KR20040094466A - Dry execution method of toilet works - Google Patents

Dry execution method of toilet works Download PDF

Info

Publication number
KR20040094466A
KR20040094466A KR1020030028252A KR20030028252A KR20040094466A KR 20040094466 A KR20040094466 A KR 20040094466A KR 1020030028252 A KR1020030028252 A KR 1020030028252A KR 20030028252 A KR20030028252 A KR 20030028252A KR 20040094466 A KR20040094466 A KR 20040094466A
Authority
KR
South Korea
Prior art keywords
fixing
fixing member
skin panel
toilet
polyurethane
Prior art date
Application number
KR1020030028252A
Other languages
Korean (ko)
Inventor
최갑순
Original Assignee
테크그린 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 테크그린 주식회사 filed Critical 테크그린 주식회사
Priority to KR1020030028252A priority Critical patent/KR20040094466A/en
Publication of KR20040094466A publication Critical patent/KR20040094466A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6801Fillings therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/58Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings
    • E04H1/1266Cubicles for dressing; Toilets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Residential Or Office Buildings (AREA)
  • Building Environments (AREA)

Abstract

PURPOSE: A dry construction method for a toilet is provided to simplify construction work without experts for plastering and tiling works by using dry construction method for a bathroom and a toilet, to cut down construction expenses, to shorten a period of construction, to improve quality and to keep the indoor space quite by preventing the noise pollution in a toilet. CONSTITUTION: The dry construction method for a toilet comprises the steps of: installing a fixture on the upper side of a floor slab to make the fixtures parallel by fitting many wedges between fixtures(S10); placing urethane to the gap among the wedges installed between the floor slab and the fixture(S20); covering up the floor slab and the fixture with a membrane sheet(S30); placing a polyurethane skin panel on the upper part of the fixture covered with the membrane sheet to make a hanger put on the top of the fixture(S40); installing a skin panel between the upper part of the polyurethane skin panel and a ceiling slab, then installing a site foaming polyurethane panel on the backside(S50); compressing a fixing pin on the backside of the polyurethane skin panel and fixing an adiabatic member(S60); and installing metal studs before installing the adiabatic member, and fixing a plaster board on the metal stud(S70).

Description

화장실 건식시공방법{Dry execution method of toilet works}Dry execution method of toilet works

본 발명은 화장실 건식시공방법에 관한 것으로서, 특히 각양각색의 소재와 여러형태의 구조로 설계되는 욕실 또는 화장실 벽면을 접착, 방수, 단열, 차음의 기능을 갖는 폴리우레탄 스킨패널을 이용하여 설치하고, 폴리우레탄 스킨패널과 바닥 슬래브 사이의 틈새를 우레탄으로 충진시킨 후 그 윗면에 멤브레인 시트를 설치하여 방수 되도록 시공하고, 폴리우레탄 스킨패널의 뒷면에 단열부재를 고정핀으로 고정시킨 후 메탈 스터드 벽을 시공함으로써, 욕실을 포함한 화장실의 시공과정을 건식화시켜 작업환경을 개선시키도록 하고, 조적, 미장, 타일 등의 숙련공이 없이도 용이한 작업이 이루어지도록 하여 시공비와 공사기간을 줄일 수 있도록 하고, 아울러 화장실을 사용하는 과정에서 발생되는 소음이 외부로 전달되면서 발생되는 실내소음을 방지하여 조용하고 쾌적한 실내공간이 유지될 수 있도록 한 것이다.The present invention relates to a dry construction method of the bathroom, and in particular, a bathroom or toilet wall surface designed with various materials and various types of structures is installed using a polyurethane skin panel having a function of adhesion, waterproofing, insulation, and sound insulation. Fill the gap between the polyurethane skin panel and the bottom slab with urethane, install a membrane sheet on the top surface to make it waterproof, and fix the insulation member on the back of the polyurethane skin panel with the fixing pins before installing the metal stud wall. By improving the working environment by drying the construction process of the bathroom including the bathroom, it is possible to reduce the construction cost and construction period by allowing easy work without skilled workers such as masonry, plastering, tile, etc. Noise generated in the process of using the noise transmitted to the outside to prevent indoor noise W is quiet and so comfortable indoor space can be maintained.

일반적으로, 목욕하는 시설을 갖춘방을 화장실(욕실)이라고 하며, 그 내부에는 욕조, 세면대, 변기 및 급수시설이 갖추어져 있고, 물을 많이 사용함에 따라 화장실의 바닥에는 별도의 방수층을 시공하여 물이 외부로 누수되는 것이 방지되도록 시공되어 있다.In general, a room equipped with a bathing facility is called a toilet (bathroom), and there is a bathtub, a sink, a toilet, and a water supply facility, and as a lot of water is used, a separate waterproof layer is installed on the floor of the bathroom. It is constructed to prevent leakage to the outside.

