KR101152270B1 - Precast concrete slab system for building which have long span and require high design load and construction method using this system - Google Patents

Precast concrete slab system for building which have long span and require high design load and construction method using this system Download PDF

Info

Publication number
KR101152270B1
KR101152270B1 KR1020120010774A KR20120010774A KR101152270B1 KR 101152270 B1 KR101152270 B1 KR 101152270B1 KR 1020120010774 A KR1020120010774 A KR 1020120010774A KR 20120010774 A KR20120010774 A KR 20120010774A KR 101152270 B1 KR101152270 B1 KR 101152270B1
Authority
KR
South Korea
Prior art keywords
slab
surface portion
concrete
shear
longitudinal direction
Prior art date
Application number
KR1020120010774A
Other languages
Korean (ko)
Inventor
이원규
최일섭
고수
Original Assignee
정원이엔씨(주)
(주)연우건축구조기술사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정원이엔씨(주), (주)연우건축구조기술사사무소 filed Critical 정원이엔씨(주)
Priority to KR1020120010774A priority Critical patent/KR101152270B1/en
Application granted granted Critical
Publication of KR101152270B1 publication Critical patent/KR101152270B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/43Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/0645Shear reinforcements, e.g. shearheads for floor slabs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

PURPOSE: A PC(precast concrete) slab for a long-span and high-load building and a construction method thereof are provided to minimize cracks generated between plates by efficiently transferring an unbalanced load to the plates. CONSTITUTION: A PC slab(10) for a long-span and high-load building is composed of a bottom part(11), multiple rib parts(12), and a top part. The bottom part is reinforced by reinforcing bars or wire meshes arranged in a latticed shape. The ribs are protruded from the bottom part in a longitudinal direction. Shear reinforcement bars(122) are arranged along the longitudinal direction of the ribs. The top part is formed on the top of the rib parts to be parallel to the bottom part. L-shaped reinforcing bars(131) for transferring an unbalanced load are arranged on both ends of the top part at uniform intervals.

Description

장경간 고하중 건물에 적합한 피씨 슬래브 및 그 시공방법{Precast Concrete Slab System for Building which have Long Span and require High Design Load and Construction Method using this system}Precast Concrete Slab System for Building which have Long Span and require High Design Load and Construction Method using this system}

본 발명은 PC 슬래브 시스템에 관한 것으로, 특히 장경간, 고하중의 물류센터나 창고 건물에 합리적으로 적용 가능한 PC 슬래브 및 그 시공방법에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a PC slab system, and more particularly, to a PC slab and a construction method which can be reasonably applied to a long span, heavy load distribution center or warehouse building.

물류센터와 창고 건물에 대한 수요가 지속적으로 증가하고 있으며, 이와 같은 건물들은 반복적인 평면 모듈로 형성되므로 경제성, 시공성 등을 고려하여 할로우코아 슬래브(Hollow Core Slab), 더블티 슬래브(Double T Slab), 멀티리브드 슬래브(Multi Ribbed Slab) 및 역방향 멀티리브드 슬래브(Inverted Multi Ribbed Slab) 등의 PC 슬래브(Precast Concret Slab) 시스템을 빈번하게 적용하고 있다.The demand for distribution centers and warehouse buildings continues to increase, and these buildings are formed of repetitive flat modules, so that hollow core slabs and double t slabs are considered in consideration of economic feasibility and constructability. Precast Concret Slab systems, such as Multi Ribbed Slab and Inverted Multi Ribbed Slab, are frequently applied.

하지만 최근 물류센터 및 창고 건물이 11m 이상의 장경간 및 20kN/㎡ 이상의 큰 설계하중을 요구함에 따라 기존의 PC 슬래브 시스템으로는 경제성, 시공성 및 구조안정성을 확보하기에는 무리가 있다.However, as distribution centers and warehouse buildings require long spans of more than 11m and large design loads of more than 20kN / ㎡, existing PC slab systems are difficult to secure economic feasibility, constructability and structural stability.

예를 들어, 할로우코아 슬래브의 경우 작은 설계하중에 대해서는 장경간의 건물에도 적용이 가능하지만 슬래브에 전단보강근이 따로 배근되지 않으므로 앞서 언급한 것과 같은 20kN/㎡ 이상의 큰 설계하중을 가지는 강경간 구조에 적용되기 위해서는 춤이 비합리적으로 커지기 때문에 근본적으로 적용이 불가능하다.For example, hollow core slabs can be applied to long span buildings for small design loads, but shear reinforcement is not added to the slabs. Therefore, they are applied to steel span structures with large design loads above 20 kN / ㎡. The dance is fundamentally inapplicable because the dance grows irrationally.

더블티 슬래브, 멀티리브드 슬래브 및 역방향 멀티리브드 슬래브 등은 전단보강근 배치가 가능하므로 장경간, 고하중의 물류센터 및 창고 건물에 적용이 가능하나 춤이 상당히 커지기 때문에 경제성이 떨어진다.Double tee slabs, multi-ribbed slabs, and reverse multi-ribbed slabs can be applied to long-span, high-load distribution centers and warehouse buildings because shear reinforcement can be placed, but they are economically insignificant due to the large dance.

본 발명의 배경이 되는 선행기술로는 공개특허 제2009-0050520호 '리브드 하프 피씨 바닥판 및 그 제조방법'(특허문헌 1)이 있다. As a background art of the present invention, there is a published Patent No. 2009-0050520 'Ribbed Half PC Bottom Plate and a Manufacturing Method thereof' (Patent Document 1).

이 선행기술에서는 얇은 판 형상으로 된 평판부의 상부에 길이방향으로 복수개의 리브부가 일체로 형성되도록 성형된 프리캐스트 콘크리트 판과, 상기 리브부 사이에 설치되는 발포체를 포함하는 것을 특징으로 하는 리브드 하프피씨 바닥판을 제안한다. This prior art includes a precast concrete plate molded to be integrally formed with a plurality of ribs in a longitudinal direction on an upper portion of a thin plate-like plate, and a rib provided between the ribs. Suggests PC bottom plate.

이에 따라 종래 더블티 슬래브에 비해 판의 하면으로 보 형태가 돌출되지 않기 때문에 자유로운 평면계획이 가능하고, 리브 사이에 발포폴리스티렌이 채워져 있으므로 현장타설 콘크리트 물량을 감소시킬 수 있으며 층간 차음 및 충격에도 유리하다는 장점을 가진다. Accordingly, compared to the conventional double tee slab, since the beam shape does not protrude into the lower surface of the plate, free plane planning is possible.Because the foam polystyrene is filled between the ribs, it is possible to reduce the amount of cast-in-place concrete. Has an advantage.

그러나 리브부의 상부가 개방된 개단면 형태로 폐단면에 비해 강성이 작기 때문에 장경간, 고하중의 건물에 적용되면 상부 현장타설 콘크리트가 타설 되기 전의 조립과정에서 시공하중 및 작업하중에 의해 별도의 하부 서포트 보강이 요구될 수 있고, 하부 서포트 보강이 불가능한 경우에는 부재 단면의 춤이 커질 우려가 있다. However, since the rigidity of the upper part of the rib is open compared to the closed section, the rigidity is smaller than that of the closed section. Support reinforcement may be required, and if the lower support reinforcement is impossible, there is a fear that the dance of the cross section of the member becomes large.

