KR100925990B1 - Excavator Tool for Block - Google Patents

Excavator Tool for Block Download PDF

Info

Publication number
KR100925990B1
KR100925990B1 KR1020070136826A KR20070136826A KR100925990B1 KR 100925990 B1 KR100925990 B1 KR 100925990B1 KR 1020070136826 A KR1020070136826 A KR 1020070136826A KR 20070136826 A KR20070136826 A KR 20070136826A KR 100925990 B1 KR100925990 B1 KR 100925990B1
Authority
KR
South Korea
Prior art keywords
fork
connecting shaft
block
construction
excavator
Prior art date
Application number
KR1020070136826A
Other languages
Korean (ko)
Other versions
KR20090068997A (en
Inventor
곽동석
Original Assignee
곽동석
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 곽동석 filed Critical 곽동석
Priority to KR1020070136826A priority Critical patent/KR100925990B1/en
Publication of KR20090068997A publication Critical patent/KR20090068997A/en
Application granted granted Critical
Publication of KR100925990B1 publication Critical patent/KR100925990B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/30Auxiliary apparatus, e.g. for thawing, cracking, blowing-up, or other preparatory treatment of the soil
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60YINDEXING SCHEME RELATING TO ASPECTS CROSS-CUTTING VEHICLE TECHNOLOGY
    • B60Y2200/00Type of vehicle
    • B60Y2200/40Special vehicles
    • B60Y2200/41Construction vehicles, e.g. graders, excavators
    • B60Y2200/412Excavators
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/96Dredgers; Soil-shifting machines mechanically-driven with arrangements for alternate or simultaneous use of different digging elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

본 발명은 굴삭기의 호안 블록 시공구에 관한 것으로서,The present invention relates to a revetment block construction tool of an excavator,

유압 모터로 구동되는 피니언과 교합된 내접 스윙기어에 유압 실린더로 작동되는 시공구, 또는 지게가 연결 장착되어, 360도 회전 가능하게 작동됨으로써, 호안 블록 시공시, 시공구, 또는 지게로 호안 블록을 집어 올려 시공 위치와 방향을 맞추고 조정하는 등의 작업을 보다 간편히 할 수 있게 하는 한편,An internal swing gear engaged with a pinion driven by a hydraulic motor is installed with a hydraulic cylinder or a fork that is connected to the fork, and is operated to rotate 360 degrees. To make it easier to align and adjust construction positions and orientations,

상기 내접 스윙기어의 하측부 또는 샤프트의 연결핀공에 상부 연결축이 선택적으로 연결되고, 그 하측부에 중간 연결축과 하부 연결축이 스프링으로 탄착된 상태에서 체인으로 연결되어, 상기 중간 연결축과 하부 연결축 사이에 장착된 유압 실린더로 상기 하부 연결축에 장착된 지게를 작동시켜, 호안 블록 시공시, 체인이 유동되는 것을 일정한 범위에서 제한하도록 하고, 지게와 호안 블록에 작용하는 부하를 스프링에 의하여 완충시켜 지게와 호안 블록이 파손되는 것을 방지할 수 있도록 함으로써,The upper connecting shaft is selectively connected to the connecting pin hole of the lower side or the shaft of the internal swing gear, and the intermediate connecting shaft and the lower connecting shaft are connected to the chain in a state where the intermediate connecting shaft and the lower connecting shaft are secured by a spring, and the intermediate connecting shaft A hydraulic cylinder mounted between the lower connecting shafts operates the fork mounted on the lower connecting shafts to limit the flow of the chain in a certain range during construction of the shore block, and to load the spring acting on the stack and the block. By buffering to prevent damage to the fork and the revetment block,

호안 블록 시공시, 시공구나 지게를 그 단독으로 사용하거나, 또는 시공구와 지게를 동시에 적절히 사용하여, 호안 블록의 시공 작업을 보다 효율적으로 할 수 있도록 한 것이다.When constructing a raft block, a construction or a fork may be used independently, or a construction tool and a fork may be used simultaneously, and the construction of a raft block may be performed more efficiently.

굴삭기의 호안 블록 시공구  Excavator Hoan Block Construction Tool

Description

굴삭기의 호안 블록 시공구{Excavator Tool for Block}Excavator Tool for Block

본 발명은 굴삭기를 이용해 하천 제방 등에 호안 블록을 시공할 때, 굴삭기에 장착하여 호안 블록을 들어 올리거나 시공 위치나 방향을 맞추고 조정하는 등의 작업을 하기 위한 굴삭기의 호안 블록 시공구에 관한 것이다.The present invention relates to a revetment block construction tool of an excavator for performing operations such as lifting a revetment block, or adjusting or adjusting a construction position or direction when mounting a revetment block by using an excavator for a river bank or the like.

