KR100777475B1 - A method of managing hub by supplier using the internet - Google Patents

A method of managing hub by supplier using the internet Download PDF

Info

Publication number
KR100777475B1
KR100777475B1 KR1020010026794A KR20010026794A KR100777475B1 KR 100777475 B1 KR100777475 B1 KR 100777475B1 KR 1020010026794 A KR1020010026794 A KR 1020010026794A KR 20010026794 A KR20010026794 A KR 20010026794A KR 100777475 B1 KR100777475 B1 KR 100777475B1
Authority
KR
South Korea
Prior art keywords
information
hub
inventory
supplier
internet
Prior art date
Application number
KR1020010026794A
Other languages
Korean (ko)
Other versions
KR20020087782A (en
Inventor
최병기
송영관
Original Assignee
엘지전자 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 엘지전자 주식회사 filed Critical 엘지전자 주식회사
Priority to KR1020010026794A priority Critical patent/KR100777475B1/en
Publication of KR20020087782A publication Critical patent/KR20020087782A/en
Application granted granted Critical
Publication of KR100777475B1 publication Critical patent/KR100777475B1/en

Links

Images

Abstract

본 발명은 인터넷상에서의 정보 교류에 의해 허브의 재고를 공급자측에서 제어할 수 있도록 한 인터넷을 이용한 공급자에 의한 허브 관리 방법에 관한 것으로, 공급자측 단말기가 인터넷을 통해 특정 서버에 접속하여 물류 재고 처리에 관련된 일정 시간 간격의 정보 입력 및 확인이 가능한 화면을 제공받는 제 1과정; 및 상기 화면상에 디스플레이되는 소요량 정보와 허브의 재고 정보 및 선적 정보에 근거하여 계산된 예상 재고량 정보가 상기 공급자측 단말기에 전송됨에 따라 상기 공급자측 단말기에서 그 화면상에 디스플레이된 예상 재고량에 따라 허브에 입고가능한 보충 스케쥴 정보를 결정하여 입력하는 제 2과정을 구비하여, 바이어와 허브측에서 입력한 정보를 근거로 하여 공급자측에서 보충 스케쥴 정보를 적절하게 결정하여 입력하므로 허브의 재고에 대한 관리를 공급자측에서 할 수 있고, 그로 인해 바이어측의 재고 부담이 경감된다.
The present invention relates to a hub management method by a supplier using the Internet which enables the supplier side to control the inventory of the hub by information exchange on the Internet. The supplier terminal is connected to a specific server through the Internet to process logistics inventory. A first process of providing a screen capable of inputting and confirming information at predetermined time intervals related to the first step; And the estimated inventory information calculated on the basis of the requirement information displayed on the screen, the inventory information of the hub, and the shipment information to the supplier terminal, according to the estimated inventory amount displayed on the screen of the supplier terminal. And a second process of determining and inputting replenishment schedule information that can be received at This can be done on the supplier side, thereby reducing the inventory burden on the buyer side.

인터넷, 물류 재고, 바이어, 공급자, 허브, 예상 재고량Internet, Logistics Inventory, Buyers, Suppliers, Hubs, Estimated Inventory

Description

인터넷을 이용한 공급자에 의한 허브 관리 방법{A method of managing hub by supplier using the internet} A method of managing hub by supplier using the internet}             

도 1은 본 발명의 방법이 적용된 시스템의 개략적인 구성도,1 is a schematic configuration diagram of a system to which the method of the present invention is applied;

도 2는 도 1에 도시된 물류처리 서버에서 제공하는 특정 화면의 일예,2 is an example of a specific screen provided by the logistics server shown in FIG.

도 3은 본 발명의 실시예에 따른 인터넷을 이용한 공급자에 의한 허브 관리 방법에서의 예상 재고량 산출 동작을 설명하는 흐름도,3 is a flowchart illustrating an operation of calculating an expected inventory amount in a hub management method by a provider using the Internet according to an embodiment of the present invention;

도 4는 본 발명의 실시예에 따른 인터넷을 이용한 공급자에 의한 허브 관리 방법에 적용되는 선적에서 허브 입고까지의 동작을 설명하는 흐름도,4 is a flowchart illustrating an operation from shipment to arrival of a hub applied to a hub management method by a provider using the Internet according to an embodiment of the present invention;

도 5는 본 발명의 실시예에 따른 인터넷을 이용한 공급자에 의한 허브 관리 방법에 적용되는 통관에서 결제까지의 동작을 설명하는 흐름도이다.
5 is a flowchart illustrating the operation from customs clearance to payment applied to the hub management method by the provider using the Internet according to an embodiment of the present invention.

※ 도면의 주요부분에 대한 부호의 설명※ Explanation of code for main part of drawing

10 : 바이어측 단말기 20 : 공급자측 단말기10: buyer side terminal 20: supplier side terminal

30 : 허브측 단말기 40 : 물류처리 서버30: hub side terminal 40: logistics processing server

본 발명은 인터넷을 이용한 공급자에 의한 허브 관리 방법에 관한 것으로, 보다 상세하게는 인터넷을 통한 허브와 공급자간의 정보 교류에 의해 허브의 재고를 공급자가 관리할 수 있도록 한 방법에 관한 것이다.
The present invention relates to a method for managing a hub by a supplier using the Internet, and more particularly, to a method for enabling a supplier to manage a stock of a hub by exchanging information between the hub and the supplier through the Internet.

종래, 바이어와 공급자간의 물류(예컨대, 자재) 거래는 상호간의 직접적인 거래 형태를 취하였다. 즉, 바이어와 공급자간에 허브(hub)를 사이에 두고서 바이어가 필요한 양을 제시하면 공급자가 그 필요량의 물류를 상기 허브에 입고시키고 상기 바이어는 그 허브에 입고되어 있는 필요한 물류를 가져가는 식이다.In the past, logistics (eg, material) transactions between buyers and suppliers took the form of direct transactions with each other. In other words, if the buyer presents the necessary amount of space between the buyer and the supplier, the supplier will receive the necessary amount of logistics in the hub, and the buyer will take the necessary logistics in the hub.

상기의 경우 바이어측에서 구매 오더(Purchasing Order; PO)를 공급자에게 보내고, 그 공급자는 그 구매 오더를 보고서 그에 상응하는 수량의 해당 물류를 허브에 입고시킨다. 그 허브에 입고된 물류에 대해서는 바이어측에서 전적으로 결제를 해 주는 것이므로 공급자는 재고 부담이 없다. In this case, the buyer sends a Purchasing Order (PO) to the supplier, who reports the purchase order and places the corresponding quantity of logistics in the hub. Logistics received at the hub are paid entirely by the buyer, so there is no inventory burden on the supplier.

즉, 상기 바이어와 공급자간의 구매 오더를 통한 거래 방식은 바이어가 구매 오더를 통해 허브의 재고를 제어하는 방식이므로, 바이어측면에서는 재고에 대한 부담이 높다.
That is, the trading method through the purchase order between the buyer and the supplier is a method in which the buyer controls the inventory of the hub through the purchase order, the burden on the inventory is high on the buyer side.

본 발명은 상기한 종래의 사정을 감안하여 제안된 것으로, 인터넷상에서의 정보 교류에 의해 허브의 재고를 공급자측에서 제어할 수 있도록 한 인터넷을 이용한 공급자에 의한 허브 관리 방법을 제공함에 그 목적이 있다.
The present invention has been proposed in view of the above-mentioned conventional circumstances, and an object thereof is to provide a hub management method by a supplier using the Internet which enables the supplier side to control the inventory of the hub by information exchange on the Internet. .

상기와 같은 목적을 달성하기 위하여 본 발명의 바람직한 실시예에 따른 인터넷을 이용한 공급자에 의한 허브 관리 방법은, 공급자측 단말기가 인터넷을 통해 특정 서버에 접속하여 물류 재고 처리에 관련된 일정 시간 간격의 정보 입력 및 확인이 가능한 화면을 제공받는 제 1과정; 및 상기 화면상에 디스플레이되는 소요량 정보와 허브의 재고 정보 및 선적 정보에 근거하여 계산된 예상 재고량 정보가 상기 공급자측 단말기에 전송됨에 따라 상기 공급자측 단말기에서 그 화면상에 디스플레이된 예상 재고량에 따라 허브에 입고가능한 보충 스케쥴 정보를 결정하여 입력하는 제 2과정을 구비한다.
In order to achieve the above object, a hub management method by a provider using the Internet according to a preferred embodiment of the present invention is provided by a provider terminal accessing a specific server via the Internet and inputting information at a predetermined time interval related to logistics inventory processing. And a first process of providing a screen capable of checking; And the estimated inventory information calculated on the basis of the requirement information displayed on the screen, the inventory information of the hub, and the shipment information to the supplier terminal, according to the estimated inventory amount displayed on the screen of the supplier terminal. And a second process of determining and inputting supplementary schedule information that can be received.

이하, 본 발명의 실시예에 따른 인터넷을 이용한 공급자에 의한 허브 관리 방법에 대하여 첨부된 도면을 참조하여 설명하면 다음과 같다.Hereinafter, a hub management method by a provider using the Internet according to an embodiment of the present invention will be described with reference to the accompanying drawings.

도 1은 본 발명의 방법이 적용된 시스템의 개략적인 구성도로서, 소비할 물류에 대한 소요량, 공급자와 협의하여 결정한 허브의 목표 재고, 허브에 입고된 물류에 대한 일당 주문량, 결제 등에 관련된 정보를 입력하고 인터넷 접속 및 수신된 정보의 확인이 가능한 바이어측 단말기(10); 보충 스케쥴 정보를 입력하고 인터넷 접속 및 수신된 정보의 확인이 가능한 공급자측 단말기(20); 허브에 입고된 물류에 대한 정보와 허브에서 출고된 물류에 대한 정보와 허브의 재고 정보 및 선적 정보를 입력하고 인터넷 접속 및 수신된 정보의 확인이 가능한 허브측 단말기(30); 및 상기 바이어측 단말기(10)와 공급자측 단말기(20) 및 허브측 단말기(30)로부터의 정보를 입력받아 내부적으로 예상 재고 정보를 생성하여 상기 바이어측 단말기(10)와 공급자측 단말기(20) 및 허브측 단말기(30)에게로 전송하고, 부가적으로 상기 바이어측 단말기(10)에게 상기 허브 재고정보 및 선적 정보를 제공하며, 상기 공급자측 단말기(20)에게 소요량 정보와 허브의 재고/입고/출고 정보 및 결제 정보를 제공하고, 상기 허브측 단말기(30)에게 일당 주문량에 대한 정보를 제공하는 물류처리 서버(40)를 구비한다.1 is a schematic configuration diagram of a system to which the method of the present invention is applied and inputs information related to requirements for logistics to be consumed, target inventory of a hub determined in consultation with a supplier, daily orders for logistics received in the hub, payment, and the like. A buyer side terminal 10 capable of accessing the Internet and checking received information; A supplier side terminal 20 capable of inputting supplementary schedule information and verifying Internet access and received information; A hub-side terminal 30 capable of inputting information on logistics received at the hub, information on logistics shipped from the hub, inventory information and shipping information of the hub, and checking Internet access and received information; And receiving the information from the buyer side terminal 10, the supplier side terminal 20, and the hub side terminal 30 to generate expected inventory information internally, thereby providing the buyer side terminal 10 and the supplier side terminal 20. And transmitting to the hub side terminal 30, additionally providing the hub stock information and shipping information to the buyer side terminal 10, and supplying the requirement information and the stock / receipt of the hub to the supplier side terminal 20. It is provided with a logistics server 40 to provide information / payment information, and to provide information on the order amount per day to the hub-side terminal (30).

상기 물류처리 서버(40)는 상기 바이어측 단말기(10)로부터의 소요량(Consumption Plan) 정보와 상기 공급자측 단말기(20)로부터의 보충 스케쥴(Replenishment Schedule) 정보 및 상기 허브측 단말기(30)로부터의 허브의 재고(Hub Inventory) 정보 및 선적(In-transit) 정보에 근거하여 예상 재고량(Projected Inventory)을 계산한 후 상기 바이어측 단말기(10)와 공급자측 단말기(20) 및 허브측 단말기(30)에게 제공한다.The logistics processing server 40 may include consumption plan information from the buyer side terminal 10, supplementary schedule information from the supplier side terminal 20, and the hub side terminal 30. After calculating the projected inventory based on Hub Inventory information and In-transit information, the Buyer-side terminal 10, the supplier-side terminal 20, and the hub-side terminal 30 are calculated. To provide.

즉, 상기 물류처리 서버(40)는 상기 바이어측 단말기(10)와 공급자측 단말기(20) 및 허브측 단말기(30)가 인터넷을 통해 접속해 오면 각종 항목에 대한 정보 입력 및 확인이 가능한 정형화된 화면을 제공한다. 그에 따라, 상기 바이어측 단말기(10)와 공급자측 단말기(20) 및 허브측 단말기(30)에서는 상대방측에서 입력 한 항목별 정보를 보고서 적절한 정보를 입력한다.That is, the logistics processing server 40 is a standardized form that enables input and confirmation of various items when the buyer terminal 10, the supplier terminal 20, and the hub terminal 30 are connected through the Internet. Provide the screen. Accordingly, the buyer-side terminal 10, the supplier-side terminal 20 and the hub-side terminal 30 reports the item-specific information input from the other side and inputs the appropriate information.

상기 정형화된 화면에 포함된 항목에 대해서는 상기 바이어측 단말기(10)와 공급자측 단말기(20) 및 허브측 단말기(30)에서 마음대로 정보 조작을 할 수 있는 것이 아니라, 각자 정보 입력 및 수정이 가능한 항목이 정해진다.For the items included in the standardized screen, the buyer side terminal 10, the supplier side terminal 20, and the hub side terminal 30 are not able to manipulate information at will, but can input information and modify them individually. This is decided.

상기 도 1에서, 상기 바이어측 단말기(10)에서 물류처리 서버(40)로 제공되는 소요량 정보는 예상 소요량을 알려주는 정보로서, 그 예상 소요량 정보는 1주일 단위로 상기 물류처리 서버(40)에게로 입력된다.
In FIG. 1, the requirement information provided from the buyer side terminal 10 to the logistics processing server 40 is information indicating an expected requirement, and the expected requirement information is provided to the logistics processing server 40 on a weekly basis. Is entered.

상기 정형화된 화면은 도 2에 예시된 바와 같이, 1주일 간격으로 각종 정보의 입력 및 확인을 가능하게 해 준다. 도 2에서, "day1, day2, day3, day4, day5, …"는 1주, 2주, 3주, 4주, 5주, 6주, 7주, 8주, 9주, 10주, 11주, 12주, 4개월, 5개월, 6개월로 구분된다. 물론, 그 정보 제공 주기를 1주일이 아니라 필요에 따라서는 2주일, 3주일, 4주일 등과 같이 늘려질 수도 있다.As illustrated in FIG. 2, the standardized screen enables input and confirmation of various information at one week intervals. In Fig. 2, "day1, day2, day3, day4, day5, ..." means 1 week, 2 weeks, 3 weeks, 4 weeks, 5 weeks, 6 weeks, 7 weeks, 8 weeks, 9 weeks, 10 weeks, 11 weeks. , 12 weeks, 4 months, 5 months, and 6 months. Of course, the information providing period may be extended to two weeks, three weeks, four weeks, etc., if necessary, rather than one week.

그리고, 상기 정형화된 화면은 하나의 물류 아이템에 대하여 하나의 벤더(vendor)가 대응된다. 즉, 상기 정형화된 화면은 공급자와 물류 아이템마다 구별되어 제공된다.In the standardized screen, one vendor corresponds to one logistics item. That is, the standardized screen is provided separately for each supplier and logistics item.

상기 도 2의 화면(즉, 표)은, 상기 바이어측에서 업로드시키는 소요량(Consumption Plan) 정보 항목, 허브 운영자가 업로드시키는 허브 재고(Hub Inventory) 정보 항목, 공급자 또는 허브 업체가 선적후에 입력하는 선적(In-transit from Supplier to Hub) 정보 항목, 공급자가 입력하는 보충 스케쥴(Replenishment Schedule) 정보 항목, 상기 정보(즉, 소요량 정보, 허브 재고 정보, 선적 정보, 보충 스케쥴 정보)에 근거하여 자동으로 계산되는 예상 재고량(Projected Inventory) 정보 항목, 상기 소요량 정보와 보충 스케쥴 정보 및 예상 재고량 정보에 근거하여 계산되는 필수 재고(Required Inventory) 정보 항목, 예상 재고량 계산 결과에 따라 고지되는 항목(Stock Out, Min Stock Violation, Excess Inventory), 바이어가 결정하는 최대/최소 허브 재고(Max Hub Inventory, Min Hub Inventory) 정보 항목 등을 포함한다.The screen (i.e., table) of FIG. 2 is a consumption plan information item uploaded from the buyer side, a hub inventory information item uploaded by a hub operator, a shipment inputted by a supplier or a hub company after shipment. (In-transit from Supplier to Hub) information item, replenishment schedule information item entered by the supplier, automatically calculated based on the above information (ie requirements information, hub inventory information, shipping information, replenishment schedule information) Projected Inventory information item to be calculated, Required Inventory information item to be calculated based on the requirement information, supplementary schedule information, and estimated inventory information, and to be notified according to the expected inventory calculation result (Stock Out, Min Stock Violation, Excess Inventory, and Max Hub Inventory and Min Hub Inventory information items determined by buyers.

물론, 상기 도 2에 예시된 정형화된 화면에 포함된 각각의 항목은 필요에 따라서 삭제 또는 대체 및 첨가될 수 있다.Of course, each item included in the standardized screen illustrated in FIG. 2 may be deleted, replaced, or added as necessary.

상기 도 2에서, 상기 바이어측에서 소요량 정보를 입력하게 되면 공급자측에서는 허브 재고 및 선적 정보를 보고서 보충할 수 있는 수량(즉, 제시간에 허브에 입고할 수 있는 수량)을 결정하여 데이터를 입력한다. 즉, 상기 공급자는 상기 바이어측에서 입력한 소요량 정보에 따라 입고 가능한 수량을 결정하게 되는데, 상기 공급자측에서 입력하는 보충 스케쥴 정보에 대한 시간적인 변경 가능 범위는 상기 바이어측에서 소요량 정보를 변경할 수 있는 시간적인 범위내이다. 예를 들어, 상기 바이어측에서 행해지는 소요량 정보의 변경은 해당하는 물류 아이템의 허브 입고 4주전 또는 8주전까지 가능하다. 상기 소요량 정보의 변경 가능 범위는 물류 아이템별로 필요에 따라 가변될 수 있다.In FIG. 2, when the buyer enters the requirement information, the supplier determines the quantity of the hub inventory and the shipment information (that is, the quantity that can be received in the hub on time) and inputs the data. . That is, the supplier determines the quantity that can be received according to the requirement information input from the buyer side, and the temporal changeable range of the supplementary schedule information input from the supplier side may change the requirement information at the buyer side. It is in the temporal range. For example, the requirement information change performed on the buyer side may be made up to 4 weeks or 8 weeks before the arrival of the hub of the corresponding logistics item. The changeable range of the requirement information may be changed as necessary for each logistics item.

한편, 상기 공급자는 상기 바이어측에서 입력한 소요량 정보에 맞게 해당 물류 아이템을 공급하는데, 상기 공급자는 상기 정형화된 화면(즉, 표)에 기입하는 허브 재고량의 최대치(Max)와 최소치(Min)의 범위내에서 공급이 가능하다. 즉, 상기 최대 허브 재고(Max Hub Inventory) 정보와 최소 허브 재고(Min Hub Inventory) 정보는 바이어측에서 입력하는 정보로서, 예를 들어 상기 최대 허브 재고 정보는 물류 아이템별로 현재의 주(예컨대, day1)를 기준하여 4주 또는 6주 후까지의 소요량 정보를 합산한 정보가 되고, 상기 최소 허브 재고 정보는 물류 아이템별로 현재의 주(예컨대, day1)를 기준으로 2주 후까지의 소요량 정보를 합산한 정보가 된다. 상기 최대 허브 재고 정보 및 최소 허브 재고 정보를 기입하는 기준이 되는 2주, 4주, 6주라는 시간적인 범위는 모든 물류 아이템에 그대로 적용되는 것이 아니라, 물류 아이템별로 다르게 설정된다. On the other hand, the supplier supplies the corresponding logistics item in accordance with the requirements information input from the buyer side, the supplier of the maximum value (Max) and the minimum value (Min) of the hub inventory amount to fill in the standardized screen (that is, the table) It can be supplied within the range. That is, the maximum hub inventory information and the minimum hub inventory information are information input from the buyer side. For example, the maximum hub inventory information is the current week for each logistic item (eg, day1). ), And the minimum hub inventory information is the sum of the requirements information up to two weeks after the current week (for example, day1) for each logistic item. It is a piece of information. The time range of 2 weeks, 4 weeks, and 6 weeks, which are the criteria for entering the maximum hub inventory information and the minimum hub inventory information, are not applied to all logistics items as they are, but are set differently for each logistics item.

상기 도 2에서, 보통 현재 주(예컨대, day1)를 기준으로 허브 재고 정보와 선적 정보를 합산한 값에서 소요량 정보를 감산한 값이 예상 재고량 정보가 되는데, 만일 day5에서와 같이 공급자측에서 입력한 보충 스케쥴 정보가 있는 경우에는 전 주(前 週)인 day4에서의 예상 재고량(0)과 현재 주(즉, day5)에서의 보충 스케쥴 정보의 값(600)을 합산한 후 현재 주(즉, day5)의 소요량 정보의 값(100)을 감산하면 현재 주(즉, day5)에 대한 예상 재고량 정보(500)가 된다.In FIG. 2, the estimated inventory information is obtained by subtracting the requirement information from the sum of the hub inventory information and the shipment information on the basis of the current week (for example, day1). If you have supplemental schedule information, add the estimated inventory (0) in the previous week, day4, and the value (600) of the supplemental schedule information in the current week (that is, day5), and then add the current week (that is, day5). Subtracting the value (100) of the requirement information of the) becomes the estimated inventory information 500 for the current week (that is, day5).

그리고, 상기 도 2에서 현재 주(예컨대, day1)에 대한 필수 재고는 다음 주(예컨대, day2)의 예상 정보량 정보(200)에서 현재 주(즉, day1)의 소요량 정보(100)를 감산한 결과 값(100)이 현재 주(즉, day1)에 대한 필수 재고 정보가 된다. 만일 day5에서와 같이 공급자측에서 입력한 보충 스케쥴 정보가 있는 경우의 day4에서의 필수 재고 정보는 다음 주(즉, day5)에서의 예상 재고량 정보(500)에서 현재 주(즉, day4)의 소요량 정보(100)를 감산한 값에 다음 주(즉, day5)의 보충 스케쥴 정보의 값(600)을 감산한 결과 값(-200)이 현재 주(즉, day4)에 대한 필수 재고 정보가 된다.2, the required stock for the current week (eg, day1) is the result of subtracting the requirement information 100 of the current week (ie, day1) from the estimated information amount information 200 of the next week (eg, day2). The value 100 becomes the required inventory information for the current week (ie day1). If there is supplemental schedule information entered by the supplier as in day5, the required inventory information in day4 is the requirement information of the current week (that is, day4) from the estimated inventory information 500 in the next week (that is, day5). As a result of subtracting the value 600 of the supplementary schedule information of the next week (that is, day5) from the value obtained by subtracting (100), the value (-200) becomes essential inventory information for the current week (that is, day4).

상기 도 2의 화면은 상기 바이어와 공급자 및 허브측에서 단말기(10, 20, 30)를 이용하여 물류처리 서버(40)에 접속하면 제공되는 화면으로서, 상기 바이어와 공급자 및 허브측에서는 그 디스플레이되는 화면상에 각자의 정보를 입력함으로써 물류 재고의 현황 및 예상 처리 상황을 간편하게 파악할 수 있게 된다.
The screen shown in FIG. 2 is a screen provided when the buyers, suppliers and hubs are connected to the logistics server 40 using the terminals 10, 20, and 30, and the screens are displayed on the buyers, suppliers, and hubs. By inputting each piece of information into the table, it is possible to easily grasp the status of logistics inventory and the expected processing situation.

도 3은 본 발명의 실시예에 따른 인터넷을 이용한 공급자에 의한 허브 관리 방법에서의 예상 재고량 산출 동작을 설명하는 흐름도로서, 바이어와 공급자 및 허브측의 단말기(10, 20, 30)에서 상기 물류처리 서버(40)에게 정보를 업로드시키고 상기 물류처리 서버(40)에서 바이어와 공급자 및 허브측으로 특정 정보를 제공하는 것으로 설명하겠으나, 실질적으로 상기 물류처리 서버(40)의 사이트에서 제공하는 특정 화면(X-Net 화면)을 통해 상기 바이어와 공급자 및 허브측에서는 정보의 입력 및 확인이 가능하다.3 is a flowchart illustrating an operation of calculating an expected inventory amount in a hub management method by a provider using the Internet according to an embodiment of the present invention, wherein the logistics processing is performed at the terminals 10, 20, and 30 of the buyer, the supplier, and the hub. Although it will be described as uploading information to the server 40 and providing specific information from the logistics processing server 40 to the buyer, supplier, and hub side, the specific screen (X) provided by the site of the logistics processing server 40 is substantially provided. -Net screen) allows buyers, suppliers and hubs to enter and verify information.

먼저, 바이어측에서는 이동물동 계획을 수립한 후에 그에 따른 소요량 정보를 산출한 후 조정 및 확정하고 나서 인터넷을 통해 상기 물류처리 서버(40)에 접속하여 그 확정된 소요량 정보를 업로드시킨다. 여기서, 상기 소요량 정보 산출은 주 1회 또는 2회 정도 실시하고 물동 변경이 클 경우에는 수시로 행한다.First, the buyer side establishes a moving goods plan, calculates the necessary requirements information, adjusts and confirms them, and then accesses the logistics server 40 through the Internet and uploads the determined requirements information. In this case, the requirement information calculation is performed once or twice a week, and when the change of water volume is large, it is frequently performed.

그리고, 허브측에서는 그 허브 운영자가 인터넷을 통해 상기 물류처리 서버(40)에 접속하여 허브의 재고정보 업로드 및 선적 정보를 입력한다. 여기서, 상기 허브의 재고정보 업로드는 허브 창고 관리 시스템에서 변동이 있을 때마다 행하고, 상기 선적 정보의 입력은 공급자로부터 선적정보를 입수하였을 때마다 행한다.At the hub side, the hub operator accesses the logistics server 40 through the Internet and inputs inventory information upload and shipment information of the hub. Here, the inventory information of the hub is uploaded every time there is a change in the hub warehouse management system, and the shipment information is input whenever the shipment information is obtained from the supplier.

그에 따라, 상기 물류처리 서버(40)에서는 현재 입력된 정보들을 기반으로 하여 예상 재고를 계산한 후 그 계산된 예상 재고를 신규 소요 정보로 하여 상기 공급자측 단말기(20)에게로 전송한다. 물론, 그 신규 소요 정보는 허브측 단말기(30)에게로도 전송된다.Accordingly, the logistics processing server 40 calculates the estimated inventory based on the currently input information and transmits the estimated inventory to the supplier terminal 20 using the calculated expected inventory as new required information. Of course, the new required information is also transmitted to the hub side terminal 30.

상기 공급자측 단말기(20)에서는 그 입력된 신규 소요 정보로서의 예상 재고를 검토한 후 공급자측에서 보충가능한 물량을 적시한 보충 스케쥴을 상기 물류처리 서버(40)에게로 입력한다.The supplier terminal 20 examines the expected inventory as the new required information, and inputs a replenishment schedule indicating the quantity that can be replenished at the supplier side to the logistics processing server 40.

그리하면, 상기 물류처리 서버(40)에서는 기 계산된 예상 재고를 재계산한 후 상기 예상 재고 수정을 통지한다.Then, the logistics processing server 40 notifies the estimated inventory correction after recalculating the estimated inventory previously calculated.

그에 따라, 상기 바이어측에서는 수신된 예상 재고가 소요량을 초과하는지 아니면 부족한지를 검토한 후 그에 대한 대응을 한다. 여기서, 상기 수신된 예상 재고가 부족한 경우에는 해당 물류를 공급하는 공급자와 접촉하여 의견 조율을 하거나 다른 공급자를 택하거나 이동계획을 변경한다.
Accordingly, the buyer side examines whether the received expected inventory exceeds or falls short of the requirement and responds thereto. In this case, if the received estimated inventory is insufficient, the supplier contacts the logistics supplier to coordinate opinions, select another supplier, or change the movement plan.

도 4는 본 발명의 실시예에 따른 인터넷을 이용한 공급자에 의한 허브 관리 방법에 적용되는 선적에서 허브 입고까지의 동작을 설명하는 흐름도로서, 바이어와 공급자 및 허브측의 단말기(10, 20, 30)에서 상기 물류처리 서버(40)에게 정보를 업로드시키고 상기 물류처리 서버(40)에서 바이어와 공급자 및 허브측으로 특정 정보를 제공하는 것으로 설명하겠으나, 실질적으로 상기 물류처리 서버(40)의 사이트에서 제공하는 특정 화면(X-Net 화면)을 통해 상기 바이어와 공급자 및 허브측에서는 정보의 입력 및 확인이 가능하다.FIG. 4 is a flowchart illustrating operations from shipment to arrival of a hub applied to a method for managing a hub by a provider using the Internet according to an embodiment of the present invention. Will be described as uploading information to the logistics processing server 40 and providing specific information from the logistics processing server 40 to buyers, suppliers, and hubs, but substantially provided by the site of the logistics processing server 40. The specific screen (X-Net screen) allows the buyer, supplier and hub to enter and confirm information.

먼저, 공급자측에서 재고 보충에 대한 계획을 확정한 후 인터넷을 통해 상기 물류처리 서버(40)에 접속하여 그 확정된 재고 보충 계획을 입력한다. 그리고, 그 공급자측에서는 인보이스(invoice)를 작성하여 운송업자(forwarder)에게 선적을 요청한다. 그에 따라, 그 운송업자는 B/L(Bill of Lading)을 그 공급자에게 발행해 주고 선적한 후 선적 정보를 상기 공급자측 및 허브측에게 발송한다. 상기 공급자측에서는 상기 운송업자로부터 B/L을 직접 인수하고, 상기 허브측에서는 상기 운송업자로부터 B/L, 인보이스, 팩스 형태로 선적 정보를 입수한다.First, the supplier determines the stock replenishment plan and then accesses the logistics server 40 through the Internet and inputs the determined replenishment plan. The supplier prepares an invoice and requests a forwarder for shipment. Accordingly, the carrier issues a bill of lading (B / L) to the supplier and sends the shipment information to the supplier side and the hub side after shipment. The supplier side directly acquires the B / L from the carrier, and the hub side obtains shipping information from the carrier in the form of B / L, invoice and fax.

이후, 상기 허브측에서는 인터넷을 통해 상기 물류처리 서버(40)에 접속하여 선적 정보를 입력한 후 보세 운송을 통해 허브에 입고한다. 그리고, 상기 허브측에서는 그 허브에 입고된 입고 실적 정보를 FTP(File Transfer Protocol)를 통해 B/L단위로 상기 물류처리 서버(40)에 전송한다. 이후, 상기 허브측에서는 세관에 반입신고를 한다.Subsequently, the hub side accesses the logistics processing server 40 through the Internet, inputs shipping information, and enters the hub through bonded transportation. Then, the hub side transfers the goods receipt history information received in the hub to the logistics processing server 40 in a B / L unit via FTP (File Transfer Protocol). Thereafter, the hub side is reported to bring in customs.

상기 물류처리 서버(40)에서는 상기 공급자측으로부터의 재고 보충 계획 정보 및 상기 허브측으로부터의 선적 정보 및 입고실적 정보에 근거하여 예상 재고를 재계산한 후 바이어 및 공급자에게 제공하여 확인시켜 준다. 그리고, 상기 물류처 리 서버(40)는 상기 허브측에서 입력한 입고 실적 정보를 B/L단위로 상기 공급자에게 전송하여 확인시켜 준다.
The logistics processing server 40 recalculates the expected inventory based on the stock replenishment plan information from the supplier side, the shipment information and the receipt performance information from the hub side, and provides the buyer and the supplier with confirmation. In addition, the logistics processing server 40 confirms by sending the receipt performance information input from the hub to the supplier in units of B / L.

도 5는 본 발명의 실시예에 따른 인터넷을 이용한 공급자에 의한 허브 관리 방법에 적용되는 통관에서 결제까지의 동작을 설명하는 흐름도로서, 바이어와 공급자 및 허브측의 단말기(10, 20, 30)에서 상기 물류처리 서버(40)에게 정보를 업로드시키고 상기 물류처리 서버(40)에서 바이어와 공급자 및 허브측으로 특정 정보를 제공하는 것으로 설명하겠으나, 실질적으로 상기 물류처리 서버(40)의 사이트에서 제공하는 특정 화면(X-Net 화면)을 통해 상기 바이어와 공급자 및 허브측에서는 정보의 입력 및 확인이 가능하다.FIG. 5 is a flowchart illustrating an operation from customs clearance to payment applied to a hub management method by a provider using the Internet according to an embodiment of the present invention. In the terminals 10, 20, and 30 of a buyer, a supplier, and a hub, FIG. Although it will be described as uploading information to the logistics server 40 and providing specific information from the logistics server 40 to buyers, suppliers, and hubs, the specifics provided by the site of the logistics server 40 are substantially. The screen (X-Net screen) allows the buyer, supplier and hub to enter and confirm information.

먼저, 바이어측에서 필요한 자재에 대한 주문(call-off) 수량을 확정하고 그 확정된 주문 수량 정보를 상기 물류처리 서버(40)를 통해 허브측으로 제공한다. 여기서, 상기 주문 수량 확정에 있어서 주문 번호는 파일 번호 형식을 취하고, MFG(Manufacturing)시스템이 기본 정보를 형성한다.First, a buyer determines the call-off quantity for the necessary materials and provides the determined order quantity information to the hub through the logistics server 40. Here, in the order quantity confirmation, the order number takes the form of a file number, and the MFG (Manufacturing) system forms basic information.

상기 허브측에서는 상기 입수된 주문 정보를 확인한 후 B/L, S/D(Ship of Document; 선적 서류)를 확정하고서 관세사 및 세관측으로 그 B/L, S/D를 보내면서 수입면허를 요청하게 된다.After confirming the obtained order information, the hub side confirms B / L and S / D (Ship of Document) and sends the B / L and S / D to the customs office and customs, requesting an import license. .

상기 관세사측에서는 그 수신된 수입면허 요청서에 따른 B/L, S/D를 보고서 과세를 평가하고, 세관측에서는 그에 대한 수입면허를 상기 허브측에게 제공하며, 상기 관세사측에서는 면허 정보를 바이어측으로 업로드시킨다. The customs office evaluates the tax on the report of B / L and S / D according to the received import license request, and the customs office provides the hub with an import license for it, and the customs office uploads the license information to the buyer.                     

이후, 상기 허브측에서는 상기 세관측으로부터 제공된 수입면허를 확인한 후 주문 수량에 대한 현물 출고를 한다. 그리고 나서, 상기 허브측에서는 출고 실적을 상기 물류처리 서버(40)에 업로드시킨다.Thereafter, the hub side checks the import license provided by the customs side, and then releases the goods in kind for the order quantity. Then, the hub side uploads the shipment results to the logistics processing server 40.

그에 따라, 상기 물류처리 서버(40)는 상기 출고 실적 정보를 상기 바이어 및 공급자에게 전송해 줌으로써, 상기 바이어 및 공급자측에서는 그 수신된 출고 실적 정보를 확인한다. 그리고, 상기 바이어측에서는 상기 관세사측에서 업로드시킨 수입면장의 입고를 처리한다.Accordingly, the logistics processing server 40 transmits the shipment performance information to the buyer and the supplier, so that the buyer and the supplier confirm the received shipment performance information. Then, the buyer side processes the receipt of the imported cotton stamp uploaded by the customs company.

그리고 나서, 상기 바이어측에서는 처리된 수입면장의 내용과 주문 정보를 기반으로 미결제 정보를 조회한 후 결제를 해주고 나서 결제 정보를 상기 물류처리 서버(40)에게로 업로드시킨다. 그에 따라, 상기 물류처리 서버(40)는 그 결제 정보를 공급자측으로 전송한다. 여기서, 상기 결제 정보는 B/L 또는 주문 번호(Call-Off No.) 기준으로 형성된다.Then, the buyer side checks the unpaid information based on the contents of the processed import slip and the order information, makes a payment, and then uploads the payment information to the logistics processing server 40. Accordingly, the logistics server 40 transmits the payment information to the supplier side. Here, the payment information is formed based on a B / L or an order number (Call-Off No.).

상기 공급자측에서는 수신된 결제 정보를 보고서 공급해 준 해당 물류에 대한 결제여부를 확인하게 된다.
The supplier side checks the payment for the corresponding logistics that provided the report of the received payment information.

이상 상세히 설명한 바와 같이 본 발명에 따르면, 바이어와 허브측에서 입력한 정보를 근거로 하여 공급자측에서 보충 스케쥴 정보를 적절하게 결정하여 입력하므로 허브의 재고에 대한 관리를 공급자측에서 할 수 있고, 그로 인해 바이어측의 재고 부담이 경감된다. As described in detail above, according to the present invention, since supplementary schedule information is appropriately determined and input by the supplier based on the information input from the buyer and the hub, the supplier can manage the inventory of the hub. This reduces the inventory burden on buyers.                     

그리고, 바이어와 공급자 및 허브간의 다양한 정보 교류를 인터넷을 통한 물류처리 서버에서 처리해 줌으로써 허브 운영에 관련된 다양한 정보를 실시간으로 공유할 수 있게 된다.
In addition, various information exchanges between buyers, suppliers, and hubs are processed by the logistics server through the Internet, thereby enabling the sharing of various information related to hub operations in real time.

한편, 본 발명은 상술한 실시예로만 한정되는 것이 아니라 본 발명의 요지를 벗어나지 않는 범위내에서 수정 및 변형하여 실시할 수 있고, 그러한 수정 및 변형이 가해진 기술사상 역시 이하의 특허청구범위에 속하는 것으로 보아야 한다.
On the other hand, the present invention is not limited only to the above-described embodiment, but can be modified and modified within the scope not departing from the gist of the present invention, the technical idea to which such modifications and variations are also applied to the claims Must see

Claims (8)

공급자측 단말기가 인터넷을 통해 특정 서버에 접속하여 물류 재고 처리에 관련된 일정 시간 간격의 정보 입력 및 확인이 가능한 화면을 제공받는 제 1과정; 및 A first process of providing a screen on which a provider terminal accesses a specific server through the Internet and inputs and checks information at a predetermined time interval related to logistics inventory processing; And 상기 화면상에 디스플레이되는 소요량 정보와 허브의 재고 정보 및 선적 정보에 근거하여 계산된 예상 재고량 정보가 상기 공급자측 단말기에 전송됨에 따라 상기 공급자측 단말기에서 그 화면상에 디스플레이된 예상 재고량에 따라 허브에 입고가능한 보충 스케쥴 정보를 결정하여 입력하는 제 2과정을 구비하는 것을 특징으로 하는 인터넷을 이용한 공급자에 의한 허브 관리 방법.As the estimated inventory information calculated on the basis of the requirement information displayed on the screen and the inventory information and the shipping information of the hub is transmitted to the supplier terminal, the hub terminal is provided to the hub according to the expected inventory quantity displayed on the screen. And a second process of determining and inputting replenishment schedule information that can be received. 제 1항에 있어서,The method of claim 1, 상기 화면상의 정보 입력 및 확인은 1주일 간격으로 행해지는 것을 특징으로 하는 인터넷을 이용한 공급자에 의한 허브 관리 방법.The information input and confirmation on the screen is a hub management method by a provider using the Internet, characterized in that the weekly interval. 제 2항에 있어서,The method of claim 2, 상기 공급자측 단말기에서 입력되는 보충 스케쥴 정보는 상기 화면상에 디스플레이된 허브 재고량의 최대치와 최소치의 범위내에서 결정되는 것을 특징으로 하는 인터넷을 이용한 공급자에 의한 허브 관리 방법.The supplementary schedule information input from the provider terminal is determined within the range of the maximum value and the minimum value of the hub inventory amount displayed on the screen. 제 3항에 있어서,The method of claim 3, wherein 상기 허브 재고량의 최대치 및 허브 재고량의 최소치는 데이터를 기입할 현재의 주를 기준하여 후속하는 다수의 주에 대한 소요량 정보를 합산한 값이 상기 현재의 주에 대한 데이터가 되되, 상기 허브 재고량의 최대치 산정에 소요된 후속 주의 수가 상기 허브 재고량의 최소치 산정에 소요된 후속 주의 수보다 많은 것을 특징으로 하는 인터넷을 이용한 허브 관리 방법.The maximum value of the hub stock amount is the maximum value of the hub stock amount and the minimum value of the hub stock amount is the sum of the requirement information for a plurality of subsequent states on the basis of the current week in which the data is to be written. A method for managing hubs using the Internet, characterized in that the number of subsequent weeks spent on the calculation is greater than the number of subsequent weeks spent on the minimum calculation of the hub stock. 제 1항에 있어서,The method of claim 1, 상기 화면은 공급자와 물류 아이템마다 구별되어 제공되는 것을 특징으로 하는 인터넷을 이용한 공급자에 의한 허브 관리 방법.The screen is a hub management method by the supplier using the Internet, characterized in that provided by distinguishing each supplier and logistics items. 제 1항에 있어서,The method of claim 1, 상기 공급자측 단말기에서 입력되는 보충 스케쥴 정보에 대한 변경은 바이어측 단말기에서 입력되는 소요량 정보의 시간적인 변경 가능 범위내에서 행해지는 것을 특징으로 하는 인터넷을 이용한 공급자에 의한 허브 관리 방법.And the change of the supplementary schedule information input from the provider terminal is performed within the range of temporal change of the requirement information input from the buyer terminal. 제 6항에 있어서,The method of claim 6, 상기 소요량 정보의 시간적인 변경 가능 범위는 물류 아이템별로 차등적인 것을 특징으로 하는 인터넷을 이용한 공급자에 의한 허브 관리 방법.The temporal changeable range of the requirement information is a hub management method by the provider using the Internet, characterized in that the differential for each logistic item. 제 1항에 있어서,The method of claim 1, 상기 공급자측 단말기에서 보충 스케쥴 정보가 입력됨에 따라 기 계산된 예상 재고량 및 상기 입력된 보충 스케쥴 정보에 근거하여 재계산한 예상 재고량을 상기 화면상에 디스플레이시키는 것을 특징으로 하는 인터넷을 이용한 공급자에 의한 허브 관리 방법.The hub by the supplier using the Internet, characterized in that the display of the estimated inventory amount recalculated based on the supplementary schedule information and the estimated inventory amount previously calculated as the supplementary schedule information is input from the provider terminal. How to manage.
KR1020010026794A 2001-05-16 2001-05-16 A method of managing hub by supplier using the internet KR100777475B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020010026794A KR100777475B1 (en) 2001-05-16 2001-05-16 A method of managing hub by supplier using the internet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020010026794A KR100777475B1 (en) 2001-05-16 2001-05-16 A method of managing hub by supplier using the internet

Publications (2)

Publication Number Publication Date
KR20020087782A KR20020087782A (en) 2002-11-23
KR100777475B1 true KR100777475B1 (en) 2007-11-19

Family

ID=27705156

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020010026794A KR100777475B1 (en) 2001-05-16 2001-05-16 A method of managing hub by supplier using the internet

Country Status (1)

Country Link
KR (1) KR100777475B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980086544A (en) * 1997-05-01 1998-12-05 포만 제프리 엘 A method for estimating future replenishment and inventory levels in a material distribution network
JP2000191118A (en) * 1998-12-25 2000-07-11 Lion Corp Shipping management system and shipping management method
KR20010000537A (en) * 2000-10-05 2001-01-05 안주호 Business method for providing information of stock control on internet and computer readable medium stored thereon computer executable instruction for performing the method
JP2001048321A (en) * 1999-06-04 2001-02-20 Murata Mach Ltd Warehouse network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980086544A (en) * 1997-05-01 1998-12-05 포만 제프리 엘 A method for estimating future replenishment and inventory levels in a material distribution network
JP2000191118A (en) * 1998-12-25 2000-07-11 Lion Corp Shipping management system and shipping management method
JP2001048321A (en) * 1999-06-04 2001-02-20 Murata Mach Ltd Warehouse network
KR20010000537A (en) * 2000-10-05 2001-01-05 안주호 Business method for providing information of stock control on internet and computer readable medium stored thereon computer executable instruction for performing the method

Also Published As

Publication number Publication date
KR20020087782A (en) 2002-11-23

Similar Documents

Publication Publication Date Title
KR100316884B1 (en) Dynamic parts feeding order system of body shop
US20020116241A1 (en) Enterprise resource planning system for ordering, tracking and shipping goods from a seller to a buyer
US20030110104A1 (en) Enhanced vendor managed inventory system and process
US20130197972A1 (en) System, method and program recording medium for supply capacity estimation
US8321297B2 (en) Community management for electronic peer to peer business to business transactions
MXPA04008805A (en) Inventory management system for reducing overall warehouse and pipeline inventory.
US20050209934A1 (en) System, apparatus and process to provide, replenish, monitor, and invoice consignment inventory with retail customers
JP5418084B2 (en) Distribution integration support system, ordering support apparatus, inventory management support apparatus, shipping operation support apparatus, ordering support apparatus control program, and logistics integration support method
RU2001128223A (en) Flexible way to pay license fees in e-commerce systems
KR20200138876A (en) System for electric commerce platform based on controlling price and method for operating the same
US20070011053A1 (en) Method and system for automating inventory management in a supply chain
KR20150053443A (en) Method, apparatus and computer readable medium for managing physucal distribution
KR102334336B1 (en) Online shared sales platform and methods of operation thereof
Radzuan et al. Vendor managed inventory practices: A case in manufacturing companies
JP2002063440A (en) Order issuing apparatus, order issuing system, method for issuing order, order issuing program and computer readable recording medium having order issuing program recorded thereon
KR100777475B1 (en) A method of managing hub by supplier using the internet
US20040254854A1 (en) Purchase management system and method
KR100777474B1 (en) An apparatus and method for processing a inventory using the internet
US20050144089A1 (en) Shipment and delivery management system
CN114004521A (en) Retail management method, system and storage medium
JP2003316862A (en) Inventory planning method
JP2005196484A (en) Production management system
KR20200013992A (en) Operating Method of Dealing System for Precise Manufactured Goods
JP2001225927A (en) Device and method for making supply and demand plan, program for making supply and demand plan, and recording medium for recording program
JP2001357270A (en) Product, component, and material supply system of supply chain

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121026

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20131024

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20141024

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20151023

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee