JP2001225927A - Device and method for making supply and demand plan, program for making supply and demand plan, and recording medium for recording program - Google Patents

Device and method for making supply and demand plan, program for making supply and demand plan, and recording medium for recording program

Info

Publication number
JP2001225927A
JP2001225927A JP2000262310A JP2000262310A JP2001225927A JP 2001225927 A JP2001225927 A JP 2001225927A JP 2000262310 A JP2000262310 A JP 2000262310A JP 2000262310 A JP2000262310 A JP 2000262310A JP 2001225927 A JP2001225927 A JP 2001225927A
Authority
JP
Japan
Prior art keywords
supply
demand
order
plan
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000262310A
Other languages
Japanese (ja)
Inventor
Motohisa Kondo
元寿 今藤
Kuniya Kaneko
邦也 金子
Hidetsugu Kojima
英嗣 小島
Hiroyoshi Suzuki
浩佳 鈴木
Kentaro Otokubo
健太郎 音窪
Hayaharu Fujiyoshi
速開 藤吉
Toshihiro Nakamura
敏弘 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Priority to JP2000262310A priority Critical patent/JP2001225927A/en
Priority to EP00126799A priority patent/EP1107147A3/en
Priority to US09/729,800 priority patent/US7668743B2/en
Publication of JP2001225927A publication Critical patent/JP2001225927A/en
Pending legal-status Critical Current

Links

Landscapes

  • Warehouses Or Storage Devices (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To make a supply and demand plan of supply chains so as to increase company's profits. SOLUTION: A plan making part 28 and a plan determination changing part 32 are provided that make and change a supply and demand plan of receiving of orders, placing of orders, delivery, and shipping every month in processes of the supply chains comprising processes such as selling and producing processes of products and a producing process of components for producing the products so that the placing of orders to each producing process is within an order placeable range calculated by an order placeable range setting part 30 on the basis of facility, personnel, and the number of working days in each producing process and a profit indicator calculated by an indicator calculating part 26 using a producing cost of products including a material cost, a labor cost, and an equipment cost, an inventory storing cost and a transportation cost becomes maximum. Therefore, a practical supply and demand plan that can increases the company's profits can be made.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、需給計画立案装置
および需給計画立案方法並びに需給計画立案用のプログ
ラムおよびそのプログラムを記録した記録媒体に関し、
詳しくは、受注,発注,納入,出荷を有する需給工程が
少なくとも二つ以上接続されてなるサプライチェーンに
おける需給計画を立案する需給計画立案装置およびその
方法並びにコンピュータを需給計画立案装置として機能
させるプログラムおよびそのプログラムをコンピュータ
読み取り可能に記録した記憶媒体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a supply and demand planning device, a supply and demand planning method, a supply and demand planning program, and a recording medium on which the program is recorded.
More specifically, a supply and demand planning apparatus and method for preparing a supply and demand plan in a supply chain in which at least two supply and demand processes including orders, ordering, delivery, and shipping are connected, and a program for causing a computer to function as a supply and demand planning apparatus The present invention relates to a storage medium that stores the program in a computer-readable manner.

【0002】[0002]

【従来の技術】従来、この種の需給計画立案装置として
は、顧客からの注文に応じて関連する部品工場からの部
品や原料が適正タイミングで供給されるよう各工場の協
調を促すシステムが提案されている(例えば、特開平8
−123535号公報など)。このシステムでは、各工
場に設置された計画協調システムによってネットワーク
を構築し、計画協調システムを介してなされるネットワ
ーク上の工場からの要求に対し、要求を受け付けた工場
は計画システムにより計画されるその工場の生産計画に
基づいて応答することにより、部品や原料の供給のタイ
ミングの適正化がはかれるものとされている。
2. Description of the Related Art Conventionally, as this kind of demand / supply planning system, a system has been proposed which promotes cooperation among factories so that parts and raw materials from related parts factories are supplied at an appropriate timing in response to an order from a customer. (See, for example,
No. 123535). In this system, a network is constructed by a plan coordination system installed in each factory, and in response to a request from a factory on the network made via the plan coordination system, the factory that has received the request is configured by the planning system. By responding based on the production plan of the factory, the supply timing of parts and raw materials is optimized.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、こうし
た工場間の協調システムでは、製品の全体的なコストや
在庫管理などが考慮されていないため、企業体の収益が
より大きくなるよう計画されない。例えば、同一の部品
や原料を複数の工場から納入可能な場合には、各工場に
対する発注の割合によって製品のコストが変化するか
ら、企業収益も変わってしまう。
However, in such a cooperative system between factories, since the overall cost of products and inventory management are not taken into account, it is not planned to increase the profit of the enterprise. For example, when the same parts and raw materials can be delivered from a plurality of factories, the cost of the product changes depending on the ratio of orders to each factory, so that the corporate profit also changes.

【0004】本発明の需給計画立案装置は、企業収益が
より大きくなるようサプライチェーンの需給計画を立案
することを目的の一つとする。また、本発明の需給計画
立案装置は、各需給工程の処理能力を判定し、将来の拡
張または縮小計画に視することを目的の一つとする。
[0004] One of the objects of the supply and demand planning device of the present invention is to prepare a supply and demand plan for a supply chain so that corporate profits are further increased. Another object of the present invention is to determine the processing capacity of each supply and demand process and to view the future expansion or reduction plan.

【0005】[0005]

【課題を解決するための手段およびその作用・効果】本
発明の需給計画立案装置は、上述の目的の少なくとも一
部を達成するために以下の手段を採った。
Means for Solving the Problems and Their Functions and Effects The demand / supply planning system of the present invention employs the following means to achieve at least a part of the above objects.

【0006】本発明の第1の需給計画立案装置は、受
注,発注,納入,出荷を有する需給工程が少なくとも二
つ以上接続されてなるサプライチェーンにおける需給計
画を立案する需給計画立案装置であって、各需給工程に
おける納入から出荷までに要する費用および時間に関す
る費用時間データを記憶するデータ記憶手段と、前記サ
プライチェーンの出荷側末端に位置する需給工程におけ
る受注計画を入力する受注計画入力手段と、該入力され
た受注計画に基づいて所定のパラメータを用いて各需給
工程の受注,発注,納入,出荷の計画データを演算する
計画データ演算手段と、該演算された計画データと前記
データ記憶手段に記憶された費用時間データとに基づい
て前記サプライチェーンの収益指標を演算する収益指標
演算手段と、前記所定のパラメータを変更するパラメー
タ変更手段と、該変更された所定のパラメータを用いて
前記計画データ演算手段により演算された計画データの
うち前記収益指標演算手段により演算された収益指標が
最大となる計画データを需給計画として設定する需給計
画設定手段とを備えることを要旨とする。
A first supply / demand planning apparatus according to the present invention is a supply / demand planning apparatus for preparing a supply / demand plan in a supply chain in which at least two supply / demand processes including an order, an order, a delivery, and a shipment are connected. Data storage means for storing cost time data relating to the cost and time required from delivery to shipment in each supply and demand process, and order plan input means for inputting an order plan in the supply and demand process located at the end of the supply chain on the shipping side, A plan data calculating means for calculating plan data of order, order, delivery, and shipping for each supply and demand process using predetermined parameters based on the input order plan; and a storage means for storing the calculated plan data and the data storage means. A profit index calculating means for calculating a profit index of the supply chain based on the stored cost time data; Parameter changing means for changing the parameters of the above, and the plan data in which the profit index calculated by the profit index calculating means among the plan data calculated by the plan data calculating means using the changed predetermined parameter is maximized. And a supply and demand plan setting means for setting the demand and supply plan.

【0007】この本発明の第1の需給計画立案装置で
は、サプライチェーンの出荷側末端に位置する需給工程
における受注計画に基づいて、所定のパラメータを逐次
変更して各需給工程の受注,発注,納入,出荷の計画デ
ータとこの計画データとデータ記憶手段に記憶された費
用時間データとに基づいてサプライチェーンの収益指標
を演算する。そして、演算した計画データのうち収益指
標が最大となる計画データを需給計画として設定する。
この結果、収益指標が最大の需給計画を立案することが
できる。
In the first supply / demand planning apparatus of the present invention, predetermined parameters are sequentially changed based on the order plan in the supply / demand process located at the end of the supply chain on the shipping side, and the order, order, order, A profit index of the supply chain is calculated based on the delivery / shipment plan data, the plan data, and the cost / hour data stored in the data storage means. Then, of the calculated plan data, the plan data with the maximum profit index is set as the supply and demand plan.
As a result, it is possible to formulate a supply and demand plan with the maximum profit index.

【0008】ここで、「需給工程」には、製品や部品の
受注,発注,納入,出荷を行なう販売工程や生産工程な
どが含まれる他、サービスの受注,発注,納入,出荷を
行なうサービス提供工程も含まれる。製品や部品の発注
および納入は、製品や部品を生産または納入するために
必要な製品や部品の発注および納入の意である。また、
サービスの発注および納入はサービスを提供するために
必要な器材や人材などの発注および納入の意であり、サ
ービスの出荷はサービスの提供の意である。
[0008] The "supply and demand process" includes a sales process and a production process for receiving, ordering, delivering and shipping products and parts, and a service providing for receiving, ordering, delivering and shipping services. A process is also included. The ordering and delivery of products and parts means the ordering and delivery of products and parts necessary to produce or deliver products and parts. Also,
Ordering and delivering a service means ordering and delivering equipment and human resources necessary to provide a service, and shipping a service means providing a service.

【0009】こうした本発明の第1の需給計画立案装置
において、前記計画データ演算手段は、前記需給工程の
受注に対する出荷の余裕実績と該需給工程の余裕目標値
との偏差を該需給工程の発注として演算する手段である
ものとすることもできる。こうすれば、余裕を考慮した
需給計画を立案することができる。なお、ここで「余
裕」とは、製品や部品の受注,発注,納入,出荷を行な
う需給工程では在庫の意であり、サービスの受注,発
注,納入,出荷を行なう需給工程ではサービスを提供す
るために必要な器材や人材などの余裕の意である。この
態様の本発明の第1の需給計画立案装置において、前記
パラメータ変更手段は、前記所定のパラメータのひとつ
としての前記余裕目標値を変更する手段であるものとす
ることもできる。
In the first supply / demand planning apparatus according to the present invention, the plan data calculation means determines a deviation between a shipping margin record for the order in the supply / demand process and a margin target value in the supply / demand process. It is also possible to use means for calculating as In this way, it is possible to formulate a supply and demand plan that takes allowance into account. Here, the "margin" means inventory in a supply and demand process for receiving, ordering, delivering, and shipping products and parts, and provides a service in a demand and supply process for receiving, ordering, delivering, and shipping services. This means that there is room for the necessary equipment and human resources. In the first supply and demand planning device of the present invention in this aspect, the parameter changing means may be means for changing the margin target value as one of the predetermined parameters.

【0010】また、本発明の第1の需給計画立案装置に
おいて、前記データ記憶手段は、前記各需給工程の受注
可能範囲に関するデータを記憶する手段であり、前記パ
ラメータ変更手段は、前記所定のパラメータの一つとし
ての受注に関するパラメータを前記受注可能範囲内で変
更する手段であるものとすることもできる。こうすれ
ば、各需給工程の受注可能範囲内で需給計画を立案する
ことができる。
Further, in the first supply / demand planning apparatus of the present invention, the data storage means is means for storing data relating to an orderable range of each supply / demand process, and the parameter changing means is provided with the predetermined parameter. The parameter may be a means for changing a parameter relating to an order as one of them within the order acceptable range. In this way, a supply and demand plan can be made within the range of possible orders for each supply and demand process.

【0011】さらに、本発明の第1の需給計画立案装置
において、前記パラメータ変更手段は、前記受注の前倒
しおよび/または後倒しにより受注を変更設定するパラ
メータを変更する手段であるものとすることもできる。
こうすれば、受注の前倒しや後倒しを考慮した需給計画
を立案することができる。
Further, in the first supply and demand planning system according to the present invention, the parameter changing means may be a means for changing a parameter for changing and setting the order by moving the order forward and / or backward. it can.
In this way, it is possible to formulate a demand-supply plan that takes into account the advance or backward order.

【0012】本発明の需給計画立案用のプログラムは、
コンピュータを、各態様のいずれかの本発明の第1の需
給計画立案装置として機能させることを要旨とする。
[0012] The program for making a supply and demand plan of the present invention comprises:
The gist of the present invention is to make a computer function as the first supply and demand planning device of the present invention in any of the aspects.

【0013】即ち、本発明の需給計画立案用のプログラ
ムは、基本的に、コンピュータを、受注,発注,納入,
出荷を有する需給工程が少なくとも二つ以上接続されて
なるサプライチェーンにおける需給計画を立案する需給
計画立案装置であって、各需給工程における納入から出
荷までに要する費用および時間に関する費用時間データ
を記憶するデータ記憶手段と、前記サプライチェーンの
出荷側末端に位置する需給工程における受注計画を入力
する受注計画入力手段と、該入力された受注計画に基づ
いて所定のパラメータを用いて各需給工程の受注,発
注,納入,出荷の計画データを演算する計画データ演算
手段と、該演算された計画データと前記データ記憶手段
に記憶された費用時間データとに基づいて前記サプライ
チェーンの収益指標を演算する収益指標演算手段と、前
記所定のパラメータを変更するパラメータ変更手段と、
該変更された所定のパラメータを用いて前記計画データ
演算手段により演算された計画データのうち前記収益指
標演算手段により演算された収益指標が最大となる計画
データを需給計画として設定する需給計画設定手段とを
備える需給計画立案装置として機能させることを要旨と
する。
That is, the supply and demand planning program according to the present invention basically includes a computer for receiving orders, placing orders, delivering,
A supply and demand planning system for preparing a supply and demand plan in a supply chain in which at least two supply and demand processes having shipments are connected, and stores cost and time data relating to costs and times required from delivery to shipment in each supply and demand process. Data storage means, order plan input means for inputting an order plan in the supply and demand process located at the end of the supply chain on the shipping side, order receiving for each supply and demand process using predetermined parameters based on the input order plan, Planning data calculating means for calculating planning data for ordering, delivery, and shipping; and a profit index for calculating a profit index for the supply chain based on the calculated planning data and the cost time data stored in the data storage means. Calculating means, parameter changing means for changing the predetermined parameter,
Supply and demand plan setting means for setting, as a demand and supply plan, plan data in which the profit index calculated by the profit index calculation means is maximum among the plan data calculated by the plan data calculation means using the changed predetermined parameters. The gist is to function as a demand and supply planning device having the following.

【0014】この本発明の需給計画立案用のプログラム
によれば、コンピュータを本発明の第1の需給計画立案
装置として機能させることができる。
According to the supply and demand planning program of the present invention, the computer can function as the first supply and demand planning device of the present invention.

【0015】本発明の第1の記録媒体は、本発明の需給
計画立案用のプログラムをコンピュータ読み取り可能に
記録したことを要旨とする。
The first recording medium of the present invention is characterized in that the program for planning a supply and demand of the present invention is recorded in a computer-readable manner.

【0016】即ち、本発明の第1の記録媒体は、基本的
に、コンピュータを、受注,発注,納入,出荷を有する
需給工程が少なくとも二つ以上接続されてなるサプライ
チェーンにおける需給計画を立案する需給計画立案装置
であって、各需給工程における納入から出荷までに要す
る費用および時間に関する費用時間データを記憶するデ
ータ記憶手段と、前記サプライチェーンの出荷側末端に
位置する需給工程における受注計画を入力する受注計画
入力手段と、該入力された受注計画に基づいて所定のパ
ラメータを用いて各需給工程の受注,発注,納入,出荷
の計画データを演算する計画データ演算手段と、該演算
された計画データと前記データ記憶手段に記憶された費
用時間データとに基づいて前記サプライチェーンの収益
指標を演算する収益指標演算手段と、前記所定のパラメ
ータを変更するパラメータ変更手段と、該変更された所
定のパラメータを用いて前記計画データ演算手段により
演算された計画データのうち前記収益指標演算手段によ
り演算された収益指標が最大となる計画データを需給計
画として設定する需給計画設定手段とを備える需給計画
立案装置として機能させるコンピュータ読み取り可能な
プログラムを記録したことを要旨とする。
That is, the first recording medium of the present invention basically makes a computer prepare a supply and demand plan in a supply chain in which at least two supply and demand processes including order, order, delivery and shipment are connected. A demand and supply planning device, which stores data and time data relating to cost and time required from delivery to shipment in each supply and demand process, and an order plan in the supply and demand process located at the end of the supply chain on the shipping side. Means for inputting order plan to be executed, plan data calculating means for calculating plan data of order, order, delivery, and shipment of each supply and demand process using predetermined parameters based on the input order plan; A revenue index for calculating the supply chain profit index based on the data and the cost time data stored in the data storage means. Index calculating means, parameter changing means for changing the predetermined parameter, and the profit calculated by the profit index calculating means among the plan data calculated by the plan data calculating means using the changed predetermined parameter. The gist is to record a computer-readable program that functions as a supply and demand planning device including a supply and demand plan setting unit that sets a plan data with the largest index as a supply and demand plan.

