KR101118121B1 - Artificial turf foundation work of a nature reconstruct type - Google Patents

Artificial turf foundation work of a nature reconstruct type Download PDF

Info

Publication number
KR101118121B1
KR101118121B1 KR1020110052289A KR20110052289A KR101118121B1 KR 101118121 B1 KR101118121 B1 KR 101118121B1 KR 1020110052289 A KR1020110052289 A KR 1020110052289A KR 20110052289 A KR20110052289 A KR 20110052289A KR 101118121 B1 KR101118121 B1 KR 101118121B1
Authority
KR
South Korea
Prior art keywords
artificial turf
soil
based method
cement
existing
Prior art date
Application number
KR1020110052289A
Other languages
Korean (ko)
Inventor
강성구
Original Assignee
강성구
코오롱스포텍 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 강성구, 코오롱스포텍 주식회사 filed Critical 강성구
Priority to KR1020110052289A priority Critical patent/KR101118121B1/en
Application granted granted Critical
Publication of KR101118121B1 publication Critical patent/KR101118121B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/08Surfaces simulating grass ; Grass-grown sports grounds
    • E01C13/083Construction of grass-grown sports grounds; Drainage, irrigation or heating arrangements therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/10Paving elements having build-in shock absorbing devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

PURPOSE: A construction method for the foundation of naturally recoverable artificial turf is provided to reduce construction time and costs by reusing existing earth and soil. CONSTITUTION: A construction method for the foundation of naturally recoverable artificial turf is as follows. Existing soil is plowed up in a specific depth(301). A hardening body is formed by mixing cement or/and loess mortar with a hardener. The formed hardening body is spread on the existing soil(302). A hardened layer is formed by sprinkling water on the existing soil and accumulating soil(303). Artificial turf is installed on the formed hardened layer(305).

Description

자연복원형 인조잔디 기반공법{Artificial turf foundation work of a nature reconstruct type}Artificial turf foundation work of a nature reconstruct type

본 발명은 인조잔디 구장 기반 공사에 관한 것으로, 보다 상세하게는, 흙 경화제를 이용하여 기존 지반의 토사를 제거하지 않고 그 위에 그대로 인조잔디 시공을 위한 기반층을 형성하여 자연복원이 가능할 수 있도록 새롭게 제안된 자연복원형 인조잔디 기반공법에 관한 것이다.The present invention relates to artificial turf ground-based construction, and more specifically, to remove the soil of the existing ground using a soil hardener to form a foundation layer for artificial turf construction as it is newly to enable a natural restoration The proposed natural restoration artificial turf based construction method.

통상적으로, 인조잔디는 야구장, 축구장 등 스포츠 관련 구장이나 골프 연습장 등에서 운동하는 사람들의 신체적인 보호는 물론 아름다운 경관을 제공하기 위해 사용되고 있다.Typically, artificial turf is used to provide a beautiful view as well as physical protection of people exercising in sports-related stadiums, such as a baseball field, soccer field or golf practice field.

최근에는 정부의 교육정책 일환인 '학교운동장 다양화 사업'과 연계해서 학교에 인조잔디운동장이 조성되기 시작하였다.In recent years, artificial turf playgrounds have begun to be built in schools in connection with the school playground diversification project, which is part of the government's education policy.

이러한 인조잔디 구장은 도로나 운동장 포장시 사용되는 막자갈, 자갈, 쇄석을 깔고 다듬질 후 아스팔트나 콘크리트 포장을 하는 기반 공사를 하고, 그 위에 인조잔디를 충진재와 함께 시공한다.Such artificial turf ground is made of asphalt or concrete pavement after finishing and finishing of mortar, gravel, and crushed stone used for paving roads and playgrounds, and construct artificial turf with filler on it.

한편, 환경에 대한 관심이 높아지면서 인조잔디 구장 기반 공사에 있어서도 그 관심을 갖게 되었다. 종래의 인조잔디 기반공법의 예를 도 1a 내지 도 2b에 간략하게 도시하였다.Meanwhile, as interest in the environment has increased, the interest in artificial turf ground-based construction has also increased. An example of the conventional artificial grass-based method is briefly shown in Figures 1a to 2b.

도 1a는 종래의 콘크리트 기반공법을 나타낸 순서도이고, 도 1b는 도 1a의 공법에 따라 시공된 인조잔디 구조물을 나타낸 단면도이다.Figure 1a is a flow chart showing a conventional concrete base method, Figure 1b is a cross-sectional view showing the artificial turf structure constructed in accordance with the method of Figure 1a.

도 1a에 나타낸 종래 콘크리트 기반공법에서는, 먼저 포크레인 등을 이용하여 터파기 공사를 한다(단계 101). 터파기 공사는 원지반을 일정깊이로 파내어 기존 토사를 제거한 후 평탄하게 다짐 시공한다. 평탄하게 다져진 기반 위에 혼합골재를 깔아 보조기층을 형성한다(단계 102). 이때, 보조기층은 40㎜ 크기의 큰 자갈을 포설한 후 다짐 작업을 하여 150㎜ 두께로 형성한다. 이렇게 형성된 보조기층 위에 콘크리트를 타설한 후 면정리하여 콘크리트기층을 형성한다(단계 103). 이때, 콘크리트기층은 150㎜ 두께로 형성한다. 이렇게 콘크리트 기반공사가 완료되면, 그 위에 대략 55㎜ 두께로 인조잔디를 시공하면 된다(단계 104). In the conventional concrete-based construction method shown in Figure 1a, first, the excavation work using a fork lane or the like (step 101). Digging work is to dig up the ground to a certain depth, remove the existing soil and compact it. Spreading the mixed aggregate on a flat chopped base to form an auxiliary base layer (step 102). At this time, the auxiliary base layer is formed into a 150mm thickness by laying a large gravel of 40mm size and compacting. The concrete is poured on the auxiliary base formed in this way, and then surface trimmed to form a concrete base (step 103). At this time, the concrete base layer is formed to a thickness of 150mm. When the concrete foundation work is completed, the artificial turf is constructed to have a thickness of approximately 55 mm thereon (step 104).

도 1b를 참조하면, 도 1a의 콘크리트 기반공법에 따른 인조잔디 구조물은 기존 토사 제거후 혼합골재로 된 보조기층(11)이 형성되며, 보조기층(11)에는 바닥을 통해 올라오는 습기를 차단하고 바닥 콘크리트를 보호하기 위해 PE필름(12)이 깔리게 된다. 이 PE필름(12)은 흙 위에 바로 콘크리트를 타설할 경우 흙이 콘크리트에 포함된 수분을 흡수해서 수분 부족으로 콘크리트 강도를 저하시키기 때문에 콘크리트를 보호하기 위해 바닥에 PE필름(12)을 깔고 콘크리트를 타설한다. 콘크리트기층(13) 중간에는 콘크리트의 건조수축 균열을 방지하도록 와이어메쉬(14)가 설치된다. 콘크리트기층(13) 상에는 인조잔디(15)가 설치된다.Referring to Figure 1b, artificial turf structure according to the concrete-based method of Figure 1a is formed of the auxiliary base layer 11 of the mixed aggregate after the removal of the existing soil, the auxiliary base layer 11 to block the moisture rising through the floor and PE film 12 is laid to protect the floor concrete. When PE is placed directly on the soil, the PE film 12 absorbs the moisture contained in the concrete and reduces the strength of the concrete due to lack of moisture. Pour. In the middle of the concrete base 13, a wire mesh 14 is installed to prevent dry shrinkage cracking of concrete. Artificial turf 15 is installed on the concrete base layer 13.

도 2a는 종래의 골재 기반공법을 나타낸 순서도이고, 도 2b는 도 2a의 공법에 따라 시공된 인조잔디 구조물을 나타낸 단면도이다.Figure 2a is a flow chart showing a conventional aggregate-based method, Figure 2b is a cross-sectional view showing the artificial turf structure constructed in accordance with the method of Figure 2a.

도 2a에 나타낸 종래 골재 기반공법에서는, 초기작업으로 콘크리트 기반공법과 같이 원지반을 일정깊이로 파내어 기존 토사를 제거한 후 평탄하게 다짐 시공하는 터파기 공사를 먼저 한다(단계 201). 평탄하게 다져진 기반 위에 쇄석을 깔아 하부기층을 형성한다(단계 202). 이때, 하부기층은 25㎜ 크기의 쇄석을 포설한 후 다짐 작업을 하여 200㎜ 두께로 형성된다. 다음으로, 하부기층 위에 쇄석과 석분을 포설하여 상부기층을 형성한다(단계 203). 이때, 상부기층은 13㎜ 크기의 쇄석과 석분을 포설한 후 다짐 작업을 하여 100㎜ 두께로 형성한다. 이렇게 골재 기반공사가 완료되면, 그 위에 55㎜ 두께로 인조잔디를 시공하면 된다(단계 204).In the conventional aggregate-based method shown in Figure 2a, as shown in the initial work is to excavate the ground to a certain depth, such as the concrete-based method to remove the existing soil, and then the trench construction for compacting construction first (step 201). Crushed stone is formed on the flatly ground base to form a lower base layer (step 202). At this time, the lower base layer is formed into a 200mm thickness by laying the crushed stone of 25mm size and then compacting. Next, crushed stone and stone powder are laid on the lower base layer to form an upper base layer (step 203). At this time, the upper base layer is formed into a 100mm thickness by laying the crushed stone and stone powder of 13mm size and compacting. When the aggregate-based construction is completed in this way, the artificial turf to 55mm thickness is constructed thereon (step 204).

도 2b를 참조하면, 도 2a의 골재 기반공법에 따른 인조잔디 구조물은 기존 토사 제거후 하부기층(21)과 상부기층(22)이 형성되며, 그 위에 인조잔디(25)가 설치된다.Referring to FIG. 2B, the artificial turf structure according to the aggregate-based method of FIG. 2A has a lower base 21 and an upper base 22 formed after removing the existing soil, and an artificial turf 25 is installed thereon.

하지만, 이러한 종래의 인조잔디 시공을 위한 콘트리트나 골재 기반공법에서는 원지반 제거로 인해 발생되는 토사를 외부 반출해야 하며, 새로운 지반층을 형성하기 위해 신규 기반재가 투입되어야 하고, 향후 복원시 투입된 기반재가 모두 폐기물로 발생하게 되어 시간적, 비용적, 환경적인 면에서 모두 문제가 야기되었다.However, in the conventional concrete or aggregate-based method for artificial turf construction, the earth and sand generated by the removal of the ground must be taken out, new base material should be put in order to form a new ground layer, and all the base materials added in the future restoration It was created as a waste, causing problems both in terms of time, cost and environment.

따라서, 본 발명의 목적은 전술한 점을 감안하여 안출된 것으로, 흙 경화제를 이용하여 기존 지반의 토사를 외부로 반출하지 않고 재사용하여 기반층을 형성할 수 있는 자연복원형 인조잔디 기반공법을 제공함에 있다.Accordingly, an object of the present invention was devised in view of the above-mentioned point, to provide a natural restoration artificial grass-based method that can form a base layer by reusing without using the soil hardener to remove the soil of the existing ground to the outside Is in.

이와 같은 목적을 달성하기 위한 본 발명의 자연복원형 인조잔디 기반공법은, 인조잔디 시공을 위한 기반공법에 있어서, (1) 원지반의 기존토를 일정깊이로 갈아엎는 단계와, (2) 경화제를 살포하여 기존토를 경화시켜 경화층을 형성하는 단계, 및 (3) 상기 형성된 경화층을 다짐 작업 후 인조잔디를 시공하는 단계를 포함한다.Natural restoration-type artificial grass-based method of the present invention for achieving the above object, in the foundation method for the construction of artificial grass, (1) to replace the existing soil of the ground to a certain depth, and (2) hardener Spraying to harden the existing soil to form a hardened layer, and (3) constructing artificial turf after compacting the formed hardened layer.

본 발명의 자연복원형 인조잔디 기반공법은, 현 지반에서 작업을 수행하므로써 기존 토사를 외부로 반출하는 것이 아닌 재사용하면서 향후에 원형으로도 복원이 가능하며, 공사기간을 단축할 수 있어 그에 따른 공사비용을 절감할 수 있는 친환경 기반의 경제적인 공법을 제공하는 효과를 갖는다.Natural restorative artificial grass-based construction method of the present invention, by carrying out the work on the current ground, can be restored in the future in the future while reusing the existing soil, not reused, and the construction period can be shortened accordingly It has the effect of providing an eco-friendly, economical method for reducing costs.

도 1a-1b는 종래 콘크리트 기반공법 및 그에 따른 인조잔디 구조물을 나타낸 순서도 및 단면도,
도 2a-2b는 종래 골재 기반공법 및 그에 따른 인조잔디 구조물을 나타낸 순서도 및 단면도,
도 3 및 도 4는 본 발명에 따른 경화토 기반공법 및 그에 따른 인조잔디 구조물을 나타내는 순서도 및 단면도.
1a-1b is a flow chart and a cross-sectional view showing a conventional concrete foundation method and the artificial turf structure according thereto,
2a-2b is a flow chart and cross-sectional view showing a conventional aggregate-based method and the artificial turf structure according thereto,
3 and 4 are a flow chart and a cross-sectional view showing a hardened soil base method and the artificial turf structure according to the present invention.

이하, 첨부한 도면들을 참조하여 본 발명의 바람직한 실시예를 상세히 기술하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 3은 본 발명에 따른 경화토 기반공법을 설명하기 위한 순서도이고, 도 4는 도 3의 공법에 따라 시공된 인조잔디 구조물을 나타내는 단면도이다.Figure 3 is a flow chart for explaining the hardening soil-based method according to the present invention, Figure 4 is a cross-sectional view showing the artificial turf structure constructed in accordance with the method of FIG.

도 3에 나타낸 본 발명의 경화토 기반공법에서는, 기 사용중인 운동장 바닥 즉 원지반을 부드럽게 하기 위해 트랙터 등을 이용하여 대략 100~200㎜ 깊이로 뒤집기한다(단계 301). 다음으로, 갈아엎은 원지반의 기존토사에 경화제와 시멘트를 적당한 조성비로 혼합한 경화체를 살포한다(단계 302). 이때, 시멘트 대용으로 친환경 물질인 황토몰탈을 사용하거나 시멘트와 황토몰탈을 함께 사용해도 된다. 여기서 바람직하게는, 토사 중량의 3~15%가 되도록 시멘트 혹은 황토몰탈을 하나 혹은 둘 이상 혼합하고, 시멘트나 황토몰탈의 중량에 대해 1/100로 경화제를 함께 살포한다.In the hardening soil-based method of the present invention shown in Figure 3, to smooth the floor of the playground ground in use, that is, the ground, using a tractor or the like to turn over to a depth of approximately 100 ~ 200mm (step 301). Next, the hardened | cured material which mixed the hardening | curing agent and cement in the suitable composition ratio is spread | spreaded on the existing soil of the ground which was grind | pulverized (step 302). At this time, it is also possible to use the loess mortar mortar, which is an environmentally friendly material as a substitute for cement, or a combination of cement and loess mortar. Preferably, one or more cement or ocher mortar is mixed so that 3-15% of the soil weight may be mixed, and the hardening | curing agent is sprayed together at 1/100 with respect to the weight of cement or ocher mortar.

경화제(hardener)는 흙을 콘크리트처럼 단단하게 경화시켜주는 역할을 한다. 이는 기존 콘크리트 포장과 수명이 동일하면서 경화속도가 빠르며 안전성, 내구성, 시공성이 우수한 자연 친화적 친환경 공법 시공이 가능하게 해준다. 기존 콘크리트 포장에서는 모래, 자갈, 시멘트, 물의 배합이지만, 본 발명에서는 흙에 소량의 시멘트, 경화제, 물의 배합으로 이루어진다. 시멘트는 과대하게 혼합될 경우 경제적이지 못하며 환경적인 문제를 유발하므로 각 나라에서 규정한 제한치 이내에서 현장 시험을 거쳐 적용할 수 있다.Hardeners harden the soil as concrete. This enables the construction of a natural, eco-friendly construction method that has the same lifespan as the existing concrete pavement, has a fast curing speed, and has excellent safety, durability, and workability. Conventional concrete pavement is a combination of sand, gravel, cement, water, but in the present invention is made of a combination of a small amount of cement, hardener, water in the soil. Cement, if mixed excessively, is not economical and causes environmental problems, so it can be applied after field testing within the limits set by each country.

경화체를 연약지반 개량공법 등에 재료로서 사용할 경우 공사비를 절감할 수 있으며 자연환경 보전에 기여할 수 있다. 토질 및 기초분야에서 경화체는 조기 강도 발현이 우수하고, 차수성 및 강도증대로 해수에 의한 팽창 및 변형의 영향이 적으며, 동결 등 기상조건에 강하고, 수축 균열 발생이 적으며 환경적으로 안정하며 다루기가 용이하며 표층의 경화만으로도 필요한 조기 강도를 얻을 수 있다는 장점을 갖는다. If the hardened body is used as a material for soft ground improvement method, it can reduce the construction cost and contribute to the preservation of the natural environment. In the soil and basic fields, the hardened body has excellent early strength development, less water and expansion and deformation due to the increase in order and strength, is resistant to weather conditions such as freezing, less shrinkage cracks and environmentally stable. It is easy to handle and has the advantage of obtaining the required early strength just by curing the surface layer.

단계 302의 경화체 살포시, 친환경 보조제로서 감람석 파쇄토 또는 참숯을 함께 살포하면(단계 302′) 좀더 친환경?웰빙의 효과를 증대시킬 수 있다. When spraying the cured product of step 302, spraying olivine crushed soil or charcoal together as an environmentally friendly supplement (step 302 ') may increase the effect of eco-friendly well-being.

감람석은 화성암의 일종으로 마그네슘과 미네랄을 다량 포함하고 있는 천연광물로 일명 화산재 흙으로 많이 알려져 있으며, 친환경 용도로 다양하게 활용되고 있다. 감람석을 첨가할 경우 뛰어난 배수성과 용도에 따라 경도를 다르게 시공할 수 있는 특징이 있다.Olivine is a type of igneous rock that contains a large amount of magnesium and minerals and is known as volcanic ash soil. It is widely used for eco-friendly purposes. When olivine is added, it has excellent drainage and hardness that can be constructed differently according to the use.

참숯은 참나무를 구워서 만든 숯으로, 이는 전자파방지기능 외에 원적외선 방출, 공기정화, 불순물제거, 습도조절 등의 효과가 있는 것으로 알려져 있다.Charcoal is a charcoal made by baking oak, which is known to have effects such as far infrared emission, air purification, impurities removal, and humidity control in addition to electromagnetic wave prevention function.

더불어 기타 친환경 보조제를 함께 사용할 수 있다.In addition, other green supplements may be used.

이후, 경화체가 살포된 기존토양 위에 살수 및 성토한 후(단계 303), 운동장 면의 규모에 따라 다짐기계의 하중을 선택하여 천천히 다짐 시공을 한다(단계 304). 다짐시공은 롤러로 다짐이 불가능한 모퉁이, 코너부분에 대해 인력 또는 기계 다짐을 하고, 다짐 후 수분 이내에 양생을 위한 살수를 하여 습윤 상태를 유지한다. 양생기간은 대기온도에 따라 1~3일 정도로 한다. Thereafter, after sprinkling and filling the existing soil on which the cured body is sprayed (step 303), the compaction machine is slowly selected by selecting the load of the compaction machine according to the size of the playground surface (step 304). Compaction construction is mandatory or mechanical compaction on the corners and corners that cannot be compacted with a roller, and sprayed for curing within minutes after compaction to maintain a wet state. The curing period is about 1 to 3 days depending on the atmospheric temperature.

이때, 전체 중량비는 흙 75~81%, 시멘트 혹은 황토몰탈 하나 혹은 둘이 혼합된 경화제 3~15%, 그리고 사용수의 투입량은 현장 조건에 따라 최적 함수비 14~24% 범위 내에서 조절한다. 경화제 분말과 물의 비율이 1㎏당 물 20L 비율로 희석함을 참조한다.At this time, the total weight ratio is 75 to 81% of soil, 3 to 15% of the hardener mixed with one or two of cement or ocher mortar, and the amount of water used is adjusted within the optimum water content of 14 to 24% depending on the site conditions. Note that the ratio of hardener powder to water is diluted to a rate of 20 liters of water per kilogram.

이렇게 기반공사가 완료되면, 그 위에 인조잔디를 시공하면 된다(단계 305). When the base construction is completed in this way, the artificial turf can be constructed thereon (step 305).

도 4를 참조하면, 도 3의 경화토 기반공법에 따른 인조잔디 구조물은 원지반 기존 토사 위에 시멘트와 황토몰탈 중 적어도 하나가 혼합된 또는 거기에 감람석 파쇄토나 참숯이 추가 혼합된 경화제를 살포하여 기존 토사를 100~200㎜ 두께로 경화시켜 경화층(31)을 형성하며, 경화층(31) 위에 55㎜ 두께로 규사(모래)(33)와 고무칩(35)을 충진재로 포설한 다음 인조잔디를 설치한다.Referring to FIG. 4, the artificial turf structure according to the hardening soil-based method of FIG. 3 is sprayed with a curing agent in which at least one of cement and ocher mortar is mixed or mixed with olivine crushed soil or charcoal on the existing existing soil. To form a hardened layer 31 by curing the thickness to 100 ~ 200㎜, and the silica sand (sand) 33 and the rubber chip 35 to the 55㎜ thickness on the hardened layer 31 as a filler and artificial turf Install.

위와 같이, 본 발명의 경화토 기반공법은 현 지반에서 작업이 수행되므로 기존 1개월정도 걸리던 공사기간을 약 1주일 정도로 단축시킬 수 있으며, 향후 토사 원형 복원이 가능하다.As described above, the hardened soil-based method of the present invention can be shortened to about one week because the work is carried out in the current ground can be reduced to about one week, it is possible to restore the original soil soil in the future.

본 발명은 기재된 실시예에 한정되는 것은 아니고, 본 발명의 사상 및 범위를 벗어나지 않고 다양하게 수정 및 변형할 수 있음은 이 기술의 분야에서 통상의 지식을 가진 자에게 자명하다. 따라서 그러한 변형예 또는 수정예들은 본 발명의 특허청구범위에 속한다 해야 할 것이다.It is apparent to those skilled in the art that the present invention is not limited to the described embodiments, and that various modifications and variations can be made without departing from the spirit and scope of the present invention. Therefore, such modifications or variations will have to belong to the claims of the present invention.

11 : 보조기층 13 : 콘크리트기층
21 : 하부기층 23 : 상부기층
31 : 경화층 33 : 규사(모래)
35 : 고무칩
11: auxiliary base 13: concrete base
21: lower base 23: upper base
31: hardened layer 33: silica sand (sand)
35: rubber chip

Claims (8)

인조잔디 시공을 위한 기반공법에 있어서,
(1) 원지반의 기존토를 일정깊이로 갈아엎는 단계;
(2) 시멘트와 황토몰탈 중 적어도 하나와 경화제를 혼합하여 경화체를 형성하며, 형성된 경화체를 기존토 위에 살포하고, 경화체가 살포된 기존토 위에 살수한 후 성토하여 경화층을 형성하는 단계; 및
(3) 상기 형성된 경화층을 다짐 작업 후 인조잔디를 시공하는 단계를 포함하는 자연복원형 인조잔디 기반공법.
In the foundation method for the construction of artificial turf,
(1) crushing the existing soil of the ground to a certain depth;
(2) mixing at least one of cement and ocher mortar with a hardener to form a hardened body, spraying the formed hardened body on the existing soil, sprinkling on the existing soil sprayed with the hardened body, and then forming the hardened layer; And
(3) natural restoring artificial turf-based method comprising the step of constructing artificial turf after compacting the formed hardened layer.
삭제delete 제 1항에 있어서, 상기 경화층은 100~200㎜ 두께로 형성됨을 특징으로 하는 자연복원형 인조잔디 기반공법. The method of claim 1, wherein the cured layer is formed of a natural restoring artificial grass-based method, characterized in that formed to a thickness of 100 ~ 200㎜. 제 1항에 있어서, 상기 단계 (2)는 친환경 보조제로서 감람석 파쇄토나 참숯을 추가로 첨가하여 혼합함을 특징으로 하는 자연복원형 인조잔디 기반공법.The method of claim 1, wherein the step (2) is a natural restoration artificial grass-based method, characterized in that the addition of olivine crushed soil or charcoal as an environmentally friendly supplement. 제 1항에 있어서, 상기 단계 (2)는 토사 중량의 3~15%가 되도록 시멘트나 황토몰탈을 혼합함을 특징으로 하는 자연복원형 인조잔디 기반공법.The method of claim 1, wherein the step (2) is a natural restoring artificial turf-based method, characterized in that for mixing 3 to 15% of the soil weight by mixing cement or loess mortar. 제 1항 또는 제 5항에 있어서, 단계 (2)의 상기 경화제 양은 시멘트나 황토몰탈의 중량에 대해 1/100인 것을 특징으로 하는 자연복원형 인조잔디 기반공법.The method according to claim 1 or 5, wherein the amount of the hardener in step (2) is 1/100 to the weight of cement or ocher mortar. 제 1항에 있어서, 단계 (2)의 상기 살수량은 현장 조건에 따라 최적 함수비 14~24% 범위내에서 조절됨을 특징으로 하는 자연복원형 인조잔디 기반공법.The method of claim 1, wherein the amount of sprinkling of step (2) is natural restoring artificial turf-based method, characterized in that adjusted to the optimum water content in the range of 14 to 24%. 제 1항 또는 제 7항에 있어서, 상기 단계 (2)는 경화제 분말 1㎏당 물 20L의 비율로 희석함을 특징으로 하는 자연복원형 인조잔디 기반공법.The method of claim 1, wherein the step (2) is a natural restoring artificial turf-based method, characterized in that dilution at a rate of 20L of water per 1kg of the curing agent powder.
KR1020110052289A 2011-05-31 2011-05-31 Artificial turf foundation work of a nature reconstruct type KR101118121B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110052289A KR101118121B1 (en) 2011-05-31 2011-05-31 Artificial turf foundation work of a nature reconstruct type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110052289A KR101118121B1 (en) 2011-05-31 2011-05-31 Artificial turf foundation work of a nature reconstruct type

Publications (1)

Publication Number Publication Date
KR101118121B1 true KR101118121B1 (en) 2012-03-12

Family

ID=46141279

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110052289A KR101118121B1 (en) 2011-05-31 2011-05-31 Artificial turf foundation work of a nature reconstruct type

Country Status (1)

Country Link
KR (1) KR101118121B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100438138B1 (en) * 2001-12-28 2004-07-02 (주)리치소일텍 A improved method of soil-paving for environment
KR100621963B1 (en) 2005-03-16 2006-09-14 주식회사 제철세라믹 Soil paving composition using water-quenched blast furnace slag and method for paving ground using the same
KR100839070B1 (en) 2008-01-14 2008-06-20 김대생 Paving material with yellow earth mixed small pipe and constructing method thereof
KR20100095403A (en) * 2010-04-14 2010-08-30 장재원 Composition for playground using olivine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100438138B1 (en) * 2001-12-28 2004-07-02 (주)리치소일텍 A improved method of soil-paving for environment
KR100621963B1 (en) 2005-03-16 2006-09-14 주식회사 제철세라믹 Soil paving composition using water-quenched blast furnace slag and method for paving ground using the same
KR100839070B1 (en) 2008-01-14 2008-06-20 김대생 Paving material with yellow earth mixed small pipe and constructing method thereof
KR20100095403A (en) * 2010-04-14 2010-08-30 장재원 Composition for playground using olivine

Similar Documents

Publication Publication Date Title
CN105040554A (en) Garden path structure and paving construction technology thereof
CN105951672B (en) A kind of construction technology of novel embankment and bank protection
JP2007284974A (en) Soil block
EP1084301B1 (en) A method of stabilising the ground in road construction work
JP5814786B2 (en) Wood chip paving method
KR101118121B1 (en) Artificial turf foundation work of a nature reconstruct type
WO2003095589A1 (en) Material for civil engineering work and its execution method
KR101014184B1 (en) Ground pavement method without expansion joint
CN105155387A (en) Garden road structure
JP4030574B1 (en) Earth-based paving material
JP2544970B2 (en) Curable soil composition and soil hardening method
JPH11209907A (en) Paving material and road paving method
KR20120055303A (en) Mathod for road constructing using water permeable concrete and permeable exposed color aggregates pavement
JPH02157304A (en) Construction for pavement of bed in play-ground
JP6850001B2 (en) How to improve surface soil
JPH0136963Y2 (en)
KR100381056B1 (en) Construction method of porous concrete for river bank and surface
CN215668814U (en) Gravel soil pavement structure with high strength and high water permeability
JP4515677B2 (en) Artificial grass pavement method
KR100981266B1 (en) The composition for soli pavement
JP5869328B2 (en) Road protection zone formation construction method and structure
JP2003227102A (en) Pavement
JP2000178910A (en) Paving structure
JP5711781B2 (en) Permeable pavement and its construction method
RU2019111858A (en) Method of arrangement and design of pavement pavements and landscape paths

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20141128

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20151125

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20181219

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20191126

Year of fee payment: 9