KR100841796B1 - Construction method of flexible connecting division of road-structure - Google Patents

Construction method of flexible connecting division of road-structure Download PDF

Info

Publication number
KR100841796B1
KR100841796B1 KR1020070107789A KR20070107789A KR100841796B1 KR 100841796 B1 KR100841796 B1 KR 100841796B1 KR 1020070107789 A KR1020070107789 A KR 1020070107789A KR 20070107789 A KR20070107789 A KR 20070107789A KR 100841796 B1 KR100841796 B1 KR 100841796B1
Authority
KR
South Korea
Prior art keywords
joint
space
ascon
expansion joint
slab
Prior art date
Application number
KR1020070107789A
Other languages
Korean (ko)
Inventor
김해영
Original Assignee
김해영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김해영 filed Critical 김해영
Priority to KR1020070107789A priority Critical patent/KR100841796B1/en
Application granted granted Critical
Publication of KR100841796B1 publication Critical patent/KR100841796B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • E01C11/04Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
    • E01C11/10Packing of plastic or elastic materials, e.g. wood, resin
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • E01C11/04Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
    • E01C11/12Packing of metal and plastic or elastic materials
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/0966Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving
    • E01C23/0973Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving with liquid or semi-liquid materials, e.g. crack sealants

Abstract

A construction method for an expansion joint of a road structure is provided to simplify construction process of the expansion joint and facilitate maintenance while perfectly preventing water from leaking through the expansion joint. A construction method for an expansion joint of a road structure comprises the steps of: cleaning an expansion joint(1) for removing dust; forcibly fitting a backup material(20) into a slab joining space(1a) between two adjacent slabs(2) to airtightly fill the space; installing a screen plate(30) on an upper joining portion of the slab joining space with the backup material fitted; paving and hardening sealing material(40) in an asphalt concrete joining space(1b) between two adjacent asphalt concretes(3), except for a space for inserting a mat; fitting a rubber mat(50) into the space for inserting a mat between the two adjacent asphalt concretes with the sealing material paved, and bonding it with sealant solution(41); filling and hardening sealant solution(42) in a gap between the asphalt concrete and rubber mat.

Description

도로구조물의 신축이음부 시공방법{construction method of flexible connecting division of road-structure}Construction method of expansion joint of road structure {construction method of flexible connecting division of road-structure}

본 발명은 도로구조물의 슬래브와 슬래브 및 아스콘과 아스콘이 연결되는 부분에 팽창과 수축을 고려하여 설치되는 신축이음부에 관한 것으로, 더 상세하게는 새로 신설되거나 또는 균열이 생긴 신축이음부를 효과적으로 용이하게 시공할 수 있도록 하고, 또한 시공구조를 단순화하여 시공성을 높일 수 있도록 하며, 그리고 누수를 완벽하게 차단하는 동시에 유지보수가 용이한 도로구조물의 신축이음부 시공방법에 관한 것이다.The present invention relates to an expansion joint that is installed in consideration of expansion and contraction in the slab and the slab of the road structure and the connection between the ascon and the ascon, and more specifically, the newly formed or cracked expansion joints effectively The present invention relates to a method of constructing new joints of road structures that can be easily installed, and also to simplify construction, thereby improving workability, and to completely prevent leakage and to maintain maintenance.

일반적으로 지하차도나 하천복개 등 도로구조물의 구축 시에는 철근 콘크리트 구조로 된 슬래브와 슬래브를 서로 연결한 후, 슬래브의 상부에 아스콘을 포장하여 도로구조물을 형성하게 된다. 그러나, 이러한 도로구조물은 온도변화에 따라 팽창하거나 수축하게 됨으로써 파손이 발생하고, 슬래브와 슬래브 사이가 이격되는 경우에는 도로가 파손되므로 차량의 주행에 안전을 위협할 수 있는바, 이를 방지하기 위해 인접하는 슬래브와 슬래브 및 아스콘과 아스콘 사이에 신축이음부를 형성한 후, 이 신축이음부에 아스팔트나 실란트 등의 조인트를 설치하여 연결하고 있 다.In general, when constructing road structures such as underground roadways or river revetments, slabs made of reinforced concrete structures and slabs are connected to each other, and asphalt structures are paved on top of the slabs to form road structures. However, these road structures are damaged due to expansion or contraction due to temperature change, and when the space between the slab and the slab is separated, the road is damaged, which may threaten the safety of the driving of the vehicle. After the expansion joint is formed between the slab and the slab, and the asphalt concrete and the asphalt concrete, joints such as asphalt or sealant are connected to the expansion joint.