이러한 화장실은 방수판과 벽판 및 천정판을 조립하여 시공되는 규격화된 화장실을 위한 건식공법과, 벽돌과 모르타르 및 타일 그리고 액체방수로 그 폭이나 높이가 다른 비규격화된 화장실을 시공하는 습식공법이 있다.These toilets have a dry method for a standardized bathroom constructed by assembling a waterproof plate, a wall plate, and a ceiling plate, and a wet method for constructing non-standard bathrooms having different widths or heights of brick, mortar, tiles, and liquid waterproofing.

상기 규격화된 건식공법은 바닥 슬래브와 천정 슬래브 사이에 시공된 옹벽(조적벽)의 안쪽에 조립식 화장실을 설치하는 것으로서, 바닥 슬래브에 방수판을 안착시킨다.The standardized dry method is to install a prefabricated toilet inside the retaining wall (masonry wall) constructed between the floor slab and the ceiling slab, the waterproof plate is mounted on the floor slab.

다음, 방수판 4면의 가장자리에 벽패널을 세워 조립한 후 벽패널 위에 천정 판을 조립하여 설치하고, 옹벽이 있는 부분을 제외한 나머지 3면 또는 2면에 바닥 슬래브에서 천정 슬래브까지 옹벽(조적벽)을 쌓는다.Next, assemble the wall panel on the edges of the four sides of the waterproof plate, and then assemble and install the ceiling plate on the wall panel, and the retaining wall from the floor slab to the ceiling slab on the other three or two surfaces except for the retaining wall. Stack it.

다음, 옹벽 설치가 끝난 화장실의 외부쪽 면 즉, 거실 또는 방 쪽을 향하는 벽에는 석고보드를 고정한 후 벽지를 발라 마감시킴으로써 화장실을 얻게 된다.Next, the bathroom is obtained by fixing the plasterboard on the outer surface of the bathroom where the retaining wall is installed, that is, the wall facing the living room or the room, and then applying wallpaper to finish.

이 같은 건식공법의 경우, 습식 화장실과 마찬가지로 화장실벽을 조적벽으로 구성함으로써, 중량이 무거워지는 원인으로 인해 전체 건물의 하중 유지를 위한 골조(콘크리트 구조체, 철골구조 내력벽)를 더욱 튼튼하게 설계해야 하는 문제점이 있었다.In the case of the dry method, as in the wet toilet, the toilet wall is composed of a masonry wall, and thus, a heavy weight frame (concrete structure, steel structure bearing wall) for maintaining the load of the entire building due to the weight becomes a problem. There was this.

또한, 이러한 조적벽내에 다시 화장실을 구성하는 타일 벽패널이 시공된 이중벽의 구조를 가짐으로써, 화장실의 면적 또는 거실의 면적 등 전용면적이 감소되는 또 다른 문제점이 있었다.In addition, since the tile wall panel constituting the bathroom in the masonry wall has a double wall structure, there is another problem in that a dedicated area such as an area of a bathroom or a living room is reduced.

그리고, 규격 방수판과 규격 천정판을 사용하는 유비알(UBR:Unit Bath Room)은 다양한 비규격 화장실에는 설계로 부터 그 사용이 한정되었고, 목조주택용으로 개발한 방수판을 콘크리트 바닥 슬래브에 적용시키는데 따른 비용 증가도 그 사용이 더욱 한정시키는 문제점이 있었다.In addition, UBI (Unit Bath Room) using standard waterproof plate and standard ceiling plate is limited in its use in various non-standard toilets from design, and the waterproof plate developed for wooden house is applied to concrete floor slab. There was also a problem that the increase in cost is more limited its use.

한편, 습식공법은 바닥 슬래브의 윗면과 천정 슬래브 사이에 벽돌을 쌓아 조적벽(옹벽)을 시공하고, 그 조적벽이나 옹벽의 내측면을 미장하고, 미장된 옹벽의 하부와 바닥 슬래브의 윗면에는 액체방수층이 시공되어 있다.On the other hand, in the wet method, a brick is constructed between a top surface of a floor slab and a ceiling slab to construct a masonry wall (retaining wall), and plaster the inner surface of the masonry wall or a retaining wall, and a liquid waterproof layer is provided on the bottom of the plastered retaining wall and the top of the floor slab. It is constructed.

또한, 미장된 옹벽에는 타일을 타일본드로 부착시키고, 타일이 부착된 조적벽이나 옹벽의 상단에는 천정판을 고정시키는 것으로 시공되어 있다.In addition, it is constructed by attaching tiles to tiled retaining walls with tile bonds, and fixing ceiling plates to upper ends of masonry or retaining walls to which tiles are attached.

그리고 바닥 액체방수층의 윗면에는 일정한 구배기울기를 갖도록 보호몰타르를 시공하고, 그 윗면에 바닥타일을 부착시켜 화장실이 시공되었다.In addition, a protective mortar was installed on the top surface of the bottom liquid waterproof layer to have a constant gradient slope, and a toilet was installed by attaching a floor tile to the top surface.

그러나, 이러한 습식공법으로 화장실을 시공하기 위해서는 먼저, 작업자가 벽돌을 수직으로 쌓아 옹벽을 갖추도록 한 다음, 그 내측면을 미장하고, 미장된 벽면의 하부 및 바닥 슬래브에 액체방수층을 시공한 후 벽면에 타일을 부착시키는 등의 작업이 현장에서 이루어짐에 따라 많은 작업 시간과 노동력이 소요되는 등 그 효율이 낮아지는 문제점이 있었다.However, in order to construct a bathroom with such a wet method, a worker first stacks bricks vertically to prepare a retaining wall, and then plasters the inner side of the wall, and then a liquid waterproof layer is applied to the lower and bottom slabs of the plastered wall. As the work such as attaching the tile to the site is made in the field, there is a problem that the efficiency is lowered such as a lot of work time and labor.

또한, 화장실을 둘러싸는 외부가 단순히 벽돌로 쌓아 올린 형태를 취하게 됨에 따라 화장실을 사용하는 과정에서 발생되는 소음이 외부로 전달되어 또 다른 실내의 소음공해가 발생되는 문제점이 있었다.In addition, as the outside surrounding the toilet is simply stacked with bricks, noise generated in the process of using the toilet is transmitted to the outside, thereby causing another noise pollution in the room.

본 발명은 이와 같은 문제점을 해소하기 위해 안출한 것으로서, 화장실의 벽면을 폴리우레탄 스킨패널을 이용하여 시공하고, 폴리우레탄 스킨패널과 바닥 슬래브 사이의 형성된 틈새에는 우레탄을 충진시킨 후 폴리우레탄 스킨패널과 바닥 사이에는 멤브레인 시트를 설치하여 방수가 되도록 시공하고, 폴리우레탄 스킨패널의 배면에 단열부재를 고정핀으로 고정시킨 후 메탈 스터드 벽을 시공함으로써, 화장실을 포함한 욕실의 시공과정을 건식화하고, 숙련된 조적, 미장, 타일등의 숙련공이 없이도 용이한 작업을 할 수 있도록 하여 시공비와 그에 따른 시공기간을 줄일 수 있도록 하고, 아울러 화장실을 사용하는 과정에서 발생되는 소음이 외부로 전달되는 것을 방지하여 실내의 소음공해를 줄일 수 있는 화장실 건식시공방법을 제공하는데 그 목적이 있다.The present invention has been made in order to solve such a problem, the construction of the wall of the bathroom using a polyurethane skin panel, and the polyurethane skin panel and the polyurethane skin panel after filling the gap formed between the polyurethane skin panel and the bottom slab. Install the membrane sheet between floors to make it waterproof, and fix the insulation member on the back of the polyurethane skin panel with fixing pins, and then install the metal stud wall to dry the construction process of the bathroom including the toilet. It allows easy work without skilled workers such as masonry, plastering, tiles, etc. so that construction cost and construction time can be reduced, and the noise generated in the process of using the toilet is prevented from being transmitted to the outside. To provide a dry construction method for toilets to reduce noise pollution There.

이와 같은 목적을 달성하기 위한 본 발명은 화장실 건식시공방법에 있어서, 바닥 슬래브의 윗면에 고정부재를 고정하되, 그 사이에 다수의 쐐기를 끼워 고정부재의 높낮이가 평행이 되도록 설치하는 고정부재 설치단계와; 상기 바닥 슬래브와 고정부재의 사이에 설치된 다수의 쐐기 사이에 형성된 틈새에는 우레탄을 발포시켜 충진하는 우레탄 발포단계와; 상기 바닥 슬래브와 고정부재의 윗면에 멤브레인 시트를 덮는 멤브레인 시트 방수단계와; 상기 멤브레인 시트가 덮여진 고정부재의 상부에 폴리우레탄 스킨패널을 얹혀지도록 설치하되, 그 뒷면에 형성된 걸림쇠가 고정부재의 상단에 걸려지도록 설치하는 폴리우레탄 스킨패널 설치단계와; 층고 변화에 따라 상기 폴리우레탄 스킨패널의 상부와 천정 슬래브 사이에 스킨패널을 설치하고 그 뒷면에 현장발포 폴리우레탄 패널을 설치하는 현장발포 폴리우레탄 설치단계와; 상기 폴리우레탄 스킨패널의 뒷면에 고정핀을 압착시켜 단열재를 고정하는 단열재 설치단계와; 상기 단열재를 고정시킨 후 메탈스터드를 설치하고, 상기 메탈스터드에 석고보드를 고정하는 메탈스터드 및 석고보드 고정단계로 시공됨을 특징으로 하는 화장실 건식시공방법을 제공함에 그 목적이 달성된다.In the present invention for achieving the above object in the dry construction method of the toilet, the fixing member is fixed to the upper surface of the floor slab, the fixing member installation step of installing so that the height of the fixing member in parallel by inserting a plurality of wedges therebetween Wow; A urethane foaming step of foaming urethane into a gap formed between a plurality of wedges installed between the bottom slab and the fixing member; A membrane sheet waterproofing step of covering the membrane sheet on the top surface of the bottom slab and the fixing member; A polyurethane skin panel installation step of installing the polyurethane skin panel so that the membrane sheet is covered with the polyurethane skin panel on the upper part of the fixing member; A field foaming polyurethane installation step of installing a skin panel between an upper portion of the polyurethane skin panel and a ceiling slab and installing a field foaming polyurethane panel on a rear surface thereof according to the change in the floor height; Insulating material installation step of fixing the insulating material by pressing the fixing pin on the back of the polyurethane skin panel; The purpose is achieved by providing a bathroom dry construction method characterized in that the metal stud is installed after fixing the heat insulating material, and the metal stud and gypsum board fixing step is fixed to the metal stud.

도 1은 본 발명에 따른 화장실의 시공과정을 도시한 공정도.1 is a process chart showing the construction process of the toilet according to the invention.

도 2는 본 발명에 따른 화장실의 종단면도.Figure 2 is a longitudinal sectional view of the toilet according to the present invention.

도 3a는 본 발명에 따른 화장실의 하부를 확대 도시한 단면도.Figure 3a is an enlarged cross-sectional view of the lower part of the toilet according to the present invention.

도 3b는 본 발명에 따른 화장실의 다른 실시예를 도시한 종단면도.Figure 3b is a longitudinal sectional view showing another embodiment of the toilet according to the present invention.

<도면의 주요 부분에 대한 부호의 간단한 설명><Brief description of symbols for the main parts of the drawings>

1:바닥 슬래브 2:고정부재1: bottom slab 2: fixing member

3:쐐기 4:우레탄3: wedge 4: urethane

5:멤브레인 시트 6:폴리우레탄 스킨패널5: Membrane sheet 6: Polyurethane skin panel

7:걸림쇠 8:천정 슬래브7: Latch 8: Ceiling slab

9:스킨패널 10:현장발포 폴리우레탄 패널9: skin panel 10: field foam polyurethane panel

11:고정핀 12:단열재11: fixing pin 12: insulation

13,13':메탈스터드 14:석고보드13,13 ': Metal Stud 14: Gypsum Board

S10:고정부재 설치단계 S20:우레탄 발포단계S10: fixed member installation step S20: urethane foaming step

S30:멤브레인 시트 방수단계 S40:폴리우레탄 스킨패널 설치단계S30: Waterproofing membrane sheet S40: Polyurethane skin panel installation

S50:현장발포 폴리우레탄 설치단계 S60:단열재 설치단계S50: site foaming polyurethane installation step S60: insulation material installation step

S70:메탈스터드 설치 및 석고보드 고정단계S70: Metal stud installation and gypsum board fixing step

이하, 본 발명의 실시예를 첨부 도면을 참조하여 설명하면 다음과 같다.Hereinafter, an embodiment of the present invention will be described with reference to the accompanying drawings.

본 발명에 따른 화장실은 다수의 벽면에 의해 내,외부가 구분된 상태로 그 내부에 소정의 공간이 제공되도록 하되, 세면기, 욕조, 변기를 사용하는 과정에서 버려지는 물이 외부로 누수되는 것을 방지하면서, 이때 발생된 소음이 외부로 전달되는 것을 방지하도록 구성되어 있다.The toilet according to the present invention is provided with a predetermined space therein in a state in which the inside and the outside are separated by a plurality of walls, and prevents water that is discarded in the process of using a washbasin, a bathtub, and a toilet to the outside. While, it is configured to prevent the noise generated at this time is transmitted to the outside.

이를 위해, 화장실은 바닥 슬래브(1)의 상부에 쐐기(3)가 개재된 상태로 고정된 고정부재(2)와, 바닥 슬래브(1)의 윗면과 고정부재(2)의 밑면 사이로 제공되는 틈 사이에 충진된 우레탄(4)과, 바닥 슬라브(1)와 폴리우레탄 스킨패널(6) 사이를 동시에 방수되도록 한 멤브레인 시트(5)로 구성된다.To this end, the toilet is provided with a fixing member 2 fixed with the wedge 3 interposed on the top of the bottom slab 1, and a gap provided between the upper surface of the bottom slab 1 and the bottom of the fixing member 2. It consists of a urethane (4) filled in between, and a membrane sheet (5) to simultaneously waterproof between the bottom slab (1) and the polyurethane skin panel (6).

또한, 상기 고정부재(2)의 상부에 폴리우레탄 스킨패널(6) 하단이 얹혀지면서 뒷면에 형성의 걸림쇠(7)가 고정부재(2)의 상단에 고정되도록 구비된 폴리우레탄 스킨패널(6)과, 층고변화에 따라 폴리우레탄 스킨패널(6)의 상부에 현장에서 조정 시공되는 스킨패널(9) 및 현장발포 우레탄 패널(10)과, 상기 폴리우레탄 스킨패널(6)과 현장발포 폴리우레탄 패널(10)의 뒷면에 수직 수평으로 메탈 스터드(13)(13')를 설치하여 단열재(12)를 삽입하되, 상기 폴리우레탄 스킨패널(6)의 뒷면에는 다수개의 고정핀(11)을 부착시키고, 와셔(11')를 끼워 단열재(12)의 유동을 방지하도록 구성된다.In addition, the polyurethane skin panel (6) provided to be fixed to the upper end of the fixing member (2) is formed on the top of the fixing member (2) while the lower end of the polyurethane skin panel (6) is mounted on the fixing member (2). And the skin panel 9 and the field foaming urethane panel 10 which are adjusted in the field on the upper part of the polyurethane skin panel 6 according to the layer height change, and the polyurethane skin panel 6 and the field foaming polyurethane panel. The metal studs 13 and 13 'are installed vertically and horizontally on the rear side of the back side 10 to insert the heat insulator 12, and a plurality of fixing pins 11 are attached to the rear side of the polyurethane skin panel 6, And the washer 11 'is configured to prevent the flow of the heat insulating material 12.

그리고, 상기 수직,수평 메탈스터드(13)(13')의 일측에는 소정의 두께를 갖는 석고보드(14)가 고정되는 것으로 구성된다.In addition, the gypsum board 14 having a predetermined thickness is fixed to one side of the vertical and horizontal metal studs 13 and 13 ′.

상기 고정부재(2)는 L형태를 갖는 앵글을 사용할 수 있으며, 수직과 직교되는 수평부분에는 중공인 사각형태를 갖도록 구비하여 사용할 수 있다.The fixing member 2 may use an angle having an L shape, and may be provided to have a hollow rectangular shape in a horizontal portion perpendicular to the vertical.

또한, 상기 고정부재(2)를 바닥 슬래브(1)에 고정하는 고정수단은 힐티 익스팬션용 볼트 및 칼 블록 중 어느 하나를 선택하여 사용할 수 있다.In addition, the fixing means for fixing the fixing member (2) to the bottom slab (1) can be used by selecting any one of the Hilti expansion bolt and knife block.

상기 폴리우레탄 스킨패널(6)은 가장자리에 각프레임(6')이 구비되어 있고, 그 전면에는 치장재(6") 그리고 뒷면에는 다수개의 고정핀(11)을 접착제를 이용하여 압착할 수 있으며, 각프레임(6')에는 다수개의 걸림쇠(7)가 나사로 고정되어 있다.The polyurethane skin panel 6 is provided with each frame (6 ') at the edge, the front of the decorative material (6 ") and the back of the plurality of fixing pins (11) can be crimped using an adhesive. A plurality of latches 7 are fixed to each frame 6 'with screws.

상기 현장발포 폴리우레탄 패널(10)은 층고의 변화에 따라 바닥 슬래브(1)와 천정 슬래브(8) 사이의 간격이 다를 경우, 폴리우레탄 스킨패널(6)의 상부에 고정하여 그 높낮이를 맞추도록 한 것으로서, 스킨패널(9)은 전면의 내장재(9')와, 내장재(9')의 뒷면 가장자리를 따라 구비된 각프레임(9")으로 구성되고, 현장발포 폴리우레탄 패널(10)은 내장재(9)의 뒷면과 각프레임(9")의 내측면 사이로 제공되는 공간에 폴리우레탄을 현장에서 발포시키는 것으로 구성된다.If the space between the floor slab (1) and the ceiling slab (8) is different according to the change in the height of the field-foamed polyurethane panel 10, it is fixed to the top of the polyurethane skin panel (6) to match the height In one embodiment, the skin panel 9 is composed of a front interior material 9 'and an angular frame 9 "provided along the rear edge of the interior material 9', and the field foamed polyurethane panel 10 is a interior material. It consists in foaming the polyurethane in situ in the space provided between the rear face of (9) and the inner face of each frame 9 ".

또한, 스킨패널(9)의 각프레임(9")에 관통공을 형성하고, 이와 맞닿는 폴리우레탄 스킨패널(6)의 각프레임(6')에 관통공을 형성하여 핀(15)을 끼워 유동이 방지되도록 구비되어 있다.In addition, through holes are formed in each frame 9 "of the skin panel 9, and through holes are formed in each frame 6 'of the polyurethane skin panel 6 in contact with the pin 15 so as to flow. It is provided to prevent this.

이때 각프레임(6')과 각프레임(9")의 일측에는 고정편(16)이 다수개의 나사로 고정되어 있다.At this time, the fixing piece 16 is fixed to one side of each frame 6 'and each frame 9 "with a plurality of screws.

상기 고정핀(11)에 끼워지는 와셔(11')는 고정핀(11)의 직경보다 다소 적은 직경의 형태를 갖는 구멍이 형성되어 있고, 이 구멍의 외주연부에는 다수곳이 절개된 상태로 형성되어 구멍이 고정핀(11)에 끼워지거나 삽입된 상태에 역으로 빠지는 것을 방지하도록 구비되어 있다.The washer 11 ′ fitted to the fixing pin 11 has a hole having a diameter slightly smaller than that of the fixing pin 11, and is formed in a state where a plurality of cutouts are formed at the outer circumference of the hole. Is provided to prevent the hole from being inserted into the fixing pin 11 or fall back in the inserted state.

이와 같은 구성을 갖는 화장실의 시공과정을 그 공정별로 구분지어 설명하면 다음과 같다.The construction process of the toilet having such a configuration will be described as follows by the process.

먼저, 바닥 슬래브(1)의 윗면에 쌓여 있는 이물질을 제거한 후 고정부재 설치단계(S10)로, 바닥 슬래브(1)의 상부에 앵글형태의 고정부재(2)를 고정하되, 고정부재(2)와 바닥 슬래브(1) 사이에 쐐기(3)를 끼워 고정부재(2)가 평행한 상태가 되도록 고정한다.First, after removing the foreign matter accumulated on the upper surface of the bottom slab (1) and then in the fixing member installation step (S10), to fix the angle-shaped fixing member (2) on the top of the bottom slab (1), the fixing member (2) And a wedge 3 between the bottom slab 1 and the fixing member 2 is fixed in a parallel state.

다음, 상기 바닥 슬래브(1)의 상부와 고정부재(2)의 하부 사이로 형성된 틈새 및 쐐기(3) 사이에 우레탄(4)을 발포시켜 충진하는 우레탄 발포단계(S20)를 통해 만일의 경우, 멤브레인 시트(5)를 통해 누수되는 물을 다시 한번 방수되도록 하여 최종적인 누수를 방지하게 된다.Next, through the urethane foaming step (S20) of filling the urethane (4) between the gap and the wedge (3) formed between the upper portion of the bottom slab 1 and the lower portion of the fixing member (2), in case of membrane The water leaking through the sheet 5 is once again waterproof to prevent the final leak.

다음, 멤브레인 시트 방수단계(S30)로서, 상기 바닥 슬래브(1)와 고정부재 (2)의 윗면에 방수를 위해 멤브레인 시트(5)를 덮은 후 멤브레인 시트(5)가 덮여진 고정부재(2)의 상부에 폴리우레탄 스킨패널(6)을 얹혀지도록 설치하되, 그 뒷면에 형성된 걸림쇠(7)가 고정부재(2)에 걸려지게 설치하는 폴리우레탄 스킨패널 설치단계(S40)를 통해 벽면 설치작업을 한다.Next, as the membrane sheet waterproofing step (S30), after covering the membrane sheet (5) for waterproofing the upper surface of the bottom slab (1) and the fixing member (2), the fixing member (2) covered with the membrane sheet (5) The polyurethane skin panel 6 is installed to be placed on the upper part of the wall, and the wall surface installation work is performed through the polyurethane skin panel installation step (S40) for installing the clamp 7 formed on the rear side of the fixing member 2. do.

다음, 층고 변화에 따라 상기 폴리우레탄 스킨패널(6)의 상부와 천정 슬래브(8) 사이에 스킨패널(9)을 설치하고 그 뒷면에 폴리우레탄을 충진시켜 현장발포 폴리우레탄 설치단계(S50)를 통해 중간 슬래브 공간이 차단된 형태를 취하게된다.Next, the skin panel 9 is installed between the upper part of the polyurethane skin panel 6 and the ceiling slab 8 according to the change in the height of the floor, and the polyurethane is filled on the back side of the foamed polyurethane installation step (S50). Through the middle slab space is taken blocked.

다음, 단열재 고정단계(S60)으로서, 상기 폴리우레탄 스킨패널(6)의 뒷면에 고정핀(11)을 압착시킨 후 차음, 결로방지, 보온 기능을 갖는 단열재(12)를 고정한다.Next, as a heat insulating material fixing step (S60), after pressing the fixing pin 11 on the back of the polyurethane skin panel 6 to fix the heat insulating material 12 having sound insulation, condensation prevention, and thermal insulation function.

이때, 단열재(12)를 뚫고 나온 고정핀(11)에 와셔(11')를 삽입하여 단열재(12)가 역으로 빠지거나 유동되는 것을 방지하게 된다.At this time, the washer 11 'is inserted into the fixing pin 11 penetrating the heat insulating material 12 to prevent the heat insulating material 12 from falling out or flowing back.

다음, 상기 단열재(12)는 수직, 수평 메탈스터드(13)(13')를 설치한 후 고정하고 다음 석고보드(14)를 고정함으로써 메탈스터드 및 석고보드 고정단계(S70)를 통해 화장실 시공이 마무리된다.Next, the insulation 12 is installed after fixing the vertical, horizontal metal studs (13, 13 ') and then fixed the next gypsum board 14, the construction of the toilet through the metal studs and gypsum board fixing step (S70) It is finished.

한편, 본 발명에서는 바닥 슬래브(1)의 상부에 고정부재(2)를 고정하고, 그 상부에 폴리우레탄 패널(6)이 지지되도록 시공하였으나, 도 3b에 도시된 바와 같이, 이 물질제거 후 고정부재 설치단계(S10) 사이에서 방수턱(15)을 설치하고, 설치된 방수턱(15)의 측면에 고정부재(2')를 고정하되, 방수턱(15)과 고정부재(2') 사이에 쐐기(3')를 개재하여 고정부재(2')가 수직 또는 수평이 유지되도록 시공할 수 도있다.Meanwhile, in the present invention, the fixing member 2 is fixed to the upper part of the bottom slab 1, and the polyurethane panel 6 is constructed to be supported on the upper part thereof. However, as shown in FIG. Installing the waterproof jaw 15 between the member installation step (S10), and fixing the fixing member (2 ') on the side of the installed waterproof jaw 15, between the waterproof jaw (15) and the fixing member (2'). The fixing member 2 'may be constructed to be vertical or horizontal through the wedge 3'.

이와 같이 본 발명은 바닥 및 천정 슬래브 사이에 폴리우레탄 스킨패널을 설치하고, 그 하부와 틈새를 우레탄으로 충진한 후 그 윗면에 멤브레인 시트를 설치하여 방수가 되도록 시공하고, 폴리우레탄 스킨패널의 배면에 단열재를 고정핀으로 고정시킨 후 메탈 스터드 벽을 갖도록 화장실을 시공함으로써, 욕실을 포함한 화장실의 시공과정을 건식화하여 숙련된 조적, 미장, 타일공이 없이도 용이한 작업이 이루어지도록 한 효과가 있다.As described above, the present invention installs a polyurethane skin panel between the floor and the ceiling slab, fills the lower part and the gap with urethane, and installs a membrane sheet on the upper surface to be waterproof, and the back surface of the polyurethane skin panel By fixing the insulating material with a fixing pin and constructing the bathroom to have a metal stud wall, the construction process of the bathroom including the bathroom is dried, thereby making it easy to perform work without skilled masonry, plastering or tile work.

또한, 본 발명은 종래의 기술에 비하여 시공비가 절감되고, 공사기간의 단축 및 품질이 향상되는 효과가 있다.In addition, the present invention has the effect of reducing the construction cost, shortening the construction period and quality compared to the prior art.

그리고 화장실의 내부에서 발생되는 소음에 의해 실내의 소음공해가 발생되는 것을 방지하여 조용한 실내공간을 유지할 수 있도록 한 효과가 있다.And it is effective to maintain a quiet indoor space by preventing the generation of noise pollution in the room by the noise generated inside the toilet.

Claims (2)

화장실 건식시공방법에 있어서,In the toilet dry construction method, 바닥 슬래브(1)의 윗면에 고정부재(2)를 고정하되, 그 사이에 다수의 쐐기(3)를 끼워 고정부재(2)의 높낮이가 평행이 되도록 설치하는 고정부재 설치단계(S10)와;A fixing member mounting step (S10) for fixing the fixing member 2 to the upper surface of the bottom slab 1, and installing a plurality of wedges 3 therebetween so that the heights of the fixing members 2 are parallel to each other; 상기 바닥 슬래브(1)와 고정부재(2)의 사이에 설치된 다수의 쐐기(3) 사이에 형성된 틈새에는 우레탄(4)을 발포시켜 충진하는 우레탄 발포단계(S20)와;A urethane foaming step (S20) of filling a urethane (4) by filling a urethane (4) in a gap formed between the plurality of wedges (3) installed between the bottom slab (1) and the fixing member (2); 상기 바닥 슬래브(1)와 고정부재(2)의 윗면에 멤브레인 시트(5)를 덮는 멤브레인 시트 방수단계(S30)와;Membrane sheet waterproofing step (S30) for covering the membrane sheet (5) on the top surface of the bottom slab (1) and the fixing member (2); 상기 멤브레인 시트(5)가 덮여진 고정부재(2)의 상부에 폴리우레탄 스킨패널(6)을 얹혀지도록 설치하되, 그 뒷면에 형성된 걸림쇠(7)가 고정부재(2)의 상단에 걸려지도록 설치하는 폴리우레탄 스킨패널 설치단계(S40)와;The membrane sheet 5 is installed so that the polyurethane skin panel 6 is mounted on the upper part of the fixing member 2 covered with the membrane sheet 5, and the latch 7 formed at the rear thereof is hooked to the upper end of the fixing member 2. Polyurethane skin panel installation step (S40) and; 층고 변화에 따라 상기 폴리우레탄 스킨패널(6)의 상부와 천정 슬래브(8) 사이에 스킨패널(9)을 설치하고 그 뒷면에 현장발포 폴리우레탄 패널(10)를 설치하는 현장발포 폴리우레탄 설치단계(S50)와;Site foaming polyurethane installation step of installing a skin panel 9 between the top of the polyurethane skin panel 6 and the ceiling slab (8) according to the change in the height of the floor and installing the field foaming polyurethane panel 10 on the back (S50); 상기 폴리우레탄 스킨패널(6)의 뒷면에 고정핀(11)을 압착시켜 단열재(12)를 고정하는 단열재 설치단계(S60)와;A heat insulating material installation step (S60) of fixing the heat insulating material 12 by compressing the fixing pin 11 on the back of the polyurethane skin panel 6; 상기 단열재(12)가 설치전 메탈스터드(13)(13')를 설치하고, 상기 메탈스터드(13)에 석고보드(14)를 고정하는 메탈스터드 설치 및 석고보드 고정단계(S70)로시공됨을 특징으로 하는 화장실 건식시공방법.The insulation material 12 is installed in the metal stud (13, 13 ') before installation, the metal stud installation and gypsum board fixing step (S70) for fixing the gypsum board 14 to the metal stud (13) Toilet dry construction method characterized in that. 제 1항에 있어서, 상기 이 물질제거 후 고정부재 설치단계(S10)에서 방수턱 (15)을 설치하고, 상기 방수턱(15)의 측면에 고정부재(2')를 고정하되, 방수턱(15)과 고정부재(2') 사이에 쐐기(3')를 개재하여 고정부재(2')가 수직 또는 수평이 유지되도록 시공됨을 특징으로 하는 화장실 건식시공방법.According to claim 1, After the removal of the material in the fixing member installation step (S10) to install the waterproof jaw 15, and fixing the fixing member (2 ') on the side of the waterproof jaw (15), 15) and the fixing member (2 ') through the wedge (3') via the fixing member (2 ') is constructed so that the vertical or horizontal construction is to dry toilet construction method.
KR1020030028252A 2003-05-02 2003-05-02 Dry execution method of toilet works KR20040094466A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030028252A KR20040094466A (en) 2003-05-02 2003-05-02 Dry execution method of toilet works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030028252A KR20040094466A (en) 2003-05-02 2003-05-02 Dry execution method of toilet works

Publications (1)

Publication Number Publication Date
KR20040094466A true KR20040094466A (en) 2004-11-10

Family

ID=37374040

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030028252A KR20040094466A (en) 2003-05-02 2003-05-02 Dry execution method of toilet works

Country Status (1)

Country Link
KR (1) KR20040094466A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100756385B1 (en) * 2006-09-01 2007-09-10 주식회사 종합건축사사무소근정 Movable base apparatus for supporting a fabricated panel and installing method by using the same
KR100804825B1 (en) * 2006-12-01 2008-02-20 주식회사 엘지화학 Construction method using dry type wall for bathroom
KR101051256B1 (en) * 2008-03-06 2011-07-21 (주)엘지하우시스 Bathroom waterproof system using waterproof sheet
KR200465920Y1 (en) * 2008-11-03 2013-03-25 (주)엘지하우시스 Waterproof Construction Structure For Bathroom
KR101252808B1 (en) * 2008-08-21 2013-04-09 (주)엘지하우시스 Waterproof system
CN113431276A (en) * 2021-07-16 2021-09-24 浙江亚厦装饰股份有限公司 Bottom sealing element used on bathroom moisture-proof film

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100756385B1 (en) * 2006-09-01 2007-09-10 주식회사 종합건축사사무소근정 Movable base apparatus for supporting a fabricated panel and installing method by using the same
KR100804825B1 (en) * 2006-12-01 2008-02-20 주식회사 엘지화학 Construction method using dry type wall for bathroom
KR101051256B1 (en) * 2008-03-06 2011-07-21 (주)엘지하우시스 Bathroom waterproof system using waterproof sheet
KR101252808B1 (en) * 2008-08-21 2013-04-09 (주)엘지하우시스 Waterproof system
KR200465920Y1 (en) * 2008-11-03 2013-03-25 (주)엘지하우시스 Waterproof Construction Structure For Bathroom
CN113431276A (en) * 2021-07-16 2021-09-24 浙江亚厦装饰股份有限公司 Bottom sealing element used on bathroom moisture-proof film

Similar Documents

Publication Publication Date Title
KR100759368B1 (en) Prefabricating permanent form unit and wall construction method using the same
EP1682730B1 (en) Construction industry pods
EP1347110B1 (en) Concrete building construction form unit, method of constructing a concrete building, and concrete building constructed by using concrete building construction form
KR101898125B1 (en) Installation structure of washstand for bathroom
KR20040094466A (en) Dry execution method of toilet works
US20030140572A1 (en) Structure for pre-assembled bathroom and method of installation of the bathroom
WO2022113067A1 (en) Wall for tiling
KR200347936Y1 (en) Prefabricated bath
KR100453352B1 (en) Operation method and operation structure of a tile for waterprofing
EP3978700B1 (en) Prefabricated finishing assembly panel and closed room trim prefabrication panel system
KR20050069115A (en) Shower/water closet room housing method by combination use of polyuretane green wall skin panel and gypsum dry wall
KR960002341B1 (en) Unit bathroom and the process for constructing the same
KR100354717B1 (en) Prefabricated Bathroom with the Integrated Wall
KR102666868B1 (en) Tile Wall Panel with a structure that facilitates non-uniform wall construction
AU2011201797A1 (en) Prefabricated Room Assembly
EP3653804B1 (en) Thermally insulated wall
AU2001263905A1 (en) Structure for pre-assembled bathroom and method of installation of the bathroom
RU2193635C2 (en) Method of erecting cast-in-place building exterior wall and face slab for method embodiment
KR200267040Y1 (en) Operation structure of a tile for waterprofing
KR100244019B1 (en) A construction system of the assembly bath room
KR200210428Y1 (en) Support for attaching the vanity counter bracket in the prefabricated bathroom
JP3555841B2 (en) Construction method of connection part of extension housing structure and frame
KR20020095608A (en) Assembly panel construction system
KR20050120006A (en) Wall-hung type water closet room housing method by using polyuretane skin wall panel---t-gps
KR101358625B1 (en) Prefabricated module

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application