KR100874344B1 - A waterway duct - Google Patents

A waterway duct Download PDF

Info

Publication number
KR100874344B1
KR100874344B1 KR1020080044136A KR20080044136A KR100874344B1 KR 100874344 B1 KR100874344 B1 KR 100874344B1 KR 1020080044136 A KR1020080044136 A KR 1020080044136A KR 20080044136 A KR20080044136 A KR 20080044136A KR 100874344 B1 KR100874344 B1 KR 100874344B1
Authority
KR
South Korea
Prior art keywords
inclined surface
water pipe
fastening
channel pipe
slope
Prior art date
Application number
KR1020080044136A
Other languages
Korean (ko)
Inventor
조항웅
Original Assignee
조항웅
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 조항웅 filed Critical 조항웅
Priority to KR1020080044136A priority Critical patent/KR100874344B1/en
Application granted granted Critical
Publication of KR100874344B1 publication Critical patent/KR100874344B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • E02B11/005Drainage conduits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Agronomy & Crop Science (AREA)
  • Mechanical Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

A channel pipe assembly for a slope at public works is provided to perform the construction works for an incline and a channel pipe effectively by preventing the collapse of a channel pipe caused by slope depression while banking at street improvement work. In a channel pipe assembly for a slope, a channel pipe(10) is formed in the C-shape opened upward by forming a base plane(12), a left incline plane(13) and a right incline plane(14) integrally, a guide unit for flowing out rainwater is formed by forming the bottom with the base plane and each side with the left and right incline planes, a support rod(15) having fitting holes at two ends is laid and installed to the base plane to be perpendicular to the longitudinal direction of a body of the channel pipe, a stiffening plate(17) fixed to a grid(16) buried in the ground is mounted to an upper incline of the channel pipe, and a fastening fixing rod(18) is provided to fix and install the channel pipe strongly to an incline by fastening the fixing plate and the support rod.

Description

비탈면 수로관조립체{A Waterway Duct}Sloped Waterway Tube Assembly {A Waterway Duct}

본 발명은 도로공사와 같은 토목공사의 비탈면에 구비되는 수로관조립체에 관한 것으로, 특히 지면에 비해 현저히 높게 형성되는 도로의 비탈면이나 기타 토목공사의 경사면에서 빗물 등이 원활하게 흘러내릴 수 있도록 하는 수로관을 견고하고 신속하게 설치하여 효율적인 토목공사가 이루어지도록 하는 비탈면 수로관조립체에 관한 것이다. The present invention relates to a water pipe assembly provided on the slope of a civil engineering, such as road construction, in particular a water pipe to allow rain water to flow smoothly on the slope of the road or other civil engineering slopes formed significantly higher than the ground. The present invention relates to a sloped channel pipe assembly that is installed firmly and quickly so that efficient civil works can be made.

일반적으로 수로관이라 함은, 빗물이나 고여있는 물 등을 안내하여 하천이나 저수지 등으로 유도하는 관을 총칭하여 이르는 것으로, 토목공사시 경사면이나 수로 또는 도로의 비탈면에 시공되어 사용되고 있다. In general, a water pipe is a generic term for a pipe leading to a river or a reservoir by guiding rainwater or standing water, and is used to be installed on a slope or a channel or a slope of a road during civil engineering.

이와 같은 수로관(30)은 도5와 같이 전방부와 상부 및 하부면이 개방되고 저면부(31)와 양측면(32,33)이 콘크리트 등과 같은 견고한 재질로 이루어져 구성되고 그 형상은 'ㄷ'자 형상으로 되어 있다. The water pipe 30 as shown in Figure 5 is the front portion and the upper and lower surfaces are opened, the bottom portion 31 and both sides (32, 33) are made of a solid material such as concrete, the shape of the 'c' character It is shaped.

따라서 종래에는 상기와 같은 수로관(30)을 도로 경사면을 따라 길이 방향으 로 연속하여 설치 시공하였다. 그러나 상기 수로관(30)을 시공할 경우 기존에는 현장 타설로 하여 시공하거나 형틀로 제작된 수도관을 이동하여 설치하는 방법으로 시공하고 있다. 여기서 현장 타설이란 도로 경사면에 상기 수로관(30)이 시공될 공간을 구비한 다음 상기 공간에 수로관 형상의 거푸집 등을 설치하여 시멘트 등의 몰타르를 넣어 시멘트 등이 소성되면 상기 거푸집 등을 제거하는 방법으로 시공하는 것을 말한다. Therefore, in the related art, the water pipe 30 as described above was continuously installed in the longitudinal direction along the road slope. However, when the water pipe 30 is installed, it is conventionally constructed as a site-pouring method or installed by moving and installing the water pipe manufactured as a mold. Here, in-site casting is a method of removing the formwork, including a space for the water pipe 30 to be installed on the slope of the road, and then installing formwork such as a water pipe form in the space and putting mortar such as cement into the cement to burn the formwork. We say construction.

상기와 같이 종래의 토목공사시 경사면에 시공되는 수로관은 현장타설 방식으로 시공되기 때문에, 공사진행 중 즉 시공기간에 지반강하나 기후불순 등으로 인해 경사면의 토양이 무너져 내리게 되는 경우가 많아 수로관 시공시 공기연장이나 추가 공사 비용부담 등과 같은 많은 문제가 있었다. As mentioned above, since the waterway pipes installed on the inclined surface during the civil engineering work are constructed in a field casting method, the soil on the inclined surface is often collapsed due to the ground strength or climate impurity during the construction process, that is, the air during the construction of the waterway tube. There have been many problems such as extension and additional construction costs.

또한 기 조성된 경사면에 상기 수로관을 시공한 경우에도 경사면 상부측으로부터 서서히 스며드는 빗물 등으로 인해 경사면 등이 함몰되고 이로 인해 수로관이 붕괴 되는 문제도 상존하게 된다. In addition, even when the water pipe is constructed on the inclined surface, the inclined surface is recessed due to the rain water slowly infiltrating from the upper side of the inclined surface, and thus there is a problem that the water pipe is collapsed.

이에 본 발명은 상기와 같은 문제를 해결하기 위해 안출된 것으로, 도로공사시 지중에 지지대 역할을 하는 그리드를 매설하고 상기 그리드의 한쪽 끝을 경사면 밖으로 노출하여 경사면에 설치 시공되는 수로관을 지지 시켜줌으로써 도로공사의 성토중에 경사면이 함몰되어 수로관이 붕괴 되지 않도록 하여 경사면 시공과 수로관 시공이 효율적으로 이루어지도록 하는 조립식 수로관조립체를 제공하는 데 그 목적이 있다. Accordingly, the present invention has been made to solve the above problems, by embedding a grid that serves as a support in the ground during road construction and by exposing one end of the grid out of the inclined surface to support the water pipes installed on the inclined surface road The purpose is to provide a prefabricated water pipe assembly that allows the construction of slopes and waterway pipes efficiently by preventing the waterway pipes from collapsing during construction.

본 발명의 또 다른 목적은 지중에 매설된 그리드가 수로관을 지탱하고 있기 때문에 완성된 도로 경사면이 상부 측으로부터 스며드는 빗물 등에 의해 함몰되지 않아 경사면이 장기간 유지될 수 있도록 함으로써 경제성이 획기적으로 향상될 수 있도록 하는 데 있다. Still another object of the present invention is that the grid embedded in the ground supports the water pipes so that the finished road slope is not recessed by rainwater seeping from the upper side, so that the slope can be maintained for a long time, so that the economic efficiency can be dramatically improved. There is.