【0017】この本発明の第1の記録媒体によれば、コ
ンピュータにプログラムを読み取らせることにより、コ
ンピュータを本発明の第1の需給計画立案装置として機
能させることができる。
According to the first recording medium of the present invention, by causing the computer to read the program, the computer can function as the first supply and demand planning device of the present invention.

【0018】本発明の需給計画立案方法は、受注,発
注,納入,出荷を有する需給工程が少なくとも二つ以上
接続されてなるサプライチェーンにおける需給計画を立
案する需給計画立案方法であって、(a) 前記サプラ
イチェーンの出荷側末端に位置する需給工程における受
注計画を入力し、(b)所定のパラメータを逐次変更し
て、前記入力された受注計画に基づいて各需給工程の受
注,発注,納入,出荷の計画データを演算すると共に該
演算された計画データと各需給工程における納入から出
荷までに要する費用および時間に関する費用時間データ
とに基づいて前記サプライチェーンの収益指標を演算
し、(c)前記所定のパラメータの変更に伴って逐次演
算された計画データのうち演算された収益指標が最大と
なる計画データを需給計画として立案することを要旨と
する。
The supply and demand planning method according to the present invention is a supply and demand planning method for preparing a supply and demand plan in a supply chain in which at least two supply and demand processes having orders, ordering, delivery and shipping are connected. Inputting an order plan in the supply and demand process located at the end of the supply chain on the shipping side, (b) sequentially changing predetermined parameters, and receiving orders, ordering, and delivering in each supply and demand process based on the input order plan. , Calculating shipping plan data and calculating the profit index of the supply chain based on the calculated planning data and the cost time data relating to the cost and time required from delivery to shipping in each supply and demand process, (c) The plan data, in which the calculated profit index is maximum among the plan data sequentially calculated in accordance with the change of the predetermined parameter, is calculated as The point is to make a plan.

【0019】この本発明の需給計画立案方法によれば、
所定のパラメータの変更に伴って逐次演算された計画デ
ータのうち演算された収益指標が最大となる計画データ
を需給計画として立案することができる。
According to the demand and supply planning method of the present invention,
Among the plan data sequentially calculated in accordance with the change of the predetermined parameter, the plan data having the maximum calculated profit index can be drafted as the supply and demand plan.

【0020】ここで、「需給工程」には、製品や部品の
受注,発注,納入,出荷を行なう販売工程や生産工程な
どが含まれる他、サービスの受注,発注,納入,出荷を
行なうサービス提供工程も含まれる。製品や部品の発注
および納入は、製品や部品を生産または納入するために
必要な製品や部品の発注および納入の意である。また、
サービスの発注および納入はサービスを提供するために
必要な器材や人材などの発注および納入の意であり、サ
ービスの出荷はサービスの提供の意である。
Here, the "supply and demand process" includes a sales process and a production process for receiving, ordering, delivering, and shipping products and parts, and a service providing for receiving, ordering, delivering, and shipping services. A process is also included. The ordering and delivery of products and parts means the ordering and delivery of products and parts necessary to produce or deliver products and parts. Also,
Ordering and delivering a service means ordering and delivering equipment and human resources necessary to provide a service, and shipping a service means providing a service.

【0021】こうした本発明の需給計画立案方法におい
て、前記ステップ(b)は、需給工程の受注に対する出
荷の余裕実績と該需給工程の余裕目標値との偏差を該需
給工程の発注として演算するステップであるものとする
こともできる。こうすれば、余裕を考慮した需給計画を
立案することができる。なお、ここで「余裕」とは、製
品や部品の受注,発注,納入,出荷を行なう需給工程で
は在庫の意であり、サービスの受注,発注,納入,出荷
を行なう需給工程ではサービスを提供するために必要な
器材や人材などの余裕の意である。この態様の本発明の
需給計画立案方法において、前記ステップ(b)は、前
記所定のパラメータのひとつとしての前記余裕目標値を
変更して演算するステップであるものとすることもでき
る。
In the supply and demand planning method according to the present invention, the step (b) is a step of calculating a deviation between the actual shipping margin for the order in the supply and demand process and the target margin of the supply and demand process as an order for the supply and demand process. May be used. In this way, it is possible to formulate a supply and demand plan that takes allowance into account. Here, the "margin" means inventory in a supply and demand process for receiving, ordering, delivering, and shipping products and parts, and provides a service in a demand and supply process for receiving, ordering, delivering, and shipping services. This means that there is room for the necessary equipment and human resources. In the supply and demand planning method of the present invention according to this aspect, the step (b) may be a step of changing and calculating the margin target value as one of the predetermined parameters.

【0022】また、本発明の需給計画立案方法におい
て、前記ステップ(b)は、前記所定のパラメータの一
つとしての受注に関するパラメータを各需給工程に設定
された受注可能範囲内で変更して演算するステップであ
るものとすることもできる。こうすれば、各需給工程の
受注可能範囲内で需給計画を立案することができる。
In the supply and demand planning method according to the present invention, the step (b) is performed by changing a parameter relating to an order as one of the predetermined parameters within an orderable range set for each supply and demand process. Step. In this way, a supply and demand plan can be made within the range of possible orders for each supply and demand process.

【0023】さらに、本発明の需給計画立案方法におい
て、前記ステップ(b)は、前記所定のパラメータの一
つとしての前記受注の前倒し量および/または後倒し量
に関するパラメータを変更して演算するステップである
ものとすることもできる。こうすれば、受注の前倒しや
後倒しを考慮した需給計画を立案することができる。
Further, in the supply and demand planning method according to the present invention, the step (b) is a step of changing and calculating a parameter relating to the advance amount and / or the backward amount of the order as one of the predetermined parameters. May be used. In this way, it is possible to formulate a demand-supply plan that takes into account the advance or backward order.

【0024】本発明の第2の需給計画立案装置は、製品
の受注を受けて製品または製品を生産する部材を発注す
ると共に該発注に応じて納入された製品を出荷または該
発注に応じて納入された部材を用いて製品を生産し出荷
する需給工程が少なくとも一つ以上並列および/または
直列に接続されてなるサプライチェーンにおける需給計
画を立案する需給計画立案装置であって、前記各需給工
程における製品または部品を納入してから製品を出荷す
るまでに要する費用および時間に関する工程データと、
該製品の出荷に伴う輸送費および輸送に要する時間に関
する輸送データと、前記各需給工程における製品および
部材の在庫目標である在庫目標値データとを記憶するデ
ータ記憶手段と、前記サプライチェーンの各需給工程に
おける製品および部材の在庫実績を入力する在庫実績入
力手段と、前記サプライチェーンの出荷側末端に位置す
る需給工程における製品の受注計画を入力する受注計画
入力手段と、前記各需給工程の受注,発注,納入,出荷
に関する計画データと、前記データ記憶手段に記憶され
た工程データおよび輸送データとに基づいて前記サプラ
イチェーンの収益指標を演算する収益指標演算手段と、
前記入力された受注計画および在庫実績と前記データ記
憶手段に記憶された在庫目標値データとに基づいて前記
収益指標が大きくなるよう前記各需給工程の受注,発
注,納入,出荷の計画データを設定する計画設定手段と
を備えることを要旨とする。
A second supply / demand planning apparatus according to the present invention receives an order for a product, orders the product or a member for producing the product, and ships or delivers the product delivered according to the order. And a supply and demand process for producing and shipping a product using the set members is connected in parallel and / or in series. Process data on the cost and time required from delivery of the product or part to shipment of the product,
Data storage means for storing transport data relating to transport costs and the time required for transport associated with the shipment of the product, and inventory target value data as inventory targets for products and components in each of the supply and demand processes, Inventory result input means for inputting the actual stock of products and parts in the process, order plan input means for inputting the order of the product in the supply and demand process located at the end of the supply chain on the shipping side, A profit index calculating means for calculating a profit index of the supply chain based on plan data relating to ordering, delivery and shipment, and process data and transportation data stored in the data storage means;
Based on the input order plan and actual stock data and the target inventory value data stored in the data storage means, set the order data of the order, order, delivery, and shipment in each of the supply and demand processes so as to increase the profit index. And a plan setting means for performing the setting.

【0025】この本発明の第2の需給計画立案装置で
は、受注計画入力手段により入力された受注計画と在庫
実績入力手段により入力された在庫実績とデータ記憶手
段に記憶された在庫目標値データとに基づいて、各需給
工程の受注,発注,納入,出荷に関する計画データとデ
ータ記憶手段に記憶された工程データおよび輸送データ
とに基づいて演算されるサプライチェーンの収益指標が
大きくなるよう各需給工程の受注,発注,納入,出荷の
計画データを設定する。この結果、収益指標の大きな需
給計画を立案することができる。
In the second supply / demand planning apparatus according to the present invention, the order plan input by the order input means, the actual stock input by the actual stock input means, and the inventory target value data stored in the data storage means. Each supply and demand process is designed to increase the profit index of the supply chain calculated based on the order data, order, delivery, and shipping plan data of each supply and demand process and the process data and transport data stored in the data storage means based on the data. Set the order data of order, order, delivery, and shipment. As a result, a supply and demand plan with a large profit index can be made.

【0026】ここで、「需給工程」には、製品の受注を
受けて製品を発注すると共に該発注に応じて納入された
製品を出荷するいわゆる販売工程と、製品の受注を受け
て製品を生産する部材を発注すると共に該発注に応じて
納入された部材を用いて製品を生産し出荷するいわゆる
製品生産工程とが含まれる。また、「製品」には、最終
製造製品の他に、部品や原料等も含まれる。「出荷」に
は他の需給工程への出荷の他、いわゆる販売工程におけ
る販売に伴う製品の引き渡しも含まれる。「工程デー
タ」には、製品や部品の生産に伴う材料費や人件費,設
備費,在庫として保管する保管費などの一部または全部
が含まれる他、製品や部品を生産するのに要する時間や
製品や部品を納入してから出荷するのに要する時間など
も含まれる。「輸送データ」には、製品や部品を輸送す
るのに必要な輸送費の他、輸送に要する時間なども含ま
れる。
Here, the "supply / demand process" includes a so-called sales process of receiving an order for a product, placing an order for the product and shipping the product delivered in accordance with the order, and producing the product in response to the order for the product. And a so-called product production process of producing and shipping a product using components delivered in accordance with the order. The “product” includes parts and raw materials in addition to the final manufactured product. “Shipment” includes not only shipment to another supply and demand process but also delivery of a product accompanying sale in a so-called sales process. "Process data" includes some or all of material costs, labor costs, equipment costs, storage costs for stocking, etc., associated with production of products and parts, and the time required to produce products and parts. And the time it takes to ship a product or part after delivery. The “transportation data” includes the transportation time required for transporting products and parts, as well as the time required for transportation.

【0027】こうした本発明の第2の需給計画立案装置
において、前記計画設定手段は、前記出荷側末端に位置
する需給工程の在庫実績から該需給工程の受注計画を減
じた値と該需給工程の在庫目標値との偏差を該需給工程
の発注量とすると共に該需給工程から発注可能な需給工
程について前記データ記憶手段に記憶された工程データ
と輸送データとに基づいて収益が多くなるよう前記発注
量を該発注可能な需給工程への発注として分配する手段
であるものとすることもできる。こうすれば、収益が多
くなるよう需給計画を立案することができる。
In the second supply / demand planning apparatus according to the present invention, the plan setting means includes a value obtained by subtracting an order plan of the supply / demand process from the actual stock of the supply / demand process located at the end of the shipping side. The deviation from the inventory target value is set as the order quantity of the supply and demand process, and the order is set so that the profit is increased based on the process data and the transport data stored in the data storage means for the supply and demand process that can be ordered from the supply and demand process. It may be a means for distributing the quantity as an order to the orderable supply and demand process. In this way, a supply and demand plan can be formulated to increase profits.

【0028】また、本発明の第2の需給計画立案装置に
おいて、前記データ記憶手段は前記各需給工程の製品の
受注可能範囲に関するデータをも記憶する手段であり、
該記憶された受注可能範囲に関するデータに基づいて前
記各需給工程の受注可能範囲を設定する受注可能範囲設
定手段と、該設定された受注可能範囲と前記計画設定手
段により設定された前記各需給工程の受注とに基づいて
前記各需給工程の適正を判定する適正判定手段とを備え
るものとすることもできる。こうすれば、各需給工程の
適正を判定することができる。この態様の本発明の需給
計画立案装置において、前記適正判定手段は、前記各需
給工程における処理能力の過不足を判定する手段である
ものとすることもできる。こうすれば、各需給工程の処
理能力の過不足を判定することができ、各需給工程の将
来における拡張または縮小計画に資することができる。
[0028] In the second supply and demand planning system of the present invention, the data storage means is also means for storing data relating to the orderable range of products in each of the supply and demand processes.
Orderable range setting means for setting an orderable range of each of the supply and demand processes based on the stored orderable range data; and each of the supply and demand processes set by the set orderable range and the plan setting means. And an adequacy determining means for determining adequacy of each of the supply and demand processes based on the order. This makes it possible to determine the suitability of each supply and demand process. In the supply-and-demand planning apparatus of this aspect of the present invention, the appropriateness determination means may be means for determining an excess or deficiency of the processing capacity in each of the supply and demand processes. In this way, it is possible to determine the excess or deficiency of the processing capacity of each supply and demand process, and to contribute to a future expansion or reduction plan of each supply and demand process.

【0029】本発明の第2の需給計画立案装置におい
て、前記データ記憶手段は前記各需給工程の製品の受注
可能範囲に関するデータをも記憶する手段であり、該記
憶された受注可能範囲に関するデータに基づいて前記各
需給工程の受注可能範囲を設定する受注可能範囲設定手
段と、前記計画設定手段により設定された前記各需給工
程の受注が前記受注可能範囲設定手段により対応する需
給工程に対して設定された受注可能範囲内にあるかを判
定する受注判定手段と、該受注判定手段が受注可能範囲
内にないと判定したとき、該判定された需給工程の受注
が対応する受注可能範囲になるよう前記計画設定手段に
より設定された計画データを変更する計画変更手段とを
備えるものとすることもできる。こうすれば、実施可能
な需給計画を立案することができる。
In the second supply and demand planning system according to the present invention, the data storage means is also means for storing data relating to the orderable range of the product in each of the supply and demand processes, and stores the data relating to the stored orderable range. Order receiving range setting means for setting the order receiving range of each supply and demand process based on the order setting of the demand and supply process set by the plan setting means for the corresponding demand and supply process by the order receiving range setting means. Order determination means for determining whether or not the received order is within the orderable range, and when the order determination means determines that the order is not within the orderable range, the determined order of the supply and demand process becomes the corresponding orderable range. A plan changing means for changing the plan data set by the plan setting means may be provided. In this way, a feasible supply and demand plan can be drafted.

【0030】この計画変更手段を備える態様の本発明の
第2の需給計画立案装置において、前記計画変更手段
は、前記判定された需給工程の受注の一部または全部を
該需給工程と同一の製品を出荷可能な需給工程の受注に
振り替えることにより前記計画データを変更する手段で
あるものとすることもできる。こうすれば、各需給工程
における受注を受注可能範囲内にすることができる。
[0030] In the second supply / demand planning apparatus according to the aspect of the present invention having the plan changing means, the plan changing means converts a part or all of the determined orders of the demand / supply process into the same product as the demand / supply process. May be a means for changing the plan data by transferring to the order of the supply and demand process that can be shipped. In this way, the order in each supply and demand process can be set within the allowable order range.

【0031】また、計画変更手段を備える態様の本発明
の第2の需給計画立案装置において、前記計画変更手段
は、前記判定された需給工程の受注の一部または全部を
前記受注計画に対して時間的に前倒しおよび/または後
倒しして受注することにより前記計画データを変更する
手段であるものとすることもできる。こうすれば、各需
給工程における受注を受注可能範囲内にすることができ
る。この態様の需給計画立案装置において、前記受注判
定手段は、前記計画変更手段により前記受注の一部また
は全部の時間的な前倒しおよび/または後倒しの受注が
行なわれたとき、該前倒しおよび/または後倒しされた
受注と前記計画設定手段により設定された受注との和が
前記受注可能範囲内にあるかを判定する手段であるもの
とすることもできる。
Further, in the second supply / demand planning apparatus of the present invention having a mode in which the order change means is provided, the plan change means transfers a part or all of the determined order of the supply and demand process to the order schedule. The plan data may be changed by receiving an order ahead of and / or backward in time. In this way, the order in each supply and demand process can be set within the allowable order range. In the supply-and-demand planning system according to this aspect, when the order change determination unit performs a partial or full time advance and / or late order of the order by the plan change unit, the order advance and / or The means for determining whether the sum of the delayed order and the order set by the plan setting means is within the orderable range.

【0032】あるいは、計画変更手段を備える態様の本
発明の第2の需給計画立案装置において、前記計画変更
手段は、前記各需給工程の少なくとも一部の在庫目標値
データを変更することにより前記判定された需給工程の
受注が対応する受注可能範囲内になるよう前記計画デー
タを変更する手段であるものとすることもできる。
Alternatively, in the second supply / demand planning apparatus according to the present invention having a mode in which the plan change means is provided, the plan change means makes the determination by changing stock target value data of at least a part of each of the supply and demand processes. It may be a means for changing the plan data so that the received order in the supply and demand process falls within the corresponding orderable range.

【0033】さらに、計画変更手段を備える態様の本発
明の第2の需給計画立案装置において、前記計画変更手
段は、前記各需給工程の受注を対応する受注可能範囲内
とすると共に前記収益指標が大きくなるよう前記計画デ
ータを変更する手段であるものとすることもできる。
Further, in the second supply / demand planning apparatus of the present invention having a mode in which the plan changing means is provided, the plan changing means sets the order of each of the demand and supply processes within a corresponding orderable range and the profit index is set. It may be a means for changing the plan data so as to increase the size.

【0034】また、本発明の第2の需給計画立案装置に
おいて、前記設定または変更された計画データと該計画
データに対して演算される前記収益指標とを出力する出
力手段を備えるものとすることもできる。
Further, the second supply / demand planning apparatus of the present invention is provided with output means for outputting the set or changed plan data and the profit index calculated on the plan data. Can also.

【0035】本発明の第2の記録媒体は、コンピュータ
を、製品の受注を受けて製品または製品を生産する部材
を発注すると共に該発注に応じて納入された製品を出荷
または該発注に応じて納入された部材を用いて製品を生
産し出荷する需給工程が少なくとも一つ以上並列および
/または直列に接続されてなるサプライチェーンにおけ
る需給計画を立案する需給計画立案装置であって、前記
各需給工程における製品または部品を納入してから製品
を出荷するまでに要する費用および時間に関する工程デ
ータと、該製品の出荷に伴う輸送費および輸送に要する
時間に関する輸送データと、前記各需給工程における製
品および部材の在庫目標である在庫目標値データとを記
憶するデータ記憶手段と、前記サプライチェーンの各需
給工程における製品および部材の在庫実績を入力する在
庫実績入力手段と、前記サプライチェーンの出荷側末端
に位置する需給工程における製品の受注計画を入力する
受注計画入力手段と、前記各需給工程の受注,発注,納
入,出荷に関する計画データと、前記データ記憶手段に
記憶された工程データおよび輸送データとに基づいて前
記サプライチェーンの収益指標を演算する収益指標演算
手段と、前記入力された受注計画および在庫実績と前記
データ記憶手段に記憶された在庫目標値データとに基づ
いて前記収益指標が大きくなるよう前記各需給工程の受
注,発注,納入,出荷の計画データを設定する計画設定
手段とを備える需給計画立案装置として機能させるコン
ピュータ読み取り可能なプログラムを記憶することを要
旨とする。
A second recording medium according to the present invention is a computer-readable storage medium for receiving an order for a product, ordering the product or a member for producing the product, and shipping the product delivered in accordance with the order or responding to the order. A supply and demand planning system for preparing a supply and demand plan in a supply chain in which at least one supply and demand process for producing and shipping a product using delivered members is connected in parallel and / or in series, wherein each of the supply and demand processes is provided. Process data relating to the cost and time required from the delivery of the product or part to the shipment of the product, the transportation data relating to the transportation cost and the time required for the transportation of the product, and the products and parts in each of the supply and demand processes Data storage means for storing inventory target value data, which is an inventory target of the supply chain, Stock input means for inputting stock results of components and parts, order input means for inputting a product order plan in the supply and demand process located at the end of the supply chain on the shipping side, order receiving, ordering and delivery for each of the demand and supply processes , A profit index calculating means for calculating a profit index of the supply chain based on plan data relating to shipping and process data and transportation data stored in the data storage means; A demand-supply-planning apparatus, comprising: plan setting means for setting plan data of order, order, delivery, and shipment in each of the demand-supply processes so that the profit index increases based on the inventory target value data stored in the data storage means. The gist of the present invention is to store a computer-readable program that functions as a computer.

【0036】この本発明の第2の記録媒体では、コンピ
ュータを前述の本発明の需給計画立案装置として機能さ
せることができる。即ち、コンピュータを収益指標の大
きな需給計画を立案することができる需給計画立案装置
として機能させることができる。なお、「需給工程」や
「製品」,「出荷」,「工程データ」,「輸送データ」
などの用語の意味は前述の本発明の需給計画立案装置の
場合と同様である。
In the second recording medium of the present invention, the computer can function as the above-described supply and demand planning device of the present invention. That is, the computer can be made to function as a demand and supply planning device that can make a supply and demand plan with a large profit index. In addition, "supply / demand process", "product", "shipment", "process data", "transportation data"
The meanings of terms such as are the same as in the case of the above-described supply and demand planning system of the present invention.

【0037】こうした本発明の第2の記録媒体におい
て、前記コンピュータを、前記データ記憶手段は前記各
需給工程の製品の受注可能範囲に関するデータをも記憶
する手段として機能すると共に、該記憶された受注可能
範囲に関するデータに基づいて前記各需給工程の受注可
能範囲を設定する受注可能範囲設定手段と、該設定され
た受注可能範囲と前記計画設定手段により設定された前
記各需給工程の受注とに基づいて前記各需給工程の適正
を判定する適正判定手段とを更に備える需給計画立案装
置として機能させるコンピュータ読み取り可能なプログ
ラムを記憶するものとすることもできる。こうすれば、
コンピュータを、各需給工程の適正を判定すると共に各
需給工程の将来における拡張または縮小計画に資するこ
とができる需給計画立案装置として機能させることがで
きる。
[0037] In the second recording medium of the present invention, the computer and the data storage means function as means for storing data relating to the orderable range of the product in each of the supply and demand processes. Orderable range setting means for setting the orderable range of each of the supply and demand processes based on the data on the possible range, based on the set orderable range and the order for each of the supply and demand processes set by the plan setting means In addition, a computer-readable program that functions as a demand-supply planning device further including appropriateness determination means for determining appropriateness of each supply-and-demand process can be stored. This way,
The computer can be made to function as a supply and demand planning device that can determine the suitability of each supply and demand process and contribute to a future expansion or reduction plan of each supply and demand process.

【0038】また、本発明の第2の記録媒体において、
前記コンピュータを、前記データ記憶手段は、前記各需
給工程の製品の受注可能範囲に関するデータをも記憶す
る手段として機能すると共に、該記憶された受注可能範
囲に関するデータに基づいて前記各需給工程の受注可能
範囲を設定する受注可能範囲設定手段と、前記計画設定
手段により設定された前記各需給工程の受注が前記受注
可能範囲設定手段により対応する需給工程に対して設定
された受注可能範囲内にあるかを判定する受注判定手段
と、該受注判定手段が受注可能範囲内にないと判定した
とき、該判定された需給工程の受注が対応する受注可能
範囲になるよう前記計画設定手段により設定された計画
データを変更する計画変更手段とを更に備える需給計画
立案装置として機能させるコンピュータ読み取り可能な
プログラムを記憶するものとすることもできる。こうす
れば、コンピュータを、実施可能な需給計画を立案する
ことができる需給計画立案装置として機能させることが
できる。
In the second recording medium of the present invention,
The computer, wherein the data storage means functions as means for also storing data relating to the orderable range of the product in each supply / demand process, and receives the order in each supply / demand process based on the stored data relating to the orderable range. An order-possible range setting means for setting a possible range, and an order for each of the supply and demand processes set by the plan setting means is within an order-possible range set for the corresponding supply and demand process by the orderable range setting means. When the order determining means determines that the order is not within the order-possible range, the plan setting means sets the order of the determined supply and demand process to be the corresponding order-possible range. A computer-readable program for functioning as a demand-supply planning device further comprising plan changing means for changing plan data; It can also be a shall. This allows the computer to function as a supply and demand planning device that can make an executable supply and demand plan.

【0039】[0039]

【発明の実施の形態】次に、本発明の実施の形態を実施
例を用いて説明する。図1は本発明の一実施例である需
給計画立案装置20の構成の概略を機能ブロックとして
示す構成図であり、図2は実施例の需給計画立案装置2
0のハード構成を例示する構成図である。
Next, embodiments of the present invention will be described with reference to examples. FIG. 1 is a configuration diagram showing, as functional blocks, an outline of the configuration of a supply and demand planning device 20 according to one embodiment of the present invention, and FIG.
FIG. 2 is a configuration diagram illustrating a hardware configuration of the H.0.

【0040】実施例の需給計画立案装置20は、図2に
示すように、ハード構成としては、中央演算処理装置と
してのCPU42を中心として構成された汎用のコンピ
ュータとして構成されている。CPU42に接続された
バス44には、キャッシュメモリ46やそのキャッシュ
コントローラ48,メインメモリ50,CRT54が接
続されたグラフィックスコントローラ52,キーボード
58やマウス60が接続されたキーボードインタフェー
ス56,ハードディスク64やフロッピー(登録商標)
ディスク66が接続された入出力インタフェース62な
どが接続されている。
As shown in FIG. 2, the demand / supply planning device 20 of the embodiment has a hardware configuration as a general-purpose computer mainly configured by a CPU 42 as a central processing unit. A bus 44 connected to the CPU 42 includes a cache memory 46 and its cache controller 48, a main memory 50, a graphics controller 52 connected to a CRT 54, a keyboard interface 56 connected to a keyboard 58 and a mouse 60, a hard disk 64 and a floppy disk. (Registered trademark)
The input / output interface 62 to which the disk 66 is connected is connected.

【0041】また、実施例の需給計画立案装置20は、
図1に示すように、機能ブロックとしては、各工程にお
ける各種データを記憶するデータ記憶部22と、各工程
の在庫実績値や販売工程の販売計画などを入力するデー
タ入力部24と、各工程の受注,発注,納入,出荷と各
工程の生産に伴う費用などに基づいて収益指標を演算す
る指標演算部26と、入力された在庫実績値や販売計画
と在庫目標値とに基づいて各工程の受注,発注,納入,
出荷の基本計画を立案する計画立案部28と、データ記
憶部22に記憶された受注範囲データに基づいて各工程
の受注可能範囲を設定する受注可能範囲設定部30と、
各工程に設定された受注可能範囲に基づいて基本計画の
実施可能性を判定すると共に実施可能に計画変更する計
画判定変更部32と、立案された基本計画や変更された
計画,計画の判定,計画の収益指標などを出力する計画
出力部34とを備える。こうした実施例の需給計画立案
装置20が備える各機能部は、前述した図2に例示する
ハード構成と後述するソフトウエアとが一体となって実
現されるものである。以下、各機能部についてハード構
成との対応を含めその機能を詳細に説明する。
Further, the demand and supply planning device 20 of the embodiment is
As shown in FIG. 1, the functional blocks include a data storage unit 22 for storing various data in each process, a data input unit 24 for inputting an actual stock value of each process, a sales plan of a sales process, and the like. An index calculator 26 that calculates a profit index based on orders received, ordered, delivered, shipped, and costs associated with the production of each process, and each process based on the input inventory actual value, sales plan, and inventory target value. Orders, orders, delivery,
A planning unit 28 for drafting a basic plan for shipment; an order receiving range setting unit 30 for setting an order receiving range for each process based on order receiving data stored in the data storage unit 22;
A plan determination change unit 32 that determines the feasibility of the basic plan based on the orderable range set for each process and changes the plan so that the plan is feasible. A plan output unit 34 for outputting a plan profit index and the like. Each functional unit included in the supply and demand planning apparatus 20 of this embodiment is realized by integrating the above-described hardware configuration illustrated in FIG. 2 and software described later. Hereinafter, the function of each functional unit including the correspondence with the hardware configuration will be described in detail.

【0042】データ記憶部22は、ハード構成としては
ハードディスク64などの外部記憶装置が相当する。デ
ータ記憶部22には、各工程における製品や部品を納入
してから製品を出荷するまでに要する費用、例えば製品
や部品1個当たりの材料費や人件費,設備費,在庫保管
費などの費用に関するデータや製品や部品を生産するの
に要する時間や保管時間などの時間に関するデータを含
む工程データ、製品や部品の出荷に伴う輸送費用や輸送
時間に関する輸送データ、各工程の在庫目標としての在
庫目標値データ、各工程の受注可能範囲を設定するため
の各工程における設備能力や人員構成,稼働可能範囲な
どに関する受注範囲データ、各製品の販売価格などの販
売データなどが記憶されている。
The data storage unit 22 corresponds to an external storage device such as a hard disk 64 as a hardware configuration. The data storage unit 22 stores costs required from the delivery of a product or part in each process to the shipment of the product, for example, costs such as material cost, labor cost, equipment cost, and inventory storage cost per product or part. Process data, including data related to the time required to produce products and parts and the storage time, etc., transportation data relating to the transportation costs and transportation time associated with the shipment of products and parts, and inventory as the inventory target for each process Target value data, order range data relating to facility capacity, personnel composition, operable range, and the like in each process for setting the order range in each process, sales data such as the selling price of each product, and the like are stored.

【0043】指標演算部26は、ハード構成としては、
処理プログラムを実行するCPU42やプログラムを記
憶するメインメモリ50などが相当する。指標演算部2
6は、計画立案部28や計画判定変更部32から要請さ
れたときに各工程に設定された受注,発注,納入,出荷
に関するデータとデータ記憶部22に記憶された工程デ
ータや輸送データに基づいて収益指標を演算し、要請さ
れた各部に演算した収益指標を返す。収益指標として
は、一般的に用いられている総資本利益率(ROA=
(収益−支出)/資産)を用いたり、利益を生み出す力
と利益を生み出すスピードの積として得られる指標(S
−ROA=(売上−生産投入材料費−業務費)/在庫分
材料費)などを定義して用いることもできる。また、こ
の他の収益指標を定義して用いてもよい。
The index calculator 26 has a hardware configuration as follows:
The CPU 42 that executes the processing program, the main memory 50 that stores the program, and the like correspond. Index calculator 2
6 is based on data on orders, orders, deliveries, and shipments set for each process when requested by the planning unit 28 and the plan determination change unit 32, and on the process data and transportation data stored in the data storage unit 22. To calculate the profit index and return the calculated profit index to each requested part. The return index is a commonly used return on total capital (ROA =
(Revenue-expenditure) / asset) or an index (S) obtained as the product of the power to generate profit and the speed to generate profit.
−ROA = (sales−production input material cost−business cost) / stock material cost) can be defined and used. Further, another profit index may be defined and used.

【0044】計画立案部28も、ハード構成としては、
処理プログラムを実行するCPU42やプログラムを記
憶するメインメモリ50などが相当する。計画立案部2
8は、データ入力部24により入力された在庫実績値と
販売計画とデータ記憶部22に記憶された在庫目標値デ
ータとに基づいて後述する処理プログラムに基づいて基
本計画、即ち各工程の受注,発注,納入,出荷を設定す
る。処理動作については後述する。
The planning unit 28 also has the following hardware configuration.
The CPU 42 that executes the processing program, the main memory 50 that stores the program, and the like correspond. Planning Dept. 2
Reference numeral 8 denotes a basic plan, that is, an order for each process, based on the actual stock value input by the data input unit 24, the sales plan, and the target stock value data stored in the data storage unit 22, based on a processing program described later. Set order, delivery, and shipment. The processing operation will be described later.

【0045】受注可能範囲設定部30も、ハード構成と
しては、処理プログラムを実行するCPU42やプログ
ラムを記憶するメインメモリ50などが相当する。受注
可能範囲設定部30は、データ記憶部22に記憶された
各工程における設備能力や人員構成,稼働可能範囲など
に関する受注範囲データに基づいて各工程の受注可能範
囲を設定する。受注可能範囲としては、各工程の定常処
理の下限値または下限値の近傍として得られる生産量と
定常処理の上限値または上限値の近傍として得られる生
産量とにより設定される範囲である。定常処理の下限値
は、例えば生産ラインのスピードを最も遅くして通常の
稼働日数駆動し、そのスピードに要求される人員を配置
して休日稼働や残業稼働を行なわないときの1ヶ月の生
産量またはこの生産量より若干大きな生産量として求め
ることができる。また、定常処理の上限値は、例えば生
産ラインのスピードを最も速くすると共にそのスピード
に要求される人員を配置し、休日稼働や残業稼働が最大
値となるフル稼働を行なったときの1ヶ月の生産量また
はこの生産量より若干小さな生産量として求めることが
できる。
The order-possible range setting section 30 also has a hardware configuration corresponding to the CPU 42 for executing the processing program, the main memory 50 for storing the program, and the like. The order receiving range setting unit 30 sets the order receiving range of each process based on the order receiving data on the facility capacity, the personnel configuration, the operable range, and the like in each process stored in the data storage unit 22. The order receiving range is a range set by the production amount obtained as the lower limit value or near the lower limit value of the steady processing and the production amount obtained near the upper or lower limit value of the steady processing in each process. The lower limit of the steady-state processing is, for example, the one-month production volume when the production line speed is the slowest and the normal number of working days is driven, and the staff required for the speed is allocated and the holiday operation or overtime operation is not performed. Alternatively, it can be obtained as a production amount slightly larger than this production amount. In addition, the upper limit of the regular processing is, for example, to maximize the speed of the production line and to allocate the personnel required for that speed, and to perform one month when full operation is performed when holiday operation and overtime operation become the maximum value. It can be obtained as a production amount or a production amount slightly smaller than this production amount.

【0046】計画判定変更部32も、ハード構成として
は、処理プログラムを実行するCPU42やプログラム
を記憶するメインメモリ50などが相当する。計画判定
変更部32は、受注可能範囲設定部30により各工程に
設定された受注可能範囲と計画立案部28により立案さ
れた基本計画との対比に基づいて各工程の処理能力の過
不足を判定したり、基本計画と各工程の処理能力との過
不足を受注の時間的な変更や工程間の変更,在庫初期値
の変更により実施可能な計画に変更する。
The hardware for the plan determination change unit 32 also corresponds to the CPU 42 for executing the processing program, the main memory 50 for storing the program, and the like. The plan determination change unit 32 determines the excess or deficiency of the processing capacity of each process based on a comparison between the orderable range set for each process by the orderable range setting unit 30 and the basic plan drafted by the planning unit 28. In addition, the excess or deficiency between the basic plan and the processing capacity of each process is changed to a plan that can be executed by changing the order time, changing between processes, or changing the initial stock value.

【0047】なお、データ入力部24はハード構成とし
てはキーボードインタフェース56やキーボード58,
マウス60が相当し、計画出力部34はハード構成とし
てはグラフィックスコントローラ52やCRT54が相
当する。
The data input section 24 has a hardware configuration such as a keyboard interface 56, a keyboard 58,
The mouse 60 is equivalent, and the plan output unit 34 is equivalent to the graphics controller 52 or the CRT 54 as a hardware configuration.

【0048】次に、こうして構成された需給計画立案装
置20の動作について説明する。図3は、実施例の需給
計画立案装置20により需給計画が立案される具体例と
してのサプライチェーンの一例を示す構成図である。具
体例のサプライチェーンは、図示するように、製品A,
B,C,Dをそれぞれ販売する二つの販売店としての販
売工程102,104と、製品A,B,C,Dの一部を
生産すると共に生産した製品A,B,C,Dの一部を二
つの販売工程102,104に出荷する製品生産工場と
しての製品生産工程112,114と、製品A,B,
C,Dを生産するための部品a1,b1,c1,d1の
一部を生産すると共に生産した部品a1,b1,c1,
d1の一部を製品生産工程112,114に出荷する部
品生産工場としての部品生産工程122,124と、製
品A,B,C,Dを生産するための部品a2,b2,c
2,d2の一部を製品生産工程112,114に出荷す
る部品供給会社としての部品供給工程126,128
と、部品a1,b1,c1,d1を生産するための部品
a11,a12,b11,b12,c11,c12,d
11,d12の一部を部品生産工程122,124に出
荷する部品供給会社としての部品供給工程132,13
4,136とから構成されている。なお、各工程内に括
弧書きされているアルファベットは、製品または部品を
表わし、各工程間の矢印は、発注に応じて出荷される様
子を示している。
Next, the operation of the demand / supply planning device 20 configured as described above will be described. FIG. 3 is a configuration diagram illustrating an example of a supply chain as a specific example in which a supply and demand plan is created by the supply and demand planning device 20 of the embodiment. As shown in the figure, the supply chain in the specific example includes products A,
Sales processes 102 and 104 as two stores for selling B, C and D, respectively, and a part of the products A, B, C and D while producing a part of the products A, B, C and D Production process 112, 114 as a product production factory for shipping the two products to two sales processes 102, 104, and products A, B,
Parts a1, b1, c1, and d1 for producing C and D are partially produced, and the produced parts a1, b1, and c1 are produced.
Parts production steps 122 and 124 as parts production factories for shipping a part of d1 to product production steps 112 and 114, and parts a2, b2 and c for producing products A, B, C and D
2 and d2, part supply processes 126 and 128 as part supply companies that ship part of the products to the product production processes 112 and 114.
And parts a11, a12, b11, b12, c11, c12, d for producing parts a1, b1, c1, d1.
Parts supply processes 132 and 13 as part supply companies that ship a part of 11 and d12 to the parts production processes 122 and 124.
4,136. The alphabets in parentheses in each process represent products or parts, and the arrows between the processes indicate how the product is shipped according to an order.

【0049】各工程は、基本的には、図4に模式図とし
て例示するように、製品の受注を受けて製品の生産に必
要な部品を発注し、この発注に応じて納入された部品を
用いて製品を生産し、生産した製品を出荷する需給工
程、具体的には製品生産工程112,114として表現
される。販売工程102,104は、部品の発注と部品
の納入を製品の発注と製品の納入に置き換えると共に生
産を行なわない場合を考えれば図4に例示する工程と同
一視することができ、部品生産工程122,124は、
製品の受注および製品の出荷を部品の受注および部品の
出荷に置き換えることにより同一視することができる。
また、部品供給工程126,128,132,134,
136は、生産や発注,納入を行なわないものとすれ
ば、同様に同一視することができる。
Basically, in each process, as shown in a schematic diagram in FIG. 4, a product order is received, parts required for product production are ordered, and parts delivered in accordance with the order are ordered. It is expressed as a supply and demand process of producing a product using the product and shipping the produced product, specifically, product production processes 112 and 114. The sales processes 102 and 104 can be considered the same as the process illustrated in FIG. 4 in consideration of the case where the ordering and delivery of parts are replaced with the ordering and delivery of products and the production is not performed. 122 and 124 are
Product orders and product shipments can be identified by replacing them with parts orders and component shipments.
Also, component supply steps 126, 128, 132, 134,
136 can be similarly identified if production, ordering, and delivery are not performed.

【0050】図3に例示する具体例のサプライチェーン
における製品A,Bに関するペトリネットモデルを図5
に例示する。この製品A,Bに関するペトリネットモデ
ルでは、工程並びにリソーセスを丸印で表わし、行為を
縦棒印で表わし、行為の所要時間を四角印で表わしてい
る。このペトリネットモデルでは、図示するように、販
売工程102,104としては各々製品販売プレースD
Sと販売トラジションDTと製品在庫プレースDIとを
備え、製品生産工程112,114としては各々製品在
庫プレースAI1と製品生産トラジションATと部品在
庫プレースAI2とを備える。製品生産トラジションA
Tには、設備や人員などを保有する設備人員保有プレー
スAHが設けられている。部品生産工程122,124
としては、製品生産工程112と同様に、各々部品在庫
プレースUI1と設備人員保有プレースUHが設けられ
た部品生産トラジションUTと部品在庫プレースUI2
とを備える。製品生産トラジションATや部品生産トラ
ジションUTに設けられた設備人員保有プレースAH,
UHには、企業全リソーセス保管プレースHからリソー
セス配分トラジションHTを介して設備や人員が配分さ
れるようになっており、この企業全リソーセス保管プレ
ースHは、リソーセス借用トラジションHLTを介して
リソーセス提供組織H1〜H3から設備や人員が借用で
きるようになっている。販売工程102,104の製品
在庫プレースDIと製品生産工程112,114の製品
在庫プレースAI1は輸送トラジションT1を介して接
続されており、製品生産工程112,114の部品在庫
プレースAI2と製品生産工程112の部品在庫プレー
スUI1や部品供給工程126,128は輸送トラジシ
ョンT2,T3により接続されている。また、部品生産
工程122,124の部品在庫プレースUI2と部品供
給工程132,134,136も輸送トラジションT4
により接続されている。
FIG. 5 shows a Petri net model for products A and B in the supply chain of the specific example illustrated in FIG.
An example is shown below. In the Petri net model for the products A and B, the process and the resources are represented by circles, the actions are represented by vertical bars, and the required times of the actions are represented by squares. In this Petri net model, as shown in FIG.
S, a sales transition DT, and a product inventory place DI, and the product production steps 112 and 114 each include a product inventory place AI1, a product production transition AT, and a parts inventory place AI2. Product Production Transition A
At T, a facility personnel holding place AH for retaining facilities, personnel, and the like is provided. Parts production process 122, 124
In the same manner as in the product production process 112, the parts production transition UT and the parts inventory place UI2 provided with the parts inventory place UI1 and the facility personnel holding place UH, respectively.
And Place AH, which is installed in equipment production transition AT and parts production transition UT
Equipment and personnel are allocated to the UH from the company-wide resource storage place H via the resource allocation transition HT. The company-wide resource storage place H is allocated to the resource via the resource borrowing transition HLT. Facilities and personnel can be borrowed from the providing organizations H1 to H3. The product inventory place DI of the sales processes 102 and 104 and the product inventory place AI1 of the product production processes 112 and 114 are connected via the transportation transition T1, and the parts inventory place AI2 of the product production processes 112 and 114 and the product production process. The parts inventory place UI1 112 and the parts supply steps 126 and 128 are connected by transportation transitions T2 and T3. In addition, the parts inventory process UI2 of the component production processes 122 and 124 and the component supply processes 132, 134 and 136 are also performed in the transportation transition T4.
Connected by

【0051】このペトリネットモデルは、次のように動
作する。販売工程102,104の製品販売プレースD
Sに販売計画を入力すると、販売トラジションDTが発
火して製品在庫プレースDIから販売計画に応じた製品
数量を表現したトークンが製品販売プレースDSに移さ
れる。次に製品在庫プレースDIに予め設定された在庫
目標値とトークンを移動した後の在庫とから販売工程1
02,104から製品生産工程112,114への発注
を演算する。製品生産工程112,114への発注は、
製品生産工程112,114の製品生産能力や収益指標
などを用いて演算されるが、その演算については後述す
る。製品生産工程112,114への発注が決定する
と、輸送トラジションT1が発火し、輸送所要時間TT
1経過後に製品生産工程112,114の製品在庫プレ
ースAI1から発注に応じたトークンが販売工程10
2,104の製品在庫プレースDIに移される。
This Petri net model operates as follows. Product sales place D for sales processes 102 and 104
When the sales plan is input to S, the sales transition DT fires and a token expressing the product quantity according to the sales plan is transferred from the product stock place DI to the product sales place DS. Next, a sales process 1 is performed based on the stock target value set in advance in the product stock place DI and the stock after the token is moved.
The order from 02, 104 to the product production process 112, 114 is calculated. The order for the product production process 112, 114
The calculation is performed using the product production capacity and the profit index of the product production processes 112 and 114, and the calculation will be described later. When the order for the product production processes 112 and 114 is determined, the transportation transition T1 is ignited, and the transportation required time TT
After one elapse, a token corresponding to the order is issued from the product inventory place AI1 of the product production processes 112 and 114 to the sales process 10
It is moved to the product inventory place DI of 2,104.

【0052】製品生産工程112,114の製品在庫プ
レースAI1から製品(トークン)が出荷(輸送)され
ると、このトークンの移動に伴って製品在庫プレースA
I1の在庫と製品在庫プレースAI1に予め設定された
在庫目標値との偏差を埋めるために製品生産トラジショ
ンATが発火する。なお、製品生産トラジションATの
発火には、部品在庫プレースAI2に製品を生産するの
に必要な部品の在庫の存在や設備人員保有プレースAH
に存在する設備や人員が稼働可能な状態にある点も発火
条件とされる。製品生産トラジションATが発火する
と、部品在庫プレースAI2の部品を表わすトークンが
減じられ、製品生産のための所要時間経過後に製品在庫
プレースAI1に生産された製品のトークンが発生す
る。部品生産工程122,124や部品供給工程12
6,128,132,134,136からの輸送トラジ
ションT2,T3,T4や、部品生産工程122,12
4における部品生産トラジションUTなどの動作につい
ても同様である。
When a product (token) is shipped (transported) from the product inventory place AI1 of the product production process 112, 114, the product inventory place A is moved with the movement of the token.
The product production transition AT is fired to fill the deviation between the inventory at I1 and the inventory target value preset in the product inventory place AI1. In addition, when the product production transition AT is ignited, the inventory of parts necessary for producing a product in the parts inventory place AI2 or the place AH where equipment personnel are held are stored.
The point where the equipment and personnel existing in the area are in an operable state is also considered to be the ignition condition. When the product production transition AT fires, the tokens representing the parts in the parts inventory place AI2 are reduced, and tokens of the products produced in the product inventory place AI1 are generated after a lapse of time required for product production. Parts production process 122, 124 and component supply process 12
6, 128, 132, 134, 136, transportation transitions T2, T3, T4, and parts production processes 122, 12
The same applies to the operation of the parts production transition UT and the like in No. 4.

【0053】製品Cに関するペトリネットモデルは、図
3のサプライチェーンにおける製品Cに関与する部分で
考えればよいから、図5のペトリネットモデルから製品
生産工程114,部品生産工程124,部品供給工程1
28,136を除いたものとなる。製品Dに関するペト
リネットモデルも同様に考えればよいから、図3のサプ
ライチェーンにおける製品Dに関与する部分で構成さ
れ、図5のペトリネットモデルから製品生産工程11
2,部品生産工程122,部品供給工程126,132
を除いたものとなる。
Since the Petri net model relating to the product C can be considered in the part related to the product C in the supply chain in FIG. 3, the product production process 114, the component production process 124, and the component supply process 1 are performed based on the Petri net model in FIG.
28 and 136 are excluded. Since the Petri net model for the product D can be considered in the same way, the Petri net model is composed of parts related to the product D in the supply chain in FIG.
2. Parts production step 122, parts supply steps 126 and 132
Is excluded.

【0054】次に、こうした各製品毎に作成されるペト
リネットモデルに対して具体的な需給計画を立案する様
子について説明する。図6は、実施例の需給計画立案装
置20により実行される需給計画立案処理ルーチンの一
例を示すフローチャートである。本ルーチンでは、需給
計画は月単位の計画として立案される。本ルーチンが実
行されると、実施例の需給計画立案装置20のCPU4
2は、まず、各工程の在庫実績を入力する処理を実行す
る(ステップS100)。この処理は、ペトリネットモ
デルの製品在庫プレースDIや製品在庫プレースAI
1,AI2,部品在庫プレースUI1,UI2の製品
A,B,C,Dに関するすべての在庫実績をキーボード
58などのデータ入力部24を介して入力されるよう在
庫実績入力画面をCRT54に表示し、操作者により在
庫実績が入力されると共に入力の終了が入力されるのを
待つ処理となる。在庫実績入力画面としては、例えばペ
トリネットモデルの各在庫プレースに対して取り扱う製
品または部品の在庫実績入力欄を設けると共に操作者に
入力すべき欄を知らしめるべくその在庫実績入力欄の色
を変える画面や、各在庫プレースの名称とその在庫プレ
ースに入力すべき在庫実績入力欄とを一覧表示する画面
などを用いることができる。なお、実施例では、キーボ
ード58により在庫実績を入力するものとしたが、各工
程に設置されたコンピュータなどから通信回線を介して
その工程の製品または部品の在庫実績を入力するものと
してもよい。
Next, a description will be given of how a specific supply and demand plan is prepared for the Petri net model created for each product. FIG. 6 is a flowchart illustrating an example of the supply and demand planning process routine executed by the supply and demand planning device 20 according to the embodiment. In this routine, the supply and demand plan is formulated as a monthly plan. When this routine is executed, the CPU 4 of the demand and supply planning device 20 of the embodiment
2 first executes a process of inputting the actual stock of each process (step S100). This processing is performed in the product inventory place DI and the product inventory place AI of the Petri net model.
1, an inventory result input screen is displayed on the CRT 54 so that all inventory results for the products A, B, C, and D in the parts inventory places UI1 and UI2 can be input through the data input unit 24 such as the keyboard 58; This is a process of waiting for the operator to input the actual stock and input the end of the input. As the stock result input screen, for example, a stock result input column for products or parts handled for each stock place of the Petri net model is provided, and the color of the stock result input column is changed so as to inform the operator of the field to be input. It is possible to use a screen, a screen displaying a list of names of each stock place and a stock result input field to be input to the stock place, or the like. In the embodiment, the actual stock is input using the keyboard 58. However, the actual stock of the product or component in that process may be input from a computer or the like installed in each process via a communication line.

【0055】各工程の在庫実績の入力処理を行なうと、
次に販売工程102,104の1ヶ月の販売計画を入力
する処理を実行する(ステップS102)。この処理
は、製品販売プレースDSで販売計画として各製品A,
B,C,Dの数量をキーボード58などのデータ入力部
24から入力される販売計画入力画面をCRT54に表
示し、操作者により販売計画が入力されると共に入力の
終了が入力されるのを待つ処理となる。販売計画入力画
面としては、例えばペトリネットモデルの各製品販売プ
レースDSに販売数量入力欄を設けると共に操作者に入
力すべき欄を知らしめるべくその販売数量入力欄の色を
変える画面や各製品販売プレースDSの名称とその製品
販売プレースDSに入力すべき販売計画入力欄とを一覧
表示する画面などを用いることもできる。なお、実施例
では、キーボード58により各製品販売プレースDSの
販売計画を入力するものとしたが、販売工程102,1
04に設置されたコンピュータなどから通信回線を介し
て各工程における販売計画を入力するものとしてもよ
い。
When input processing of the stock result of each process is performed,
Next, a process of inputting a one-month sales plan of the sales processes 102 and 104 is executed (step S102). This processing is performed as a sales plan for each product A,
A sales plan input screen in which the quantities of B, C, and D are input from the data input unit 24 such as the keyboard 58 is displayed on the CRT 54, and the operator waits for the input of the sales plan and the end of the input. Processing. As the sales plan input screen, for example, a sales quantity input field is provided in each product sales place DS of the Petri net model, and a screen for changing the color of the sales quantity input field so as to notify the operator of the field to be input, and each product sales A screen that lists the name of the place DS and a sales plan input field to be entered in the product sale place DS may be used. In the embodiment, the sales plan of each product sales place DS is input using the keyboard 58. However, the sales processes 102, 1
The sales plan in each step may be input via a communication line from a computer or the like installed in the computer 04.

【0056】販売計画が入力されると、続いて販売工程
102,104から製品生産工程112,114への各
製品毎の発注の総計(発注量)を各販売工程毎に演算す
る処理を実行する(ステップS104)。各販売工程の
発注量は、各販売工程に対して予めデータ記憶部22と
して機能するハードディスク64に記憶されている在庫
目標値データから入力された在庫実績と販売計画との偏
差を減じて求められる。
When the sales plan is input, a process of calculating the total order amount (order quantity) for each product from the sales processes 102 and 104 to the product production processes 112 and 114 is executed for each sales process. (Step S104). The order quantity of each sales process is obtained by subtracting the deviation between the actual stock input and the sales plan from the stock target value data stored in advance in the hard disk 64 functioning as the data storage unit 22 for each sales process. .

【0057】次に、製品生産工程112,114や部品
生産工程122,124の受注可能範囲を演算する処理
を行なう(ステップS106)。生産可能範囲は、前述
したようにデータ記憶部22に記憶された各生産工程に
おける設備能力や人員構成,稼働可能範囲などに関する
受注範囲データに基づいて各生産工程毎に演算される。
Next, a process for calculating the orderable range of the product production steps 112 and 114 and the parts production steps 122 and 124 is performed (step S106). The production possible range is calculated for each production process based on the order range data related to the equipment capacity, the personnel configuration, the operable range, and the like in each production process stored in the data storage unit 22 as described above.

【0058】そして、各販売工程102,104からの
各製品の発注量を初期分配する処理を行なう(ステップ
S108)。初期分配は、製品A,Bについては各製品
生産工程の受注可能範囲の上限値で各製品生産工程に比
例配分することによって行なわれる。製品Cについては
すべて製品生産工程112に対して発注され、製品Dに
ついてはすべて製品生産工程114に対して発注され
る。
Then, a process of initially distributing the order quantity of each product from each sales process 102, 104 is performed (step S108). The initial distribution is performed by allocating the products A and B in proportion to each product production process at the upper limit of the orderable range of each product production process. All the products C are ordered for the product production process 112, and all the products D are ordered for the product production process 114.

【0059】こうして各販売工程102,104からの
発注量の初期分配が行なわれると、この初期分配された
発注が各製品生産工程112,114で受注可能か否か
を判定する処理を実行する(ステップS110)。この
処理は、初期分配された発注が各製品生産工程112,
114に対して演算された受注可能範囲内に入っている
か否かを判定することにより行なう。
When the initial distribution of the order quantity from each of the sales processes 102 and 104 is performed in this way, a process for determining whether or not the initially distributed order can be ordered in each of the product production processes 112 and 114 is executed ( Step S110). In this process, the initially distributed order is assigned to each product production process 112,
The determination is made as to whether or not the order is within the orderable range calculated for 114.

【0060】この判定が否定的な結果のとき、即ち初期
分配された発注のいずれかが対応する製品生産工程の受
注可能範囲内にないときには、初期分配された発注の分
配調整を行なう処理を実行する(ステップS112)。
この処理は、図7に例示する分配調整処理ルーチンによ
り行なわれる。この分配調整処理ルーチンが実行される
と、CPU42は、調整1〜3を各々演算すると共に調
整1〜3を行なったときの収益指標をそれぞれ演算し
(ステップS200〜S210)、調整1〜3のうち収
益指標が最も大きな調整を選択して(ステップS21
2)、終了する。以下に調整1〜3の内容について説明
する。なお、説明の容易のため、実施例では、調整1〜
3のうち収益指標が最も大きな調整を選択するものとし
たが、調整1〜3を複合的に用いて収益指標が最大とな
る調整を求めて行なうものとしてもよい。
When the result of this determination is negative, that is, when any of the initially distributed orders is not within the range of possible orders for the corresponding product production process, a process of adjusting the distribution of the initially distributed orders is executed. (Step S112).
This processing is performed by the distribution adjustment processing routine illustrated in FIG. When the distribution adjustment processing routine is executed, the CPU 42 calculates the adjustments 1 to 3 and calculates the profit index when the adjustments 1 to 3 are performed (steps S200 to S210). The adjustment with the largest profit index is selected (step S21).
2), end. The contents of adjustments 1 to 3 will be described below. In addition, for the sake of simplicity of explanation, in the embodiment, adjustment 1 to adjustment 1
Although the adjustment with the largest profit index is selected from among the three, the adjustment that maximizes the profit index may be performed by using adjustments 1 to 3 in combination.

【0061】調整1は、収益が最大または損益が最小と
なるよう販売工程102,104からの発注のいずれも
が対応する製品生産工程112,114の受注可能範囲
内になるように調整するものである。いま、初期分配で
製品生産工程112では受注可能範囲を上回っており、
製品生産工程114では受注可能範囲を下回っていると
判定され、販売工程102から製品生産工程112への
製品Aについての発注を製品生産工程114に移動させ
ることにより調整する場合を考える。図8に調整1によ
る発注の調整を行なう際の収益または損益と調整との関
係の一例を示す。図中、直線Aは製品生産工程112か
ら製品生産工程114に製品Aの生産を移したときに生
じるコストと移動数との関係を例示するものであり、折
れ線Bは製品生産工程114の受注不足が解消される方
向に調整される際の移動数とそのうれしさを収益として
コスト表現したものとの関係を例示するものであり、折
れ線Cは製品生産工程112の受注過剰が解消される方
向に調整される際の移動数とそのうれしさを収益として
コスト表現したものとの関係を例示するものである。折
れ線Dは、直線A,折れ線B、折れ線Cの和を示すもの
である。この例では、製品生産工程112から製品生産
工程114へ発注をn個移動させたときに収益が最大と
なるから、n個移動する調整が調整1の結果として得ら
れる。なお、この例では、説明の容易のために製品Aに
ついての発注を移動させることにより調整するものとし
たが、実施例では製品Aについての発注の移動と製品B
についての発注の移動とを同時に行なって損益が最小ま
たは収益が最大となるよう調整するものとしている。も
とより、製品Bについての発注を移動させることにより
調整するものとしてもよい。
Adjustment 1 is to adjust both the orders from the sales processes 102 and 104 to be within the orderable range of the corresponding product production processes 112 and 114 so that the profit is maximized or the profit or loss is minimized. is there. Now, in the initial distribution, the product production process 112 has exceeded the range that can be ordered.
In the product production process 114, it is determined that the order is below the order-possible range, and a case is considered in which the order of the product A from the sales process 102 to the product production process 112 is adjusted by moving the order to the product production process 114. FIG. 8 shows an example of the relationship between the profit or profit and loss and the adjustment when the order is adjusted by the adjustment 1. In the figure, a straight line A illustrates the relationship between the cost and the number of transfers when the production of the product A is transferred from the product production process 112 to the product production process 114, and a broken line B indicates a shortage of orders in the product production process 114. Is an example of the relationship between the number of movements when the adjustment is made in the direction in which the order is eliminated and the joyfulness thereof expressed as cost as a profit. The line C indicates the direction in which the excess orders in the product production process 112 are eliminated. This is an example of the relationship between the number of movements at the time of adjustment and the joy of the movement expressed as cost. The broken line D indicates the sum of the straight line A, the broken line B, and the broken line C. In this example, the profit is maximized when n orders are transferred from the product production process 112 to the product production process 114, so that an adjustment of n products is obtained as a result of the adjustment 1. In this example, the order of the product A is adjusted by moving the order for ease of explanation. However, in this embodiment, the order of the product A is moved and the order of the product B is adjusted.
The order is moved at the same time and the profit or loss is adjusted to be the minimum or the profit to be the maximum. Of course, the adjustment may be made by moving the order of the product B.

【0062】調整2は、受注可能範囲内にない生産工程
への発注を損益が最小になるよう前月へ前倒ししたり、
後月へ後倒しして調整するものである。前倒しの際の損
益としては、前倒しによる在庫保管費用や前倒しにより
製品が古くなることによる値引きなどが含まれる。図9
に製品の在庫日数と値引きとの関係の一例を示す。実施
例では需給計画処理は月単位に行なわれるから、前月へ
の前倒しによる値引きは、通常の在庫日数に30日を加
えたものとして求められる。在庫日数と値引きとの関係
は、製品の種類や競争製品の有無などにより異なるもの
であり、それぞれの製品について求められるものであ
る。また、後倒しの際の損益としては、製品が直ぐに納
品できないことによって販売の機会を損失することによ
る損益や納品が遅れることに対する値引きなどが含まれ
る。図10に製品の納品待ち日数と販売の機会損失係数
との関係の一例を示す。機会損失係数は、機会の損失が
ない値0から機会の損失が100%の値1の範囲の係数
である。前述したように、実施例では需給計画処理は月
単位に行なわれるから、後月への後倒しによる機会損失
係数は、通常の納品待ち日数に30日を加えたものとし
て求められる。納品待ち日数と機会損失係数との関係
は、製品の種類や競争製品の有無などにより異なるもの
であり、それぞれの製品について求められるものであ
る。なお、前倒しについては、前月の需給計画から前倒
し可能範囲、即ち前月の生産工程における受注可能範囲
の上限値と受注計画値との偏差を求め、その範囲内の数
量とする制約が課せられる。
In the adjustment 2, orders for production processes that are not within the orderable range are moved forward to the previous month so that the profit and loss are minimized,
The adjustment is made by moving back to the next month. Profit and loss at the time of advancement includes inventory storage costs due to advancement and discounts due to aging of products due to advancement. FIG.
Fig. 7 shows an example of the relationship between the number of days of stock of a product and the discount. In the embodiment, since the supply and demand planning process is performed on a monthly basis, the discount by moving forward to the previous month is obtained by adding 30 days to the normal stock days. The relationship between the number of days in stock and the discount varies depending on the type of product, the presence or absence of competitive products, and the like, and is required for each product. In addition, the profit or loss at the time of postponement includes a profit or loss due to loss of a sales opportunity due to a failure to deliver the product immediately or a discount for delay of delivery. FIG. 10 shows an example of the relationship between the number of days to wait for product delivery and the sales opportunity loss coefficient. The opportunity loss coefficient is a coefficient in a range from a value 0 where there is no opportunity loss to a value 1 where the opportunity loss is 100%. As described above, in the embodiment, since the supply and demand planning process is performed on a monthly basis, the opportunity loss coefficient due to the delay in the later month is obtained by adding 30 days to the normal number of waiting days for delivery. The relationship between the number of waiting days for delivery and the opportunity loss coefficient differs depending on the type of product, the presence or absence of competitive products, and the like, and is required for each product. In addition, with regard to the advance, a constraint is imposed on a range that can be advanced from the supply and demand plan of the previous month, that is, a deviation between the upper limit of the order acceptable range in the production process of the previous month and the planned order, and the quantity within the range.

【0063】調整3は、販売工程102,104や製品
生産工程112,114などの製品や部品の在庫目標値
を補正することによって調整するものである。発注量
は、各工程における在庫目標値から在庫実績と販売計画
との偏差を減じて演算されるから、在庫目標値を下方修
正または上方修正することにより発注量を加減調整する
ことができる。在庫目標値を変更することにより生じる
損益は、在庫目標値を下方修正する場合には在庫不足に
より販売の機会を失うことに伴う損失などが含まれ、在
庫目標値を上方修正する場合には在庫保管費用や製品が
古くなることによる値引き費用などが含まれる。
Adjustment 3 is to adjust by correcting the inventory target value of products and parts in the sales processes 102 and 104 and the product production processes 112 and 114. Since the order quantity is calculated by subtracting the deviation between the actual stock and the sales plan from the stock target value in each process, the order quantity can be adjusted by adjusting the stock target value downward or upward. The profit and loss resulting from the change of the inventory target value includes the loss caused by losing sales opportunities due to lack of inventory when the inventory target value is revised downward, and the inventory loss when the inventory target value is revised upward. Includes storage costs and discount costs due to aging of the product.

【0064】図6の需給計画立案処理ルーチンに戻っ
て、ステップS110の判定が肯定的な結果のときやス
テップS112で発注の分配調整が行なわれた後には、
現在の計画値に基づいて収益指標を演算し(ステップS
114)、この収益指標が増大する方向に発注の分配調
整を行なうことができるか否かを判定する(ステップS
118)。ステップS110の判定が肯定的な結果のと
きには、発注は受注可能範囲の最大値に対する比例配分
による初期分配であるから、収益が最大になるように発
注は配分されていないし、発注の分配調整処理を行なっ
た場合でも受注可能範囲内にない生産工程に対する発注
の調整を行なったにすぎないから、初期分配で受注可能
範囲内の生産工程では収益が最大になるように発注が分
配されていないからである。この分配調整の可能性の判
定は、いずれかの製品の発注の一部を他の生産工程に移
動させた際の収益の増減や、発注の一部を前倒しまたは
後倒しすることによる損益と前月の計画における収益の
増加との偏差に基づく収益の増減に基づいて行なわれ
る。
Returning to the supply and demand planning process routine of FIG. 6, when the determination in step S110 is affirmative or after the distribution of the order is adjusted in step S112,
A profit index is calculated based on the current plan value (step S
114), it is determined whether or not the distribution of the order can be adjusted in a direction in which the profit index increases (step S).
118). If the determination in step S110 is affirmative, the order is the initial distribution by proportional distribution with respect to the maximum value of the orderable range, and therefore the order is not distributed so that the profit is maximized. Even if it is done, the order is only adjusted for the production process that is not within the orderable range, and the order is not distributed so that the profit is maximized in the production process within the orderable range by the initial distribution. is there. The determination of the possibility of this distribution adjustment is based on the change in revenue when a part of an order for one product is transferred to another production process, and the profit and loss and the previous month caused by moving part of the order forward or backward. Is performed based on the increase or decrease of the profit based on the deviation from the increase of the profit in the plan.

【0065】発注の分配調整が可能なときには、調整1
〜3と同様な手法を用いて収益指標が大きくなるよう発
注の分配調整を行ない(ステップS118)、分配調整
された計画値に基づいて収益指標を演算する(ステップ
S120)。そして、分配調整がなされた計画値とその
収益指標をCRT54などに出力して(ステップS12
2)、本ルーチンを終了する。
When order distribution adjustment is possible, adjustment 1
The distribution of the order is adjusted so as to increase the profit index by using the same method as in (1) to (3) (step S118), and the profit index is calculated based on the planned value that has been distributed (step S120). Then, the planned value and the profit index for which the distribution has been adjusted are output to the CRT 54 or the like (step S12).
2) This routine ends.

【0066】以上、販売工程102,104から製品生
産工程112,114への製品の発注に基づく処理を中
心に説明したが、製品生産工程112,114から部品
生産工程122,124への部品の発注に基づく処理も
同様に行なわれ、全体として収益指標が大きくなるよう
に調整された計画を立案し、その計画値と収益指標とを
CRT54などに出力する。
In the above, the processing based on the ordering of the products from the sales processes 102, 104 to the product production processes 112, 114 has been mainly described, but the ordering of the components from the product production processes 112, 114 to the component production processes 122, 124 has been described. Is performed in the same manner, a plan adjusted so as to increase the profit index as a whole is prepared, and the plan value and the profit index are output to the CRT 54 or the like.

【0067】以上説明した実施例の需給計画立案装置2
0によれば、実施可能で収益指標が大きな需給計画を立
案することができる。この結果、立案された需給計画を
実行することにより、各工程を円滑に効率的に機能させ
ることができると共に収益をより大きくすることができ
る。
The demand and supply planning system 2 of the embodiment described above
According to 0, it is possible to formulate a demand and supply plan that is feasible and has a large profit index. As a result, by executing the planned supply and demand plan, each process can function smoothly and efficiently, and the profit can be further increased.

【0068】実施例の需給計画立案装置20では、調整
1〜3のうち収益指標が最も大きな調整を選択するもの
としたが、調整1〜3のいずれかのうちの一つのみによ
り調整するものとしたり、調整1〜3のうちのいずれか
二つの調整の選択により或いは複合的に用いて調整する
ものとしてもよい。また、他の調整を行なうものとして
もよい。
In the supply and demand planning apparatus 20 of the embodiment, the adjustment with the largest profit index is selected from the adjustments 1 to 3, but the adjustment is made by only one of the adjustments 1 to 3. Alternatively, the adjustment may be performed by selecting any two of the adjustments 1 to 3 or by using a combination thereof. Other adjustments may be made.

【0069】実施例の需給計画立案装置20では、販売
工程102,104から製品生産工程112,114へ
の発注の初期分配を製品生産工程112,114の受注
可能範囲の上限値の比例配分としたが、製品コスト(製
品の生産に関する費用と輸送費の和)が最小となる配分
を初期分配とするものとしてもよい。例えば、製品A,
Bの製品生産工程112から販売工程102への輸送費
が製品生産工程114から販売工程102への輸送費よ
り小さく、製品A,Bの製品生産工程114から販売工
程104への輸送費が製品生産工程112から販売工程
104への輸送費より小さい場合で、製品生産工程11
2における製品A,Bの生産に関する費用と製品生産工
程114における製品A,Bの生産に関する費用とが同
じである場合、初期分配は、販売工程102の製品A,
Bの発注はすべて製品生産工程112に分配され、販売
工程104の製品A,Bの発注はすべて製品生産工程1
14に分配されることになる。そして、この初期分配に
対して各生産工程における受注可能範囲との関係で発注
の分配調整を行なえばよい。
In the supply / demand planning apparatus 20 of the embodiment, the initial distribution of orders from the sales processes 102 and 104 to the product production processes 112 and 114 is set as a proportional distribution of the upper limit of the orderable range of the product production processes 112 and 114. However, the distribution that minimizes the product cost (the sum of the cost related to the production of the product and the transportation cost) may be the initial distribution. For example, product A,
The transportation cost from the product production process 112 of the B to the sales process 102 is smaller than the transportation cost from the product production process 114 to the sales process 102, and the transportation cost of the products A and B from the product production process 114 to the sales process 104 is the product production. If the transportation cost from the process 112 to the sales process 104 is smaller, the product production process 11
2 is the same as the cost of producing the products A and B in the product production process 114, the initial distribution is the product A and B in the sales process 102.
All orders of B are distributed to the product production process 112, and all orders of products A and B in the sales process 104 are product production process 1
14 will be distributed. Then, the distribution of the order may be adjusted in relation to the initial distribution in relation to the orderable range in each production process.

【0070】また、販売工程102,104から製品生
産工程112,114への発注の初期分配を販売工程1
02,104からの発注に対して製品生産工程112,
114から納入するまでに要する時間としてのリードタ
イムを用いて分配するものとしてもよい。例えば、販売
工程Aからの発注に対して製品生産工程B,Cから納入
される場合について考えれば図11に示すようになる。
即ち、販売工程Aからの発注に対して製品生産工程B,
Cから製品が納入されるまでに要する時間としてのリー
ドタイムt1、t2を計算し、このリードタイムt1,
t2だけ製品生産工程B,Cの計画月を販売工程Aの計
画月からズラし、販売工程Aの各計画月Anに設定され
た分配比αnを用いて発注量Xnを製品生産工程B,C
に分配し、分配された発注量を同時刻の計画月Anから
のリードタイムt1,t2による比例配分として次式
(1)および式(2)により各製品生産工程の計画月B
n,Cnの受注量Yn,Znとして計算するのである。
こうすれば、受注から納入までに要する時間としてのリ
ードタイムを考慮してより適切な発注量の分配を行なう
ことができる。この場合、分配比αnはパラメータであ
るから、受注可能範囲などにより変更することができ、
収益指標が最大となる分配比αnを求めればよい。な
お、こうしたリードタイムを用いる分配は、販売工程の
発注に対する初期分配に限られず、製品生産工程の発注
に対する分配や部品生産工程の発注にも適用することが
できる。
The initial distribution of orders from the sales processes 102 and 104 to the product production processes 112 and 114 is based on the sales process 1
02, 104, the product production process 112,
The distribution may be performed using a lead time as a time required from 114 to delivery. For example, FIG. 11 shows a case where an order from the sales process A is delivered from the product production processes B and C.
That is, in response to an order from the sales process A, the product production process B,
Calculate lead times t1 and t2 as time required until the product is delivered from C, and calculate lead times t1 and t2.
At t2, the planned months of the product production processes B and C are shifted from the planned month of the sales process A, and the order quantity Xn is calculated using the distribution ratio αn set for each planned month An of the sales process A.
And the distributed order quantity is set as a proportional distribution based on the lead times t1 and t2 from the planned month An at the same time, according to the following formulas (1) and (2).
It is calculated as the order quantities Yn and Zn of n and Cn.
In this way, it is possible to more appropriately distribute the order quantity in consideration of the lead time required from the order receipt to the delivery. In this case, since the distribution ratio αn is a parameter, the distribution ratio αn can be changed according to the orderable range and the like.
What is necessary is just to find the distribution ratio αn that maximizes the profit index. Note that the distribution using such a lead time is not limited to the initial distribution for the order of the sales process, but can be applied to the distribution for the order of the product production process and the order of the component production process.

【0071】[0071]

【数1】 (Equation 1)

【0072】実施例の需給計画立案装置20は、また、
現状の各工程の適正を判定する判定装置としても機能す
る。図12は、各工程の適正を判定する際に実行される
工程適正判定処理ルーチンの一例を示すフローチャート
である。本ルーチンでは、需給計画の立案と同様に月単
位の計画を用いて各工程の判定が行なわれる。本ルーチ
ンが実行されると、実施例の需給計画立案装置20のC
PU42は、まず、図6の需給計画立案処理ルーチンの
ステップS100〜S104の処理と同一の処理、即ち
各工程の在庫実績を入力する処理(ステップS300)
と、販売工程102,104の1ヶ月の販売計画を入力
する処理(ステップS302)と、販売工程102,1
04から製品生産工程112,114への各製品毎の発
注の総計(発注量)を各販売工程毎に演算する処理(ス
テップS304)とを実行する。
The demand / supply planning device 20 of the embodiment also
It also functions as a determination device that determines the appropriateness of each current process. FIG. 12 is a flowchart illustrating an example of a process suitability determination process routine executed when determining the suitability of each process. In this routine, determination of each process is performed using a monthly plan as in the case of drafting a supply and demand plan. When this routine is executed, C of the supply and demand planning device 20 of the embodiment is
The PU 42 firstly performs the same processing as the processing of steps S100 to S104 of the supply and demand plan planning processing routine of FIG. 6, that is, the processing of inputting the actual stock of each process (step S300).
Inputting a one-month sales plan of the sales processes 102 and 104 (step S302);
A process of calculating the total order quantity (order quantity) for each product from 04 to the product production processes 112 and 114 for each sales process (step S304).

【0073】次に、各販売工程102,104からの各
製品の発注量を製品コスト(製品の生産に関する費用と
輸送費の和)が最小になるよう分配すると共に(ステッ
プS306)、各生産工程の受注可能範囲を演算する
(ステップS308)。製品コストが最小となる発注量
の配分と受注可能範囲の演算については前述した。そし
て、各生産工程への発注と各生産工程の受注可能範囲と
を含むリストを作成し(ステップS310)、リストを
CRT54などに出力して(ステップS312)、本ル
ーチンを終了する。
Next, the order quantity of each product from each of the sales processes 102 and 104 is distributed so that the product cost (the sum of the cost relating to the production of the product and the transportation cost) is minimized (step S306). Is calculated (step S308). The allocation of the order quantity and the calculation of the orderable range that minimize the product cost have been described above. Then, a list including an order for each production process and an orderable range of each production process is created (step S310), and the list is output to the CRT 54 or the like (step S312), and this routine ends.

【0074】このリストは、製品コストが最小となる発
注量の配分が受注可能範囲内にあるか否かにより、その
生産工程の処理能力の過不足を判断することができる。
こうしたリストを数ヶ月或いは数年分考慮することによ
り、各生産工程に要求される処理能力の推移を知ること
ができ、各生産工程の長期的な見地から見た整備計画に
資することができる。
This list can be used to determine whether the processing capacity of the production process is sufficient or not, based on whether or not the distribution of the order quantity that minimizes the product cost is within the order receiving range.
By considering such a list for several months or years, it is possible to know the transition of the processing capacity required for each production process, and to contribute to a maintenance plan from a long-term viewpoint of each production process.

【0075】なお、実施例の需給計画立案装置20で
は、製品A,B,C,Dについての具体例は示さなかっ
たが、生産工程により生産可能な製品であれば如何なる
製品であってもよいのは言うまでもない。
Although the supply-and-demand planning apparatus 20 of the embodiment does not show a specific example of the products A, B, C and D, any product may be used as long as it can be produced in the production process. Needless to say.

【0076】本発明の実施の形態の一つとして製品や部
品のサプライチェーンに関する需給計画を立案する需給
計画立案装置20について説明したが、サービスのサプ
ライチェーンに関する需給計画を立案する需給計画立案
装置に適用するものとしてもよい。サービスには、製品
や部品の修理などの物品を介在するものや人的なサービ
スの提供などのように物品を介在しないものも含まれ
る。サービスの発注や納入は、サービスを提供するため
に必要な器材や人材などの発注や納入として考えること
ができる。また、サービスの出荷は、サービスの提供と
して考えることができる。製品や部品のサプライチェー
ンにおける在庫は、サービスのサプライチェーンでは、
その工程においてサービスを提供するために必要な器材
や人材などの余裕として考えることができる。
As one of the embodiments of the present invention, the supply and demand planning apparatus 20 for preparing a supply and demand plan relating to the supply chain of products and parts has been described. It may be applied. The services include those that intervene with goods such as repair of products and parts and those that do not intervene with goods such as provision of human services. The ordering and delivery of a service can be considered as the ordering and delivery of equipment and human resources necessary for providing the service. Also, shipping a service can be considered as providing a service. The inventory of products and parts in the supply chain is
It can be considered as a margin for equipment and human resources necessary for providing services in the process.

【0077】また、本発明の実施の形態の一つとして実
施例の需給計画立案装置20について説明したが、本発
明の他の実施の形態の一つとして、コンピュータを実施
例の需給計画立案装置20またはその変形例の装置とし
て機能させるプログラムやこのプログラムをコンピュー
タ読み取り可能に記憶した記録媒体とすることもでき
る。記録媒体としては、CD−ROMやフロッピーディ
スク,DVD−ROMなど種々のものが含まれる。ま
た、本発明の他の実施の形態の一つとして、コンピュー
タを実施例の需給計画立案装置20またはその変形例の
装置として機能させるコンピュータ読み取り可能なプロ
グラム伝送媒体とすることもできる。
Although the supply and demand planning apparatus 20 according to the embodiment has been described as one embodiment of the present invention, a computer according to another embodiment of the present invention uses a computer as the embodiment. The program may function as the device of the embodiment 20 or a modification thereof, or may be a computer-readable recording medium storing the program. Various types of recording media such as a CD-ROM, a floppy disk, and a DVD-ROM are included. Further, as one of other embodiments of the present invention, a computer-readable program transmission medium that causes a computer to function as the supply and demand planning device 20 of the example or the device of the modification thereof may be used.

【0078】以上、本発明の実施の形態について実施例
を用いて説明したが、本発明はこうした実施例に何等限
定されるものではなく、本発明の要旨を逸脱しない範囲
内において、種々なる形態で実施し得ることは勿論であ
る。
Although the embodiments of the present invention have been described with reference to the embodiments, the present invention is not limited to these embodiments, and various embodiments may be made without departing from the gist of the present invention. Of course, it can be carried out.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の一実施例である需給計画立案装置2
0の構成の概略を機能ブロックとして示す構成図であ
る。
FIG. 1 is a supply and demand planning system 2 according to an embodiment of the present invention.
FIG. 3 is a configuration diagram showing an outline of the configuration of a 0 as a functional block.

【図2】 実施例の需給計画立案装置20のハード構成
を例示する構成図である。
FIG. 2 is a configuration diagram illustrating a hardware configuration of a demand-supply planning device according to an embodiment;

【図3】 実施例の需給計画立案装置20により需給計
画が立案される具体例としてのサプライチェーンの一例
を示す構成図である。
FIG. 3 is a configuration diagram illustrating an example of a supply chain as a specific example in which a supply and demand plan is created by the supply and demand planning device 20 of the embodiment.

【図4】 需給工程を模式的に示す模式図である。FIG. 4 is a schematic diagram schematically showing a supply and demand process.

【図5】 具体例としてのサプライチェーンにおける製
品A,Bに関するペトリネットモデルを例示する説明図
である。
FIG. 5 is an explanatory diagram illustrating a Petri net model regarding products A and B in a supply chain as a specific example.

【図6】 実施例の需給計画立案装置20で実行される
需給計画立案処理ルーチンの一例を示すフローチャート
である。
FIG. 6 is a flowchart illustrating an example of a supply and demand planning process routine executed by the supply and demand planning device 20 according to the embodiment;

【図7】 実施例の需給計画立案装置20で実行される
分配調整処理ルーチンの一例を示すフローチャートであ
る。
FIG. 7 is a flowchart illustrating an example of a distribution adjustment processing routine executed by the supply and demand planning device 20 according to the embodiment;

【図8】 調整1による発注の調整を行なう際の収益ま
たは損益と調整との関係の一例を示す説明図である。
FIG. 8 is an explanatory diagram showing an example of the relationship between the profit or profit and loss and the adjustment when the order is adjusted by the adjustment 1.

【図9】 製品の在庫日数と値引きとの関係の一例を示
す説明図である。
FIG. 9 is an explanatory diagram illustrating an example of a relationship between the number of days of stock of a product and a discount.

【図10】 製品の納品待ち日数と販売の機会損失係数
との関係の一例を示す説明図である。
FIG. 10 is an explanatory diagram showing an example of the relationship between the number of waiting days for delivery of a product and a sales opportunity loss coefficient.

【図11】 販売工程Aの計画月毎の発注量Xnに対し
て二つの製品生産工程B,Cの受注量を計画している様
子を例示する説明図である。
FIG. 11 is an explanatory diagram exemplifying a situation in which an order quantity of two product production processes B and C is planned for an order quantity Xn of a sales process A for each planned month.

【図12】 各工程の適正を判定する際に実行される工
程適正判定処理ルーチンの一例を示すフローチャートで
ある。
FIG. 12 is a flowchart illustrating an example of a process appropriateness determination processing routine executed when determining appropriateness of each process.

【符号の説明】[Explanation of symbols]

20 需給計画立案装置、22 データ記憶部、24
データ入力部、26指標演算部、28 計画立案部、3
0 受注可能範囲設定部、32 計画判定変更部、34
計画出力部、42 CPU、44 バス、46 キャ
ッシュメモリ、48 キャッシュコントローラ、50
メインメモリ、52 グラフィックスコントローラ、5
4 CRT、56 キーボードインタフェース、58
キーボード、60 マウス、62 入出力インタフェー
ス、64 ハードディスク、66 フロッピーディス
ク、102,104 販売工程、112,114 製品
生産工程、122,124 部品生産工程、126,1
28,132,134,136 部品供給工程。
20 supply and demand planning device, 22 data storage unit, 24
Data input unit, 26 index calculation unit, 28 planning unit, 3
0 Orderable range setting part, 32 Plan judgment change part, 34
Planning output unit, 42 CPU, 44 bus, 46 cache memory, 48 cache controller, 50
Main memory, 52 graphics controller, 5
4 CRT, 56 keyboard interface, 58
Keyboard, 60 mouse, 62 input / output interface, 64 hard disk, 66 floppy disk, 102, 104 sales process, 112, 114 product production process, 122, 124 parts production process, 126, 1
28, 132, 134, 136 Parts supply process.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 小島 英嗣 愛知県豊田市トヨタ町1番地 トヨタ自動 車株式会社内 (72)発明者 鈴木 浩佳 愛知県豊田市トヨタ町1番地 トヨタ自動 車株式会社内 (72)発明者 音窪 健太郎 愛知県豊田市トヨタ町1番地 トヨタ自動 車株式会社内 (72)発明者 藤吉 速開 愛知県豊田市トヨタ町1番地 トヨタ自動 車株式会社内 (72)発明者 中村 敏弘 愛知県豊田市トヨタ町1番地 トヨタ自動 車株式会社内 Fターム(参考) 3F022 AA05 MM02 MM03 MM11 MM21 5B049 AA00 BB07 CC05 CC24 CC28 DD05 EE01 EE31  ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Eiji Kojima 1 Toyota Town, Toyota City, Aichi Prefecture Inside Toyota Motor Corporation (72) Inventor Hiroyoshi Suzuki 1 Toyota Town, Toyota City, Aichi Prefecture Inside Toyota Motor Corporation (72) Inventor Kentaro Okubo 1 Toyota Town, Toyota City, Aichi Prefecture Inside Toyota Motor Corporation (72) Inventor Hayashi 1 Toyota Town, Toyota City, Aichi Prefecture Toyota Motor Corporation (72) Inventor Nakamura Toshihiro 1st Toyota Town, Toyota City, Aichi Prefecture F-term in Toyota Motor Corporation (reference) 3F022 AA05 MM02 MM03 MM11 MM21 5B049 AA00 BB07 CC05 CC24 CC28 DD05 EE01 EE31

Claims (30)

【特許請求の範囲】[Claims] 【請求項1】 受注,発注,納入,出荷を有する需給工
程が少なくとも二つ以上接続されてなるサプライチェー
ンにおける需給計画を立案する需給計画立案装置であっ
て、 各需給工程における納入から出荷までに要する費用およ
び時間に関する費用時間データを記憶するデータ記憶手
段と、 前記サプライチェーンの出荷側末端に位置する需給工程
における受注計画を入力する受注計画入力手段と、 該入力された受注計画に基づいて所定のパラメータを用
いて各需給工程の受注,発注,納入,出荷の計画データ
を演算する計画データ演算手段と、 該演算された計画データと前記データ記憶手段に記憶さ
れた費用時間データとに基づいて前記サプライチェーン
の収益指標を演算する収益指標演算手段と、 前記所定のパラメータを変更するパラメータ変更手段
と、 該変更された所定のパラメータを用いて前記計画データ
演算手段により演算された計画データのうち前記収益指
標演算手段により演算された収益指標が最大となる計画
データを需給計画として設定する需給計画設定手段とを
備える需給計画立案装置。
1. A supply-and-demand planning system for planning a supply-and-demand plan in a supply chain in which at least two supply-and-demand processes having an order, an order, a delivery and a shipment are connected. Data storage means for storing cost time data relating to required costs and time; order plan input means for inputting an order plan in a supply and demand process located at the end of the supply chain on the shipping side; and a predetermined order based on the input order plan. Planning data calculation means for calculating planning data of order, order, delivery, and shipping for each supply and demand process using the parameters of the following: based on the calculated planning data and the cost time data stored in the data storage means A profit index calculating means for calculating the supply chain profit index; and a parameter for changing the predetermined parameter. Data changing means; and setting, as a demand-supply plan, plan data in which the profit index calculated by the profit index calculating means among the plan data calculated by the plan data calculating means using the changed predetermined parameters is maximum. And a supply and demand plan setting device.
【請求項2】 前記需給工程は、製品および/または部
品の受注,発注,納入,出荷を行なう工程である請求項
1記載の需給計画立案装置。
2. The supply and demand planning system according to claim 1, wherein said supply and demand step is a step of receiving, ordering, delivering, and shipping products and / or parts.
【請求項3】 前記需給工程は、サービスの受注,発
注,納入,出荷を行なう工程である請求項1記載の需給
計画立案装置。
3. The supply and demand planning system according to claim 1, wherein the supply and demand process is a process of receiving, ordering, ordering, delivering and shipping services.
【請求項4】 前記計画データ演算手段は、前記需給工
程の受注に対する出荷の余裕実績と該需給工程の余裕目
標値との偏差を該需給工程の発注として演算する手段で
ある請求項1ないし3いずれか記載の需給計画立案装
置。
4. The planning data calculating means is means for calculating a deviation between an actual shipping margin with respect to an order received in the supply and demand process and a margin target value of the demand and supply process as an order for the demand and supply process. The demand / supply planning device according to any of the above.
【請求項5】 前記パラメータ変更手段は、前記所定の
パラメータのひとつとしての前記余裕目標値を変更する
手段である請求項4記載の需給計画立案装置。
5. The supply and demand planning system according to claim 4, wherein said parameter changing means is means for changing said margin target value as one of said predetermined parameters.
【請求項6】 請求項1ないし5いずれか記載の需給計
画立案装置であって、 前記データ記憶手段は、前記各需給工程の受注可能範囲
に関するデータを記憶する手段であり、 前記パラメータ変更手段は、前記所定のパラメータの一
つとしての受注に関するパラメータを前記受注可能範囲
内で変更する手段である需給計画立案装置。
6. The supply and demand plan planning device according to claim 1, wherein said data storage means is means for storing data on an orderable range of each of said supply and demand processes, and said parameter changing means is A demand and supply plan planning device, which is a means for changing a parameter relating to an order as one of the predetermined parameters within the order acceptable range.
【請求項7】 前記パラメータ変更手段は、前記受注の
前倒しおよび/または後倒しにより受注を変更設定する
パラメータを変更する手段である請求項1ないし6いず
れか記載の需給計画立案装置。
7. The demand and supply planning system according to claim 1, wherein said parameter changing means is means for changing a parameter for changing and setting the order by moving the order forward and / or backward.
【請求項8】 コンピュータを、請求項1ないし7いず
れか記載の需給計画立案装置として機能させる需給計画
立案用のプログラム。
8. A program for making a supply and demand plan, which causes a computer to function as the supply and demand planning apparatus according to any one of claims 1 to 7.
【請求項9】 請求項8記載の需給計画立案用のプログ
ラムをコンピュータ読み取り可能に記録した記録媒体。
9. A computer-readable recording medium for recording the supply / demand planning program according to claim 8.
【請求項10】 受注,発注,納入,出荷を有する需給
工程が少なくとも二つ以上接続されてなるサプライチェ
ーンにおける需給計画を立案する需給計画立案方法であ
って、(a) 前記サプライチェーンの出荷側末端に位
置する需給工程における受注計画を入力し、(b)所定
のパラメータを逐次変更して、前記入力された受注計画
に基づいて各需給工程の受注,発注,納入,出荷の計画
データを演算すると共に該演算された計画データと各需
給工程における納入から出荷までに要する費用および時
間に関する費用時間データとに基づいて前記サプライチ
ェーンの収益指標を演算し、(c)前記所定のパラメー
タの変更に伴って逐次演算された計画データのうち演算
された収益指標が最大となる計画データを需給計画とし
て立案する需給計画立案方法。
10. A supply and demand planning method for preparing a supply and demand plan in a supply chain comprising at least two or more supply and demand processes having an order, an order, a delivery, and a shipment, wherein: (a) a shipping side of the supply chain; An order plan for the supply and demand process located at the end is input, and (b) predetermined parameters are sequentially changed, and the order, order, delivery, and shipping plan data of each supply and demand process are calculated based on the input order plan. And calculating a profit index of the supply chain based on the calculated plan data and cost time data on costs and time required from delivery to shipment in each supply and demand process, and (c) changing the predetermined parameters. A supply and demand plan that formulates, as a supply and demand plan, the plan data with the largest calculated profit index among the plan data calculated sequentially Draft method.
【請求項11】 前記需給工程は、製品および/または
部品の受注,発注,納入,出荷を行なう工程である請求
項10記載の需給計画立案方法。
11. The demand and supply planning method according to claim 10, wherein said supply and demand step is a step of receiving an order, ordering, delivering and shipping of a product and / or part.
【請求項12】 前記需給工程は、サービスの受注,発
注,納入,出荷を行なう工程である請求項10記載の需
給計画立案方法。
12. The supply and demand planning method according to claim 10, wherein said supply and demand step is a step of receiving, ordering, delivering, and shipping services.
【請求項13】 前記ステップ(b)は、需給工程の受
注に対する出荷の余裕実績と該需給工程の余裕目標値と
の偏差を該需給工程の発注として演算するステップであ
る請求項10ないし12いずれか記載の需給計画立案方
法。
13. The method according to claim 10, wherein the step (b) is a step of calculating a deviation between the actual shipping margin for the order in the supply and demand process and the target margin of the supply and demand process as an order for the supply and demand process. Or supply and demand planning method described.
【請求項14】 前記ステップ(b)は、前記所定のパ
ラメータのひとつとしての前記余裕目標値を変更して演
算するステップである請求項13記載の需給計画立案方
法。
14. The demand and supply planning method according to claim 13, wherein the step (b) is a step of changing and calculating the margin target value as one of the predetermined parameters.
【請求項15】 前記ステップ(b)は、前記所定のパ
ラメータの一つとしての受注に関するパラメータを各需
給工程に設定された受注可能範囲内で変更して演算する
ステップである請求項10ないし14いずれか記載の需
給計画立案方法。
15. The method according to claim 10, wherein said step (b) is a step of changing a parameter relating to an order as one of said predetermined parameters within an orderable range set for each supply and demand process, and calculating. Any of the supply and demand planning methods described.
【請求項16】 前記ステップ(b)は、前記所定のパ
ラメータの一つとしての前記受注の前倒し量および/ま
たは後倒し量に関するパラメータを変更して演算するス
テップである請求項10ないし15いずれか記載の需給
計画立案方法。
16. The method according to claim 10, wherein the step (b) is a step of changing and calculating a parameter relating to an advance amount and / or a backward amount of the order as one of the predetermined parameters. Supply and demand planning method described.
【請求項17】 製品の受注を受けて製品または製品を
生産する部材を発注すると共に該発注に応じて納入され
た製品を出荷または該発注に応じて納入された部材を用
いて製品を生産し出荷する需給工程が少なくとも一つ以
上並列および/または直列に接続されてなるサプライチ
ェーンにおける需給計画を立案する需給計画立案装置で
あって、 前記各需給工程における製品または部品を納入してから
製品を出荷するまでに要する費用および時間に関する工
程データと、該製品の出荷に伴う輸送費および輸送に要
する時間に関する輸送データと、前記各需給工程におけ
る製品および部材の在庫目標である在庫目標値データと
を記憶するデータ記憶手段と、 前記サプライチェーンの各需給工程における製品および
部材の在庫実績を入力する在庫実績入力手段と、 前記サプライチェーンの出荷側末端に位置する需給工程
における製品の受注計画を入力する受注計画入力手段
と、 前記各需給工程の受注,発注,納入,出荷に関する計画
データと、前記データ記憶手段に記憶された工程データ
および輸送データとに基づいて前記サプライチェーンの
収益指標を演算する収益指標演算手段と、 前記入力された受注計画および在庫実績と前記データ記
憶手段に記憶された在庫目標値データとに基づいて前記
収益指標が大きくなるよう前記各需給工程の受注,発
注,納入,出荷の計画データを設定する計画設定手段と
を備える需給計画立案装置。
17. Receiving an order for a product, ordering the product or a member for producing the product, and shipping the product delivered according to the order or producing the product using the component delivered according to the order. A supply and demand planning system for preparing a supply and demand plan in a supply chain in which at least one supply and demand process is connected in parallel and / or in series, comprising: Process data on costs and time required for shipping, transport data on shipping costs and time required for shipping the product, and inventory target value data as inventory targets for products and components in each of the supply and demand processes. A data storage means for storing, and an inventory actual for inputting an actual inventory of products and components in each supply and demand process of the supply chain. Input means; input means for inputting a sales order plan of a product in a supply and demand process located at the end of the supply chain on the shipping side; plan data relating to order, order, delivery, and shipment in each of the supply and demand processes; Means for calculating a profit index of the supply chain based on the process data and transportation data stored in the means; and the input order plan and actual stock and the inventory target value stored in the data storage means. And a plan setting means for setting plan data of order, order, delivery, and shipment in each of the supply and demand processes so that the profit index increases based on the data.
【請求項18】 前記計画設定手段は、前記出荷側末端
に位置する需給工程の在庫実績から該需給工程の受注計
画を減じた値と該需給工程の在庫目標値との偏差を該需
給工程の発注量とすると共に該需給工程から発注可能な
需給工程について前記データ記憶手段に記憶された工程
データと輸送データとに基づいて収益が多くなるよう前
記発注量を該発注可能な需給工程への発注として分配す
る手段である請求項17記載の需給計画立案装置。
18. The plan setting means calculates a deviation between a value obtained by subtracting an order plan of the supply and demand process from an actual stock of the supply and demand process located at the terminal on the shipping side and an inventory target value of the supply and demand process. The order quantity is set to the orderable supply and demand process so that the profit is increased based on the process data and the transportation data stored in the data storage means for the order and supply process that can be ordered from the demand and supply process. 18. The supply and demand planning system according to claim 17, wherein the distribution is performed as a distribution.
【請求項19】 請求項17または18記載の需給計画
立案装置であって、 前記データ記憶手段は、前記各需給工程の製品の受注可
能範囲に関するデータをも記憶する手段であり、 該記憶された受注可能範囲に関するデータに基づいて前
記各需給工程の受注可能範囲を設定する受注可能範囲設
定手段と、 該設定された受注可能範囲と前記計画設定手段により設
定された前記各需給工程の受注とに基づいて前記各需給
工程の適正を判定する適正判定手段とを備える需給計画
立案装置。
19. The supply and demand planning device according to claim 17, wherein said data storage means is means for also storing data relating to a range of possible orders for products in each of said supply and demand processes. Orderable range setting means for setting the orderable range of each of the supply and demand processes based on data on the orderable range; and the set orderable range and the order of each of the supply and demand processes set by the plan setting means. A supply-and-supply-planning device comprising: an appropriate determination unit that determines the appropriateness of each of the supply and demand processes based on the information.
【請求項20】 前記適正判定手段は、前記各需給工程
における処理能力の過不足を判定する手段である請求項
19記載の需給計画立案装置。
20. The supply and demand planning system according to claim 19, wherein said appropriateness determination means is means for determining an excess or deficiency of a processing capacity in each of said supply and demand processes.
【請求項21】 請求項17または18記載の需給計画
立案装置であって、 前記データ記憶手段は、前記各需給工程の製品の受注可
能範囲に関するデータをも記憶する手段であり、 該記憶された受注可能範囲に関するデータに基づいて前
記各需給工程の受注可能範囲を設定する受注可能範囲設
定手段と、 前記計画設定手段により設定された前記各需給工程の受
注が前記受注可能範囲設定手段により対応する需給工程
に対して設定された受注可能範囲内にあるかを判定する
受注判定手段と、 該受注判定手段が受注可能範囲内にないと判定したと
き、該判定された需給工程の受注が対応する受注可能範
囲になるよう前記計画設定手段により設定された計画デ
ータを変更する計画変更手段とを備える需給計画立案装
置。
21. The supply and demand planning system according to claim 17, wherein said data storage means is means for also storing data relating to an orderable range of a product in each of said supply and demand processes. An order-receiving range setting means for setting an order-receiving range of each of the supply and demand processes based on data on an order-receiving range; and the order-receiving-range setting means corresponding to the order of each supply and demand process set by the plan setting means. An order determination means for determining whether the order is within an orderable range set for the supply and demand process; and an order corresponding to the determined order of supply and demand when the order determination means determines that the order is not within the orderable range. A demand and supply plan planning device, comprising: plan change means for changing plan data set by the plan setting means so as to be within an order-receiving possible range.
【請求項22】 前記計画変更手段は、前記判定された
需給工程の受注の一部または全部を該需給工程と同一の
製品を出荷可能な需給工程の受注に振り替えることによ
り前記計画データを変更する手段である請求項21記載
の需給計画立案装置。
22. The plan changing means changes the plan data by transferring a part or all of the determined order in the supply and demand process to an order in the supply and demand process capable of shipping the same product as the demand and supply process. 22. The demand and supply planning device according to claim 21, which is a means.
【請求項23】 前記計画変更手段は、前記判定された
需給工程の受注の一部または全部を前記受注計画に対し
て時間的に前倒しおよび/または後倒しして受注するこ
とにより前記計画データを変更する手段である請求項2
1または22記載の需給計画立案装置。
23. The plan change means receives the order data of the determined supply and demand process by partially or entirely moving forward and / or backward in time with respect to the order plan, thereby obtaining the plan data. 3. A means for changing.
23. The demand / supply planning device according to 1 or 22.
【請求項24】 前記受注判定手段は、前記計画変更手
段により前記受注の一部または全部の時間的な前倒しお
よび/または後倒しの受注が行なわれたとき、該前倒し
および/または後倒しされた受注と前記計画設定手段に
より設定された受注との和が前記受注可能範囲内にある
かを判定する手段である請求項23記載の需給計画立案
装置。
24. The order determination means, when a part or all of the order is temporally advanced and / or delayed by the plan changing means, the order is determined to be advanced and / or delayed. 24. The supply and demand planning system according to claim 23, wherein the unit determines whether the sum of the order and the order set by the plan setting unit is within the order acceptable range.
【請求項25】 前記計画変更手段は、前記各需給工程
の少なくとも一部の在庫目標値データを変更することに
より前記判定された需給工程の受注が対応する受注可能
範囲内になるよう前記計画データを変更する手段である
請求項21ないし24いずれか記載の需給計画立案装
置。
25. The plan changing means, wherein the planned data of at least a part of each of the supply and demand processes is changed so that the determined order of the demand and supply process falls within a corresponding orderable range. 25. The demand-supply planning device according to claim 21, wherein the device is a means for changing the value.
【請求項26】 前記計画変更手段は、前記各需給工程
の受注を対応する受注可能範囲内とすると共に前記収益
指標が大きくなるよう前記計画データを変更する手段で
ある請求項21ないし25いずれか記載の需給計画立案
装置。
26. The plan change means for changing the plan data so that the order in each of the supply and demand processes is within the corresponding orderable range and the profit index is increased. The supply and demand planning device described in the above.
【請求項27】 前記設定または変更された計画データ
と該計画データに対して演算される前記収益指標とを出
力する出力手段を備える請求項17ないし26いずれか
記載の需給計画立案装置。
27. The supply and demand planning system according to claim 17, further comprising an output unit configured to output the set or changed plan data and the profit index calculated on the plan data.
【請求項28】 コンピュータを、 製品の受注を受けて製品または製品を生産する部材を発
注すると共に該発注に応じて納入された製品を出荷また
は該発注に応じて納入された部材を用いて製品を生産し
出荷する需給工程が少なくとも一つ以上並列および/ま
たは直列に接続されてなるサプライチェーンにおける需
給計画を立案する需給計画立案装置であって、 前記各需給工程における製品または部品を納入してから
製品を出荷するまでに要する費用および時間に関する工
程データと、該製品の出荷に伴う輸送費および輸送に要
する時間に関する輸送データと、前記各需給工程におけ
る製品および部材の在庫目標である在庫目標値データと
を記憶するデータ記憶手段と、 前記サプライチェーンの各需給工程における製品および
部材の在庫実績を入力する在庫実績入力手段と、 前記サプライチェーンの出荷側末端に位置する需給工程
における製品の受注計画を入力する受注計画入力手段
と、 前記各需給工程の受注,発注,納入,出荷に関する計画
データと、前記データ記憶手段に記憶された工程データ
および輸送データとに基づいて前記サプライチェーンの
収益指標を演算する収益指標演算手段と、 前記入力された受注計画および在庫実績と前記データ記
憶手段に記憶された在庫目標値データとに基づいて前記
収益指標が大きくなるよう前記各需給工程の受注,発
注,納入,出荷の計画データを設定する計画設定手段と
を備える需給計画立案装置として機能させるコンピュー
タ読み取り可能なプログラムを記憶した記録媒体。
28. A computer, which receives an order for a product, orders a product or a member for producing the product, and ships the product delivered in accordance with the order or manufactures a product using the member delivered in accordance with the order. A supply and demand planning process for drafting a supply and demand plan in a supply chain in which at least one or more supply and demand processes for producing and shipping are connected in parallel and / or in series. From the process data on the cost and time required to ship the product, the transport data on the shipping cost and the time required for the shipping of the product, and the inventory target value which is the inventory target of the product and member in each of the supply and demand processes Data storage means for storing data, and the actual stock of products and components in each supply and demand process of the supply chain Means for inputting actual stock data, input means for inputting a sales order plan for a product in the supply and demand process located at the end of the supply chain on the shipment side, and plan data relating to order, order, delivery and shipping in each of the supply and demand processes And a profit index calculating means for calculating a profit index of the supply chain based on the process data and the transportation data stored in the data storage means; and the input order plan and inventory results and the data stored in the data storage means. A computer-reading device functioning as a demand-supply planning device including plan setting means for setting order data of order, order, delivery, and shipment in each of the supply and demand processes so that the profit index increases based on the obtained inventory target value data. A recording medium that stores a possible program.
【請求項29】 請求項28記載の記録媒体であって、 前記コンピュータを、 前記データ記憶手段は前記各需給工程の製品の受注可能
範囲に関するデータをも記憶する手段として機能すると
共に、 該記憶された受注可能範囲に関するデータに基づいて前
記各需給工程の受注可能範囲を設定する受注可能範囲設
定手段と、 該設定された受注可能範囲と前記計画設定手段により設
定された前記各需給工程の受注とに基づいて前記各需給
工程の適正を判定する適正判定手段とを更に備える需給
計画立案装置として機能させるコンピュータ読み取り可
能なプログラムを記憶した記録媒体。
29. The recording medium according to claim 28, wherein said computer, said data storage means functions as means for storing also data relating to an orderable range of a product in each of said supply and demand processes, and said storage means. Orderable range setting means for setting the orderable range of each of the supply and demand processes based on the data on the orderable range which has been set, and the set orderable range and the order of each of the supply and demand processes set by the plan setting means. A storage medium storing a computer-readable program that causes the computer to function as a supply and demand planning device, further comprising: an appropriate determination unit that determines appropriateness of each of the supply and demand processes based on the program.
【請求項30】 請求項28記載の記録媒体であって、 前記コンピュータを、 前記データ記憶手段は、前記各需給工程の製品の受注可
能範囲に関するデータをも記憶する手段として機能する
と共に、 該記憶された受注可能範囲に関するデータに基づいて前
記各需給工程の受注可能範囲を設定する受注可能範囲設
定手段と、 前記計画設定手段により設定された前記各需給工程の受
注が前記受注可能範囲設定手段により対応する需給工程
に対して設定された受注可能範囲内にあるかを判定する
受注判定手段と、 該受注判定手段が受注可能範囲内にないと判定したと
き、該判定された需給工程の受注が対応する受注可能範
囲になるよう前記計画設定手段により設定された計画デ
ータを変更する計画変更手段とを更に備える需給計画立
案装置として機能させるコンピュータ読み取り可能なプ
ログラムを記憶した記録媒体。
30. The recording medium according to claim 28, wherein said computer stores said data, and said data storage means functions as means for storing data relating to an order-receiving range of a product in each of said supply and demand processes. Orderable range setting means for setting the orderable range of each of the supply and demand processes based on the data on the settable orderable range, and the order for each of the supply and demand processes set by the plan setting means is set by the orderable range setting means. Order determination means for determining whether the order is within the orderable range set for the corresponding supply and demand process; and when the order determination means determines that the order is not within the orderable range, the order for the determined supply and demand process is determined. And a plan changing means for changing plan data set by the plan setting means so as to be in a corresponding orderable range. Recording medium storing a computer-readable program for ability.
JP2000262310A 1999-12-06 2000-08-31 Device and method for making supply and demand plan, program for making supply and demand plan, and recording medium for recording program Pending JP2001225927A (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2000262310A JP2001225927A (en) 1999-12-06 2000-08-31 Device and method for making supply and demand plan, program for making supply and demand plan, and recording medium for recording program
EP00126799A EP1107147A3 (en) 1999-12-06 2000-12-06 Demand-production scheme planning apparatus and storage medium
US09/729,800 US7668743B2 (en) 1999-12-06 2000-12-06 Demand-production scheme planning apparatus, and storage medium

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP34676199 1999-12-06
JP11-346761 1999-12-06
JP2000262310A JP2001225927A (en) 1999-12-06 2000-08-31 Device and method for making supply and demand plan, program for making supply and demand plan, and recording medium for recording program

Publications (1)

Publication Number Publication Date
JP2001225927A true JP2001225927A (en) 2001-08-21

Family

ID=26578342

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000262310A Pending JP2001225927A (en) 1999-12-06 2000-08-31 Device and method for making supply and demand plan, program for making supply and demand plan, and recording medium for recording program

Country Status (1)

Country Link
JP (1) JP2001225927A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002297220A (en) * 2001-03-30 2002-10-11 Fujitsu Ltd Planning program, planning method and recording medium
KR20030063921A (en) * 2002-01-24 2003-07-31 (주) 자이오넥스 Supply Chain Planning System and Method
JP2007122154A (en) * 2005-10-25 2007-05-17 Kozo Nagata Solution system and solution method for supply chain
US7409363B2 (en) 2002-08-28 2008-08-05 Daifuku Co., Ltd. Centralized management system for maintenance parts
JP2010039649A (en) * 2008-08-01 2010-02-18 Canon It Solutions Inc Information processor and information processing method
CN115829481A (en) * 2022-12-01 2023-03-21 航天科技控股集团股份有限公司 Oil storage management method and system based on Internet of things

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08123535A (en) * 1994-09-28 1996-05-17 I Two Technol Inc Factory network having plurality of factories and method forcoordinating plurality of factories with one factory network
JPH0973491A (en) * 1995-09-08 1997-03-18 Hitachi Ltd Component inventory planning support system
JPH09305663A (en) * 1996-05-10 1997-11-28 Kawasaki Steel Corp Estimating method for profit plan
JPH10269294A (en) * 1997-03-28 1998-10-09 Hitachi Ltd Method for generating plan and system therefor
JPH11306233A (en) * 1998-04-21 1999-11-05 Yokogawa Electric Corp Overall production system for medical supplies manufacturing company

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08123535A (en) * 1994-09-28 1996-05-17 I Two Technol Inc Factory network having plurality of factories and method forcoordinating plurality of factories with one factory network
JPH0973491A (en) * 1995-09-08 1997-03-18 Hitachi Ltd Component inventory planning support system
JPH09305663A (en) * 1996-05-10 1997-11-28 Kawasaki Steel Corp Estimating method for profit plan
JPH10269294A (en) * 1997-03-28 1998-10-09 Hitachi Ltd Method for generating plan and system therefor
JPH11306233A (en) * 1998-04-21 1999-11-05 Yokogawa Electric Corp Overall production system for medical supplies manufacturing company

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002297220A (en) * 2001-03-30 2002-10-11 Fujitsu Ltd Planning program, planning method and recording medium
JP4672166B2 (en) * 2001-03-30 2011-04-20 富士通株式会社 Planning program, planning method, and recording medium
KR20030063921A (en) * 2002-01-24 2003-07-31 (주) 자이오넥스 Supply Chain Planning System and Method
US7409363B2 (en) 2002-08-28 2008-08-05 Daifuku Co., Ltd. Centralized management system for maintenance parts
JP2007122154A (en) * 2005-10-25 2007-05-17 Kozo Nagata Solution system and solution method for supply chain
JP2010039649A (en) * 2008-08-01 2010-02-18 Canon It Solutions Inc Information processor and information processing method
CN115829481A (en) * 2022-12-01 2023-03-21 航天科技控股集团股份有限公司 Oil storage management method and system based on Internet of things

Similar Documents

Publication Publication Date Title
US7668743B2 (en) Demand-production scheme planning apparatus, and storage medium
Baboli et al. A replenishment policy based on joint optimization in a downstream pharmaceutical supply chain: centralized vs. decentralized replenishment
CN111340421A (en) Purchasing method
US6591243B1 (en) Method and system for supply chain control
KR20030093344A (en) Parts procurement method and apparatus
JP2010269867A (en) Transportation schedule planning support system and transportation schedule planning support method
JP4847030B2 (en) Ordering system and ordering method
CN101099120A (en) Production planning method and production planning system for mixed flows of production by order and forecasting
Sancak et al. Multi-item dynamic lot-sizing with delayed transportation policy
Chen et al. Multimodal Transport Network Optimization Considering Safety Stock under Real‐Time Information
JP2001225927A (en) Device and method for making supply and demand plan, program for making supply and demand plan, and recording medium for recording program
JP2009217573A (en) System and method for optimizing supply chain
Nguyen et al. Quantity discount with freight consolidation
JPH0798741A (en) Integrated management method for production sales article
JP2002304452A (en) Device and method for managing commodity distribution
JP3945941B2 (en) Stock replenishment method with safety stock ratio
JPH08147358A (en) Device for preparing order plan of raw material
JP2003316862A (en) Inventory planning method
JP2009140140A (en) Supply chain optimization system and supply chain optimization method
JP2006244470A (en) Delivery date reply system, delivery date reply method, and delivery date reply program
JP2007279998A (en) Inventory balance simulation system of type taking change to prior plan into account
CN117314319B (en) Steel packaging demand processing method, device, storage medium and equipment
JP2003312848A (en) Product distribution system, product supply source device, product distribution method, and supply target warehouse terminal
JP2010250668A (en) Supply chain management support system
JP5837457B2 (en) Repair parts ordering support system and ordering support method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040922

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041207

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050207

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20050207

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050628