일반적으로 종래에는 굴삭기를 이용해 하천 제방 등에 호안 블록 시공 작업을 할 때,In general, when the retreat block construction work on river banks, etc. using an excavator,

호안 블록 시공을 위한 적절한 시공구가 없었기 때문에, 기존의 굴삭기 공구로 여러 가지 불편을 감수하며 호안 블록 시공 작업을 하고 있는 실정에 있었다.Since there was no proper construction tool for the construction of the revetment block, the existing excavator tool was in the situation of constructing the revetment block at the expense of various inconveniences.

따라서 굴삭기 만으로는 호안 블록 시공 작업이 원활하게 이루어지지 못함으로 인하여, 굴삭기와 함께, 굴삭기가 하기 어려운 작업을 보조 인력이 투입되어 시공해야 하는 번거로움이 있었다.Therefore, since only the excavator alone does not perform the construction of the revetment block smoothly, there was a hassle that the auxiliary personnel are required to construct the work difficult for the excavator with the excavator.

본 발명은 이와 같은 종래의 굴삭기를 이용한 호안 블록 시공 방식이 갖고 있는 제반 문제점을 해결하기 위하여 연구된 것으로서,The present invention has been studied in order to solve all the problems of the conventional block construction method using a conventional excavator,

본 발명의 과제는,The subject of this invention,

하천 제방의 호안 블록 시공 작업을 보조 인력의 투입없이, 굴삭기 만으로 간편히 효율적으로 할 수 있는 굴삭기의 호안 블록 시공구를 제공하는 데 있다.An object of the present invention is to provide a relief block construction tool for an excavator that can be easily and efficiently carried out by an excavator only without an auxiliary manpower.

본 발명의 과제를 해결하기 위하여 본 발명은,In order to solve the problem of the present invention, the present invention,

유압 모터로 구동되는 피니언과 교합된 내접 스윙기어에 유압 실린더로 작동되는 시공구, 또는 지게가 연결 장착되어, 360도 회전 가능하게 작동됨으로써, 호안 블록 시공시, 시공구, 또는 지게로 호안 블록을 집어 올려 시공 위치와 방향을 맞추고 조정하는 등의 작업을 보다 간편히 할 수 있게 하는 한편,An internal swing gear engaged with a pinion driven by a hydraulic motor is installed with a hydraulic cylinder or a fork that is connected to the fork, and is operated to rotate 360 degrees. To make it easier to align and adjust construction positions and orientations,

상기 내접 스윙기어의 하측부 또는 샤프트의 연결핀공에 상부 연결축이 선택적으로 연결되고, 그 하측부에 중간 연결축과 하부 연결축이 스프링으로 탄착된 상태에서 체인으로 연결되어, 상기 중간 연결축과 하부 연결축 사이에 장착된 유압 실린더로 상기 하부 연결축에 장착된 지게를 작동시켜, 호안 블록 시공시, 체인이 유동되는 것을 일정한 범위에서 제한하도록 하고, 지게와 호안 블록에 작용하는 부하를 스프링에 의하여 완충시켜 지게와 호안 블록이 파손되는 것을 방지할 수 있도록 함으로써,The upper connecting shaft is selectively connected to the connecting pin hole of the lower side or the shaft of the internal swing gear, and the intermediate connecting shaft and the lower connecting shaft are connected to the chain in a state where the intermediate connecting shaft and the lower connecting shaft are secured by a spring, and the intermediate connecting shaft A hydraulic cylinder mounted between the lower connecting shafts operates the fork mounted on the lower connecting shafts to limit the flow of the chain in a certain range during construction of the shore block, and to load the spring acting on the stack and the block. By buffering to prevent damage to the fork and the revetment block,

호안 블록 시공시, 시공구나 지게를 그 단독으로 사용하거나, 또는 시공구와 지게를 동시에 적절히 사용하여, 호안 블록의 시공 작업을 보다 효율적으로 할 수 있도록 한 것을 특징으로 한다.When constructing a raft block, a construction or a fork may be used independently, or a construction tool and a fork may be used simultaneously, and the construction of a raft block may be performed more efficiently.

