解消
し、長さの調整の部材は組み込みを主として地上で行う
ことができ、高所作業を無くして安全性を高めることが
でき、また、プレロードジャッキとして油圧ジャッキを
用いた場合でも途中でジャッキを撤去して転用できるの
でジャッキ損料の節減になり、また、ジャッキはこれと
調整材を予め組み合わせることによりストローク巾の大
きなものとして利用でき、充分なプレロードを導入する
ことができる山留め支保工材を提供することにある。
The object of the present invention is to eliminate the disadvantages of the above-mentioned conventional example, the member for adjusting the length can be incorporated mainly on the ground, work at height can be eliminated, and the safety can be improved. Even if a hydraulic jack is used as the preload jack, the jack can be removed and diverted on the way, which saves jack damage and the jack can be used with a large stroke width by combining it with an adjustment material in advance. The purpose of the present invention is to provide a mountain retaining material that can introduce various preloads.

【0009】[0009]

【課題を解決するための手段】本発明は前記目的を達成
するため、第1に、山留め支保工主材に予め地上で結合
する伸縮部材として、外箱材とこの外箱材内に端部から
差し入れる伸長材とからなり、外箱材は端部の上面に開
口を形成し、この開口から出し入れ自在な油圧ジャッキ
とこの油圧ジャッキが当接する調整材とを外箱材内で伸
長材端との隙間に配設し、前記油圧ジャッキで移動後の
伸長材と外箱材とは仮組ボルトで固定するようにしたこ
と、第2に、調整材は、板状で、厚さの異なる数種類の
ものから選択すること、第3に、油圧ジャッキは、U字
形のジャッキ受け台とともに開口から出し入れすること
を要旨とするものである。
In order to achieve the above-mentioned object, the present invention firstly comprises an outer box material and an end portion inside the outer box material as an elastic member which is preliminarily connected to the mountain retaining support main material on the ground in advance. The outer box material has an opening formed on the upper surface of the end, and the hydraulic jack that can be inserted and removed freely through this opening and the adjustment material that the hydraulic jack abuts are placed inside the outer box material. The adjusting member is arranged in a gap between the moving member and the outer casing member after being moved by the hydraulic jack, and is fixed with a temporary assembly bolt. Secondly, the adjusting member is plate-shaped and has a different thickness. The main point is to select from several types, and thirdly, the hydraulic jack is to be put in and taken out from the opening together with the U-shaped jack receiving base.

【0010】[0010]

【作用】請求項1記載の本発明によれば、伸縮部材を構
成する外箱材と伸長材はそれぞれ予め地上で山留め支保
工主材である切梁り主材に結合して、かつ外箱材内に伸
長材を端部から差し入れた状態で架設できる。そして、
外箱材内で伸長材端との隙間に油圧ジャッキとこの油圧
ジャッキが当接する調整材とを開口を介して配設し、油
圧ジャッキを伸長すれば、調整材を介して伸長材が押し
出され、プレロードがかけられる。そして、油圧ジャッ
キで移動後の伸長材と外箱材とは仮組ボルトで固定すれ
ば、その後は油圧ジャッキや調整材は開口より取り出し
てこれを他に転用できる。
According to the present invention as set forth in claim 1, the outer box material and the elongate material constituting the elastic member are preliminarily bonded on the ground to the sill beam main material which is the main material of the mountain retaining support, and the outer box. It can be erected with the stretched material inserted from the end into the material. And
If the hydraulic jack and the adjusting material with which this hydraulic jack abuts are arranged through the opening in the gap between the extending material end in the outer box material and the hydraulic jack is extended, the extending material is pushed out through the adjusting material. , Preload is applied. Then, if the stretched material and the outer casing material after being moved by the hydraulic jack are fixed by temporary assembly bolts, then the hydraulic jack and the adjusting material can be taken out from the opening and diverted to another.

【0011】なお、山留め支保工の解体時に仮組ボルト
を外す作業で調整材をさらに押し込む必要があるとき
は、再度油圧ジャッキや調整材を設置すればよい。
When it is necessary to further push in the adjusting member in the work of removing the temporary assembling bolt at the time of disassembling the mountain retaining support, the hydraulic jack and the adjusting member may be installed again.

【0012】請求項2記載の本発明によれば、前記作用
に加えて、調整材は、板状で、厚さの異なる数種類のも
のから選択できるので、これらを適宜組み合わせれば必
要な調整巾を簡単に得ることができる。
According to the second aspect of the present invention, in addition to the above-mentioned action, the adjusting material can be selected from several kinds having a plate shape and different thicknesses. Can be easily obtained.

