KR100899861B1 - Method and device for hardening a rehabilitating pipe - Google Patents

Method and device for hardening a rehabilitating pipe Download PDF

Info

Publication number
KR100899861B1
KR100899861B1 KR1020080105609A KR20080105609A KR100899861B1 KR 100899861 B1 KR100899861 B1 KR 100899861B1 KR 1020080105609 A KR1020080105609 A KR 1020080105609A KR 20080105609 A KR20080105609 A KR 20080105609A KR 100899861 B1 KR100899861 B1 KR 100899861B1
Authority
KR
South Korea
Prior art keywords
tube
steam
reinforcement
reinforcing
water
Prior art date
Application number
KR1020080105609A
Other languages
Korean (ko)
Inventor
김진석
Original Assignee
(주)크린텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)크린텍 filed Critical (주)크린텍
Priority to KR1020080105609A priority Critical patent/KR100899861B1/en
Application granted granted Critical
Publication of KR100899861B1 publication Critical patent/KR100899861B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/162Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/18Appliances for use in repairing pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

본 발명은 지하에 매설된 상수 또는 하수관의 내부 이물질을 제거한 후 내측 표면에 열경화성 수지가 함침 된 보강튜브를 반전시킨 후 스팀으로 경화시킴으로써 갱생관을 형성시킴에 있어서, 보강튜브를 반전 설치할 때 미리 보강튜브의 내측에 스팀튜브가 설치되게 함으로써, 스팀을 이용한 보강튜브 경화시간을 줄이는 한편 균일한 경화품질을 갖도록 하는 상하수관 비굴착 전체보수 갱생관의 경화 공법및 장치에 관한 것이다.The present invention is to reinforce the reinforcement tube in the reverse installation in the reinforcement tube by forming a rehabilitation tube by removing the internal foreign matters of the constant or sewage pipes buried underground and inverting the reinforcement tube impregnated with the thermosetting resin on the inner surface and then curing with steam, The present invention relates to a hardening method and a device of a water and sewage pipe unexcavated total repair and rehabilitation pipe, which reduces the hardening time of the reinforcing tube using steam and has a uniform hardening quality by allowing the steam tube to be installed inside the tube.

본 발명은 상하수관로에 열경화성 수지가 함침된 보강튜브를 반전시켜 주입한 후 반전장치에서 보강튜브로 스팀을 공급하여 열경화가 이루어지도록 공법에 있어서, 보강튜브를 반전장치에 감을 때 스팀튜브도 보강튜브와 함께 감기도록 하고, 상기 보강튜브의 선단을 반전장치에 반전 고정시키기 전에 스팀튜브를 반전장치에 고정시키며, 보강튜브를 반전시키면 보강튜브가 상하수관로로 반전될 때 스팀튜브가 같이 상하수관로로 끼워지게 하고, 보강튜브의 반전이 완료되면 반전장치에서 보강튜브의 입구와 스팀튜브로 스팀을 공급하여 보강튜브의 열경화가 이루어지도록 함으로써 이루어지는 것이다.The present invention is inverted by the reinforcing tube impregnated with a thermosetting resin in the water supply and sewage pipe injecting the steam from the reversing device in the reinforcing tube in the construction method so that the thermosetting is carried out, reinforcing the steam tube when winding the reinforcing tube in the inverting device The coils are wound together, and the steam tube is fixed to the inverting device before the tip of the reinforcing tube is inverted and fixed to the inverting device. When the reinforcing tube is inverted, the steam tube is connected to the water and sewage pipe together when the reinforcing tube is inverted to the water and sewage pipe. When the reinforcement tube is completed, the reversal of the reinforcement tube is completed by supplying steam to the inlet of the reinforcement tube and the steam tube in the inverter to achieve the thermosetting of the reinforcement tube.

갱생관, 열경화성 수지, 튜브, 스팀 Regeneration tube, thermosetting resin, tube, steam

Description

상하수관 비굴착 전체보수 갱생관의 경화 공법및 장치{Method and device for hardening a rehabilitating pipe}Method and device for hardening a rehabilitating pipe}

본 발명은 지하에 매설된 상수 또는 하수관의 내부 이물질을 제거한 후 내측 표면에 열경화성 수지가 함침 된 보강튜브를 반전시킨 후 스팀으로 경화시킴으로써 갱생관을 형성시킴에 있어서, 보강튜브를 반전 설치할 때 미리 보강튜브의 내측에 스팀튜브가 설치되게 함으로써, 스팀을 이용한 보강튜브 경화시간을 줄이는 한편 균일한 경화품질을 갖도록 하는 상하수관 비굴착 전체보수 갱생관의 경화 공법및 장치에 관한 것이다.The present invention is to reinforce the reinforcement tube in the reverse installation in the reinforcement tube by forming a rehabilitation tube by removing the internal foreign matters of the constant or sewage pipes buried underground and inverting the reinforcement tube impregnated with the thermosetting resin on the inner surface and then curing with steam, The present invention relates to a hardening method and a device of a water and sewage pipe unexcavated total repair and rehabilitation pipe, which reduces the hardening time of the reinforcing tube using steam and has a uniform hardening quality by allowing the steam tube to be installed inside the tube.

지하에 매설된 상하수도관로 및 산업용 배관을 굴착하지 않고 노후 된 관로 내부를 청소하고, 관로 내로 한쪽 면이 코팅된 튜브(부직포)에 열경화성수지를 함침시킨 보강튜브를 반전시켜 주면서 삽입한 후 보강튜브의 내부로 스팀을 공급하여 열경화성수지를 고형화시키도록 하되 열경화성수지가 함침된 면이 노후 된 관로의 내면과 일체화 되도록 하는 비굴착 방식의 관로보수 공법 및 장치는 일반화되어 있다.Clean the inside of old pipes without digging water supply and sewage pipes and industrial pipes buried underground, and inserting the reinforcing tubes by inverting the reinforcing tubes impregnated with thermosetting resin into the tubes (non-woven fabric) coated on one side into the pipelines. The non-excavation pipeline repairing method and apparatus for supplying steam to solidify the thermosetting resin so that the surface impregnated with the thermosetting resin is integrated with the inner surface of the aging pipe are common.