본 발명의 굴삭기의 호안 블록 시공구는 호안 블록 시공시, 시공구나 지게를 그 단독으로 사용하거나, 또는 시공구와 지게를 동시에 적절히 사용하여, 호안 블록의 시공 작업을 보다 효율적으로 할 수 있는 효과가 있다.The revetment block construction tool of the excavator of the present invention has the effect of making the construction of the revetment block more efficiently by using the construction tool or the fork alone, or by simultaneously using the tool and the fork properly.

이하, 본 발명의 굴삭기의 호안 블록 시공구의 바람직한 실시예를 첨부 도면을 참조하여 구체적으로 설명한다.DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the relief block construction tool of an excavator of the present invention will be described in detail with reference to the accompanying drawings.

도 1 은 본 발명에 의한 굴삭기의 호안 블록 시공구의 구성 상태를 보여 주는 정면도로서,1 is a front view showing the configuration of the revetment block construction tool of the excavator according to the present invention,

본 발명의 굴삭기의 호안 블록 시공구는,The revetment block construction tool of the excavator of the present invention,

상측에 굴삭기 연결핀공(1)이 형성된 지지판(3)의 하측부에 내접 스윙기어(5)가 내주면에 형성된 스윙 원판(7)이 360도 회전 가능하게 설치되어 있고,The swing disc 7 formed on the inner circumferential surface of the support plate 3 having the excavator connecting pin hole 1 formed thereon is rotatably installed 360 degrees.

상기 내접 스윙기어(5)에는 피니언(9)이 교합되어 상기 지지판(3)에 장착된 유압 모터(11)와 연결되어 있으며,The internal swing gear 5 is engaged with a pinion 9 and connected to a hydraulic motor 11 mounted on the support plate 3.

상기 지지판(3)과 스윙 원판(7) 사이에는 중심부에 유압 센터 조인트(13)가 장착되어 있다.A hydraulic center joint 13 is mounted at the center between the support plate 3 and the swing disc 7.

그리고 상기 스윙 원판(7)의 하측부에는 샤프트(15)가 장착되어 그 하측부에 유압 실린더(17)로 작동되는 시공구(19)와 지게 연결핀공(21)이 구비되어 있다.And the lower portion of the swing disc 7 is equipped with a shaft (15) is mounted on the lower side of the work tool 19 and the fork connecting pin hole 21 to operate as a hydraulic cylinder (17).

도 2 는 본 발명의 굴삭기의 호안 블록 시공구에 장착되는 지게의 구성 상태를 나타낸 정면도로서,2 is a front view showing the configuration of a fork mounted on the revetment block construction tool of the excavator of the present invention;

도 1 의 샤프트(15)가 분리된 스윙 원판(7)의 하측부 또는 지게 연결핀공(21)에 상부 연결축(23)이 볼트와 핀으로 연결되고, 상기 상부 연결축(23)의 하측부에는 중간 연결축(25)과 하부 연결축(24)이 스프링(30)(31)으로 탄착된 상태에서 체인(27)(28)으로 연결되며, 상기 하부 연결축(24)에 지게(33)가 핀(35)으로 연결되어, 상기 중간 연결축(25)에 장착된 유압 실린더(37)와 연결 작동되게 구성되어 있다.The upper connecting shaft 23 is connected by bolts and pins to the lower part of the swing disc 7 or the fork connecting pin hole 21 in which the shaft 15 of FIG. 1 is separated, and the lower part of the upper connecting shaft 23. In the state in which the intermediate connecting shaft 25 and the lower connecting shaft 24 is secured by the springs 30 and 31 are connected to the chain 27, 28, the forge 33 to the lower connecting shaft 24 Is connected to the pin 35, it is configured to be connected to the hydraulic cylinder (37) mounted on the intermediate connecting shaft (25).

미 설명 부호 39 는 호안 블록, 41 은 식생구이다.Reference numeral 39 is a relief block, and 41 is a vegetation zone.

이와 같이 구성된 본 발명의 굴삭기의 호안블록 시공구는,The relief block construction tool of the excavator of the present invention configured as described above,

하천 제방에 호안 블록 시공 작업을 할 때,When we work on the bank of the river bank construction

먼저, 굴삭기의 붐 하단부에 장착된 연결축에 굴삭기 연결핀공(1)을 삽입하여 연결한 뒤, 유압 모터(11)를 작동시켜 피니언(9)을 구동시키면, 피니언(9)에 교합된 내접 스윙기어(5)가 회전하면서 하측부에 연결된 스윙 원판(7)을 회전시켜, 도 1 에서와 같이, 스윙 원판(7)의 하측부에 설치된 샤프트(15)와 그에 장착된 시공구(19)나, 또는 도 2 의 하부 연결축(24)에 연결된 지게(33)를 360도 회전 가능하게 함으로써, 시공구(19)나 지게(33)를 호안 블록(39)의 시공 방향과 위치로 임의로 조정할 수 있게 된다.First, the excavator connecting pin hole (1) is inserted into the connecting shaft mounted on the lower end of the excavator and connected. Then, when the hydraulic motor (11) is operated to drive the pinion (9), the internal swing engaged with the pinion (9) As the gear 5 rotates, the swing disc 7 connected to the lower part is rotated, and as shown in FIG. 1, the shaft 15 provided at the lower part of the swing disc 7 and the construction tool 19 mounted thereon; Alternatively, by allowing the fork 33 connected to the lower connecting shaft 24 of FIG. 2 to be rotated 360 degrees, the construction tool 19 or the fork 33 can be arbitrarily adjusted to the construction direction and position of the revetment block 39. Will be.

이 상태에서 시공구(19)나 지게(33)의 단부를 식생구(41)에 넣고 시공구(19)가 연결된 유압 실린더(17)나, 지게(33)가 연결된 유압 실린더(37)를 작동시키면,In this state, the end of the construction tool 19 or the fork 33 is inserted into the vegetation tool 41, and the hydraulic cylinder 17 to which the construction tool 19 is connected or the hydraulic cylinder 37 to which the fork 33 is connected are operated. Let's say

도 3 에서와 같이, 지게(33)의 경우, 편심으로 형성된 식생구(41)의 내측면에 지게(33)의 단부가 무게 중심에 의해 걸리면서 호안 블록(39)이 지게(33)에서 이탈되는 것이 방지되어 호안 블록(39)을 들어 올리거나, 시공 위치와 방향을 맞추고 조정하는 등의 작업을 할 수 있게 되며,As in FIG. 3, in the case of the fork 33, the end of the fork 33 is caught by the center of gravity on the inner surface of the vegetation port 41 formed as an eccentricity, and the revetment block 39 is separated from the fork 33. Can be prevented to lift the raft block 39, or to adjust and adjust the construction position and orientation,

실린더(37)를 작동시켜 지게(33)를 수직으로 세우면, 지게(33)의 단부가 호안 블록(39)의 식생구(41)에서 해제되면서 호안 블록(39)을 하천 제방에 설치할 수 있게 된다.When the forage 33 is erected vertically by operating the cylinder 37, the end of the fore 33 is released from the vegetation opening 41 of the retreat block 39 so that the revetment block 39 can be installed on the river bank. .

그리고 지게(33)를 사용하여 호안 블록(39)을 시공할 경우, 상부 연결축(23)과 중간 연결축(25) 및 하부 연결축(24) 사이에 체인(27)(28)이 스프링(30)(31)으로 탄착되어 연결됨으로써,And when constructing the revetment block 39 using the fork 33, the chain 27, 28 is a spring (27) between the upper connecting shaft 23 and the intermediate connecting shaft 25 and the lower connecting shaft (24) 30) (31) by being rigidly connected

호안 블록(39) 시공시, 체인(27)(28)이 유동되는 것을 스프링(30)(31)으로 일정한 범위에서 제한시켜, 지게(33)를 보다 안정적으로 작동시킴과 동시에, 지게(33)와 호안 블록(39)에 작용하는 부하를 스프링(30)(31)에 의하여 완충시켜 지게(33)와 호안 블록(39)이 파손되는 것을 방지할 수 있는 효과가 있다.At the time of construction of the shore block 39, the flow of the chains 27 and 28 is restricted to the springs 30 and 31 in a predetermined range, thereby operating the fork 33 more stably, and at the same time, the fork 33 And the load acting on the raft block 39 is buffered by the spring (30) (31) has an effect that can prevent the breakage 33 and the raft block 39 is damaged.

그리고 이와 같은 본 발명은 호안 블록(39) 시공시, 시공구(19)나 지게(33)를 스윙 원판(7)의 하측부에 직접 장착하여 그 단독으로 각각 사용하거나,
또는 시공구(19)가 장착된 샤프트(15)의 연결핀공(21)에 지게(33)의 상부 연결축(23)을 연결시켜, 시공구(19)와 지게(33)를 동시에 적절히 사용함으로써, 호안 블록(39)의 시공 작업을 보다 효율적으로 할 수 있는 장점이 있다.
In the present invention as described above, the construction of the revetment block 39, the installation tool 19 or the fork 33 is directly mounted to the lower side of the swing disc 7 and used individually, respectively,
Alternatively, by connecting the upper connecting shaft 23 of the fork 33 to the connecting pin hole 21 of the shaft 15 on which the tool 19 is mounted, by using the tool 19 and the fork 33 appropriately at the same time. In addition, there is an advantage that the construction work of the raft block 39 can be more efficiently.

이상에서는 본 발명을 특정한 실시예에 의거하여 설명하였으나, 본 발명은 본 발명의 기술적 범위 내에서 여러가지 변형예가 가능하며, 상기 실시예 만으로 본 발명의 기술적 범위가 한정되는 것은 물론 아니다.In the above, the present invention has been described based on specific embodiments, but the present invention may be modified in various ways within the technical scope of the present invention, and the technical scope of the present invention is not limited to the above embodiments.

도 1 은 본 발명에 의한 굴삭기의 호안 블록 시공구의 구성 상태를 보여 주는 정면도,1 is a front view showing the configuration of the revetment block construction tool of the excavator according to the present invention,

도 2 는 본 발명의 굴삭기의 호안 블록 시공구에 장착되는 지게의 구성 상태를 나타낸 정면도,Figure 2 is a front view showing the configuration of the fork mounted on the revetment block construction tool of the excavator of the present invention,

도 3 은 동 시공 상태를 보여 주는 정면도.3 is a front view showing the construction state.

* 도면의 주요 부분에 대한 부호의 설명* Explanation of symbols for the main parts of the drawings

1 : 굴삭기 연결핀공 3 : 지지판 1 Excavator connecting pin hole 3 Support plate

5 : 내접 스윙기어 7 : 스윙 원판 5: Internal swing gear 7: Swing disc

9 : 피니언 11 : 유압 모터 9: pinion 11: hydraulic motor

13 : 유압 센터 조인트 15 : 샤프트13: hydraulic center joint 15: shaft

17, 37 : 유압 실린더 19 : 시공구17, 37: hydraulic cylinder 19: construction tools

21 : 지게 연결핀공 23 : 상부 연결축21: fork connecting pin hole 23: upper connecting shaft

24 : 하부 연결축 25 : 중간 연결축24: lower connecting shaft 25: intermediate connecting shaft

27, 28 : 체인 30, 31 : 스프링27, 28: chain 30, 31: spring

33 : 지게 35 : 핀33: fork 35: pin

39 : 호안 블록 41 : 식생구39: raft block 41: vegetation zone

Claims (1)

상측에 굴삭기 연결핀공(1)이 형성된 지지판(3)의 하측부에 내접 스윙기어(5)가 내주면에 형성된 스윙 원판(7)이 360도 회전 가능하게 설치되고,A swing disc 7 having an internal swing gear 5 formed on an inner circumferential surface of the support plate 3 having an excavator connecting pin hole 1 formed thereon is rotatable 360 degrees. 상기 내접 스윙기어(5)에 피니언(9)이 교합되어 상기 지지판(3)에 장착된 유압 모터(11)와 연결되며,The pinion 9 is engaged with the internal swing gear 5 so as to be connected to the hydraulic motor 11 mounted on the support plate 3. 상기 지지판(3)과 스윙 원판(7) 사이 중심부에 유압 센터 조인트(13)가 장착되고,A hydraulic center joint 13 is mounted at the center between the support plate 3 and the swing disc 7, 상기 스윙 원판(7)의 하측부에 샤프트(15)가 장착되어 그 하측부에 유압 실린더(17)로 작동되는 시공구(19)와 지게 연결핀공(21)이 구비되며,The shaft 15 is mounted to the lower side of the swing disc 7, and the lower side is provided with a construction tool 19 and a fork connecting pin hole 21 operated by the hydraulic cylinder 17, 상기 샤프트(15)가 분리된 스윙 원판(7)의 하측부 또는 지게 연결핀공(21)에 상부 연결축(23)이 볼트와 핀으로 연결되고,The upper connecting shaft 23 is connected to the lower portion or the fork connecting pin hole 21 of the swing disc 7, the shaft 15 is separated by a bolt and a pin, 상기 상부 연결축(23)의 하측부에 중간 연결축(25)과 하부 연결축(24)이 스프링(30)(31)으로 탄착된 상태에서 체인(27)(28)으로 연결되며,The intermediate connecting shaft 25 and the lower connecting shaft 24 are connected to the chains 27 and 28 in a state in which the intermediate connecting shaft 25 and the lower connecting shaft 24 are secured by the springs 30 and 31. 상기 하부 연결축(24)에 지게(33)가 핀(35)으로 연결되어, 상기 중간 연결축(25)에 장착된 유압 실린더(37)와 연결된 것을 특징으로 하는 굴삭기의 호안 블록 시공구.The fork block construction tool of the excavator, characterized in that the fork 33 is connected to the lower connecting shaft (24) by a pin (35), and is connected to the hydraulic cylinder (37) mounted on the intermediate connecting shaft (25).
KR1020070136826A 2007-12-24 2007-12-24 Excavator Tool for Block KR100925990B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070136826A KR100925990B1 (en) 2007-12-24 2007-12-24 Excavator Tool for Block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070136826A KR100925990B1 (en) 2007-12-24 2007-12-24 Excavator Tool for Block

Publications (2)

Publication Number Publication Date
KR20090068997A KR20090068997A (en) 2009-06-29
KR100925990B1 true KR100925990B1 (en) 2009-11-10

Family

ID=40996315

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070136826A KR100925990B1 (en) 2007-12-24 2007-12-24 Excavator Tool for Block

Country Status (1)

Country Link
KR (1) KR100925990B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101402448B1 (en) * 2012-10-30 2014-06-03 곽동석 Excavator of auxiliary equipment connection

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61174092A (en) 1985-01-28 1986-08-05 日立建機株式会社 Block gripper
JPH07216927A (en) * 1994-02-09 1995-08-15 Sumitomo Constr Mach Co Ltd Mounting device for attachment
KR19980044674A (en) * 1996-12-07 1998-09-05 도시히꼬 다께우찌 Excavator Bucket
KR200171753Y1 (en) 1999-09-06 2000-03-15 최종선 Apparatus for handling stones for use in landscape architecture

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61174092A (en) 1985-01-28 1986-08-05 日立建機株式会社 Block gripper
JPH07216927A (en) * 1994-02-09 1995-08-15 Sumitomo Constr Mach Co Ltd Mounting device for attachment
KR19980044674A (en) * 1996-12-07 1998-09-05 도시히꼬 다께우찌 Excavator Bucket
KR200171753Y1 (en) 1999-09-06 2000-03-15 최종선 Apparatus for handling stones for use in landscape architecture

Also Published As

Publication number Publication date
KR20090068997A (en) 2009-06-29

Similar Documents

Publication Publication Date Title
EP2762643B1 (en) Machine main body and operating machine provided with same
KR20110085250A (en) Drilling machine
US20150053450A1 (en) Stator for a hydraulic work tool assembly
CN1840785B (en) Working machine
ES2223010T3 (en) PROVISION FOR THE INTERCHANGEABLE FIXING OF A COUPLING PART, FOR EXAMPLE, OF AN EXCAVATOR SHOVEL, TO AN EXCAVATOR FISHING OR TO A VEHICLE.
KR100925990B1 (en) Excavator Tool for Block
US7621689B2 (en) Attachment coupler
JP4781161B2 (en) Dismantling machine
JP4816685B2 (en) Boom assembly structure of work machine
KR20110003932U (en) The hydraulic pressure type wood clamps structure
US6249993B1 (en) Trencher assembly utilizing a direct drive motor
JP2009007764A (en) Construction machinery
KR20090027364A (en) A nipper equipment for excavator
JP3818519B2 (en) Drilling tool for earth drill
JP4643603B2 (en) Construction machinery
JP4246663B2 (en) Construction machinery
JP5562051B2 (en) Pile driver
WO2006107139A1 (en) A rock drilling apparatus
JP4931665B2 (en) Pile driver
KR19980044674A (en) Excavator Bucket
JP4511894B2 (en) Work machine
KR20100007787U (en) a excavator forceps part
KR20090069376A (en) Apparatus for removing and mounting a counter weight of heavy equipment
JP7130543B2 (en) Construction machine and construction machine assembly method
JP2010106529A (en) Hydraulic hose fixing apparatus for construction machine

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E601 Decision to refuse application
E801 Decision on dismissal of amendment
J201 Request for trial against refusal decision
S901 Examination by remand of revocation
GRNO Decision to grant (after opposition)
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121027

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140430

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20160130

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20171102

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee