KR100993538B1 - Construction structure of internal and external stone panels in buildings - Google Patents
Construction structure of internal and external stone panels in buildings Download PDFInfo
- Publication number
- KR100993538B1 KR100993538B1 KR1020080033593A KR20080033593A KR100993538B1 KR 100993538 B1 KR100993538 B1 KR 100993538B1 KR 1020080033593 A KR1020080033593 A KR 1020080033593A KR 20080033593 A KR20080033593 A KR 20080033593A KR 100993538 B1 KR100993538 B1 KR 100993538B1
- Authority
- KR
- South Korea
- Prior art keywords
- stone panel
- building
- unit
- panel construction
- exterior
- Prior art date
Links
- 239000004575 stone Substances 0.000 title claims abstract description 269
- 238000010276 construction Methods 0.000 title claims abstract description 214
- 238000005266 casting Methods 0.000 claims abstract description 79
- 230000008878 coupling Effects 0.000 claims abstract description 65
- 238000010168 coupling process Methods 0.000 claims abstract description 65
- 238000005859 coupling reaction Methods 0.000 claims abstract description 65
- 238000000034 method Methods 0.000 claims abstract description 49
- 239000000463 material Substances 0.000 claims abstract description 26
- 239000011810 insulating material Substances 0.000 claims description 20
- 238000009413 insulation Methods 0.000 claims description 20
- 239000004570 mortar (masonry) Substances 0.000 claims description 16
- 230000002265 prevention Effects 0.000 claims description 13
- 230000001681 protective effect Effects 0.000 claims description 6
- 238000003780 insertion Methods 0.000 claims description 5
- 230000037431 insertion Effects 0.000 claims description 5
- 238000011049 filling Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims 1
- 238000003466 welding Methods 0.000 abstract description 6
- 239000000428 dust Substances 0.000 abstract description 4
- 239000002440 industrial waste Substances 0.000 abstract description 4
- 238000005406 washing Methods 0.000 abstract description 4
- 230000008569 process Effects 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 description 11
- 229910000831 Steel Inorganic materials 0.000 description 10
- 239000010959 steel Substances 0.000 description 10
- 238000009434 installation Methods 0.000 description 8
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 6
- 229910052782 aluminium Inorganic materials 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 238000005192 partition Methods 0.000 description 5
- 239000011229 interlayer Substances 0.000 description 4
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 4
- 238000004873 anchoring Methods 0.000 description 3
- 238000009833 condensation Methods 0.000 description 3
- 230000005494 condensation Effects 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 239000010410 layer Substances 0.000 description 2
- 239000003921 oil Substances 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 238000007634 remodeling Methods 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 230000002087 whitening effect Effects 0.000 description 2
- 229910001335 Galvanized steel Inorganic materials 0.000 description 1
- 238000003916 acid precipitation Methods 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 229910003460 diamond Inorganic materials 0.000 description 1
- 239000010432 diamond Substances 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000008397 galvanized steel Substances 0.000 description 1
- 239000010438 granite Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 238000011068 loading method Methods 0.000 description 1
- 239000004579 marble Substances 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 239000000565 sealant Substances 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 229910052710 silicon Inorganic materials 0.000 description 1
- 239000010703 silicon Substances 0.000 description 1
- 238000009751 slip forming Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/14—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
- E04B1/4107—Longitudinal elements having an open profile, with the opening parallel to the concrete or masonry surface, i.e. anchoring rails
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0803—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
- E04F13/081—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements
- E04F13/0821—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements located in-between two adjacent covering elements
- E04F13/0826—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements located in-between two adjacent covering elements engaging side grooves running along the whole length of the covering elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0832—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
- E04F13/0833—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable
- E04F13/0846—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable the fastening elements engaging holes or grooves in the side faces of the covering elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Finishing Walls (AREA)
- Panels For Use In Building Construction (AREA)
Abstract
본 발명은 건축물의 내외장용 석재패널 시공구조에 관한 것으로 특히, 건축물의 내,외측에 커튼 월 형태로 시공하는 건축물의 내외장용 석재패널 시공구조에 있어서, 단위 석재패널과 외곽 프레임 및 "ㄱ"자형 연결구를 구비하고 실제 건물의 내외장재로 시공되는 석재패널 시공유닛과; 사각 결합봉과 고정편을 구비하고 상기 석재패널 시공유닛의 상면과 저면 또는 양측면에 각각 대향되게 설치되어 석재패널 시공유닛 자체를 건물의 벽체나 슬라브에 설치된 케스팅 채널에 패스너와 볼트 및 너트를 통해 고정 설치해 주는 수개의 고정바와; 건물의 벽체나 슬라브에 매립 또는 엥커 볼트를 통해 고정 설치되어 상기 석재패널 시공유닛에 결합된 고정바가 패스너와 볼트 및 너트를 통해 고정되도록 하는 방식을 통해 석재패널 시공유닛 자체가 건물의 외벽 또는 내벽에 고정된 상태를 유지하도록 하는 수개의 케스팅 채널과; 상기 케스팅 채널과 고정바 사이를 볼트와 너트를 통해 상호 결합시킬 수 있도록 하는 수개의 패스너;로 구성하되, 필요에 따라서는 배면에 고정편을 선택적으로 구비하고 서로 인접된 상기 석재패널 시공유닛의 외곽 프레임에 형성된 유닛 연결겸 고정바 결합홈에 상,하부 또는 양측이 절반씩 끼워지게 삽입 설치되어 서로 인접된 석재패널 시공유닛들을 상호 결합시켜 주는 사각 봉형 유닛 연결겸 고정바;를 더 포함하는 것을 특징으로 한다.
따라서, 건축물의 내외장 시공에 따른 인건비와 시공비를 대폭 줄일 수 있고, 자원을 절약할 수 있으며, 건물을 경량화할 수 있고, 건물 구조체 자체의 손상 을 방지할 수 있고, 신축되는 건축물 자체의 공기(工期)를 대폭 단축할 수 있으며, 공장에서 석재패널 유닛 자체를 제작함으로 인해 신축 공사장에서의 분진 발생 및 산업 폐기물의 발생을 미연에 방지할 수 있고, 시공시 비계의 설치가 불필요함은 물론 용접 등과 같은 후 작업이 필요 없으며, 시공 후 석재의 세척 등과 같은 후 작업이 전혀 필요 없는 것이다.
트러스, 석재패널, 석재패널 시공유닛, 고정바, 케스팅 채널, 패스너
The present invention relates to a stone panel construction structure for interior and exterior of a building, and in particular, in the interior and exterior stone panel construction structure of a building that is constructed in the form of a curtain wall on the inside and outside of the building, the unit stone panel and the outer frame and the "b" shape A stone panel construction unit having a connector and constructed as interior and exterior materials of an actual building; It is provided with a square coupling rod and a fixed piece and installed opposite to the top and bottom or both sides of the stone panel construction unit, and the stone panel construction unit itself is fixed to the casting channel installed on the wall or slab of the building through fasteners, bolts and nuts. Several fixed bars; The stone panel construction unit itself is fixed to the outer wall or the inner wall of the building through a method in which a fixed bar coupled to the stone panel construction unit is fixed to the wall or slab of the building through a buried or anchor bolt so that the fixing bar coupled to the stone panel construction unit is fixed through the fastener, the bolt and the nut. Several casting channels to maintain a fixed state; Consists of a plurality of fasteners to be coupled to each other between the casting channel and the fixing bar through a bolt and nut, but if necessary, optionally provided with a fixing piece on the back and the outer side of the stone panel construction unit adjacent to each other The unit connection and fixed bar formed in the frame is installed in the upper, lower or both sides of the coupling groove is inserted into the coupling groove, the square bar unit connection and fixing bar for coupling the stone panel construction units adjacent to each other; It is done.
Therefore, it is possible to drastically reduce labor and construction costs due to the interior and exterior construction of the building, to save resources, to reduce the weight of the building, to prevent damage to the building structure itself, and to expand the air of the building itself. It is possible to drastically shorten the work process, and by producing the stone panel unit itself in the factory, it is possible to prevent the occurrence of dust and industrial waste at new construction sites, and it is unnecessary to install the scaffold during construction, as well as welding. There is no need for the same post-work, and no post-work such as washing the stone after construction.
Truss, Stone Panel, Stone Panel Construction Unit, Fixing Bar, Casting Channel, Fastener
Description
본 발명은 건축물의 내외장용 석재패널 시공구조에 관한 것으로, 더욱 상세하게는 건축물의 내외장재로 널리 사용되고 있는 석재패널을 보다 얇고 넓게 제작하되, 석재패널의 사면에 전체에 프레임 결합홈을 연이어 형성하고 이에 알루미늄으로 압출 성형한 외곽 프레임을 결합 고정하는 방식을 통해 커튼 월(curtain wall) 형태의 건축물 내,외벽 형성용 석재패널 유닛을 제작하여 건축물의 내외장 시공에 따른 인건비와 시공비를 대폭 줄일 수 있고, 자원을 절약할 수 있으며, 건물을 경량화할 수 있고, 건물 구조체 자체의 손상을 방지할 수 있고, 신축되는 건축물 자체의 공기(工期)를 대폭 단축할 수 있으며, 공장에서 석재패널 유닛 자체를 제작함으로 인해 신축 공사장에서의 분진 발생 및 산업 폐기물의 발생을 미연에 방지할 수 있고, 시공시 비계의 설치가 불필요함은 물론 용접 등과 같은 후 작업이 필요 없으며, 시공 후 석재의 세척 등과 같은 후 작업이 필요 없도록 발명한 것이다.The present invention relates to the construction structure of the stone panel for interior and exterior of a building, and more specifically, to produce a thinner and wider stone panel widely used as interior and exterior materials of a building, the frame joining grooves are continuously formed on the slope of the stone panel. By combining and fixing the outer frame extruded with aluminum, it is possible to greatly reduce labor and construction costs in accordance with the interior and exterior construction of the building by manufacturing a stone wall unit for curtain wall-like building and exterior wall forming. It can save resources, lighten the building, prevent damage to the building structure itself, greatly reduce the air of the new building itself, and manufacture the stone panel unit itself in the factory. Therefore, it is possible to prevent dust generation and industrial waste generation at new construction sites, and to install scaffolding during construction. Of course, it is not necessary that the post work is not necessary, such as welding, etc., and the invention is not required after work such as washing the stone after construction.
근래 들어 고층 빌딩과 같은 건축물의 내외장 벽체를 시공하기 위한 마감재로, 사각 평판형으로 가공 제작된 대리석이나 화강암 등과 같은 석재패널이 많이 채용되고 있다.Recently, as a finishing material for the interior and exterior walls of buildings such as high-rise buildings, stone panels, such as marble or granite, which are processed into square flat plates, have been adopted.
이와 같은 석재패널은 종횡으로 연속적으로 부착하여 건물의 외관을 고급스럽게 하고 있으며, 이러한 석재패널을 건물에 부착하는 구조물은 종래에도 여러 가지가 제안된 바 있다. Such a stone panel is continuously attached vertically and horizontally to enhance the appearance of the building, and various structures for attaching such a stone panel to the building have been proposed in the past.
이와 같은 석재패널의 설치방법으로는 습식공법과 건식공법이 있다.Installation methods of such stone panels include a wet method and a dry method.
상기에 있어서 습식공법은, 구조체와 석재 사이에 모르타르를 채우고, 연결철물을 사용하여 일체화시킨 공법으로 내,외부 낮은 벽체나 화단, 바닥용 석재 깔기에 사용하고 있는데 이와 같은 습식공법은 공사실적이 많아 신뢰성 있고, 모르타르 경화시간 필요이 필요하며, 동절기 시공이 곤란하고, 빗물 침투시 백화현상 발생한다는 장,단점이 있다.In the above method, the wet method is a method in which mortar is filled between the structure and the stone, and it is integrated with the connecting hardware, and it is used for laying internal and external low walls, flower beds, and floors. It is reliable, it needs mortar hardening time, it is difficult to install in winter, and there are advantages and disadvantages of whitening phenomenon when rainwater infiltrates.