【0013】請求項3記載の本発明によれば、油圧ジャ
ッキはジャッキ受け台とともに開口から出し入れするの
で安定した状態で配設でき、また、このジャッキ受け台
は調整材を配置する際の添え材としても役立つ。
According to the present invention as set forth in claim 3, the hydraulic jack can be arranged in a stable state because it is put in and taken out from the opening together with the jack receiving base, and the jack receiving base is an attachment material when the adjusting material is arranged. Also useful as.

【0014】[0014]

【実施例】以下、図面について本発明の実施例を詳細に
説明する。図1は本発明の山留め支保工材の1実施例を
示す縦断側面図、図2は同上平面図である。
Embodiments of the present invention will now be described in detail with reference to the drawings. FIG. 1 is a vertical sectional side view showing an embodiment of a mountain clasp support material of the present invention, and FIG. 2 is a plan view of the same.

【0015】図中3は切梁り主材であるが、これに予め
地上で結合する伸縮部材としては、外箱材11とこの外箱
材11内に端部から差し入れる伸長材12とからなる。
Reference numeral 3 in the drawing is a main member of the beam, and as an elastic member to be preliminarily joined to the main member, an outer box member 11 and an extension member 12 to be inserted into the outer box member 11 from the end are used. Become.

【0016】図3にも示すように、前記伸長材12はボッ
クスタイプのものであり、一端近くに切梁り主材3との
結合をなすカバープレート15をボルト止めするための開
口13を設け、他端近くに長穴等によるボルト挿通孔14を
適宜間隔で設けた。
As shown in FIG. 3, the extension member 12 is of a box type, and an opening 13 is provided near one end for bolting a cover plate 15 that is connected to the main member 3 of the beam. The bolt insertion holes 14 such as elongated holes are provided at appropriate intervals near the other end.

【0017】外箱材11は一端は前記伸長材12が挿入する
開口端となっており、また、他端には切梁り主材3との
結合を行うカバープレート15を止める結合部16を設け
た。この結合部16は山留め支保工で使用する補助ピース
的なものでよい。
One end of the outer box material 11 is an open end into which the elongate material 12 is inserted, and the other end is provided with a connecting portion 16 for stopping a cover plate 15 for connecting with the main beam 3 for beaming. Provided. The connecting portion 16 may be an auxiliary piece used in mountain retaining support work.

【0018】さらに、該結合部16がある側で外箱材11の
上面に長さ方向に沿う開口17を形成し、また、前記ボル
ト挿通孔14に対応するものとして、この外箱材11の側部
にもボルト挿通孔18を適宜間隔で設ける。
Further, an opening 17 along the length direction is formed on the upper surface of the outer box material 11 on the side where the connecting portion 16 is present, and the outer box material 11 of the outer box material 11 corresponds to the bolt insertion hole 14. Bolt insertion holes 18 are also provided in the side portions at appropriate intervals.

【0019】前記開口17を介して外箱材11内に収めるも
のとしては、図7に示すようなU字形のジャッキ受け台
19と、このジャッキ受け台19の内部に横たえるように配
置する油圧ジャッキ20と、図4〜6に示すような調整材
21a,21b,21cである。
A U-shaped jack cradle as shown in FIG. 7 is to be accommodated in the outer box member 11 through the opening 17.
19, a hydraulic jack 20 arranged so as to lie inside the jack cradle 19, and an adjusting member as shown in FIGS.
21a, 21b and 21c.

【0020】この調整材21aは前記伸長材12の断面と同
程度の大きさの板状のタイプのもので、図1に示すよう
にその厚さで何種類かある。また、調整材21bは外形の
大きさは調整材21aと同程度であるが、中を油圧ジャッ
キ20のロッドが通過するように開口とした横コ字状のも
ので、これもその厚さで何種類かある。さらに、調整材
21cは枠組みのボックスタイプとして構成し、断面積は
調整材21aと同じであるが、大きな厚みが取れるものと
する。これらは適宜把手22を設けておく。
The adjusting member 21a is of a plate-like type having the same size as the cross section of the extending member 12, and there are several kinds of adjusting members as shown in FIG. Further, the adjusting member 21b has an outer shape similar to that of the adjusting member 21a, but is a horizontal U-shaped member having an opening through which the rod of the hydraulic jack 20 passes, which is also the thickness thereof. There are several types. In addition, adjustment material
21c is constructed as a box type frame, and has the same cross-sectional area as the adjusting material 21a, but a large thickness. A handle 22 is provided for each of these.