이러한 비굴착 방식의 관로보수 공법 및 장치는 도 1및 도 2에 도시된 바와 같이 상하수관로(10)의 내부의 이물질을 준설하여 제거한 후 세척이 이루어지게 하고, 세척이 이루어진 상하수관로(10)에는 열경화성 수지가 함침된 보강튜브(30)를 반전하여 삽입한 후 반전장치(20)를 통하여 보강튜브(30)의 내측으로 스팀을 공급함으로써 보강튜브(30)가 상하수관로(10)에 끼워진 채로 열경화가 이루어져 갱생관을 만들게 된다.The non-excavation pipeline repair method and apparatus is dredged and removed by removing the foreign material inside the water and sewage pipe 10, as shown in Figures 1 and 2, the cleaning is made, and the water and sewage pipe (10) After reversing and inserting the reinforcement tube 30 impregnated with the thermosetting resin and supplying steam to the inside of the reinforcement tube 30 through the reversing device 20, the reinforcement tube 30 is opened while being inserted into the water supply and drainage pipe line 10. The hardening takes place, creating a rehabilitation tube.

위와 같은 방식으로 상하수관로(10)의 내측으로 보강튜브(30)를 반전시킨 후 반전장치(20)에서 보강튜브(30)의 내측으로 스팀을 공급함으로써 보강튜브(30)를 경화시키는 경우 반전장치(20)에서 보강튜브(30)로 스팀을 공급할 때 보강튜브(30)의 입구 쪽은 온도가 높은 반면 보강튜브(30)의 선단에는 온도가 낮아지게 되고, 반전장치(20)에서 보강튜브(30)로 스팀을 채워주는 시간이 오래 걸리게 되므로, 결국 보강튜브(30)의 내측으로 균일한 스팀이 공급되지 않아 경화가 균일하게 이루어지지 않는 문제가 있고, 또한 경화시간이 오래 걸리는 단점이 있는 것이었다.Inverting device when the reinforcing tube 30 is hardened by supplying steam from the reversing apparatus 20 to the inside of the reinforcing tube 30 after inverting the reinforcing tube 30 to the inside of the water supply and drainage pipe 10 in the same manner as described above. When supplying steam to the reinforcement tube 30 in the 20, the inlet side of the reinforcement tube 30 is high temperature while the temperature of the front end of the reinforcement tube 30 is lowered, the reinforcement tube ( Since 30) takes a long time to fill the steam, there is a problem that the curing is not uniformly made even since the uniform steam is not supplied to the inside of the reinforcing tube 30, and also takes a long curing time. .

이러한 문제를 해결하기 위하여 본 출원인은 도 3및 도 4에 도시된 바와 같이 반전장치(20)에 연결관(40)을 연결하고, 상기 연결관(40)에 L자형 연결홀더(50)를 결합시킨 후 상기 연결홀더(50)에 보강튜브(30)를 연결하여 반전시킬 수 있도록 하는 한편 연결홀더(50)에는 스팀관(70)이 끼워지는 삽입구(60)를 형성하되 상기 스팀관(70)에는 보강튜브(30)의 내측으로 일정거리만큼 투입될 수 있도록 함으로써, 보강튜브(30)의 경화시 반전장치(20)와 스팀관(70)에서 동시에 스팀이 공급될 수 있도록 하여, 보강튜브(30)의 내측이 빠르고 균일한 온도로 스팀이 채워져 경화가 균일하게 이루어질 수 있도록 하는 "상하수관 비굴착 전체보수 갱생관의 현장 경화 공법."을 특허등록 10-0791318호로 등록 받은 바 있다.In order to solve this problem, the applicant connects the connecting pipe 40 to the inverting device 20 as shown in FIGS. 3 and 4, and couples the L-shaped connecting holder 50 to the connecting pipe 40. After the reinforcement tube 30 is connected to the connection holder 50 so as to be reversed, an insertion hole 60 into which the steam pipe 70 is inserted is formed in the connection holder 50, but the steam pipe 70 is formed. In the reinforcement tube 30 to be introduced into the inside by a predetermined distance, at the time of curing of the reinforcement tube 30 so that the steam can be supplied simultaneously from the reversing apparatus 20 and the steam tube 70, the reinforcement tube ( 30) has been registered as a patent registration No. 10-0791318, "in-situ hardening method of water and sewage pipe unexcavated total repair and rehabilitation pipe."

즉 상하수관로(10)에 열경화성 수지가 함침된 보강튜브(30)를 반전시켜 주입한 후 반전장치(20)에서 보강튜브(30)로 스팀을 공급하여 열경화가 이루어지도록 하되 반전장치(20)에서 상하수관로(10)의 입구에 연결관(40)과 연결홀더(50)를 사용하는 공법에 있어서, 상하수관로(10)에 반전되어 투입된 보강튜브(30)에 스팀관(70)을 끼워주되 상기 스팀관(70)의 선단은 보강튜브(30)의 내측에 놓이게 하고, 상기 스팀관(30)에는 연결홀더(50)를 통하여 스팀을 공급하는 것으로, 보강튜브(30)의 경화속도를 높이는 한편 균일한 경화가 이루어지도록 하고 있다.In other words, the inverted tube 30 impregnated with the thermosetting resin in the water supply and sewage pipe 10 is inverted and injected, and then the steam is supplied to the reinforcement tube 30 from the inverter 20 to be thermally cured, but the inversion device 20 In the method of using the connecting pipe 40 and the connecting holder 50 at the inlet of the water and sewage pipe 10, the steam pipe 70 is fitted to the reinforcement tube 30 inverted into the water and sewage pipe 10, The front end of the steam pipe 70 is placed inside the reinforcement tube 30, and the steam pipe 30 to supply steam through the connection holder 50, to increase the curing rate of the reinforcement tube (30) On the other hand, uniform curing is achieved.

그러나 상기 된 방식은 엑셀 파이프로 이루어진 스팀관(70)을 보강튜브(30)의 반전이 완료된 후 연결홀더(50)의 삽입구(60)를 이용하여 보강튜브(30)의 내측으로 삽입을 해 주어야 하나, 이때 스팀관(70)이 스팀에 견딜 수 있는 엑셀 파이프로 이루어져 있는 관계로, 연결홀더(50)에서 스팀관(70)을 보강튜브(30)의 내측으로 밀어 넣기가 곤란하고, 또한 보강튜브(30)의 내측으로 미리 길이를 정하여 스팀관(70)을 넣어주어야 하나, 그 길이를 맞추기가 곤란한 것이었다.However, the above method should be inserted into the reinforcement tube 30 by using the insertion hole 60 of the connection holder 50 after the reversal of the reinforcement tube 30 of the steam pipe 70 made of the Excel pipe. However, at this time, since the steam pipe 70 is made of an Excel pipe that can withstand steam, it is difficult to push the steam pipe 70 into the reinforcing tube 30 in the connection holder 50, and also reinforcement. The length of the steam tube 70 should be put in the tube 30 in advance, but it was difficult to match the length.

특히 스팀관(70)은 일정 경도를 갖게 되어 연결홀더(50)를 통하여 끼우는 작업이 대단히 번거롭고, 작업 시간도 많이 걸리게 되며, 또한 길이가 다른 여러 개의 스팀관(70)을 끼운 후에는 각각의 스팀관(70)으로 스팀을 공급해주기 위한 연결을 하여야 한다.In particular, the steam pipe 70 has a certain hardness, so that the work to be inserted through the connection holder 50 is very cumbersome and takes a lot of work time, and after inserting several steam pipes 70 having different lengths, each steam Connection to supply steam to the pipe (70) should be made.

본 발명은 상기와 같은 점을 감안하여 상하수관로의 내부에 보강튜브를 반전시켜 주입한 후 상기 보강튜브의 입구와 내측 일정 구간에서 스팀을 공급하여 보강튜브를 열경화시키도록 함에 있어서, 보강튜브를 반전장치에 감아줄 때 미리 길이가 다른 스팀튜브를 같이 감아준 후, 반전장치에서 보강튜브의 반전 고정과 함께 스팀튜브를 고정시킨 후 보강튜브의 반전이 이루어지게 하여 보강튜브의 내측으로 스팀튜브가 설치되게 한 후 보강튜브의 입구와 스팀튜브로 동시에 스팀을 공급함으로써 보강튜브의 경화시간을 줄이고, 전체적으로 균일한 품질의 경화가 이루어지도록 한다.In the present invention, the reinforcement tube is inverted and injected into the inside of the water supply and drainage pipe in view of the above point, and then the steam is supplied from the inlet and the inner portion of the reinforcement tube to thermally cure the reinforcement tube. When winding up the inverter, the steam tubes of different lengths are wound together in advance, and then the inverter is fixed with the inversion of the reinforcement tube. After installation, the steam is simultaneously supplied to the inlet of the reinforcing tube and the steam tube to reduce the curing time of the reinforcing tube, and to achieve a uniform quality of the overall curing.

본 발명은 상하수관로에 열경화성 수지가 함침된 보강튜브를 반전시켜 주입한 후 반전장치에서 보강튜브로 스팀을 공급하여 열경화가 이루어지도록 공법에 있어서, 보강튜브를 반전장치에 감을 때 스팀튜브도 보강튜브와 함께 감기도록 하고, 상기 보강튜브의 선단을 반전장치에 반전 고정시키기 전에 스팀튜브를 반전장치에 고정시키며, 보강튜브를 반전시키면 보강튜브가 상하수관로로 반전될 때 스팀튜브가 같이 상하수관로로 끼워지게 하고, 보강튜브의 반전이 완료되면 반전장치에서 보강튜브의 입구와 스팀튜브로 스팀을 공급하여 보강튜브의 열경화가 이루어지도록 함으로써 이루어지는 것으로, 보강튜브의 경화속도를 높이는 한편 균일한 경화가 이루어지도록 하는 것이다.The present invention is inverted by the reinforcing tube impregnated with a thermosetting resin in the water supply and sewage pipe injecting the steam from the reversing device in the reinforcing tube in the construction method so that the thermosetting is carried out, reinforcing the steam tube when winding the reinforcing tube in the inverting device The coils are wound together, and the steam tube is fixed to the inverting device before the tip of the reinforcing tube is inverted and fixed to the inverting device. When the reinforcing tube is inverted, the steam tube is connected to the water and sewage pipe together when the reinforcing tube is inverted to the water and sewage pipe. When the reinforcement tube is inverted, the reinforcing device is supplied with steam to the inlet of the reinforcement tube and the steam tube so that the thermosetting of the reinforcement tube is performed. To make it happen.

본 발명은 비굴착 방식으로 상하수관로에 열경화성 수지를 함침시킨 보강튜브를 반전하여 설치한 때 보강튜브의 내측으로 스팀튜브를 설치하여 보강튜브를 경화시키는 스팀이 보강튜브의 입구와 스팀튜브를 통하여 공급되게 함으로써 보강튜브의 열경화 시간을 줄이는 한편 보강튜브의 열경화가 일관되게 이루어져 품질을 향상시킬 수 있게 된다.In the present invention, when the reinforcing tube impregnated with a thermosetting resin in the water supply and sewage pipe in the non-excavation method, the steam to install the steam tube to the inside of the reinforcement tube to cure the reinforcement tube is supplied through the inlet of the reinforcement tube and the steam tube By reducing the heat curing time of the reinforcement tube by the heat treatment of the reinforcement tube is made consistently it is possible to improve the quality.

또한 본 발명은 보강튜브의 반전 설치시 스팀튜브가 동시에 설치되게 되므로, 기존과 같이 별도의 스팀 파이프를 설치하는 어려움이 없어지게 되므로, 작업시간을 단축할 수 있으며, 보강튜브를 수 개 사용하는 빠른 시간에 경화시킬 수 있다.In addition, the present invention is because the steam tube is installed at the same time when the reverse installation of the reinforcement tube, so as to eliminate the difficulty of installing a separate steam pipe as in the past, can shorten the working time, fast using several reinforcement tube It can be cured in time.

본 발명은 상하수관로의 내부 이물질을 제거하고 세척한 후 반전장치에서 열경화성 수지가 함침된 보강튜브를 반전시켜 상하수관로에 끼워준 후 반전장치를 통하여 보강튜브의 내측으로 스팀을 공급하여 열경화가 이루어지도록 하는 공법에 있어서, 보강튜브를 반전장치에 감아줄 때 보강튜브가 일정길이만큼 감긴 후 보강튜브의 내측으로 스팀튜브를 끼워주어 보강튜브와 함께 스팀튜브가 반전장치에 감기도록 한 후 반전장치에 보강튜브를 고정시키기 전에 스팀튜브를 고정시키되 상기 보강튜브와 스팀튜브에는 스팀이 공급되게 함으로써 이루어지게 된다.The present invention removes and cleans the internal debris of the water supply and drainage pipe line and then inverts the reinforcement tube impregnated with the thermosetting resin in the inverting device inserted into the water and sewage pipe line and supply steam to the inside of the reinforcement tube through the inverting device so that the thermosetting is made. In the construction method, when the reinforcing tube is wound around the reversing device, the reinforcing tube is wound by a certain length, and then the steam tube is inserted into the reinforcing tube so that the steam tube is wound on the reversing device together with the reinforcing tube and then reinforcing the reversing device. The steam tube is fixed before the tube is fixed, but is made by supplying steam to the reinforcement tube and the steam tube.

즉 본 발명은 반전장치에 보강튜브를 감을 때 스팀튜브를 같이 감아주는 과정과, 보강튜브를 고정시키기 전에 스팀튜브를 스팀 공급호스에 고정하는 과정과, 보강튜브를 고정시킨 후 상수관로에 반전 주입시키는 과정과, 상기 반전장치에서 보강튜브와 스팀튜브로 스팀을 공급하여 보강튜브를 경화시키는 과정과, 보강튜브를 상수관로에 맞추어 절단한 후 스팀튜브를 회수하는 과정을 수행시킴으로써 이루어지게 된다.That is, according to the present invention, a process of winding a steam tube together when winding a reinforcement tube in the inverter, a process of fixing the steam tube to a steam supply hose before fixing the reinforcement tube, and inverting the reinforcement tube after fixing the reinforcement tube And a process of supplying steam to the reinforcement tube and the steam tube in the inverter, curing the reinforcement tube, and cutting the reinforcement tube according to the water pipe and recovering the steam tube.

여기서 스팀튜브는 보강튜브가 반전되면 보강튜브의 내측에 위치하게 되나, 보강튜브가 일정길이만큼 감긴 후 스팀튜브가 감도록 하여 보강튜브 내부 깊숙이 위치되게 함으로써, 보강튜브의 내측으로 깊숙이 스팀이 공급될 수 있도록 한다.Here, the steam tube is located inside the reinforcing tube when the reinforcing tube is reversed, but after the reinforcing tube is wound for a certain length, the steam tube is wound so that the steam tube is located deep inside the reinforcing tube, so that steam can be supplied deeply into the reinforcing tube. To help.

본 발명은 보강튜브의 내측으로 스팀을 공급하되 상기 스팀이 스팀튜브를 통하여 보강튜브의 내부 깊숙이 공급되게 되므로, 보강튜브가 전체적으로 균일한 스팀온도로 경화가 빠르고 균일 되게 이루어지도록 하는 것이다.The present invention supplies steam to the inside of the reinforcing tube, but the steam is supplied deep inside the reinforcing tube through the steam tube, so that the reinforcing tube is made to be uniform and fast curing at a uniform steam temperature as a whole.

본 발명의 스팀튜브는 소방호스와 같이 높은 압력을 견디면서도 쉽게 감아줄 수 있는 것을 사용하되 보강튜브보다 적은 길이를 갖고 보강튜브와 함께 반전장치에 감길 수 있도록 한다.The steam tube of the present invention is used to withstand high pressures like a fire hose, but can be easily wound, but has a length less than that of the reinforcement tube and can be wound on the inverter together with the reinforcement tube.

여기서 보강튜브가 반전되어 펼쳐 졌을 때 스팀튜브는 상기 보강튜브의 내측에서 보강튜브 보다는 적은 길이만큼 펼쳐 질 수 있도록 하고, 보강튜브와 함께 반전장치에 감기되 보강튜브의 끝단이 반전장치에 고정되게 전에 스팀튜브가 반전장치를 통하여 고정이 이루어지며, 상기 보강튜브의 내측과 스팀튜브로 고압의 공기나 스팀이 공급될 수 있도록 한다.Here, when the reinforcing tube is inverted and unfolded, the steam tube can be unfolded by less length than the reinforcing tube inside the reinforcing tube, and wound together with the reinforcing tube to the inverter, but before the end of the reinforcing tube is fixed to the inverter. The steam tube is fixed through an inverting device, so that high pressure air or steam can be supplied to the inner side of the reinforcement tube and the steam tube.

본 발명은 반전장치에 반전되어 끼워진 보강튜브에 반전장치를 통하여 증기가 공급될 수 있도록 하되 보강튜브의 반전시 보강튜브의 내측으로 깊숙이 끼워져 있는 스팀튜브를 통하여 스팀이 공급되게 하는 것으로, 스팀이 공급될 때 보강튜브의 입구로 공급되는 동시에 스팀튜브를 통하여 보강튜브의 내측 깊숙이 공급되는 것이다.The present invention allows steam to be supplied to the reinforcing tube inverted into the reversing apparatus through the reversing apparatus so that the steam is supplied through the steam tube deeply inserted into the reinforcing tube when the reinforcing tube is inverted. When it is supplied to the inlet of the reinforcement tube at the same time is supplied deep inside the reinforcement tube through the steam tube.

즉 본 발명은 보강튜브에 스팀을 공급하는 동시에 보강튜브의 내측으로 끼워진 스팀튜브를 통하여 스팀을 공급함으로써 온도를 높이지 않고도 균일한 품질의 열경화가 이루어지게 하는 한편 경화시간을 줄이도록 하는 것이다.In other words, the present invention is to supply steam to the reinforcing tube and at the same time by supplying steam through the steam tube inserted into the reinforcing tube to achieve a uniform quality of thermal curing without reducing the temperature while reducing the curing time.

여기서 보강튜브의 내측으로 끼워지는 스팀튜브는 길이를 다르게 하여 하나 이상 여러 개를 끼워주도록 하되 각각의 길이를 달리함으로써, 보강튜브와 스팀튜브로 동시에 스팀이 공급되었을 경우 동시에 여러 곳에서 스팀이 공급되어 균일한 열경화가 이루어지도록 한다.Here, the steam tube that is inserted into the reinforcement tube is different in length so that one or more pieces can be fitted, but by varying the length, when steam is simultaneously supplied to the reinforcement tube and the steam tube, steam is supplied from several places at the same time. Ensure uniform thermal curing.

이러한 본 발명을 첨부된 실시예 도면에 의거 상세히 설명하기로 한다.The present invention will be described in detail with reference to the accompanying drawings.