또한 바닥판과 바닥판 사이의 접합부가 양측의 바닥판 측면에 각각 형성된 홈을 맞대어 이루는 공간부에 토핑 콘크리트를 충전하여 일체화시킨 구조로서 바닥판과 바닥판 사이의 수평레벨이 맞지 않는 상태에서 접합부가 시공될 경우 상부의 하중 불균형 하중으로 인해 접합부에 균열이 발생하기 쉽다는 단점이 있다.In addition, the joint between the bottom plate and the bottom plate is a structure in which the topping concrete is integrated into the space formed by facing the grooves formed on the side of the bottom plate on both sides. When constructed, there is a disadvantage in that cracks are liable to occur at the joint due to an unbalanced load on the upper part.

공개특허 제2009-0050520호 '리브드 하프 피씨 바닥판 및 그 제조방법'(2009.05.20.공개)Publication No. 2009-0050520 'Ribbed Half PC Bottom Plate and Manufacturing Method thereof' (published May 20, 2009)

본 발명은 상기한 기존의 장경간, 고하중 슬래브 시스템이 가지는 제반 문제점을 해소하기 위한 것으로, 물류센터 및 창고 건물에 합리적으로 적용이 가능한 새로운 장경간, 고하중의 PC 슬래브 및 그 시공방법을 제공하는 것으로 목적으로 한다.The present invention is to solve all the problems of the existing long span, high load slab system, provides a new long span, high-load PC slab and construction method that can be reasonably applied to the distribution center and warehouse building. It is aimed to be.

구체적으로, 11m 이상의 장경간 구조를 가지며 20kN/㎡ 이상의 큰 설계하중을 요구하는 경우 슬래브 단면은 개단면이 아닌 폐단면을 형성하여야 큰 단면 계수를 통해 큰 하중에 견딜 수 있다. 하지만 별도의 전단보강근 배치 없이 PC 슬래브의 콘크리트 단면만으로 큰 전단력에 저항하려면 큰 춤이 필요하므로 층고 부분에서 불리하고 경제성이 떨어진다.Specifically, in the case of having a long span structure of 11 m or more and requiring a large design load of 20 kN / m 2 or more, the slab cross section must form a closed cross section rather than an open cross section to withstand a large load through a large cross section coefficient. However, it is disadvantageous and economical in the floor area because a large dance is required to resist the large shear force only by the concrete cross section of the PC slab without additional shear reinforcement arrangement.

또한 장경간, 고하중 건물에 PC 슬래브를 적용하면 판과 판 사이의 균열이 손쉽게 발생할 수 있고, 슬래브 판 상부의 하중 불균형으로 인해 인접한 판과 판 사이의 수평레벨이 맞지 않는 상태에서 상부 현장 콘크리트(토핑 또는 덧침 콘크리트)를 타설하는 경우가 발생할 수 있기 때문에 판과 판 사이의 불균형 하중을 원활하게 전달하고 균열을 저감할 수 있는 방안이 필요하다.In addition, the application of PC slabs to long span, heavy load buildings can easily cause cracks between the plates and the slabs, and due to the unbalanced loads on the slab plate, the upper level concrete ( Since topping or overlay concrete can be poured, there is a need for a method of smoothly transferring unbalanced loads between plates and reducing cracks.

따라서 본 발명에서는 춤의 증가 없이 큰 하중을 견딜 수 있어 층고에서 유리하고 판과 판 사이에 작용하는 불균형 하중을 원활하게 전달할 수 있어 균열 발생을 최소화할 수 있는 대형 물류센터 및 창고 건물에 적합한 장경간, 고하중 PC 슬래브 및 그 시공방법을 제공하고자 한다.Therefore, in the present invention, it can withstand large loads without increasing the dancing, which is advantageous in the floor height and can smoothly transfer the unbalanced loads acting between the plates and the plates, so that the long span is suitable for large distribution centers and warehouse buildings that can minimize the occurrence of cracks. To provide a high load PC slab and its construction method.

본 발명에 따른 장경간 고하중 건물에 적합한 피씨 슬래브는 콘크리트를 이용하여 일체로 형성되며, 하면부와, 하면부의 폭방향을 따라 일정 간격을 두고 길이방향으로 돌출된 복수 개의 리브부와, 슬래브의 길이방향으로 중앙부는 폐합된 단면이 되도록 하고 양단부는 개방된 단면이 되도록 리브부의 상부에 하면부와 평행하게 형성된 상면부로 구성된 단면 형상을 가진다. 하면부와 상면부는 전체가 격자 형태로 배근된 철근 또는 와이어 메쉬로 보강된다. 각 리브부의 아래쪽 하면부 단면 내에 길이방향으로 배치된 긴장재를 통해 추가로 하면부에는 압축프리스트레스가 도입된다. 리브부 중 최외측에 위치하는 리브부의 외측면에는 각각 슬래브 판과 판 사이의 접합부의 일체성을 확보하기 위한 전단연결홈이 형성된다. 서로 인접한 양측 슬래브의 전단연결홈에 의해 형성된 공간부에는 덧침 콘크리트 타설시 콘크리트가 충전되어 슬래브 판과 판 사이의 접합부의 일체성을 확보한다. 리브부에는 그 길이방향을 따라 전체 길이에 걸쳐 높이방향으로 산과 골이 연속되어 파형 형상을 이루도록 단일의 철근을 절곡한 전단보강철근이 배근된다. 전단보강철근의 산부분은 상면부의 위쪽으로 노출되도록 설치된다. 상면부의 양단부에는 길이방향을 따라 일정한 간격을 두고 U자형으로 절곡된 철근을 L자형으로 구부린 불균형 하중 전달용 L형 철근이 배근된다. 불균형 하중 전달용 L형 철근은 그의 수평부분이 상면부에 매립되어 있고 수직부분은 상면부 위쪽으로 돌출되게 설치되고, 수직부분은 슬래브의 거치 후 서로 인접한 양측 슬래브의 전단연결홈에 의해 형성된 공간부에 구부려 넣어져 콘크리트와 함께 슬래브 판과 판 사이의 접합부의 일체성을 확보하고 상부의 불균형 하중을 원활하게 전달한다.The PC slab suitable for the long span heavy load building according to the present invention is integrally formed using concrete, and includes a lower surface portion, a plurality of rib portions protruding in a longitudinal direction at regular intervals along the width direction of the lower surface portion, and a slab. The central portion in the longitudinal direction has a closed cross section, and both ends have a cross-sectional shape composed of an upper surface portion formed parallel to the lower surface portion on the upper portion of the rib portion so as to have an open cross section. The lower surface portion and the upper surface portion are reinforced with reinforcing bars or wire meshes that are arranged in a lattice form. Compression prestress is further introduced into the lower surface portion through the tension member disposed in the longitudinal direction in the lower cross section of the lower lower surface portion of each rib. Shear connecting grooves are formed on the outer surface of the rib portion located at the outermost side of the rib portion to secure the integrity of the joint between the slab plate and the plate, respectively. The space formed by the shear connection grooves of both slabs adjacent to each other is filled with concrete during pouring concrete to ensure the integrity of the joint between the slab plate and the plate. Shear reinforcing bars are bent at the ribs by bending a single reinforcing bar to form a corrugated shape in which the peaks and valleys continue in the height direction over the entire length along the longitudinal direction. The mountain part of the shear reinforcing bar is installed to be exposed upward of the upper surface part. At both ends of the upper surface portion, an L-shaped reinforcing bar for unbalanced load transmission is arranged, in which L-shaped bent bars are bent in a U-shape at regular intervals along the longitudinal direction. The L-shaped rebar for unbalanced load transfer has its horizontal part embedded in the upper part, and the vertical part is installed so as to protrude above the upper part, and the vertical part is formed by the shear connection grooves of both slabs adjacent to each other after mounting the slab. It is bent in to ensure the integrity of the joint between the slab plate and the plate together with the concrete, and smoothly transmit the unbalanced load at the top.

