- KR100804825B1 KR100804825B1 KR1020060120950A KR20060120950A KR100804825B1 KR 100804825 B1 KR100804825 B1 KR 100804825B1 KR 1020060120950 A KR1020060120950 A KR 1020060120950A KR 20060120950 A KR20060120950 A KR 20060120950A KR 100804825 B1 KR100804825 B1 KR 100804825B1
- Authority
- KR
- South Korea
- Prior art keywords
- wall
- wall panel
- panel
- bathroom
- fixing
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0875—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements having a basic insulating layer and at least one covering layer
- E04F13/0876—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements having a basic insulating layer and at least one covering layer the covering layer comprising mutual alignment or interlocking means
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/70—Drying or keeping dry, e.g. by air vents
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0832—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
- E04F13/0857—Supporting consoles, e.g. adjustable only in a direction parallel to the wall
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0871—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements having an ornamental or specially shaped visible surface
- E04F13/0873—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements having an ornamental or specially shaped visible surface the visible surface imitating natural stone, brick work, tiled surface or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Residential Or Office Buildings (AREA)
Abstract
Description
도 1은 종래기술에 따른 욕실용 건식벽체가 설치된 욕실의 평면도.1 is a plan view of a bathroom with a drywall for bathroom according to the prior art is installed.
도 2는 본 발명의 따른 욕실용 건식벽체가 설치된 욕실의 평면도.Figure 2 is a plan view of a bathroom with a drywall for bathroom according to the present invention.
도 3은 도 2의 Ⅲ-Ⅲ 단면도.3 is a sectional view taken along the line III-III of FIG. 2;
도 4는 도 2의 욕실용 건식벽체가 욕실의 시멘트벽에 설치되는 모습을 나타내는 사시도.Figure 4 is a perspective view showing the bathroom drywall of Figure 2 is installed on the cement wall of the bathroom.
도 5는 도 4의 Ⅴ-Ⅴ결합단면도.5 is a V-V coupling cross-sectional view of FIG.
도 6은 도 4의 Ⅵ-Ⅵ 결합단면도.Figure 6 is a VI-VI coupling cross-sectional view of FIG.
도 7은 도 4의 Ⅶ-Ⅶ 결합단면도.FIG. 7 is a cross-sectional view of the VIII-VIII coupling of FIG. 4. FIG.
<도면부호의 상세한 설명><Detailed Description of Drawings>
100... 건축벽 110... 방수액100 ...
120... 단열재 130...하부벽판넬120
140... 상부벽판넬 150... 높이조정부재140 ...
160...바닥면 170... 브라켓160
180... 상하판넬고정브라켓180.Top and bottom panel fixing bracket
본 발명은 욕실용 건식벽체 시공방법에 관한 것으로, 공정감소에 따른 시공비용 절감은 물론 단열성 및 벽체 두께를 대폭 감소시킬 수 있는 욕실용 건식벽체 시공방법에 관한 것이다.The present invention relates to a drywall construction method for a bathroom, and to a construction method for drywall construction for a bathroom that can significantly reduce the construction cost due to the process reduction and significantly reduce the insulation and wall thickness.
일반적인 습식벽체는 도 1에 도시한 바와 같이 안쪽으로부터 시멘트 건축벽(10)에 단열재(20)를 설치한 후 시멘트를 이용하여 벽돌(30)을 쌓고 그 위에 방수액(40)을 바른 후 모르타르(50)를 도포하여 평활도를 확보한 다음 다수의 타일(60)을 붙여주는 여러 단계의 시공구조로 이루어져 있다.The general wet wall, as shown in FIG. 1, after installing the
그러나, 이러한 단면구성으로 이루어지는 종래의 습식벽체 공법은 일련의 전 공정이 습식공정으로 시공기간이 길고 양생에 따르는 공사가 지연되며 구조 변경이 곤란하거나 불가능하기 때문에 시공작업이 까다로우며 전체적인 시공비용의 과다 지출로 인해 경제적으로 바람직하지 못하며 특히, 이와 같은 습식벽체 공법은 벽체의 과다한 두께로 인하여 내부의 유효면적이 대폭 줄어들게 되는 문제점이 있다.However, in the conventional wet wall method having such a cross-sectional configuration, the construction process is difficult because the whole construction process is a wet process, the construction period is long, the construction work is delayed, and the structural change is difficult or impossible. It is not economically desirable due to excessive spending, in particular, such a wet wall method has a problem that the effective area of the interior is greatly reduced due to the excessive thickness of the wall.
본 발명은 이러한 문제점을 해결하기 위하여 창출된 것으로서, 습식벽체 공법에 비하여 시공이 간편하고 시공기간이 단축되며 벽체 두께를 대폭 감소시킬 수 있는 욕실용 건식벽체 시공방법을 제공하는 것을 그 목적으로 한다.It is an object of the present invention to provide a drywall construction method for a bathroom which can be easily constructed, shortened construction time, and can significantly reduce wall thickness, compared to a wetwall construction method.
상기한 목적을 달성하기 위한 본 발명의 욕실용 건식벽체 시공방법은, 건축 시공을 통해 마련된 욕실의 시멘트 건축벽에 지지되는 상부벽판넬과 하부벽판넬을 이용하여, 욕실의 내벽면을 이루는 욕실용 건식벽체 시공방법으로서,Dry wall construction method for a bathroom of the present invention for achieving the above object, using the upper wall panel and the lower wall panel supported on the cement building wall of the bathroom provided through the construction, for the bathroom to form the inner wall surface of the bathroom As a dry wall construction method,
상기 하부벽판넬을, 상기 욕실의 바닥면으로부터 상방으로 이격된 상태로, 다수의 브라켓에 의하여 건축벽의 일면에 고정시키는 단계;Fixing the lower wall panel to one surface of the building wall by a plurality of brackets while being spaced upwardly from the bottom surface of the bathroom;
상기 하부벽판넬의 상단양측과 상기 상부벽판넬의 하단양측을 함께 건축벽에 고정할 수 있는 상하판넬고정브라켓을 상기 하부벽판넬의 상단양측에 결합된 상태로 건축벽에 고정하는 단계;Fixing the upper and lower panel fixing brackets capable of fixing the upper both sides of the lower wall panel and the lower both sides of the upper wall panel to the building wall in a state in which the upper and lower panel fixing brackets are coupled to the upper both sides of the lower wall panel;
상기 상부벽판넬의 하단양측을 상기 건축벽에 고정된 상하판넬고정브라켓에 결합시키면서, 상기 하부벽판넬의 상단에 올려두는 단계; 및Coupling both lower ends of the upper wall panel to the upper and lower panel fixing brackets fixed to the building wall, and placing the lower wall panel on the upper end of the lower wall panel; And
상기 상하판넬고정브라켓에 결합된 상기 상부벽판넬을 다수의 브라켓에 의하여 건축벽에 고정시키는 단계;로 이루어진다.Fixing the upper wall panel coupled to the upper and lower panel fixing bracket to the building wall by a plurality of brackets.
상기 욕실용 건식벽체 시공방법에서, 상기 하부벽판넬을 건축벽에 고정시키는 브라켓 중에서 하부벽판넬의 하단부측에 마련되는 브라켓은, 일단이 하부벽판넬과 나사결합되고 타단이 접착제에 의하여 건축벽에 고정되는 것이 바람직하다.In the dry wall construction method for the bathroom, one of the brackets for fixing the lower wall panel to the building wall is provided on the lower end of the lower wall panel, one end is screwed to the lower wall panel and the other end is bonded to the building wall by the adhesive It is preferable to be fixed.
상기 욕실용 건식벽체 시공방법에서, 상기 상하판넬고정브라켓은, 건축벽에 고정되는 고정판과, 상단으로부터 하방으로 연장되는 상단장공홈 및 하단으로부터 상방으로 연장되는 하단장공홈이 마련된 끼움판으로 이루어지며,In the dry-wall construction method for the bathroom, the upper and lower panel fixing bracket is made of a fixing plate is fixed to the building wall, the upper slot groove extending downward from the top and the lower slot groove extending upward from the bottom ,
상기 상부벽판넬에는 상기 상단장공홈에 끼워져 지지되는 걸림턱부재가 마련되고,The upper wall panel is provided with a locking jaw member that is inserted into and supported in the upper slot groove,
상기 하부벽판넬에는 상기 하단장공홈에 끼워져 지지되는 걸림턱부재가 마련 되는 것이 바람직하다.It is preferable that the lower wall panel is provided with a locking jaw member which is inserted into and supported by the lower slot groove.
상기 욕실용 건식벽체 시공방법에서, 상기 상부벽판넬과 하부벽판넬은,In the drywall construction method for the bathroom, the upper wall panel and the lower wall panel,
사각의 틀을 이루는 프레임과, 상기 프레임의 내부영역을 채워 사각판을 형성하는 합성수지와, 상기 사각판의 전면에 부착되는 다수의 타일로 구성된 것이 바람직하다.It is preferable that the frame comprises a rectangular frame, a synthetic resin forming a rectangular plate by filling an inner region of the frame, and a plurality of tiles attached to the front surface of the rectangular plate.
상기 욕실용 건식벽체 시공방법에서, 상기 건축벽의 일면을 따라 다수개의 높이조정부재를 욕실의 바닥면에 설치하는 단계를 더 구비하며,In the dry wall construction method for the bathroom, further comprising the step of installing a plurality of height adjustment members along the surface of the building wall on the floor of the bathroom,
상기 하부벽판넬은 상기 높이조정부재의 상단에 올려진 상태에서 상기 다수의 브라켓에 의하여 건축벽의 일면에 고정되는 것이 바람직하다.The lower wall panel is preferably fixed to one surface of the building wall by the plurality of brackets in the state raised on the top of the height adjustment member.
상기 욕실용 건식벽체 시공방법에서, 상기 높이조정부재는 하단이 접착제에 의하여 욕실바닥에 고정되고, 상단은 하부벽판넬과 나사결합되는 것이 바람직하다.In the dry wall construction method for the bathroom, the height adjustment member is preferably fixed to the bottom of the bathroom floor by the adhesive, the top is screwed with the lower wall panel.
상기 욕실용 건식벽체 시공방법에서, 상기 접착제는 우레탄 수지 또는 에폭시 수지인 것이 바람직하다.In the drywall construction method for the bathroom, the adhesive is preferably a urethane resin or an epoxy resin.
이하, 본 발명에 따른 바람직한 실시예를 첨부된 도면을 참조하여 상세히 설명한다. Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도 2는 본 발명의 따른 욕실용 건식벽체가 설치된 욕실의 평면도이며, 도 3은 도 2의 Ⅲ-Ⅲ 단면도이며, 도 4는 도 2의 욕실용 건식벽체가 욕실의 시멘트벽에 설치되는 모습을 나타내는 사시도이며, 도 5는 도 4의 Ⅴ-Ⅴ결합단면도이며, 도 6은 도 4의 Ⅵ-Ⅵ 결합단면도이고, 도 7은 도 4의 Ⅶ-Ⅶ 결합단면도이다.2 is a plan view of a bathroom with a drywall for bathroom according to the present invention, FIG. 3 is a sectional view taken along line III-III of FIG. 2, and FIG. 4 is a view showing the bathroom drywall of FIG. 5 is a V-V coupling cross section of FIG. 4, FIG. 6 is a VI-VI coupling cross section of FIG. 4, and FIG. 7 is a V-V coupling cross section of FIG.
본 실시예에 따른 욕실용 건식벽체(120) 시공방법은 건축시공을 통해 마련된 욕실의 시멘트 건축벽(100)에 지지되는 상부벽판넬(140)과 하부벽판넬(130)을 이용하여, 욕실의 내벽면을 이루는 욕실용 건식벽체(120)를 시공하는 방법에 관한 것이다.
건식벽체(120)란 모르타르를 쓰지 않고 벽체를 시공하는 것으로서, Dry wall 이라고도 한다. 이러한 건식벽체(120)는 상부벽판넬(140)과 하부벽판넬(130)로 이루어진다. 상기 상부벽판넬(140)과 하부벽판넬(130)은 각각 사각의 틀을 이루는 프레임(131,141)과, 상기 프레임(131,141)의 내부영역을 채워 사각판(132,142)을 형성하는 합성수지와, 상기 사각판(132,142)의 전면에 부착되는 다수의 타일(133,143)로 구성된다. 합성수지(132,142)는 구체적으로는 폴리우레탄을 이용하는 것이 바람직한데, 상기 폴리우레탄은 보온성이 우수하여 외부로부터의 냉기가 욕실로 전달되기 않도록 한다.The
욕실용 건식벽체(120)를 시공하기 위하여, 먼저 시멘트 건축벽(100)에 대략 5mm의 두께를 가지는 방수액(110)을 바른 후, 그 위에 단열재(111)를 설치하는 기본적인 건축시공을 실시한다.In order to construct the
단열재(111)의 설치가 완료되면, 건축벽(100)의 일면을 따라 다수개의 높이조정부재(150)를 욕실의 바닥면(160)에 설치한다. When the installation of the
상기 높이조정부재(150)는 하단이 바닥판(151)과 연결되고 상측에 나사산이 형성된 하부지지체(152)와, 상단이 받침판(153)과 연결되고 하측에 나사산이 형성된 상부지지체(154)와, 상기 하부지지체(152)의 나사산과 상부지지체(154)의 나사산을 그 내부의 암나사산(155a)에 결합하는 너트부(155)로 구성된다. 상기 너트 부(155)의 암나사산(155a)은 상기 하부지지체(152)의 나사산과 결합되는 부분과 상기 상부지지체(154)의 나사산이 결합되는 부분이 서로 반대방향의 비틀림각을 이루고 있어, 상기 너트부(155)가 일방향으로 회전을 하면 상부지지체(154)와 하부지지체(152)가 서로 접근하는 방향으로 이동하고 상기 너트가 타방향으로 회전을 하면 상부지지체(154)와 하부지지체(152)가 서로 멀어지는 방향으로 이동가능하다.The
이상과 같이 높이조정부재(150)를 다수개 배치하면, 상기 높이조정부재(150)의 상단에 하부벽판넬(130)을 올려고정한다. 상기 높이조정부재(150)는 상기 하부벽판넬(130)이 상기 높이조정부재(150)에 올려졌을 때 상기 하부벽판넬(130)을 안정적으로 지지할 수 있도록 등간격으로 3개를 배치하는 것이 바람직하나, 이에 한정되는 것은 아니며 하부벽판넬(130)의 길이에 따라 그 이상 또는 그 이하로 배치하는 것도 가능하다.When the plurality of
높이조정부재(150)는 그 하단이 접착제에 의하여 욕실 바닥면(160)에 고정되고, 상단은 하부벽판넬(130)과 나사결합된다. 접착제는 접착력이 우수하고 외부온도에 따른 접착강도의 변화가 적은 우레탄 수지 또는 에폭시 수지로 이루어지는 것이 바람직하나, 그 이외에도 다양한 접착제가 사용될 수 있다.
상기 높이조정부재(150)에 하부벽판넬(130)을 올려 고정한 후에, 하부벽판넬(130)을 다수의 브라켓(170)에 의하여 건축벽(100)에 고정시킨다. 상기 브라켓(170)은 "ㄱ"자형을 가진다. 상기 브라켓(170)에서 일면은 하부벽판넬(130)의 프레임 배면에 나사결합하고, 상기 브라켓(170)의 일면과 절곡된 타면은 나사못(190)에 의하여 건축벽(100)에 고정한다. 구체적으로는 상기 브라켓의 타면은 건축 벽(100)에서 상기 하부벽판넬(130)이 배치되는 면과 인접한 건축벽(100)에 고정된다. 이때, 상기 브라켓(170)은 상기 하부벽판넬(130)을 건축벽(100)에 설치하기 전에 미리 프레임(131)의 배면에 나사결합된다.After raising and fixing the
다만, 상기 하부벽판넬(130)을 건축벽(100)에 고정시키는 브라켓(170) 중에서 하부벽판넬(130)의 하단부측에 마련되는 브라켓(170)은, 일면이 하부벽판넬(130)과 나사결합되고 타면이 접착제에 의하여 건축벽(100)에 고정되는 것이 바람직하다. 이때, 사용되는 접착제는 접착력이 우수하고 외부온도에 따른 접착강도의 변화가 적은 우레탄 수지 또는 에폭시 수지로 이루어지는 것이 바람직하나, 그 이외에도 다양한 접착제가 사용될 수 있다.However, one of the
이와 같이, 높이조정부재(150)를 욕실의 바닥면(160)에 접착제로 고정시키고, 하부벽판넬(130)의 하단부측에 마련되는 브라켓(170)의 타면을 접착제에 의하여 건축벽(100)에 고정시키는 이유는 상술한 바와 같이 욕실의 건축벽(100)의 하단과, 바닥면(160)에는 미리 방수액(110)이 발라져 있는 데, 이와 같은 방수액(110)에 의하여 형성된 방수층이 나사못(190)에 의하여 상기 높이조정부재(150) 또는 브라켓(170)을 건축벽(100)에 고정하는 과정에서 파손되기 되는 것을 막기 위해서이다. 특히, 바닥면과 건축벽의 하단에 마련된 방수층이 파손되면, 그 파괴된 면을 따라 물이 건축벽(100)으로 스며들게 되는데, 이는 아랫층으로 물이 흘러내리게 되는 원인이 된다. As such, the
하부벽판넬(130)의 상부는 "┏"과 "┛" 형 브라켓(172,173)의 결합에 의하여 건축벽(100)에 지지된다. 구체적으로는 "┏"형 브라켓(172)의 수직면이 하부벽판 넬(130)의 프레임(131)에 고정되고, 수직면으로부터 절곡되어 있는 수평면은 "┛"형 브라켓(173)의 수평면과 나사결합된다. 또한, 상기 "┛"형 브라켓(172)의 수직면은 건축벽(100)에 나사못(190)에 의하여 고정된다.The upper portion of the
상기 하부벽판넬(130)의 상부는 하부벽판넬(130)이 설치되는 건축벽(100)의 면에 고정된다. 이를 위하여 하부벽판넬(130)과 건축벽(100)의 사이에 미리 설치되어 있는 단열재(111)의 일부를 미리 제거하여, 브라켓(170)이 설치될 수 있는 위치를 마련한 후에 "┏"과 "┛" 형 브라켓(172,173)을 이용하여 상기와 같은 방식으로 하부벽판넬(130)의 상부를 건축벽(100)에 고정한다. The upper portion of the
이후, 상기 단열재(111)가 제거된 부분에 폴리우레탄을 충진하여 단열성능이 저하되지 않도록 하는 것도 바람직하다.Thereafter, it is also preferable to fill the polyurethane to the part from which the
이상과 같이 하부벽판넬(130)의 설치가 완료되면, 상기 하부벽판넬(130)의 상단양측과 상기 상부벽판넬(140)의 하단양측을 함께 건축벽(100)에 고정할 수 있는 상하판넬고정브라켓(180)이 상기 하부벽판넬(130)의 상단양측에 결합된 상태로 건축벽(100)에 고정된다.When the installation of the
구체적으로는 상기 상하판넬고정브라켓(180)은 고정판(181)과 끼움판(182)으로 구성된다. 상기 고정판(181)은 건축벽(100)에 고정되는 부분으로, 상기 고정판(181)이 나사못(190)에 의하여 건축벽(100)에 고정된다.Specifically, the upper and lower
상기 끼움판(182)에는 상단으로부터 하방으로 연장되는 상단장공홈(183) 및 하단으로부터 상방으로 연장되는 하단장공홈(183)이 마련되어 있다. The
한편, 상기 상부벽판넬(140)의 측면 하단에는 상기 상단장공홈(183)에 끼워 져 지지되는 걸림턱부재(144)가 마련되고, 하부벽판넬(130)의 측면 상단에는 상기 하단장공홈(184)에 끼워져 지지되는 걸림턱부재(134)가 마련된다. 상기 걸림턱부재(134, 144)는 상단장공홈(183) 또는 하단장공홈(184)보다 큰 직경을 가진 걸림부(134a, 144a)와, 상기 걸림부(134a, 144a)와 연결되어 있으며 상기 상단장공홈(183) 또는 하단장공홈(184)의 직경과 동일한 정도의 직경을 갖는 끼움부(134b, 144b)로 구성된다.Meanwhile, a locking
상기 상하판넬고정브라켓(180)은 이미 설치가 완료된 하부벽판넬(130)의 걸림턱부재(134)를 하단장공홈(184)에 끼워넣는다. 이후, 상기 상하판넬고정브라켓(180)의 고정판(181)을 나사못(190)에 의하여 고정하여, 상기 하부벽판넬(130)의 측면 상단이 상하판넬고정브라켓(180)에 의하여 지지될 수 있게 한다. The upper and lower
상하판넬고정브라켓(180)의 설치가 완료되면, 상부벽판넬(140)의 하단양측을 상기 건축벽(100)에 고정된 상하판넬고정브라켓(180)에 결합시킨다. 구체적으로는 상기 상부벽판넬(140)의 측면 하단에 마련된 걸림턱부재(144)를 상기 상하판넬고정브라켓(180)의 상단장공홈(183)에 끼워넣는다. 이와 함께, 상기 상부벽판넬(140)을 하부벽판넬(130)의 상단에 올려둔다.When the installation of the upper and lower
한편, 하부벽판넬(130)의 상부에는 밀림방지부재(135)가 마련되어 있다. 상기 밀림방지부재(135)는 평판으로 이루어지며, 하부측이 하부벽판넬(130)의 상단에 나사결합되고 상부측은 하부벽판넬(130)로부터 돌출된다.On the other hand, the upper portion of the
상기 상부벽판넬(140)은 상기 하부벽판넬(130)의 위에 설치할 때, 그 상부벽판넬(140)의 하단이 상기 밀림방지부재(135)의 전면에 놓일 수 있게 한다. When the
이와 같이 밀림방지부재(135)를 설치하는 이유는 상기 상부벽판넬(140)의 측면과 상부측에는 다수의 브라켓(170)을 설치하여 건축벽(100)과의 고정결합이 가능하게 하지만, 상기 상부벽판넬(140)의 하단 중앙부위에는 별도의 고정수단이 존재하지 않아, 상기 밀림방지부재를 두어 상기 상부벽판넬(140)의 하단이 외력에 의하여 건축벽(100) 쪽으로 밀려 파손되지 않도로 하게 한다.The reason why the
이상과 같이 상하판넬고정브라켓(180)에 의해 결합된 상기 상부벽판넬(140)을 다수의 브라켓(170)에 의하여 건축벽(100)에 고정시킨다. 상기 다수의 브라켓(170)은 상부벽판넬(140)의 측면에 각각 설치되며, 이는 하부벽판넬(130)의 측면에 설치되는 브라켓(170)과 동일한 방식으로 설치된다. 다만, 상기 상부벽판넬(140)의 하단부측에 마련된 브라켓(170)의 타단은 접착제에 의하여 건축벽(100)에 고정될 필요없이, 나사못(190)에 의하여 고정되는 것도 가능하다.As described above, the
상기 상부벽판넬(140)의 상부는 하부벽판넬(130)의 상부와 동일하게는 "┏"과 "┛" 형 브라켓(172,173)의 결합에 의하여 건축벽(100)에 지지된다. 다만, 상기 상부벽판넬(140)과 건축벽(100)사이에 단열재(111)가 마련되어 있으므로, 상기 상부벽판넬(140)의 브라켓(172,173)이 건축벽(100)에 지지될 단열재(111) 부분을 미리 제거한 상태에서 상기 브라켓(172,173)을 설치하고, 그 단열재(111)가 제거된 부분(S)에 폴리우레탄을 채워넣는 것이 바람직하다.The upper part of the
이상과 같은 작업을 통하여 하부벽판넬과 상부벽판넬을 욕실의 건축벽의 일면에 설치한 이후, 상기 건식벽체가 설치된 건축벽의 인접한 다른 면은 단열재가 필요없이 시멘트 건축벽에 방수액을 바른 후, 그 위에 직접 다수의 타일을 부착한 다.After the lower wall panel and the upper wall panel are installed on one surface of the building wall of the bathroom through the above operation, the other side of the building wall on which the drywall is installed is coated with a cement building wall without the need for insulation. Attach multiple tiles directly on it.
이와 같이 건축벽의 벽체시공이 마무리되면, 욕실의 바닥면으로부터 하부벽판넬의 하단부분까지 시멘트를 채우고, 그 윗면에 타일을 접착한다.When the wall construction of the building wall is completed in this way, cement is filled from the bottom surface of the bathroom to the lower portion of the lower wall panel, and the tiles are adhered to the upper surface.
이상과 같은 벽체 및 바닥시공이 마무리된 후에, 천정시공 및 기타 전기배선등을 마무리하여 욕실공사를 마감한다.After the above-mentioned wall and floor construction is finished, the bathroom construction is finished by finishing the ceiling construction and other electrical wiring.
이상에서 설명한 본 실시예에 따른 욕실용 건식벽체(120) 시공방법은 다음과 같은 장점이 있다.The construction method of the
먼저, 종래의 습식공법의 경우 단열을 위하여 타일과 건축벽 사이에 단열재와 벽돌층을 설치하였다. 통상적으로 습식공법에 의한 욕실벽공사에서 벽체가 설치되어야 할 일면의 폭이 1680mm 인 건축벽을 가진 경우, 상기 벽돌층의 두께는 대략적으로 90mm, 타일두께가 대략 30mm 정도가 필요하다. 그러나, 본 실시예에서는 상기 벽돌층의 역할을 하는 폴리우레탄과 타일을 일체로 형성한 건식벽판넬의 두께가 25mm 이므로, 대략 종래의 건식벽에 비하여 최소 95mm정도의 유효길이를 확보할 수 있다. 또한 본 실시예에 따른 폴리우레탄은 벽돌에 비하여 그 단열성이 우수한 장점이 있다.First, in the case of the conventional wet method, a heat insulating material and a brick layer were installed between a tile and a building wall for heat insulation. In general, when the bathroom wall construction by the wet method has a building wall having a width of 1680mm on one surface to be installed, the brick layer needs to have a thickness of approximately 90mm and a tile thickness of approximately 30mm. However, in this embodiment, since the thickness of the drywall panel formed integrally with the polyurethane and the tile serving as the brick layer is 25mm, it is possible to secure an effective length of at least 95mm compared to the conventional drywall. In addition, the polyurethane according to the present embodiment has an advantage of excellent thermal insulation compared to the brick.
특히, 본 실시예에 따른 건식벽체(120)는 복수개의 브라켓만으로 손쉽게 욕실의 건축벽에 시공할 수 있으므로, 종래의 습식벽체에 비하여 공기가 단축된다. 종래의 습식벽체는 벽돌을 쌓고 벽돌전면에 모르타르를 발라 평활도를 확보하게 되는 다수의 공정을 본 실시예에서는 다수의 나사못 고정만으로 쉽게 욕실벽을 시공이 가능하므로 불필요하게 시멘트 또는 모르타르가 굳을 때까지 기다려야 하는 시 간이 절약되어 공기가 대폭적으로 감소된다.In particular, the
또한, 본 실시예에 따른 욕실용 건식벽체 시공방법은 수평이 맞지 않은 욕실벽에 손쉽게 설치할 수 있는 장점이 있다. 건식벽체를 시공할 때 바닥면으로부터의 수평이 약간이라도 맞지 않는 경우, 욕실용 건식벽체를 시공하기 용이하지 않는다. 건식벽체는 공장으로부터 일정한 규격이 정해져 있도록 생산되고 욕실벽면에 맞도록 절단되어 욕실벽면에 설치된다. 그러나, 만일 약간이라도 욕실바닥의 평활도 계산에 오차가 있는 경우 욕실벽에 정확하게 설치되지 않아 다시 건식벽체를 절단해오는 등의 불편함이 있다. 그러나, 본 실시예에서는 대략적으로 욕실벽면의 치수만 정해지고 이에 맞게 건식벽체를 절단해오면, 욕실바닥의 수평은 현장에서 높이조정기구를 이용하여 간단하게 맞추어지기 때문에, 다시 건식벽체를 제작해 오는 등의 불편함이 없게 된다.In addition, the dry wall construction method for a bathroom according to the present embodiment has the advantage that can be easily installed on the bathroom wall is not horizontal. When the drywall is constructed, even if the level from the bottom surface is slightly different, it is not easy to construct the drywall for bathroom. Drywall is produced from the factory to a certain standard, cut to fit the bathroom wall and installed on the bathroom wall. However, if there is an error in the calculation of the smoothness of the bathroom floor, there is an inconvenience such as not cutting the drywall again because it is not correctly installed on the bathroom wall. However, in this embodiment, when only the dimensions of the bathroom wall are roughly determined and the drywall is cut accordingly, the horizontal level of the bathroom floor is simply adjusted using a height adjusting mechanism in the field, so that the drywall is manufactured again. There is no inconvenience.
이상에서 설명한 본 발명에 따른 욕실용 건식벽체 시공방법은 다음과 같은 변형이 가능하다.The drywall construction method for a bathroom according to the present invention described above can be modified as follows.
첫째, 본 실시예에서 하부벽판넬을 설치하기 위하여 높이조정부재를 먼저 욕실의 바닥벽에 설치한 상태에서 그 높이조정부재의 상단에 하부벽판넬을 올려고정하고, 그 하부벽판넬의 상단에 상부벽판넬을 올려고정하는 순서로 욕실벽체의 시공을 하였다. First, in order to install the lower wall panel in this embodiment, the height adjustment member is first mounted on the bottom wall of the bathroom, and the lower wall panel is fixed on the top of the height adjustment member, and the upper part of the lower wall panel is fixed. The wall of the bathroom was constructed in the order of fixing the wall panel.
그러나, 높이조정부재를 욕실의 바닥면에 설치하지 않고 높이조정부재없이 하부벽판넬을 직접 건축벽에 설치하는 방법도 가능하다. 이를 위하여, 먼저 욕실의 건축벽의 중간부분에 허리먹선(중간라인)을 먼저 그어 넣은 후에, 상기 허리먹선을 따라 복수개의 "┛" 형 브라켓(173)을 복수개 설치한다. 이후, 상기 "┛" 형 브라켓(173)과 대응되는 상기 하부벽판넬의 상단부분에 "┏"형 브라켓(172)을 복수개 고정시킨다. 그 후, "┛"형 브라켓(173) 위에 "┏"형 브라켓을 올린 후에, "┛"형 브라켓(173)과 "┏"형 브라켓(172)를 서로 나사결합시켜 고정시켜, 상기 하부벽판넬의 상단부가 건축벽에 고정될 수 있게 한다. 이후, 상기 하부벽판넬의 측벽에 다수의 브라켓을 설치한다. 하부벽판넬의 설치가 완료되면, 이후에는 하부벽판넬의 상단양측에 상하판넬고정브라켓을 결합된 상태로 건축벽에 고정한다. 이후에는 상술한 실시예와 동일한 방식으로 상부벽판넬을 하부벽판넬의 상부에 설치한다.However, it is also possible to install the lower wall panel directly on the building wall without the height adjustment member installed on the floor of the bathroom. To this end, first draw a waist line (intermediate line) in the middle of the building wall of the bathroom, and then install a plurality of "┛"
둘째, 본 실시예에서 높이조정부재에서 상부지지체와 하부지지체 모두에 나사산이 형성된 것을 언급하였으나, 상부지지체 또는 하부지지체 중 어느 하나에만 나사산이 형성되고 다른 것은 회동가능하게 너트에 고정된 것도 가능하다. 즉, 이때 너트를 회전시키면 나사산이 형성된 상부지지체 또는 하부지지체만 높이변화가 되고 다른 것은 회전만 될 뿐 원래 높이를 유지한다.Second, although the thread is formed on both the upper support and the lower support in the height adjusting member in the present embodiment, it is also possible that the thread is formed only in any one of the upper support or the lower support and the other is rotatably fixed to the nut. In other words, when the nut is rotated, only the upper support or the lower support on which the thread is formed is changed in height, and the other is only rotated to maintain the original height.
또한 높이조정부재는 이에 한정되지 않는다. 즉, 다수의 높이를 가진 받침목을 이용하여 필요한 높이에 적당한 높이를 가진 받침목을 욕실의 바닥면에 설치하여 하부벽판넬의 하단기준라인을 맞추는 것도 가능하다. 이와 같이, 높이조정부재는 쉽게 하부벽판넬의 하단의 수평도를 맞출수 있는 것이라면 다양한 형태의 높이조정부재가 사용가능하다.In addition, the height adjustment member is not limited to this. That is, it is also possible to fit the bottom reference line of the lower wall panel by installing a support neck having a suitable height to the required height using the support necks having a plurality of heights on the bottom surface of the bathroom. As such, if the height adjusting member can easily match the horizontality of the lower end of the lower wall panel, various types of height adjusting members can be used.
셋째, 상술한 실시예에서는 건식벽체를 건축벽의 일면에 설치하는 구성을 설시하였으나, 상기 건식벽체는 건축벽의 일면과 마주하는 타면에도 상기 건식벽체를 시공할 수 있다. 이 경우, 다른 공정에 있어서는 상술한 실시예와 동일하나, 상하판넬고정브라켓 만을 다르게 변형하여 실시한다.Third, in the above-described embodiment, the construction of installing the drywall on one surface of the building wall has been described, but the drywall may be constructed on the other surface facing one surface of the building wall. In this case, the other steps are the same as in the above-described embodiment, but only the upper and lower panel fixing bracket is modified differently.
상술한 예에서 상하판넬고정브라켓은 일면이 벽에 고정되는 고정판이며, 타면은 상단장공홈과 하단장공홈이 형성된 끼움판으로 구성되나, 변형예에서는 양면에 모두 상단장공홈과 하단장공홈이 형성되도록 한다.In the above-described example, the upper and lower panel fixing brackets are fixed plates on one side of which are fixed to the wall, and the other side is composed of a fitting plate formed with upper and lower slot grooves, but in the modified example, upper and lower slot grooves are formed on both sides. Be sure to
이 경우 나사못이 체결되는 부분은 장공홈사이의 여분의 면이 될 것이다.In this case, the part where the screw is fastened will be an extra surface between the slots.
이와 같이 양면 모두 상단장공홈과 하단장공홈을 설치하게 되면, 하나의 상하판넬고정브라켓에 의하여 좌우한쌍의 상부벽판넬과 하부벽판넬을 동시에 고정할 수 있다.As such, when the upper and lower slot grooves are installed on both sides, one pair of upper and lower wall panels can be simultaneously fixed by the upper and lower panel fixing brackets.
지금까지 구체적인 실시예를 통해 본 발명의 기술사상에 대해 설명하였다. 그러나 본 발명의 기술은 상기 실시예에만 한정되는 것이 아님은 자명하다. 본 발명의 기술적 범위는 첨부한 등록청구범위의 합리적 해석에 의해 결정되는 것이다. So far, the technical idea of the present invention has been described through specific examples. However, it is obvious that the technique of the present invention is not limited only to the above embodiment. The technical scope of the present invention is to be determined by reasonable interpretation of the appended claims.
본 발명에 따른 욕실용 건식벽체 시공방법은 시공비용 절감은 물론 단열성 및 벽체 두께를 대폭 감소시킬 수 있는 효과가 있다.Dry wall construction method for a bathroom according to the present invention has an effect that can significantly reduce the construction cost, as well as significantly reduce the insulation and wall thickness.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060120950A KR100804825B1 (en) | 2006-12-01 | 2006-12-01 | Construction method using dry type wall for bathroom |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060120950A KR100804825B1 (en) | 2006-12-01 | 2006-12-01 | Construction method using dry type wall for bathroom |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100804825B1 true KR100804825B1 (en) | 2008-02-20 |
Family
ID=39382485
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020060120950A KR100804825B1 (en) | 2006-12-01 | 2006-12-01 | Construction method using dry type wall for bathroom |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100804825B1 (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101177705B1 (en) | 2010-03-18 | 2012-08-29 | 이현배쓰(주) | Method of constructing unit bath room |
KR101224147B1 (en) * | 2012-05-04 | 2013-01-21 | 권기목 | Installation structure of yellow earth tile and its construction method |
KR101250655B1 (en) | 2010-12-22 | 2013-04-03 | 주식회사 새턴바스 | Prefabricated wall |
CN103266689A (en) * | 2013-05-24 | 2013-08-28 | 东莞市彩丽建筑维护技术有限公司 | Construction method and elastic binders for bonding lightweight concrete board wall, and wallboards |
CN103266686A (en) * | 2013-06-07 | 2013-08-28 | 贵州皆盈科技开发有限公司 | Inflatable skeleton filling wall |
KR101982188B1 (en) | 2018-10-23 | 2019-05-24 | 대림산업 주식회사 | Waterproof structure of bathroom |
CN109932502A (en) * | 2019-04-19 | 2019-06-25 | 河南省第一建筑工程集团有限责任公司 | The measuring method of structure glue dosage, ceramic tile construction method |
KR102247046B1 (en) | 2020-06-30 | 2021-04-30 | 주식회사 뉴비엠 | Waterproof finish panel fixing device |
CN113931403A (en) * | 2021-11-25 | 2022-01-14 | 江苏昊钧华科住宅工业有限公司 | Mounting process for main structure of assembled integral bathroom and kitchen |
CN115262902A (en) * | 2022-08-13 | 2022-11-01 | 上海嘉春装饰设计工程有限公司 | Building decoration energy-saving wallboard and construction method |
KR20230003927A (en) * | 2021-06-30 | 2023-01-06 | 이현배쓰(주) | Wall panel alignment assembly of prefabricated bathroom |
KR102572471B1 (en) * | 2023-05-17 | 2023-08-29 | 주식회사 성일 | Construction method of ENM tile wall for bathroom earthquake resistance |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR960037620U (en) * | 1995-05-15 | 1996-12-18 | 주식회사엘지화학 | Prefab bathroom wall and its assembly bracket |
JPH09296546A (en) * | 1996-05-03 | 1997-11-18 | Inax Corp | Connecting structure between partition wall and unit wall |
KR20000008475U (en) * | 1998-10-22 | 2000-05-15 | 성재갑 | Prefabricated bathroom wall made by connecting wall panels with brackets for flat and corner connections |
KR200247957Y1 (en) | 2001-06-15 | 2001-10-31 | 김원대 | Assembly panel construction system |
KR200251055Y1 (en) | 2001-06-14 | 2001-11-16 | 주식회사 일성 | tlie panel |
KR20040094466A (en) * | 2003-05-02 | 2004-11-10 | 테크그린 주식회사 | Dry execution method of toilet works |
KR200399127Y1 (en) | 2005-08-06 | 2005-10-19 | 주식회사 네이엔 | A Dry-wall fixing member for construction |
-
2006
- 2006-12-01 KR KR1020060120950A patent/KR100804825B1/en not_active IP Right Cessation
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR960037620U (en) * | 1995-05-15 | 1996-12-18 | 주식회사엘지화학 | Prefab bathroom wall and its assembly bracket |
JPH09296546A (en) * | 1996-05-03 | 1997-11-18 | Inax Corp | Connecting structure between partition wall and unit wall |
KR20000008475U (en) * | 1998-10-22 | 2000-05-15 | 성재갑 | Prefabricated bathroom wall made by connecting wall panels with brackets for flat and corner connections |
KR200251055Y1 (en) | 2001-06-14 | 2001-11-16 | 주식회사 일성 | tlie panel |
KR200247957Y1 (en) | 2001-06-15 | 2001-10-31 | 김원대 | Assembly panel construction system |
KR20040094466A (en) * | 2003-05-02 | 2004-11-10 | 테크그린 주식회사 | Dry execution method of toilet works |
KR200399127Y1 (en) | 2005-08-06 | 2005-10-19 | 주식회사 네이엔 | A Dry-wall fixing member for construction |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101177705B1 (en) | 2010-03-18 | 2012-08-29 | 이현배쓰(주) | Method of constructing unit bath room |
KR101250655B1 (en) | 2010-12-22 | 2013-04-03 | 주식회사 새턴바스 | Prefabricated wall |
KR101224147B1 (en) * | 2012-05-04 | 2013-01-21 | 권기목 | Installation structure of yellow earth tile and its construction method |
CN103266689A (en) * | 2013-05-24 | 2013-08-28 | 东莞市彩丽建筑维护技术有限公司 | Construction method and elastic binders for bonding lightweight concrete board wall, and wallboards |
CN103266689B (en) * | 2013-05-24 | 2015-10-28 | 东莞市彩丽建筑维护技术有限公司 | A kind of construction method of the light weight concrete construction board wall that bonds, elastic binder and wallboard |
CN103266686A (en) * | 2013-06-07 | 2013-08-28 | 贵州皆盈科技开发有限公司 | Inflatable skeleton filling wall |
KR101982188B1 (en) | 2018-10-23 | 2019-05-24 | 대림산업 주식회사 | Waterproof structure of bathroom |
CN109932502B (en) * | 2019-04-19 | 2021-06-01 | 河南省第一建筑工程集团有限责任公司 | Method for measuring and calculating structural adhesive consumption and tile construction method |
CN109932502A (en) * | 2019-04-19 | 2019-06-25 | 河南省第一建筑工程集团有限责任公司 | The measuring method of structure glue dosage, ceramic tile construction method |
KR102247046B1 (en) | 2020-06-30 | 2021-04-30 | 주식회사 뉴비엠 | Waterproof finish panel fixing device |
KR20230003927A (en) * | 2021-06-30 | 2023-01-06 | 이현배쓰(주) | Wall panel alignment assembly of prefabricated bathroom |
KR102619873B1 (en) * | 2021-06-30 | 2024-01-04 | 이현배쓰(주) | Wall panel alignment assembly of prefabricated bathroom |
CN113931403A (en) * | 2021-11-25 | 2022-01-14 | 江苏昊钧华科住宅工业有限公司 | Mounting process for main structure of assembled integral bathroom and kitchen |
CN115262902A (en) * | 2022-08-13 | 2022-11-01 | 上海嘉春装饰设计工程有限公司 | Building decoration energy-saving wallboard and construction method |
CN115262902B (en) * | 2022-08-13 | 2024-04-19 | 上海嘉春装饰设计工程有限公司 | Building decoration energy-saving wallboard and construction method |
KR102572471B1 (en) * | 2023-05-17 | 2023-08-29 | 주식회사 성일 | Construction method of ENM tile wall for bathroom earthquake resistance |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100804825B1 (en) | Construction method using dry type wall for bathroom | |
US8789339B2 (en) | Method for making façades of buildings | |
US11091906B2 (en) | Vacuum insulating material providing assembly and vacuum insulating material providing method using same | |
WO2016006899A1 (en) | Heating pipe panel of floating floor structure for reducing floor noise | |
CN108179893B (en) | Assembled kitchen and its installation method | |
CN204225324U (en) | Wall thermal insulating integration point extension system | |
KR20130086879A (en) | Low noise type wall panel for prefabricated bathroom | |
KR101040167B1 (en) | Wall panels of a prefabricated bathroom and connector and structure of wall panels thereby | |
KR102104428B1 (en) | Brick structure for connecting open top of brick wall and construction method thereof | |
KR101768683B1 (en) | Suspension device for exterior materials in building and construction method using that | |
KR101174283B1 (en) | Curtain wall and ceramic panel for building outer wall | |
KR102210564B1 (en) | Ceramic tile putty method | |
EP2543791A1 (en) | Method for making façades of buildings | |
KR20090006267U (en) | Double bottom system and Panel for the double bottom system | |
KR102264711B1 (en) | module type bathroom and building method using the same | |
CN113530143A (en) | Dry floor heating and construction method | |
KR20180028596A (en) | Panel supporting frame, frame base, assembled wall structure therewith and the execution method thereof | |
KR102124412B1 (en) | Exterior panel | |
CN215977816U (en) | Integrated external wall heat insulation system | |
KR200412098Y1 (en) | Insert for ceiling | |
KR102255185B1 (en) | Building exterior panel with assembly for improved earthquake-proof and thermal insulation | |
CN216664831U (en) | Side keel structure and ground overhead system | |
CN220133332U (en) | External corner splicing structure for integral bathroom wallboard | |
KR102688694B1 (en) | Snap slide type exterior system | |
KR101206672B1 (en) | Bracket for dry type wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20111214 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20121227 Year of fee payment: 6 |
|
LAPS | Lapse due to unpaid annual fee |