본 발명은 상하수관로(10)를 세척하고 건조한 후 반전장치(20)의 입구를 통하여 내부에서 보강튜브(30)를 감아주도록 하고, 반전장치(20)의 입구에 연결관(40)과 연결홀더(50)를 고정하며, 상기 연결홀더(50)의 입구 외측으로 반전장치(20)에 감겨진 보강튜브(30)를 고정시킨 후 상하수관로(10)의 내부로 보강튜브(30)를 반전하여 투입하는 공지의 갱생관 열경화 공법에 있어서, 상기 보강튜브(30)가 반전장치(20)의 내부에 감겨질 때 일정 길이를 갖는 스팀튜브(80)를 같이 감기게 하되 상기 스팀튜브(80)는 반전장치(20)의 외측에 고정된 브라켓(21)의 고정구(22)에 끼워져 고정되게 하고, 상기 보강튜브(30)는 반전장치(20)의 입구나 연결홀더(50)에서 고정된 후 상하수관로(10)의 내부로 반전되어 주입되게 한다.The present invention is to wash the water and sewage pipe (10) and to dry the reinforcing tube 30 from the inside through the inlet of the inverting device 20, the connection pipe 40 and the connection holder to the inlet of the inverting device (20) Fixing the 50, and fixing the reinforcement tube 30 wound on the inverting device 20 to the outside of the inlet of the connection holder 50, and then inverts the reinforcement tube 30 into the interior of the water and sewer pipe (10) In the known reinforcement tube thermal curing method, the reinforcement tube 30 is wound around the inside of the reversing device 20, the coiling the steam tube 80 having a predetermined length together, but the steam tube 80 Is fixed to the fixture 22 of the bracket 21 fixed to the outside of the reversing device 20, and the reinforcing tube 30 is fixed at the inlet or connecting holder 50 of the reversing device 20 Reversed to the inside of the water and sewage pipe 10 to be injected.

여기서 스팀공급호스(90)의 스팀은 반전장치(20)의 내부로 공급되어 보강튜브(30)의 내측으로 공급되는 한편 밸브(81)를 통하여 스팀튜브(80)의 내측으로 공급될 수 있도록 한다.Here, the steam of the steam supply hose 90 is supplied to the inside of the reversing device 20 to be supplied to the inside of the reinforcement tube 30 and to be supplied to the inside of the steam tube 80 through the valve 81. .

본 발명은 반전장치(20)의 입구 외측으로 스팀튜브(80)가 끼워지는 고정구(22)가 형성된 브라켓(21)을 설치하고, 상기 브라켓(21)의 고정구(22)에는 밸브(81)를 통하여 스팀공급호스(90)가 연결되게 하며, 상기 브라켓(21)은 볼트에 의해 착탈되어 고정구(22)가 노출될 수 있도록 하고, 상기 고정구(22)에는 반전장치(20)의 내측에서 스팀호스(80)가 끼워져 밴드(23)로 결합될 수 있도록 한다.According to the present invention, a bracket (21) having a fixture (22) into which a steam tube (80) is fitted to the outside of the inlet of the inverter (20) is installed, and a valve (81) is attached to the fixture (22) of the bracket (21). The steam supply hose 90 is connected through, and the bracket 21 is detached by a bolt so that the fixture 22 can be exposed, and the fixture 22 has a steam hose inside the inverter 20. 80 is fitted to be coupled to the band (23).

상기 스팀공급호스(90)로는 외부에서 스팀이나 고압의 공기가 공급되게 되며, 상기 스팀공급호스(90)로 공급된 스팀은 반전장치(20)의 내부로 공급된 후 보강튜브(30)를 반전시키기 위하여 보강튜브(30)를 밀어주는데 사용되는 한편 밸브(81)를 통하여 스팀튜브(80)로 공급되게 된다.Steam or high pressure air is supplied from the outside to the steam supply hose 90, and the steam supplied to the steam supply hose 90 is supplied to the inside of the inverter 20 and then reverses the reinforcement tube 30. It is used to push the reinforcement tube 30 in order to be supplied to the steam tube 80 through the valve (81).

이러한 구성의 본 발명에서, 상하수관로(10)를 세척하고 건조한 후 반전장치(20)의 입구를 통하여 내부에서 보강튜브(30)를 감아주도록 하고, 반전장치(20)의 입구에 연결관(40)과 연결홀더(50)를 고정하며, 상기 연결홀더(50)의 입구 외측으로 반전장치(20)에 감겨진 보강튜브(30)를 고정시킨 후 상하수관로(10)의 내부로 보강튜브(30)를 반전하여 투입하는 갱생관 열경화 공법은 공지의 공법으로써, 이에 대한 상세 설명은 생략하기로 한다.In the present invention of such a configuration, after washing and drying the water and sewage pipe (10) to wind the reinforcing tube 30 from the inside through the inlet of the inverting device 20, the connection pipe 40 to the inlet of the inverting device (20) ) And the connection holder 50, and after fixing the reinforcement tube 30 wound on the inverting device 20 to the outside of the inlet of the connection holder 50, the reinforcement tube 30 into the interior of the water supply and drainage pipe (10). Reinforcement tube thermosetting method to invert the) is a known method, a detailed description thereof will be omitted.

그리고 반전장치(20)의 입구에 연결관(40)을 연결하지 않고, 반전장치(20)의 입구에 보강튜브(30)를 직접 연결시켜도 무방한 것으로, 본 발명에서는 연결관(40) 과 연결홀더(50)를 연결한 상태의 실시예에 대하여 설명하기로 한다.And without connecting the connecting pipe 40 to the inlet of the inverting device 20, it is possible to connect the reinforcing tube 30 directly to the inlet of the inverting device 20, in the present invention is connected to the connecting pipe 40 An embodiment of a state in which the holder 50 is connected will be described.

본 발명은 연결관(40)을 반전장치(20)에 연결하기 전에 반전장치(20)의 내부로 보강튜브(30)를 감아주게 되며, 이때 보강튜브(30)와 함께 스팀튜브(80)를 같이 감아주도록 하며, 상기 스팀튜브(80)는 보강튜브(30)가 일정거리만큼 감긴 후부터 감아지게 하며, 상기 스팀튜브(80)는 브라켓(21)의 고정구(22)에 연결한다.The present invention is to wrap the reinforcing tube 30 into the interior of the reversing device 20 before connecting the connecting pipe 40 to the reversing device 20, wherein the steam tube 80 together with the reinforcing tube 30 The steam tube 80 is wound up after the reinforcing tube 30 is wound by a predetermined distance, and the steam tube 80 is connected to the fixture 22 of the bracket 21.

여기서 보강튜브(30)의 일측으로 스팀튜브(80)를 놓고, 보강튜브(30)와 스팀튜브(80)를 감아주게 되는 것으로, 반전장치(20)의 내부에는 보강튜브(30)와 함께 스팀튜브(80)가 감겨져 있게 된다.Here, the steam tube 80 is placed on one side of the reinforcement tube 30, and the reinforcement tube 30 and the steam tube 80 are wound around the steam reinforcement tube 30 together with the reinforcement tube 30. The tube 80 is wound up.

반전장치(20)의 내부에 보강튜브(30)와 스팀튜브(80)가 감긴 후에는 반전장치(20)의 일측에 설치된 브라켓(21)을 분리한 후 브라켓(21)의 고정구(22)에 스팀튜브(80)의 선단을 끼워 밴드(23)로 고정하고, 상기 브라켓(21)은 반전장치(20)에 고정시키도록 한다.After the reinforcing tube 30 and the steam tube 80 are wound inside the reversing apparatus 20, the bracket 21 installed on one side of the reversing apparatus 20 is removed, and then the fixing tool 22 of the bracket 21 is removed. The front end of the steam tube 80 is fitted into the band 23 to fix the bracket 21 to the inverting device 20.

그리고 연결관(40)의 내부와 연결홀더(50)를 통하여 보강튜브(30)를 빼낸 후 보강튜브(30)의 선단을 연결홀더(50)의 외측에 고정시키고, 보강튜브(30)를 상하수관로(10)의 내부에 끼워준다.Then, the reinforcing tube 30 is removed through the inside of the connecting pipe 40 and the connecting holder 50, and the front end of the reinforcing tube 30 is fixed to the outside of the connecting holder 50, and the reinforcing tube 30 is raised. Insert into the sewer pipe (10).

그리고 스팀공급호스(90)로 고압의 공기를 공급하게 되면, 반전장치(20)의 내부로 공급된 고압의 공기가 연결관(40)과 연결홀더(50)를 거쳐 보강튜브(30)를 반전시키게 되며, 이때 보강튜브(30)는 반전과 함께 상하수관로(10)에 끼워지게 되고, 이와 동시에 스팀튜브(80)가 보강튜브(30)의 내측에 끼워진 상태로 펼쳐지게 된다.When the high pressure air is supplied to the steam supply hose 90, the high pressure air supplied into the inverter 20 inverts the reinforcement tube 30 through the connection pipe 40 and the connection holder 50. At this time, the reinforcement tube 30 is fitted to the water and sewage pipe 10 with the inversion, and at the same time the steam tube 80 is unfolded in the state of being fitted inside the reinforcement tube (30).

즉 보강튜브(30)와 함께 스팀튜브(80)를 감아준 상태에서 보강튜브(30)를 반전시켜 펼치게 되므로, 스팀튜브(80)는 보강튜브(30)의 내측에서 보강튜브(30)와 함께 펼쳐지게 된다.That is, since the reinforcement tube 30 is inverted and unfolded while the steam tube 80 is wound together with the reinforcement tube 30, the steam tube 80 is together with the reinforcement tube 30 inside the reinforcement tube 30. It will unfold.

보강튜브(30)가 완전히 반전되어 상하수관로(10)에 끼워지게 되면, 스팀튜브(80)는 보강튜브(30)보다 짧게 끼워져 있게 되고, 만약에 스팀튜브(80)를 두 개 이상 끼울 경우 두 개의 스팀튜브는 길이를 다르게 하여 끼워질 수 있도록 한다.When the reinforcement tube 30 is completely reversed and fitted to the water and sewage pipe line 10, the steam tube 80 is shorter than the reinforcement tube 30, and if two or more steam tubes 80 are fitted, The two steam tubes can be fitted with different lengths.

보강튜브(30)가 완전히 반전되어 끼워지게 되면, 스팀공급호스(90)로 스팀을 공급함으로써 스팀이 반전장치(20)의 내부에서 연결관(40)과 연결홀더(50)를 통하여 보강튜브(30)로 공급되게 되고, 밸브(81)를 개방하는 경우 스팀튜브(80)의 내부로도 스팀이 공급되게 된다.When the reinforcement tube 30 is completely inverted and fitted, the steam is supplied to the steam supply hose 90 so that the steam is reinforced through the connection pipe 40 and the connection holder 50 in the inverter 20. 30 is supplied to the steam, and when the valve 81 is opened, steam is also supplied to the inside of the steam tube 80.

즉 보강튜브(30)를 경화시키기 위한 스팀은 스팀공급호스(90)에서 반전장치(20)를 통하여 보강튜브(30)로 공급하는 동시에 밸브(81)를 개방하여 스팀튜브(80)를 통하여 공급이 이루어지게 된다.That is, the steam for curing the reinforcement tube 30 is supplied from the steam supply hose 90 to the reinforcement tube 30 through the inverter 20, and at the same time, the valve 81 is opened to supply the steam through the steam tube 80. This is done.

따라서 보강튜브(30)를 경화시키기 위한 스팀은 보강튜브(30)의 입구를 통하여 공급되는 동시에 스팀튜브(80)를 통하여 보강튜브(30)의 내측에서 공급되게 되므로, 스팀이 보강튜브(30)의 내측으로 빠르면서 골고루 공급되게 되므로, 균일한 경화가 이루어지게 된다.Therefore, the steam for curing the reinforcement tube 30 is supplied through the inlet of the reinforcement tube 30 at the same time is supplied from the inside of the reinforcement tube 30 through the steam tube 80, the steam is reinforced tube 30 Since it is quickly and evenly supplied to the inside of, uniform curing is made.

즉 기존에는 보강튜브(30)를 경화시킬 때 보강튜브(30)의 입구를 통하여 스팀이 공급되므로, 보강튜브(30) 전체가 스팀으로 경화되기 위해서는 시간이 오래 걸리고, 또한 보강튜브(30)의 입구 쪽과 끝단의 온도 차이가 발생화게 되어 균일한 경화를 보장할 수 없는 것이다.That is, conventionally, since steam is supplied through the inlet of the reinforcing tube 30 when the reinforcing tube 30 is cured, it takes a long time for the entire reinforcing tube 30 to be cured with steam, and also the reinforcing tube 30 of the The temperature difference between the inlet and the end will be generated, which will not guarantee uniform curing.

그러나 본 발명은 보강튜브(30)의 입구와 보강튜브(30)의 내측에서 스팀튜브(80)를 통하여 스팀이 다 방향에서 공급되므로, 빠른 시간에 경화를 시킬 수 있는 동시에 온도 차이를 줄일 수 있어 균일한 품질의 경화를 이룰 수 있게 된다.However, in the present invention, since the steam is supplied in multiple directions through the steam tube 80 at the inlet of the reinforcing tube 30 and the inside of the reinforcing tube 30, it can be cured in a short time and at the same time reduce the temperature difference. A uniform quality of hardening can be achieved.

이 같이 본 발명은 보강튜브(30)의 열경화가 순차적으로 진행되지 않고 전체적으로 진행되게 되므로, 기존과 같이 경화온도를 높여주지 않아도 경화가 진행되게 되어 보강튜브(30)의 입구 쪽 또는 연결관(40)이 손상되는 경우를 없애게 되며, 또한 스팀튜브(80)를 여러 개 설치할 경우 보다 빠르게 열경화를 진행할 수 있고, 보강튜브(30)의 경화 품질도 향상시킬 수 있게 된다.As described above, the present invention does not proceed sequentially with the thermosetting of the reinforcing tube 30, so that the curing proceeds without raising the curing temperature as in the prior art, so that the inlet side of the reinforcing tube 30 or the connecting pipe ( 40 is eliminated the damage, and also if the steam tube 80 is installed a plurality of heat curing can proceed faster, it is possible to improve the curing quality of the reinforcement tube (30).

도 1및 도 2는 기존의 보강튜브 삽입 상태를 보인 단면도1 and 2 is a cross-sectional view showing a state of inserting a conventional reinforcement tube

도 3및 도 4는 도 1및 도 2를 개선한 상태의 단면도3 and 4 are cross-sectional views of an improved state of FIGS. 1 and 2.

도 5및 도 6은 연결홀더에 스팀관을 끼우는 상태를 보인 단면도5 and 6 are cross-sectional view showing a state of fitting the steam pipe to the connection holder.

도 7은 본 발명에서 보강튜브와 스팀튜브를 상하수관로에 삽입시키는 상태의 단면도Figure 7 is a cross-sectional view of the state in which the reinforcing tube and steam tube is inserted into the water and sewage pipe in the present invention

도 8은 본 발명에서 보강튜브와 스팀튜브를 상하수관로에 삽입시킨 상태의 단면도Figure 8 is a cross-sectional view of the reinforcement tube and steam tube inserted into the water and sewage pipe in the present invention

도 9는 본 발명의 보강튜브와 스팀튜브의 설치상태를 보인 단면도9 is a cross-sectional view showing the installation state of the reinforcing tube and steam tube of the present invention.

도 10은 본 발명 반전장치의 입구부위 사시도10 is a perspective view of the inlet portion of the present invention reversing device

도 11은 본 발명의 브라켓 분리 상태 사시도Figure 11 is a perspective view of the bracket detachment state of the present invention

도 12는 본 발명의 브라켓에 스팀튜브를 끼운 상태의 사시도12 is a perspective view of the steam tube fitted to the bracket of the present invention;

도 13은 본 발명의 보강튜브와 스팀튜브를 감기 전 사시도Figure 13 is a perspective view before winding the reinforcement tube and the steam tube of the present invention

도 14는 본 발명의 보강튜브와 스팀튜브의 감은 상태 측면도Figure 14 is a side view of the reinforcing tube and steam tube of the present invention wound

[도면의 주요 부분에 대한 부호의 설명][Description of Symbols for Main Parts of Drawing]

10 : 상하수관로 20 : 반전장치10: water and sewage pipe 20: inverting device

21 : 브라켓 22 : 고정구21: bracket 22: fixture

30 : 보강튜브 40 : 연결관30: reinforcement tube 40: connector

50 : 연결홀더 80 : 증기파이프50: connection holder 80: steam pipe

81 : 밸브 90 : 스팀공급호스81: valve 90: steam supply hose

Claims (3)

반전장치(20)에 연결된 연결관(40)과 연결홀더(50)를 통하여 상하수관로(10)의 내부로 열경화성 수지가 함침된 보강튜브(30)를 반전시켜 주입한 후 보강튜브(30)의 내측으로 스팀을 주입하여 보강튜브(30)를 경화시키는 갱생관의 현장 경화 공법에 있어서, After inverting and injecting the reinforcement tube 30 impregnated with the thermosetting resin into the water and sewage pipe line 10 through the connection pipe 40 and the connection holder 50 connected to the inversion device 20, In the field hardening method of the rehabilitation pipe that injects steam to cure the reinforcement tube 30, 상기 반전장치(20)에 보강튜브(30)를 감을 때 스팀튜브(80)를 같이 감아주되 보강튜브(30)가 일정길이만큼 감긴 후 스팀튜브(80)가 감기도록 하는 과정과,Winding the reinforcing tube 30 on the reversing device 20, while winding the steam tube 80 together, and then winding the reinforcing tube 30 by a predetermined length so that the steam tube 80 is wound; 반전장치(20)에 감긴 보강튜브(30)를 연결홀더(50)에 고정시키기 전에 스팀튜브(80)를 스팀 공급호스(90)에 연결하는 과정과, Connecting the steam tube 80 to the steam supply hose 90 before fixing the reinforcing tube 30 wound around the reversing apparatus 20 to the connection holder 50; 스팀튜브(80)를 연결하고, 보강튜브(30)를 고정시킨 후 상하수관로(10)에 보강튜브(30)를 반전 주입시키는 과정과, Connecting the steam tube 80, fixing the reinforcement tube 30, and inverting and injecting the reinforcement tube 30 into the water and sewage pipe line 10; 보강튜브(30)의 반전 주입이 완료된 후 스팀공급호스(90)로 공급되는 스팀을 보강튜브(30)와 스팀튜브(80)로 공급하여 보강튜브(30)를 경화시키는 과정과, A process of curing the reinforcement tube 30 by supplying steam supplied to the steam supply hose 90 to the reinforcement tube 30 and the steam tube 80 after the reverse injection of the reinforcement tube 30 is completed; 보강튜브(30)의 경화가 완료된 후 보강튜브(30)를 상하수관로(10)에 맞추어 절단한 후 스팀튜브(80)를 회수하는 과정을 수행하여 이루어지는 것을 특징으로 하는 상하수관 비굴착 전체보수 갱생관의 경화 공법.After the hardening of the reinforcement tube 30 is completed, the reinforcing tube 30 is cut according to the water supply and drain pipe line 10, and then the process of recovering the steam tube 80 is characterized in that the water and sewage pipe non-excavation overall repair rehabilitation is performed. Tube hardening method. 반전장치(20)에 보강튜브(30)를 감아준 후 보강튜브(30)를 상하수관로(10)에 반전 주입시킨 후 경화시키는 갱생관의 현장 경화 장치에 있어서,In the field curing apparatus of the rehabilitation tube to wind the reinforcement tube 30 to the inverting device 20 and then invert the reinforcing tube 30 into the water and sewage pipe 10 and then harden, 반전장치(20)의 내측으로 보강튜브(30)와 함께 스팀튜브(80)가 감기게 하고, 상기 반전장치(20)의 입구 외측으로 스팀튜브(80)가 끼워지는 고정구(22)가 형성된 브라켓(21)이 착탈 가능하게 설치되고, 상기 브라켓(21)의 고정구(22)에 결합된 스팀튜브(80)에는 밸브(81)를 통하여 스팀공급호스(90)가 연결되게 하며, 상기 스팀공급호스(90)는 반전장치(20)와 스팀튜브(80)로 고압의 공기 또는 스팀을 공급하게 구성한 것을 특징으로 하는 상하수관 비굴착 전체보수 갱생관의 경화 장치A bracket having a fastener 22 into which the steam tube 80 is wound together with the reinforcing tube 30 to the inside of the reversing apparatus 20, and the steam tube 80 is fitted to the outside of the inlet of the reversing apparatus 20. 21 is detachably installed, and the steam supply hose 90 is connected to the steam tube 80 coupled to the fixing tool 22 of the bracket 21 through a valve 81, and the steam supply hose 90 is a hardening device for water and sewage pipe unexcavated total repair rehabilitation pipe, characterized in that configured to supply high-pressure air or steam to the inverter 20 and the steam tube 80 제2항에 있어서, 보강튜브(30)와 같이 반전장치(20)에 감기는 스팀튜브(80)는 보강튜브(30)가 감긴 후 일정 길이를 지나서부터 감기도록 하고, 보강튜브(30)가 완전히 감긴 후 일정 길이만큼 더 감기는 길이를 갖도록 하는 것을 특징으로 하는 상하수관 비굴착 전체보수 갱생관의 경화 장치.The method according to claim 2, wherein the steam tube 80 wound around the reversing device 20, such as the reinforcing tube 30 is wound after passing through a predetermined length after the reinforcing tube 30 is wound, the reinforcing tube 30 is Hardening apparatus of water and sewage pipe unexcavated total repair rehabilitation pipe, characterized in that it has a length that is wound up by a predetermined length after winding completely.
KR1020080105609A 2008-10-28 2008-10-28 Method and device for hardening a rehabilitating pipe KR100899861B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080105609A KR100899861B1 (en) 2008-10-28 2008-10-28 Method and device for hardening a rehabilitating pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080105609A KR100899861B1 (en) 2008-10-28 2008-10-28 Method and device for hardening a rehabilitating pipe

Publications (1)

Publication Number Publication Date
KR100899861B1 true KR100899861B1 (en) 2009-05-29

Family

ID=40862599

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080105609A KR100899861B1 (en) 2008-10-28 2008-10-28 Method and device for hardening a rehabilitating pipe

Country Status (1)

Country Link
KR (1) KR100899861B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0347733A (en) * 1989-07-17 1991-02-28 Japan Steel & Tube Constr Co Ltd Lining material for reverse lining
KR20000006990A (en) * 1999-11-17 2000-02-07 김유성 Method and apparatus for inverting impregnated tube in pipe
KR20010105173A (en) * 2000-05-18 2001-11-28 가미야마 다카오 An eversion nozzle for a pipe lining member and a pipe lining process
KR100433060B1 (en) 2001-05-03 2004-05-28 엘지건설 주식회사 An Appartus and Methode for Repairing pipelines Without digging

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0347733A (en) * 1989-07-17 1991-02-28 Japan Steel & Tube Constr Co Ltd Lining material for reverse lining
KR20000006990A (en) * 1999-11-17 2000-02-07 김유성 Method and apparatus for inverting impregnated tube in pipe
KR20010105173A (en) * 2000-05-18 2001-11-28 가미야마 다카오 An eversion nozzle for a pipe lining member and a pipe lining process
KR100433060B1 (en) 2001-05-03 2004-05-28 엘지건설 주식회사 An Appartus and Methode for Repairing pipelines Without digging

Similar Documents

Publication Publication Date Title
KR101354120B1 (en) Method and apparatus for non-digging renovation
KR101125215B1 (en) Non-digging sewerage mending apparatus and its manufacturing method
KR100606188B1 (en) Polyethylene pi p e rehabilitation
KR100949956B1 (en) A hardening quickly repairing method for aged water pipes using air-tube
KR100921481B1 (en) Apparatus and methode for repairing pipelines withoutdigging of drain pipe
KR100590001B1 (en) sewer pipe repairing process
KR100791318B1 (en) Method for hardening a rehabilitating pipe
KR101206994B1 (en) Partial repairing method for inner pipe using stainless reinforcement pipe
KR101272131B1 (en) A repairing device of water pipe by non-digging using turning inside out of reinforce tube
KR100899861B1 (en) Method and device for hardening a rehabilitating pipe
KR20060054925A (en) Top and bottom water pipe part repair device and method of construction
KR101168048B1 (en) Non-digging sewerage mending apparatus and its manufacturing method
KR101083363B1 (en) A turning inside out repairing device of water pipe by non-digging using nulti-function safety high pressure hose and method of construction thereof
KR101109660B1 (en) Non-digging sewerage mending apparatus and its manufacturing method
KR20060122361A (en) Non-excavation mortar injection method
KR100838923B1 (en) Sewage pipe unexcavated lining composite pipe repair
KR100784617B1 (en) Method for rehabilitating pipe conduit
JP5893276B2 (en) Ground reinforcement method around underground pipes
KR100871311B1 (en) Steam backflow prevention device and pipeline reversal development method
KR20120085398A (en) Repairing Method Of Wrinkle Pipe Using Paker and Thereof Paker
KR20050072863A (en) A not-digging repair method for pipe connetion part, damage part, pipe sill
KR102243581B1 (en) Method for finishing of pipe line renovation
KR100648981B1 (en) Sleeve of reparing for water supply ducts
JP2012102766A (en) Method of repairing fitting pipe
KR100739858B1 (en) Repair method for drain

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130515

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20140521

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20150521

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20160523

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20170522

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20180521

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20190521

Year of fee payment: 11