KR101150795B1 - The deepened sheet plate and the method of installation of the same - Google Patents

The deepened sheet plate and the method of installation of the same Download PDF

Info

Publication number
KR101150795B1
KR101150795B1 KR1020110069976A KR20110069976A KR101150795B1 KR 101150795 B1 KR101150795 B1 KR 101150795B1 KR 1020110069976 A KR1020110069976 A KR 1020110069976A KR 20110069976 A KR20110069976 A KR 20110069976A KR 101150795 B1 KR101150795 B1 KR 101150795B1
Authority
KR
South Korea
Prior art keywords
steel
row
type steel
type
ground
Prior art date
Application number
KR1020110069976A
Other languages
Korean (ko)
Inventor
이승철
차보영
채현철
Original Assignee
이승철
채현철
차보영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이승철, 채현철, 차보영 filed Critical 이승철
Priority to KR1020110069976A priority Critical patent/KR101150795B1/en
Application granted granted Critical
Publication of KR101150795B1 publication Critical patent/KR101150795B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE: A high-depth prefabricated temporary earth retaining structure installation method is provided to prevent generation of horizontal displacement of an earth retaining wall body, thereby maintaining structural stability. CONSTITUTION: A first row H type steel material(24) is vertically installed in the ground. A second row H type steel material(25) is separated from the first row H type steel material with a designed distance. The second row H type steel material is installed by separately inserting steel plates. The steel plate is vertically inserted in the ground between the first row H type steel material and the second row H type steel material. A steel structure is inserted into empty space by eliminating soil between the first row H type steel material, the second row H type steel material, and the steel plate. The H type steel materials and the steel plates are eliminated when concrete is placed and cured. A permanent ferro-concrete structure is constructed in an opposite side. Soil between both side permanent ferro-concrete structures is excavated.

Description

고심도 조립식 가설 흙막이 구조물 설치 방법 {The deepened sheet plate and the method of installation of the same}{The deepened sheet plate and the method of installation of the same}

일반적으로 흙막이(토류 가시설)는 지하구조물을 건설할 때, 지반이 붕괴되는 것을 막기 위하여 굴착된 지하공간에 설치되는 임시 구조물로서, 토목의 경우에는 지하철 건설 등에 많이 사용되고 있으며, 건축의 경우에는 빌딩의 지하층 건설에 대대적으로 사용되고 있다.In general, when a basement is constructed, an earth block is a temporary structure installed in an excavated underground space in order to prevent the ground from collapsing. It is widely used for the construction of basement floors.

그러나 현재의 흙막이 공법은 많은 수의 버팀보(Strut)가 사용되어 비경제적이며 작업 공간 확보가 어려울 뿐만 아니라, 구조적으로도 비효율적이라서 주변지반 침하의 우려가 있다.However, the current retaining method is not only economical and difficult to secure a work space due to the use of a large number of struts, but also structurally inefficient, there is a fear of settlement of the surrounding ground.

종래의 흙막이 공법의 경우 H형 강재를 일정간격으로 현장에 설치하고, 굴착과 동시에 토류판을 사이에 끼워 흙막이벽을 설치한 후, 버팀보를 설치하여 흙막이벽을 지지하는 방법으로 흙막이 공사를 한다.In the case of the conventional clamding method, the H-shaped steel is installed on the site at regular intervals, and at the same time as the excavation, the earthen board is interposed between the earthen boards, and then the retaining wall is installed to support the retaining wall.

이는 시공이 비교적 간단하고 경제적이고 공기도 짧고 강성체로서의 토류벽 역할을 할 수 있으나, 토질 조건으로 판단하여 볼 때 차수 효과를 기대할 수 없어 상부 두부 변위가 상대적으로 크게 발생 되므로 배면부 지반의 이완 현상이 크게 발생한다.This construction is relatively simple, economical and short in air, and can act as a soil wall as a rigid body. However, due to the soil condition, the order effect cannot be expected, so the displacement of the upper head is relatively large. Occurs.

또한, 토질조건에 부합되는 차수 그라우트 공법선택이 어렵고, 연결부에 누수현상의 발생 가능이 높고 차수 효과는 기대할 수 없다.
In addition, it is difficult to select the order grout method that meets the soil conditions, the possibility of leakage phenomenon at the connection part is high, and the order effect is not expected.

흙막이 공법의 시공 단가를 보면 가장 저렴한 것이 H형 강제에 목제 토류판을 시설하는 것이 가장 저렴하며, 그 다음으로 금속판 강재의 사용, 금속 토류판의 사용, 철근 콘크리트를 사용하는 CIP공법, 역타공법(BRD 공법) 순으로 시공 비용이 증가한다.According to the construction unit price of the earthquake method, the cheapest is to install the wood earth plate in H type steel, followed by the use of metal plate steel, the use of metal earth plate, the CIP method using reinforced concrete, and the reverse drilling method (BRD method). Construction costs increase in order.

또한, 시공된 흙막이벽의 보강을 위해 사용되는 버팀목(Rake)으로 가장 저렴한 목제 버팀목, H형 강재로 대체되는 강재 버팀목, 어스앙카(Earth Anchor), 버팀보(Strut) 설치 등 다양한 보강 공법이 존재하고 있다.In addition, there is a variety of reinforcement methods, such as the cheapest wooden shoring, steel shoring replaced with H-type steel, earth anchor, strut installation, etc. have.

특히, 어스앙카 시공방법은 지하굴착 작업의 안전성을 향상시키기 위하여 상기 굴착면에 일정한 간격으로 구멍을 천공하고, 천공 구멍에 와이어 또는 철근, 특수제작 앙카 등을 삽입한 후 팽창제(충전재)를 삽입 후 마감하는 사면을 보강하는 공법으로 이러한 어스앙카 시공방법은 시공된 지반의 인장응력, 전단응력 및 휨 모멘트에 대한 저항력을 증가시키고 이에 따라 굴착공사 도중 및 굴착공사 완료 후 사면파괴에 대한 안정성을 향상시키는 것을 목적으로 하는 지반 보강공법의 일종으로 단순한 와이어에서 특수 어스앙카까지 그 종류는 다양하며 시공 단가 역시 어스앙카의 종류와 시공 방법에 따라 다양하나 대체로 고가의 시공 비용을 발생한다.In particular, the earth anchor construction method drills holes at regular intervals in the excavation surface to improve the safety of underground excavation work, inserts wires or reinforcing bars, specially produced anchors, etc. into the drilling holes, and then inserts an expansion agent (filler). As a method of reinforcing the finished slope, this earth anchor construction method increases the resistance to tensile stress, shear stress, and bending moment of the constructed ground, thereby improving stability against slope failure during excavation and after completion of excavation. It is a kind of ground reinforcement method for the purpose of various types from simple wire to special earth anchor, and construction cost also varies depending on the type and construction method of earth anchor, but incurs expensive construction cost.

종래의 어스앙카 시공방법은 일반적으로 보강이 필요한 굴착면에 구멍을 천공하여 천공구멍을 형성시키는 공정; 상기 천공작업 공정 후 천공구멍에 연선을 삽입하는 공정 및 팽창제를 투입하는 공정;및 상기 천공구멍의 입구를 막으며 마감 처리하는 공정으로 이루어져 있었다.
Conventional earth anchor construction method generally comprises a step of forming a hole by drilling a hole in the excavation surface that needs to be reinforced; After the drilling operation process, the step of inserting the stranded wire into the drilling hole and the step of adding an expanding agent; and the process of closing the inlet of the drilling hole to finish the process.

1. 토압에 의한 구조적인 변형 및 지진의 발생에 의해 흙막이 구조물의 변형에 따른 자가급전 방식에 의한 위험 사전 경고가 가능해야 한다.1. It should be possible to warn of the danger by the self-feeding method due to the deformation of the earth block structure due to the structural deformation and earthquake caused by earth pressure.

2. 2열 이상의 흙막이 구조물 사이에 철근콘크리트를 타설하여 영구 콘크리트 구조물 옹벽을 간단히 시공한다.2. Simple construction of permanent concrete structure retaining wall by placing reinforced concrete between two or more rows of retaining structures.

3. 흙막이 구조물을 활용하여 거푸집의 설치를 최소화하여 콘크리트를 타설한다.3. Minimize the installation of formwork by using the earthen structure to cast concrete.

4. 대지 경계에 최소한의 이격 거리를 두고 건축물을 시공한다.4. Construct the building with minimum distance from the land boundary.

5. 흙막이벽에 사용되는 기존의 H형 강재의 개수에 추가로 사용되는 보강용 강재(H형 강재, 금속판 강재)의 개수를 최소화한다.5. Minimize the number of reinforcing steels (H type steel, sheet steel) used in addition to the number of existing H type steels used for retaining walls.

6. 흙막이벽의 설치 후 보강공사 방법으로 적용하는 어스앙카 공법과 같은 고가의 자재와 인건비가 과다하게 소요되지 않는 상대적인 경제성을 갖추어야 한다.6. Relatively economical and costly materials and labor costs, such as earth anchor method, applied as a method of reinforcement after the installation of retaining walls.

7. 버팀목(Rake)의 사용으로 작업공간이 협소화 되지 않는다.7. The use of a rack does not narrow the workspace.

8. 지하수의 유입을 차단하며 동시에 흙막이 벽의 내구성을 강화하는 이중의 효과를 갖는다.8. It blocks the inflow of groundwater and at the same time has the dual effect of strengthening the durability of the retaining wall.

9. 최대한 사용된 자재의 회수 및 차수(방수)공사에 따른 환경 오염 물질을 사용하지 않아야 한다. 9. As far as possible, no environmental pollutants should be used as a result of the recovery and ordering (waterproofing) of the materials used.

10. 흙막이벽 일부에 토압상승이 발생할 경우 흙막이벽 전체 구조체가 힘을 분산하여 구조적 안정성을 갖는다.
10. When earth pressure rises in a part of the retaining wall, the entire structure of the retaining wall has structural stability by dispersing the force.

지중에 수직으로 타설된 제 1열 H형 강재 사이로 삽입된 강철판으로 구성된 기본 가설 흙막이 구조물에 추가로 지중에 수직으로 타설된 2열 이상의 H형 강재 및 2열 이상의 H형 강재 사이에 강철판을 삽입한 후 제 1열 H형 강재와 제 2열 H형 강재 상단부를 H형 강재 결합 보강재를 연결 후 용접하여 보강된 가설 흙막이 구조물이다.In addition to the basic construction cladding structure consisting of steel plates inserted between the first row H-shaped steel vertically poured into the ground, steel plates are inserted between two or more rows of H-type steel and two or more H-shaped steels vertically poured into the ground. After the first row of H-type steel and the second row of H-type steel is connected to the H-type steel joint reinforcement is a temporary earthquake structure reinforced by welding.

또한, 일 실시 예로 흙막이벽 H형 강재 상단에 비스듬히 ㄷ형 강재를 지중에 삽입 후 H형 강재와 ㄷ형 강재를 용접 결합 후 ㄷ형 강재의 사이에 금속판 강재를 끼워 지중 삽입 시공하여 금속판 강재와 H형 강재가 일체화되며, 특히 금속판 강재에 작용하는 토압에 의해 흙막이벽에 구조적 안정성을 갖는다.In addition, as an example, the c-type steel is inserted into the ground at an angle to the top of the earthen wall H-shaped steel, and then the H-type and the c-type steel are welded and combined, and then the metal plate steel is inserted between the c-type steel to be inserted into the ground. It is integrated and has structural stability on the retaining wall, in particular by earth pressure acting on the sheet steel.

심도 굴착을 위해 추가로 보강을 필요로 하는 흙막이벽 H형 강재 중간 단에 비스듬히 ㄷ형 강재를 지중에 삽입 후 H형 강재와 ㄷ형 강재를 용접 결합 후 ㄷ형 강재의 사이에 금속판 강재를 끼워 지중 삽입 시공하여 금속판 강재와 H형 강재가 일체화되며, 특히 금속판 강재에 작용하는 토압에 의해 흙막이벽에 구조적 안정성을 갖는다.Insert the c-type steel into the ground at an intermediate end of the H-wall steel, which requires additional reinforcement for depth excavation, weld the H-type and c-type steel joints, and insert the metal plate between the c-type steels to insert the underground. The sheet steel and the H-shaped steel are integrated, and in particular, the earth wall has structural stability due to earth pressure acting on the sheet steel.

목제 토류판, 금속 토류판 등을 이용하여 흙막이벽 시공 중 지하수가 유입될 경우, 지하수가 유입되는 흙막이벽 H형 강재부위 상단에서 비스듬히 ㄷ형 강재를 지중에 삽입 후 H형 강재와 ㄷ형 강재를 용접 결합 후 ㄷ형 강재의 사이에 금속판 강재를 끼워 지중 삽입하여 지하수를 차단하며, 동시에 금속판 강재와 H형 강재가 일체화되며, 부가적으로 금속판 강재에 작용하는 토압에 의해 흙막이벽에 구조적 안정성을 갖는다.
If groundwater flows in during construction of the earthen wall using wood earthen board or metal earthen board, insert c-type steel at the top of the earthen-wall H-type steel part into which underground water flows, and then weld H-type and c-type steel after welding Metal plate steel is sandwiched between steels to block underground water, and at the same time, the plate steel and H type steel are integrated, and the earthquake wall has structural stability due to earth pressure acting on the plate steel.

대지 경계에 최대한 근접한 건축물 시공이 가능한 신공법으로 흙막이 가시설물 자체가 한쪽 거푸집을 대신하여 바로 직접 콘크리트 타설이 되어 시공비, 시공시간 등에서 기존의 어떤 공법과 비교해도 비교 우위에 있다. As a new construction method that allows construction of buildings as close as possible to the boundary of the site, the earthenware fixture itself is directly cast in place of one formwork, which is superior in comparison with any existing construction methods in terms of construction cost and construction time.

최소한의 강재 사용으로 재료비 절감 및 최대한의 기계화 시공으로 인건비가 절감되며, 지하수의 유입을 차단하면서 동시에 흙막이벽의 내구성을 강화하는 이중의 효과를 갖는다.The use of minimal steel reduces labor costs by reducing material costs and maximum mechanized construction, and has the dual effect of blocking the inflow of groundwater and enhancing the durability of the retaining wall.

특히 흙막이 벽체의 수평방향 변위가 거의 발생하지 않으며, 구조적 안정을 유지할 수 있는 것으로 본 발명의 원리는 수중 생물의 물갈퀴와 같은 역활을 강철판이 하는 것과 비유할 수 있는 것으로, 물갈퀴가 있는 손가락과 물갈퀴가 없는 손가락의 차이로 비교할 수 있는 것으로, 토목공사에 있어 구조적으로 토압에 효과적으로 대응하는 흙막이 공법은 최초이다. In particular, the horizontal displacement of the retaining wall hardly occurs, and structural stability can be maintained. The principle of the present invention can be compared with that of a steel plate, such as a webbed of an aquatic organism. Comparable with the difference of the missing finger, it is the first time that the earthquake construction method which responds to earth pressure structurally effectively in civil engineering work.

또한, 버팀목을 설치하지 않아도 되므로 시공성 증대로 인한 공기단축과 공사비를 절감할 수 있으며 구조적 안전성과 경제성이 뛰어나다.In addition, because it does not need to install a crutch, it is possible to reduce the air shortening and construction costs due to the increase in construction, and excellent structural safety and economic efficiency.

또한, 2열 이상의 흙막이 구조물 사이에 철근콘크리트를 양생하여 영구 콘크리트 구조물 옹벽을 간단히 시공한다.In addition, by reinforcing the reinforced concrete between two or more layers of earthen structures, a permanent concrete structure retaining wall is simply constructed.

또한, 흙막이 구조물의 이상변위 발생시 조기 경보가 가능하다.
In addition, early warning is possible in the event of abnormal displacement of the retaining structure.

도 1은 본 발명의 이해를 위한 간략한 시공 평면도
도 2는 본 발명의 이해를 위한 H형 강재를 시공하는 간략도
도 3은 H형 강재와 ㄷ형 강재를 결합하여 ㄷ형 강재 사이의 홈에 강철판을 끼워 지중에 비스듬히 삽입하는 것을 간략히 분해하여 설명하는 간략도
도 4는 흙막이벽의 구조 강화를 위해 중간에 강철판을 결합할 경우 힘 벡터의 이해를 위한 간략도
도 5는 H형 강재 상단에 ㄷ형 강재를 결합하여 강철판을 지중에 삽입한 간략도
도 6은 흙막이벽의 구조 강화 및 지하수 유입부에 대한 방수 효과가 있는 시공 간략도
도 7은 ㄷ형 강재 삽입구를 포함하는 ㄷ형 강재 유도틀의 이해를 위한 간략도
도 8은 H형 강재를 추가로 구성하여 보강 시공하는 본 발명의 간략도
도 9는 본 발명의 엇갈려 용접된 결합가이드의 이해를 위한 간략도
도 10은 지중에 삽입된 H형 강재 및 강철판이 삽입된 흙막이벽 측면 상상도
도 11은 지중에 삽입된 H형 강재 및 강철판을 이용해 간단히 영구 콘크리트 구조물을 만드는 일 실시 예 간략도
도 12은 지중에 삽입된 H형 강재 및 강철판을 이용해 간단히 영구 콘크리트 구조물을 만드는 일 실시 예 간략도
도 13은 바닥까지 철근 콘크리트 타설된 일 실시 예 간략도
1 is a simplified construction plan view for understanding of the present invention
Figure 2 is a simplified view of constructing the H-shaped steel for understanding of the present invention
Figure 3 is a simplified diagram illustrating the brief decomposition and insertion of the H-type steel and c-type steel by inserting the steel sheet in the ground between the c-type steel by inserting the steel plate in the groove between the c-type steel
Figure 4 is a simplified diagram for understanding the force vector when combining the steel sheet in the middle to strengthen the structure of the retaining wall
5 is a simplified view of inserting the steel plate in the ground by combining the c-type steel on the top of the H-type steel
Figure 6 is a simplified construction showing the waterproofing effect on the structure of the retaining wall and the groundwater inlet
Figure 7 is a simplified view for understanding of the c-shaped steel guide frame including the c-type steel insert
8 is a simplified view of the present invention to further construct and construct the H-shaped steel
Figure 9 is a simplified view for understanding the cross-welded coupling guide of the present invention
10 is an imaginary view of the side wall of the H-type steel and the steel plate inserted into the ground
Figure 11 is a simplified embodiment of making a permanent concrete structure using the H-type steel and steel plate inserted in the ground
Figure 12 is an embodiment of briefly making a permanent concrete structure using the H-type steel and steel sheet inserted into the ground
13 is a simplified view of one embodiment of reinforced concrete poured to the floor

삭제delete

본 발명의 가장 중요한 특징이며 타 기술과 차별성을 갖는 세 가지만을 함축적으로 추린다면 아래와 같다.If only three of the most important features of the present invention and different technologies and implicitly as follows.

첫째, 본 발명의 원리는 수중 생물의 물갈퀴와 같은 역활을 강철판이 하는 것과 비유할 수 있는 것으로, 물갈퀴가 있는 손가락과 물갈퀴가 없는 손가락의 차이로 비교할 수 있어 구조적으로 토압에 효과적으로 대응하는 흙막이 공법은 최초이다. First, the principle of the present invention can be compared to the role of the steel sheet to the role of the water web of the aquatic organisms, it can be compared with the difference between the finger with the web and the finger without the web so that the earthquake construction method that effectively responds to earth pressure First time.

두 번째, 본 발명은 흙막이벽 각 변에 설치되는 강철판의 개수는 꼭 대칭이 되지 않아도 된다. 그 이유는 흙막이벽이 토압에 의해 안정화되어 있다면, 어느 강철판에도 힘이 실리지 않기 때문이다.Second, the present invention does not necessarily have to be symmetric in the number of steel plates installed on each side of the retaining wall. The reason is that if the retaining wall is stabilized by earth pressure, no force is applied to any steel sheet.

즉, 흙막이벽의 일부에 토압에 의한 변위가 발생할 경우에만 해당 변의 흙막이벽에 시공된 강철판에 힘이 실리게 되고, 2차로 흙막이벽 전체의 강철판에 힘이 분산되면서 전체적으로 구조적인 안정성을 갖으며 토압에 의한 변위가 없어지는 평형점을 갖게 되기 때문이다.That is, only when displacement occurs due to earth pressure on a part of the retaining wall, the force is applied to the steel plate installed on the retaining wall of the side. Secondly, the force is distributed to the steel plate of the entire retaining wall, and thus, the overall structural stability is achieved. This is because the equilibrium point is eliminated by the displacement.

셋 째, 상기와 같은 본 발명의 효과에 의해 기존의 공법에 비해 흙막이벽 전체가 구조적인 안정성을 갖으며 갑자기 흙막이벽이 붕괴되지 않고 천천히 흙막이벽 전체에 변형이 발생하는 것을 확인할 수 있기 때문에 토압에 의한 힘이 가중되는 부위에 추가적으로 강철판을 보강하는 공사를 통해 붕괴 전 가장 힘 모멘트가 집중 되는 부분에 대해 강철판으로 보강공사를 시공하여 최소한의 시공으로 최대의 효과를 얻는다.Third, as a result of the above-described effects of the present invention, it is possible to confirm that the entire wall is structurally stable compared to the existing method, and that the wall is not suddenly collapsed. By reinforcing the steel plate in addition to the site where the force is increased, the steel plate is used to construct the reinforcement work for the part where the most moment of force is concentrated before collapse.

도 4, 도 5를 참조하면 토압에 의해 H형 강재에 힘이 작용하게 되면 강철판(13)은 수직변위로 항력이 발생하여 H형 강재의 변형(쓰러짐)을 방지한다.Referring to Figures 4 and 5, when a force acts on the H-shaped steel by earth pressure, the steel plate 13 prevents deformation (falling) of the H-shaped steel by generating a drag at a vertical displacement.

또한, 도 1을 참조하면 지중에 비스듬히 삽입 H형 강재에 고정된 강철판 A에 힘이 작용하게 되면 힘의 분산과 반작용 및 반대편의 B에서도 반작용이 발생하여 작용과 반작용에 의해 전체 구조체가 상당히 안정적인 힘의 분산 구조가 된다.
In addition, referring to Figure 1 when the force acts on the steel plate A fixed to the H-shaped steel inserted obliquely in the ground, the reaction occurs in the dispersion and reaction of the force and the opposite side B, the entire structure is quite stable by the action and reaction It becomes the dispersion structure of.

이하 일 실시 예를 통해 상세히 설명한다.Hereinafter will be described in detail through an embodiment.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

일 실시 예로, 지중에 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하는 제 1열 H형 강재(24) 타설단계; 제 1열 H형 강재(24) 뒤에 제 2열 H형 강재(25)가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하는 제 2열 H형 강재(25) 타설단계; 제 1열 H형 강재(24)와 제 2열 H형 강재(25) 사이에 H형 강재 결합 보강재(21)를 매개체로 제 1열 H형 강재(24)와 제 2열 H형 강재(25) 사이를 용접한다.In one embodiment, the first stage H-type steel (24) placing step of placing the H-type steel on the ground so that the H-type steel in the ground vertically; A second-row H-type steel placing step of placing H-type steel on the ground so that the second-row H-type steel 25 is vertically placed after the first-row H-type steel 24; The first-row H-type steel 24 and the second-row H-type steel 25 between the first-row H-shaped steel 24 and the second-row H-shaped steel 25 through the H-type steel joint reinforcing material 21 as a medium. Weld between).

상기 용접 결합단계에 있어서, 도 8을 참조하면 H형 강재 결합 보강재(21)는 박스형 철강, 강철판, H형 강재, U형 강재, T형 강재 등으로 제 1열 H형 강재(24)와 제 2열 H형 강재(25) 사이에 용접 결합을 통해 구조적인 결합을 위한 것으로 특정 모양의 결합 보강재로 한정되지는 않는다. In the welding joining step, referring to FIG. 8, the H-type steel reinforcing reinforcement 21 is formed of box-type steel, steel sheet, H-type steel, U-type steel, T-type steel, etc., and the first row H-type steel 24. It is for structural coupling through welding coupling between two rows of H-shaped steels 25 and is not limited to a specific shape of coupling reinforcement.

H형 강재 사이로 지중에 강철판(13)을 삽입하는 강철판 삽입단계; 굴착영역(1)을 굴착하는 굴착단계;를 특징으로 하는 가설 흙막이 구조물 설치방법이다.
Steel sheet insertion step of inserting the steel sheet 13 in the ground between the H-shaped steel; The excavation step of excavating the excavation area (1); is a method of installing a temporary crust structure.

일 실시 예로, 상기에서 제 2열 H형 강재(25) 타설단계에 있어서; 제 1열 H형 강재(24)의 개수 대비 제 2열 H형 강재(25)의 개수는 절반 이하인 것을 특징으로 하는 가설 흙막이 구조물 설치방법이다. In an embodiment, in the second row H-type steel 25 in the pouring step; The number of second-row H-shaped steels 25 is less than half of the number of first-row H-shaped steels 24.

도 8을 참조하면, 제 1열 H형 강재의 개수는 총 20개이며 제 2열 H형 강재는 총 8개가 사용된 일 예로, 제 1열 H형 강재 대비 50%이하의 H형 강재 사용만으로도 충분한 효과를 갖는다.
Referring to FIG. 8, the number of first-row H-type steels is 20 and the second-row H-type steel is eight, for example, using only 50% or less of H-type steels compared to the first-row H-type steels. Has sufficient effect.

일 실시 예로, 상기에서 H형 강재 내부는 엇갈려 용접된 결합가이드를 포함하는 것을 특징으로 하는 가설 흙막이 구조물이다.In one embodiment, the H-shaped steel interior is a temporary earthquake structure, characterized in that it comprises a coupling guide welded alternately.

도 9를 참조로, H형 강재 내부에 엇갈려 용접된 결합가이드(22, 23)는 최소한의 결합가이드 강재를 사용하여 최소한의 용접 가공 과정을 통해 제작되며, H형 강재 사이에 엇갈려 용접된 결합가이드의 빈 공간에 강철판(13)를 끼워 지중에 삽입할 때 강철판의 삽입 가이드 역활을 한다.
Referring to Figure 9, the coupling guides 22, 23 welded alternately inside the H-shaped steel is manufactured through the minimum welding processing process using a minimum of the coupling guide steel, the coupling guide welded across the H-shaped steel When inserting the steel sheet 13 into the empty space of the underground serves as the insertion guide of the steel sheet.

일 실시 예로, 용접에 의해 고정하는 것은 고정구에 의해 조립 고정되는 것을 특징으로 하는 가설 흙막이 구조물 설치방법으로, 고정구는 클램프, 천공된 구멍을 관통하는 볼트에 너트를 조여 고정하는 볼트, 너트 등 다양한 종래의 공지된 고정구를 통해 고정하는 것으로 본 발명에서는 특정하지는 않는다.
In one embodiment, the fixing by welding is a method of installing a temporary earthquake structure, characterized in that the assembly is fixed by a fastener, the fastener is a clamp, a bolt, a nut and the like fixed by tightening a nut to a bolt through a drilled hole It is not specified in the present invention to be fixed through a known fixture of.

일 실시 예로, 토류판 설치단계는 H형 강재 사이에 강철판을 끼워 삽입 후 굴착영역(1)을 굴착하는 것을 특징으로 하는 가설 흙막이 구조물 설치방법이다.
In one embodiment, the earth plate installation step is a temporary earthquake structure installation method characterized in that the excavation of the excavation area (1) after inserting the steel plate between the H-shaped steel.

일 실시 예로, 지중에 수직으로 타설되는 H형 강재(15)와; 지중에 삽입된 강철판(13)과; H형 강재(15)와 강철판(13)을 결합보강재를 매개체로 용접된 결합보강재와; H형 강재(15) 사이에 토류판이 설치된 것을 특징으로 하는 가설 흙막이 구조물이다.
In one embodiment, the H-type steel 15 is poured into the ground vertically; A steel sheet 13 inserted into the ground; Coupling stiffener welded to the H-shaped steel 15 and the steel plate 13 through the coupling stiffener; Temporary earth block structure, characterized in that the earth plate is installed between the H-shaped steel (15).

일 실시 예로, 지중에 수직으로 타설되는 H형 강재(15)와 지중에 삽입된 강철판(13)은 지면을 기준으로 30도 내지 60도 사이의 각도로 강철판이 삽입된 것을 특징으로 하는 가설 흙막이 구조물이다.
In one embodiment, the H-shaped steel 15 and the steel plate 13 inserted into the ground vertically placed in the ground is a temporary soil structure, characterized in that the steel plate is inserted at an angle between 30 degrees to 60 degrees relative to the ground to be.

일 실시 예로, 지중에 수직으로 타설되는 H형 강재(15)와 지중에 삽입된 강철판(13)은 지면을 기준으로 45도의 각도로 강철판이 삽입된 것을 특징으로 하는 가설 흙막이 구조물이다.
As an example, the H-type steel 15 and the steel plate 13 inserted into the ground vertically placed in the ground is a temporary soil structure, characterized in that the steel plate is inserted at an angle of 45 degrees relative to the ground.

일 실시 예로, 지중에 수직으로 타설되는 H형 강재(15)와; H형 강재(15) 상단부로부터 지중에 삽입된 강철판(13)과; H형 강재(15) 상단과 강철판(13)을 결합보강재를 매개체로 용접된 결합보강재와; H형 강재(15) 상단과 하단 사이에 지중에 삽입된 강철판(13)과; H형 강재(15) 상단과 하단 사이에 삽입된 강철판(13)을 결합보강재를 매개체로 용접된 결합보강재와; H형 강재(15) 사이에 토류판이 설치된 것을 특징으로 하는 가설 흙막이 구조물이다.
In one embodiment, the H-type steel 15 is poured into the ground vertically; A steel plate 13 inserted into the ground from an upper end of the H-shaped steel 15; Joining reinforcing material welded to the upper portion of the H-type steel 15 and the steel plate 13 by the coupling reinforcing material; Steel plate 13 inserted into the ground between the top and bottom H-shaped steel 15; Coupling stiffener welded to the steel plate (13) inserted between the top and bottom of the H-shaped steel 15 by the medium of the coupling stiffener; Temporary earth block structure, characterized in that the earth plate is installed between the H-shaped steel (15).

일 실시 예로, 지중에 수직으로 타설되는 제 1열 H형 강재(24)와; 지중에 수직으로 타설되는 제 2열 H형 강재(25)와; H형 강재 사이로 지중에 삽입된 강철판(13)과; 제 1열 H형 강재(24)와 제 2열 H형 강재(25) 사이에 H형 강재 결합 보강재(21)를 매개체로 용접된 H형 강재 결합 보강재(21)를 특징으로 하는 가설 흙막이 구조물이다.
In one embodiment, the first row H-shaped steel 24 is placed vertically in the ground; A second row H-type steel 25 placed in the ground vertically; A steel plate 13 inserted into the ground between the H-shaped steels; It is a temporary soil block structure characterized by the H-type steel joint reinforcing member 21 welded between the first-row H-type steel 24 and the second-row H-type steel 25 via the H-type steel coupling reinforcement 21. .

일 실시 예로, 상기에서 H형 강재 내부는 엇갈려 용접된 결합가이드를 포함하는 것을 특징으로 하는 가설 흙막이 구조물이다.In one embodiment, the H-shaped steel interior is a temporary earthquake structure, characterized in that it comprises a coupling guide welded alternately.

H형 강재 내부에 엇갈려 용접된 결합가이드(22, 23)는 최소한의 결합가이드 강재를 사용하여 최소한의 용접 가공 과정을 통해 제작되며, H형 강재 사이에 엇갈려 용접된 결합가이드의 빈 공간에 강철판(13)를 끼워 지중에 삽입할 때 강철판의 삽입 가이드 역활을 한다.
The coupling guides 22 and 23 welded alternately inside the H-shaped steel are manufactured through the minimum welding processing process using the minimum coupling guide steel, and the steel plates are formed in the empty space of the coupling guides welded alternately between the H-shaped steels. 13) serves as an insertion guide for steel sheets when inserted into the ground.

일 실시 예로, 지하수가 유입되는 지점에 삽입된 강철판(13)을 결합보강재를 매개체로 H형 강재와 용접된 것을 특징으로 하는 가설 흙막이 구조물이다.
In one embodiment, the temporary earthquake structure is characterized in that the steel plate 13 inserted into the ground water inflow point is welded with the H-type steel through the medium of the coupling reinforcement.

일 실시 예로, 용접에 의해 고정하는 것은 고정구에 의해 조립 고정되는 것In one embodiment, the fixing by welding is to be assembled and fixed by the fixture

을 특징으로 하는 가설 흙막이 구조물이다.
Temporary earthquake structure characterized in that.

이하 청구항을 중심으로 상세히 설명한다.Hereinafter, the claims will be described in detail.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

지중에 수직으로 타설되는 제 1열 기초 H형 강재(24) 및 지중에 타설된 제 1열 기초 H형 강재에 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 타설되어 구성되는 제 1열 다단 H형 강재이다.The first row constructed by vertically placing the ground to the design depth while continuously welding one or more rows to the first row foundation H-shaped steel 24 placed in the ground and the first row foundation H-shaped steel placed in the ground. It is a multi-stage H type steel.

삭제delete

삭제delete

삭제delete

즉, 강철판의 길이에 한계가 있으며, 흙막이 공사의 깊이 역시 공사 현장에 따라 설계심도가 다르기 때문에 고심도의 가설 흙막이 공사를 위해서는 기초가 되는 기초 H형 강재를 지중에 타설한 후 H형 강재를 용접 연결하여 다시 타설하며, 그래도 설계 깊이까지 H형 강재가 타설되지 않을 경우 설계 심도에 도달 할 때까지 하나 이상 연속적으로 타설, 용접 연결 타설을 반복하여 설계심도까지 H형 강재를 타설한다.In other words, the length of the steel plate is limited, and the depth of the earthwork construction also varies depending on the construction site. Therefore, for the construction of the high-definition temporary earthquake, the foundation H-type steel, which is the foundation, is placed in the ground and then welded the H-type steel. If the H-type steel is not poured to the design depth, the H-type steel is poured to the design depth by repeating one or more consecutive castings and welding connection pouring until the design depth is reached.

상기와 같은 과정을 통해 다단으로 구성된 제 1열의 H형 강재인 제 1열 다단 H형 강재이다. Through the above-described process is a first row H-stage steel of the first row of H-type steel composed of multiple stages.

제 1열 다단 H형 강재 사이로 지중에 수직으로 삽입된 기초 강철판(13)에 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 삽입되어 구성되는 다단 강철판이다.It is a multi-stage steel sheet configured to be inserted into the ground vertically to the design depth while continuously welding one or more to the base steel sheet 13 inserted vertically into the ground between the first row multi-stage H-shaped steel.

즉, 상기 다단 H형 강재의 구성과 같은 원리로 설계심도까지 강철판을 삽입하기 위해 하나 이상의 강철판을 용접 연결하면서 지중에 삽입한 다단 강철판이다.That is, a multi-stage steel sheet inserted into the ground while connecting one or more steel sheets by welding to insert the steel sheet to the design depth in the same principle as the configuration of the multi-stage H-shaped steel.

지중에 수직으로 타설되는 제 2열 기초 H형 강재(25) 및 강철판을 수직으로 삽입한다.A second row H-shaped steel 25 and a steel sheet vertically poured into the ground are inserted vertically.

즉, 상기 제 1열과 같은 원리로 제 1열의 뒤에 제 2열의 기초 강철판을 삽입한다.That is, the basic steel sheet of the second row is inserted after the first row on the same principle as the first row.

제 1열 다단 H형 강재와 제 2열 기초 H형 강재 상단부 사이에 H형 강재 결합 보강재(21)를 매개체로 용접된 H형 강재 결합 보강재(21)로 구성된다.The H-type steel joint reinforcing member 21 welded between the first-row multi-stage H-type steel and the second-row base H-type steel upper end portion through the H-type steel joint reinforcing material 21 as a medium.

제 1열 다단 H형 강재와 제 2열 기초 H형 강재 상단부 사이에 H형 강재인 결합 보강재(21)를 매개체(상단부에 올려놓고) 용접하여 구성된 H형 강재 결합 보강재(21)로 구성된다.An H-shaped steel joint reinforcing member 21 is formed by welding a coupling reinforcement 21, which is an H-type steel, between a first row multi-stage H-shaped steel and a second row H-shaped steel upper end.

구성 요소간을 결합관계를 상세히 설명하면, 지중에 수직으로 타설된 제 1열 기초 H형 강재와 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 타설된 제 1열 다단 H형 강재와 다단 H형 강재 사이로 삽입된 다단 강철판으로 구성된 기본 가설 흙막이 구조물에 추가로 지중에 수직으로 타설된 제 2열 기초 H형 강재와 제 1열 다단 H형 강재 상단부를 H형 강재 결합 보강재를 연결 용접 후 굴착영역(1)을 굴착하는 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물이다.When explaining the coupling relationship between the components in detail, the first row multi-stage H-shaped steel and the multi-stage vertically placed in the ground to the design depth while continuously connecting one or more first-row basic H-shaped steel placed vertically in the ground In addition to the basic temporary earthquake structure consisting of a multi-stage steel sheet inserted between H-type steels, excavation after welding the second-row basic H-type steel and the first-tier multi-stage H-shaped steel upper end of H-type steel joint reinforcement It is a high-depth prefabricated construction block structure, characterized in that excavating the region (1).

굴착 영역은 결국 제1열 H형 강재로 둘러 쌓인 다각형 내부의 공간이 굴착 영역이 된다고 볼 수 있다.
The excavation area can be regarded as the excavation area as the space inside the polygon surrounded by the first row H-type steel.

지중에 수직으로 타설되는 제 1열 기초 H형 강재 및 지중에 타설된 제 1열 기초 H형 강재에 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 타설되어 구성되는 제 1열 다단 H형 강재와; First-tier multi-stage H type constructed by vertically pouring into the ground to the design depth while continuously welding one or more rows to the first-row basic H-shaped steel placed in the ground and the first-row basic H-shaped steel placed in the ground Steel;

제 1열 다단 H형 강재 사이로 지중에 수직으로 삽입된 기초 강철판에 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 삽입되어 구성되는 다단 강철판과;A multi-stage steel sheet configured to be inserted vertically into the ground to a design depth while continuously welding one or more consecutively connected to the base steel sheet vertically inserted into the ground between the first row multi-stage H-shaped steels;

지중에 수직으로 타설되는 제 2열 기초 H형 강재 및 강철판과; A second row base H-type steel and steel sheet vertically placed in the ground;

지중에 수직으로 타설되는 제 3열 기초 H형 강재 및 강철판과; A third row base H-shaped steel and steel sheet vertically placed in the ground;

제 1열 다단 H형 강재와 제 2열 기초 H형 강재, 제 3열 기초 H형 강재 상단부 사이에 H형 강재 결합 보강재를 매개체로 용접된 H형 강재 결합 보강재로 구성되어,It consists of H type steel joint reinforcement welded by H-steel joint reinforcement between first row multi-stage H type steel, second row basic H type steel, and third row basic H type steel upper end.

지중에 수직으로 타설된 제 1열 기초 H형 강재와 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 타설된 제 1열 다단 H형 강재와 다단 H형 강재 사이로 삽입된 다단 강철판으로 구성된 기본 가설 흙막이 구조물에 추가로 지중에 수직으로 타설된 제 2열 기초 H형 강재, 제 3열 기초 H형 강재, 제 1열 다단 H형 강재 상단부를 H형 강재 결합 보강재를 연결 용접 후 굴착영역을 굴착하는 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물이다.A base consisting of a first-stage multi-stage H-steel placed vertically in the ground and a multi-stage steel sheet inserted between the first-stage multistage H-shaped steel and the multi-stage H-shaped steel vertically poured into the ground to the design depth while continuously welding one or more continuous In addition to the temporary cladding structure, the upper part of the second-row H-steel, the third-row H-steel, and the first-stage multi-stage H-steel, which are placed vertically in the ground, are connected to the H-type steel joint reinforcement and then excavated the excavation area. It is a high-depth prefabricated temporary construction structure.

제 1열 다단 H형 강재와 제 2열 기초 H형 강재, 제 3열 기초 H형 강재와 강철판이 삽입된 것을 특징으로 한다.
The first row multi-stage H type steel, the second row basic H type steel, the third row basic H type steel and the steel sheet are inserted.

지중에 수직으로 타설되는 제 1열 기초 H형 강재 및 지중에 타설된 제 1열 기초 H형 강재에 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 타설되어 구성되는 제 1열 다단 H형 강재와; First-tier multi-stage H type constructed by vertically pouring into the ground to the design depth while continuously welding one or more rows to the first-row basic H-shaped steel placed in the ground and the first-row basic H-shaped steel placed in the ground Steel;

지중에 수직으로 타설되는 제 2열 기초 H형 강재 및 지중에 타설된 제 2열 기초 H형 강재에 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 타설되어 구성되는 제 2열 다단 H형 강재와; Second row multi-stage H type constructed by vertically laying in the ground to the design depth while continuously welding at least one continuous connection to the second-row basic H-shaped steel placed in the ground and the second-row H-shaped steel placed in the ground Steel;

H형 강재 사이로 지중에 수직으로 삽입된 기초 강철판에 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 삽입되어 구성되는 다단 강철판과;A multi-stage steel sheet configured to be inserted vertically into the ground to a design depth while continuously welding one or more welded base metal sheets inserted vertically into the ground between the H-shaped steels;

제 1열 다단 H형 강재와 제 2열 다단 H형 강재 사이에 H형 강재 결합 보강재를 매개체로 용접된 H형 강재 결합 보강재로 구성되어,It consists of H type steel joint reinforcement welded by H-type steel joint reinforcement between the first row multi-stage H type steel and the second row multi-stage H type steel,

지중에 수직으로 타설된 제 1열 기초 H형 강재와 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 타설된 제 1열 다단 H형 강재 및 추가로 지중에 수직으로 타설된 제 2열 기초 H형 강재와 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 타설된 제 2열 다단 H형 강재와 다단 H형 강재 사이에 다단 강철판을 삽입한 후 제 1열 다단 H형 강재와 제 2열 다단 H형 강재 상단부를 H형 강재 결합 보강재를 연결 용접 후 굴착영역(1)을 굴착하는 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물이다.First row multi-stage H-shaped steel laid vertically to the ground to the design depth while continuously connecting one or more continuous H-steels vertically cast into the ground, and second row foundations vertically cast into the ground. The first row multistage H type steel and the second row after inserting the multi-stage steel sheet between the second row multi-stage H type steel and the multi-stage H type steel which are placed vertically in the ground to the design depth while continuously welding one or more H type steels together. It is a high-depth prefabricated temporary construction structure, characterized in that excavation excavation area (1) after connecting the H-shaped steel joint reinforcement to the upper end of the thermal multi-stage H-type steel.

제 1열 다단 H형 강재, 제 2열 다단 H형 강재와 강철판이 삽입된 것을 특징으로 한다.
The first row multi-stage H-shaped steel, the second row multi-stage H-shaped steel and a steel sheet is inserted.

지중에 수직으로 타설되는 제 1열 기초 H형 강재 및 지중에 타설된 제 1열 기초 H형 강재에 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 타설되어 구성되는 제 1열 다단 H형 강재와; First-tier multi-stage H type constructed by vertically pouring into the ground to the design depth while continuously welding one or more rows to the first-row basic H-shaped steel placed in the ground and the first-row basic H-shaped steel placed in the ground Steel;

지중에 수직으로 타설되는 제 2열 기초 H형 강재 및 지중에 타설된 제 2열 기초 H형 강재에 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 타설되어 구성되는 제 2열 다단 H형 강재와; Second row multi-stage H type constructed by vertically laying in the ground to the design depth while continuously welding at least one continuous connection to the second-row basic H-shaped steel placed in the ground and the second-row H-shaped steel placed in the ground Steel;

지중에 수직으로 타설되는 제 3열 기초 H형 강재와; A third-row base H-shaped steel vertically poured into the ground;

제 1열 다단 H형 강재 및 제 2열 다단 H형 강재 사이로 지중에 수직으로 삽입된 기초 강철판에 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 삽입되어 구성되는 다단 강철판과;A multi-stage steel sheet configured to be inserted into the ground vertically to a design depth while continuously welding at least one continuous steel plate inserted vertically into the ground between the first row multi-stage H-shaped steel and the second row multi-stage H-shaped steel;

제 1열 다단 H형 강재 및 제 2열 다단 H형 강재 및 제 3열 기초 H형 강재 사이를 H형 강재 상단부에 결합 보강재를 매개체로 용접된 H형 강재 결합 보강재로 구성되어,It consists of H type steel joint reinforcement welded between the first row multi-stage H type steel, the second row multi-stage H type steel, and the third row basic H type steel by the coupling reinforcement at the upper end of the H type steel.

지중에 수직으로 제 1열 기초 H형 강재를 타설 후 지중에 타설된 제 1열 기초 H형 강재에 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 타설되는 제 1열 다단 H형 강재와 다단 H형 강재 사이로 지중에 수직으로 삽입된 기초 강철판을 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 다단 강철판을 삽입 및 지중에 수직으로 타설되는 제 2열 기초 H형 강재와 지중에 타설된 제 2열 기초 H형 강재를 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 타설되는 제 2열 다단 H형 강재와 다단 H형 강재 사이로 지중에 수직으로 삽입된 기초 강철판을 하나 이상 연속적으로 용접 연결하면서 설계 심도까지 지중에 수직으로 삽입되어 구성되는 다단 강철판 및 지중에 수직으로 타설되는 제 3열 기초 H형 강재에 있어서, 제 1열 다단 H형 강재 및 제 2열 다단 H형 강재 및 제 3열 기초 H형 강재 사이를 H형 강재 결합 보강재를 매개체로 용접하여 구성된 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물이다.The first row multi-stage H type steel that is placed vertically in the ground to the design depth while continuously welding one or more columns of the first row H type steel that is placed in the ground and then continuously welded to the first row basic H type steel placed in the ground. Two-stage H-steels placed in the ground and placed vertically in the ground and inserted into the ground vertically to the design depth while continuously welding one or more foundation steel sheets inserted vertically into the ground between the multi-stage H-shaped steels One or more continuous steel plates inserted vertically into the ground between the second row multi-stage H type steel and the multi-stage H type steel, which are placed vertically in the ground to the design depth while continuously welding one or more second row basic H type steels continuously Multi-stage steel sheet constructed by inserting vertically into the ground to the design depth while welding connection by means of In the H type steel, high depth prefabricated hypothesis, which is constructed by welding H type steel joint reinforcement between first row multi-stage H type steel, second row multi-stage H type steel and third row basic H type steel. It is an earth block structure.

제 1열 다단 H형 강재, 제 2열 다단 H형 강재, 제 3열 기초 H형 강재와 강철판이 삽입된 것을 특징으로 한다.
The first row multi-stage H type steel, the second row multi-stage H type steel, the third row basic H type steel and the steel sheet is inserted.

지중에 수직으로 타설되는 제 1열의 H형 강재 및 지중에 타설된 제 1열의 H형 강재에 하나 이상의 후 열에 지중으로 수직 타설되어 구성되는 하나 이상의 후 열 H형 강재와; One or more post-heat H-type steels constructed by vertically placing the H-type steel in the first row and the H-type steel in the first row placed in the ground vertically in the ground;

제 1열의 H형 강재 또는 하나 이상의 후 열 H형 강재 중 어느 하나 이상에 H형 강재 사이로 지중에 수직으로 강철판을 삽입하며;Inserting a steel plate perpendicular to the ground between the H-shaped steels in at least one of the first-row H-shaped steels or one or more post-heated H-shaped steels;

제 1열의 H형 강재 및 하나 이상의 H형 강재 상단부 사이를 H형 강재 결합 보강재를 매개체로 용접된 H형 강재 결합 보강재로 구성되어,It consists of H type steel joint reinforcement welded between H type steel in the first row and at least one H type steel upper end by H type steel joint reinforcement,

지중에 수직으로 제 1열의 H형 강재를 타설 후 지중에 타설된 제 1열의 H형 강재 뒤에 하나 이상의 후 열 H형 강재를 지중으로 수직 타설한 하나 이상의 후 열 H형 강재에 있어서, 제 1열의 H형 강재 또는 하나 이상의 후 열 H형 강재 중 어느 하나 이상에 H형 강재 사이를 지중에 수직으로 강철판을 삽입 한 후 제 1열의 H형 강재 및 하나 이상의 후 열 H형 강재 상단부 사이를 H형 강재 결합 보강재를 매개체로 용접하여 구성된 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물이다.In the one or more post-heat H-steels in which one or more post-heat H-type steels are placed vertically in the ground after the first-row H-type steels are placed in the ground and the first-row H-steels are placed in the ground. Insert a steel plate perpendicular to the ground between H type steel in any one or more of H type steel or at least one post heat H type steel, and then connect H type steel in the first row and one or more post H type steel upper ends. It is a high-depth prefabricated temporary construction structure characterized in that the coupling reinforcing material is constructed by welding.

제 1열의 H형 강재와 그 뒤에 하나 이상의 후 열 H형 강재로 열을 구성하고 강철판이 삽입된 것을 특징으로 한다.
The first row of H-shaped steel, followed by one or more post-row H-shaped steel constitutes a row, characterized in that the steel sheet is inserted.

지중에 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하는 제 1열 H형 강재 타설단계; A first row H-type steel placing step of placing H-type steel on the ground so that H-type steel is vertically placed in the ground;

제 1열 H형 강재 뒤에 하나 이상의 후 열 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하는 후 열 H형 강재 타설단계; A post heat H-type steel pouring step of placing the H-type steel on the ground so that at least one post-heat H-type steel is vertically placed behind the first row H-type steel;

제 1열 H형 강재와 후 열 H형 강재 상단부 사이에 H형 강재 결합 보강재를 매개체로 제 1열 H형 강재와 하나 이상의 후 열 H형 강재 사이를 용접하는 용접 결합단계;A welding joint step of welding between the first row H type steel and the at least one post row H type steel by using an H type steel joint reinforcing material between the first row H type steel and the upper part of the post row H type steel;

제 1열을 포함하는 하나 이상의 후 열 H형 강재에 있어서, 하나 이상의 열에 강철판을 삽입하는 강철판 삽입단계;1. At least one post-heat H-steel comprising a first row, comprising: a steel sheet inserting step of inserting a steel sheet in at least one row;

마주보는 제 1열 H형 강재 사이의 굴착영역을 굴착하는 굴착단계;An excavation step of excavating an excavation area between the first row H-type steels facing each other;

상기 제 1열 H형 강재 타설단계를 통해 구성되는 기초 골조와 추가로 보강되는 하나 이상의 후 열 H형 강재 타설 단계를 통해 구성되는 제 1열 H형 강재와 후 열 H형 강재 상단부를 H형 강재 결합 보강재를 연결 후 용접하는 용접 결합단계를 통해 구성되는 기본 골조에 하나 이상의 열 H형 강재 사이에 강철판을 삽입하는 강철판 삽입단계를 통해 구성된 가설 흙막이 구조물에 굴착영역을 굴착하는 굴착단계를 통한 보강된 가설 흙막이 구조물을 특징으로 하는 고심도 조립식 가설 흙막이 구조물 및 설치방법.H-shaped steel upper part of the first row H-type steel and the post-row H-shaped steel, which are configured through the foundation frame and the one or more post-heat H-steels, which are additionally reinforced, by the first-row H-type steel placing step Reinforced through the excavation step of excavating the excavation area in the construction of the temporary earthquake structure formed by inserting the steel plate between the one or more thermal H-type steel in the basic frame composed of the welding joint step of connecting and welding the joint reinforcement. High-depth prefabricated temporary cladding structure and installation method characterized by the temporary cladding structure.

제 1열의 H형 강재와 그 뒤에 하나 이상의 후 열 H형 강재로 열을 구성하고 강철판이 삽입된 후 굴착 영역을 굴착하여 완성되는 고심도 조립식 가설 흙막이 구조물 및 설치방법을 특징으로 한다.
It is characterized by a high-depth prefabricated temporary scaffolding structure and installation method comprising a row of H-type steels in the first row and one or more post-heat H-steels, followed by excavation of the excavation area after the steel sheet is inserted.

지중에 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하는 제 1열 H형 강재 타설단계; A first row H-type steel placing step of placing H-type steel on the ground so that H-type steel is vertically placed in the ground;

제 1열 H형 강재 뒤에 하나 이상의 후 열 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하는 후 열 H형 강재 타설단계; A post heat H-type steel pouring step of placing the H-type steel on the ground so that at least one post-heat H-type steel is vertically placed behind the first row H-type steel;

제 1열 H형 강재와 후 열 H형 강재 사이에 H형 강재 결합 보강재를 매개체로 제 1열 H형 강재와 하나 이상의 후 열 H형 강재 사이를 용접하는 용접 결합단계;A welding joint step of welding between the first row H-type steel and the at least one post-heat H-type steel via the H-type steel joint reinforcing material between the first row H-type steel and the post-row H-type steel;

H형 강재 사이로 하나 이상의 열에 강철판을 삽입하는 강철판 삽입단계;Steel sheet insertion step of inserting the steel sheet in one or more rows between the H-shaped steel;

마주보는 제 1열 H형 강재 사이의 굴착영역을 굴착하는 굴착단계;An excavation step of excavating an excavation area between the first row H-type steels facing each other;

제 1열 H형 강재와 강철판으로 구성된 한 쪽 흙막이벽에 대해 설계 거리만큼 이격된 빈 공간에 철근 구조물을 삽입 후 벽체 거푸집을 시공하는 거푸집 시공 및 콘크리트를 타설하는 철근 콘크리트 타설단계;Reinforced concrete pouring step of constructing formwork and placing concrete after inserting the reinforcing structure into the empty space spaced by the design distance for one retaining wall composed of the first row H-type steel and steel sheet;

철근콘크리트 양생 후 H형 강재와 강철판을 인발 및 거푸집을 제거하는 인발 단계;A drawing step of drawing the H-type steel and the steel sheet and removing the formwork after the reinforced concrete curing;

상기 제 1열 H형 강재 타설단계를 통해 구성되는 기초 골조와 추가로 보강되는 하나 이상의 후 열 H형 강재 타설 단계를 통해 구성되는 제 1열 H형 강재와 후 열 H형 강재 상단부를 H형 강재 결합 보강재를 연결 후 용접하는 용접 결합단계를 통해 구성되는 기본 골조에 하나 이상의 열 H형 강재 사이에 강철판을 삽입하는 강철판 삽입단계를 통해 구성된 가설 흙막이 구조물에 굴착영역을 굴착하는 굴착단계를 통한 보강된 가설 흙막이 구조물에 추가로 흙막이벽에 대해 설계거리 이격 후 철근 구조물을 삽입 및 거푸집을 시공한 후 콘크리트를 타설하여 양생 후 H형 강재와 강철판을 인발 제거하여 생성된 영구 철근 콘크리트 구조물을 특징으로 하는 고심도 조립식 가설 흙막이 구조물 및 설치방법이다.H-shaped steel upper part of the first row H-type steel and the post-row H-shaped steel, which are configured through the foundation frame and the one or more post-heat H-steels, which are additionally reinforced, by the first-row H-type steel placing step Reinforced through the excavation step of excavating the excavation area in the construction of the temporary earthquake structure formed by inserting the steel plate between the one or more thermal H-type steel in the basic frame composed of the welding joint step of connecting and welding the joint reinforcement. In addition to the temporary earthquake structures, after inserting the reinforcing structures apart from the design wall and inserting the formwork, placing concrete, and curing the H-shaped steel and steel plates after curing, Prefabricated temporary cladding structure and installation method.

종래에 천공기로 지면을 뚫고 콘크리트를 타설하여 콘크리트 영구 흙막이 구조물을 만드는 방법에 비해 훨씬 저비용으로 영구 철근콘크리트 흙막이 구조물(옹벽)을 만들 수 있는 방법이다.It is a method that can make a permanent reinforced concrete retaining structure (retaining wall) at a much lower cost than the conventional method of making a concrete permanent blocking structure by drilling the ground through a perforator.

제 1열 H형 강재와 후열 H형 강재와 강철판을 이용해 흙막이 벽을 형성한 후 기초 구조물이 완성될 때까지 H형 강재와 강철판을 회수할 수 없을 때 그 기간이 길어지면 자재의 회전율이 낮아짐에 따라 바로 영구 철근콘크리트 흙막이 벽 구조물 만든 후 고가의 H형 강재와 강철판을 회수하여 자재 회전율을 향상시킨다.
When the retaining wall is formed using the first-row H-type steel and the post-heat H-steel and the steel sheet, and the H-steel and the steel sheet cannot be recovered until the basic structure is completed, the turnover of the material decreases. As a result, the permanent reinforced concrete retaining wall structure is made, and the expensive H-type steel and steel sheet are recovered to improve the material turnover rate.

지중에 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하는 제 1열 H형 강재 타설단계; A first row H-type steel placing step of placing H-type steel on the ground so that H-type steel is vertically placed in the ground;

제 1열 H형 강재 뒤에 제 2열 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하는 제 2열 H형 강재 타설단계; A second row H-type steel placing step of placing the H-type steel on the ground so that the second-row H-type steel is vertically placed after the first-row H-type steel;

H형 강재 사이로 강철판을 삽입하는 강철판 삽입단계;Steel sheet insertion step of inserting the steel sheet between the H-shaped steel;

제 1열의 H형 강재와 제 2열 H형 강재 사이의 흙을 제거한 빈 공간에 철골 구조물을 삽입한 후 콘크리트를 타설하여 영구 철근 콘크리트 구조물을 양생하는 철근콘크리트 구조물 단계;A reinforced concrete structure step of curing a permanent reinforced concrete structure by inserting a steel structure into an empty space from which the soil between the H type steels of the first row and the second row H type steel is removed, and then pouring concrete;

제 1열 H형 강재와 강철판으로 구성된 가설 흙막이벽 사이의 굴착영역을 굴착하는 굴착단계;An excavation step of excavating an excavation area between the temporary row wall formed of the first row H-type steel and the steel sheet;

H형 강재와 강철판을 인발 제거하는 인발단계;를 특징으로 하는 고심도 조립식 가설 흙막이 구조물 및 설치방법이다.A pull-out step of removing the H-type steel and steel sheet; is a high-depth prefabricated temporary construction structure and installation method.

영구 철근 콘크리트 구조물을 생성한 후 굴착영역을 굴착하는 고심도 조립식 가설 흙막이 구조물 및 설치방법이다.
It is a high-depth prefabricated temporary block structure and installation method that excavates excavation area after creating permanent reinforced concrete structure.

지중에 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하는 H형 강재 타설단계; H-type steel placing step of placing H-type steel on the ground so that H-type steel is vertically placed in the ground;

H형 강재 사이로 강철판을 삽입하는 강철판 삽입단계;Steel sheet insertion step of inserting the steel sheet between the H-shaped steel;

H형 강재와 강철판으로 구성된 흙막이벽 사이의 굴착영역을 굴착하는 굴착단계;An excavation step of digging an excavation area between the H-shaped steel and the earthen wall formed of the steel sheet;

흙막이 벽과 설계 거리만큼 떨어진 빈 공간에 철근 구조물과 지하 벽체 배관 및 시스템 박스를 삽입 고정한 후 벽체 거푸집을 시공하는 거푸집 시공단계;A formwork step of constructing wall formwork after inserting and fixing the reinforcing structure, the underground wall piping, and the system box in an empty space separated by the design wall;

콘크리트를 타설하는 철근 콘크리트 타설단계;Reinforced concrete pouring step of pouring concrete;

철근 콘크리트가 양생된 후 H형 강재와 강철판을 인발 및 거푸집을 제거하는 인발단계;를 특징으로 하는 고심도 조립식 가설 흙막이 구조물 및 설치방법.After the reinforced concrete is cured, the drawing step to remove the H-shaped steel and steel sheet and formwork; high-depth prefabricated temporary construction clamshell structure and installation method.

대지 경계에 최대한 입접하여 건축물을 시공할 경우 기존의 어떤 공법보다 대지 경계에 밀착하여 시공할 수 있는 공법이다.When building the building as close to the land boundary as possible, it is a construction method that can be installed in close contact with the land boundary than any existing construction methods.

즉, 건축물과 건축물 사이에 신규로 건축물을 건축할 경우 기존의 공법은 흙막이 벽을 시공한 후 흙막이 벽에 최대한 근접하여 지하 구조물을 만들어야 하는데, 흙막이 벽에 지지목을 세우거나 버팀보를 세우거나 하여야 하며, 흙막이 벽과 떨어져 지하구조물을 만드는 작업 공간이 필요하게 된다.In other words, when constructing a new building between buildings, the existing construction method should construct an underground structure as close as possible to the earth wall after constructing the earth wall. In addition, a work space is needed to make the underground structure away from the retaining wall.

본 발명은 대지경계에 밀착하여 H형 강재를 타설 및 강철판을 삽입하여 흙막이 구조물을 시공하고 굴착 구역을 굴착 후 흙막이벽(H형 강재 + 강철판)을 한쪽 거푸집 벽체로 활용하여 떨어져 철근 구조물을 시공하고 철근 구조물에 건축 구조물에 삽입되는 배관, 박스류, 앙커 등을 삽입 고정한 후 거푸집을 세워 바로 타설하여 대지 경계에 최대한 근접한 지하 건축 구조물이 타설됨과 동시에 그 자체가 흙막이 벽이 된다.The present invention is in close contact with the earth boundary, placing the H-type steel and inserting the steel plate to construct the earthquake structure, and excavation of the excavation area by using the earthquake wall (H-type steel + steel plate) as one formwork wall to construct the rebar structure After inserting and fixing the pipes, boxes, and anchors that are inserted into the reinforcing structures, the molds are built and poured directly, and the underground building structure as close as possible to the land boundary is poured.

콘크리트 양생 후 강철판과 H형 강재를 인발 하고 바닥에 버림 타설 후 지하층을 타설하며, 지하 2층 이상일 경우 도 12의 우측 벽체와 같이 층별로 타설해 올라 간다.
After curing the concrete, the steel plate and H-type steel are drawn out and then cast on the floor, and then the basement is poured. If the basement is two or more floors, it is poured up by floor as shown in the right wall of FIG.

지중에 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하는 H형 강재 타설단계; H-type steel placing step of placing H-type steel on the ground so that H-type steel is vertically placed in the ground;

H형 강재 사이로 강철판을 삽입하는 강철판 삽입단계;Steel sheet insertion step of inserting the steel sheet between the H-shaped steel;

H형 강재와 강철판으로 구성된 흙막이벽 사이의 굴착영역을 굴착하는 굴착단계;An excavation step of digging an excavation area between the H-shaped steel and the earthen wall formed of the steel sheet;

흙막이 벽과 설계 거리만큼 떨어진 공간에 철근을 삽입 후 벽체 거푸집을 시공 및 콘크리트를 타설하는 철근 콘크리트 타설단계;Reinforced concrete placing step of constructing wall formwork and placing concrete after inserting reinforcing bar in space far away from design wall;

철근 콘크리트가 양생된 후 H형 강재와 강철판을 인발 및 거푸집을 제거하는 인발단계;를 특징으로 하는 고심도 조립식 가설 흙막이 구조물 및 설치방법.
After the reinforced concrete is cured, the drawing step to remove the H-shaped steel and steel sheet and formwork; high-depth prefabricated temporary construction clamshell structure and installation method.

지중에 수직으로 타설되는 제 1열의 H형 강재 및 지중에 타설된 제 1열의 H형 강재 뒤에 제 2열 H형 강재를 지중으로 수직 타설되어 구성되는 제 1열 및 제 2열 H형 강재와; First and second rows of H-type steels formed by vertically placing a second row of H-type steels into the ground after the first-row H-type steels and a first row of H-type steels placed in the ground;

제 1열 및 제 2열 H형 강재 사이로 지중에 수직으로 강철판을 삽입하며;Inserting a steel plate perpendicular to the ground between the first and second row H-shaped steels;

제 1열 및 제 2열 H형 강재와 강철판 사이의 흙을 제거한 빈 공간에 철골 구조물을 삽입한 후 콘크리트를 타설하여 영구 철근 콘크리트 구조물을 양생한 후 H형 강재와 강철판을 인발 제거하며;Inserting the steel structure into the empty space from which the soil between the first and second columns of H-type steel and the steel sheet is removed, and then pouring concrete to cure the permanent reinforced concrete structure, and then removing the H-type steel and the steel sheet;

철근 콘크리트가 양생된 후 H형 강재와 강철판을 인발 및 거푸집을 제거하여 생성된 한 쪽 가설 흙막이 구조물 겸 지하 콘크리트 구조물에 설계 거리만큼 이격하여 상기와 동일한 방법으로 다른 쪽 가설 흙막이 구조물 겸 지하 콘크리트 구조물을 시공한 후 양 쪽 가설 흙막이 구조물 겸 지하 콘크리트 구조물 사이의 흙을 굴착한 후 바닥에 철근 콘크리트를 타설한 가설 흙막이 구조물 겸 지하 콘크리트 구조물.After the reinforced concrete is cured, it is separated from the one-sided temporary structure and the underground concrete structure, which is generated by drawing and removing the H-type steel and the steel plate, by the design distance. Temporary cladding structure and underground concrete structure in which reinforced concrete is placed on the floor after excavating soil between both temporary cladding structures and underground concrete structures after construction.

흙막이 구조물은 건축물을 시공하기 위한 흙막이 구조물 뿐 만아니라 상하수도 철근콘크리트 구조물관을 시공할 때도 필요하다.The earth block structure is necessary not only for the earth block structure for constructing the building but also for the construction of water pipes of reinforced concrete structures.

즉, 제 1열과 제 2열 사이의 흙을 파내서 형성된 흙막이 벽 자체가 거푸집으로 사용되어 도 13과 같은 상하수도 철근 콘크리트관을 시공하기 편리하다.That is, the soil wall formed by digging the soil between the first row and the second row is used as a formwork, so it is convenient to construct the water and sewage reinforced concrete pipe as shown in FIG.

상세히 설명하면,In detail,

지중에 수직으로 타설되는 제 1열의 H형 강재 및 지중에 타설된 제 1열의 H형 강재 뒤에 제 2열 H형 강재를 지중에 수직 타설되어 구성되는 제 1열 및 제 2열 H형 강재와; First and second rows of H-type steels formed by vertically placing a second row of H-type steels in the ground after the first-row H-type steels and a first row of H-type steels placed in the ground;

제 1열 및 제 2열 H형 강재 사이로 지중에 수직으로 강철판을 삽입하며;Inserting a steel plate perpendicular to the ground between the first and second row H-shaped steels;

제 1열 및 제 2열 H형 강재와 강철판 사이의 흙을 제거한 빈 공간에 철골 구조물을 삽입한 후 콘크리트를 타설하여 영구 철근 콘크리트 구조물을 양생한 후 H형 강재와 강철판을 인발 제거하여 한쪽 상하수도 철근 콘크리트관을 시공하며, 상기와 동일한 방법으로 나머지 상하수도 철근 콘크리트관을 시공한 후 바닥에 철근 코크리트를 타설할 경우 효율적으로 철근 콘크리트 상하수도관을 시공할 수 있다.
After inserting the steel structure into the empty space between the H-type steel and the steel plate in the first and second rows, the concrete is poured to cure the permanent reinforced concrete structure, and then the H-type steel and the steel plate are removed to remove the water and sewage When constructing the concrete pipe, if you install the remaining water and sewage reinforced concrete pipe in the same way as above, it is possible to efficiently construct the reinforced concrete water and sewage pipe when placing the reinforced concrete on the floor.

지중에 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하며;Placing H-type steel on the ground so that H-type steel is vertically placed in the ground;

H형 강재 사이로 강철판을 삽입하며;Inserting a steel sheet between the H-shaped steels;

H형 강재 및 강철판으로 구성된 흙막이벽 사이의 굴착영역을 굴착하며;Excavating the excavation area between the retaining wall composed of the H type steel and the steel plate;

굴착단계를 거쳐 생성된 흙막이 벽에 설계 거리만큼 떨어져 벽체 거푸집을 시공하며;Constructing the wall formwork by the design distance to the earthen wall created by the excavation step;

흙막이 벽과 설계 거리만큼 떨어진 공간에 철근 구조물과 지하 벽체 배관 및 시스템 박스를 삽입 고정 후 벽체 거푸집을 시공 후 콘크리트를 타설 및 양생된 후 H형 강재와 강철판을 인발 및 거푸집을 제거하여 생성된 가설 흙막이 구조물 겸 지하 콘크리트 구조물.
Reinforcement structures, underground wall piping and system boxes are inserted in the space far away from the design wall, and the wall formwork is installed, concrete is poured and cured, and then the H-shaped steel and steel plate are removed and removed. Structure and underground concrete structure.

지중에 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하며;Placing H-type steel on the ground so that H-type steel is vertically placed in the ground;

H형 강재 사이로 강철판을 삽입하며;Inserting a steel sheet between the H-shaped steels;

H형 강재 및 강철판으로 구성된 서로 마주보는 흙막이벽 사이의 굴착영역을 굴착하며;Excavating the excavation area between the facing wall of the H-shaped steel and the steel plate;

흙막이 벽과 설계 거리만큼 떨어진 공간에 철근 구조물을 삽입 후 벽체 거푸집을 시공 및 콘크리트를 타설하며;Inserting the reinforcing structure into the space away from the wall and designing the wall formwork and placing concrete;

철근 콘크리트가 양생된 후 H형 강재와 강철판을 인발 및 거푸집을 제거하여 생성된 가설 흙막이 구조물 겸 지하 콘크리트 구조물.
Temporary cinder structure and underground concrete structure produced by drawing and removing formwork of H-type steel and steel plate after reinforced concrete is cured.

지중에 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하며;Placing H-type steel on the ground so that H-type steel is vertically placed in the ground;

제 1열 H형 강재 뒤에 하나 이상의 후 열 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하며; Placing H-type steel on the ground so that at least one post-heat H-type steel is vertically placed behind the first-row H-type steel;

제 1열 H형 강재와 후 열 H형 강재 사이에 H형 강재 결합 보강재를 매개체로 제 1열 H형 강재와 하나 이상의 후 열 H형 강재 사이를 용접하며;Welding between the first row H type steel and the at least one post row H type steel via an H type steel joint reinforcing material between the first row H type steel and the post row H type steel;

H형 강재 사이로 하나 이상의 열에 강철판을 삽입하며;Inserting a steel sheet in one or more rows between the H-shaped steels;

마주보는 제 1열 H형 강재 사이의 굴착영역을 굴착하며;Excavating an excavation area between the first row H-type steels facing each other;

제 1열 H형 강재와 강철판으로 구성된 한 쪽 흙막이벽에 대해 설계 거리만큼 이격된 빈 공간에 철근 구조물을 삽입 후 벽체 거푸집을 시공 및 콘크리트를 타설하며;Inserting the reinforcing structure into an empty space spaced by a design distance with respect to one retaining wall composed of the first row H-type steel and the steel sheet, and constructing wall formwork and placing concrete;

철근콘크리트 양생 후 H형 강재와 강철판을 인발 및 거푸집을 제거하여 구성된 흙막이 구조물로 구성되어,After reinforced concrete curing, it consists of H-shaped steel and steel plate, which is made of earth block structure composed of drawing and removing formwork,

상기 제 1열 H형 강재로 구성된 기초 골조에 추가로 보강되는 하나 이상의 후 열 H형 강재에 있어서, 제 1열 H형 강재와 후 열 H형 강재 상단부를 H형 강재 결합 보강재를 연결 후 용접하여 구성되는 기본 골조에 하나 이상의 열 H형 강재 사이에 강철판을 삽입하여 구성된 가설 흙막이 구조물에 굴착영역을 굴착한 후 가설 흙막이벽에 대해 설계거리 이격 후 철근 구조물을 삽입 후 거푸집을 시공 및 콘크리트를 타설하여 양생 후 H형 강재와 강철판을 인발 제거하여 생성된 영구 철근 콘크리트 구조물을 특징으로 하는 고심도 조립식 가설 흙막이 구조물이다.
In one or more post-heat H-type steel further reinforced to the basic frame composed of the first-row H-type steel, the first row H-type steel and the post-heat H-type steel upper end portion is connected by welding the H-type steel joint reinforcement After excavating the excavation area in the temporary earthquake structure constructed by inserting steel plates between one or more thermal H-type steels in the basic frame, and inserting the reinforcement structure after placing the reinforcing structure and placing concrete It is a high-depth prefabricated temporary cladding structure characterized by permanent reinforced concrete structure produced by drawing out the H-type steel and steel plate after curing.

이하 종속항을 중심으로 설명한다.The following description focuses on the dependent claims.

일 실시 예로, 상기에서 제 1열 H형 강재 사이에 강철판을 삽입하는 것에 대해서, 강철판 대신에 굴착 영역을 굴착하면서 제 1열 H형 강재 사이에 목제 토류판을 끼우는 것으로 대체되는 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물이다.In one embodiment, for inserting the steel sheet between the first row H-shaped steel, the high depth, characterized in that replaced by sandwiching the wood earth plate between the first row H-shaped steel while excavating the excavation area instead of the steel sheet It is a prefabricated temporary structure.

제 2열 이후 후 열 강재 사이에는 강철판을 삽입하여 강철판이 물갈퀴와 같은 역할을 하여 흙막이 구조물의 안정성을 향상시키고, 제 1열의 경우 제 1열 H형 강재로 둘러쌓인 다각형의 내부의 굴착 영역을 굴착하면서 H형 강의 사이에 목재 토류판을 삽입하여 목재 토류판 흙막이 벽을 형성하며 굴착한다.
After the second row, a steel plate is inserted between the post-heat steels to improve the stability of the structure of the retaining structure by acting as a webbed, and in the case of the first row, excavation area of the polygonal interior surrounded by the first row H-type steel is excavated. While inserting the wood earth plate between the H-shaped steel, the earth excavation is formed by forming the wood earth plate wall.

일 실시 예로, 상기에서 후 열 H형 강재의 개수 및 H형 강재 사이에 삽입되는 강철판의 개수는 제 1열 H형 강재 및 H형 강재 사이에 삽입되는 강철판 개수 대비 그 이하인 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물이다.In one embodiment, the number of the post-heat H-shaped steel and the number of steel sheets inserted between the H-type steel is less than the number of steel plates inserted between the first row H-shaped steel and H-type steel, characterized in that less than It is a prefabricated temporary structure.

제 1열 H형 강재와 강철판으로 둘러쌓인 다각형 구조의 제 1열 흙막이벽에 거리는 두고 제 2열 H형 강재와 강철판으로 다각형을 완전히 다 둘러 쌓지 않아도 안전한 구조물이 형성될 경우 그렇게 할 필요가 없다.It is not necessary to do so when a safe structure is formed even if the polygons are not completely enclosed by the second row H-type steel plate and the steel plate with a distance from the first row retaining wall of the polygonal structure surrounded by the first column H-type steel plate and the steel sheet.

그러나, 그 반대로 2열로도 안전성이 미흡할 경우에는 3열 및 그 이상의 열을 추가하여 시공 보강한다.
On the contrary, if the safety is not satisfactory in two rows, three and more rows are added to reinforce the construction.

일 실시 예로, 상기에서 H형 강재 내부는 엇갈려 용접된 결합가이드(22, 23)를 포함하는 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물이다.
In one embodiment, the H-type steel interior is a high-depth prefabricated temporary construction structure, characterized in that it comprises a coupling guide 22, 23 welded alternately.

일 실시 예로, 상기에서 용접에 의해 고정하는 H형 강재 결합 보강재(21)는 용접하는 대신에 클램프, 볼트와 너트 중 어느 하나의 고정구에 의해 조립 고정되는 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물이다.
In one embodiment, the H-type steel joint reinforcing member 21 fixed by welding is a high-definition prefabricated temporary construction structure, characterized in that the assembly is fixed by any one of the clamp, bolt and nut instead of welding. .

일 실시 예로, 상기에서 제 1열의 H형 강재와 후 열 H형 강재 사이의 흙을 제거한 빈 공간에 철골 구조물을 삽입한 후 콘크리트를 타설하여 영구 철근 콘크리트 구조물을 양생한 후 H형 강재와 강철판을 인발 제거하는 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물이다.
In one embodiment, the steel structure is inserted into an empty space from which the soil between the H-type steel and the post-heat H-steel in the first row is removed, and the concrete is poured to cure the permanent reinforced concrete structure, and then the H-type steel and the steel sheet. It is a high-depth prefabricated temporary construction structure characterized in that the removal of the draw.

일 실시 예로, 상기에서 서로 마주보는 제 1열의 H형 강재 사이의 굴착영역(1)을 굴착한 후 생성된 흙막이 벽에 설계 거리만큼 떨어져 벽체 거푸집을 시공한 후 흙막이 벽과 설계 거리만큼 떨어져 생성된 벽체거푸집 사이의 빈 공간에 철근을 삽입 후 콘크리트를 타설하여 양생된 후 H형 강재와 강철판을 인발 및 거푸집을 제거 후 생성되는 영구 철근 콘트리트 옹벽을 특징으로 하는 고심도 조립식 가설 흙막이 구조물이다.
In one embodiment, after excavating the excavation area (1) between the H-type steel in the first row facing each other in the above wall formed by the design distance away from the earth wall created by the wall and the distance formed by the design distance away from the earth wall It is a high-definition prefabricated temporary wall structure characterized by permanent reinforced concrete retaining wall which is created after inserting reinforcing bars into the empty space between wall formwork and curing after pouring concrete and drawing and removing formwork of H type steel and steel sheet.

일 실시 예로, 상기에서 H형 강재 및 강철판은 지중에 수직으로 입설 되도록 타설하는데 있어서, In one embodiment, in the H-type steel and the steel sheet is placed in the vertical to be placed in the ground,

기초 H형 강재를 타설하고 하나 이상 연속적으로 H형 강재를 용접 연결하면서 설계 심도까지 지중에 수직으로 타설되며;Pour basic H-shaped steel and weld one or more H-shaped steel in series, vertically to the design depth;

H형 강재 사이에 기초 강철판을 수직으로 삽입하고 하나 이상 연속적으로 강철판을 용접 연결하면서 설계 심도까지 지중에 수직으로 삽입하는 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물이다.
It is a high-depth prefabricated construction block structure, characterized in that the basic steel plate is inserted vertically between the H-shaped steel and inserted into the ground vertically to the design depth while welding one or more consecutive steel plates.

일 실시 예로, 상기에서 이격된 빈 공간의 한 쪽면 또는 양쪽면 중 어느 하나에 부직포 또는 박리제가 도포된 부직포를 붙이고 철근 구조물을 삽입 후 콘크리트를 타설하는 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물이다.
In one embodiment, the high-depth prefabricated temporary construction structure is characterized in that a non-woven fabric or a non-woven fabric coated with a release agent is attached to any one side or both sides of the empty space spaced apart, and then the concrete is poured after the reinforcing structure is inserted.

1 : 굴착영역
2 : 지하수
10 : ㄷ형 강재 삽입구
11 : ㄷ형 강재 유도틀
12 : 결합 보강재
13 : 강철판
14 : ㄷ형 강재
15 : H형 강재
16 : 결합 보강재의 다른 실시 예
17 : 버팀보
21 : 제 1열 및 제 2열 H형 강재 사이를 연결하여 용접하는 H형 강재 결합 보강재의 다른 실시 예
22, 23 : 엇갈려 용접된 결합가이드
1: excavation area
2: groundwater
10: C type steel insertion hole
11: Type C steel guide frame
12: bonding reinforcement
13: steel sheet
14: Type C steel
15: H type steel
16: Another embodiment of the bond reinforcement
17: brace
21 is another embodiment of the H-type steel joint reinforcement for welding by connecting between the first and second row H-shaped steel
22, 23: staggered welded joint guide

Claims (9)

삭제delete 지중에 수직으로 강철판 삽입 간격을 이격하며 타설되는 제 1열 H형 강재 타설단계;
지중에 타설된 제 1열 H형 강재 뒤에 설계 거리만큼 이격한 후, 강철판 삽입 간격을 이격하여 타설되는 제 2열 H형 강재 타설단계;
제 1열 및 제 2열 H형 강재 사이로 지중에 수직으로 강철판을 삽입하는 강철판 삽입단계;
제 1열 및 제 2열 H형 강재와 강철판 사이의 흙을 제거한 후, 빈 공간에 철골 구조물을 삽입한 후, 콘크리트를 타설하여 양생한 후 H형 강재와 강철판을 인발 제거하여 시공하는 영구 철근 콘크리트 구조물 시공단계;
상기 영구 철근 콘크리트 구조물에 설계 거리만큼 이격하여 상기와 동일한 방법으로 반대편에 영구 철근 콘크리트 구조물을 더 시공한 후, 양쪽 영구 철근 콘크리트 구조물 사이의 흙을 굴착한 후, 바닥에 철근 콘크리트를 타설하는 고심도 조립식 가설 흙막이 구조물 설치 방법.
A first row H-type steel pouring step spaced apart from each other by inserting steel plates vertically into the ground;
A second row H type steel placing step spaced apart by a design distance after the first row H type steel placed in the ground and spaced apart from the steel sheet insertion gap;
A steel sheet inserting step of inserting a steel sheet vertically in the ground between the first and second row H-type steels;
Permanent reinforced concrete constructed by removing the soil between the H-type steel and the steel sheet in the first and second rows, inserting the steel structure into the empty space, casting and curing concrete, and then removing the H-shaped steel and the steel sheet. Structure construction step;
After constructing a permanent reinforced concrete structure on the other side in the same manner as above by separating the permanent reinforced concrete structure by the design distance, excavating soil between both permanent reinforced concrete structures, and then placing the reinforced concrete on the floor How to install the prefabricated temporary cladding structure.
지중에 강철판 삽입 간격을 이격하며 굴착영역의 경계선을 따라 수직으로 입설 되도록 H형 강재를 맨땅에 타설하는 H형 강재 타설단계;
H형 강재 사이로 강철판을 삽입하는 강철판 삽입단계;
H형 강재 및 강철판으로 구성된 흙막이벽 사이의 굴착영역을 굴착하는 굴착단계;
굴착을 통해 생성된 흙막이벽에 설계 거리만큼 떨어져 벽체 거푸집을 시공하는 거푸집 시공단계;
흙막이 벽과 벽체 거푸집 사이의 공간에 철근 구조물과 지하 벽체 배관 및 시스템 박스를 삽입 고정 후 콘크리트를 타설 및 양생 후 H형 강재와 강철판을 인발 및 거푸집을 제거하여 생성된 고심도 조립식 가설 흙막이 구조물 설치 방법.
H-type steel placing step of placing H-type steel on the ground so as to be vertically spaced along the boundary line of the excavation area, spaced apart from the steel sheet insertion interval;
Steel sheet insertion step of inserting the steel sheet between the H-shaped steel;
An excavation step of excavating an excavation area between the earthen wall formed of the H-type steel and the steel plate;
Formwork construction step of constructing the wall formwork by the design distance to the earthen wall created by excavation;
Reinforcement structure, underground wall piping and system box are inserted into the space between the wall and the wall formwork. After installation and curing of concrete, H-shaped steel and steel sheet are removed and formwork is installed. .
지중에 강철판 삽입 간격을 이격하며 굴착영역의 경계선을 따라 수직으로 입설 되도록 H형 강재를 맨땅에 타설하는 H형 강재 타설단계;
H형 강재 사이로 강철판을 삽입하는 강철판 삽입단계;
H형 강재 및 강철판으로 구성된 서로 마주보는 흙막이벽 사이의 굴착영역을 굴착하는 굴착단계;
흙막이 벽과 설계 거리만큼 떨어진 공간에 철근 구조물을 삽입 후 벽체 거푸집을 시공 및 콘크리트를 타설하는 콘크리트 타설단계;
철근 콘크리트가 양생된 후 H형 강재와 강철판을 인발 및 거푸집을 제거하는 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물 설치 방법.
H-type steel placing step of placing H-type steel on the ground so as to be vertically spaced along the boundary line of the excavation area, spaced apart from the steel sheet insertion interval;
Steel sheet insertion step of inserting the steel sheet between the H-shaped steel;
An excavation step of excavating an excavation area between the earthen wall facing each other composed of H-type steel and steel plate;
A concrete pouring step of constructing wall formwork and placing concrete after inserting the reinforcement structure in a space separated from the earth wall by a design distance;
After the reinforced concrete is cured, the installation method of the high-depth prefabricated temporary cladding structure characterized in that the H-shaped steel and the steel sheet is removed and formwork is removed.
지중에 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하는 제 1열 H형 강재 타설단계;
제 1열 H형 강재 뒤에 하나 이상의 후 열 H형 강재가 수직으로 입설 되도록 H형 강재를 맨땅에 타설하는 후 열 H형 강재 타설단계;
제 1열 H형 강재와 후 열 H형 강재 사이에 H형 강재 결합 보강재를 매개체로 제 1열 H형 강재와 하나 이상의 후 열 H형 강재 사이를 용접하는 보강재 용접단계;
H형 강재 사이로 하나 이상의 열에 강철판을 삽입하는 강철판 삽입단계;
제 1열 H형 강재 사이의 굴착영역을 굴착하는 굴착단계;
제 1열 H형 강재와 강철판으로 구성된 한 쪽 흙막이벽에 대해 설계 거리만큼 이격된 빈 공간에 철근 구조물을 삽입 후 벽체 거푸집을 시공 및 콘크리트를 타설하는 콘크리트 타설단계;
철근콘크리트 양생 후 H형 강재와 강철판을 인발 및 거푸집을 제거하는 철거단계;
상기 철거단계를 통해 시공된 흙막이 구조물은,
제 1열 H형 강재로 구성된 기초 골조에 추가로 보강되는 하나 이상의 후 열 H형 강재에 있어서, 제 1열 H형 강재와 후 열 H형 강재 상단부를 H형 강재 결합 보강재를 연결 후 용접하여 구성되는 기본 골조에 하나 이상의 열 H형 강재 사이에 강철판을 삽입하여 구성된 가설 흙막이 구조물에 굴착영역을 굴착한 후 가설 흙막이벽에 대해 설계거리 이격 후 철근 구조물을 삽입 후 거푸집을 시공 및 콘크리트를 타설하여 양생 후 H형 강재와 강철판을 인발 제거하여 생성된 영구 철근 콘크리트 구조물을 특징으로 하는 고심도 조립식 가설 흙막이 구조물 설치 방법.
A first row H-type steel placing step of placing H-type steel on the ground so that H-type steel is vertically placed in the ground;
A post heat H-type steel pouring step of placing the H-type steel on the ground so that at least one post-heat H-type steel is vertically placed behind the first row H-type steel;
A reinforcement welding step of welding between the first row H type steel and the at least one post row H type steel by using an H type steel joint reinforcing material between the first row H type steel and the post row H type steel;
Steel sheet insertion step of inserting the steel sheet in one or more rows between the H-shaped steel;
An excavation step of excavating an excavation area between the first row H-type steels;
A concrete pouring step of constructing wall formwork and placing concrete after inserting a reinforcing structure into an empty space separated by a design distance with respect to one of the first wall of the H-type steel and the steel sheet;
Demolition step to remove the H-shaped steel and steel sheet and formwork after reinforced concrete curing;
The earth block structure constructed through the demolition step,
In one or more post-heat H-steels, which are additionally reinforced to the basic frame composed of the first-row H-shaped steels, the first row H-steels and the post-heat H-steels are formed by connecting the upper ends of the H-type steel joint reinforcing members and welding them. After excavating the excavation area in the temporary earthquake structure constructed by inserting a steel plate between one or more thermal H-type steels in the basic frame, and inserting the reinforcing structure after placing the reinforcing structure away from the temporary earthquake wall, Method for installing a high-definition prefabricated temporary cladding structure characterized by the permanent reinforced concrete structure produced by the removal of the H-shaped steel and the steel plate after.
제 2항, 제 3항, 제 4항, 제 5항 중 어느 하나에 있어서,
H형 강재 내부는 엇갈려 용접된 결합가이드를 포함하는 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물 설치 방법.
The method according to any one of claims 2, 3, 4, and 5,
The inner depth of the H-type steel plate is a method of installing a high-definition prefabricated temporary construction structure characterized in that it comprises a combined guide welded.
제 2항, 제 3항, 제 4항, 제 5항 중 어느 하나에 있어서,
용접에 의해 고정하는 H형 강재 결합 보강재는 용접하는 대신에 클램프, 볼트와 너트 중 어느 하나의 고정구에 의해 조립 고정되는 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물 설치 방법.
The method according to any one of claims 2, 3, 4, and 5,
H-type steel joint reinforcement to be fixed by welding is a method of installing a high-depth prefabricated temporary construction structure, characterized in that the assembly is fixed by any one of the clamp, bolt and nut instead of welding.
제 2항, 제 3항, 제 4항, 제 5항 중 어느 하나에 있어서,
이격된 빈 공간의 한 쪽면 또는 양쪽면 중 어느 하나에 부직포를 붙이고 철근 구조물을 삽입 후 콘크리트를 타설하는 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물 설치 방법.
The method according to any one of claims 2, 3, 4, and 5,
A method for installing a high-definition prefabricated construction block structure, characterized in that the concrete is poured after attaching a nonwoven fabric to one or both sides of the spaced space and inserting a reinforcing structure.
제 2항, 제 3항, 제 4항, 제 5항 중 어느 하나에 있어서,
H형 강재 및 강철판은 지중에 수직으로 입설 되도록 타설하는데 있어서,
기초 H형 강재를 타설하고 하나 이상 연속적으로 H형 강재를 용접 연결하면서 설계 심도까지 지중에 수직으로 타설되며;
H형 강재 사이에 기초 강철판을 수직으로 삽입하고 하나 이상 연속적으로 강철판을 용접 연결하면서 설계 심도까지 지중에 수직으로 삽입하는 것을 특징으로 하는 고심도 조립식 가설 흙막이 구조물 설치 방법.
















The method according to any one of claims 2, 3, 4, and 5,
H-steels and steel sheets are to be placed vertically in the ground,
Pour basic H-shaped steel and weld one or more H-shaped steel in series, vertically to the design depth;
A method for installing a high-definition prefabricated construction block structure, comprising inserting a base steel sheet vertically between H-shaped steels and vertically inserting the steel sheet vertically to the design depth while welding one or more continuous steel sheets.
















KR1020110069976A 2011-07-14 2011-07-14 The deepened sheet plate and the method of installation of the same KR101150795B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110069976A KR101150795B1 (en) 2011-07-14 2011-07-14 The deepened sheet plate and the method of installation of the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110069976A KR101150795B1 (en) 2011-07-14 2011-07-14 The deepened sheet plate and the method of installation of the same

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020110069933A Division KR20130009091A (en) 2011-07-14 2011-07-14 The method of temporary retaining wall including cctv and broadcast system

Publications (1)

Publication Number Publication Date
KR101150795B1 true KR101150795B1 (en) 2012-06-13

Family

ID=46607173

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110069976A KR101150795B1 (en) 2011-07-14 2011-07-14 The deepened sheet plate and the method of installation of the same

Country Status (1)

Country Link
KR (1) KR101150795B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115492128A (en) * 2022-10-28 2022-12-20 上海市机械施工集团有限公司 Variable cross-section ground wall supporting method at junction of standard section of foundation pit and end well

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080026014A (en) * 2006-09-19 2008-03-24 주식회사 영창토건 Establishment method of soil guard structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080026014A (en) * 2006-09-19 2008-03-24 주식회사 영창토건 Establishment method of soil guard structure
KR100846229B1 (en) * 2006-09-19 2008-07-15 주식회사 영창토건 Establishment Method of Soil Guard Structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115492128A (en) * 2022-10-28 2022-12-20 上海市机械施工集团有限公司 Variable cross-section ground wall supporting method at junction of standard section of foundation pit and end well
CN115492128B (en) * 2022-10-28 2023-11-21 上海市机械施工集团有限公司 Variable cross section ground wall supporting method for junction of standard section and end well of foundation pit

Similar Documents

Publication Publication Date Title
KR101179770B1 (en) Soil protection against build structure and the method
US20110142550A1 (en) Method for constructing a chair-type, self-supported earth retaining wall
KR102234513B1 (en) Block type reinforcement retaining wall structure and constructing method for the same
KR100968048B1 (en) A retaining panel structure and construction method
KR101973565B1 (en) Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate
KR101221970B1 (en) Construction Method for Basement Structure without Temporary Structure
KR101171040B1 (en) Pre-fabricated earth retaining wall structure constructing method using prestressed tendon
KR200452946Y1 (en) Welded H type steel sheet pile and integrated composite order wall
KR100634726B1 (en) Form system for construction of underground slab and method for constructing underground slab and breast wall using the same
KR20120109418A (en) Inclined earth retaining structure method
KR20090057708A (en) Bracing structure to use two rows pile
KR20110052321A (en) Steel pipe pile for sheet pile wall and construction method using that
KR101150795B1 (en) The deepened sheet plate and the method of installation of the same
KR101568232B1 (en) Apparatus and installation method of self-stand retaining wall using double columns h-beam and high strength steel sheet
JP2015183366A (en) Structure and construction method for banking structure
KR20130098579A (en) Soil protection against build system
KR200492883Y1 (en) Braced wall
KR101221084B1 (en) Temporary pile using bending restoring force and temporary structure construction method therewith
KR101151052B1 (en) The deepened sheet plate made of an iron reinforcing rod and the method of installation
KR102617795B1 (en) Retaining wall system combine H-piles with steel reinforcement structure
KR101150794B1 (en) The deepened sheet plate
KR101545713B1 (en) Composite type cutoff wall of steel temporary facility and construction method of the same
KR101256311B1 (en) Structual deepening method
KR20130009091A (en) The method of temporary retaining wall including cctv and broadcast system
KR101127423B1 (en) Reformed sheet plate and the method of installation of the same

Legal Events

Date Code Title Description
A107 Divisional application of patent
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150522

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160520

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170522

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180523

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee