KR101120588B1 - Vertical joint frame for improving monolithic concrete - Google Patents

Vertical joint frame for improving monolithic concrete Download PDF

Info

Publication number
KR101120588B1
KR101120588B1 KR1020090107482A KR20090107482A KR101120588B1 KR 101120588 B1 KR101120588 B1 KR 101120588B1 KR 1020090107482 A KR1020090107482 A KR 1020090107482A KR 20090107482 A KR20090107482 A KR 20090107482A KR 101120588 B1 KR101120588 B1 KR 101120588B1
Authority
KR
South Korea
Prior art keywords
concrete
vertical joint
plate
vertical
rod
Prior art date
Application number
KR1020090107482A
Other languages
Korean (ko)
Other versions
KR20110050898A (en
Inventor
송성용
Original Assignee
(주)유송엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)유송엔지니어링 filed Critical (주)유송엔지니어링
Priority to KR1020090107482A priority Critical patent/KR101120588B1/en
Publication of KR20110050898A publication Critical patent/KR20110050898A/en
Application granted granted Critical
Publication of KR101120588B1 publication Critical patent/KR101120588B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

본 발명은 철근콘크리트조에서 콘크리트 분리타설을 위해 굴절판(100)과 분리, 결합이 가능한 상부봉(201)과 하부봉(202)으로 틀을 구성하여 간단하게 설치할 수 있으며, 콘크리트 양생 후에도 탈형이 용이하고, 철재로 만들어져 반복사용이 가능한 장점을 갖는다. 또한 굴절판(100)이 분리타설 부위의 수직조인트를 반턱이음(500)이 될 수 있도록 하여 콘크리트의 전단력과 일체성을 높여 분리타설시 발생하는 수직조인트 부분의 품질을 향상시켜 콘크리트의 균열과 누수발생을 크게 저감시킬 수 있는 것을 특징으로 한다.

Figure 112009068628654-pat00001

철근콘크리트, 분리타설, 수직조인트, 굴절판, 전단력, 일체성

The present invention can be installed simply by forming a frame consisting of the upper rod 201 and the lower rod 202 that can be separated and combined with the refraction plate 100 for the concrete separation in the reinforced concrete tank, even after the concrete curing Easy and made of steel has the advantage that can be used repeatedly. In addition, the refraction plate 100 allows the vertical joint of the separate casting site to be the half joint 500, thereby improving the shearing force and integrity of the concrete, thereby improving the quality of the vertical joint part generated during the separate casting, thereby causing cracking and leakage of the concrete. It is characterized by the fact that generation | occurrence | production can be greatly reduced.

Figure 112009068628654-pat00001

Reinforced concrete, separate casting, vertical joint, refractive plate, shear force, integrity

Description

콘크리트 일체성을 향상시키는 수직조인트 부재 {Vertical joint frame for improving monolithic concrete}Vertical joint frame for improving monolithic concrete}

본 발명은 콘크리트 분리타설시 발생하는 수직조인트 부위에 굴절판(100)과 분리, 결합이 가능한 상부봉(201)과 하부봉(202)으로 구성된 틀로 간편하게 설치 및 탈형이 가능 하고, 수직조인트 부위가 반턱이음(500)이 될 수 있도록 해주는 수직조인트 부재에 관한 것이다.The present invention can be easily installed and demoulded by a frame composed of an upper rod 201 and a lower rod 202 that can be separated and combined with the refracting plate 100 in a vertical joint portion generated when concrete is placed in concrete, and the vertical joint portion is It relates to a vertical joint member to be a half-tension 500.

최근 건축공사에서 대규모의 공사가 많이 이루어지고 있으며 이로 인해 콘크리 트의 타설면적이 넓어서 하루 작업시간내에 모두 타설할 수 없거나, 콘크리트의 생 산현장에서 타설현장까지의 운송지연 또는 타설장비의 고장 등으로 인해 콘크리트 의 공급이 중단될 시에는 타설가능한 면적을 구획하여 분리타설을 실시한다. In recent years, large-scale construction has been carried out in the construction work, and as a result, the concrete can not be placed within a day's working hours due to the wide casting area, or due to the delay of transportation from the production site of concrete to the casting site or the failure of the casting equipment. When the supply of concrete is stopped due to this, separate casting is carried out by dividing the castingable area.

그리고 초고층 건축물 시공시 수직부재와 수평부재의 콘크리트 압축강도차이로 인해 분리타설과 도심지 공사에서 주로 사용되는 탑다운 공법시에는 기둥부재의 선 타설하고 보 및 슬래브 부재의 후타설로 인해 분리타설을 하고, 구조물의 설계변경 으로 인한 후타설부위, 자재인양구, 토사 반출구 등 슬래브와 일체로 시공되지 않 는 부분의 분리타설 부위에는 끊어치기를 위한 수직조인트 부재를 설치하게 된다.   In the case of the top-down method, which is mainly used in the construction of segregation and urban construction, due to the difference in the compressive strength of concrete between the vertical and horizontal members in the construction of high-rise buildings, the casting of the column members is carried out and the casting of the beam and slab members is carried out separately. In addition, vertical joint members for breakage are to be installed at the site of the separation of parts not constructed with the slab, such as the after-installation part, material lifting tool, and earth and sand outlet due to the design change of the structure.

콘크리트 분리타설을 위한 구간에 수직조인트 부재를 설치하는 방법에는 합판, 각목재, 메탈라스 등을 일정크기로 만들어 상부근과 타설면 사이를 길이 방향으로 막아주어 콘크리트의 수직조인트 부위를 형성하였으나, 설치작업이 번거롭고 수직 조인트 부재의 틈사이로 콘크리트가 흘러나와 양생된 후 콘크리트의 조직이 치밀하 지 않아 건물 사용시 콘크리트 균열과 누수의 원인이 된다. 또한 선타설 구간과 후 타설 구간의 시공조인트 부분에서 부착강도 저하로 콘크리트의 일체성이 저하된다.    In order to install the vertical joint member in the section for concrete casting, the vertical joint part of concrete was formed by blocking the upper part and the pour surface in the longitudinal direction by making plywood, lumber, metal lath, etc. to a certain size. The work is cumbersome and the concrete flows out through the gap between the vertical joint members, and the structure of the concrete is not dense, which causes concrete cracks and water leakage when the building is used. In addition, the integrity of the concrete decreases due to the decrease in adhesive strength in the construction joints of the pre-pouring section and the post-pouring section.

종래의 설치방법에는 공개특허공보 공개번호 특1998-015825의 철근콘크리트 슬래브의 이어치기용 거푸집설치구조 - 이하 인용발명 1이라 한다.- 가 있다.     Conventional installation methods include a formwork for connecting the reinforcement of reinforced concrete slab of Patent Publication No. 1998-015825-referred to as Invention 1 below.

인용발명 1은 <도 6>에서와 같이 비교적 눈이 촘촘하게 형성된 철망을 - 이하 메탈라스 라고 한다.- 분리타설 되는 수직조인트 부분의 슬래브 주근에 수직하게 끼우고 슬래브 배력근에 고정시켜 메탈라스를 지지하는 수직각재로 구성하여 수직조인트를 형성하는 것을 특징으로 한다. 그러나 이러한 방법은 슬래브 높이로 절취한 메탈라 스를 고정시키기 위해 슬래브 주근에 끼우고 배력근에 고정시킨 후 철선으로 하나 하나 꿰매어야 하며 타설중 생콘크리트의 측압으로 인해 절취부가 찢어질 우려가 있어 절취부 외측에 수직각재를 세워 철선으로 고정시켜 주어야 하는 등 설치방법 이 번잡하여 많은 시간과 공임이 초래되고 있다.   Cited Invention 1 refers to a wire mesh formed with relatively dense eyes, as shown in Fig. 6, hereinafter referred to as metal lath. It is characterized by forming a vertical joint by configuring a vertical angle. However, in order to fix the metallas cut at the height of the slab, it should be inserted into the slab root and fixed to the back muscle, and then sewn one by one with wire. The installation method is complicated, such as having to set up the vertical lumber on the outside of the part and fix it with iron wire, which causes a lot of time and labor.

한편 등록특허공보의 공고번호: 특10-0689658)의 콘크리트의 이어치기 및 끊어치 기를 위한 마감부재 -이하 인용발명 2 이라 한다.- 가 있다. 인용발명 2는   On the other hand, there is a finishing member for connecting and breaking the concrete of the Patent Publication No. 10-0689658) (hereinafter referred to as citation invention 2). Cited Invention 2

<도 7> 에서와 같이 마감부재에 다수개의 차단봉이 분리, 결합가능토록 장착된 차단프레임을 설치하여, 차단프레임은 콘크리트의 상부타설면을 막아주고, 차단봉은 상부근과 하부근 및 거푸집 바닥면 사이의 하부 타설면을 차단시킬 수 있도록 하였으 며, 수직조인트면의 부착강도를 높이기 위해 다양한 모양의 차단봉과 요철모양의 차단프레임을 사용하는 것을 특징으로 한다. 이 방법은 비교적 설치가 간편하여 수직조인트를 수월하게 형성할 수 있는 장점이 있지만, 콘크리트 타설시 차단봉 사이의 틈으로 콘크리트가 유실되어, 양생 후 콘크리트의 균열과 누수를 유발시키고 부착강도를 저하시켜 고품질의 시공이 되지 않는 단점이 있다. As shown in Figure 7 by installing a blocking frame that is equipped with a plurality of blocking rods to be separated and coupled to the finishing member, the blocking frame blocks the upper casting surface of the concrete, the blocking rod is the upper and lower roots and formwork bottom surface In order to block the lower pour surface between, and to increase the attachment strength of the vertical joint surface, it is characterized by using the various types of blocking rods and uneven shaped blocking frame. This method has the advantage that it is relatively easy to install, making it easy to form vertical joints.However, when concrete is placed, the concrete is lost by the gap between the blocking rods, causing cracking and leakage of concrete after curing and lowering the adhesive strength. There is a drawback of not being installed.

본 발명은 종래의 문제점을 개선하고자 안출된 것으로서 수평부재의 주근 (301, 302) 및 배력근(303, 304)이 교차하는 부위에 수직조인트 부재를 상부봉 (201)들과 하부봉(202)들로 상부근(301)과 하부근(302) 및 거푸집 바닥면 사이에 형성된 공간부를 차단시킬 수 있도록 하고, 중앙부는 굴절판(100)으로 차단시켜 수직조인트 부재를 간편하게 설치하여 작업시간을 단축할 수 있으며, 타설되는 생콘크리트를 굴절판(100)으로 밀실하게 막고 수직조인트가 반턱이음(500)이 되도록 하여 전단력을 높이고 조인트 부위의 일체성을 증진시켜, 조인트 부위에서 콘크리트의 균열과 누수를 차단할 수 있으므로 고품질의 시공을 이루는데 목적이 있다.The present invention has been made to improve the conventional problems, the vertical joint member at the intersection of the main rods (301, 302) and the reinforcement muscles (303, 304) of the horizontal member to the upper rod (201) and the lower rod (202) It is possible to block the space formed between the upper root 301 and the lower root 302 and the form bottom, and the center portion is blocked by the refracting plate 100 to easily install a vertical joint member to shorten the working time. It is possible to tightly block the raw concrete being poured with the refraction plate 100 and to make the vertical joint become a half-tight joint 500 to increase the shear force and improve the integrity of the joint site, thereby preventing cracks and leakage of concrete at the joint site. The purpose is to achieve high quality construction.

<도 1>은 본 발명의 설치상태에 대한 사시도이며, <도 2>는 본 발명의 수직조인트 부재를 상부주근(301)이 지나가는 곳에 상부봉(201)이 설치된 측면단면도이며, Figure 1 is a perspective view of the installation state of the present invention, Figure 2 is a side cross-sectional view in which the upper rod 201 is installed where the upper circumference 301 passes through the vertical joint member of the present invention,

<도 3>은 상부주근(301) 사이에 상부봉(201)이 설치된 측면단면도를 나타낸 것이다. 발명한 수직조인트 부재를 콘크리트 분리타설을 하고자 하는 부위에 상부배력근 (303) 하부에 수직조인트 부재의 굴절판(100) 상부 부분을 안착시킨 후 결속선으로 묶어 고정시켜 타설되는 생콘크리트(403)의 차단판 역할을 하도록 한다. Figure 3 shows a cross-sectional side view of the upper rod 201 is installed between the upper freckle 301. The raw concrete 403 that is poured by fixing the vertical joint member in the upper part of the upper reinforcement bar 303 to the lower portion of the vertical joint member on the portion of the vertical joint member to be placed, then tied with a binding line and fixed To act as a barrier to