상기 건식공법은 동절기 시공이 가능하고 공기단축과 함께 백화현상이 없으며, 상부하중이 하부로 전달되지 않고, 단열효과 및 결로방지 효과가 크나, 충격에 약하고 긴결철물물에 녹이 발생할 우려가 있고 중량이 무거워 양 중장비의 사용이 요구되며 습식공법에 비해 비교적 고가(高價)인데, 이와 같은 건식공법을 이용한 석재를 고정 설치하는 방법으로는 다음과 같은 공법이 있다.The dry method can be installed in winter, there is no whitening phenomenon with the air shortening, the upper load is not transferred to the lower side, the heat insulation effect and the condensation prevention effect is large, but it is weak to impact, and there is a risk of rust in long-bonded steel and weight It is heavy and requires the use of both heavy equipment and relatively expensive (wet) compared to the wet method, there is the following method of fixing the stone using the dry method.
그 첫째 공법으로 엥커(anchor) 긴결공법이 있는데, 이는 건물 벽체에 단위 석재를 1개씩 엥커 철물로 부착하는 공법으로 석재의 판 두께가 30㎜로 제한되어 충격에 의한 파손우려가 크고, 석재패널의 상부하중이 하부로 전달되지 않으며 엥 커 철물에 대한 방청이 요구된다.The first method is the anchor anchoring method, which attaches unit stone to the wall of the building one by one with anchor hardware. The plate thickness of the stone is limited to 30mm, which is likely to damage due to impact. The upper load is not transmitted to the lower part and rust prevention of anchor hardware is required.
둘째로, 강재 트러스(TRUSS) 지지공법이 있는데, 이는 미리 조립된 트러스에 여러장의 석재 판재를 지상에서 부착한 후 양중기를 사용하여 패널을 부착하는 방식으로 석재 조인트(JOINT) 줄 눈 시공이 용이하고, 대형화 시공으로 공기를 단축할 수 있으며, 대형 양 중장비가 필요하고, 강재 트러스 강성 검토가 필요하다.Secondly, there is a steel truss support method. It is easy to construct a joint joint by attaching several pieces of stone plate to the pre-assembled truss on the ground and then attaching the panel using a heavy lifting machine. In addition, it is possible to shorten the air by the large-scale construction, large heavy equipment is needed, and steel truss stiffness needs to be examined.
셋째로, GPC 공법이 있는데 이는 PC 뒷면에 석판재를 일체화시켜 PC로 조립하는 공법으로 공장에서 생산하므로 공기단축 효과가 있고, 석재의 두께를 얇게 할 수 있어 경제적이며, 백화현상 발생 우려가 있고, 대형 양중장비가 필요한 단점이 있다.Thirdly, there is the GPC method, which is a method of assembling the slab on the back of the PC to assemble it into a PC, which is produced at the factory, which has the effect of shortening the air, and the thickness of the stone can be made thinner. The disadvantage is the need for large lifting equipment.
이러한 건축물 내외장벽 시공 마감재로 사용되는 석재패널을 엥커(anchor) 긴결공법을 이용한 건식공법으로 설치하는 방법은, 통상 도 1 및 도 2에 도시된 바와 같이 건축물 슬라브의 외벽에 다수가 일정한 간격을 이루며 나란한 상태로 배열되어 커튼 월 형태의 외장벽체를 형성하도록 마감 시공된다.The method for installing the stone panel used as a building interior and exterior barrier finishing material in the dry method using the anchor anchoring method, as shown in Figures 1 and 2 usually have a plurality of regular intervals on the outer wall of the building slab. They are arranged side by side and finished to form an exterior wall in the form of a curtain wall.
이와 같은 석재패널(10)을 건축물의 외장 벽으로 마감하여 시공하는 경우에 있어서, 통상 앵커(41)와 브라켓(42) 및 볼트(43) 등과 같은 다수의 고정구들을 이용하여 트러스(20)를 건축물 슬라브(30)에 고정 설치하게 되는데, 이때 상기 트러스(20)는 각 파이프 등으로 이루어진 수직부재(21)와 수평부재(22)가 일정한 규격의 격자형 단위 모듈을 이루도록 철제 틀로 제작된다.In the case of constructing such a
상술한 바와 같은 트러스(20)에 석재패널(30)이 고정되도록 "ㄴ"형 앵커 또는 브라켓 및 볼트와 너트 등과 같은 다수의 체결부재(51 내지 53)를 체결하여 커 튼 월 형태의 외벽체로 시공하게 된다.Construction of the outer wall in the form of curtain wall by fastening a plurality of fastening
한편, 상술한 바와 같은 종래 건축물 외장용 석재패널의 시공구조는 주로 클로우즈드 조인트(closed joint) 공법이나 오픈 조인트(open joint) 공법에 의해 시공된다.On the other hand, the construction structure of the conventional building exterior stone panel as described above is mainly constructed by a closed joint (open joint) method or an open joint (open joint) method.
즉, 클로우즈드 조인트 공법은 서로 인접한 석재패널(10)의 사이에 각각 형성된 소정 간격의 틈새를 통해 빗물 등이 유입되는 것을 차단하기 위하여 예컨대, 실리콘 등과 같이 반죽상태의 석유화합물로 이루어진 코킹재(C)를 충전하여 씰링된 시공구조를 가지게 된다.That is, the closed joint method is a caulking material (C) made of petroleum compounds in the form of dough, for example, silicon in order to block the inflow of rainwater through a gap of a predetermined interval formed between the
그리고, 오픈 조인트 공법은 서로 인접한 석재패널(10)의 사이에 각각 형성된 소정 간격의 틈새가 오픈된 상태의 시공구조를 가지게 된다.In addition, the open joint method has a construction structure in which gaps of predetermined intervals formed between the
그러나, 클로우즈드 조인트 시공구조의 경우, 코킹재(C)가 태양열, 자외선, 산성비 등의 외부환경에 장시간 노출됨에 따라 물성이 기름성분으로 변하면서 석재패널(10)의 외벽면에 기름띠와 같은 얼룩 등의 오염상태를 유발시키게 됨에 따라, 건축물 외관미의 저하는 물론 오염에 따른 앵커와 브라켓 등의 철제 고정구와 트러스(20)의 부식으로 인하여 내구성과 안전성이 약화되는 문제점을 가지고 있다.However, in the case of the closed joint construction structure, as the caulking material (C) is exposed to the external environment such as solar heat, ultraviolet light, acid rain, etc. for a long time, the physical property is changed into an oil component, such as an oil band on the outer wall surface of the
또한, 오픈 조인트 시공구조의 경우, 석재패널(10)의 틈새를 통한 빗물 누수 등으로 인하여 결로가 발생함으로써, 앵커와 브라켓 등의 철제 고정구와 트러스(20)의 부식으로 인하여 내구성과 안전성이 약화되는 문제점을 가지고 있다.In addition, in the case of the open joint construction structure, condensation occurs due to leakage of rain water through the gap of the
다른 한편으로는, 상술한 바와 같은 종래 건축물 외장용 석재패널의 시공구조와 시공방법에 따르면, 트러스(20)의 제작과 운반 및 설치과정에 따른 준비절차 가 복잡함과 동시에 앵커 또는 브라켓 및 볼트와 너트 등과 같은 다수의 체결 부재가 소요되므로, 시공시간과 시공비용이 증가하는 등 시공효율이 저하되는 문제점을 가지고 있다.On the other hand, according to the construction structure and construction method of the conventional building exterior stone panel as described above, the preparation procedure according to the production, transportation and installation process of the
따라서, 국내 공개특허공보 2007-117790호에서는 상기한 문제점을 해결하기 위한 강재 트러스(TRUSS) 지지공법으로, 다수의 단위 석재패널이 각각 인접한 단위 석재패널과 일정한 틈새 간격을 유지한 상태로 동일 평면상에 나란하게 배열되어 커튼월 형태의 외장벽을 형성하도록 건축물 슬라브에 설치 시공되는 것으로,Therefore, in Korean Patent Laid-Open Publication No. 2007-117790, a steel truss supporting method for solving the above problems is provided, in which a plurality of unit stone panels have the same planar state while maintaining a constant gap with each adjacent unit stone panel. To be installed in the building slabs arranged side by side to form a curtain wall-shaped exterior wall,
복수의 단위 석재패널 배면 양측 가장자리에 각각 대향되도록 나란하게 배치되는 1쌍의 브라켓 프레임과, 상기 석재패널과 상기 브라켓 프레임을 결합시켜 주도록 체결되는 다수의 앵커 볼트와, 상기 1쌍의 브라켓 프레임에 각각 설치되는 복수의 앵커 브라켓을 구비하고, 상기 각 단위 석재패널 사이의 틈새 간격에는 후방에서 충전된 코킹재가 개재되도록 씰링되며, 상기 코킹재의 배면과 단위 석재패널의 배면이 서로 나란하게 동일 평면상에 배열되어 단위 유닛을 이루는 석재패널 유닛과;A pair of bracket frames arranged side by side to face both edges of the rear surface of a plurality of unit stone panels, a plurality of anchor bolts fastened to couple the stone panels and the bracket frame, and each of the pair of bracket frames It is provided with a plurality of anchor brackets installed, the gap between each unit stone panel is sealed so that the caulking material filled from the rear is interposed, the rear surface of the caulking material and the rear surface of the unit stone panel is arranged on the same plane parallel to each other A stone panel unit which constitutes a unit unit;
상기 건축물 슬라브에 설치된 앵커 바아와 결합되는 결합부재와, 상기 석재패널 유닛의 앵커 브라켓과 정렬되어 체결부재가 체결되도록 형성된 앵커홀이 구비되며, 일면에 단열부재가 적층되도록 설치되어 단위 유닛을 이루는 트러스 프레임 유닛과;A coupling member coupled to the anchor bar installed on the building slab, and an anchor hole formed to align with the anchor bracket of the stone panel unit so as to fasten the fastening member, are installed to stack a heat insulating member on one surface of the truss to form a unit unit. A frame unit;
상기 석재패널 유닛과 상기 트러스 프레임 유닛이 대면한 상태로 한조의 단위 시공 유닛을 형성하도록 상기 앵커홀과 상기 앵커 브라켓을 관통 결합시켜 주기 위한 체결부재;를 포함하며,And a fastening member for coupling the anchor hole and the anchor bracket through the stone panel unit and the truss frame unit to face each other so as to form a set of unit construction units.
상기 건축물의 슬라브에 설치된 앵커 바아와 상기 트러스 프레임 유닛의 결합부재가 결합되도록 상기 단위 시공유닛 다수가 설치되어 다수의 석재패널이 건축물 슬라브에 커튼 월 형태의 외장벽을 형성하는 것을 특징으로 하는 건축물 외장벽 형성용 석재패널의 시공구조를 제시한 바 있다.A plurality of unit construction units are installed so that the anchor bar installed in the slab of the building and the coupling member of the truss frame unit are coupled to each other, so that a plurality of stone panels form an exterior wall in the form of a curtain wall on the building slab. The construction structure of the stone panel for barrier formation was presented.
즉, 건축물 외장벽 형성용 석재패널의 시공구조는, 공장에서 두께가 30㎜ 이상으로 두꺼운 수개의 석재패널 배면에 수개의 앵커 홀을 형성하고 이에 볼트를 설치한 후 상하로 연이어 배열된 석재패널의 배면에 철재로 된 브라켓 프레임을 볼트 체결방식을 통해 고정시키되, 상기 브라켓 프레임의 측면부에는 수개의 엥커 브라켓을 설치하여 하나의 석재패널 유닛을 형성하고, 상기 석재패널 유닛의 브라켓 프레임의 엥커 브라켓에는 철재를 이용하여 사각 틀체 형상으로 용접이나 볼트를 통해 형성시킨 트러스 프레임 유닛을 볼트를 통해 고정 설치하여 하나의 석재패널 시공유닛을 완성하고 이를 현장으로 운반하여 건축물의 슬라브에 조립하는 구성으로 되어 있다.That is, the construction structure of the stone panel for building exterior wall is formed in the factory by forming several anchor holes on the back of several stone panels having a thickness of 30 mm or more and installing bolts thereon, The bracket frame made of steel is fixed to the rear side through a bolting method, and a plurality of anchor brackets are installed on the side portion of the bracket frame to form one stone panel unit, and the anchor bracket of the bracket frame of the stone panel unit is made of steel. The truss frame unit formed by welding or bolt in the shape of a square frame is fixed using bolts to complete one stone panel construction unit and transport it to the site to assemble the building slab.
이와 같은 시공구조는 종래 엥커(anchor) 긴결공법에 비하여, 코킹재가 석재패널의 배면 후방부에서 충전된 구조를 가지므로 실제로는 클로즈 조인트(Closed Joint) 시공구조를 가지나, 코킹재의 충전 깊이로 인하여 석재패널의 전면부에서 관찰할 때 오픈 조인트(Open Joint) 시공구조의 외관 효과를 가질 수가 있으므로 양자의 시공구조에서 얻을 수 있는 장점을 모두 취할 수 있고, 별도의 생산현장에서 대량생산 시스템 구축에 의해 표준화된 상태의 단위 석재패널 시공유닛을 패키 지화된 상태로 양산하여 건축현장으로 운반 시공할 수 있으므로 시공 용이성 향상과 시공기간 및 시공비용을 절감할 수 있을 뿐만 아니라 시공품질 향상과 건축현장의 자재적재 공간을 절감할 수 있으며, 또한 석재패널의 외장 마감 시공을 위한 준비시간을 어느 정도 단축할 수 있을 장점을 가지고 있다.Such a construction structure has a structure in which the caulking material is filled at the rear of the back of the stone panel, compared with the conventional anchor anchoring method, and thus has a closed joint construction structure, but due to the filling depth of the caulking material When viewed from the front of the panel, it can have the appearance effect of the open joint construction structure, so it can take all the advantages of both construction structures, and standardize by establishing mass production system at separate production sites. As the unit stone panel construction unit in the finished state can be mass-produced and transported to the construction site, it can not only improve the ease of construction, reduce the construction period and construction cost, but also improve the construction quality and material loading space of the construction site. Can reduce the preparation time for the exterior finishing of stone panels. It has advantages
그러나, 이와 같은 구성은 브라켓 프레임을 석재패널의 배면에 너트와 볼트를 이용하여 고정하는 형태를 갖고 있어 비교적 얇은 석재패널을 사용할 수 없으므로 최소한 그 두께가 30㎜ 이상인 것을 사용해야 하므로 자원을 많이 낭비하게 됨은 물론 원하는 면적의 석재패널 시공유닛을 자유롭게 제조하여 시공할 수 없으므로 하나의 벽체에 대해서도 다수개의 석재패널 시공유닛을 제작하여 설치해야 하는 제약이 뒤따르고, 또 상기 석재패널을 하나의 유닛으로 고정시켜 주는 브라켓 프레임 자체를 포함하여 그의 배면으로 중량이 매우 무거운 철재로 된 또 다른 트러스 프레임 유닛을 고정 설치해야 하므로 석재패널 시공유닛 자체의 중량이 많이 나가게 되어 운반비가 많이 들고 시공성이 매우 좋지 않을 뿐만 아니라 건물 자체에 많은 하중을 주고, 심할 경우 건축물 구조체에 손상을 주게 되는 문제점이 있다.However, this configuration has a form in which the bracket frame is fixed to the back of the stone panel by using nuts and bolts, so that a relatively thin stone panel cannot be used, so at least a thickness of 30 mm or more should be used, which wastes a lot of resources. Of course, the stone panel construction unit of the desired area can not be freely manufactured and constructed, there is a restriction to manufacture and install a plurality of stone panel construction unit for a single wall, and also to fix the stone panel as a unit It is necessary to fix another truss frame unit made of steel that is very heavy on its back, including the bracket frame itself. Therefore, the stone panel construction unit itself has a heavy weight, which leads to high transportation costs and very poor construction. Giving a lot of load to the shim There is a problem in that damage to the building structure.
또한, 석재패널에 브라켓 프레임을 설치하는 작업을 포함하여 용접 또는 볼트와 너트 등을 이용하여 사각 틀체 형상으로 형성시킨 트러스 프레임 유닛을 석재패널 유닛에 고정시킬 때 및 석재패널 시공유닛을 건축물에 고정시킬 때 많은 볼트와 너트 및 체결 부재들을 사용함으로써 원자재비릴 포함한 부대 자재비 및 인건비가 많이 들고 제품의 생산시간이 길어 결국 제품의 생산원가가 높아지므로 석재시공에 따른 건축물의 내장 또는 외장 벽체 마감시설비가 많이 들게 되는 문제점이 있다.In addition, including the installation of the bracket frame on the stone panel, when fixing the truss frame unit formed in the square frame shape by using welding or bolts and nuts to the stone panel unit and to fix the stone panel construction unit to the building When using many bolts, nuts, and fastening members, additional materials and labor costs including raw material reel are increased, and the production time of the product is long, resulting in high production cost of the product. There is a problem.
본 발명은 이와 같은 종래의 제반 문제점을 해소하기 위하여 안출한 것으로, 건축물의 내외장재로 널리 사용되고 있는 석재패널을 15㎜-12㎜로 얇은 것을 사용할 수 있도록 함은 물론 그 면적은 매우 넓게 제작하되, 석재패널의 4 측면에는 프레임 결합홈을 연이어 형성하고 유닛 연결겸 고정바 결합홈을 일체로 구비하도록 알루미늄으로 압출 성형한 외곽 프레임을 사각틀 형태로 결합 고정하여 석재패널 시공유닛을 형성하고, 이들 석재패널 시공유닛들의 연결부위는 사각 고정바를 통해 상호 연결하되 필요에 따라서는 연결부위에 "T"형 유닛 연결겸 고정바를 설치하여 석재패널 시공유닛들을 상호 연결함과 동시에 해당 부위를 건물에 고정 설치된 케스팅 채널에 고정할 수 있도록 하고, 석재패널 시공유닛들의 상,하부는 "ㄴ"자형 고정바를 통해 슬라브의 상하부에 고정 설치된 케스팅 채널 또는 패스너에 고정하는 방식을 통해 커튼 월(curtain wall) 형태의 건축물 내,외벽 형성용 석재패널 시공유닛을 시공할 수 있도록 함으로써 건축물의 내외장 시공에 따른 인건비와 시공비를 대폭 줄일 수 있고, 자원을 절약할 수 있으며, 건물을 경량화할 수 있고, 건물 구조체 자체의 손상을 방지할 수 있고, 신축되는 건축물 자체의 공기(工期)를 대폭 단축할 수 있으며, 공장에서 석재패널 유닛 자체를 제작함으로 인해 신축 공사장에서의 분진 발생 및 산업 폐기물의 발생을 미연에 방지할 수 있고, 시공시 비계의 설치가 불필요함은 물론 용접 등과 같은 후 작업이 필요 없으며, 시공 후 석재의 세척 등과 같은 후 작업이 전혀 필요 없는 건축물의 내외장용 석재패널 시공 구조를 제공하는데 그 목적이 있는 것이다.The present invention has been devised to solve such a conventional problem, the stone panel which is widely used as interior and exterior materials of the building to be used as thin as 15㎜-12㎜ as well as the area is very wide, but the stone Frame panels are formed on four sides of the panel in series, and the outer frame extruded from aluminum is combined to fix the square frame in a square frame form to integrally connect the unit connection and the fixing bar to form the stone panel construction unit. The connecting parts of the units are interconnected through the square fixing bar, but if necessary, the "T" type unit connecting and fixing bar is installed on the connecting part to interconnect the stone panel construction units and at the same time, the part is fixed to the casting channel installed in the building. The upper and lower parts of the stone panel construction units can be fixed through the “b” shaped fixing bar. It is possible to install the stone panel construction unit for forming the curtain wall (curtain wall) and the exterior wall by fixing it to the casting channel or fastener fixedly installed at the upper and lower parts of the building, thereby reducing the labor and construction costs according to the interior and exterior construction of the building. It can greatly reduce, save resources, lighten the building, prevent damage to the building structure itself, greatly reduce the air of the new building itself, and stone panels in the factory By manufacturing the unit itself, it is possible to prevent dust generation and industrial waste generation in the new construction site, and it is not necessary to install the scaffolding at the time of construction, and also does not need post-work such as welding, etc. The purpose is to provide a building structure for stone panels for interior and exterior of buildings that do not require any post-work.
상기한 목적을 달성하기 위한 본 발명의 건축물 내외장용 석재패널 시공구조는, 한 장의 단위 석재패널 또는 다수의 단위 석재패널을 각각 인접하게 배치하고 프레임을 통해 하나의 석재패널 시공유닛으로 형성하고 이를 건축물의 내,외측에 커튼 월 형태로 시공하는 건축물의 내외장용 석재패널 시공구조에 있어서,Building panel construction structure for the interior and exterior of the present invention for achieving the above object, one unit stone panel or a plurality of unit stone panel is disposed adjacent to each other and formed as one stone panel construction unit through the frame and building In the interior and exterior stone panel construction structure of the building to be installed inside and outside of the curtain wall,
4 측면에 프레임 결합홈이 연이어 형성된 단위 석재패널과, 전면부로 수직하게 돌출되어 상기 단위 석재패널의 측면부를 감싸주는 날개의 내측에 상기 단위 석재패널의 프레임 결합홈에 끼워져 걸려지는 걸림편이 돌출 형성되고 상기 날개의 후방부로는 유닛 연결겸 고정바 결합홈과 연결구 삽입홈을 일체로 구비한 "ㄷ"자형 결합구가 구비된 구성을 갖고 상기 단위 석재패널의 4 측면에 결합되는 외곽 프레임 및, 서로 인접된 외곽 프레임의 연결구 삽입홈에 각각 양단부가 끼워진 형태에서 고정구를 통해 외곽 프레임의 결합구에 일체로 고정설치되어 외곽 프레임 자체가 단위 석재패널의 4측면에 사각 틀체 형상으로 고정 설치되도록 하는 수개의 "ㄱ"자형 연결구;를 구비하고 실제 건물의 내외장재로 시공되는 석재패널 시공유닛과;4, the unit stone panel is formed on the side of the unit stone panel is formed in succession, and the engaging piece which is fitted into the frame coupling groove of the unit stone panel is protruded to the inner side of the wing that is projected vertically to the front portion to surround the side stone panel The rear portion of the wing has a configuration that is provided with a "c" -shaped coupling unit having a unit connection and fixed bar coupling groove and a connector insertion groove integrally and the outer frame coupled to the four sides of the unit stone panel, and adjacent to each other Each end is fitted into the connector insert groove of the outer frame, which is fixedly installed in the coupling frame of the outer frame through the fastener so that the outer frame itself is fixed in a rectangular frame shape on the four sides of the unit stone panel. A " shaped connector; and a stone panel construction unit constructed with interior and exterior materials of an actual building;
상기 석재패널 시공유닛의 외곽 프레임에 형성된 유닛 연결겸 고정바 결합홈에 끼워져 결합되는 사각 결합봉과, 상기 결합봉의 어느 일면에서 후방부를 향해 연장 형성된 고정편을 구비하고 상기 석재패널 시공유닛의 상면과 저면 또는 양측 면에 각각 대향되게 설치되어 석재패널 시공유닛 자체를 건물의 벽체나 슬라브에 설치된 케스팅 채널에 패스너와 볼트 및 너트를 통해 고정 설치해 주는 수개의 고정바와;The top and bottom surfaces of the stone panel construction unit is provided with a square coupling rod that is inserted into the unit connection and fixed bar coupling groove formed in the outer frame of the stone panel construction unit and coupled to the rear portion from one side of the coupling rod. Or a plurality of fixing bars installed on opposite sides to fix the stone panel construction unit itself through fasteners, bolts, and nuts in a casting channel installed on a wall or slab of the building;
건물의 벽체나 슬라브에 매립 또는 엥커 볼트를 통해 고정 설치되어 상기 석재패널 시공유닛에 결합된 고정바가 패스너와 볼트 및 너트를 통해 고정되도록 하는 방식을 통해 석재패널 시공유닛 자체가 건물의 외벽 또는 내벽에 고정된 상태를 유지하도록 하는 수개의 케스팅 채널과;The stone panel construction unit itself is fixed to the outer wall or the inner wall of the building through a method in which a fixed bar coupled to the stone panel construction unit is fixed to the wall or slab of the building through a buried or anchor bolt so that the fixing bar coupled to the stone panel construction unit is fixed through the fastener, the bolt and the nut. Several casting channels to maintain a fixed state;
상기 케스팅 채널과 고정바 사이를 볼트와 너트를 통해 상호 결합시킬 수 있도록 하는 수개의 패스너;를 포함하는 것을 특징으로 한다.And a plurality of fasteners configured to couple between the casting channel and the fixing bar through bolts and nuts.
