KR100986548B1 - The engineering work method and sloping surface use earth anchor - Google Patents
The engineering work method and sloping surface use earth anchor Download PDFInfo
- Publication number
- KR100986548B1 KR100986548B1 KR1020080057740A KR20080057740A KR100986548B1 KR 100986548 B1 KR100986548 B1 KR 100986548B1 KR 1020080057740 A KR1020080057740 A KR 1020080057740A KR 20080057740 A KR20080057740 A KR 20080057740A KR 100986548 B1 KR100986548 B1 KR 100986548B1
- Authority
- KR
- South Korea
- Prior art keywords
- anchor
- wire
- slope
- head
- earth
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/30—Miscellaneous comprising anchoring details
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
본 발명은 지반의 침하나 토사의 유실로 안정성이 떨어지는 것을 보강하기 위해 설치되는 사면보강용 어스앙카에 관한 것으로서, 어스앙카의 와이어 고정부를 소일네일 앙카 형태로 이루어진 제1앙카와 제2앙카로 구성하여 지지토록 함으로서 와이어의 견고한 지지력을 갖도록 하여 인장력을 향상시키고 공사 후 많은 시간이 지나더라도 강력한 인장력을 유지할 수 있도록 하며, 제1, 제2 앙카를 헤드가 설치된 케이싱 몸체 상단에 지지돌기를 갖는 다수의 블레이드를 설치하여 천공 홀에 설치시 와이어로 철근봉을 당기는 간단한 동작으로 케이싱 몸체 내의 헤드가 블레이드의 지지돌기 저부를 밀어 블레이드가 펼쳐져 천공 홀의 내벽에 걸려 와이어를 지지하도록 함으로 연결부재와 지안판의 결속 인장력을 강화시켜 지반의 사면을 보호할 수 있도록 한 사면 보강용 어스앙카 및 이를 이용한 어스앙카 시공 방법에 관한 것이다.The present invention relates to an earth anchor for slope reinforcement, which is installed to reinforce the stability of the ground due to sedimentation or loss of soil, and the first anchor and the second anchor made of a wire nail part of the anchor anchor in the form of a small nail anchor. By constructing and supporting, it has a strong supporting force of the wire to improve the tensile strength and to maintain a strong tensile force even after a long time after construction, and the first and second anchors have a plurality of support protrusions on the upper casing body head Of the connecting member and the finger plate by installing the blade of the perforated hole and pulling the reinforcing bar with the wire when installing it in the drilling hole. Strengthen the binding tension to protect the slope of the ground It relates to the slope reinforcement Earth Anchor Earth Anchor and construction methods for using the same.
와이어, 어스앙카, 블레이드, 힌지부. 헤드. 케이싱 몸체, 철근봉 Wire, earth anchor, blade, hinge part. head. Casing Body, Reinforcing Bars
Description
본 발명은 지반의 침하나 토사의 유실로 안정성이 떨어지는 것을 보강하기 위해 설치되는 사면보강용 어스 앙카 및 이를 이용한 어스앙카 시공 방법에 관한 것이다.The present invention relates to an earth anchor for slope reinforcement, and an earth anchor construction method using the same, which is installed to reinforce the stability of the soil due to sedimentation or loss of soil.
특히, 도로공사를 위해 불가피하게 산을 절토하게 된다. 이 경우 절토된 사면을 보강하여야만 한다. 이를 위해 어스앙카를 설치하는 것이 일반적이다. 어스앙카는 와이어 일측 단을 앙카에 연결하고 다른 일측단은 지압판에 고정시켜 인장력을 부여 함으로써 지압판이 사면의 슬라이딩을 방지할 수 있도록 한 것으로 본 발명은 앙카를 이중으로 설치하고 앙카와 앙카 사이에는 그라우팅시켜 고정단을 형성하고 와이어와 연결된 앙카와 지압판 사이에는 와이어의 인장력을 발생시켜 사면을 보호할 수 있도록 한 사면 보강용 어스앙카 및 이를 이용한 시공 방법에 관한 것이다. In particular, the mountain is inevitably cut for road construction. In this case the cut slopes must be reinforced. It is common to install earth anchors for this purpose. Earth anchor is connected to one end of the wire to the anchor and the other end is fixed to the pressure plate to give a tension force to the pressure plate to prevent the sliding of the slope in the present invention is to install the anchor double and grout between the anchor and the anchor And an anchor for slope reinforcement and a construction method using the same to form a fixed end and protect the slope by generating a tensile force of the wire between the anchor and the pressure plate connected to the wire.
종래에도 사면보강을 위해 다양한 사면보강용 어스앙카가 개발되어 제공되었 다. Conventionally, various slope reinforcement earth anchors have been developed and provided for slope reinforcement.
산업이 발전함에 따라 기반도로나 단지조성 등 산지와 같은 사면을 개발하는 것은 불가피한 실정으로, 현재 사면의 슬라이딩 현실은 시간과 장소에 관계없이 끊임없이 발생하고 있으며, 생명과 재산을 위협하는 주변요소로서 작용을 하고 있다.As the industry develops, it is inevitable to develop slopes such as mountain roads such as foundation roads and complexes. Currently, the sliding reality of slopes is constantly occurring regardless of time and place, and acts as a threat to life and property. Doing
따라서, 사면의 붕괴나 슬라이딩을 억제하기 위한 안정공법으로 가장 널리 이용되고 있는 것이 와이어를 이용한 어스앙카 공법이다.Therefore, the earth anchor method using a wire is most widely used as a stabilization method for suppressing the collapse and sliding of the slope.
여기서, 어스앙카라 함은 원지반에 인장재(앙카 구조체)를 설치하여 원지반 강도를 최대한 이용하면서 복합보강지반을 형성함으로써, 지반의 전단 및 인장강도를 증가시켜 변위를 억제시키고 지반의 이완을 방지시키는 공법이다.Here, the earth anchor is a method of installing a tensile material (anchor structure) on the ground to form a composite reinforcement ground while maximizing the strength of the ground, thereby increasing the shear and tensile strength of the ground to suppress displacement and prevent the ground from loosening. .
즉, 어스앙카 공법의 기본 설계개념은 어스앙카의 구조체에 의해 보강된 영역의 토괴가 마치 일체화된 옹벽과 같은 작용을 한다는 것에 의해 보강토 벽체가 가정할 수 있는 어떠한 경사면에 대해서도 안정을 유지할 수 있도록 하는 것이다. 이러한 어스앙카는 가시설 흙막이 구조물, 기초 터파기 등에 사용되어 왔으나 근래에 들어 도로의 사면보강, 철도,댐, 터널 갱구부 등의 암반보강 등 그 적용대상이 한층 넓어지고 있는 실정이다. 그러나, 이러한 어스앙카는 토반에 유용하게 고안된 앙카를 암반에 접목시킨 것인데, 각종 사면의 암반구조는 토반과 달라 절리가 많은 암반, 공동층이 많은 암반, 단층의 영향을 받아 열변질화 되어 취약한 암반, 발파의 영향으로 불연속면이 발달되어 모암과 분리된 암반등 많은 사면 구조가 불안정하여 기존의 와이어를 이용한 어스앙카 만으로 암반사면을 보강시키는 것은 상당한 문제점이 있다.In other words, the basic design concept of the earth anchor construction is to maintain stability on any inclined surface that can be assumed by the reinforced earth wall by acting as an integral retaining wall. will be. Earth anchors have been used for temporary earthquake structures, foundation trenches, etc., but in recent years, the applications of the ground anchors have been expanded to include slope reinforcement of roads, rock reinforcement of railways, dams, and tunnel shafts. However, this earth anchor is a combination of rock anchors, which are useful for soils, and the rock structures of various slopes are different from soils. Discontinuity is developed due to the blasting effect and many slope structures, such as the rock, separated from the mother rock, are unstable. Therefore, there is a significant problem in reinforcing the rock slope with only the earth anchor using the existing wire.
기존의 와이어를 이용한 어스앙카 구조체는 천공 홀에 다수의 와이어가 연결된 어스앙카를 삽입한 후 당겨 어스앙카가 지반 또는 암반에 걸리도록 한 후 와이어를 지압판에 고정시키는 방법으로 사면보강 구조체를 설치하였으나, 시간이 지남에 따라서 천공홀에 고정된 어스앙카가 지반에서 밀리는 현상이 발생되어 와이어의 인장력이 소멸되어 지반의 사면에 슬라이딩이 발생되는 문제점이 있었다.In the conventional anchor structure using wires, a slope reinforcement structure was installed by inserting an earth anchor connected to a plurality of wires in a drilling hole and pulling the ground anchor to the ground or rock, and then fixing the wire to the pressure plate. As time goes by, the earth anchor fixed to the drilling hole is pushed out of the ground, so that the tension of the wire disappears and there is a problem of sliding on the slope of the ground.
이 분야의 선등록 기술을 살펴보면, 등록특허공보 제0598024호의 쐐기식 앵커는 앵커공(A) 안쪽에 삽입되는 정착 헤드(10)와; 상기 정착 헤드의 후방에 배치되는 중공의 케이싱(20)와; 상기 케이싱에 삽입되며 선단부가 상기 정착 헤드에 고정되며 후단부가 상기 앵커 외부의 지압수단(31)에 연결되는 하나 이상의 인장재(30)와; 그리고, 상기 케이싱의 후단부 외주면에 설치되는 패커(40)를 포함하고, 상기 케이싱의 둘레부에 슬라이딩 가능하도록 결합되는 날개 지지링(60)과; 일단이 상기 케이싱의 둘레부에 회전 가능하게 연결되어 상기 케이싱의 이동시 함께 이동되며 상기 날개 지지링에 의해 자유단부가 펼쳐져 상기 앵커공 주변의 지중에 쐐기식으로 박히는 하나 이상의 앵커날개(50)가 더 포함되어 구성된다. 이와 같이 구성된 특허 제0598024호는 도2와 같이 홀에 앵커를 삽입한 후 인장재(30)을 당기면 정착헤드(10)가 당겨지면서 날개연결부가 홀 입구 측으로 이동되고 날개 지지링은 이동되지 않으므로 날개연결부를 따라 이동하던 앵커날개가 날개지지링에 의해 펼쳐지도록 하여 앵커날개가 천공 홀 내벽을 지지토록 한 구성이나, 이는 인장재를 당기는 과정에서 정착헤드가 인장재측으로 이동되려는 이동력이 생기고 후면에 설치된 패커(40)가 날개 지지링의 이동을 저지하여 이동되는 앵커날개(50)가 벌 어지도록 하고 있으나 인장재의 당김에 의해 패커가 함께 당겨지므로 앵커가 펼쳐지지 못하는 문제점이 있다. 즉, 와이어 형태의 인장재를 갖는 앵커는 그라우팅을 하는 것이 아니라 천공홀 내측에서 앵커날개가 펼쳐져 천공홀 내벽에 걸려지도록 하고, 정착헤드에 연결된 인장재는 당겨져 천공홀 입구에 설치된 지압판에 의해 고정되어 인장재인 와이어가 계속 당겨져 지반을 결속하도록 된 구성으로, 특허 제0598024호는 지반이 슬라이딩하기 시작하면 인장재의 인장력이 제로로 떨어져 수직하중이나 사면 하중에 대한 저지능력이 전혀 소용이 없게 되는 문제점이 있다. Looking at the pre-registration technology in this field, the wedge-type anchor of Patent No. 0598024 is a
본 발명은 이와 같은 문제점을 해결하기 위한 것으로서, 어스앙카를 소정의 간격으로 천공 홀 내부 2중으로 설치하여 그라우팅 된 고정단을 설치하고, 일측의 어스앙카에는 와이어 일측단을 연결하고 와이어 타측단은 지압판에 연결함으로써 사면이 슬라이딩되는 것을 방지하며, 지반의 사면하중 저항력과 결속 인장력을 향상시킬 수 있도록 함을 목적으로 한 것이다.The present invention is to solve such a problem, install a fixed anchored grout by installing the earth anchors in the drilling hole in a predetermined interval in a predetermined interval, the one end of the wire is connected to one end of the wire anchor wire and the other end of the pressure plate It is intended to prevent the slope from sliding by connecting to, and to improve the slope load resistance and binding tension of the ground.
본 발명은 사면을 보강하기 위해 설치되는 사면보강용 어스 앙카에 관한 것으로, 와이어를 지지할 수 있도록 제1 앙카(10)와 제2 앙카(10')사이에 그라우팅하여 고정단을 형성하고, 제2 앙카(10') 일측의 연결부재(24)와 지압판(50) 사이에는 인장력을 갖는 와이어(25)가 설치되어 사면을 보호할 수 있도록 함으로써, 지반의 사면이 슬라이딩되는 것을 방지하고, 작업의 간편성, 사면에 대한 인장력 강화, 구성부품의 간편성, 작업시간을 절약하는 특징을 갖는 사면 보강용 어스앙카를 제공할 수 있도록 한 것이다. The present invention relates to an earth anchor for slope reinforcement installed to reinforce the slope, and grouted between the
본 발명은 어스앙카의 와이어 고정부를 소일네일 앙카 형태로 이루어진 제1 앙카와 제2 앙카로 구성하여 지지토록 함으로서 와이어가 견고한 지지력을 갖도록 하여 인장력을 향상시키고 공사 후 많은 시간이 지나더라도 강력한 인장력을 유지 할 수 있도록 하는 효과를 가지며, 제1, 제2 앙카를 헤드가 설치된 케이싱 몸체 상단에 지지돌기를 갖는 다수의 블레이드를 설치하여 천공 홀에 설치시 와이어로 철근봉을 당기는 간단한 동작으로 케이싱 몸체 내의 헤드가 블레이드의 지지돌기 저부를 밀어 블레이드가 펼쳐져 천공 홀의 내벽에 걸려 와이어를 지지하도록 함으로 블레이드를 확개시키는 작업이 간단 용이하여 어스앙카 시공 시간을 단축시켜 공기와 고사비용을 절감하는 효과를 갖는다.The present invention consists of the first anchor and the second anchor in the form of a nail nail anchor to anchor the wire anchor so that the wire has a solid support force to improve the tensile force and a strong tensile force even after a lot of time after construction It has the effect to maintain, and installs a plurality of blades having a support protrusion on the upper casing body with the first and second anchors in the casing body by a simple operation of pulling the reinforcing bar with wire when installed in the drilling hole The head pushes the bottom of the support protrusion of the blade to expand the blade to the wire hanging on the inner wall of the hole to support the wire is easy to expand the blade is easy to shorten the construction time of the earth anchor has the effect of reducing the air and dead costs.
이하 본 발명의 실시 예를 상세히 설명하면 다음과 같다.Hereinafter, an embodiment of the present invention will be described in detail.
사면 슬라이딩 방지 보강부재로 사용되는 어스 앙카에 있어서,In the earth anchor used as the slope preventing reinforcement member,
철근으로 이루어진 철근봉(11) 일단에 용접 또는 볼트 결합 방식으로 연결된 헤드(13)와;A
상기 헤드(13)가 수용되도록 공간부(16)가 형성되고 양단부에 다수의 힌지부(18)가 구비된 케이싱 몸체(15)와;A casing body (15) having a space (16) formed to accommodate the head (13) and having a plurality of hinge portions (18) at both ends;
상기 케이싱 몸체(15)에 형성된 힌지부(18)에 외향으로 확개될 수 있도록 설치된 블레이드(20)와;A
상기 블레이드(20) 하단 내측에 지지돌기(23)를 형성하되 지지돌기의 저면 경사 각도는 헤드(13)의 상단 경사면(14)과 대응되도록 형성된 제1앙카(10)를 구성하고, The
상기 철근봉(11)의 다른측 단에는 헤드(13)를 관통하도록 연결한 제2 앙카(10')와;A second anchor 10 'connected to the other end of the reinforcing
상기 제2 앙카(10')의 헤드(13)을 관통하여 돌출된 철근봉 끝단에 고정된 연결부재(24)와;A
상기 연결부재(24)와 지압판(50) 사이에 연결되어 사면이 슬라이딩되는 것을 발지할 수 있도록 와이어(25)가 연결되어 어스 앙카(1)를 구성한다. The
상기 블레이드는 날개 몸체(21)와 힌지부(18)를 갖는 보강편(22)으로 형성된 것을 특징으로 한다. The blade is characterized in that formed by the reinforcing
상기 날개 몸체(21)는 케이싱 몸체 상단부에 설치되므로 케이싱 몸체(15)의 형상과 동일하게 호형으로 이루어지도록 하고 힌지부를 갖는 보강편은 날개 몸체 내측에 설치되어 하단부에 지지돌기와 힌지부가 형성된다.Since the
상기 와이어는 피복관(26) 내부에 다수의 강선(27)이 위치하고 그리스(28)가 충진된 것을 특징으로 한다.The wire is characterized in that a plurality of
상기 어스앙카는 제1 앙카(10)와 제2 앙카(10') 사이에 그라우팅하여 소일레일 앙카 형태의 고정단을 형성하고 제2 앙카(10') 일측의 연결부재(24)와 지압판(50) 사이에는 인장력을 갖는 와이어(25)가 설치되어 사면을 보호할 수 있도록 된 것을 특징으로 한다. The earth anchor is grouted between the
상기와 같이 된 어스앙카를 이용한 시공방법은 다음과 같다.The construction method using the above-mentioned earth anchor is as follows.
사면을 보호하기 위해 어스앙카를 설치하기 위해 굴착기를 이용하여 지반 사면에 다수의 천공 홀을 시공하는 단계; Constructing a plurality of perforation holes on the ground slope using an excavator to install an earth anchor to protect the slope;
상기 천공홀에 제1 앙카와 제2 앙카를 삽입한 후 일측의 와이어를 당겨 제1 앙카와 제2 앙카의 블레이드가 펼쳐져 천공홀 내벽에 걸려 고정되도록 어스앙카를 설치하는 단계:Inserting a first anchor and a second anchor into the drilling hole and then pulling a wire on one side to install an earth anchor so that the blades of the first anchor and the second anchor are unfolded and fixed to the inner wall of the drilling hole;
상기 설치된 어스앙카의 제1 앙카와 제2 앙카 사이에 몰타르를 주입하여 그라우팅체를 형성하는 단계;Forming a grouting body by injecting mortar between the first anchor and the second anchor of the installed anchor;
상기 제2 앙카 일측의 연결부재에 다수 결합된 와이어를 천공홀 입구의 사면 에 위치하는 지압판에 고정시켜어 인장력을 갖도록 하는 단계로 어스앙카 시공방법이 이루어진다.Earth anchor construction method is made to have a tensile force by fixing a plurality of wires coupled to the connection member of the second anchor one side to the pressure plate located on the slope of the inlet hole.
이와 같이 실시되는 본 발명의 어스 앙카의 시공방법을 설명하면 다음과 같다.The construction method of the earth anchor of this invention implemented in this way is as follows.
제1 공정: 지반 천공 홀 시공단계1st process: Ground drilling hole construction stage
사면을 보호하기 위해 어스앙카를 설치하기 위해서는 천공 홀을 형성한다. 상기 천공 홀은 내부 깊숙히 굴착하여 단단한 지반 또는 암반층까지 굴착한다. 통상적으로 와이어 인장력을 이용한 사면 보강장치의 길이는 15m에서 30m정도이며, 작업현장에 따라 달라질 수 있다.In order to install the earth anchor to protect the slope, a perforation hole is formed. The perforation holes are drilled deep inside to excavate to hard ground or rock layers. Typically, the length of the slope reinforcement device using a wire tension force is about 15m to 30m, it may vary depending on the work site.
제2 공정: 천공홀에 어스앙카 설치시공 단계2nd process: Earth anchor installation in drilling hole
상기 제1 공정에서 다수 형성된 천공홀(30)에 제1앙카(10)를 선두로 하여 어스앙카(1)를 천공홀(30)에 삽입한다.The
이때 천공홀에 인입되는 어스앙카(1)의 제2 앙카(10') 일측과 연결부재(24) 일면는 별도의 강봉을 대응시켜 어스앙카(1)를 밀어 삽입한다.At this time, one side of the second anchor 10 'of the
상기와 같이 다수의 천공홀(30)에 어스앙카(1)를 삽입한 후에는 제2앙카(10')의 연결부재(24)에 연결된 와이어(25)를 당겨 제1앙카(10)와 제2 앙카(10')의 헤드(13)와 연결된 철근봉(11)이 당겨지도록하여 헤드(13)를 일측으로 이동시키면 헤드(13) 상면이 브레이드(20)의 지지돌기(23)을 위로 밀게 됨으로 블레이드(20)의 날개 몸체(21)가 힌지부(18)를 중심으로 외향으로 벌어지면서 천공홀(30) 내면에 제1 앙카(10)와 제2 앙카(10')가 걸려 고정 설치된다.After inserting the
제3공정: 그라우팅 시공단계3rd process: grouting construction stage
상기 제2공정에서 천공홀에 어스앙카를 설치한 후에는 몰타르 주입호스와 가스배출호스를 제1 앙카와 제 2앙카 사이에 위치하도록 설치한다.After the earth anchor is installed in the drilling hole in the second step, the mortar injection hose and the gas discharge hose are installed to be positioned between the first anchor and the second anchor.
상기 그라우팅을 위한 몰타르 주입 호스와 가스 제거 호스는 통상적으로 실시되는 방법으로 실시한 것이다.The mortar injection hose and the gas removal hose for grouting are carried out in a conventional manner.
상기와 같이 2개의 호스가 천공 홀의 제1 앙카와 제2 앙카 사이에 설치되면 외부에서 몰타르 주입장비에 의하여 몰타르 주입호스로 몰타르를 주입하여 제1 앙카와 제2 앙카 사이에 그라우팅(40)을 충진 함으로서 고정단을 형성하게 된다.When the two hoses are installed between the first and second anchors of the drilling hole as described above, the mortar is injected into the mortar injection hose by the mortar injection equipment from the outside to fill the
이때 제1 앙카와 제2 앙카의 블레이드는 외향으로 벌어져 천공홀 내벽에 걸린 상태로 그라우팅 된다.At this time, the blades of the first anchor and the second anchor are outwardly grouted in a state of being caught in the inner wall of the drilling hole.
상와 같이 그라우팅(40)이 완료된 후에는 설치된 2개의 호스를 제거하고 그라우팅을 양생시켜 고정단을 형성한다.After the
제4공정:와이어 인장 작업단계Step 4: wire tensioning work
상기와 같이 제1앙카와 제2 앙카 사이에 그라우팅시켜 고정단을 형성한 후에는 지반의 사면 외부로 노출된 와이어(11)를 지압판(50)에 낀후 당겨 천공홀 내의 와이어가 팽팽하게 인장되도록 한 다음 지압판(50)에 와이어(25)를 고정한다.After forming the fixed end by grouting between the first and second anchors as described above, the
상기 제2 앙카 일측 연결부재(24)와 지압판(50) 사이에 설치된 와이어는 관체로 이루어진 피복관(26) 내부에 다수의 강선(27)이 설치되고 강선 외주면의 피복관 내에는 그리스(28)가 충만되어 자유단을 형성함으로서 천공홀이 흙으로 채워지더라고 와이어는 인장력이 소멸되지 않고 유지하여 지반의 사면이 슬라이딩되는 것을 방지한다. The wires provided between the second anchor one
이하 첨부도면에 의거하여 본 발명을 설명하면 다음과 같다.Hereinafter, the present invention will be described based on the accompanying drawings.
도2는 본 발명의 제1 앙카와 제2 앙카 및 와이어로 이루어진 어스 앙카의 구성도로서, 제1 앙카(10)와 제2 앙카(10')를 설치하고, 상기 제1 앙카와 제2 앙카는 동일한 구성으로 이루어진 것으로 철근봉(11) 일단에는 제1 앙카를 설치하고 철근봉 다른 단에는 제2 앙카를 설치하여 철근봉(11)을 당기면 양측의 헤드(13)가 일측으로 이동하면서 상부의 블레이드(20) 지지돌기(23)를 밀어 힌지부(18)를 중심으로 블레이드의 날개몸체(21)이 외향으로 벌어져 천공홀의 내벽에 걸려 고정된다.2 is a configuration diagram of an earth anchor composed of a first anchor, a second anchor, and a wire of the present invention, wherein a
상기와 같이 제1 앙카(10)와 제2 앙카(10')가 천공홀에 고정되면 통상의 방법으로 몰타르 주입호스를 통하여 제1 앙카와 제2 앙카 사이에 몰타르를 타설시켜 그라우팅(40)한다.As described above, when the
상기와 같이 그라우팅된 제1 앙카와 제2 앙카 사이에는 소일레일과 같이 형성되어 와이어가 팽팽하게 당겨지도록 지지역할을 하는 동시에 슬라이딩 상부하중 을 지지하고 인장강도를 갖는다.As described above, the grouted first anchor and the second anchor are formed like a soil rail to support the wire to be pulled taut while simultaneously supporting the sliding upper load and having tensile strength.
상기와 같이 그라우팅 된 제1 앙카(10)와 제2 앙카(10') 사이는 고정단 형성된다. A fixed end is formed between the grouted
또한 제2 앙카(10')의 헤드(13)로 돌출된 철근봉(11)과 결합된 연결부재(24)와 지반의 사면에 설치되는 지압판(50) 사이에는 와이어(25)가 팽팽하게 당겨진 상태로 고정되므로 와이어(25)가 사면을 당겨 결속하는 형태가된다. In addition, the
상기와 같이 설치된 본 발명의 어스앙카(1)는 제1 앙카와 제2 앙카 사이에는 고정단으로 형성되고, 제2앙카 일측 연결부재와 지압판사이에는 인장력이 부가된 와이어에 의해 인장 된 형태이다.Earth anchor (1) of the present invention installed as described above is formed as a fixed end between the first anchor and the second anchor, the tension between the connecting member and the pressure plate of the second anchor one side is tensioned by a wire added tension.
또한 본 발명의 연결부재(24)와 지압판(50) 사이에 인장력을 갖도록 설치되는 와이어는 다수개가 설치된다. In addition, a plurality of wires are installed to have a tensile force between the connecting
도3은 본 발명에 따른 어스앙카의 블레이드가 접힌 상태를 나타낸 예시도로서, 제1 앙카(10) 또는 제2 앙카(10')의 케이싱 몸체(15) 상부에 형성된 블레이드(20)가 접혀진 상태를 나타낸 것이다. Figure 3 is an exemplary view showing a folded state of the ground anchor according to the present invention, the
먼저, 어스앙카(1)를 설치하고자 하는 사면에 통상의 천공기(굴착기)를 이용하여 천공 홀(30)를 형성하고, 상기 지반의 사면에 천공 홀(30)이 형성되면 철근봉(11) 일측단(선단)에 결합된 제1앙카(10)의 케이싱 몸체(15)를 천공 홀(30)에 삽입한다.First, the
이때 케이싱 몸체(15) 상단에 형성된 블레이드(20)는 도2과 같이 접힌 상태로 삽입된다.At this time, the
또한, 이중 철근 또는 이와 동일한 강봉으로 이루어진 철근봉(11)의 일측단부는 제1 앙카(10) 헤드(13) 중앙부를 관통시켜 용접이나 볼트결합방식으로 결합되며, 헤드(13)는 케이싱 몸체(15) 내의 공간부(16)에 위치한다. In addition, one side end portion of the reinforcing
상기 케이싱 몸체(15) 공간부(16)의 하부 직경은 헤드(13)가 인. 입출될 수 있도록 형성하고, 상부는 철근봉(11)의 일측단 연결부만 끼워질 수 있도록 걸림턱(17)이 형성된다.The lower diameter of the
따라서, 철근봉(11) 선단과 헤드(13)의 연결은 철근봉(11)의 일측단 연결부(12)를 케이싱 몸체(15) 상부 걸림턱(17) 측을 통하여 공간부(16)로 삽입하고 헤드(13)는 공간부(16) 저면을 통하여 삽입한 후 연결부(12)에 결합한다. Accordingly, the connection between the tip of the
또한 철근봉(11) 다른 단인 후단에도 상기 제1 앙카(10)와 동일한 결합방식으로 제2 앙카(10')와 결합된다.In addition, the other end of the reinforcing
이때 제2 앙카의 헤드(13)과 연결되는 철근봉(11) 후단은 헤드(13) 중앙부 를 관통하여 끝단이 돌출되도록 용착고정한 후 철근봉(11) 끝단부에 연결부재(24)를 나사결합방식 또는 용착하여 고정한다. At this time, the rear end of the reinforcing
또한 상기 제1 앙카와 연결되는 철근봉(11)의 선단부인 연결부(12)는 헤드(13)와 연결한 후에도 더 길게 노출되도록 형성하여 헤드와 결합한 후에는 연결부(12)의 단부가 케이싱 몸체(15) 일측으로 노출되도록 형성한다.In addition, the connecting
상기 철근봉(11)의 선단 연결부(12)를 케이싱 몸체(15) 밖으로 노출되도록 더 길게 형성하는 것은 결합시 용이하도록 하는 것과 천공 홀로 케이싱 몸체(15)를 끼울때 공간부로 돌이나 흙 등이 유입되는 것을 방지하여 차후 네일형태의 철근봉을 당길 때 케이싱 몸체(15)의 걸림턱(17)과 헤드(13) 상면 사이에 돌(석재) 등이 유입되어 헤드가 상승되는 것을 방해하지 않도록 한다.Forming a
또한, 케이싱 몸체(15)의 걸림턱(17) 상부의 외주연에는 다수의 블레이드(20)가 힌지부(18)에 설치되어 절첩될 수 있도록 하며, 블레이드의 개수는 2개에서 4개 사이로 설치될 수 있다. In addition, a plurality of
상기 헤드(13)는 케이싱 몸체(15)의 공간부(16) 내에서 승하강되며, 헤드(13)의 상면 외주면 테두리에는 경사면(14)이 형성되고 이의 경사면(14)은 블레이드(20) 하단 지지돌기(23)의 저면 각도와 대응되도록 형성된다. The
도4는 본 발명에 따른 어스앙카의 블레이드가 펼쳐진 상태를 나타낸 예시도로서, 상기 도3에서 도시된 바와 같은 어스앙카(1)의 제1앙카(10) 또는 제2 앙카(10')의 케이싱 몸체(15)의 블레이드(20)가 접힌 상태에서 천공 홀(30)에 최대한 깊숙이 밀어 넣어 암반 천공 홀까지 삽입한 다음 철근봉(11)이 당겨지도록 사면 외부에서 와이어를 당기면 철근봉 양단에 결합된 헤드(13)가 공간부(16) 내에서 와이어 측으로 당겨져 이동되면서 헤드의 상면이 블레이드(20) 지지돌기(23) 저면을 밀어 올리게 되므로 블레이드(20)는 힌지부(18)를 중심으로 외향으로 펼쳐져 천공 홀의 내벽에 걸려 지지된다.4 is an exemplary view showing an unfolded state of the earth anchor blade according to the present invention, the casing of the
이때 와이어를 천공홀 외부에서 당기게 되면 블레이드는 도4와 같이 펼쳐진 상태에서 천공홀(30) 내벽에 지지되어 견고하게 고정된 상태를 이룬다. At this time, when the wire is pulled from the outside of the hole, the blade is firmly fixed by being supported by the inner wall of the
도5는 본 발명에 따른 어스앙카의 제1 앙카와 제2 앙카 사이에 그라우팅한 상태의 실시 예시도로서, 본발명의 어스앙카(1)를 제1 앙카(10)와 제2 앙카(10')로 구성하고, 상기 제1 앙카(10)와 제2 앙카(10') 사이에 몰타르를 주입시켜 그라우팅을 형성한다.FIG. 5 is an exemplary view of a grouting state between the first and second anchors of the earth anchor according to the present invention. FIG. 5 shows the
또한 일측에서 와이어로 당기더라도 제1, 제2 앙카(10)(10')가 이중으로 천공홀 내벽에 걸려 지지되므로 인장된 와이어는 인장력이 완화되지 않는다. In addition, even when the wire is pulled from one side, since the first and
도6는 본 발명에 따른 어스앙카의 제1 앙카와 제2 앙카 사이에 그라우팅을 설치하지 않은 상태의 실시 예시도로서, 본 발명의 사면 보강용 어스앙카(1) 설치현장의 지반이 암반 층을 이루고 있는 경우에는 지반의 사면 슬라이딩만 방지하도록하면 됨으로 천공홀에 설치된 제1 앙카(10)와 제2 앙카(10') 사이에 그라우팅을 생략한다.FIG. 6 is an exemplary view illustrating a state in which grouting is not installed between the first and second anchors of the earth anchor according to the present invention, wherein the ground of the slope
본 발명은 상기 도5 및 도6에서 알 수 있듯이 천공홀의 지반층에 따라서 제1 앙카와 제2앙카 사이에 그라우팅을 선택적으로 할 수 있다.5 and 6, the present invention can selectively grout between the first and second anchors according to the ground layer of the drilled hole.
즉, 그라우팅은 안 하는 것보다 하는 것이 바람직하나 제1 앙카와 제2 앙카가 위치하는 지반층이 암반일 경우에는 일측의 와이어를 당기더라도 제1 앙카와 제2 앙카가 이끌려 나오지 않으므로 와이어는 팽팽하게 유지되어 인장력을 가지므로 그라우팅을 안 할 수 있다. That is, it is preferable to grout rather than not, but when the ground layer where the first and second anchors are located is a rock, even if the wire of one side is pulled, the first anchor and the second anchor are not drawn out, so the wire is taut. It is maintained and has a tensile force, so grouting can be avoided.
본원 발명에서는 와이어를 지지하는 고정단을 형성하고 사면을 와이어 인장력에 의해 결속되도록 하여 보호할 수 있도록 한 것이다.In the present invention is to form a fixed end for supporting the wire and to be protected by binding the slope by the wire tension force.
도7은 본 발명의 와이어 절단면 구성도로서, 본 발명에서 사용되는 와이어는 외면에 피복관(26)을 형성하고 내부에는 다수의 강선(27)이 배치되며, 강선 외주면의 피복관 내에는 그리스(28)를 충만시켜 천공홀이 흙으로로 메워지더라도 와이어의 인장력이 떨어지지 않고 유지되록 한 것이다.Fig. 7 is a schematic view of the cut wire of the present invention, in which the wire used in the present invention forms a
이와 같이 된 본 발명은 고정단은 와이어 형태의 인장부재를 사용하여 사면 보강부재인 어스앵커를 구성함으로 시공시 작업의 간편성, 수직 및 사면 슬라이딩에 대한 결속 인장력 강화, 구성부품의 간편성, 작업시간을 절약하는 특징이 있다.In the present invention as described above, the fixed end by using a wire-like tension member to form a ground reinforcement member anchor anchor construction ease of work, strengthen the binding tension for vertical and slope sliding, ease of components, work time There is a feature to save.
도1은 종래의 쐐기식 앵커를 나타낸 예시도. 1 is an exemplary view showing a conventional wedge anchor.
도2는 본 발명의 제1앙카와 제2앙카 및 와이어로 이루어진 어스 앙카의 구성도. Figure 2 is a configuration diagram of the earth anchor consisting of the first anchor, the second anchor and the wire of the present invention.
도3은 본 발명에 따른 어스앙카의 블레이드가 접힌 상태를 나타낸 예시도.Figure 3 is an exemplary view showing a folded state of the ground anchor according to the invention.
도4는 본 발명에 따른 어스앙카의 블레이드가 펼쳐진 상태를 나타낸 예시도.Figure 4 is an exemplary view showing an unfolded state of the blade of the earth anchor according to the invention.
도5는 본 발명에 따른 어스앙카의 제1 앙카와 제2 앙카 사이에 그라우팅한 상태의 실시 예시도.Figure 5 is an exemplary embodiment of the grouting state between the first anchor and the second anchor of the earth anchor according to the present invention.
도6는 본 발명에 따른 어스앙카의 제1 앙카와 제2 앙카 사이에 그라우팅을 하지 않은 상태의 실시 예시도.Figure 6 is an exemplary embodiment of a state without grouting between the first anchor and the second anchor of the earth anchor according to the present invention.
도7은 본 발명의 와이어 절단면 구성도.Figure 7 is a wire cut surface configuration of the present invention.
<도면의 주요 부분에 대한 부호 설명> <Description of the symbols for the main parts of the drawings>
10,10':제1, 제2 앙카 11:철근봉10,10 ': First and second anchors 11: Reinforcing bar
12:연결부 13:헤드12: Connection 13: Head
14:경사면 15:케이싱 몸체14: inclined surface 15: casing body
16:공간부 17:걸림턱16: Space part 17: Hanging jaw
18:힌지부 20:블레이드18: hinge part 20: blade
21:날개몸체 22:보강편21: wing body 22: reinforcement
23:지지돌기 24:연결부재23: support protrusion 24: connecting member
25:와이어 26:피복관25: wire 26: coating tube
27:강선 28:그리스27: steel wire 28: Greece
30:천공 홀 40:그라우팅 30: hole 40: grouting
50:지압판 1:어스앙커50: Acupressure plate 1: Earth anchor
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080057740A KR100986548B1 (en) | 2008-06-19 | 2008-06-19 | The engineering work method and sloping surface use earth anchor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080057740A KR100986548B1 (en) | 2008-06-19 | 2008-06-19 | The engineering work method and sloping surface use earth anchor |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090131807A KR20090131807A (en) | 2009-12-30 |
KR100986548B1 true KR100986548B1 (en) | 2010-10-07 |
Family
ID=41690940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080057740A KR100986548B1 (en) | 2008-06-19 | 2008-06-19 | The engineering work method and sloping surface use earth anchor |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100986548B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101166127B1 (en) | 2011-09-23 | 2012-07-23 | 주식회사 하이콘엔지니어링 | A method of construction for a bridge abutment using poor ground and a bridge abutment structureconstructed by the method |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101055744B1 (en) * | 2011-03-21 | 2011-08-11 | (주)이엔피엔지니어링 | Pile member with folded reinforcement part and construction method thereof |
KR101302143B1 (en) * | 2011-08-23 | 2013-09-04 | 김규배 | Method construction anchor rock pressure style use the hole which widens double |
KR101136371B1 (en) * | 2011-11-16 | 2012-04-18 | 주식회사 비엠테크 | Anchor cap including displacement sensing system, anchor assembly using the anchor cap and construction method for the anchor assembly |
KR101286937B1 (en) * | 2011-12-02 | 2013-07-16 | 서호택 | Device for reinforcing the ground |
KR101255811B1 (en) * | 2012-03-05 | 2013-04-17 | 지오텍엔지니어링 주식회사 | Anchor of extension type |
CN106759406B (en) * | 2017-03-12 | 2018-12-04 | 兰州理工大学 | One kind exempting from power and accelerates convection current anchor pole and construction method |
CN109424206A (en) * | 2017-08-31 | 2019-03-05 | 上海宝冶集团有限公司 | Reusable guard rail device |
CN115354671B (en) * | 2022-07-28 | 2023-09-26 | 四川省公路规划勘察设计研究院有限公司 | Anchor-pulling structure for in-situ reinforcement of dangerous rock |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050017160A (en) * | 2003-08-08 | 2005-02-22 | 한미기초개발주식회사 | Multi-blade high strength anchor, mhs anchor |
-
2008
- 2008-06-19 KR KR1020080057740A patent/KR100986548B1/en not_active IP Right Cessation
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050017160A (en) * | 2003-08-08 | 2005-02-22 | 한미기초개발주식회사 | Multi-blade high strength anchor, mhs anchor |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101166127B1 (en) | 2011-09-23 | 2012-07-23 | 주식회사 하이콘엔지니어링 | A method of construction for a bridge abutment using poor ground and a bridge abutment structureconstructed by the method |
Also Published As
Publication number | Publication date |
---|---|
KR20090131807A (en) | 2009-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100986548B1 (en) | The engineering work method and sloping surface use earth anchor | |
KR101696916B1 (en) | Construction method of permanent wall with retaining wall combined PHC pile and steel pipe | |
CN107060803B (en) | Tunnel construction method by utilizing pipe curtain grouting | |
KR100847358B1 (en) | Anchor | |
KR100870410B1 (en) | Soilr nailing device for slope reinforcement use | |
KR101096664B1 (en) | Construction method of approaching duel tunnel and pressing unit of pillar using the same | |
KR101528569B1 (en) | Structure of Permanent Anchor | |
KR20140013497A (en) | Method for constructing block type reinforced retaining wall in cut site | |
KR101253496B1 (en) | Expansion anchor body structure and execution a method | |
KR100746879B1 (en) | Anchor | |
KR100437910B1 (en) | grouting apparatus for earth anchor using compound packer and earth anchor construction method using the same | |
KR100797800B1 (en) | Fixing device of permanent anchor | |
KR101191289B1 (en) | The method of a dual helical pile according to the subsidence for decreasing negative friction | |
JP4780781B2 (en) | Seismic reinforcement method for existing concrete pier | |
KR101005193B1 (en) | Pile for cofferdam | |
KR101241351B1 (en) | The nail with high anchorage and the nailing construction method thereof | |
KR100912482B1 (en) | A double type wing anchor | |
KR101066641B1 (en) | Pre-stressing tunneling method using presupport concept and thereof apparatus | |
KR101393728B1 (en) | Construction anchor for soft ground and ground reinforcement method using the same | |
KR100674634B1 (en) | Anchor for reinforcing a slope | |
KR100871467B1 (en) | Ground pressure anchor and constructing method thereof | |
KR100895770B1 (en) | Inner member additional reinforcement assembly for preventing ground collapse and its construction method to be used therefor | |
KR101861684B1 (en) | Reinforced earth-anchor structure for weakground | |
KR102054994B1 (en) | Cylindrical wedge anchor for reinforcing the ground and method for constructing this same | |
KR100793510B1 (en) | Tension soil nail and construction method of underground wall using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
LAPS | Lapse due to unpaid annual fee |