그러나 종래에는 도로구조물의 신축이음부에 단순히 아스팔트나 실란트 등의 조인트를 포설하여 시공하였기 때문에, 여름과 같이 기온이 올라가 도로구조물이 신장되면 신축이음부의 간격이 좁아지게 되고 그 사이에 포설된 조인트가 상부로 밀리면서 부풀어올라 둔턱이 생기게 될 뿐만 아니라 차량의 진행방향에 따라 조인트가 한쪽으로 쏠려 골이 파여지는 현상이 발생됨으로 차량의 통행에 큰장애물로 작용하게 되는 문제점이 있었다.However, in the past, simply install joints such as asphalt or sealant in the expansion joint of the road structure, so when the temperature rises in summer and the road structure is elongated, the interval between the expansion joints is narrowed and the joints installed therebetween. Was pushed to the upper side to not only swell, but also to create a barrier, as the joint is pulled to one side in accordance with the direction of the vehicle is a phenomenon that the bone is dug to occur, there was a problem that acts as a big obstacle in the passage of the vehicle.

또 겨울과 같이 기온이 내려가면 신축이음부의 간격이 넓어지게 되어 조인트는 넓어진 용적의 공간으로 분산되기 때문에 여름과는 반대로 오목한 요홈과 갈라짐이 발생되어 탈락되므로 역시 차량의 통행에 장애물로 작용하게 되는 문제점이 있었으며, 또한 이러한 문제점 발생 시 수시로 유지보수작업을 수행해야 하기 때문에 많은 인력과 시간 및 비용이 낭비되는 폐단이 있었다.In addition, when the temperature decreases as in winter, the space between the expansion joints becomes wider, and the joints are distributed to the space of the enlarged volume. There was a problem, and in addition, a lot of manpower, time and money was wasted because maintenance work had to be carried out from time to time.

한편, 상기와 같이 구축된 도로구조물은 설치기간이 경과함에 따라 구조물이 노후화되고 진동 등의 외부적인 힘에 의해, 특히 신축이음부에 균열이 발생하고 이 균열부위를 통해 누수가 발생하게 된다.On the other hand, the road structure constructed as described above, the structure is aging as the installation period elapses, and by the external force such as vibration, in particular, the crack occurs in the expansion joint and the leak occurs through this cracked portion.

이러한 신축이음부의 누수 발생 시 종래에는 조인트를 완전히 제거한 후, 슬래브와 슬래브 사이 신축이음부를 수시로 보수하였기 때문에 교통혼잡과 유지보수비용이 많이 발생되는 문제점이 있었다.In the case of leakage of such expansion joints, conventionally, after completely removing the joint, since the expansion joint between the slab and the slab is often repaired, there is a problem that a lot of traffic congestion and maintenance costs are generated.

또한 종래에는 신축이음부의 시공 시 상술한 바와 같이 거푸집을 설치해야 하는 관계로 시공구조가 복잡하여 시간적으로나 경제적으로 시공성이 크게 떨어지 는 문제점이 있었다.In addition, there is a problem in that the construction structure is complicated due to the need to install the formwork as described above when the expansion joint is constructed, the construction performance is greatly reduced in time and economics.

그리고 종래에는 신축이음부의 보수 시 조인트를 전체적으로 완전히 제거한 상태에서 다시 신축이음부에 전체적으로 조인트를 포설하였기 때문에, 구조적으로 수리 또는 교체작업이 매우 까다롭고 불편하여 유지보수가 용이하지 못한 문제점이 있었다.In the related art, since the joint is completely installed in the expansion joint in the state where the joint is completely removed when the expansion joint is repaired, there is a problem that the repair or replacement work is very difficult and inconvenient in structure, and thus the maintenance is not easy.

본 발명의 목적은 상기에서와 같은 종래의 결점을 해소하기 위해 발명한 것으로, 새로 신설되거나 또는 균열이 생긴 신축이음부를 효과적으로 용이하게 시공할 수 있도록 하고, 또한 신축이음부의 시공구조를 단순화하여 시공성을 높일 수 있도록 하며, 그리고 신축이음부의 누수를 완벽하게 차단하는 동시에 유지보수가 용이한 도로구조물의 신축이음부 시공방법을 제공하는데 있다.An object of the present invention is to invent the above-mentioned conventional drawbacks, to facilitate the construction of new or cracked expansion joints effectively and to simplify the construction of expansion joints In order to improve the workability, and to completely prevent the leakage of the expansion joints, and to provide a construction method for the construction of the expansion joints of the road structure easy to maintain.

상기 목적을 달성하기 위해 본 발명은 신축이음부를 청소하여 먼지 등을 제거하고, 슬래브와 슬래브 사이 슬래브이음공간에 백업재를 압입하여 메우고, 백업재가 끼워진 슬래브이음공간의 상부 이음부분에 차단판을 설치하고, 아스콘과 아스콘 사이 아스콘이음공간에 매트삽입공간을 남기고 봉합제를 포설하여 경화시키고, 봉합제가 포설된 아스콘과 아스콘 사이 매트삽입공간에 말굽형 홈이 성형된 고무매트를 끼워 실란트용액으로 부착하고, 아스콘과 고무매트 사이 양측 틈새에 실란트용액을 충전하여 경화시킨 것이다.In order to achieve the above object, the present invention cleans the expansion joint to remove dust and the like, presses and fills the backing material into the slab joint space between the slab and the slab, and inserts a blocking plate in the upper joint portion of the slab joint space in which the backing material is inserted. After installing, leave the mat insertion space in the ascon joint space between the ascon and the ascon, install the sealant and harden it, and attach the rubber mat formed with the horseshoe groove in the mat insertion space between the ascon and ascon where the sealant is installed and attach it with the sealant solution. Then, the sealant solution was filled in both gaps between the asphalt concrete and the rubber mat to cure.