상기한 목적을 달성하기 위한 본 발명은 도로나 제방과 같이 지면보다 높게 형성되는 도로나 제방의 토목공사 비탈면에 구비되어 빗물이나 저장된 물을 안내하여 주거나 하천으로 유도할 수 있도록 하는 수로관(10)이 구비된 비탈면 수로관조립체(1)에 있어서, The present invention for achieving the above object is provided in the civil engineering slope of the road or embankment is formed higher than the ground, such as a road or embankment water pipe 10 for guiding rainwater or stored water or to guide the river In the provided sloped channel tube assembly (1),

상기 수로관(10)은 바닥면(12)과 좌측경사면(13) 및 우측경사면(14)이 일체형으로 되어 윗쪽이 개방되는 "ㄷ" 자 형상으로 되어, The water pipe 10 has a bottom surface 12, the left inclined surface 13 and the right inclined surface 14 is integrated into a "c" shape that is open at the top,

상기 바닥면(12)이 저면이 되고 상기 좌·우측 경사면(13,14)이 각각 측면이 되어 빗물이 흘러내리는 안내부(19)가 형성되되, The bottom surface 12 is the bottom surface and the left and right inclined surfaces (13, 14) are each side to form a guide portion 19, the rain water flows down,

상기 바닥면(12)에는 양단에 끼움구멍(151,152)이 구비된 지지로드(15)를 수로관몸체의 길이방향과 수직되게 매립하여 설치하고, 상기 수로관(10)의 상부측 경사지면에는 지중에 매립된 그리드(16)에 고정되는 보강플레이트(17)를 장착하되, 상기 고정플레이트(17)와 상기 지지로드(15)를 체결하여 상기 수로관(10)이 경사면에 견고하게 고정 설치될 수 있도록 체결고정로드(18)가 구비되어 이루어진 것을 특징으로 한다.The bottom 12 has a support rod 15 having fitting holes 151 and 152 at both ends, and is buried vertically in the longitudinal direction of the waterway tube body, and is buried in the ground at an upper inclined surface of the waterway tube 10. Reinforcement plate 17 is fixed to the grid 16, the fastening and fixing so that the water pipe 10 can be firmly installed on the inclined surface by fastening the fixing plate 17 and the support rod 15 It is characterized in that the rod 18 is provided.

또한 상기 체결고정로드(18)는 상단부가 후크(hook) 형상의 걸림부(181)를 이루고 하단부는 체결수단이 구비된 것을 특징으로 한다.In addition, the fastening fixing rod 18 is characterized in that the upper end forms a hook portion (181) of the hook shape and the lower end is provided with a fastening means.

상기와 같은 본 발명의 비탈면 조립식 수로관조립체는 지중에 매설되는 그리 드에 수로관을 지지하면서 조립하는 구조로 되어 있는바, 이는 지중에 설치된 그리드에 의해 수로관을 지지해주기 때문에 비탈면의 토사가 어느 정도 함몰되어도 수로관이 붕괴되는 것을 막아주게 될 뿐만 아니라, 수로관이 견고하게 고정 지지되어 비탈면의 토사가 무너지게 되는 것을 사전에 예방할 수 있으므로 시공이 편리함은 물론 비용 절감, 공기단축 및 사후관리 등 경제성이 획기적으로 향상되는 효과를 가져온다. The sloped prefabricated water pipe assembly of the present invention as described above has a structure for assembling while supporting the water pipe in the grid embedded in the ground, which supports the water pipe by the grid installed in the ground, so that the soil of the slope is recessed to some extent. Not only does it prevent the water pipes from collapsing, but the water pipes are firmly fixed and supported to prevent the soil from falling down on the slopes in advance, which is convenient for construction and greatly improves economic efficiency such as cost reduction, air shortening and after-care. Brings the effect.

이하 본 발명을 첨부도면에 의거 상세히 설명한다. Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도1은 본 발명에 따른 비탈면 수로관조립체가 적용된 상태의 도로공사가 완공된 상태도이고, 도2는 본 발명에 따른 비탈면 수로관조립체가 적용되는 상태도와 확대 사시도이고, 도3은 본 발명에 따른 비탈면 수로관조립체의 확대사시도이고, 도4는 본 발명에 따른 비탈면 수로관조립체의 배면도이고, 도5는 본 발명에 따른 비탈면 수로관조립체의 측단면도이다.1 is a state diagram in which the road construction of the sloped waterway tube assembly is applied according to the present invention is completed, Figure 2 is an enlarged perspective view of the sloped waterway tube assembly is applied according to the present invention, Figure 3 is a sloped waterway tube according to the present invention 4 is an enlarged perspective view of the assembly, FIG. 4 is a rear view of the inclined waterway tube assembly according to the present invention, and FIG. 5 is a side cross-sectional view of the inclined waterway tube assembly according to the present invention.

본 발명의 비탈면 조립식 수로관조립체(1)의 수로관(10)은 도1 내지 도3에 도시되어 있는 바와 같이, 도로나 제방을 축조하는 공사에 있어서 보통 20~30cm 정도 흙을 조성하여 압착장비 등으로 단단하게 다지는 과정을 반복하여 일정높이의 경사면을 완공한 다음 빗물이 흘러내리도록 형성된 구거(11)에 설치되어 상기 구거(11)가 붕괴되지 않도록 하면서 빗물을 흘려보내는 구조물인바, 바닥면(12)과 좌측경사면(13) 및 우측경사면(14)이 일체형으로 되어 윗쪽이 개방되는 "ㄷ" 자 형상 으로 되어 있으며, 또한 상기 수로관(10)은 바닥면(12)이 저면이 되고 상기 좌·우측 경사면(13,14)이 각각 측면이 되어 빗물이 흘러내리는 안내부(19)를 이루도록 구성하되, 상기 바닥면(12)에는 수로관몸체의 길이방향과 수직되게 직사각형 모양의 지지로드(15)를 수로관몸체 내부에 매립하여 설치하고, 상기 수로관(10)의 상부측 경사지면에는 지중에 매립된 그리드(16)에 고정되면서 장착되는 보강플레이트(17)를 설치하여, 상기 보강플레이트(17)와 상기 수로관(10)의 지지로드(15)를 체결고정로드(18)로 연결 지지함으로써 상기 수로관(10)이 경사면에 견고하게 고정설치되도록 하는 구조로 되어 있다.As shown in Figs. 1 to 3, the channel tube 10 of the slope-surface type channel tube assembly 1 of the present invention is usually formed with soil about 20 to 30 cm in the construction of roads or banks, and is used as a crimping equipment. After repeating the stiffening process to complete the slope of a certain height and then installed in the gugger (11) formed so that rain water flows down, the gug (11) is a structure for flowing rain water while preventing the collapse of the bar, the bottom surface (12) And the left inclined surface 13 and the right inclined surface 14 are integrally formed in a "c" shape, the upper side of which is open, and the water pipe 10 has a bottom surface 12 at the bottom and the left and right inclined surfaces. (13, 14) are respectively configured to form a guide portion 19, the rain water flows down to the side, the bottom surface 12 has a rectangular support rod 15 in the vertical direction perpendicular to the longitudinal direction of the water pipe body Inside The reinforcing plate 17 is installed while being fixed to the grid 16 embedded in the ground on the upper inclined surface of the water pipe 10, the reinforcing plate 17 and the water pipe 10 The support rod 15 is connected to the fastening fixing rod 18 to support the water pipe 10 so as to be firmly installed on the inclined surface.

그리고 상기 지지로드(15)의 양측에는 각각 상기 체결고정로드(18)가 삽설되는 끼움구멍(151,152)이 구비되어 있고, 상기 보강플레이트(17)에는 상기 그리드(16)를 끼워 고정하는 그리드체결구멍(171)과 상기 체결고정로드(18)가 끼워 설치되는 로드끼움구멍(172,173)이 각각 형성되어 있으며, 상기 체결고정로드(18)는 상단부가 후크(hook) 형상의 걸림부(181)를 이루고 하단부는 체결나사(182) 등의 체결수단이 구비되어 있다.And both sides of the support rod 15 is provided with fitting holes (151, 152) for inserting the fastening fixing rod 18, respectively, and the grid fastening hole for fixing the grid 16 to the reinforcing plate 17 171 and rod fitting holes 172 and 173 are formed to be fitted into the fastening fixing rod 18, and the fastening fixing rod 18 has a hook portion 181 having a hook shape at an upper end thereof. The lower end is provided with fastening means such as a fastening screw 182.

그리고 상기 그리드(16)는 사각형의 긴 플레이트로 구비되되 끝단부에 체결나사(164)가 형성된 구조로 되어 있다. And the grid 16 is provided with a rectangular long plate has a structure in which a fastening screw 164 is formed at the end.

상기와 같이 이루어진 수도관조립체(1)는 도2에 도시되어 있는 바와 같이, 성토면에 그리드를 놓고 그 위에 다시 성토한 후 롤러 장비를 사용하여 지반을 견고하게 다지면서 도로공사나 제방을 2~3m 높이로 쌓은 후 노출된 그리드 끝단을 이용하여 경사면에 구거(11)를 형성하면서 상기 수로관(10)을 설치하고, 다시 공사를 하고 또 상기 수로관(10)을 연이어 설치하는 방법으로 시공하게 되는데, 이때 적당한 높이의 경사면 지중에 상기 그리드(16)를 매설하되 상기 그리드(16)의 끝 부위에 형성된 상기 체결나사(164)을 경사면 밖으로 돌출되도록 상기 그리드(16)를 매설한다.As shown in Figure 2, the water pipe assembly (1) made as described above, after laying the grid on the surface of the fill and re-filled on it and then using the roller equipment to solidify the ground 2 ~ 3m road construction or embankment After stacking to the height by using the exposed grid end to form a groove (11) on the inclined surface to install the waterway pipe 10, and then re-construction and installation by the method to install the waterway pipe 10 in succession, at this time The grid 16 is embedded in an inclined surface of an appropriate height, and the grid 16 is embedded so that the fastening screw 164 formed at the end of the grid 16 protrudes out of the inclined surface.

그리고 상기 보강플레이트(17)는 상기 그리드(16)의 체결나사(164)를 상기 그리드체결구멍(171)에 끼워 너트(162)를 체결하여 경사면에 장착한다.The reinforcing plate 17 inserts the fastening screw 164 of the grid 16 into the grid fastening hole 171 to fasten the nut 162 to be mounted on the inclined surface.

그리고 상기 보강플레이트(17)의 양측에 형성된 상기 로드끼움구멍(172,173)에 상기 체결고정로드(18)의 걸림부(181)를 끼워 고정한 다음, 상기 체결고정로드(18)의 체결나사(182)부를 상기 수로관(10)의 바닥면(12)에 구비된 상기 지지로드(18)의 양측 끼움구멍(151,152)에 각각 나사체결 함으로써 상기 수로관(10)이 경사면에 견고하게 고정 설치되게 된다.Then, the locking portion 181 of the fastening fixing rod 18 is fixed to the rod fitting holes 172 and 173 formed at both sides of the reinforcing plate 17, and then the fastening screw 182 of the fastening fixing rod 18 is fixed. The water pipe 10 is firmly fixed to an inclined surface by screwing a portion into both fitting holes 151 and 152 of the support rod 18 provided on the bottom surface 12 of the water pipe 10.

상기와 같이 도로 경사면에 상기 구거(11)를 형성된 후, 상기 그리드(16)의 나사(161)부에 상기 보강플레이트(17)를 고정 체결하고 상기 수로관(10)을 상기 구거(11)에 안착시킨 다음 상기 체결고정로드(18)를 이용하여 상기 지지로드(15)를 고정 체결함으써 상기 수로관(10)의 설치가 끝나게 된다.After the groove 11 is formed on the road slope as described above, the reinforcing plate 17 is fixed to the screw 161 of the grid 16, and the water pipe 10 is seated on the groove 11. After the fastening and fastening the support rod 15 using the fastening fixing rod 18, the installation of the water pipe 10 is completed.

상기와 같은 절차로 도로나 제방을 2~3m 단위 즉 일정높이로 쌓으면서 상기 수로관(10)을 설치하면 도1과 같이 도로의 경사면에 상기 수로관(10)이 다단으로 연이어 설치되게 된다. When the waterway pipe 10 is installed while stacking the road or the embankment at a predetermined height in a unit of 2 to 3m by the above procedure, the waterway pipe 10 is continuously installed in multiple stages on the inclined surface of the road as shown in FIG. 1.

따라서 일정한 높이가 형성될 때마다 이에 맞는 상기 수로관(10)이 설치되고 그 위에 또 다른 수로관(10)이 설치되는 식으로 하여 도로나 제방의 축조공사가 이 루어지게 되는 것이다, Therefore, whenever a certain height is formed, the waterway pipe 10 corresponding thereto is installed and another waterway pipe 10 is installed thereon, so that construction of the road or the embankment is performed.

본 발명에 따른 상기 수로관(10)의 설치 방법으로는 상술한 방법 이외에, 기존에 이미 형성되어 있는 경사면에 수로관을 설치하고자 하는 경우에 경사면에 구거(11)를 형성시킨 다음 상기 그리드(16)를 봉 타입의 바아(bar)형으로 하여 경사면에 깊이 박아 설치하고 상기 바아형의 그리드에 상기 보강플레이트(17)를 체결하여 상기 수로관(10)을 설치할 수도 있다.As the installation method of the water pipe 10 according to the present invention, in addition to the above-described method, in the case of installing the water pipe on the inclined surface that is already formed, the grooves 11 are formed on the inclined surface, and then the grid 16 is formed. The bar type bar (bar) can be installed deeply inclined on the inclined surface and the reinforcing plate 17 is fastened to the bar grid to install the water pipe (10).

또한 기존 경사면에 상기 그리드(16)를 박아 넣는 경우, 경사면이 암반 등과 같은 견고한 지질이 나올 경우 암반에 별도의 장비를 이용하여 구멍을 뚫고 레진을 넣은 다음 상기 그리드(16)를 봉 타입의 바아(bar)형으로 하여 구멍에 삽설하고 레진이 굳은 후 상기 바아형의 그리드에 상기 보강플레이트(17)를 체결하여 상기 수로관(10)을 설치할 수도 있다.In addition, when injecting the grid 16 to the existing inclined surface, if the inclined surface comes out solid rock, such as rock, and drilled a hole using a separate equipment in the rock and put the resin and then the grid 16 bar bar ( It is also possible to install the water pipe 10 by inserting the bar into a hole and fastening the reinforcing plate 17 to the bar grid after the resin is hardened.

이와 같이 축조공사시 비탈면에서 지중에 매설되는 상기 그리드(16)에 고정 설치된 상기 보강플레이트(17)가 상기 수로관(10)을 당겨 지지하여 주기 때문에 경사면에 조성된 흙 등이 무너져 내리거나 함몰되는 것을 막아줌은 물론 상기 수로관(10)이 견고하게 경사면에 고정 설치되게 된다. As such, the reinforcing plate 17 fixed to the grid 16 embedded in the ground at the slope during the construction construction supports the water pipe 10 so that the soil formed on the inclined surface collapses or sinks. As well as preventing the water pipe 10 is firmly fixed to the inclined surface.

도1은 본 발명에 따른 비탈면 수로관조립체가 적용된 상태의 도로공사가 완공된 상태도이고, 1 is a state diagram of the road construction completed in the state in which the sloped channel pipe assembly is applied according to the present invention,

도2는 본 발명에 따른 비탈면 수로관조립체가 적용되는 상태도와 확대 사시도이고, Figure 2 is an enlarged perspective view showing a state in which the sloped channel pipe assembly is applied according to the present invention,

도3은 본 발명에 따른 비탈면 수로관조립체의 확대사시도이고,3 is an enlarged perspective view of a sloped channel tube assembly according to the present invention;

도4는 본 발명에 따른 비탈면 수로관조립체의 배면도이고, 4 is a rear view of a sloped channel tube assembly according to the present invention;

도5는 본 발명에 따른 비탈면 수로관조립체의 측단면도이다.Figure 5 is a side cross-sectional view of a sloped channel tube assembly according to the present invention.

도6는 종래의 수로관 상태도이다.6 is a conventional water pipe state diagram.

<도면의 주요부분에 대한 부호설명><Code Description of Main Parts of Drawing>

1:수도관조립체 10:수로관 11:구거 12:바닥면 13:좌측경사면 DESCRIPTION OF SYMBOLS 1: Water pipe assembly 10: Water pipe 11: Relief 12: Bottom 13: Left inclined surface

14:우측경사면 15:지지로드 16:그리드 17:보강플레이트 14: right inclined surface 15: support rod 16: grid 17: reinforcing plate

18:체결고정로드 19:안내부18: Fastening rod 19: Guide

151,152:끼움구멍 161:체결나사 162:너트151,152: fitting hole 161: tightening screw 162: nut

171,172:로드끼움구멍 181:걸림부 182:체결나사171, 172: rod fitting hole 181: locking portion 182: tightening screw

30:수로관 31:저면부 32,33:양측면30: water pipe 31: bottom 32, 33: both sides

Claims (2)

지면보다 높게 형성되는 도로나 제방의 토목공사 비탈면에 구비되어 빗물이나 저장된 물을 안내하여 주거나 하천으로 유도할 수 있도록 하는 수로관(10)이 구비된 비탈면 수로관조립체(1)에 있어서, In the inclined surface aqueduct assembly (1) provided with a water pipe (10) provided on the slope of the civil construction of the road or embankment formed higher than the ground to guide rainwater or stored water or to guide to the river, 상기 수로관(10)은 바닥면(12)과 좌측경사면(13) 및 우측경사면(14)이 일체형으로 되어 위쪽이 개방되는 "ㄷ" 자 형상으로 되어, The water pipe 10 has a bottom surface 12, the left inclined surface 13 and the right inclined surface 14 is integrated into a "c" shape that is open at the top, 상기 바닥면(12)이 저면이 되고 상기 좌·우측 경사면(13,14)이 각각 측면이 되어 빗물이 흘러내리는 안내부(19)가 형성되되, The bottom surface 12 is the bottom surface and the left and right inclined surfaces (13, 14) are each side to form a guide portion 19, the rain water flows down, 상기 바닥면(12)에는 양단에 끼움구멍(151,152)이 구비된 지지로드(15)를 수로관몸체의 길이방향과 직각되게 매립하여 설치하고, 상기 수로관(10)의 상부측 경사지면에는 지중에 매립된 그리드(16)에 고정되는 보강플레이트(17)를 장착하되, 상기 고정플레이트(17)와 상기 지지로드(15)를 체결하여 상기 수로관(10)이 경사면에 견고하게 고정 설치될 수 있도록 체결고정로드(18)가 구비되어 이루어진 것을 특징으로 하는 비탈면 수로관조립체.The bottom surface 12 is provided with the support rods 15 having fitting holes 151 and 152 at both ends to be buried at right angles to the longitudinal direction of the waterway tube body, and buried in the ground on the inclined surface of the upper side of the waterway tube 10. Reinforcement plate 17 is fixed to the grid 16, the fastening and fixing so that the water pipe 10 can be firmly installed on the inclined surface by fastening the fixing plate 17 and the support rod 15 A sloped channel conduit assembly, characterized in that the rod 18 is provided. 제1항에 있어서, 상기 체결고정로드(18)는 상단부가 후크(hook) 형상의 걸림부(181)를 이루고 하단부는 체결수단이 구비된 것을 특징으로 하는 비탈면 수로관조립체.According to claim 1, wherein the fastening fixing rod (18) is a sloped waterway tube assembly, characterized in that the upper end is made of hook (181) of the hook shape and the lower end is provided with a fastening means.
KR1020080044136A 2008-05-13 2008-05-13 A waterway duct KR100874344B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080044136A KR100874344B1 (en) 2008-05-13 2008-05-13 A waterway duct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080044136A KR100874344B1 (en) 2008-05-13 2008-05-13 A waterway duct

Publications (1)

Publication Number Publication Date
KR100874344B1 true KR100874344B1 (en) 2008-12-16

Family

ID=40372709

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080044136A KR100874344B1 (en) 2008-05-13 2008-05-13 A waterway duct

Country Status (1)

Country Link
KR (1) KR100874344B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200404058Y1 (en) 2005-09-13 2005-12-16 (주)정방종합엔지니어링 Combined Retaining Wall
KR100629722B1 (en) 2006-03-07 2006-09-28 주식회사 오름엔지니어링 Precasted concrete for drainage canal in slope area
KR100743043B1 (en) 2006-07-31 2007-07-26 주식회사 일원테크 Waterproof in expansion joint

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200404058Y1 (en) 2005-09-13 2005-12-16 (주)정방종합엔지니어링 Combined Retaining Wall
KR100629722B1 (en) 2006-03-07 2006-09-28 주식회사 오름엔지니어링 Precasted concrete for drainage canal in slope area
KR100743043B1 (en) 2006-07-31 2007-07-26 주식회사 일원테크 Waterproof in expansion joint

Similar Documents

Publication Publication Date Title
KR100588445B1 (en) Method for installation of environment friendly electric utility pole
KR101105092B1 (en) A precast retaining panel and construction method of the same with half pc type backfill
KR101559751B1 (en) This does not require a retaining wall erected formwork
KR101732669B1 (en) Reinforcement member, concrete box reinforced with the same and the construction method thereof
KR101126666B1 (en) Vertical drain induction type retaining wall reinforced by nailing
KR20140013497A (en) Method for constructing block type reinforced retaining wall in cut site
KR100824713B1 (en) Ledge type revetment using a pc wall plate and construction method thereof
KR20070122190A (en) Assembled drainage ditch and construction method of using thereof
KR101259860B1 (en) Trench-type Water Conduit and Method for it
CN219157761U (en) Basement bottom plate high-low span connection structure
KR20190045603A (en) Retaining Walls, and Construction Method of Underground Structure
KR100874344B1 (en) A waterway duct
KR100995815B1 (en) Shortcrete retaining wall construction method
KR101521558B1 (en) Underground wall construction method using the wall members
KR100758231B1 (en) Environmentally friendly sloped block structure for landscaping
KR101416289B1 (en) Gutter
KR101390683B1 (en) Retaining wall using precast concrete panel and construction method of the same
KR101018359B1 (en) A Waterway Duct
KR100931866B1 (en) A tension control type waterway duct
CN111206602B (en) Partially collapsed high slope lattice beam formwork system and construction method
KR101799237B1 (en) Method of manufacturing grounding stone for pillar fixed and grounding stone for pillar fixed produced by the same
CN211596799U (en) Slope reinforcement structure with existing building/structure on slope top
CN107514140B (en) Basement floor support and method for constructing outer wall and floor by using same
KR100964721B1 (en) Block for road extension
KR101106799B1 (en) Construction method of Top-down concrete slab

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121002

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20131031

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20141126

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150925

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20171127

Year of fee payment: 10

LAPS Lapse due to unpaid annual fee