이때, 인접하는 슬래브의 전단연결홈에 의해 형성되는 공간부에 불균형 하중 전달용 보강철근이 더 설치될 수 있다.In this case, an unbalanced load transmission reinforcing bar may be further installed in the space formed by the shear connection groove of the adjacent slab.

또한, 상면부에 의해 폐합된 리브부 사이에는 발포체가 더 채워질 수 있다.In addition, the foam may be further filled between the rib portions closed by the upper surface portion.

본 발명에 따른 피씨 슬래브의 시공방법은, (a) 보 위에 본 발명에 따른 PC 슬래브를 거치하는 단계; (b) 보 위에 거치된 서로 인접한 PC 슬래브 사이의 공간부 속으로 불균형 하중 전단용 L형 철근의 수직부분을 구부려 넣는 단계; 및 (c) 서로 인접한 PC 슬래브 사이의 공간부와 보 위에서 길이방향으로 서로 이웃하는 PC 슬래브의 포켓부에 콘크리트가 채워지도록 PC 슬래브 상면에 덧침 콘크리트를 타설하는 단계를 포함한다.The construction method of PC slab according to the present invention comprises the steps of: (a) mounting the PC slab according to the present invention on a beam; (b) bending the vertical portion of the L-shaped rebar for shearing unbalanced load into spaces between adjacent PC slabs mounted on beams; And (c) placing the overlay concrete on the upper surface of the PC slab so that the concrete is filled in the space between the adjacent PC slabs and the pockets of the PC slabs neighboring each other in the longitudinal direction on the beam.

이때, (b) 단계에서, 공간부에 불균형 하중 전달용 보강철근을 더 설치하는 단계를 더 포함할 수 있다.At this time, in step (b), it may further comprise the step of further installing a reinforcing bar for unbalance load transfer to the space.

본 발명에서 제안하는 PC 슬래브 시스템은 단면 계수가 큰 폐단면을 가지며, 전단력에 저항하는 전단보강근이 배치되고, 슬래브 판과 판 사이의 균열 저감 및 상부 불균형 하중의 원활한 전달을 위한 보강상세가 적용된 것으로서, 장경간, 고하중의 물류센터 및 창고 건물에 적용되어 춤의 증가 없이 큰 하중을 견딜 수 있어 층고에서 유리하고 판과 판 사이에 작용하는 불균형 하중을 원활하게 전달할 수 있어 균열 발생을 최소화할 수 있는 효과가 있다.The PC slab system proposed in the present invention has a closed cross section with a large cross-sectional coefficient, a shear reinforcement bar is disposed to resist shear force, and a reinforcement detail is applied to reduce cracks between the slab plate and the plate and to smoothly transfer the upper unbalanced load. It can be applied to distribution centers and warehouse buildings with long spans, heavy loads, and it can withstand large loads without increasing dance, which is advantageous in flooring and can smoothly transmit unbalanced loads between plates. It has an effect.

본 명세서에서 첨부되는 다음의 도면들은 본 발명의 바람직한 실시예를 예시하는 것이며, 발명의 상세한 설명과 함께 본 발명의 기술사상을 더욱 이해시키는 역할을 하는 것이므로, 본 발명은 첨부한 도면에 기재된 사항에만 한정되어서 해석되어서는 아니 된다.
도 1은 본 발명의 일 실시예에 따른 장경간 고하중 건물에 적합한 PC 슬래브를 나타낸 사시도이고, 도 2는 단면도이며, 도 3은 평면도이다.
도 4a는 리브부에 설치된 전단연결철근을 나타낸 사시도이다.
도 4b는 불균형 하중 전달용 L형 철근을 나타낸 사시도이다.
도 5는 슬래브 판과 판 사이의 접합부에 불균형 하중 전달용 L형 철근과 불균형 하중 전달용 보강철근을 설치하는 모습을 나타낸 예시 도면이다.
도 6은 본 발명의 일 실시예에 따른 장경간 고하중 건물에 적합한 PC 슬래브를 이용하여 바닥판을 시공하는 방법을 순서대로 나타낸 도면이다.
The following drawings, which are attached in this specification, illustrate the preferred embodiments of the present invention, and together with the detailed description thereof, serve to further understand the technical spirit of the present invention. It should not be construed as limited.
1 is a perspective view showing a PC slab suitable for a long span heavy load building according to an embodiment of the present invention, Figure 2 is a cross-sectional view, Figure 3 is a plan view.
Figure 4a is a perspective view showing a shear connecting rebar provided in the rib portion.
Figure 4b is a perspective view showing the L-shaped reinforcing bar for unbalanced load transmission.
5 is an exemplary view showing a state in which the L-shaped reinforcing bar for the unbalanced load and the reinforcing bars for the unbalanced load transmission are installed at the junction between the slab plate and the plate.
FIG. 6 is a view sequentially illustrating a method of constructing a floor plate using a PC slab suitable for a long span heavy load building according to an embodiment of the present invention.

아래에서 본 발명은 첨부된 도면에 제시된 실시예를 참조하여 상세하게 설명이 되지만 제시된 실시예는 본 발명의 명확한 이해를 위한 예시적인 것으로 본 발명은 이에 제한되지 않는다. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to the embodiments shown in the accompanying drawings, but the present invention is not limited thereto.

도 1 내지 도 3에 도시된 것처럼, 본 발명의 일 실시예에 따른 PC 슬래브(10)는, 콘크리트를 이용하여 일체로 형성되며, 하면부(11)와, 하면부(11)의 폭방향을 따라 일정 간격을 두고 길이방향으로 돌출된 복수 개의 리브부(12)와, 슬래브의 길이방향으로 중앙부는 폐합된 단면이 되도록 하고 양단부는 개방된 단면이 되도록 리브부(12)의 상부에 하면부(11)와 평행하게 형성된 상면부(13)로 구성된다. As shown in Figures 1 to 3, the PC slab 10 according to an embodiment of the present invention, is formed integrally using the concrete, the lower surface portion 11 and the width direction of the lower surface portion 11 Accordingly, the plurality of ribs 12 protruding in the longitudinal direction at a predetermined interval, and the center portion in the longitudinal direction of the slab to be a closed cross-section and both ends of the rib portion 12 to the open end surface so that the lower surface portion ( It consists of an upper surface portion 13 formed in parallel with 11).

하면부(11)는 전체가 격자 형태로 배근된 철근 또는 와이어 메쉬(111)로 보강된다. 또한 각 리브부(12)의 아래쪽 하면부(11) 단면 내에 길이방향으로 배치된 PC 강봉이나 PC 강연선으로 구성된 긴장재(112)를 통해 추가로 압축프리스트레스가 도입된다. 따라서 얇은 판 형상으로 된 하면부(11)는 장경간, 고하중 하에서 효과적으로 인장력에 저항할 수 있게 된다. The lower surface portion 11 is reinforced with reinforcing bars or wire meshes 111 that are all arranged in a lattice form. In addition, compression prestress is further introduced through a tension member 112 composed of PC steel bars or PC strands arranged in the longitudinal direction in the lower face 11 of the bottom of each rib 12. Therefore, the lower surface portion 11 having a thin plate shape can effectively resist the tensile force under long span and high load.

본 발명에 따른 PC 슬래브는 구조 단면의 반정도를 프리캐스트 콘크리트화하기 때문에 구조상 얇은 판 거동을 피할 수 없고 탈형, 운반, 조립시 그리고 현장타설 콘크리트 타설시에 균열이 발생할 수 있다. 따라서 얇은 판의 형태를 갖는 프리캐스트 콘크리트 부재는 판의 보강문제가 제일 큰 과제이다. 이러한 프리캐스트 콘크리트 판의 균열은 바닥판 붕괴 및 처짐 증가에 영향을 주므로 균열방지를 위한 적절한 조치를 취해야 한다. 이를 위해 본 발명에서는 얇은 판으로 구성된 하면부(11)의 상면에 리브부(12)를 형성한다.Since the PC slab according to the present invention precast concrete about half of the structural cross-section, structural thin plate behavior is inevitable, and cracking may occur during demolding, transportation, assembly, and cast-in-place concrete. Therefore, the reinforcement problem of the plate is the biggest problem in the precast concrete member having a thin plate form. The cracks in these precast concrete plates affect the bottom plate collapse and sag increase, so appropriate measures should be taken to prevent cracking. To this end, in the present invention, the rib portion 12 is formed on the upper surface of the lower surface portion 11 composed of a thin plate.

리브부(12)는 하면부(11)의 상면에 하면부(11)의 폭방향을 따라 일정 간격을 두고 길이방향으로 전체 길이에 걸쳐 형성된다. 일정 간격을 두고 형성되는 리브부(12)는 자중을 크게 증가시키지 않으면서 하면부(11)의 강도와 강성을 보강하여 하면부(11)에 도입된 프리스트레스 및 후술하는 폐단면을 만들고 상부 압축력을 지지하는 상면부(13)와 함께 본 발명에 따른 PC 슬래브(10)가 장경간화되고 고하중을 지지할 수 있도록 한다. 그 단면 형상은 도시된 단면 형상에 한정되지 않고 다양한 단면 형상으로 형성될 수 있다. The rib portion 12 is formed on the upper surface of the lower surface portion 11 over the entire length in the longitudinal direction at regular intervals along the width direction of the lower surface portion 11. The rib portion 12 formed at regular intervals reinforces the strength and rigidity of the lower surface portion 11 without significantly increasing its own weight, thereby making the prestress introduced into the lower surface portion 11 and the closed cross section described later, The PC slab 10 according to the present invention together with the supporting upper surface portion 13 can be made longer and can support high loads. The cross-sectional shape is not limited to the cross-sectional shape shown, but may be formed into various cross-sectional shapes.

리브부(12)에는 그 길이방향을 따라 전체 길이에 걸쳐 높이방향으로 전단보강철근(122)이 배근된다. 본 발명에 따른 PC 슬래브는 장경간, 고하중용으로서 작용하중에 의해 리브부(12)에 큰 전단력이 발생하게 되는데 이를 콘크리트 단면만으로 저항하려면 큰 춤이 필요하게 되어 층고 부분에서 불리하고 경제성이 떨어진다. 때문에 본 발명에서는 리브부(12)에 전단보강철근(122)을 배근하여 콘크리트 단면과 함께 전단력에 저항하도록 하였다. Shear reinforcement 122 is reinforced to rib portion 12 in the height direction over its entire length along its longitudinal direction. The PC slab according to the present invention generates a large shear force in the rib portion 12 by the working load for the long span, high load, and to resist it only in the concrete cross section, a large dance is required, which is disadvantageous in the layered portion and economical efficiency. Therefore, in the present invention, the shear reinforcing reinforcement 122 is placed on the rib 12 to resist the shear force along with the concrete cross section.

전단보강철근(122)은 도 4a에 나타낸 것처럼 산과 골이 연속되어 파형 형상을 이루도록 단일의 철근을 절곡한 것으로, 리브부(12) 보강에 요구되는 철근량을 만족시키면서 배근을 간편하게 할 수 있는 이점이 있다. 전단보강철근(122)의 산부분(122a)은 상면부(13)의 위쪽으로 노출되도록 설치된다. 노출된 산부분(122a)은 슬래브 양중시 양중고리로 이용할 수 있고 전단연결재로서 현장타설되는 덧침 콘크리트와의 합성효과를 증진시킬 수 있으며 슬래브 상부철근 배근작업을 용이하게 한다. 리브부(12)의 길이방향의 양쪽 단부에는 2개의 전단보강철근(122)의 산부분(122a)이 서로 마주보도록 배근하여 단부에서 크게 작용하는 전단력에 저항하도록 한다. Shear reinforcing reinforcement 122 is a single reinforcing bar bent so that the mountain and the valley to form a corrugated shape as shown in Figure 4a, there is an advantage that can simplify the reinforcement while satisfying the amount of reinforcement required for the rib portion 12 reinforcement have. The mountain portion 122a of the shear reinforcing bar 122 is installed to be exposed upward of the upper surface portion 13. The exposed mountain portion 122a can be used as a bilateral hook for lifting the slab and can enhance the synthesizing effect with the overlaid concrete that is cast in place as a shear connector, and facilitates the slab upper reinforcement work. At both ends in the longitudinal direction of the rib part 12, the mountain portions 122a of the two shear reinforcing bars 122 are arranged to face each other so as to resist the shear force acting greatly at the end.

리브부(12) 중 최외측에 위치하는 리브부(12a,12a)의 외측면에는 각각 슬래브 판과 판 사이의 접합부의 일체성을 확보하기 위한 전단연결홈(123)이 형성된다. 서로 인접한 양측 슬래브의 전단연결홈(123)에 의해 형성된 공간부에는 덧침 콘크리트 타설시 콘크리트가 충전되어 슬래브 판과 판 사이의 접합부의 일체성을 확보할 수 있게 된다. 전단연결홈(123)을 둘러싸는 리브부(12)의 외측면 중 아래쪽 부분은 위쪽 부분보다 더 외측으로 돌출되어 도 5에 도시된 것처럼 인접한 양측의 슬래브가 설치할 경우 상부에 양측 슬래브의 전단연결홈(123)에 의해 형성된 공간부(s)로 덧침 콘크리트를 타설할 수 있는 개구가 형성된다.Shear connecting grooves 123 are formed on the outer surfaces of the rib portions 12a and 12a located at the outermost side of the rib portion 12 to secure the integrity of the joint between the slab plate and the plate. The space formed by the shear connection grooves 123 of both sides of the slab adjacent to each other is filled with concrete at the time of pouring concrete to ensure the integrity of the joint between the slab plate and the plate. The lower portion of the outer surface of the rib portion 12 surrounding the shear connection groove 123 is projected outward more than the upper portion so that the shear connection grooves of both slabs on the upper side when the adjacent slabs are installed as shown in FIG. An opening through which the concrete can be poured is formed in the space s formed by 123.

리브부(12)의 상부에는 하면부(11)와 평행하게 상면부(13)가 형성된다. 상면부(13)는 하면부(11)와 동일하게 판 형상으로 구성되고 전체가 격자 형태로 배근된 철근 또는 와이어 메쉬(111)로 보강된다. 상면부(13)의 전체 길이는 리브부(12) 보다 짧게 구성되어 리브부(12)의 중앙부는 폐합시키고 양단부는 개방시킨다. 따라서 본 발명에 따른 슬래브는 길이방향으로 중앙부는 폐합된 단면이 되고 양단부는 개방된 단면이 된다. 이처럼 상면부(13)에 의해 리브부(12)를 폐합시켜 중앙부를 폐합된 단면으로 구성함에 따라 큰 단면 계수를 통해 고하중에 견딜 수 있다. 그리고 슬래브의 양단부는 상면부(13)를 형성하지 않고 단면을 개방시킴으로써 리브부(12) 사이의 중공부에 현장타설 덧침 콘크리트가 채워지는 포켓부(p)를 형성함으로써 보-슬래브의 접합부 일체성과 슬래브의 길이방향 연속성을 확보할 수 있다.An upper surface portion 13 is formed at the upper portion of the rib portion 12 in parallel with the lower surface portion 11. The upper surface portion 13 is formed in the same plate shape as the lower surface portion 11 and is reinforced with a reinforcing steel bar or wire mesh 111 is arranged in a lattice form as a whole. The overall length of the upper surface portion 13 is shorter than the rib portion 12 so that the center portion of the rib portion 12 is closed and both ends are open. Therefore, the slab according to the present invention has a closed section in the center in the longitudinal direction and an open section in both ends. As described above, the ribs 12 are closed by the upper surface 13 so that the central portion is configured to have a closed cross section, and thus it is possible to withstand high loads through a large cross-sectional coefficient. And both ends of the slab open the cross section without forming the upper surface portion 13 to form a pocket portion (p) filled with the cast-in-place concrete in the hollow portion between the rib portion 12 to form a joint of the beam-slab Longitudinal continuity of the slab can be ensured.

상면부(13)의 양단부에는 길이방향을 따라 일정한 간격을 두고 불균형 하중 전달용 L형 철근(131)이 배근된다. 불균형 하중 전달용 L형 철근(131)은 U자형으로 절곡된 철근을 L자형으로 구부린 것으로, 그의 수평부분(131a)은 상면부(13)에 매립되어 있고 수직부분(131b)은 상면부(13) 위쪽으로 돌출되어 있다. 도 5에 나타낸 것처럼, 불균형 하중 전달용 L형 철근(131)의 수직부분(131b)은 본 발명에 따른 PC 슬래브를 보 위에 거치한 후 서로 접하는 양측 슬래브의 전단연결홈(123)에 의해 형성된 공간부(s) 속으로 구부려 넣어진다. 장경간, 고하중 건물에 PC 슬래브를 적용하면 슬래브 판과 판 사이의 균열이 손쉽게 발생할 수 있고 슬래브 판 상부의 하중 불균형으로 인해 인접한 판과 판 사이의 수평레벨이 맞지 않는 상태에서 덧침 콘크리트를 타설하는 경우가 빈번하게 발생할 수 있는데 불균형 하중 전달용 L형 철근(131)을 통해 상부 불균형 하중을 원활하게 전달할 수 있고 또한 균열을 저감시킬 수 있다.At both ends of the upper surface portion 13, the L-shaped reinforcing bars 131 for transmitting an unbalanced load are arranged at regular intervals along the longitudinal direction. The unbalanced L-shaped reinforcing bar 131 is formed by bending a reinforcing bar bent into a U shape in an L shape. The horizontal portion 131a is embedded in the upper surface portion 13 and the vertical portion 131b is the upper surface portion 13. ) It protrudes upwards. As shown in Figure 5, the vertical portion 131b of the L-shaped rebar 131 for unbalanced load transfer is a space formed by the shear connection grooves 123 of the both side slab after mounting the PC slab according to the invention on the beam It is bent into the s. The application of PC slabs to long span, heavy load buildings can easily cause cracks between slab plates and plates, and due to load imbalance at the top of slab plates, Cases may occur frequently, but the L-shaped rebar 131 for unbalanced load transmission can smoothly transmit the upper unbalanced load and can also reduce cracks.

슬래브 판과 판 사이에서 상당한 균열 및 불균형 하중의 발생이 예상되는 경우 도 5에 나타낸 것처럼 인접하는 슬래브의 전단연결홈(123)에 의해 형성되는 공간부(s)에 추가로 불균형 하중 전달용 보강철근(132)을 설치할 수 있다. 이를 위해 도 2b에 도시된 것처럼, 전단연결홈(123)이 형성된 리브부(12)의 측면에 보강철근 삽입용 홈(132a)을 형성할 수 있다. 불균형 하중 전달용 보강철근(132)으로는 다양한 보강재료가 사용될 수 있으며 일례로서 와이어 메쉬가 사용될 수 있다. If significant cracks and unbalanced loads are expected between the slab plate and the plate, the rebar for transferring unbalanced loads in addition to the space s formed by the shear connection grooves 123 of the adjacent slabs, as shown in FIG. 132 can be installed. To this end, as shown in FIG. 2B, the reinforcing bar insertion groove 132a may be formed on the side surface of the rib part 12 in which the shear connection groove 123 is formed. Various reinforcing materials may be used as the reinforcing bar 132 for unbalanced load transmission, and a wire mesh may be used as an example.

이상과 같이 본 발명에 따르면, 도 5에 나타낸 것과 같이, 슬래브 판과 판 사이의 접합부가 전단연결홈(123)에 의해서 형성된 공간부(s)에 채워지는 콘크리트에 의해 일체화되고, 불균형 하중 전달용 L형 철근(131) 및 불균형 하중 전달용 보강철근(132)에 의해 보강됨으로써 상부 불균형 하중을 원활하게 전달할 수 있고 또한 균열을 저감시킬 수 있다.As described above, according to the present invention, as shown in Figure 5, the joint between the slab plate and the plate is integrated by concrete filled in the space (s) formed by the shear connection groove 123, for unbalanced load transmission By reinforcing by the L-shaped reinforcing bar 131 and the unbalanced load transfer reinforcing bar 132, it is possible to smoothly transfer the upper unbalanced load and to reduce the cracks.

한편, 상면부(13)에 의해 폐합된 리브부(12) 사이에는 자중을 증가시키지 않으면서 슬래브의 전체 두께를 증가시켜 현장타설 콘크리트의 양을 줄일 수 있도록 발포체(14)가 채워질 수 있다. 발포체(14)로는 이러한 목적에 부합되는 다양한 종류의 것이 사용될 수 있으며 일례로 발포폴리스티렌 블럭을 사용할 경우 단열 및 차음 등의 효과를 기대할 수 있다. Meanwhile, the foam 14 may be filled between the rib portions 12 closed by the upper surface portion 13 so as to reduce the amount of cast concrete by increasing the overall thickness of the slab without increasing its own weight. As the foam 14, various kinds of materials that meet this purpose can be used. For example, when the foam polystyrene block is used, effects such as insulation and sound insulation can be expected.

아래에서는 이상과 같이 구성된 본 발명에 따른 PC 슬래브를 이용하여 바닥판을 시공하는 방법을 상세히 설명한다.Hereinafter, a method of constructing a bottom plate using the PC slab according to the present invention configured as described above will be described in detail.

먼저, 도 6a에서와 같이, 보(20) 위에 본 발명에 따른 PC 슬래브(10)를 거치한다(도 8a). 도면에서 보(20)는 장방형 단면으로 도시되었으나 본 발명이 적용될 수 있는 보는 이에 한정되지 않으며 이 분야에서 공지된 보 예를 들어, 역T형 보 등에도 적용될 수 있다.First, as shown in FIG. 6a, the PC slab 10 according to the present invention is mounted on the beam 20 (FIG. 8a). Although the beam 20 is shown in the cross-sectional view in the drawings, the beam to which the present invention can be applied is not limited thereto, and the beam 20 may be applied to a beam known in the art, for example, an inverted T-beam.

다음으로, 도 6b에서와 같이, 서로 인접한 PC 슬래브(10) 사이의 공간부 속으로 불균형 하중 전단용 L형 철근(131)의 수직부분(131a)을 구부려 넣는다. 이때, 추가로 공간부에 불균형 하중 전달용 보강철근(132)을 설치할 수 있다.Next, as shown in FIG. 6B, the vertical portion 131a of the L-shaped rebar 131 for shearing unbalanced load is bent into the space between the adjacent PC slabs 10. At this time, the reinforcing bars 132 for transmitting an unbalanced load may be additionally installed in the space.

다음으로, 도 6c에서와 같이, PC 슬래브(10) 상면에 덧침 콘크리트(30)를 타설한다. 이때, 서로 인접한 PC 슬래브(10) 사이의 공간부와 보(20) 위에서 길이방향으로 서로 이웃하는 PC 슬래브(10)의 포켓부(p)에도 콘크리트가 채워지도록 한다. 길이방향으로 서로 이웃하는 PC 슬래브(10)의 포켓부(p)에는 PC 슬래브의 지점부 연속화를 위해 보(20)를 지나서 양쪽의 PC 슬래브(10)의 포켓부(p)에 양단이 위치하는 연결철근(151)이 배근될 수 있다.Next, as shown in FIG. 6c, the overcast concrete 30 is poured on the upper surface of the PC slab 10. In this case, concrete is also filled in the pocket portion p of the PC slab 10 adjacent to each other in the longitudinal direction on the beam 20 and the space between the adjacent PC slab 10. In the pocket portion p of the PC slab 10 adjacent to each other in the longitudinal direction, both ends are positioned in the pocket portions p of the PC slabs 10 on both sides past the beam 20 for continuity of the point portion of the PC slab. The connecting reinforcing bar 151 may be arranged.

마지막으로, 덧침 콘크리트(30)를 양생한다.Finally, curing the overlay concrete (30).

이상에서 상세히 설명한 것과 같이, 본 발명에 따른 PC 슬래브 시스템은 단면 계수가 큰 폐단면을 가지며, 전단력에 저항하는 전단보강철근(122)이 리브부(12)에 배치되고, 슬래브 판과 판 사이의 균열 저감 및 상부 불균형 하중의 원활한 전달을 위한 불균형 하중 전달용 L형 철근(131) 및 보강철근(132)이 적용된 것으로서, 장경간, 고하중의 물류센터 및 창고 건물에 적용되어 춤의 증가 없이 큰 하중을 견딜 수 있어 층고에서 유리하고 판과 판 사이에 작용하는 불균형 하중을 원활하게 전달할 수 있어 균열 발생을 최소화할 수 있는 효과가 있다. As described in detail above, the PC slab system according to the present invention has a closed cross section with a large cross-sectional coefficient, and a shear reinforcing steel 122 that resists shear force is disposed on the rib portion 12, and between the slab plate and the plate. L-shaped reinforcing bars 131 and reinforcing bars 132 are applied to transfer unbalanced loads to reduce cracks and smoothly transfer unbalanced loads. They are applied to long span, heavy load distribution centers, and warehouse buildings without increasing dance. It is able to withstand the load, which is advantageous in the floor height and can smoothly transmit the unbalanced load acting between the plate and plate, thereby minimizing the occurrence of cracks.

또한 시공방법에서도 기존의 PC 슬래브 시공방법과 전체적으로 동일한 공정으로 시공되고 단지 불균형 하중 전달용 L형 철근(131) 및 보강철근(132) 배근 등 단순 공정이 더 추가된 것으로 공사비 및 공사기간을 크게 증가시키지 않고 구조안정성이 확보된 장경간, 고하중의 물류센터 및 창고 건물의 바닥판을 시공할 수 있다.In addition, the construction method is constructed in the same general process as the existing PC slab construction method, and simple processes such as L-shaped rebar 131 and rebar reinforcing bars for unbalanced load transfer are added. It is possible to construct floor spans of long spans, heavy load distribution centers, and warehouse buildings with structural stability.

지금까지 본 발명은 제시된 실시예를 참조하여 상세하게 설명이 되었지만 이 분야에서 통상의 지식을 가진 자는 제시된 실시예를 참조하여 본 발명의 기술적 사상을 벗어나지 않는 범위에서 다양한 변형 및 수정 발명을 만들 수 있을 것이다. 본 발명은 이와 같은 변형 및 수정 발명에 의하여 제한되지 않으며 다만 아래에 첨부된 청구범위에 의하여 제한된다. So far, the present invention has been described in detail with reference to the presented embodiments, but those skilled in the art may make various modifications and modifications without departing from the technical spirit of the present invention with reference to the presented embodiments. will be. The invention is not limited by these variations and modifications, but is limited only by the claims appended hereto.

10: PC 슬래브 11: 하면부
111: 와이어 메쉬 112: 긴장재
12: 리브부 12a: 최외측 리브부
122: 전단보강철근 123: 전단연결홈
13: 상면부 131: 불균형 하중 전달용 L형 철근
132: 불균형 하중 전달용 보강철근 14: 발포체
151: 연결철근 20: 보
30: 덧침 콘크리트 p: 포켓부
s: 공간부
10: PC slab 11: bottom part
111: wire mesh 112: tension material
12: rib portion 12a: outermost rib portion
122: shear reinforcing bar 123: shear connecting groove
13: Top face 131: L-shaped rebar for unbalanced load transfer
132: rebar for transferring unbalanced load 14: foam
151: Rebar 20: Beam
30: overlay concrete p: pocket part
s: space part

Claims (5)

콘크리트를 이용하여 일체로 형성되며, 하면부(11)와, 하면부(11)의 폭방향을 따라 일정 간격을 두고 길이방향으로 돌출된 복수 개의 리브부(12)와, 슬래브의 길이방향으로 중앙부는 폐합된 단면이 되도록 하고 양단부는 개방된 단면이 되도록 리브부(12)의 상부에 하면부(11)와 평행하게 형성된 상면부(13)로 구성되고,
하면부(11)와 상면부(13)는 전체가 격자 형태로 배근된 철근 또는 와이어 메쉬(111)로 보강되며,
각 리브부(12)의 아래쪽 하면부(11) 단면 내에 길이방향으로 배치된 긴장재(112)를 통해 추가로 하면부(11)에는 압축프리스트레스가 도입되고,
리브부(12) 중 최외측에 위치하는 리브부(12a)의 외측면에는 각각 슬래브 판과 판 사이의 접합부의 일체성을 확보하기 위한 전단연결홈(123)이 형성되며, 서로 인접한 양측 슬래브의 전단연결홈(123)에 의해 형성된 공간부에는 덧침 콘크리트 타설시 콘크리트가 충전되어 슬래브 판과 판 사이의 접합부의 일체성을 확보하고,
리브부(12)에는 그 길이방향을 따라 전체 길이에 걸쳐 높이방향으로 산과 골이 연속되어 파형 형상을 이루도록 단일의 철근을 절곡한 전단보강철근(122)이 배근되며, 전단보강철근(122)의 산부분(122a)은 상면부(13)의 위쪽으로 노출되도록 설치되고,
상면부(13)의 양단부에는 길이방향을 따라 일정한 간격을 두고 U자형으로 절곡된 철근을 L자형으로 구부린 불균형 하중 전달용 L형 철근(131)이 배근되며, 불균형 하중 전달용 L형 철근(131)은 그의 수평부분(131a)이 상면부(13)에 매립되어 있고 수직부분(131b)은 상면부(13) 위쪽으로 돌출되게 설치되고, 수직부분(131b)은 슬래브의 거치 후 서로 인접한 양측 슬래브의 전단연결홈(123)에 의해 형성된 공간부에 구부려 넣어져 콘크리트와 함께 슬래브 판과 판 사이의 접합부의 일체성을 확보하고 상부의 불균형 하중을 원활하게 전달하는 것을 특징으로 하는 장경간 고하중 건물에 적합한 피씨 슬래브.
It is formed integrally using concrete, the plurality of ribs 12 protruding in the longitudinal direction at regular intervals along the width direction of the lower surface portion 11, the lower surface portion 11, and the central portion in the longitudinal direction of the slab The upper end portion 13 is formed in parallel with the lower surface portion 11 in the upper portion of the rib portion 12 so as to be a closed cross section and both ends are open sections,
The lower surface portion 11 and the upper surface portion 13 are reinforced with reinforcing bars or wire meshes 111 all reinforced in a lattice form.
Compression prestress is further introduced into the lower surface portion 11 through the tension member 112 disposed in the longitudinal direction in the cross section of the lower lower surface portion 11 of each rib portion 12.
Shear connecting grooves 123 are formed on the outer surface of the rib portion 12a located at the outermost side of the rib portion 12 to secure the integrity of the joint between the slab plate and the plate. The space formed by the shear connection groove 123 is filled with concrete during pouring concrete to ensure the integrity of the joint between the slab plate and the plate,
The rib portion 12 is reinforced with a shear reinforcing bar 122 is bent a single reinforcement so as to form a corrugated shape by the mountain and the valley in the height direction over the entire length along the longitudinal direction, the reinforcement of the shear reinforcement 122 The mountain portion 122a is installed to be exposed above the upper surface portion 13,
On both ends of the upper surface portion 13, an unbalanced load transmission L-shaped reinforcing bar 131, which is bent into a U-shape, which is bent in a U-shape at regular intervals along the longitudinal direction, is reinforced, and an unbalanced load transmission L-shaped rebar 131 The horizontal portion 131a is buried in the upper surface portion 13 and the vertical portion 131b is installed to protrude upward from the upper surface portion 13, and the vertical portion 131b is adjacent to each other after slab mounting. Bent in the space formed by the shear connection groove 123 of the long span heavy load building, characterized in that to ensure the integrity of the joint between the slab plate and the plate together with the concrete and smoothly transfer the unbalanced load of the upper PC slab suitable for.
청구항 1에 있어서,
인접하는 슬래브의 전단연결홈(123)에 의해 형성되는 공간부에 불균형 하중 전달용 보강철근(132)이 더 설치된 것을 특징으로 하는 장경간 고하중 건물에 적합한 피씨 슬래브.
The method according to claim 1,
PC slab suitable for a long span heavy load building, characterized in that the reinforcing bar 132 for unbalanced load transmission is further installed in the space formed by the shear connection groove 123 of the adjacent slab.
청구항 1에 있어서,
상면부(13)에 의해 폐합된 리브부(12) 사이에는 발포체(14)가 채워진 것을 특징으로 하는 장경간 고하중 건물에 적합한 피씨 슬래브.
The method according to claim 1,
PC slab suitable for long span heavy load building, characterized in that the foam 14 is filled between the rib portion 12 closed by the upper surface portion (13).
(a) 보(20) 위에 청구항 1에 기재된 PC 슬래브(10)를 거치하는 단계;
(b) 보(20) 위에 거치된 서로 인접한 PC 슬래브(10) 사이의 공간부 속으로 불균형 하중 전단용 L형 철근(131)의 수직부분(131a)을 구부려 넣는 단계; 및
(c) 서로 인접한 PC 슬래브(10) 사이의 공간부와 보(20) 위에서 길이방향으로 서로 이웃하는 PC 슬래브(10)의 포켓부에 콘크리트가 채워지도록 PC 슬래브(10) 상면에 덧침 콘크리트(30)를 타설하는 단계를 포함하는 것을 특징으로 하는 장경간 고하중 건물에 적합한 피씨 슬래브의 시공방법.
(a) mounting the PC slab 10 according to claim 1 over the beam 20;
(b) bending the vertical portion 131a of the L-shaped rebar 131 for unbalanced load shear into spaces between the adjacent PC slabs 10 mounted on the beams 20; And
(c) Overlaid concrete 30 on the upper surface of the PC slab 10 so that concrete is filled in the space between the adjacent PC slabs 10 and the pockets of the PC slabs 10 adjacent to each other in the longitudinal direction on the beam 20. Construction method of the PC slab suitable for long span heavy load building, characterized in that it comprises the step of pouring).
청구항 4에 있어서,
(b) 단계에서, 공간부에 불균형 하중 전달용 보강철근(132)을 더 설치하는 단계를 포함하는 것을 특징으로 하는 장경간 고하중 건물에 적합한 피씨 슬래브의 시공방법.
The method of claim 4,
In step (b), the construction method of the PC slab suitable for long span heavy load building, characterized in that further comprising the step of installing a reinforcing steel reinforcing bar (132) for unbalanced load transmission.
KR1020120010774A 2012-02-02 2012-02-02 Precast concrete slab system for building which have long span and require high design load and construction method using this system KR101152270B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120010774A KR101152270B1 (en) 2012-02-02 2012-02-02 Precast concrete slab system for building which have long span and require high design load and construction method using this system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120010774A KR101152270B1 (en) 2012-02-02 2012-02-02 Precast concrete slab system for building which have long span and require high design load and construction method using this system

Publications (1)

Publication Number Publication Date
KR101152270B1 true KR101152270B1 (en) 2012-06-19

Family

ID=46688635

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120010774A KR101152270B1 (en) 2012-02-02 2012-02-02 Precast concrete slab system for building which have long span and require high design load and construction method using this system

Country Status (1)

Country Link
KR (1) KR101152270B1 (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101220678B1 (en) 2012-05-02 2013-01-10 서울시립대학교 산학협력단 Rib optimized slab
KR101506620B1 (en) 2013-05-08 2015-03-27 주식회사 네비엔 Precast concrete slab and Precast concrete slab assembly
CN104631674A (en) * 2015-01-29 2015-05-20 济南轨道交通集团有限公司 Composite floor slab and construction method thereof
KR101588161B1 (en) * 2015-01-21 2016-01-25 아이에스동서 주식회사 Ribbed Precast Concrete Slab and Connection Method Using The Same
KR101614722B1 (en) * 2015-10-20 2016-04-22 장정화 The flat and Ribbed slab
KR101621188B1 (en) * 2015-01-21 2016-05-13 아이에스동서 주식회사 Headed Rib Precast Concrete Slab and Connection Method Using The Same
KR101701416B1 (en) * 2016-07-14 2017-02-01 (주)에스앤씨산업 Precast Concrete Deck for Long-Span Slab and the Slab using it
KR101707942B1 (en) * 2016-07-04 2017-02-27 삼표피앤씨 주식회사 Precast concrete hollow core slab and manufacturing method of the same
KR101721603B1 (en) * 2016-05-24 2017-03-30 주식회사 신원알피씨 Deck for concrete slab construction
KR101745092B1 (en) * 2015-05-29 2017-06-09 동진산업 주식회사 Headed Rib Precast Concrete Slab Using Deck Plate
KR20170114913A (en) * 2016-04-06 2017-10-16 (주)연우피씨엔지니어링 Hybrid inverted rib slab structure
KR101847544B1 (en) * 2016-10-07 2018-04-10 이진희 Precast concrete slab having shear reinforcement function
CN108005285A (en) * 2018-01-22 2018-05-08 齐齐哈尔大学 A kind of multi-laminate plywood of framework of steel reinforcement interval adjustable
KR20190034062A (en) * 2017-09-22 2019-04-01 (주)연우피씨엔지니어링 Shear reinforcing slab structure capable of automatic production and automatic manufacturing apparatus therefor
CN111535455A (en) * 2020-04-14 2020-08-14 中铁第四勘察设计院集团有限公司 Assembly type plate connecting structure and construction method thereof
KR102170635B1 (en) * 2019-04-18 2020-10-28 유재천 Libbed half PC slab

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090050520A (en) * 2007-11-16 2009-05-20 (주)콘솔베르 Libbed half pc slab and manufacturing method of the same
KR20100012404A (en) * 2008-07-28 2010-02-08 (주)콘솔베르 Half pc slab having closed lib
KR20100013548A (en) * 2008-07-31 2010-02-10 삼성중공업 주식회사 Joint of half pc slab

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090050520A (en) * 2007-11-16 2009-05-20 (주)콘솔베르 Libbed half pc slab and manufacturing method of the same
KR20100012404A (en) * 2008-07-28 2010-02-08 (주)콘솔베르 Half pc slab having closed lib
KR20100013548A (en) * 2008-07-31 2010-02-10 삼성중공업 주식회사 Joint of half pc slab

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101220678B1 (en) 2012-05-02 2013-01-10 서울시립대학교 산학협력단 Rib optimized slab
KR101506620B1 (en) 2013-05-08 2015-03-27 주식회사 네비엔 Precast concrete slab and Precast concrete slab assembly
KR101588161B1 (en) * 2015-01-21 2016-01-25 아이에스동서 주식회사 Ribbed Precast Concrete Slab and Connection Method Using The Same
KR101621188B1 (en) * 2015-01-21 2016-05-13 아이에스동서 주식회사 Headed Rib Precast Concrete Slab and Connection Method Using The Same
CN104631674A (en) * 2015-01-29 2015-05-20 济南轨道交通集团有限公司 Composite floor slab and construction method thereof
KR101745092B1 (en) * 2015-05-29 2017-06-09 동진산업 주식회사 Headed Rib Precast Concrete Slab Using Deck Plate
KR101614722B1 (en) * 2015-10-20 2016-04-22 장정화 The flat and Ribbed slab
KR101963315B1 (en) * 2016-04-06 2019-07-31 (주)연우피씨엔지니어링 Hybrid inverted rib slab structure
KR20170114913A (en) * 2016-04-06 2017-10-16 (주)연우피씨엔지니어링 Hybrid inverted rib slab structure
KR101721603B1 (en) * 2016-05-24 2017-03-30 주식회사 신원알피씨 Deck for concrete slab construction
KR101707942B1 (en) * 2016-07-04 2017-02-27 삼표피앤씨 주식회사 Precast concrete hollow core slab and manufacturing method of the same
KR101701416B1 (en) * 2016-07-14 2017-02-01 (주)에스앤씨산업 Precast Concrete Deck for Long-Span Slab and the Slab using it
KR101847544B1 (en) * 2016-10-07 2018-04-10 이진희 Precast concrete slab having shear reinforcement function
KR20190034062A (en) * 2017-09-22 2019-04-01 (주)연우피씨엔지니어링 Shear reinforcing slab structure capable of automatic production and automatic manufacturing apparatus therefor
KR102219607B1 (en) * 2017-09-22 2021-02-24 (주)연우피씨엔지니어링 Automatic manufacturing device for automatic production of shear reinforced slab structures
CN108005285A (en) * 2018-01-22 2018-05-08 齐齐哈尔大学 A kind of multi-laminate plywood of framework of steel reinforcement interval adjustable
CN108005285B (en) * 2018-01-22 2024-01-30 齐齐哈尔大学 Multilayer superimposed sheet with adjustable steel reinforcement skeleton interval
KR102170635B1 (en) * 2019-04-18 2020-10-28 유재천 Libbed half PC slab
CN111535455A (en) * 2020-04-14 2020-08-14 中铁第四勘察设计院集团有限公司 Assembly type plate connecting structure and construction method thereof

Similar Documents

Publication Publication Date Title
KR101152270B1 (en) Precast concrete slab system for building which have long span and require high design load and construction method using this system
KR101144586B1 (en) Steel built-up beam having closed section for applying long span and reduction of height and concrete filled composite beam system using the same
KR101652664B1 (en) Precast deckplate and composite slab and concrete slab manufacturing method using the same
KR20090013830A (en) Structual element and methods of use thereof
KR20120011043A (en) Half precast floor plank, and slab construction method using same
KR101851557B1 (en) Arch structure with reinforced arch rib segment and arch structure construction method therefor
KR20100012404A (en) Half pc slab having closed lib
KR101355926B1 (en) Reusable waffle type slab form assembly
KR101994089B1 (en) Precast Concrete Slab With Pullout-Shear Resistance Elements Of Mesh Rib And Manufacturing Method Thereof
KR102170635B1 (en) Libbed half PC slab
KR20180094673A (en) Double plate walls and manufacturing method thereof
CN111502091A (en) Building floor with long service life and preparation method thereof
CN111734033A (en) Floor system structure with prefabricated double-curved arch shell and construction method thereof
KR100796216B1 (en) A complex girder with concrete and h section steel in a building
KR101220678B1 (en) Rib optimized slab
KR101758596B1 (en) Half precast concrete slab with insulation
KR101505719B1 (en) Method for manufacturing composite deck plate integrated with a bar truss
JP5750246B2 (en) Composite beam, building, and composite beam construction method
KR102304567B1 (en) π-TYPED HOLLOW PRECAST CONCRETE SLAB CONSTRUCTION METHOD USING SIDE CONNECTION MEMBER
KR101797960B1 (en) Formed steel beam having neutral axis lifting elements and composite beam using the same
KR101241400B1 (en) Arch structure
KR102267643B1 (en) Inverse Tee PSC Girder Prefabricated With Top Saddle PC blocks And Slab Construction Method Using Thereof
KR102224281B1 (en) Fabricating Method Of Half Depth Concrete Deck Panel With Precast Rib Made Of Reinforced Steel Mesh Form And Half Depth Concrete Deck Panel
KR20220048104A (en) Libbed half PC hollow slab with truss girder
KR101912308B1 (en) Construction structure of balcony integral type building structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150305

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160523

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170525

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180528

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190523

Year of fee payment: 8