또, 필요에 따라서는 하나의 건물 벽체에 여러 개의 석재패널 시공유닛을 좌,우,상,하부로 연이어 설치할 경우, 서로 인접된 상기 석재패널 시공유닛의 외곽 프레임에 형성된 유닛 연결겸 고정바 결합홈에 상,하부 또는 양측이 절반씩 끼워지게 삽입 설치되어 서로 인접된 석재패널 시공유닛들을 상호 결합시켜 주는 사각 봉형 유닛 연결겸 고정바;를 더 포함하는 것을 특징으로 한다.In addition, if necessary to install a plurality of stone panel construction unit in a building wall in succession left, right, top, bottom, unit connection and fixed bar coupling groove formed in the outer frame of the stone panel construction unit adjacent to each other The upper, lower or both sides are inserted to be inserted by half, the square bar unit connection and fixing bar for coupling the stone panel construction units adjacent to each other; characterized in that it further comprises.
이때, 상기 사각 봉형 유닛 연결겸 고정바의 배면 중심선 상에서 수평방향으로는 필요에 따라 석재패널 시공유닛들의 결합부를 건물의 벽체나 슬라브에 설치된 케스팅 채널에 패스너와 볼트 및 너트를 통해 고정 설치해 주는 고정편을 더 돌출되게 설치한 것을 특징으로 한다.At this time, in the horizontal direction in the horizontal direction on the back center line of the rectangular bar-shaped unit connecting and fixing bar, the fixing piece for fixing the coupling portion of the stone panel construction units through the fasteners, bolts and nuts to the casting channel installed on the wall or slab of the building Characterized in that installed more protruding.
또한, 상기 석재패널 시공유닛의 외곽 프레임에 구비된 "ㄷ"자형 결합구의 후방 내측에는 단열재 및 차음재 이탈 방지돌기를 더 형성하여, 필요에 따라서는 상기 석재패널 시공유닛의 배면에 단열재 또는 차음재를 더 설치할 수 있도록 한 것을 특징으로 한다.In addition, the inner side of the "c" -shaped coupler provided in the outer frame of the stone panel construction unit is further formed with a heat insulating material and a sound insulating material escape prevention projections, if necessary, further insulation or sound insulating material on the back of the stone panel construction unit Characterized in that it can be installed.
그리고, 상기 단위 석재패널의 전면부에는 보호용 필름을 부착 설치한 것을 특징으로 한다.The protective film is attached to the front part of the unit stone panel.
한편, 상기 케스팅 채널은 종단면이 'ㄷ"자 형상을 갖도록 절곡 형성된 본체의 개구부 양단부에서 내측으로 한 쌍의 경사 걸림편이 일체로 구비된 것을 특징으로 한다.On the other hand, the casting channel is characterized in that the pair of inclined engaging pieces are provided integrally inward from both ends of the opening of the main body bent so that the longitudinal section has a '' "shape.
이때, 상기 케스팅 채널의 내부에 삽입 설치되는 볼트는 머리부 양측에 걸림홈을 구비한 "T"자 형상을 갖는 것이고, 또 너트는 상면 양측에 걸림홈이 구비되고 저면에는 스프링이 일체로 설치된 형태에서 평단면이 평행사변형의 형상을 갖는 것임을 특징으로 한다.At this time, the bolt is inserted into the casting channel has a "T" shape having a locking groove on both sides of the head, the nut is provided with a locking groove on both sides of the upper surface and the spring is integrally installed on the bottom surface In the flat section is characterized in that it has a parallelogram shape.
또, 건물의 슬라브 및 벽체에 매립 설치되는 케스팅 채널의 경우 본체의 저면에 건물의 철근에 그 단부를 직접 용접하거나 철사로 고정시킬 수 있는 수개의 고정봉을 더 설치한 것을 특징으로 한다.In addition, in the case of a casting channel embedded in the slab and the wall of the building is characterized in that the bottom of the main body further installed several fixing rods that can be directly welded to the end of the building or fixed with a wire.
또한, 상기 케스팅 채널을 건물의 슬라브 및 벽체에 매립 설치할 때 본체의 내부 공간에 모르타르 유입방지 부재를 충진시키는 것을 특징으로 한다.In addition, when the casting channel is buried in the slab and the wall of the building is characterized in that the filling of the mortar inflow preventing member in the interior space of the main body.
상기 케스팅 채널이 건물의 슬라브에 매립 설치된 경우 상기 본체의 공간부에 충진된 모르타르 유입방지 부재를 제거하고, 그 내부에 머리부가 걸려지도록 "T"자형 볼트를 설치하고, 상기 케스팅 채널의 상부로 종단면이 "ㄴ"자 형상을 갖는 패스너를 위치시킨 후 볼트에 너트를 결합하여 패스너를 케스팅 채널에 고정 설 치한 것을 특징으로 한다.When the casting channel is buried in the slab of the building, the mortar inflow prevention member filled in the space part of the main body is removed, and a “T” shaped bolt is installed so that the head is caught in the interior thereof, and the longitudinal section is located above the casting channel. After positioning the fastener having the "b" shape, it is characterized in that the fastener is fixedly installed in the casting channel by coupling the nut to the bolt.
한편, 상기 케스팅 채널에 고정바나, 패스너 또는 고정편을 구비한 사각 봉형 유닛 연결겸 고정바를 볼트와 너트로 고정할 때 사용되는 와셔의 배면과 상기 패스너의 물체 접촉면에는 각각 미끄럼방지 및 너트 풀림 방지돌기를 더 구비시킨 것을 특징으로 한다.On the other hand, the back of the washer and the object contact surface of the fastener used to secure the square bar unit connection and fixing bar having a fixing bar, a fastener or a fixing piece to the casting channel with bolts and nuts, respectively, the anti-slip and nut loosening projections Characterized in that further provided.
그리고, 상기 석재패널 시공유닛 사이의 틈새에는 줄눈용 가스켓을 삽입 설치한 것을 특징으로 한다.In addition, the gap between the stone panel construction unit is characterized in that the joint gasket is inserted.
이상에서 설명한 바와 같이 본 발명에 의하면, 건축물의 내외장재로 널리 사용되고 있는 석재패널을 15㎜-12㎜로 얇은 것을 사용할 수 있도록 함은 물론 그 면적은 매우 넓게 제작하되, 석재패널의 4 측면에는 프레임 결합홈을 연이어 형성하고 유닛 연결겸 고정바 결합홈을 일체로 구비하도록 알루미늄으로 압출 성형한 외곽 프레임을 사각틀 형태로 결합 고정하여 석재패널 시공유닛을 형성하고, 이들 석재패널 시공유닛들의 연결부위는 사각 고정바를 통해 상호 연결하되 필요에 따라서는 연결부위에 "T"형 유닛 연결겸 고정바를 설치하여 석재패널 시공유닛들을 상호 연결함과 동시에 해당 부위를 건물에 고정 설치된 케스팅 채널에 고정할 수 있도록 하며, 석재패널 시공유닛들의 상,하부는 "ㄴ"자형 고정바를 통해 슬라브의 상하부에 고정 설치된 케스팅 채널 또는 패스너에 고정하는 방식을 통해 커튼 월(curtain wall) 형태의 건축물 내,외벽 형성용 석재패널 시공유닛을 시공할 수 있도록 함으 로써 첫째 건축물의 내외장 시공에 따른 인건비와 시공비를 대폭 줄일 수 있고, 둘째 자원을 절약할 수 있으며, 셋째 건물을 경량화할 수 있고, 건물 구조체 자체의 손상을 방지할 수 있고, 넷째 신축되는 건축물 자체의 공기(工期)를 대폭 단축할 수 있으며, 다섯째 공장에서 석재패널 유닛 자체를 제작함으로 인해 신축 공사장에서의 분진 발생 및 산업 폐기물의 발생을 미연에 방지할 수 있고, 여섯째 시공시 비계의 설치가 불필요함은 물론 용접 등과 같은 후 작업이 필요 없으며, 일곱째 시공 후 석재의 세척 등과 같은 후 작업이 전혀 필요 없는 등 매우 유용한 발명인 것이다. As described above, according to the present invention, it is possible to use a thin stone panel widely used as interior and exterior materials of the building to 15mm-12mm, as well as to manufacture a very wide area, but the frame is coupled to the four sides of the stone panel Form the grooves in series, and connect and fix the outer frame extruded from aluminum to form a square frame in order to have unit connection and fixing bar coupling grooves integrally to form a stone panel construction unit, and the connection portion of these stone panel construction units is square fixing Interconnect through the bars, but if necessary, install a "T" type unit connection and fixing bar at the connection part to connect the stone panel construction units and to fix the part to the casting channel fixed to the building. The upper and lower parts of the panel construction units are fixed to the upper and lower parts of the slab through the “b” shaped fixing bar. By fixing to the channel or fastener, it is possible to construct the stone panel construction unit for forming the curtain wall (curtain wall) and the exterior wall, so that the labor and construction costs can be greatly reduced according to the interior and exterior construction of the building. Second, it can save resources, third can lighten the building, prevent damage to the building structure itself, fourth, can greatly reduce the air of the new building itself, and the fifth stone in the factory By producing the panel unit itself, it is possible to prevent dust generation and industrial waste generation in the new construction site, and it is not necessary to install the scaffolding during the sixth construction, and also do not need post-work such as welding. It is a very useful invention, such as no post-working, such as washing at all.
이하, 첨부된 도면을 참조하여 본 발명에 따른 바람직한 실시 예를 상세히 설명하면 다음과 같다. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도 3은 본 발명 중 석재패널 시공유닛의 분해 사시도이고, 도 4는 본 발명 석재패널 시공구조의 분해 사시도이며, 도 5는 본 발명에서 사용된 케스팅 채널과 스패너 및 이들을 고정해 주는 볼트와 너트의 일부 절취 분해 사시도이고, 도 6은 도 4의 Ⅳ-Ⅳ선 절취 단면도이다.Figure 3 is an exploded perspective view of the stone panel construction unit of the present invention, Figure 4 is an exploded perspective view of the stone panel construction structure of the present invention, Figure 5 is a cast channel and spanner used in the present invention of the bolt and nut fixing them Partly cutaway exploded perspective view, FIG. 6 is a cross-sectional view taken along line IV-IV of FIG. 4.
또, 도 7은 본 발명에서 사용된 케스팅 채널은 슬라브 상면에 매립 설치한 상태를 보인 요부 절취 확대 단면도이고, 도 8과 도 9는 본 발명을 이용하여 슬라브와 슬라브 사이의 층간 외벽을 시공한 상태를 보인 측단면도이고, 도 10은 본 발명을 이용하여 슬라브와 슬라브 사이의 층간 외벽 및 내벽을 시공한 상태를 보인 측단면도이며, 도 11은 본 발명을 이용하여 실내의 벽체 내벽을 시공한 상태를 보인 측단면도이고, 도 12는 본 발명을 이용하여 실내의 칸막이를 시공한 상태를 보인 측단면도이다.In addition, Figure 7 is an enlarged cross-sectional view showing the state of the cast channel used in the present invention buried in the upper surface of the slab, Figure 8 and Figure 9 is a state in which the interlayer outer wall between the slab and the slab is constructed using the present invention Figure 10 is a side cross-sectional view, Figure 10 is a side cross-sectional view showing a state of constructing the interlayer outer wall and the inner wall between the slab and the slab using the present invention, Figure 11 is a state in which the interior wall of the room was constructed using the present invention Figure 12 is a side cross-sectional view, Figure 12 is a side cross-sectional view showing a state in which a room partition is constructed using the present invention.
또한, 도 13은 사각 봉형 유닛 연결겸 고정바를 이용하여 석재패널 유니트들을 연결시킨 상태를 보인 요부 확대 단면도이고, 도 14는 사각 봉형 유닛 연결겸 고정바를 이용하여 석재패널 유니트들을 상호 연결시켜 줌과 동시에 그에 돌출 형성시킨 고정편을 이용하여 이들을 벽체에 고정시킨 상태를 보인 요부 확대 단면도이며, 도 15 및 도 16은 사각 봉형 유닛 연결겸 고정바를 이용하여 석재패널 유니트들을 상호 연결시켜 줌과 동시에 그에 돌출 형성시킨 고정편을 이용하여 이들을 슬라브 측면 및 상면에 고정시킨 상태를 보인 요부 확대 단면도를 나타낸 것이다.13 is an enlarged cross-sectional view showing main parts of the stone panel units connected by using the rectangular bar unit connection and fixing bar, and FIG. 14 simultaneously connects the stone panel units using the rectangular bar unit connection and fixing bar. It is an enlarged cross-sectional view of the main portion showing the state of fixing them to the wall by using a fixing piece protruding to it, Figures 15 and 16 are connected to the stone panel units using a rectangular bar-shaped unit connection and fixing bar to interconnect and at the same time forming a protrusion The enlarged sectional view of the main part showing the state which fixed these to the slab side surface and the upper surface using the said fixed piece is shown.
이에 따르면 본 발명은, 한 장의 단위 석재패널(10) 또는 다수의 단위 석재패널(10)을 각각 인접하게 배치하고 프레임을 통해 하나의 석재패널 시공유닛(100)으로 형성하고, 이를 건축물의 내,외측에 커튼 월 형태로 시공하는 건축물의 내외장용 석재패널 시공구조에 있어서,According to the present invention, one
4 측면에 프레임 결합홈(11)이 연이어 형성된 단위 석재패널(10)과, 전면부로 수직하게 돌출되어 상기 단위 석재패널(10)의 측면 일부를 감싸주는 날개(121)의 내측에 상기 단위 석재패널(10)의 프레임 결합홈(11)에 끼워져 걸려지는 걸림편(122)이 돌출 형성되고 상기 날개(121)의 후방부로는 유닛 연결겸 고정바 결합홈(124)과 연결구 삽입홈(125)을 일체로 구비한 "ㄷ"자형 결합구(123)가 구비된 구성을 갖고 상기 단위 석재패널(10)의 4 측면에 결합되는 외곽 프레임(12) 및, 서로 인접된 외곽 프레임(12)의 연결구 삽입홈(125)에 각각 양단부가 끼워진 형태에서 고정구(126)를 통해 외곽 프레임(12)의 "ㄷ"자형 결합구(123)에 일체로 고정설치되어 외곽 프레임(12) 자체가 단위 석재패널(10)의 4 측면에 사각 틀체 형상으로 고정 설치되도록 하는 수개의 "ㄱ"자형 연결구(13);를 구비하고 실제 건물의 내외장재로 시공되는 석재패널 시공유닛(100)과;The
상기 석재패널 시공유닛(100)의 외곽 프레임(12)에 형성된 유닛 연결겸 고정바 결합홈(124)에 끼워져 결합되는 사각 결합봉(201)과, 상기 사각 결합봉(201)의 어느 일면에서 후방부를 향해 연장 형성된 고정편(202)을 구비하고 상기 석재패널 시공유닛(100)의 상면과 저면 또는 양측면에 각각 대향되게 설치되어 석재패널 시공유닛(100) 자체를 건물의 벽체(31)나 슬라브(30)에 설치된 케스팅 채널(300)에 패스너(400)와 볼트(61) 및 너트(62)를 통해 고정 설치해 주는 수개의 고정바(200)와;
건물의 벽체(31)나 슬라브(30)에 매립 또는 엥커 볼트(60)를 통해 고정 설치되어 상기 석재패널 시공유닛(100)에 결합된 고정바(200)가 패스너(400)와 볼트(61) 및 너트(62)를 통해 고정되도록 하는 방식을 통해 석재패널 시공유닛(100) 자체가 건물의 외벽 또는 내벽에 고정된 상태를 유지하도록 하는 수개의 케스팅 채널(300)과;The fixing
상기 케스팅 채널(300)과 고정바(200) 사이를 볼트(61)와 너트(62)를 통해 상호 결합시킬 수 있도록 하는 수개의 패스너(400);를 포함하는 것을 특징으로 한다.And a plurality of
또, 필요에 따라서는 하나의 건물 벽체(31)에 여러 개의 석재패널 시공유닛(100)을 좌,우,상,하부로 선택적 또는 연이어 설치할 경우, 서로 인접된 상기 석재패널 시공유닛(100)의 외곽 프레임(12)에 형성된 유닛 연결겸 고정바 결합홈(124)에 상,하부 또는 양측이 절반씩 끼워지게 삽입 설치되어 서로 인접된 석재패널 시공유닛(100)들을 상호 결합시켜 주는 사각 봉형 유닛 연결겸 고정바(500);를 더 포함하는 것을 특징으로 한다.In addition, when a plurality of stone
이때, 상기 사각 봉형 유닛 연결겸 고정바(500)의 배면 중심선 상에서 수평방향으로는 필요에 따라 석재패널 시공유닛(100)들의 결합부를 건물의 벽체(31)나 슬라브(30)에 설치된 케스팅 채널(300)에 패스너(400)와 볼트(61) 및 너트(62)를 통해 고정 설치해 줄 수 있는 고정편(501)을 더 돌출되게 설치한 것을 특징으로 한다.At this time, in the horizontal direction on the back center line of the rectangular bar-shaped unit connecting and fixing
또한, 상기 석재패널 시공유닛(100)의 외곽 프레임(12)에 구비된 "ㄷ"자형 결합구(123)의 후방 내측에는 단열재 및 차음재 이탈 방지돌기(127)를 더 형성하여, 필요에 따라서는 상기 석재패널 시공유닛(100)의 배면에 단열재 또는 차음재(110)를 더 설치할 수 있도록 한 것을 특징으로 한다.In addition, the rear inner side of the "c" -shaped
그리고, 상기 단위 석재패널(10)은 그 두께가 15㎜ -12㎜를 갖는 것으로, 그의 전면부에는 보호용 필름(120)을 탈거 가능하게 부착 설치한 것을 특징으로 한다.The
한편, 상기 케스팅 채널(300)은 종단면이 'ㄷ"자 형상을 갖도록 절곡 형성된 본체(301)의 개구부 양단부에서 내측으로 한 쌍의 경사 걸림편(302)을 일체로 구비 시킨 것을 특징으로 한다.On the other hand, the casting
이때, 상기 케스팅 채널(300)의 내부에 삽입 설치되는 볼트(61)는 머리부 양측에 케스팅 채널(300)의 경사 걸림편(302)이 끼워져 걸려지는 걸림홈(611)을 구비한 "T"자 형상을 갖는 것을 특징으로 하고, 또 너트(64)는 상면 양측에 케스팅 채널(300)의 경사 걸림편(302)이 끼워져 걸려지는 걸림홈(641)이 구비되고 저면에는 스프링(642)이 일체로 설치된 형태에서 평단면이 평행사변형의 형상을 갖는 것임을 특징으로 한다.At this time, the
또, 건물의 슬라브(30) 및 벽체(31)에 매립 설치되는 케스팅 채널(300)의 경우, 본체(301)의 저면에 건물의 철근(32)에 그 단부를 직접 용접하거나 철사로 고정시킬 수 있는 수개의 고정봉(303)을 더 설치한 것을 특징으로 한다.In addition, in the case of the casting
또한, 상기 케스팅 채널(300)을 건물의 슬라브(30) 및 벽체(31)에 매립 설치할 때 본체(301)의 내부 공간에 모르타르 유입방지 부재(304)를 충진시켜 모르타르를 포함한 이물질이 케스팅 채널(300)의 본체(301) 내부 공간부로 유입되는 것을 방지할 수 있도록 한 것을 특징으로 한다.In addition, when the casting
이와 같은 구성을 갖는 상기 케스팅 채널(300)이 건물의 슬라브(30)에 매립 설치된 경우, 상기 본체(301)의 공간부에 충진된 모르타르 유입방지 부재(304)를 제거하고, 그 내부에 머리부가 걸려지도록 "T"자형 볼트(61)를 설치하며, 이후 상기 케스팅 채널(300)의 상부로 종단면이 "ㄴ"자 형상을 갖는 패스너(400)를 위치시킨 다음 볼트(61)에 너트(62)를 결합하여 패스너(400)를 케스팅 채널(300)에 고정 설치한 것을 특징으로 한다.When the casting
한편, 상기 케스팅 채널(300)에 고정바(200)나, 패스너(400) 또는 고정편(501)을 구비한 사각 봉형 유닛 연결겸 고정바(500)를 볼트(61)와 너트(62)로 고정할 때 사용되는 와셔(63)의 배면과 상기 패스너(400)의 물체 접촉면에는 각각 미끄럼방지 및 너트 풀림 방지돌기(631)(401)를 더 구비시킨 것을 특징으로 한다.Meanwhile, a square bar unit connection and fixing
그리고, 상기 석재패널 시공유닛(100) 사이에 형성되는 틈새에는 줄눈용 가스켓(700)을 삽입 설치한 것을 특징으로 한다.In addition, the gap formed between the stone
이와 같이 구성된 본 발명에 대한 작용효과를 설명하면 다음과 같다. Referring to the effects of the present invention configured as described above are as follows.
먼저, 본 발명은 석재패널 시공유닛(100)과 수개의 고정바(200), 수개의 케스팅 채널(300) 및 수개의 패스너(400)로 건축물의 내외장용 석재패널 시공구조를 형성한 것을 주요기술 구성요소로 한다.First, the present invention is a stone
이때, 상기 석재패널 시공유닛(100)은 도 3과 같이 단위 석재패널(10)과 외곽 프레임(12) 및 수개의 "ㄱ"자형 연결구(13)를 상호 결합하여 형성된 구성을 갖게 된다.At this time, the stone
상기에 있어서 단위 석재패널(10)의 두께는, 석재패널의 후면부에 너트를 매설하고 이에 볼트를 체결하는 방식을 통해 프레임을 고정 설치하기 위하여 필히 30㎜ 이상의 두께를 가져야 했던 종래의 트러스 시공방법과 달리 너트의 매설 없이 석재패널(10)의 외주면에 외곽 프레임(12)을 고정 설치하는 방식을 채택함으로써 15㎜ -12㎜의 두께만 가져도 되어 자원을 절약할 수 있고, 건물을 경량화할 수 있음은 물론 건물 구조체 자체의 손상을 방지할 수 있다.In the above, the thickness of the
이와 같은 단위 석재패널(10)의 4 측면에서 길이방향으로는 프레임 결합 홈(11)이 연이어 형성된 구성을 갖는다.The four side surfaces of the
뿐만 아니라, 상기 단위 석재패널(10)을 이용하여 석재패널 시공유닛(100)을 제작하는 과정 또는 이를 운반하거나, 이를 이용하여 건물의 내장 또는 외장을 시공하는 과정에서 단위 석재패널(10) 자체에 흠집이 발생하거나 각종 이물질 등이 부착될 우려가 있으므로 본 발명에서는 상기 단위 석재패널(10)의 전면부에 보호용 필름(120)을 더 부착시켜 건물의 내,외장 시공 완료 후 이를 탈거시킬 수 있도록 함으로써 시공 후 석재의 세척 등과 같은 후 작업이 전혀 필요 없게 된다.In addition, in the process of manufacturing the stone
또, 상기 외곽 프레임(12)은 기본적으로 그 무게가 적게 나가도록 함과 동시에 습기에 의해 녹이 슬게 되는 것을 방지하기 위해 알루미늄으로 압출 성형한 것으로, 전면부로 수직하게 돌출되어 상기 단위 석재패널(10)의 측면 일부를 감싸주는 날개(121)의 내측에 상기 단위 석재패널(10)의 프레임 결합홈(11)에 끼워져 걸려지는 걸림편(122)이 돌출 형성되고, 상기 날개(121)의 후방부로는 유닛 연결겸 고정바 결합홈(124)과 연결구 삽입홈(125)을 일체로 구비한 "ㄷ"자형 결합구(123)가 형성된 구성을 갖는다.In addition, the
뿐만 아니라, 필요에 따라서는 상기 외곽 프레임(12)의 "ㄷ"자형 결합구(123) 후방 내측에 단열재 및 차음재 이탈 방지돌기(127)를 더 구비시켜, 상기 석재패널 시공유닛(100)의 단위 석재패널(10) 배면에 단열재 또는 차음재(110)를 더 설치할 수 있도록 한 구성을 갖는다.In addition, if necessary, further provided with a heat insulating material and a sound insulating material
또한, 상기 "ㄱ"자형 연결구(13)는 단위 석재패널(10)의 4 측면에 결합되는 외곽 프레임(12)들 중 서로 인접된 외곽 프레임(12)의 연결구 삽입홈(125)에 각각 양단부가 끼워진 형태에서 스크류나 에어총에 의해 발사되는 못 등과 같은 고정구(126)를 통해 외곽 프레임(12)의 "ㄷ"자형 결합구(123)에 일체로 고정설치되어 외곽 프레임(12) 자체가 단위 석재패널(10)의 4 측면에 사각 틀체 형상(예를 들어 사진틀 형상)으로 고정 설치되도록 하는 기능을 하게 된다.In addition, the "a" shaped
한편, 상기 고정바(200)는 도 4와 같이 석재패널 시공유닛(100)의 외곽 프레임(12)에 형성된 유닛 연결겸 고정바 결합홈(124)에 끼워져 결합되는 사각 결합봉(201)과, 상기 사각 결합봉(201)의 어느 일면에서 후방부를 향해 연장 형성된 고정편(202)을 구비하고 상기 석재패널 시공유닛(100)의 상면과 저면 또는 양측면에 각각 대향되게 설치되어 석재패널 시공유닛(100) 자체를 건물의 벽체(31)나 슬라브(30)에 설치된 케스팅 채널(300)에 패스너(400)와 볼트(61) 및 너트(62)를 통해 고정 설치해 줄 수 있도록 하는 기능을 수행하게 된다.On the other hand, the fixed
또, 상기 케스팅 채널(300)은 도 5와 같이 종단면이 'ㄷ"자 형상을 갖도록 철판을 절곡 형성한 본체(301)의 개구부 양단부에서 내측으로 한 쌍의 경사 걸림편(302)을 일체로 구비시킨 구성을 갖는 것으로, 이와 같은 케스팅 채널(300)은 건물의 시공시 석재패널 시공유닛(100)의 크기 등을 감안하여 벽체(31)나 슬라브(30) 자체에 적절한 형태로 매립 설치하거나 또는 이미 시공된 건물의 벽체(31)나 슬라브(30)에 엥커 볼트(60)를 통해 고정 설치하고, 상기 석재패널 시공유닛(100)에 결합되는 고정바(200)가 패스너(400)와 볼트(61) 및 너트(62)를 통해 고정되도록 하는 방식을 통해 석재패널 시공유닛(100) 자체가 건물의 외벽 또는 내벽에 고정된 상태를 유지하도록 하는 기능을 수행하게 된다.In addition, the casting
이때, 상기 케스팅 채널(300)을 건물의 슬라브(30) 및 벽체(31)를 콘크리트로 타설할 때 매립 설치하기 위하여, 필요에 따라서는 상기 케스팅 채널(300)의 본체(301) 저면에 건물의 철근(32)에 단부를 직접 용접하거나 철사로 고정시킬 수 있는 도 5와 같이 수개의 고정봉(303)을 더 설치하여 주는 것이 바람직하다.At this time, in order to install the
또한, 상기 케스팅 채널(300)을 건물의 슬라브(30) 및 벽체(31)에 매립 설치할 때 모르타르를 포함한 이물질이 케스팅 채널(300)의 본체(301) 내부 공간부로 유입될 우려가 있으므로, 상기 케스팅 채널(300)의 본체(301)의 내부 공간에는 모르타르의 타설에 앞서 도 7과 같이 모르타르 유입방지 부재(304)를 충진시켜 주는 것이 바람직하다.In addition, when the casting
물론, 상기와 같은 구성을 갖는 상기 케스팅 채널(300)이 건물의 슬라브(30) 또는 벽체(31)에 매립 설치된 경우, 이에 "ㄴ"자 형상을 갖는 패스너(400) 등을 고정 설치하고자 할 때에는 상기 본체(301)의 공간부에 충진되어 있는 모르타르 유입방지 부재(304)를 제거하고, 도 5에 도시된 바와 같이 본체(301)의 내부에 "T"자형 볼트(61) 또는 평행사변형 너트(64)를 설치한 다음 상기 케스팅 채널(300)의 상부로 종단면이 "ㄴ"자 형상을 갖는 패스너(400)를 위치시킨 후 볼트(61)에 너트(62)를 체결하거나 평행사변형 형상을 갖는 너트(64)에 볼트(61)를 상호 결합하여 패스너(400)를 케스팅 채널(300)에 고정 설치하면 된다.Of course, when the casting
또, 상기한 패스너(400)는 케스팅 채널(300)과 고정바(200) 사이를 볼트(61)와 너트(62)를 통해 상호 결합시킬 수 있도록 하는 기능을 수행한다.In addition, the
한편, 하나의 건물 벽체(31) 내측 또는 외측에 석재패널 시공유닛(100)을 설 치하는 방법으로는 슬라브(30)와 슬라브(30) 사이에 비교적 큰 면적을 갖도록 제작한 단일 석재패널 시공유닛(100)을 설치할 수도 있고, 필요에 따라서는 여러 개의 석재패널 시공유닛(100)을 좌,우,상,하부로 선택적 또는 연이어 설치할 수도 있는데, 이와 같이 여러 개의 석재패널 시공유닛(100)을 이용하여 건물의 내장 또는 외장을 시공할 경우 서로 인접된 상기 석재패널 시공유닛(100)의 외곽 프레임(12)에 형성된 유닛 연결겸 고정바 결합홈(124)에 상,하부 또는 양측이 절반씩 끼워지게 삽입 설치하여 서로 인접된 석재패널 시공유닛(100)들을 상호 결합시켜 줄 수 있도록 하는 사각 봉형 유닛 연결겸 고정바(500)를 사용하면 된다.On the other hand, as a method of installing the stone
이와 같이 상기 유닛 연결겸 고정바(200)를 단순히 사각 봉 형상으로만 형성할 경우 서로 인접된 석재패널 시공유닛(100)들을 상호 결합시켜 주는 기능만 수행할 뿐 해당 연결부위를 고정시킬 수 없으므로, 필요에 따라서는 상기 사각 봉형 유닛 연결겸 고정바(500)의 배면 중심선 상에서 수평방향으로는 고정편(501)을 더 돌출되게 설치하여 석재패널 시공유닛(100)들의 결합부를 건물의 벽체(31)나 슬라브(30)에 설치된 케스팅 채널(300)에 패스너(400)와 볼트(61) 및 너트(62)를 통해 고정 설치해 줄 수 있도록 하는 것이 바람직하다.As such, when the unit connection and fixing
한편, 상기에 있어서 상기 케스팅 채널(300)의 내부에 삽입 설치되는 볼트(61)는 일반적은 육각 머리를 볼트를 사용하지 않고 케스팅 채널(300)의 경사 걸림편(302) 사이에 형성된 틈을 통해 볼트(61)의 머리부를 손쉽게 본체(301) 내로 삽입 또는 본체(301)의 내부로부터 분리시킬 수 있도록 하기 위하여 머리부 양측에 케스팅 채널(300)의 경사 걸림편(302)이 끼워져 걸려지는 걸림홈(611)을 구비한 "T"자형 볼트를 사용하게 되고, 또 너트(64) 역시 상면 양측에 케스팅 채널(300)의 경사 걸림편(302)이 끼워져 걸려지는 걸림홈(641)이 구비되고 저면에는 너트(62) 자체의 회동 및 이탈을 방지하기 위하여 탄성력을 발생시켜 주는 스프링(642)이 일체로 설치된 형태에서 평단면이 평행사변형의 형상을 갖는 너트(64)를 사용하였다.On the other hand, the
또한, 상기 케스팅 채널(300)에 고정바(200)나, 패스너(400) 또는 고정편(501)을 구비한 사각 봉형 유닛 연결겸 고정바(500)를 볼트(61)와 너트(62)로 고정할 때에는 너트(62)의 풀림을 방지하기 위하여 와셔(63)를 사용하게 되는데, 이와 같은 와셔(63)의 배면을 포함하여 상기 패스너(400)의 물체 접촉면에 도 5와 같이 각각 미끄럼방지 및 너트 풀림 방지돌기(631)(401)를 더 구비시켜 줌으로써 외부의 강한 충격에도 너트(62)의 풀림을 완벽히 방지할 수 있음은 물론 고정바(200)나, 패스너(400) 또는 고정편(202)(501)의 위치변화를 완벽히 방지할 수 있다.In addition, a square bar unit connection and fixing
그리고, 상기 석재패널 시공유닛(100) 사이에 형성되는 틈새 즉, 서로 인접된 석재패널 시공유닛(100)의 두 외곽 프레임(12) 두께에 대응하는 폭을 갖는 틈새에는 종래와 같이 실란트를 충진시키지 않고 줄눈용 가스켓(700)을 삽입 설치하여 줌으로써 석재패널 시공유닛(100)을 이용한 건물의 내장 또는 외장을 시공한 후 석재의 세척 등과 같은 후 작업이 전혀 필요 없음은 물론 장기간 경과 되어도 줄 눈이 오염되는 것을 미연에 방지할 수 있다.And, the gap formed between the stone
또, 상기에 있어서 고정바(200)나 패스너(400), 사각 봉형 유닛 연결겸 고정바(500) 및 케스팅 채널(300)은 녹이 잘 슬지 않는 아연도강판으로 절곡 성형하여 도 무방하나, 무게 등을 감안하여 볼 때 알루미늄재로 성형하는 것이 더 바람직하다.In addition, in the above, the fixing
한편, 이와 같은 본 발명을 이용하여 건축물의 내장 또는 외장을 시공하는 방법은 다음과 같다.On the other hand, the method of constructing the interior or exterior of the building using the present invention as follows.
먼저, 공장에서는 두께가 15㎜ -12㎜를 갖는 원판 석재를 다이아몬드 톱날을 이용하여 절단하여 원하는 면적을 갖는 석재패널(10)로 절단함은 물론 해당 석재패널(10)의 4 측면에 프레임 결합홈(11)을 형성하는 한편, 알루미늄재로 기 압출 성형된 프레임을 상기에서 절단한 석재패널(10)의 가로 및 세로 폭에 대응하여 길이로 절단한다.First, in a factory, a disc stone having a thickness of 15 mm -12 mm is cut using a diamond saw blade to cut a
이후, "ㄱ"자형 연결구(13)와 스크류나 에어총에 의해 발사되는 못 등과 같은 고정구(126)를 이용하여 상기 석재패널(10)의 외주면에 외곽 프레임(12)을 사각 틀체 형태로 고정 설치하여 석재패널 시공유닛(100)들을 제조 완료하게 된다.Thereafter, the
이와 같이 제조 완료된 상기 석재패널 시공유닛(100)들을 화물차 등을 이용하여 현장으로 운반하면 된다.Thus, the manufactured stone
한편, 상기 석재패널 시공유닛(100)을 이용하여 내장 또는 외장을 장식하고자 하는 건물이 신축현장일 경우에는 건물의 바닥공사나 슬라브 공사 또는 벽체 공사를 실시하고자 할 때 모르타르 타설에 앞서 고정봉(303)을 구비한 케스팅 채널(300)들을 석재패널 시공유닛(100)의 면적 등을 감안하여 적절히 배치한 후 건물의 철근(32)에 고정 설치한 다음 모르타르를 타설하여 케스팅 채널(300) 자체가 건물의 바닥이나 슬라브 또는 벽체에 매설되도록 하고, 리모델링 건물의 경우는 엥커 볼트(60)를 이용하여 상기 케스팅 채널(300)들을 설치하고자 하는 석재패널 시공유닛(100)의 면적 등을 감안하여 적절히 배치하고 이를 고정시켜 주면 된다.On the other hand, if the building to decorate the interior or exterior using the stone
이후, 상기 케스팅 채널(300)들 중 최하단에 위치되는 케스팅 채널(300)에는 시공하고자 하는 석재패널 시공유닛(100)들의 저면 기준선을 잡기 위하여 사각 결합봉(201)과 고정편(201)으로 구성된 고정바(200)를 패스너(400)와 볼트 및 너트(62)를 이용하여 "ㄴ"자 형태로 고정 설치하여 준다.Subsequently, the casting
또한, 설치하고자 하는 석재패널 시공유닛(100)이 신축 건물의 외벽일 경우에는 도 8 내지 도 10과 같이 건물의 슬라브(30) 상면에 매설한 케스팅 채널(300)에 "T"형 볼트(61)와 너트(62)를 이용하여 석재패널 시공유닛(100)의 상면부를 고정바(200)를 통해 고정시켜 주기 위한 패스너(400)를 고정 설치해 주고, 설치하고자 하는 석재패널 시공유닛(100)이 리모델링 건물의 외벽이거나 신축 또는 리모텔링 건축물에 무관하게 내벽인 경우 또는 칸막이로 시공할 경우 도 10 내지 도 12와 같이 슬라브(30)의 천정면에 구비된 데코에 패스너(400)를 용접 설치하거나, 슬라브(30)의 천정면이나 벽체(31) 또는 바닥면의 엥커 볼트(60)를 이용하여 케스팅 채널(300)이나 패스너(400)를 직접 고정 설치 또는 기 설치되어 있는 케스팅 채널(300)에 패스너(400)를 고정 설치해 둔다.In addition, when the stone
이와 같이 수개의 케스팅 채널(300) 또는 패스너(400)의 설치가 완료되면 공장에서 제조되어 운반되어 온 상기 석재패널 시공유닛(100)들을 기중기 등을 이용하여 들어올려 시공하고자 하는 벽체 등으로 이동시킨 후, 석재패널 시공유닛(100)의 외곽 프레임(12)의 하방부에 형성된 유닛 연결겸 고정바 결합홈(124)에 상기에 서 기 설치해 놓은 벽체(31) 저부의 고정바(200) 사각 결합봉(201)이 끼워지도록 결합한 다음, 석재패널 시공유닛(100)을 세워 그의 외곽 프레임(12)의 상방부에 형성된 유닛 연결겸 고정바 결합홈(124)에 고정바(200)의 사각 결합봉(201)을 결합시켜 고정바(200) 자체가 전술한 저부 고정바(200)와 반대방향으로 결합(즉, "「"형태로 결합)되도록 하고 상기 고정바(200)의 고정편(202)을 패스너(400)와 볼트 및 너트(62)를 이용하여 벽체(31) 상부 또는 슬라브(30) 상에 고정 설치되어 있는 케스팅 채널(300)이나 패스너(400)에 고정시켜 주게 되면 하나의 석재패널 시공유닛(100) 설치가 완료된다.As such, when the installation of
한편, 건물의 슬라브(30) 사이가 높거나 벽체 자체가 넓어 하나의 석재패널 시공유닛(100)으로 해당 건물의 외장 또는 내장 시공이 완성되지 않아 여러 개의 석재패널 시공유닛(100)을 좌,우,상,하부로 선택적 또는 연이어 설치해야 할 경우에는, 전술한 바와 같이 벽체(31)의 저면에 위치되는 상기 석재패널 시공유닛(100)의 저면부를 "ㄴ"자 형태로 결합되는 고정바(200)와 패스너(400), 볼트(61) 및 너트(62)를 이용하여 벽체의 저면부에 고정 설치된 케스팅 채널(300)에 고정시킨 다음 그 상부나 좌,우측으로 위치되어 서로 인접되는 상기 석재패널 시공유닛(100)의 외곽 프레임(12)에 형성된 유닛 연결겸 고정바 결합홈(124)에는 각각 도 13과 같이 사각 봉형 유닛 연결겸 고정바(500)를 결합시켜 서로 인접된 석재패널 시공유닛(100)들을 상호 결합시켜 주면 된다.On the other hand, the
이때, 서로 인접된 상기 석재패널 시공유닛(100)들을 사이에 전술한 바와 같이 사각 봉형 유닛 연결겸 고정바(500)를 설치하여 상호 연결한 상태를 그대로 둘 경우 결합부에 충격이 가해질 경우 서로 인접된 석재패널 시공유닛(100)들을 전,후 방향으로 유동될 우려가 있으면, 상기 석재패널 시공유닛(100)의 외곽 프레임(12)에 일체로 형성된 "ㄷ"자형 결합구(123)의 배면에서 스크류나 에어총에 의해 발사되는 못 등과 같은 고정구를 체결시켜 유닛 연결겸 고정바 결합홈(124)에 끼워겨 결합된 사각 봉형 유닛 연결겸 고정바(500) 자체가 외곽 프레임(12)의 "ㄷ"자형 결합구(123)에 고정되도록 하게 되면 서로 인접된 석재패널 시공유닛(100)들이 상호 일체가 되므로 외부에서 충격력이 가해지더라도 결합부가 전,후방향으로 유동되지 않게 된다.At this time, when the stone
또한, 상기 석재패널 시공유닛(100)들이 비교적 넓은 면적을 갖거나, 서로 인접된 석재패널 시공유닛(100)들이 결합부위를 벽체(31)에 고정시키고자 할 때에는 상기 사각 봉형 유닛 연결겸 고정바(500)의 배면 중심선 상에서 수평방향으로는 고정편(501)을 더 돌출되게 형성시킨 사각 봉형 유닛 연결겸 고정바(500)를 석재패널 시공유닛(100)들의 결합부에 설치한 후 석재패널 시공유닛(100)의 배면부로 돌출된 상기 사각 봉형 유닛 연결겸 고정바(500)의 고정편(501)을 도 14 내지 도 16과 같이 건물의 벽체(31)나 슬라브(30)에 설치된 케스팅 채널(300) 또는 패스너(400)에 또 다른 패스너(400)와 볼트(61) 및 너트(62)를 통해 고정시켜 주게 되면 외부에서 어떠한 충격력이 가해지더라도 석재패널 시공유닛(100)들의 결합부가 유동 또는 분리되는 것 등을 완벽히 방지할 수 있다.In addition, when the stone
또, 상기 석재패널 시공유닛(100)을 건물의 외벽 등에 그대로 시공할 경우 외부의 공기온도와 배부의 공기온도 차에 의해 석재패널(10)의 내측에 결로가 발생 될 우려가 있음은 물론 건물의 내,외측 사이에서 방음이 이루어지지 않아 소음으로 인한 실내외 공간의 생활환경에 악영향을 미칠 우려가 있다.In addition, when the stone
따라서, 상기 석재패널 시공유닛(100)을 건물의 외벽 또는 내벽에 시공할 때에는 상기 석재패널 시공유닛(100)들을 건물의 외벽 또는 내벽에 시공하기에 앞서 상기 석재패널(10)의 배면부에 단열재 또는 차음재(110)를 부가 설치한 상태에서 시공하는 것이 바람직한데, 이때 상기 외곽 프레임(12)의 "ㄷ"자형 결합구(123) 후방 내측에는 단열재 및 차음재 이탈 방지돌기(127)가 구비되어 있으므로 상기 석재패널 시공유닛(100)의 단위 석재패널(10) 배면에 설치한 단열재 또는 차음재(110)가 석재패널 시공유닛(100)으로부터 분리되는 것을 방지할 수 있다.Therefore, when constructing the stone
이와 같은 시공 방법을 통해 건물의 외벽 또는 내벽에 석재패널 시공유닛(100)들의 설치 시공이 완료되면 석재패널 시공유닛(100)들의 틈새에 줄눈용 가스켓(700)을 삽입 설치한 다음 석재패널(10)의 전면부에 부착된 보호용 필름(120)를 떼어내면 모든 시공이 완료된다.After the installation of the stone
한편, 본 발명은 전술한 바와 같이 벽체(31)가 구비되지 않은 신축 건물은 물론 벽체(31) 자체가 처음부터 구비되도록 시공하는 신축 건물 및 벽체가 구비된 리모델링 건물의 내장 또는 외장에 모두 시공 가능함은 물론 건물 내에서 벽체가 구비되지 않은 부분에 도 12와 같은 형태로 설치하여 칸막이처럼 시공도 가능하다.On the other hand, the present invention can be installed both in the interior or exterior of the new building and the remodeling building provided with the wall as well as the new building without the
예를 들어 벽체(31)가 구비되지 않은 신축 건물의 경우 석재패널(10)의 배면에 단열재 또는 차음재(110)가 설치되어 있는 석재패널 시공유닛(100)들을 도 8 및 도 9와 같이 슬라브(30)와 슬라브(30) 사이의 외장재로만 설치할 수도 있고, 또 도 10과 같이 내,외장재로 모두 설치할 수도 있는데, 전술의 경우는 외장재로 석재패널 시공유닛(100)을 설치한 후 그 내측에 벽돌 등을 이용하여 별도의 벽체 시공을 하고 필요에 따라 단열 및 차음 공사를 더 실시하면 되고, 후자의 경우는 내,외장재를 서로 일정간격을 두고 설치하게 되면 석재패널(10)의 배면에 단열재 또는 차음재(110)가 설치된 상태에서 내,외장재로 각각 설치된 석재패널 시공유닛(100)들 사이에 공기층이 형성되므로 이 공기층이 단열 및 차음 기능을 수행하게 되므로 별도의 벽체 공사나 단열 및 차음 공사를 실시하지 않아도 내,외장재로 각각 설치된 석재패널 시공유닛(100)들이 이들 기능까지 수행하게 된다.For example, in the case of a new building that is not provided with the
또, 벽체(31)가 구비된 신축 건물 또는 리모델링 건물의 경우 석재패널(10)의 배면에 단열재 또는 차음재(110)가 설치되어 있는 석재패널 시공유닛(100)들을 슬라브(30)와 슬라브(30) 사이의 외장재로만 설치할 수도 있고, 또 내,외장재로 모두 설치할 수도 있으며, 또한 도 11과 같이 건물 내의 벽체 일측 또는 양측에 시공할 경우에는 벽체의 내부 상태에 따라 석재패널(10)의 배면에 단열재 또는 차음재(110)를 설치 또는 설치하지 않은 상태에서 선택적으로 시공하면 된다.In addition, in the case of a new building or a remodeled building having a
뿐만 아니라, 벽체(31)가 구비되지 않은 신축 건물 또는 리모델링 건물에서 실내에 칸막이 공사가 필요할 경우 도 12와 같은 형태로 석재패널 시공유닛(100)들을 건물의 천정면과 바닥면 사이에 설치하여 칸막이 자체를 보다 미려하게 시공할 수도 있다.In addition, when a partition construction is required indoors in a new building or a remodeling building that is not provided with the
한편, 지금까지의 설명은 석재패널 시공유닛(100)을 이용하여 건축물의 내외장만을 시공하는 구조에 대해 설명하였으나, 이에 한정하는 것은 아니며, 동일한 구조물과 시공방법을 통해 건물의 천정면에 대한 내장시공도 가능한 것임은 당 분야에서 통상의 지식을 가진 자라면 누구라도 알 수 있는 바이다.On the other hand, the description so far has described a structure for constructing only the interior and exterior of the building using the stone
상술한 실시 예는 본 발명의 가장 바람직한 예에 대하여 설명한 것이지만, 상기 실시 예에만 한정되는 것은 아니며, 본 발명의 기술사상을 벗어나지 않는 범위 내에서 다양한 변형이 가능하다는 것은 당업자에게 있어서 명백한 것이다.It should be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined in the appended claims.
도 1은 종래 건축물 외장용 석재패널 시공구조의 요부 발취 분해 사시도.Figure 1 is an exploded perspective view of the main portion extraction of the conventional building stone panel construction structure.
도 2는 도 1의 결합상태 측단면도.Figure 2 is a side cross-sectional view of the coupled state of FIG.
도 3은 본 발명 중 석재패널 시공유닛의 분해 사시도.Figure 3 is an exploded perspective view of the stone panel construction unit of the present invention.
도 4는 본 발명 석재패널 시공구조의 분해 사시도.Figure 4 is an exploded perspective view of the stone panel construction structure of the present invention.
도 5는 본 발명에서 사용된 케스팅 채널과 스패너 및 이들을 고정해 주는 볼트와 너트의 일부 절취 분해 사시도.5 is an exploded perspective view of a portion of the casting channel and spanner used in the present invention and bolts and nuts securing them.
도 6은 도 4의 Ⅳ-Ⅳ선 절취 단면도.6 is a cross-sectional view taken along the line IV-IV of FIG. 4.
도 7은 본 발명에서 사용된 케스팅 채널은 슬라브 상면에 매립 설치한 상태를 보인 요부 절취 확대 단면도.Figure 7 is an enlarged cross-sectional view of the main portion cutting showing the state in which the casting channel used in the present invention is buried in the upper surface of the slab.
도 8과 도 9는 본 발명을 이용하여 슬라브와 슬라브 사이의 층간 외벽을 시공한 상태를 보인 측단면도.8 and 9 are side cross-sectional views showing a state in which the interlayer outer wall between the slab and the slab is constructed using the present invention.
도 10은 본 발명을 이용하여 슬라브와 슬라브 사이의 층간 외벽 및 내벽을 시공한 상태를 보인 측단면도.Figure 10 is a side cross-sectional view showing a state of constructing the interlayer outer wall and the inner wall between the slab and the slab using the present invention.
도 11은 본 발명을 이용하여 실내의 벽체 내벽을 시공한 상태를 보인 측단면도.Figure 11 is a side cross-sectional view showing a state in which the interior wall of the indoor construction using the present invention.
도 12는 본 발명을 이용하여 실내의 칸막이를 시공한 상태를 보인 측단면도.Figure 12 is a side cross-sectional view showing a state in which the construction of the room divider using the present invention.
도 13은 사각 봉형 유닛 연결겸 고정바를 이용하여 석재패널 유니트들을 연결시킨 상태를 보인 요부 확대 단면도.Figure 13 is an enlarged cross-sectional view showing the main part showing the state of connecting the stone panel units using a square bar unit connection and fixing bar.
도 14는 사각 봉형 유닛 연결겸 고정바를 이용하여 석재패널 유니트들을 상 호 연결시켜 줌과 동시에 그에 돌출 형성시킨 고정편을 이용하여 이들을 벽체에 고정시킨 상태를 보인 요부 확대 단면도.14 is an enlarged cross-sectional view showing main parts of a state in which stone panel units are connected to each other by using rectangular bar unit connection and fixing bars, and at the same time, fixing them to a wall using fixing pieces protruding from the stone panel units.
도 15 및 도 16은 사각 봉형 유닛 연결겸 고정바를 이용하여 석재패널 유니트들을 상호 연결시켜 줌과 동시에 그에 돌출 형성시킨 고정편을 이용하여 이들을 슬라브 측면 및 상면에 고정시킨 상태를 보인 요부 확대 단면도.15 and 16 are enlarged cross-sectional views of main parts showing the state in which the stone panel units are connected to each other by using a rectangular bar unit connection and fixing bar, and at the same time, they are fixed to the slab side and the upper surface by using a fixing piece protruding from the stone panel units.
* 도면의 주요 부분에 대한 부호의 설명 * Explanation of symbols on the main parts of the drawings
10 : 단위 석재패널 11 : 프레임 결합홈10: unit stone panel 11: frame coupling groove
12 : 외곽 프레임 13 : "ㄱ"자형 연결구12: the outer frame 13: "a" shaped connector
30 : 슬라브 31 : 벽체30: slab 31: wall
32 : 철근 60 : 엥커 볼트32: rebar 60: anchor bolt
61 : 볼트 62,64 : 너트61:
63 : 와셔 100 : 석재패널 시공유닛63: washer 100: stone panel construction unit
110 : 단열재 또는 차음재 120 : 보호용 필름110: insulation or sound insulation 120: protective film
121 : 날개 122 : 걸림편121: wing 122: hook
123 : "ㄷ"자형 결합구 124 : 유닛 연결겸 고정바 결합홈123: "ㄷ" shaped coupler 124: unit connection and fixed bar coupling groove
125 : 연결구 삽입홈 126 : 고정구125: connector insertion groove 126: fixture
127 : 단열재 및 차음재 이탈 방지돌기127: prevention of separation of insulation and sound insulation
200 : 고정바 201 : 사각 결합봉200: fixing bar 201: square coupling rod
202, 501 : 고정편 300 : 케스팅 채널202, 501: fixed piece 300: casting channel
301 : 본체 302 : 경사 걸림편301: main body 302: oblique locking piece
303 : 고정봉 304 : 모르타르 유입방지 부재303: fixing rod 304: mortar inflow prevention member
400 : 패스너 400: Fastener
401,631 : 미끄럼방지 및 너트 풀림 방지돌기401,631: Non-slip and nut loosening protrusion
500 : 사각 봉형 유닛 연결겸 고정바500: square bar unit connection and fixing bar
611, 641 : 걸림홈 642 : 스프링611, 641: locking groove 642: spring
700 : 줄눈용 가스켓700: joint gasket
Claims (14)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080033593A KR100993538B1 (en) | 2008-04-11 | 2008-04-11 | Construction structure of internal and external stone panels in buildings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080033593A KR100993538B1 (en) | 2008-04-11 | 2008-04-11 | Construction structure of internal and external stone panels in buildings |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090108258A KR20090108258A (en) | 2009-10-15 |
KR100993538B1 true KR100993538B1 (en) | 2010-11-12 |
Family
ID=41551678
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080033593A KR100993538B1 (en) | 2008-04-11 | 2008-04-11 | Construction structure of internal and external stone panels in buildings |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100993538B1 (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101272990B1 (en) | 2012-03-21 | 2013-06-10 | ㈜스트롱플러스 | L-type clip angle for installing alc panel to concrete slab using rocking construction method |
KR101273087B1 (en) | 2012-03-22 | 2013-06-10 | (주) 에스와이씨 | Method for installing alc panel to concrete slab |
WO2013141424A1 (en) * | 2012-03-21 | 2013-09-26 | (주)에스와이씨 | Method for installing alc panels by longitudinally wall locking construction |
KR101365137B1 (en) * | 2012-11-28 | 2014-02-18 | 정향임 | Removable stonework smoking room |
KR101469503B1 (en) * | 2014-04-15 | 2014-12-05 | 정기채 | External Metal Panel for Construction |
KR101500707B1 (en) * | 2014-05-29 | 2015-03-12 | 김윤수 | Exterior panel for buildings |
KR101546900B1 (en) * | 2014-05-29 | 2015-08-25 | 김윤수 | Method of manufacturing exterior panels for buildings |
WO2015182820A1 (en) * | 2014-05-29 | 2015-12-03 | 김윤수 | Building exterior panel and manufacturing method therefor |
KR101613300B1 (en) * | 2013-12-17 | 2016-04-18 | 주식회사 조은데코 | finishing panel fixing brakets and finishing apparatus with this |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101451673B1 (en) * | 2012-11-14 | 2014-10-16 | 이윤근 | A composite panel |
FR3033818B1 (en) * | 2015-03-20 | 2018-03-02 | Benoit Bertron | PLATE HEAT SHIELD |
KR102103626B1 (en) * | 2017-03-22 | 2020-04-22 | 이나영 | Assembly type panel frame and assembly type panel thereof |
CN108265934B (en) * | 2017-08-08 | 2024-01-23 | 傅明 | Decorative plate assembly |
TWI681100B (en) * | 2019-05-29 | 2020-01-01 | 陳奕帆 | Fixing mechanism and j-shaped fixing method for building wall materials |
KR102343376B1 (en) * | 2021-03-30 | 2021-12-24 | (주)셈텍 | Insulation Panel Structure Having Stone Material |
KR102343377B1 (en) * | 2021-03-30 | 2021-12-24 | (주)셈텍 | Insulation Panel Structure Having Stone Material |
WO2024055061A1 (en) * | 2022-09-13 | 2024-03-21 | Stonelake Pty. Ltd. | Wall module and façade assembly |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200312362Y1 (en) | 2003-02-20 | 2003-06-02 | 주식회사 미앤지산업 | A subframe for assambling the inner-outer panel and panel system |
KR200357096Y1 (en) | 2004-04-26 | 2004-07-21 | 이원우 | A finishing goods for architectural use |
KR100668112B1 (en) | 2005-08-05 | 2007-01-11 | 알루텍 (주) | Channel of assembly type casted in concrete structure |
-
2008
- 2008-04-11 KR KR1020080033593A patent/KR100993538B1/en not_active IP Right Cessation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200312362Y1 (en) | 2003-02-20 | 2003-06-02 | 주식회사 미앤지산업 | A subframe for assambling the inner-outer panel and panel system |
KR200357096Y1 (en) | 2004-04-26 | 2004-07-21 | 이원우 | A finishing goods for architectural use |
KR100668112B1 (en) | 2005-08-05 | 2007-01-11 | 알루텍 (주) | Channel of assembly type casted in concrete structure |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101272990B1 (en) | 2012-03-21 | 2013-06-10 | ㈜스트롱플러스 | L-type clip angle for installing alc panel to concrete slab using rocking construction method |
WO2013141424A1 (en) * | 2012-03-21 | 2013-09-26 | (주)에스와이씨 | Method for installing alc panels by longitudinally wall locking construction |
KR101273087B1 (en) | 2012-03-22 | 2013-06-10 | (주) 에스와이씨 | Method for installing alc panel to concrete slab |
KR101365137B1 (en) * | 2012-11-28 | 2014-02-18 | 정향임 | Removable stonework smoking room |
KR101613300B1 (en) * | 2013-12-17 | 2016-04-18 | 주식회사 조은데코 | finishing panel fixing brakets and finishing apparatus with this |
KR101469503B1 (en) * | 2014-04-15 | 2014-12-05 | 정기채 | External Metal Panel for Construction |
KR101500707B1 (en) * | 2014-05-29 | 2015-03-12 | 김윤수 | Exterior panel for buildings |
KR101546900B1 (en) * | 2014-05-29 | 2015-08-25 | 김윤수 | Method of manufacturing exterior panels for buildings |
WO2015182820A1 (en) * | 2014-05-29 | 2015-12-03 | 김윤수 | Building exterior panel and manufacturing method therefor |
Also Published As
Publication number | Publication date |
---|---|
KR20090108258A (en) | 2009-10-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100993538B1 (en) | Construction structure of internal and external stone panels in buildings | |
US8132388B2 (en) | Modular concrete building | |
CA2191914C (en) | Insulated concrete form | |
US5934039A (en) | Apparatus and method for dimensionally uniform building construction using interlocking connectors | |
US8490363B2 (en) | Modular concrete building | |
US20080104913A1 (en) | Lightweight Concrete Wall Panel With Metallic Studs | |
US20060096204A1 (en) | Structural wall apparatuses, systems, and methods | |
JP5077664B2 (en) | RC building method with no external insulation and no adjacent space | |
US20090071092A1 (en) | Structural Lintel Assembly And Building Construction Method Using The Same | |
RU2440473C2 (en) | Vertical construction joints | |
KR101272601B1 (en) | A joint structure for sculpture of rooftop | |
EA013175B1 (en) | Outer multi-story frame building wall of arcos system and method of erection thereof | |
RU2459913C2 (en) | Set of leave-in-place form by vv podsevalov | |
KR100722237B1 (en) | Waterproof hummock of waterproof layer in outer wall of structure and manufacturing method and constructing method thereof | |
JP3599240B2 (en) | External wall forming method and metal fittings used in external insulation building of reinforced concrete wall type structure | |
KR200432330Y1 (en) | Waterproof hummock of waterproof layer in outer wall of structure | |
KR101241302B1 (en) | Construction method of ALC block build during winter | |
AU2014265071B2 (en) | A building and methods of constructing the building | |
JP2786412B2 (en) | Exterior panel covering structure of concrete building and covering construction method | |
Akramovna et al. | DESIGN CHANGE OF A DETAIL AND ADDITION OF A USEFUL ELEMENT | |
KR101929265B1 (en) | the red clay brick structure frame work for a elevation anti-shock and use it the structure of execution method | |
RU2368742C1 (en) | Method for manufacturing of wall-ceiling structure in reinforced concrete version | |
KR101601627B1 (en) | Prefabricated construction using half slab | |
KR101201438B1 (en) | Construction method of ALC block build | |
JPH03262854A (en) | Outer wall panel unit, manufacture thereof and outer wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
N231 | Notification of change of applicant | ||
LAPS | Lapse due to unpaid annual fee |