KR100877580B1 - 쉴드공법의 뒷채움재 시험장치 - Google Patents
쉴드공법의 뒷채움재 시험장치 Download PDFInfo
- Publication number
- KR100877580B1 KR100877580B1 KR1020080000529A KR20080000529A KR100877580B1 KR 100877580 B1 KR100877580 B1 KR 100877580B1 KR 1020080000529 A KR1020080000529 A KR 1020080000529A KR 20080000529 A KR20080000529 A KR 20080000529A KR 100877580 B1 KR100877580 B1 KR 100877580B1
- Authority
- KR
- South Korea
- Prior art keywords
- shield
- inner tube
- tube
- filling space
- filling
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0607—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
Abstract
Description
Claims (2)
- 지지판(1); 상기 지지판(1)에 고정되게 설치된 쉴드추진용피스톤(2); 상기 쉴드추진용피스톤(2)이 내부에 삽입되게 설치되고, 일측단부가 지지판(1)에 고정된 내관(3); 상기 내관(3)의 외측에 설치되어 내관(3)의 외측 둘레에 동일한 크기의 충진공간(4)이 빙 둘러 형성되게 설치된 외관(5); 상기 충진공간(4)에 삽입되되, 내관(3)의 외측과 외관(5)의 내측에 기밀되게 접촉되며, 상기 쉴드추진용피스톤(2)의 작동에 의해 충진공간(4)에서 이동되게 설치되고, 충진공간(4)에 뒷채움재(6)를 주입할 수 있도록 된 모형쉴드(7);를 포함하여 구성됨을 특징으로 하는 쉴드공법의 뒷채움재 시험장치.
- 제 1항에 있어서, 모형쉴드(7)는 내관(3)과 외관(5)의 사이 충진공간(4)에 삽입되는 크기이고, 길이 방향으로 그라우트주입홀(8)이 관통되게 뚫려 외부의 주입관(9)과 연결되어 뒷채움재(6)가 송급되는 관체(10); 관체(10)의 양단부에 고리형상으로 설치되어 내관(3)과 외관(5)에 기밀되게 유지하는 실링(11); 상기 각각의 실링(11)의 외측에 부착되어 실링(11)을 관체(10)에 고정시키는 고정링(12);으로 구성됨을 특징으로 하는 쉴드공법의 뒷채움재 시험장치.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080000529A KR100877580B1 (ko) | 2008-01-03 | 2008-01-03 | 쉴드공법의 뒷채움재 시험장치 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080000529A KR100877580B1 (ko) | 2008-01-03 | 2008-01-03 | 쉴드공법의 뒷채움재 시험장치 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100877580B1 true KR100877580B1 (ko) | 2009-01-07 |
Family
ID=40482325
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080000529A KR100877580B1 (ko) | 2008-01-03 | 2008-01-03 | 쉴드공법의 뒷채움재 시험장치 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100877580B1 (ko) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104062408A (zh) * | 2014-07-08 | 2014-09-24 | 北京科技大学 | 一种分层注浆模型试验系统 |
CN104329556A (zh) * | 2014-09-20 | 2015-02-04 | 辽宁三三工业有限公司 | 盾构机中心回转接头 |
CN104655803A (zh) * | 2015-01-30 | 2015-05-27 | 北京交通大学 | 一种隧道注浆模型试验装置 |
CN105545325A (zh) * | 2015-12-29 | 2016-05-04 | 上海隧道工程有限公司 | 类矩形盾构同步注浆可视化模拟试验系统及方法 |
CN108278118A (zh) * | 2018-01-25 | 2018-07-13 | 山东大学 | 地质力学模型试验复杂结构洞室群开挖定位装置及方法 |
CN110529148A (zh) * | 2019-07-24 | 2019-12-03 | 中南大学 | 一种用于模拟填土注浆的实验装置及实验方法 |
CN110761801A (zh) * | 2019-12-14 | 2020-02-07 | 哈尔滨工业大学 | 一种模拟移动式小型盾构机施工扰动土体室内装置及方法 |
CN111337278A (zh) * | 2020-02-24 | 2020-06-26 | 清华大学 | Tbm掘进机模拟试验装置及其试验方法 |
KR20200140680A (ko) | 2019-06-07 | 2020-12-16 | 강릉건설 주식회사 | 신축 세그먼트 및 신축 세그먼트를 이용한 쉴드 tbm 터널 뒷채움 방법 |
CN114165244A (zh) * | 2021-11-30 | 2022-03-11 | 中交隧道工程局有限公司 | 盾构同步双液注浆工艺现场验证试验方法 |
KR20220051720A (ko) | 2020-10-19 | 2022-04-26 | 강릉건설 주식회사 | 뒤채움부재의 역류방지부재를 구비한 터널굴착구조 |
CN114673512A (zh) * | 2022-04-01 | 2022-06-28 | 中国科学院武汉岩土力学研究所 | 可控自由度的盾构隧道开挖同步注浆试验设备及其应用 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002082013A (ja) | 2000-09-07 | 2002-03-22 | Railway Technical Res Inst | トンネル圧力波の模型実験方法 |
JP2002365170A (ja) | 2001-06-11 | 2002-12-18 | Mitsubishi Heavy Ind Ltd | トンネル掘削機模型試験方法及び装置 |
JP2006322808A (ja) | 2005-05-19 | 2006-11-30 | Nachi Fujikoshi Corp | 射出成形機部品用材料評価試験方法及び試験装置 |
KR100679128B1 (ko) | 2004-06-01 | 2007-02-07 | 허정도 | 도로포장 재료 용 침입시험 장비와 물성 측정방법 및 시편제조방법 |
-
2008
- 2008-01-03 KR KR1020080000529A patent/KR100877580B1/ko active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002082013A (ja) | 2000-09-07 | 2002-03-22 | Railway Technical Res Inst | トンネル圧力波の模型実験方法 |
JP2002365170A (ja) | 2001-06-11 | 2002-12-18 | Mitsubishi Heavy Ind Ltd | トンネル掘削機模型試験方法及び装置 |
KR100679128B1 (ko) | 2004-06-01 | 2007-02-07 | 허정도 | 도로포장 재료 용 침입시험 장비와 물성 측정방법 및 시편제조방법 |
JP2006322808A (ja) | 2005-05-19 | 2006-11-30 | Nachi Fujikoshi Corp | 射出成形機部品用材料評価試験方法及び試験装置 |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104062408A (zh) * | 2014-07-08 | 2014-09-24 | 北京科技大学 | 一种分层注浆模型试验系统 |
CN104329556A (zh) * | 2014-09-20 | 2015-02-04 | 辽宁三三工业有限公司 | 盾构机中心回转接头 |
CN104655803A (zh) * | 2015-01-30 | 2015-05-27 | 北京交通大学 | 一种隧道注浆模型试验装置 |
CN105545325A (zh) * | 2015-12-29 | 2016-05-04 | 上海隧道工程有限公司 | 类矩形盾构同步注浆可视化模拟试验系统及方法 |
CN108278118A (zh) * | 2018-01-25 | 2018-07-13 | 山东大学 | 地质力学模型试验复杂结构洞室群开挖定位装置及方法 |
KR20200140680A (ko) | 2019-06-07 | 2020-12-16 | 강릉건설 주식회사 | 신축 세그먼트 및 신축 세그먼트를 이용한 쉴드 tbm 터널 뒷채움 방법 |
CN110529148A (zh) * | 2019-07-24 | 2019-12-03 | 中南大学 | 一种用于模拟填土注浆的实验装置及实验方法 |
CN110761801A (zh) * | 2019-12-14 | 2020-02-07 | 哈尔滨工业大学 | 一种模拟移动式小型盾构机施工扰动土体室内装置及方法 |
CN111337278A (zh) * | 2020-02-24 | 2020-06-26 | 清华大学 | Tbm掘进机模拟试验装置及其试验方法 |
KR20220051720A (ko) | 2020-10-19 | 2022-04-26 | 강릉건설 주식회사 | 뒤채움부재의 역류방지부재를 구비한 터널굴착구조 |
CN114165244A (zh) * | 2021-11-30 | 2022-03-11 | 中交隧道工程局有限公司 | 盾构同步双液注浆工艺现场验证试验方法 |
CN114165244B (zh) * | 2021-11-30 | 2022-12-02 | 中交隧道工程局有限公司 | 盾构同步双液注浆工艺现场验证试验方法 |
CN114673512A (zh) * | 2022-04-01 | 2022-06-28 | 中国科学院武汉岩土力学研究所 | 可控自由度的盾构隧道开挖同步注浆试验设备及其应用 |
CN114673512B (zh) * | 2022-04-01 | 2023-02-28 | 中国科学院武汉岩土力学研究所 | 可控自由度的盾构隧道开挖同步注浆试验设备及其应用 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100877580B1 (ko) | 쉴드공법의 뒷채움재 시험장치 | |
CN103742129B (zh) | 松软煤层钻孔测定煤层瓦斯压力的方法 | |
KR101234814B1 (ko) | 다발형 강관 그라우트 장치 및 이를 이용한 터널의 강관 그라우트 보강 공법 | |
JP6474994B2 (ja) | コンクリート構造物のせん断補強方法 | |
KR101524355B1 (ko) | 회수식 확공비트를 이용한 터널 그라우팅 보강 공법 | |
KR102014460B1 (ko) | 관로 배면의 함몰량 진단겸 채움재 주입장치 및 이를 이용한 관로 배면 함몰량 진단겸 채움재 주입공법 | |
JP2009138489A (ja) | トンネル外周地山の調査方法、調査装置および調査用棒材 | |
JP6785587B2 (ja) | 固結材の充填状況検知方法、及び固結材の充填状況検知システム | |
JP4467477B2 (ja) | 推進管の到達用エントランス、到達用エントランスの構造および到達用エントランスの止水工法 | |
JP2011252370A (ja) | 切羽前方地山におけるひずみ計測パイプの設置方法 | |
JP3849440B2 (ja) | トンネル裏込め注入材の充填確認方法 | |
KR101029547B1 (ko) | 동시 다단 지반강화제 주입장치 | |
JP4985235B2 (ja) | 孔内透水係数計測装置及び孔内透水係数計測方法 | |
JP5414924B1 (ja) | ケーシングパイプ | |
JP2006249773A (ja) | 鋼管の口元コーキング装置 | |
KR102301170B1 (ko) | 터널 세그먼트용 약제주입구의 방수구조 | |
KR200424430Y1 (ko) | 가압식 고강도 강관 그라우팅 장치 | |
JP6339772B2 (ja) | 保護管 | |
JP6396824B2 (ja) | シールドトンネルの前方探査装置及び方法 | |
JP3924294B2 (ja) | シールド機の推進補助装置およびシールド機の推進方法 | |
JPH10102980A (ja) | トンネル到達口封止装置 | |
JP2010121332A (ja) | 地山補強用インサートユニットおよびそれを用いた地山補強工法 | |
JPH074174A (ja) | 坑口封止装置 | |
JP2007009566A (ja) | 小土被り区間の推進工法 | |
JP2002256790A (ja) | ダウンザホールドリルを介してのグラウト材注入による削孔内への充填方法及び装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
N231 | Notification of change of applicant | ||
A302 | Request for accelerated examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20121210 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20131209 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20141212 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20151211 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20161212 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20171219 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20181219 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20191219 Year of fee payment: 12 |