【0021】なお、図9、図10に示すように油圧ジャッ
キ20もその推進力の異なるものが数種類があるとして、
それに対応すべくジャッキ受け台19も内部空間および肉
厚の異なる複数のものを準備する。
As shown in FIGS. 9 and 10, there are several types of hydraulic jacks 20 having different propulsive forces.
In order to cope with this, a plurality of jack pedestals 19 having different internal spaces and different wall thicknesses are prepared.

【0022】以上が部材の説明であるが、外箱材11とこ
の外箱材11内に端部から伸長材12を差し入れ、カバープ
レート15により予め地上でこれらを切梁り主材3に結合
し、また、開口17を介して外箱材11内で伸長材12端との
隙間に、ジャッキ受け台19とこれに収めた油圧ジャッキ
20、該ジャッキ受け台19の前の調整材21b、さらにその
前の調整材21aもしくは調整材21cを配設する。
The above is the description of the members. The outer box member 11 and the extension member 12 are inserted into the outer box member 11 from the ends, and these are joined to the main beam 3 by the cover plate 15 in advance on the ground. In addition, through the opening 17, in the gap between the extension member 12 end inside the outer box member 11, the jack receiving base 19 and the hydraulic jack housed therein.
20, an adjusting member 21b in front of the jack receiving base 19, and an adjusting member 21a or an adjusting member 21c in front of the adjusting member 21b are arranged.

【0023】その後、切梁り主材3を架設するが、前記
ジャッキ受け台19とこれに収めた油圧ジャッキ20や調整
材21a,21b,21cの配設はこの切梁り主材3のを架設
後に行ってもよい。
After that, the main beam 3 of the beam is erected. The jack receiving base 19 and the hydraulic jacks 20 and the adjusting members 21a, 21b, 21c housed therein are arranged on the main beam 3 of the beam. You may go after erection.

【0024】このようにして油圧ジャッキ20を伸長すれ
ば、調整材調整材21aや調整材21cを介して伸長材12が
外箱材11外へ押し出され、プレロードがかけられる。先
に述べたように調整材21bは中を油圧ジャッキ20のロッ
ドが通過するので、これは整材調整材21aや調整材21c
とジャッキ受け台19との間にあり、全体のガタツキ防止
をなす。また、ジャッキ受け台19はこれがあると油圧ジ
ャッキ20を安定して設置できるとともに、調整材21a〜
21cを配置する際の添え材としても役立つ。
When the hydraulic jack 20 is extended in this manner, the extension material 12 is pushed out of the outer box material 11 via the adjustment material adjustment material 21a and the adjustment material 21c and preloaded. As described above, since the rod of the hydraulic jack 20 passes through the adjusting member 21b, the adjusting member 21a and the adjusting member 21c are used.
Between the jack and the cradle 19 to prevent rattling. Further, the jack cradle 19 allows the hydraulic jack 20 to be stably installed, and the adjustment material 21a to
It also serves as a support when placing 21c.

【0025】そして、かかる油圧ジャッキ20で移動後の
伸長材12は、外箱材11とはボルト挿通孔14と18が合致し
た所で仮組ボルト23を挿通させこれで固定すれば、その
後は油圧ジャッキ20やジャッキ受け台19や調整材は開口
より取り出してこれを他に転用できる。
After the extension member 12 has been moved by the hydraulic jack 20, the temporary assembly bolt 23 is inserted at the place where the bolt insertion holes 14 and 18 are aligned with the outer box member 11 and fixed there. The hydraulic jack 20, the jack pedestal 19 and the adjusting material can be taken out from the opening and used for other purposes.

【0026】[0026]

【発明の効果】以上述べたように本発明の山留め支保工
材は、長さの調整の部材は組み込みを主として地上で行
うことができ、高所作業を無くして安全性を高めること
ができるものである。
As described above, in the mountain retaining support material of the present invention, the member for adjusting the length can be incorporated mainly on the ground, and the work at high places can be eliminated to enhance the safety. Is.

【0027】また、プレロードジャッキとして油圧ジャ
ッキを用いた場合でも途中でジャッキを撤去してこれを
転用できるのでジャッキ損料の節減になり、また、ジャ
ッキはこれと調整材を予め組み合わせることによりスト
ローク巾の大きなものとして利用でき、充分なプレロー
ドを導入することができるものである。
Further, even when a hydraulic jack is used as the preload jack, the jack can be removed and diverted in the middle, so that the jack damage can be saved, and the jack can be adjusted in advance in stroke width by combining it with an adjusting material. It can be used as a large one and can introduce sufficient preload.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の山留め支保工材の1実施例を示す縦断
側面図である。
FIG. 1 is a vertical cross-sectional side view showing an embodiment of a mountain retaining support material of the present invention.

【図2】本発明の山留め支保工材の1実施例を示す平面
図である。
FIG. 2 is a plan view showing an embodiment of a mountain retaining support material of the present invention.

【図3】本発明の山留め支保工材の伸縮部材の構成を示
す斜視図である。
FIG. 3 is a perspective view showing a configuration of an elastic member of the mountain clasp support member of the present invention.

【図4】調整材の1例を示す斜視図である。FIG. 4 is a perspective view showing an example of an adjusting material.

【図5】調整材の他例を示す斜視図である。FIG. 5 is a perspective view showing another example of the adjusting material.

【図6】調整材の更に他例を示す斜視図である。FIG. 6 is a perspective view showing still another example of the adjusting material.

【図7】ジャッキ受け台の斜視図である。FIG. 7 is a perspective view of a jack pedestal.

【図8】図1のB−B線断面図である。8 is a cross-sectional view taken along the line BB of FIG.

【図9】図1のA−A線断面図である。9 is a cross-sectional view taken along the line AA of FIG.

【図10】ジャッキ受け台の他例の場合の図1のA−A
線断面図である。
10] AA of FIG. 1 in the case of another example of a jack cradle
It is a line sectional view.

【図11】本発明の山留め支保工材の組み込み状態を示
す説明図である。
FIG. 11 is an explanatory view showing a built-in state of the mountain retaining material of the present invention.

【図12】山留め支保工の一般例を示す斜視図である。FIG. 12 is a perspective view showing a general example of mountain retaining support work.

【図13】従来例を示す説明図である。FIG. 13 is an explanatory diagram showing a conventional example.

【符号の説明】[Explanation of symbols]

1…山留め壁 2…腹起し主材 3…切梁り主材 4…調整材 5…キリンジャッキ 6…火打主材 7…火打受ピース 8…隅部ピース 9…ジャッキ補強ピース 10…交差部ピー
ス 11…外箱材 12…伸長材 13…開口 14…ボルト挿通
孔 15…カバープレート 16…結合部 17…開口 18…ボルト挿通
孔 19…ジャッキ受け台 20…油圧ジャッ
キ 21a〜21c…調整材 22…把手 23…仮組ボルト
1 ... Mountain retaining wall 2 ... Raised main material 3 ... Girder main material 4 ... Adjusting material 5 ... Kirin jack 6 ... Firing main material 7 ... Firing piece 8 ... Corner piece 9 ... Jack reinforcing piece 10 ... Crossing part Piece 11 ... Outer box material 12 ... Stretching material 13 ... Opening 14 ... Bolt insertion hole 15 ... Cover plate 16 ... Coupling 17 ... Opening 18 ... Bolt insertion hole 19 ... Jack cradle 20 ... Hydraulic jack 21a-21c ... Adjusting material 22 … Handle 23… Temporary assembly bolt

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 山留め支保工主材に予め地上で結合する
伸縮部材として、外箱材とこの外箱材内に端部から差し
入れる伸長材とからなり、外箱材は端部の上面に開口を
形成し、この開口から出し入れ自在な油圧ジャッキと調
整材とを外箱材内で伸長材端との隙間に配設し、前記油
圧ジャッキで移動後の伸長材と外箱材とは仮組ボルトで
固定するようにしたことを特徴とする山留め支保工材。
1. An expansion / contraction member that is preliminarily joined to the mountain retaining support main material on the ground. The expansion / contraction member is composed of an outer box material and an elongate material inserted into the outer box material from the end. An opening is formed, and a hydraulic jack that can be inserted and removed through this opening and an adjusting material are placed in the outer box material in the gap between the extension material end, and the extension material and the outer box material after moving by the hydraulic jack are temporarily A mountain clasp support material characterized by being fixed with assembled bolts.
【請求項2】 調整材は、板状で、厚さの異なる数種類
のものから選択する請求項1記載の山留め支保工材。
2. The mountain retaining material according to claim 1, wherein the adjusting material is plate-shaped and is selected from several kinds having different thicknesses.
【請求項3】 油圧ジャッキは、U字形のジャッキ受け
台とともに開口から出し入れする請求項1記載の山留め
支保工材。
3. The mountain retaining support material according to claim 1, wherein the hydraulic jack is put in and taken out from the opening together with the U-shaped jack receiving base.
JP28326894A 1994-11-17 1994-11-17 Landslide protection wall timbering material Pending JPH08144283A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28326894A JPH08144283A (en) 1994-11-17 1994-11-17 Landslide protection wall timbering material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28326894A JPH08144283A (en) 1994-11-17 1994-11-17 Landslide protection wall timbering material

Publications (1)

Publication Number Publication Date
JPH08144283A true JPH08144283A (en) 1996-06-04

Family

ID=17663263

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28326894A Pending JPH08144283A (en) 1994-11-17 1994-11-17 Landslide protection wall timbering material

Country Status (1)

Country Link
JP (1) JPH08144283A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013073891A1 (en) * 2011-11-17 2013-05-23 Heo Won Jong Strut and construction method using the strut
CN111088799A (en) * 2019-12-06 2020-05-01 中国建筑第八工程局有限公司 Foundation pit steel support and mounting method thereof
JP2020094329A (en) * 2018-12-10 2020-06-18 ジェコス株式会社 Short strut jack installation box and landslide protection strut
CN111501773A (en) * 2020-04-13 2020-08-07 中建三局集团有限公司 Connecting structure for self-adaptive compensation of supporting axial force in concrete and using method
CN111778984A (en) * 2020-06-28 2020-10-16 苏州建设(集团)有限责任公司 Construction method of deep foundation pit and intelligent detection system thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013073891A1 (en) * 2011-11-17 2013-05-23 Heo Won Jong Strut and construction method using the strut
JP2020094329A (en) * 2018-12-10 2020-06-18 ジェコス株式会社 Short strut jack installation box and landslide protection strut
CN111088799A (en) * 2019-12-06 2020-05-01 中国建筑第八工程局有限公司 Foundation pit steel support and mounting method thereof
CN111088799B (en) * 2019-12-06 2022-07-12 中国建筑第八工程局有限公司 Foundation pit steel support and mounting method thereof
CN111501773A (en) * 2020-04-13 2020-08-07 中建三局集团有限公司 Connecting structure for self-adaptive compensation of supporting axial force in concrete and using method
CN111778984A (en) * 2020-06-28 2020-10-16 苏州建设(集团)有限责任公司 Construction method of deep foundation pit and intelligent detection system thereof
CN111778984B (en) * 2020-06-28 2021-10-29 苏州建设(集团)有限责任公司 Construction method of deep foundation pit and intelligent detection system thereof

Similar Documents

Publication Publication Date Title
KR100571102B1 (en) Device of Innovative Prestressed Scaffolding System for Improving Workability
JP3780816B2 (en) Seismic isolation method for existing buildings
JPH08144283A (en) Landslide protection wall timbering material
JP2000265574A (en) High floor type steel frame footing beam method
JP4067688B2 (en) Construction method of seismic isolation structure
JP2000179161A (en) Vibration-isolation construction method for existing building
KR200270268Y1 (en) The length adjustable lagging
JPH05179647A (en) Supporting structure for earth retaining wall
JPH0362848B2 (en)
JP3063673B2 (en) Foundation structure of building with soil cement pillar row retaining wall tied to frame
JP2979117B2 (en) Building foundation method
JP2001123672A (en) Method and mechanism for shifting existing building for base isolation
JP2001271499A (en) Temporary bearing construction method for existing building by steel batter brace member
KR20050051163A (en) A retaining panel and manufacturing process
CN215715342U (en) Supporting structure with prestressing force pressure components
JP2566162B2 (en) Method for cutting and expanding between parallel tunnels and supporting device used therefor
JP2800688B2 (en) Foundation method of building consisting of high-rise building and low-rise building
JP3809618B2 (en) Foundation pile and construction method of foundation pile
JP2523234B2 (en) Anchor retaining wall
JP2649682B2 (en) Underground structure
JP3177590B2 (en) Existing building seismic isolation structuring method
JPH08189054A (en) Structure coping with uneven settlement
JP3406370B2 (en) Horizontal shaft construction method
JP3002795B2 (en) How to build a building with a basement
JP2842149B2 (en) Underground structure