본 발명은 새로 신설되거나 또는 균열이 생긴 신축이음부를 효과적으로 용이하게 시공할 수 있으며, 또한 신축이음부의 시공구조를 단순화하여 시공성을 높일 수 있으며, 그리고 신축이음부의 누수를 완벽하게 차단하는 동시에 유지보수가 용이한 효과가 있다.The present invention can effectively construct a newly formed or cracked expansion joints, and can simplify the construction structure of the expansion joints to increase the workability, and at the same time completely block the leakage of the expansion joints Maintenance is easy effect.

이하 첨부된 도면에 따라서 본 발명의 기술적 구성을 상세히 설명하면 다음과 같다.Hereinafter, the technical configuration of the present invention according to the accompanying drawings in detail.

본 발명에 따른 도로구조물의 신축이음부 시공방법은 도 1b 내지 도 1g에 도시되는 바와 같이, 신축이음부(1)를 청소하여 먼지 등을 제거하는 단계; 슬래브(2)와 슬래브(2) 사이 슬래브이음공간(1a)에 백업재(20)를 압입하여 기밀하게 메우는 단계; 백업재(20)가 끼워진 슬래브이음공간(1a)의 상부 이음부분에 차단판(30)을 설치하는 단계; 아스콘(3)과 아스콘(3) 사이 아스콘이음공간(1b)에 매트삽입공간을 남기고 봉합제(40)를 포설하여 경화시키는 단계; 봉합제(40)가 포설된 아스콘(3)과 아스콘(3) 사이 매트삽입공간에 고무매트(50)를 끼워 실란트용액(41)으로 부착하는 단계; 아스콘(3)과 고무매트(50) 사이 양측 틈새에 실란트용액(42)을 충전하여 경화시키는 단계를 포함하여 구성된 것을 그 기술적 구성상의 기본적인 특징으로 한다. 이때, 도 1a에서와 같이 상기 신축이음부(1)에 균열이 생긴 기존의 조인트(10)가 존재할 경우에는 기존 조인트(10)를 완전히 제거하는 단계가 부가된다.Construction method of the expansion joint of the road structure according to the present invention, as shown in Figure 1b to Figure 1g, cleaning the expansion joint (1) to remove dust and the like; Press-fitting the backing material 20 into the slab joint space 1a between the slab 2 and the slab 2, and filling the gas tightly; Installing a blocking plate 30 at an upper joint portion of the slab joint space 1a into which the backup material 20 is inserted; Laying and curing the encapsulant 40 leaving a mat insertion space in the ascon joint space 1b between the ascon 3 and the ascon 3; Attaching the rubber mat 50 to the mat inserting space between the ascon 3 and the ascon 3 on which the encapsulant 40 is installed, and attaching the sealant solution 41 with the sealant solution 41; Comprising the step of filling the sealant solution 42 in both gaps between the ascon (3) and the rubber mat (50) is a basic feature of the technical configuration. In this case, as shown in FIG. 1A, when there is an existing joint 10 in which the expansion joint 1 is cracked, a step of completely removing the existing joint 10 is added.

여기서, 상기 신축이음부(1)는 주지된 바와 같이 도로구조물의 슬래브(2)와 슬래브(2) 및 아스콘(3)과 아스콘(3)이 연결되는 부분에 팽창과 수축을 고려하여 설치되는 것으로, 이러한 신축이음부(1)는 슬래브(2)와 슬래브(2) 사이에 형성되는 슬래브이음공간(1a)과, 아스콘(3)과 아스콘(3) 사이에 형성되는 아스콘이음공간(1b)으로 이루어진다.Here, the expansion joint (1) is to be installed in consideration of the expansion and contraction in the portion where the slab (2) and the slab (2) and the ascon (3) and the ascon (3) of the road structure is connected. , The expansion joint (1) is a slab joint space (1a) formed between the slab (2) and the slab (2), and ascon joint space (1b) formed between the ascon (3) and the ascon (3) Is done.

상기 백업재(20)는 도 1c에서와 같이 슬래브(2)와 슬래브(2) 사이 슬래브이 음공간(1a)에 끼워진다.The backing material 20 has a slab between the slab 2 and the slab 2 is fitted in the sound space (1a) as shown in Figure 1c.

상기 차단판(30)은 도 1d에서와 같이 백업재(20)가 끼워진 슬래브이음공간(1a)의 상부 이음부분에 설치되는 것으로, 이러한 차단판(30)을 신축이음부(1)의 누수를 방지함과 동시에 또한 백업재(20)로 열이 전달되는 것을 차단한다. 이때, 본 발명의 바람직한 실시예에 따르면 상기 차단판(30)은 열에 강하고 부식되지 않는 알루미늄으로 이루어진다.The blocking plate 30 is to be installed in the upper joint portion of the slab joint space (1a) in which the backing material 20 is fitted as shown in Figure 1d, this blocking plate 30 to leak the expansion joint (1) It also prevents heat from being transferred to the backup material 20 at the same time. At this time, according to a preferred embodiment of the present invention, the blocking plate 30 is made of aluminum that is resistant to heat and does not corrode.

상기 봉합제(40)는 도 1e에서와 같이 아스콘(3)과 아스콘(3) 사이 아스콘이음공간(1b)에 매트삽입공간을 남기고 포설되는 것으로, 이러한 봉합제(40)는 신축이음부(1)의 누수를 방지함과 동시에 신축성을 부여한다. 이때, 상기 봉합제(40)는 골재가 혼합된 고무아스콘이나 고무성질을 가지는 실란트 등으로 이루어진다.The suture 40 is to be installed leaving a mat insertion space in the ascon joint space (1b) between the ascon (3) and the ascon (3) as shown in Figure 1e, the suture (40) is the expansion joint (1) ) Prevents leaks and gives elasticity. At this time, the encapsulant 40 is made of rubber ascon or a sealant having rubber properties in which aggregate is mixed.

상기 고무매트(50)는 도 1f에서와 같이 봉합제(40)가 포설된 아스콘(3)과 아스콘(3) 사이 매트삽입공간에 끼워져 실란트용액(41)으로 부착되는 것으로, 이러한 고무매트(50)는 누수 및 부식을 방지하고, 또한 고무매트(50)는 여름철 봉합제(40)가 밀리는 것을 방지하는 동시에 겨울철 봉합제(40)가 갈라지는 것을 방지한다. 이때, 본 발명의 바람직한 실시예에 따르면 도 2에서와 같이 상기 고무매트(50)의 상부와 하부에는 적정간격을 두고 다수의 홈(51) 및 다수의 말굽형 홈(52)이 각각 형성되고, 상기 고무매트(50)의 양측 중앙부에는 홈(53)이 각각 형성된다.The rubber mat 50 is inserted into the mat insertion space between the ascon (3) and the ascon (3) in which the encapsulant (40) is installed as shown in FIG. 1F, and is attached to the sealant solution (41). ) Prevents leakage and corrosion, and the rubber mat 50 prevents the summer suture 40 from being pushed and at the same time prevents the winter suture 40 from cracking. At this time, according to a preferred embodiment of the present invention, as shown in Figure 2, the upper and lower portions of the rubber mat 50, a plurality of grooves 51 and a plurality of horseshoe-shaped grooves 52 are formed at appropriate intervals, respectively, Grooves 53 are formed in both central portions of the rubber mat 50, respectively.

상기 고무매트(50)의 상부 홈(51)은 미끄럼방지 및 신축성을 부여하고, 상기 하부 말굽형 홈(52)과 양측 홈(53)은 고무매트(50)가 떨어지지 않도록 실란트용액(41)과의 접촉면적과 밀착성 및 접착력을 크게 증대시켜 일체화시킨다. 이때, 상 기 상부 홈(51)들은 하부 말굽형 홈(52)들 사이 중앙 상부에 형성함이 바람직하고, 상기 말굽형 홈(52)의 가장 역할은 고무매트(50)가 떨어지지 않도록 접착력을 크게 증대시키는 것이다.The upper groove 51 of the rubber mat 50 provides slippage and elasticity, and the lower horseshoe-shaped groove 52 and both grooves 53 are sealant solution 41 and the rubber mat 50 so as not to fall. The contact area and adhesion of the adhesive and adhesion are greatly increased to integrate. At this time, the upper grooves 51 are preferably formed in the upper center between the lower horseshoe-shaped grooves 52, the most role of the horseshoe-shaped grooves 52 is to increase the adhesive force so that the rubber mat 50 does not fall To increase.

본 발명의 바람직한 실시예에 따르면 상기 고무매트(50)의 하부에 형성된 말굽형 홈(52)은 도 2에서와 같이 양측이 경사지게 이루어지는 더브테일(dovetail)모양으로 형성된다. 따라서, 이러한 하부 말굽형 홈(52)의 양측 경사면에 의해 고무매트(50)와 실란트용액(41)은 일체화되어 한층 더 견고하게 고정되어 접착력이 크게 증대되므로 시공 후 고무매트(50)는 떨어지지 않는다.According to a preferred embodiment of the present invention, the horseshoe-shaped groove 52 formed on the lower portion of the rubber mat 50 is formed in a dovetail shape in which both sides are inclined as shown in FIG. 2. Therefore, the rubber mat 50 and the sealant solution 41 are integrally fixed by both inclined surfaces of the lower horseshoe-shaped groove 52 to be more firmly fixed so that the adhesive force is greatly increased, so that the rubber mat 50 does not fall after the construction. .

이와 같이 구성된 본 발명의 신축이음부 시공방법을 첨부된 도면에 의거하여 공정별로 설명하면 다음과 같다.Referring to the process of construction of the expansion joint construction of the present invention configured as described above according to the accompanying drawings as follows.

(제1공정)(Step 1)

먼저, 도로구조물의 설치기간이 경과함에 따라 구조물이 노후화되고 진동 등의 외부적인 힘에 의해, 도 1a에서와 같이 신축이음부(1)와 조인트(10) 사이에 균열이 발생하고 이 균열부위를 통해 누수가 발생하면, 도 1b에서와 같이 균열이 생긴 신축이음부(1)의 기존 조인트(10)를 완전히 제거한 후, 조인트(10)가 제거된 신축이음부(1)를 압축공기와 고압 물청소를 이용하여 먼지와 이물질 등을 깨끗하게 제거한다.First, as the installation period of the road structure elapses, the structure ages, and due to external force such as vibration, a crack occurs between the expansion joint 1 and the joint 10 as shown in FIG. When leakage occurs through, as shown in Figure 1b, after completely removing the existing joint 10 of the expansion joint (1) cracked, the expansion joint (1) from which the joint 10 is removed is compressed air and high pressure water Use cleaning to remove dust and dirt.

이때, 도로구조물의 신설 시에는 기존의 조인트(10)를 제거하는 공정이 삭제되기 때문에, 새로 신설되는 도로구조물의 신축이음부(1)를 압축공기와 고압 물청소를 이용하여 먼지와 이물질 등을 깨끗하게 제거하면 된다.At this time, since the process of removing the existing joint 10 is deleted when the road structure is newly installed, the new joint portion 1 of the newly formed road structure is cleaned of dust and foreign substances by using compressed air and high pressure water cleaning. You can remove it cleanly.

(제2공정)(2nd step)

신축이음부(1)의 청소가 완료되면 도 1c에서와 같이, 슬래브(2)와 슬래브(2) 사이 슬래브이음공간(1a)에 백업재(20)를 압입하여 기밀하게 끼워 넣는다.When the expansion joint 1 is cleaned, as shown in FIG. 1C, the backing material 20 is press-fitted into the slab joint space 1a between the slab 2 and the slab 2 to be hermetically inserted.

(제3공정)(3rd step)

슬래브이음공간(1a)에 백업재(20)가 끼워지면 도 1d에서와 같이, 백업재(20)가 끼워진 슬래브이음공간(1a)의 상부 이음부분에 알루미늄으로 이루어진 차단판(30)을 설치한다.When the backup material 20 is inserted into the slab joint space 1a, as shown in FIG. 1D, a blocking plate 30 made of aluminum is installed in the upper joint portion of the slab joint space 1a into which the backup material 20 is inserted. .

이와 같이 슬래브이음공간(1a)의 상부 이음부분에 차단판(30)을 설치하면 슬래브이음공간(1a)의 누수 및 부식을 방지할 수 있으며, 또한 차단판(30)에 의해 백업재(20)로 열이 전달되든 것이 차단되므로 백업재(20)가 녹는 것을 방지할 수 있다.Thus, if the blocking plate 30 is installed in the upper joint portion of the slab joint space (1a) can prevent the leakage and corrosion of the slab joint space (1a), and also the backing material 20 by the blocking plate 30 Since heat is blocked from being transferred to the furnace, the backup material 20 may be prevented from melting.

(제4공정)(4th step)

슬래브이음공간(1a)의 상부에 차단판(30)이 설치되면 도 1e에서와 같이, 아스콘(3)과 아스콘(3) 사이 아스콘이음공간(1b)에 매트삽입공간을 남기고 봉합제(40)를 포설하여 경화시킨다.If the blocking plate 30 is installed in the upper portion of the slab joint space (1a), as shown in Figure 1e, leaving the mat insertion space in the ascon joint space (1b) between the ascon (3) and the ascon (3) suture (40) Install and cure.

이와 같이 아스콘(3)과 아스콘(3) 사이 아스콘이음공간(1b)에 봉합제(40)를 포설하여 경화시키면 아스콘이음공간(1)의 누수 및 부식을 방지할 수 있다.As such, when the encapsulant 40 is placed and cured in the ascon joint space 1b between the ascon 3 and the ascon 3, leakage and corrosion of the ascon joint space 1 can be prevented.

(제5공정)(5th process)

아스콘이음공간(1b)에 포설된 봉합제(40)가 경화되면 도 1f에서와 같이, 봉합제(40)가 포설된 아스콘(3)과 아스콘(3) 사이 매트삽입공간에 고무매트(50)를 끼 워 실란트용액(41)으로 부착한다.When the encapsulant 40 installed in the ascon joint space 1b is cured, as shown in FIG. 1F, a rubber mat 50 is disposed between the ascon 3 and the ascon 3 in which the encapsulant 40 is installed. Insert into the sealant solution (41).

이와 같이 아스콘(3)과 아스콘(3) 사이 매트삽입공간에 고무매트(50)를 끼워 실란트용액(41)으로 부착하면 아스콘이음공간(1b)의 누수 및 부식을 방지할 수 있으며, 또한 고무매트(50)를 통해 여름철에는 봉합제(40)가 밀리는 것을 방지하는 동시에 겨울철에는 봉합제(40)가 갈라지는 것을 방지할 수 있으며, 그리고 고무매트(50)의 상부에 형성된 홈(51)에 의해 미끄럼을 방지할 수 있다. 이때, 고무매트(50)의 하부에 형성된 말굽형 홈(52)에 의해 고무매트(50)는 접착력이 증대되어 한층 더 견고하게 부착되어 떨어지지 않는다.As such, when the rubber mat 50 is inserted into the mat insertion space between the ascon 3 and the ascon 3 and attached with the sealant solution 41, leakage and corrosion of the ascon joint space 1b can be prevented, and the rubber mat Through 50, the suture 40 may be prevented from being pushed in the summer, and at the same time, the suture 40 may be prevented from splitting in the winter, and slipped by the groove 51 formed on the rubber mat 50. Can be prevented. At this time, by the horseshoe-shaped groove 52 formed in the lower portion of the rubber mat 50, the rubber mat 50 is more adhesive force is more firmly attached and do not fall off.

(제6공정)(Step 6)

매트삽입공간에 고무매트(50)가 부착되면 도 1g에서와 같이, 아스콘(3)과 고무매트(50) 사이 양측 틈새에 실란트용액(42)을 충전하여 경화시킨다.When the rubber mat 50 is attached to the mat insertion space, as shown in FIG. 1g, the sealant solution 42 is filled in both gaps between the ascon 3 and the rubber mat 50 and cured.

이와 같이 아스콘(3)과 고무매트(50) 사이 양측 틈새에 실란트용액(42)을 충전하여 경화시키면 시공작업이 완료되므로 이후 차량을 통행시킨다. 이때, 고무매트(50)의 양측에 형성된 홈(53)에 의해 고무매트(50)는 한층 더 견고하게 부착된다.Thus, when the sealant solution 42 is filled and cured in both gaps between the asphalt concrete 3 and the rubber mat 50, the construction work is completed, and then the vehicle passes. At this time, the rubber mat 50 is more firmly attached by the grooves 53 formed on both sides of the rubber mat 50.

따라서, 이러한 본 발명에 따르면 새로 신설되거나 균열이 생긴 도로구조물의 신축이음부(1)를 거푸집을 사용하지 않고 한층 더 효과적으로 보다 간단하고도 단순한 구조로 용이하게 시공할 수 있는 장점이 있으며, 이와 같이 신축이음부(1)의 시공구조가 간단하고 시공작업이 단순하기 때문에 전체적으로 시간과 비용을 절감할 수 있는 동시에 시공성을 높일 수 있는 장점이 있다.Therefore, according to the present invention, there is an advantage that the expansion joint 1 of the newly constructed or cracked road structure can be easily constructed in a simpler and simpler structure more effectively without using formwork. Since the construction structure of the expansion joint (1) is simple and the construction work is simple, there is an advantage that can reduce the overall time and cost, and at the same time improve the workability.

또한 본 발명에 따르면 구조적으로 신축이음부(1)의 누수를 완벽하게 차단할 수 있는 장점이 있다.In addition, according to the present invention there is an advantage that can completely block the leakage of the expansion joint (1).

그리고 본 발명에 따르면 신축이음부(1)의 시공 후 하자발생 시 전체를 제거하지 않고, 기존의 고무매트(50)만을 간단하게 떼어내고 새로운 고무매트(50)로 교체하면 간단하게 보수할 수 있기 때문에 신축이음부(1)의 유지보수가 용이한 장점이 있다.And according to the present invention can be easily repaired by simply removing the existing rubber mat 50 and replacing it with a new rubber mat (50) without removing the whole when the defect occurs after the construction of the expansion joint (1) Because of the easy maintenance of the expansion joint (1) has the advantage.

도 1a 내지 도 1g는 본 발명의 시공방법을 보인 공정도로서,1a to 1g is a process chart showing a construction method of the present invention,

도 1a는 균열이 생긴 신축이음부의 기존 조인트를 보인 예시도.Figure 1a is an exemplary view showing an existing joint of the expansion joint is cracked.

도 1b는 청소한 상태를 보인 예시도.Figure 1b is an exemplary view showing a cleaned state.

도 1c는 슬래브이음공간에 백업재를 끼워 메운 상태를 보인 예시도.Figure 1c is an exemplary view showing a state filled with a backup material in the slab joint space.

도 1d는 슬래브이음공간의 상부에 차단판을 설치한 상태를 보인 예시도.Figure 1d is an exemplary view showing a state in which a blocking plate is installed on the upper portion of the slab joint space.

도 1e는 아스콘이음공간에 매트삽입공간을 남기고 봉합제를 포설한 상태를 보인 예시도.Figure 1e is an exemplary view showing a state in which the suture is laid leaving a mat insertion space in the ascon joint space.

도 1f는 매트삽입공간에 고무매트를 끼워 실란트용액으로 부착한 상태를 보인 예시도.1f is an exemplary view showing a state in which a rubber mat is inserted into a mat inserting space with a sealant solution.

도 1g는 아스콘과 고무매트 사이 양측 틈새에 실란트용액을 충전한 상태를 보인 예시도.Figure 1g is an illustration showing a state in which the sealant solution is filled in the gap between both sides of the ascon and rubber mat.

도 2는 본 발명에 따른 말굽형 홈을 가진 고무매트를 보인 사시도.Figure 2 is a perspective view of a rubber mat having a horseshoe groove according to the present invention.

<도면의 주요부분에 대한 부호설명><Code Description of Main Parts of Drawing>

1 : 신축이음부 1a : 슬래브이음공간1: expansion joint 1a: slab joint space

1b : 아스콘이음공간 2 : 슬래브1b: ascon joint space 2: slab

3 : 아스콘 10 : 조인트3: ascon 10: joint

20 : 백업재 30 : 차단판20: backup material 30: blocking plate

40 : 봉합제 41,42 : 실란트용액40: suture 41, 42: sealant solution

50 : 고무매트 51 : 홈50: rubber mat 51: groove

52 : 말굽형 홈 53 : 홈52: horseshoe groove 53: groove

Claims (4)

신축이음부(1)를 청소하여 먼지 등을 제거하는 단계; 슬래브(2)와 슬래브(2) 사이 슬래브이음공간(1a)에 백업재(20)를 압입하여 기밀하게 메우는 단계; 백업재(20)가 끼워진 슬래브이음공간(1a)의 상부 이음부분에 차단판(30)을 설치하는 단계; 아스콘(3)과 아스콘(3) 사이 아스콘이음공간(1b)에 매트삽입공간을 남기고 봉합제(40)를 포설하여 경화시키는 단계; 봉합제(40)가 포설된 아스콘(3)과 아스콘(3) 사이 매트삽입공간에 고무매트(50)를 끼워 실란트용액(41)으로 부착하는 단계; 아스콘(3)과 고무매트(50) 사이 양측 틈새에 실란트용액(42)을 충전하여 경화시키는 단계를 포함하는 도로구조물의 신축이음부 시공방법.Cleaning the expansion joint part 1 to remove dust and the like; Press-fitting the backing material 20 into the slab joint space 1a between the slab 2 and the slab 2, and filling the gas tightly; Installing a blocking plate 30 at an upper joint portion of the slab joint space 1a into which the backup material 20 is inserted; Laying and curing the encapsulant 40 leaving a mat insertion space in the ascon joint space 1b between the ascon 3 and the ascon 3; Attaching the rubber mat 50 to the mat inserting space between the ascon 3 and the ascon 3 on which the encapsulant 40 is installed, and attaching the sealant solution 41 with the sealant solution 41; Construction method of the expansion joint of the road structure comprising the step of filling the sealant solution 42 in both gaps between the ascon (3) and the rubber mat (50). 제 1 항에 있어서, 상기 신축이음부(1)에 균열이 생긴 기존의 조인트(10)가 존재할 경우에는 기존 조인트(10)를 완전히 제거하는 단계가 부가되는 것을 특징으로 하는 도로구조물의 신축이음부 시공방법.The expansion joint of claim 1, wherein the existing joint 10 is cracked in the expansion joint 1, and a step of completely removing the existing joint 10 is added. Construction method. 제 1 항에 있어서, 상기 차단판(30)은 알루미늄으로 이루어지는 것을 특징으로 하는 도로구조물의 신축이음부 시공방법.The method of claim 1, wherein the blocking plate 30 is made of aluminum, the expansion joint construction method of the road structure. 제 1 항에 있어서, 상기 고무매트(50)의 상부와 하부에는 적정간격을 두고 다수의 홈(51) 및 말굽형 홈(52)이 각각 형성되고, 상기 고무매트(50)의 양측 중앙 부에는 홈(53)이 각각 형성된 것을 특징으로 하는 도로구조물의 신축이음부 시공방법.According to claim 1, A plurality of grooves 51 and the horseshoe-shaped grooves 52 are formed at the upper and lower portions of the rubber mat 50 at appropriate intervals, respectively, on both side central portions of the rubber mat 50 Construction method of the expansion joint of the road structure, characterized in that each groove 53 is formed.
KR1020070107789A 2007-10-25 2007-10-25 Construction method of flexible connecting division of road-structure KR100841796B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070107789A KR100841796B1 (en) 2007-10-25 2007-10-25 Construction method of flexible connecting division of road-structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070107789A KR100841796B1 (en) 2007-10-25 2007-10-25 Construction method of flexible connecting division of road-structure

Publications (1)

Publication Number Publication Date
KR100841796B1 true KR100841796B1 (en) 2008-06-27

Family

ID=39772638

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070107789A KR100841796B1 (en) 2007-10-25 2007-10-25 Construction method of flexible connecting division of road-structure

Country Status (1)

Country Link
KR (1) KR100841796B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100954597B1 (en) 2009-06-12 2010-04-26 이수명 Expansion joint and manufacturing method and construciting method
KR101220435B1 (en) * 2012-06-29 2013-02-07 산이건설 주식회사 Unit bridges girders and transverse girders for bridges unit bond structure
KR101280988B1 (en) 2013-02-08 2013-07-02 이수명 Slide and elasticity type expansion joint device and constructing method thereof
KR101392477B1 (en) 2013-11-20 2014-05-07 주식회사 삼송마그마 Repacking of asphalt concrete pavement method
CN106087643A (en) * 2016-06-27 2016-11-09 山西四建集团有限公司 Cement concrete pavement is to contracting seam construction method
KR102335800B1 (en) * 2021-05-14 2021-12-03 진현오 Method for repairing expansion joint of underground driveways

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR830003628A (en) * 1980-08-19 1983-06-21 에이이찌 다마리부찌 Expansion joint structure of road
KR20020085416A (en) * 2001-05-08 2002-11-16 금호엔지니어링 (주) method jointing a surface layer over expansion parts for use in underground roadway structure
WO2006002992A2 (en) * 2004-07-07 2006-01-12 Mageba S.A. Bridging device
KR100979825B1 (en) * 2001-12-10 2010-09-02 에멀럭스 디자인 앤드 매뉴팩처링 코포레이션 Direct memory access transfer buffer processor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR830003628A (en) * 1980-08-19 1983-06-21 에이이찌 다마리부찌 Expansion joint structure of road
KR20020085416A (en) * 2001-05-08 2002-11-16 금호엔지니어링 (주) method jointing a surface layer over expansion parts for use in underground roadway structure
KR100979825B1 (en) * 2001-12-10 2010-09-02 에멀럭스 디자인 앤드 매뉴팩처링 코포레이션 Direct memory access transfer buffer processor
WO2006002992A2 (en) * 2004-07-07 2006-01-12 Mageba S.A. Bridging device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100954597B1 (en) 2009-06-12 2010-04-26 이수명 Expansion joint and manufacturing method and construciting method
KR101220435B1 (en) * 2012-06-29 2013-02-07 산이건설 주식회사 Unit bridges girders and transverse girders for bridges unit bond structure
KR101280988B1 (en) 2013-02-08 2013-07-02 이수명 Slide and elasticity type expansion joint device and constructing method thereof
KR101392477B1 (en) 2013-11-20 2014-05-07 주식회사 삼송마그마 Repacking of asphalt concrete pavement method
CN106087643A (en) * 2016-06-27 2016-11-09 山西四建集团有限公司 Cement concrete pavement is to contracting seam construction method
KR102335800B1 (en) * 2021-05-14 2021-12-03 진현오 Method for repairing expansion joint of underground driveways

Similar Documents

Publication Publication Date Title
US6039503A (en) Expansion joint system
KR100841796B1 (en) Construction method of flexible connecting division of road-structure
KR101036277B1 (en) Expansion joint waterproof material of structure including road and bridge, and constructing method of expansion joint part using this
JP2008121374A (en) Structure for embedding expansion joint in highway bridge
KR20170082318A (en) Elastic recovering type expansion joint and the construction method therefor
KR102008773B1 (en) Elastic form precast joint member and quick construction method of bridge expansion joint using of the same
KR101084669B1 (en) Mono cell type flexible connecting device easy to changing the and its changing method
KR101596689B1 (en) Expansion joint for connecting slabs of a bridge structure and method for construction the same
JP2003064613A (en) Structure of expansion joint for bridge
KR100805842B1 (en) A joint device and construction method of concrete structure
KR20190112451A (en) Construction Method of Expansion Joints Device with Improved Durability using Elastomeric Pad
KR100736858B1 (en) Expansion jointing apparatus with drainpipe for a bridge and construction method thereof
KR20160005575A (en) Expansion joint repairing construction method using compression seal
KR101593998B1 (en) Expansion joint maintenance facility and using the repair method
KR100659978B1 (en) Crevice join fabric of construction
KR20030077683A (en) The fabricated expansion joint and installation method without concrete-breaking
JP5875855B2 (en) Block type buried joint expansion and contraction device for bridge
CN213328515U (en) Expansion joint device is handled to compound long-life road surface tip of rigidity softness based on sponge city
CN113605930A (en) Assembly type tunnel bottom structure replacing inverted arch filling layer and construction method
KR20050079965A (en) The road boundary stone jointer filling device and the construction method with this
KR100544519B1 (en) The coupling device and carrying out mothed of an agriculture waterway and well water system waterway
KR101283556B1 (en) expansion joint for agriculture channels and this construction technique
KR100995060B1 (en) A joint device and construction method of concrete structure
KR100258297B1 (en) Expansion joint matter using concrete slab
JP3789412B2 (en) Buried joints for road bridge buried joints and buried bridge joints for road bridges

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130618

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140616

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150616

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160617

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20180614

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20190617

Year of fee payment: 12