이 작업이 완료된 후 상부콘크리트(401)에 대한 차단판을 형성하기 위해 굴절판 (100) 안의 원형관(204)에서 상부봉(201)을 상부콘크리트(401) 타설면 보다 1cm 높 게 연속적으로 뽑아내어 차단판을 형성시킨다. 이때 상부주근(301)이 지나가는 자리에는 상부봉(201)을 상부주근(301)의 하부에 위치하도록 한다. After this operation is completed, the upper rod 201 is continuously drawn from the circular tube 204 in the refraction plate 100 by 1 cm higher than the upper concrete 401 placing surface to form a blocking plate for the upper concrete 401. To form a barrier plate. In this case, the upper rod 201 is positioned at the lower portion of the upper root 301 at the place where the upper root 301 passes.

그리고 하부콘크리트(402)의 차단판을 형성하기 위해 굴절판(100) 안의 원형관 (204)에서 하부봉(202)을 하부콘크리트(402) 타설면인 거푸집에 닿도록 연속적으로 뽑아내어 차단판을 형성시킨 다. 이때 하부 주근(302)이 지나가는 자리에는 하부봉 (202)을 하부주근(202)의 상부에 위치하도록 한다. In order to form the blocking plate of the lower concrete 402, the lower bar 202 is continuously drawn out from the circular tube 204 in the refraction plate 100 so as to contact the formwork that is the lower concrete 402 casting surface, thereby blocking the blocking plate. Form. In this case, the lower rod 202 is positioned at the upper portion of the lower main root 202 at the place where the lower main root 302 passes.

상기와 같이 콘크리트의 분리타설 부위에 본 발명의 수직조인트 부재를 설치한 후 생콘크리트가 타설될 때 상부봉(201)들로 구성된 상부차단판, 굴절판(100), 하부봉 (202)들로 구성된 하부차단판이 생콘크리트가 흘러내리지 않도록 막아준다. 이러한 방법으로 수직조인트가 형성되는데 굴절판(100)으로 인해 조인트 부분이 반턱이음 (500)이 되어 조인트의 품질을 높일 수 있다. After the vertical joint member of the present invention is installed in the separate casting portion of the concrete as described above, when the raw concrete is poured into the upper blocking plate consisting of the upper rods 201, the refractive plate 100, the lower rods (202) The constructed lower barrier plate prevents fresh concrete from flowing down. In this way, a vertical joint is formed, and due to the refracting plate 100, the joint part becomes a half-tight joint 500, thereby improving the quality of the joint.

분리타설되는 부위에 선타설 콘크리트(403)의 타설작업이 완료되어 일정시간 지나 양생이 된 후 본 발명의 수직조인트 부재를 탈형하여 수직조인트를 완성시킨다. After the casting work of the pre-pouring concrete 403 is completed in a portion to be separated and cured after a predetermined time, the vertical joint member of the present invention is demolded to complete the vertical joint.

본 발명의 특징인 굴절판(100)은 선타설 콘크리트(403)를 완벽하게 차단함과 동시에 반턱이음(500)으로 수직조인트의 품질을 높일 수 있으며, <도 4>에 나타낸 것과 같이 이 굴절판(100)의 각도를 직각 이외에 예각 굴절판(101)과 둔각 굴절판 (102)으로 처리할 수 있고, 선타설 콘크리트(403)와 닿는 부분을 요철로 처리하여 접착강도를 더 높게 할 수 있다. Refractive plate 100 is a feature of the present invention to completely block the pre-cast concrete 403 and at the same time can improve the quality of the vertical joint with a half-tapped joint 500, as shown in Figure 4 The angle of 100 may be treated with an acute angle refracting plate 101 and an obtuse angle refracting plate 102 in addition to the right angle, and a portion contacting with the precast concrete 403 may be treated with irregularities to increase the adhesive strength.

위에서 기술한 것과 같이 본 발명은 다수의 상부봉(201), 다수의 하부봉 (202)과 굴절판(100)으로 구성된 수직조인트 틀을 간단히 설치 및 탈형이 가능하고 철재로 구성되어 반복사용토록 해 자재손실을 최소화하였고, 굴절판(100)을 사용하여 <도 5>에 나타낸 것과 같이 수직조인트의 반턱이음(500)으로 처리하여 일체성을 높여 조인트 부분에서 발생할 수 있는 콘크리트 균열 및 누수를 방지하여 고품질의 철근콘크리트 시공이 가능해서 시공성, 경제성, 안전성을 높이는데 기여할 수 있다.As described above, the present invention can easily install and demould a vertical joint frame composed of a plurality of upper rods 201, a plurality of lower rods 202 and a refraction plate 100, and can be repeatedly made of steel. The material loss was minimized, and by using the refraction plate 100, it is treated with the half joint 500 of the vertical joint as shown in FIG. 5 to increase the integrity to prevent concrete cracks and leaks that may occur in the joint portion. High-quality reinforced concrete can be constructed, contributing to increase workability, economy and safety.

본 발명은 다수개의 상부봉(201), 굴절판(100)과 다수개의 하부봉(202)으로 구성되어 있으며, 굴절판(100) 안쪽은 상부봉(201)과 하부봉(202)을 넣고 뺄 수 있는 원형관(204)이 들어가 있다.The present invention is composed of a plurality of upper rods 201, refracting plate 100 and a plurality of lower rods 202, the inside of the refracting plate 100, the upper rod 201 and the lower rod 202 to put in and out There is a circular tube 204.

상부봉(201)과 하부봉(202)은 원형으로 되어 있고 그 아래쪽에는 고무패킹(203)으로 감싸여져 있으며, 고무패킹(203)은 굴절판(100) 안쪽의 원형관(204)안에서 상부봉(201)과 하부봉(202)이 위, 아래로 이동하는 경우 상부봉(201)과 하부봉(202)의 위치를 고정시키는 역할을 하고 있다. 상부봉(201)은 상부주근(301)이 지나가는 곳에는 상부근 상부에 위치하고, 하부봉(202)은 하부주근(302)이 지나가는 곳에는 하부주근(302)위에 위치하고, 상부 및 하부주근(301, 302)이 지나가지 않는 곳에는 생콘크리트가 흘러나가지 않도록 상부봉(201)과 하부봉(202)을 굴절판(100)에서 더 뽑아내어 차단면을 형성시켜 상부 콘크리트(401)와 하부 콘크리트(402)가 흘러나가는 것을 막아준다.The upper rod 201 and the lower rod 202 have a circular shape and are wrapped with a rubber seal 203 under the rubber rod 203, and the rubber seal 203 is in the upper rod in the circular tube 204 inside the deflection plate 100. When the 201 and the lower rod 202 moves up and down, it serves to fix the positions of the upper rod 201 and the lower rod 202. The upper rod 201 is positioned above the upper root where the upper freckle 301 passes, and the lower rod 202 is positioned above the lower freckle 302 where the lower freckle 302 passes, and the upper and lower freckle 301. , Where the 302 does not pass, the upper rod 201 and the lower rod 202 are further extracted from the refracting plate 100 so that the fresh concrete does not flow out to form a shielding surface so that the upper concrete 401 and the lower concrete ( 402 prevents the flow out.

굴절판(100)은 상부배력근(303)에 고정시키도록 되어 있으며 철판으로 구성되어 생콘크리트가 흘러나가지 않도록 완벽하게 막아주는 역할을 한다. 이 굴절판(100)은 수직조인트를 반턱이음(500)이 되도록 하여 콘크리트의 전단력을 높여서 일체성을 증진시켜 수직조인트 부분의 품질을 높여 준다. 콘크리트 양생 후 상부봉(201)과 하부봉(202)과 굴절판(100)을 탈형하여 수직조인트를 완성시킨다. Refractive plate 100 is to be fixed to the upper reinforcement muscle 303 and is composed of an iron plate serves to completely prevent the raw concrete flows. The refraction plate 100 increases the shearing force of the concrete by increasing the shearing force of the concrete by making the vertical joints the half-tension joints 500 to increase the quality of the vertical joints. After curing the concrete, the upper rod 201, the lower rod 202 and the refracting plate 100 is demolded to complete the vertical joint.

<도 1>은 본 발명의 분리타설 부분에 수직조인트 부재를 설치한 사시도1 is a perspective view of a vertical joint member installed in a separate pouring portion of the present invention.

<도 2>는 본 발명을 상부주근(301) 위치에서 설치한 상태를 보인 측단면도Figure 2 is a side cross-sectional view showing a state in which the present invention is installed in the upper freckle position 301

<도 3>는 본 발명의 상부주근(301) 사이의 위치에서 설치한 상태를 보인 측단면도Figure 3 is a side cross-sectional view showing a state installed at a position between the upper freckle 301 of the present invention

<도 4>는 본 발명의 굴절판(100)을 직각부분 이외에 예각(101)과 둔각(102) 부분으로 구성되어진 경우의 측단면도FIG. 4 is a side cross-sectional view of the refraction plate 100 of the present invention having an acute angle 101 and an obtuse angle 102 portion in addition to a right angle portion.

<도 5>는 본 발명을 이용하여 수직조인트를 반턱이음(500)으로 시공완료한 상태의 측단면도Figure 5 is a side cross-sectional view of the completed state of the vertical joint with a half-tight joint 500 using the present invention

<도 6>은 종래의 분리타설 부위의 수직조인트재가 설치된 측단면도 Figure 6 is a side cross-sectional view of the vertical joint material installed in the conventional pour site

<도 7>은 종래의 분리타설 부위의 수직조인트재가 설치된 입면도Figure 7 is an elevational view of the vertical joint material installed in the conventional pour site

<도면의 주요부분에 대한 부호의 설명>    <Description of the symbols for the main parts of the drawings>

100 : 굴절판, 101 : 예각 굴절판, 102 : 둔각 굴절판  100: refraction plate, 101: acute angle refraction plate, 102: obtuse angle refracting plate

201 : 상부봉, 202 : 하부봉, 203 : 고무패킹, 204 : 원형관  201: upper rod, 202: lower rod, 203: rubber packing, 204: round tube

301 : 상부주근, 302 : 하부주근, 303 : 상부배력근, 304 : 하부배력근  301: upper main root, 302: lower main root, 303: upper main back muscle, 304: lower main back muscle

401 : 상부콘크리트, 402 : 하부콘크리트, 403 : 콘크리트  401: upper concrete, 402: lower concrete, 403: concrete

500 : 반턱이음  500: half jaw

Claims (4)

굴절판(100)은 이어치기 부분의 수직조인트에서 생콘크리트(403)의 차단판 역할을 하며, 반턱이음(500)이 될 수 있도록 철판을 접어서 직각이 되도록 하였고, 굴절판(100) 수직부분의 속에 있는 원형관(204) 내부에서 상부봉(201)과 하부봉 (202)이 위, 아래로 움직여 굴절판 상부면과 하부면의 생콘크리트가 흘러내리는 것을 방지해주는 수직조인트 부재The refraction plate 100 serves as a blocking plate of the raw concrete 403 in the vertical joint of the joint portion, and folded the iron plate to be a right angle so as to be a half-tight joint 500, and the vertical plate of the refraction plate 100 Vertical joint member to prevent the top concrete 20 and the lower rod 202 to move up and down in the inner circular tube 204 to prevent the falling concrete of the upper and lower surfaces of the refracting plate 청구항 1에 있어서, 수직조인트에서 생콘크리트가 흘러내리지 않도록 완벽하게 막아주는 굴절판(100)의 각도를 직각이외에 예각굴절판(101) 또는 둔각굴절판(102)의 수직조인트 부재The vertical joint member of the acute refraction plate 101 or the obtuse refraction plate 102 in addition to the right angle to the angle of the refracting plate 100 to prevent the raw concrete from flowing down in the vertical joint 청구항 1에 있어서, 수직조인트에서 생콘크리트가 흘러내리지 않도록 완벽하게 막아주는 굴절판(100)에서 선타설 콘크리트와 닿는 면을 요철 처리하여 부착강도를 증진시키는 수직조인트 부재The vertical joint member according to claim 1, wherein the vertical joint member is formed to increase the adhesive strength by roughening a surface in contact with the precast concrete in the refraction plate 100, which completely prevents the raw concrete from flowing down from the vertical joint. 삭제delete
KR1020090107482A 2009-11-09 2009-11-09 Vertical joint frame for improving monolithic concrete KR101120588B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090107482A KR101120588B1 (en) 2009-11-09 2009-11-09 Vertical joint frame for improving monolithic concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090107482A KR101120588B1 (en) 2009-11-09 2009-11-09 Vertical joint frame for improving monolithic concrete

Publications (2)

Publication Number Publication Date
KR20110050898A KR20110050898A (en) 2011-05-17
KR101120588B1 true KR101120588B1 (en) 2012-03-09

Family

ID=44361358

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090107482A KR101120588B1 (en) 2009-11-09 2009-11-09 Vertical joint frame for improving monolithic concrete

Country Status (1)

Country Link
KR (1) KR101120588B1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102943564A (en) * 2012-10-23 2013-02-27 中国华冶科工集团有限公司 Flexible concrete rabbet connecting construction method
CN102936954A (en) * 2012-11-28 2013-02-20 深圳市鹏城建筑集团有限公司 Method and structure for plugging pipeline floor hole
CN103485418B (en) * 2013-09-26 2016-09-14 中国华冶科工集团有限公司 The method of the indirect stubble of concrete
CN109138185B (en) * 2018-10-29 2020-09-01 深圳大学建筑设计研究院有限公司 Post-cast strip vertical construction joint construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100689658B1 (en) 2006-12-26 2007-03-08 박동수 Concrete closing device
KR200444261Y1 (en) 2008-05-06 2009-04-24 박동수 Concrete closing device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100689658B1 (en) 2006-12-26 2007-03-08 박동수 Concrete closing device
KR200444261Y1 (en) 2008-05-06 2009-04-24 박동수 Concrete closing device

Also Published As

Publication number Publication date
KR20110050898A (en) 2011-05-17

Similar Documents

Publication Publication Date Title
CN106677069B (en) A kind of construction method of bridge pier integral formwork support one-shot forming structure
CN103104091B (en) Sliding mold whole lifting platform and construction method
CN110439137A (en) Prefabricated panel, wall and prefabricated panel production method, precast wall body construction method
CN108505805B (en) Large cast-in-situ water pool with expansion reinforcing belt for crack control and construction method thereof
CN105507476B (en) A kind of construction method of even arch covering
CN104060781A (en) Cast-in-situ cranked slab stair without seams at stair sections and construction method
CN101487293A (en) Concreting method with different intensity grades for beam column nodes
CN105275097A (en) A post-cast strip water-stop steel plate and demolition-free template net installing method
KR101120588B1 (en) Vertical joint frame for improving monolithic concrete
CN109577377A (en) Basement post-pouring zone structure and its construction method
CN206174120U (en) Prefabricated constructional column and structure thereof
CN105714635A (en) Concrete drainage road surface and construction and repairing method thereof
CN108104284B (en) Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method
CN205976167U (en) Based on cast -in -place floor structures of detachable positioning control spare
CN103938871B (en) A kind of construction method adopting the steel core concrete column bonded prestress frame beam structure of reinforced concrete ring beam joint
CN106285002A (en) Cast-in-place walls difference of height tool-type hoisting die construction method
CN207260378U (en) A kind of assembled frame-shear structure curved scissors type combines keyway connection structure
CN111456105B (en) Construction method of post-pouring belt of underground garage bottom plate
CN103758347B (en) Large-span RC girder plated construction late poured band support underpinning construction method
CN107724427B (en) A kind of connection method of sinking tunnel section connector
CN113789898A (en) Construction method of large-span slow-bonding prestressed floor slab
CN106149877A (en) Docking structure at concrete frame structure prefabricated post and beam slab node and method
CN102936953B (en) Construction method of a bridging-arm stiffened steel structure template
CN108130889B (en) Manufacturing method of stepped construction joint between main bottom plate of pump brake and side wall of runner layer
KR20120025945A (en) Reinforcement assembly of concrete file and building foundation

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee