KR100767172B1 - A prop system for wooden bridge - Google Patents

A prop system for wooden bridge Download PDF

Info

Publication number
KR100767172B1
KR100767172B1 KR1020070076639A KR20070076639A KR100767172B1 KR 100767172 B1 KR100767172 B1 KR 100767172B1 KR 1020070076639 A KR1020070076639 A KR 1020070076639A KR 20070076639 A KR20070076639 A KR 20070076639A KR 100767172 B1 KR100767172 B1 KR 100767172B1
Authority
KR
South Korea
Prior art keywords
vertical plate
plate
shaft
vertical
shaft hole
Prior art date
Application number
KR1020070076639A
Other languages
Korean (ko)
Inventor
김종창
Original Assignee
김종창
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김종창 filed Critical 김종창
Priority to KR1020070076639A priority Critical patent/KR100767172B1/en
Application granted granted Critical
Publication of KR100767172B1 publication Critical patent/KR100767172B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • E01D19/042Mechanical bearings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/10Wood

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A bridge seat system for a wooden bridge is provided to improve durability of the same by absorbing and buffering vibration with an upper bracket, to repair and install easily by combining a lower bracket with the upper bracket by a shaft, and to improve safety by expanding or contracting a beam and the shaft according to temperature. A bridge seat system for a wooden bridge includes a lower bracket(110), an upper bracket(120), a shaft(130), and a key plate(140). A first vertical plate and a second vertical plate are installed in parallel in the upper part of a horizontal plate(112). Shaft holes are formed horizontally in the vertical plates, and the horizontal plate is fastened to a post. A vertical plate is installed between the first and second vertical plates, and the horizontal plate is fixed to a lower beam of a slab. The upper bracket is turned in the lower bracket by penetrating the shaft through the shaft holes of the vertical plates. The lower part of the key plate is inserted to a key groove of the shaft, and the key plate is fastened to the side of the second vertical plate by bolting to prevent displacement of the shaft. A spacer(136) is installed to the shaft between the vertical plate and the first or second vertical plate.

Description

목재교의 교좌장치{A prop system for wooden bridge}A prop system for wooden bridge

본 발명은 목재교의 교좌장치에 관한 것으로, 특히, 본 발명은 목재교에 가해지는 하중 및 충격과, 이에 따른 진동을 흡수 완화되게 함으로써, 그 사용수명이 연장되게 하고, 설치 및 보수 작업이 간단하고 편리하며 신속하게 될 수 있게 함으로써, 설치 및 보수 작업자에게 편의를 제공할 수 있게 하며, 온도 변화에 따라 H빔으로 된 대들보 및 샤프트의 열팽창 및 수축이 원활하게 진행되게 함으로써, 설치 후 안전에 따른 신뢰도를 향상시킬 수 있도록 하는 목재교의 교좌장치에 관한 것이다.The present invention relates to a wooden bridge bridge device, and in particular, the present invention by absorbing and mitigating the load and impact applied to the wooden bridge, and thus the vibration, thereby extending the service life of the wooden bridge, and easy to install and repair It can be convenient and fast, providing convenience to installation and maintenance workers, and the thermal expansion and contraction of H beam girders and shafts smoothly proceeds according to temperature changes. It relates to a wood bridge chair system to improve the.

일반적으로 종래 국내 실용신안등록 제0403754호에 개시되어 있는 목교용 교좌장치는 하부체와 상부체를 힌지축으로 연결되게 하고, 하부체는 교각에, 상부체는 상판을 지지하는 빔에 각각 고정되게 하며, 상부체가 힌지축을 중심으로 적절히 회동되게 하여, 상판에 가해지는 하중 및 충격과 이에 따른 진동을 흡수할 수 있도록 하고 있는데, 상기와 같은 경우, 오랜 사용시 힌지축의 중앙 부위가 처지는 현상이 발생되어 상부체가 회동되지 못하게 되는 상태로 고정되는 문제점이 발생되었 고, 이러한 문제점에 의해 힌지축의 교체작업이 어렵게 진행되는 등의 문제점이 발생되었다.In general, the wooden bridge teaching apparatus disclosed in the Republic of Korea Utility Model Registration No. 0403754 is connected to the lower body and the upper body by a hinge axis, the lower body to the piers, the upper body to be fixed to the beam supporting the upper plate, respectively In addition, the upper body is rotated properly around the hinge axis to absorb the load and impact applied to the upper plate and the vibration thereof. In the above case, the central part of the hinge axis sags during long use. There was a problem that the sieve is fixed in a state that can not be rotated, a problem such as difficult to replace the hinge shaft by this problem has occurred.

또한 온도 변화에 따라 온도 변화에 따라 H빔으로 된 대들보 및 힌지축이 열팽창하거나 수축함이 반복되고, 충격에 의해 힌지축이 점차적으로 이탈하게 되어 안정상의 신뢰도가 떨어지게 되는 문제점도 발생되었다.In addition, as the temperature changes, the H-beam girder and the hinge axis are repeatedly thermally expanded or contracted, and the hinge axis is gradually separated by an impact, thereby degrading reliability.

본 발명은 상기와 같은 문제점을 개선하기 위한 것으로, 그 목적은 본 발명은 목재교에 가해지는 하중 및 충격과, 이에 따른 진동을 흡수 완화되게 함으로써, 그 사용수명이 연장되게 하고, 설치 및 보수 작업이 간단하고 편리하며 신속하게 될 수 있게 함으로써, 설치 및 보수 작업자에게 편의를 제공할 수 있게 하며, 온도 변화에 따라 H빔으로 된 대들보 및 샤프트의 열팽창 및 수축이 원활하게 진행되게 함으로써, 설치 후 안전에 따른 신뢰도를 향상시킬 수 있도록 하는 목재교의 교좌장치를 제공하는 것이다.The present invention is to improve the problems as described above, the object of the present invention is to absorb and mitigate the load and impact applied to the wooden bridge, and the vibration accordingly, to extend its service life, installation and maintenance work This simple, convenient, and quick operation provides convenience to installation and maintenance personnel, and ensures that the thermal expansion and contraction of the H-beam girder and shaft proceeds smoothly with changes in temperature, thus ensuring safety after installation. In order to improve the reliability of the wooden bridge to provide a bridge system.

본 발명은 상기와 같은 목적을 달성하기 위해 교각과 상판의 사이에 설치되어 상판을 지지하여주는 교좌장치를 구성함에 있어서, 수평판(112)의 상부면에 제1수직판(114-1)과 제2수직판(114-2)이 거리를 두고 평행하게 수직 설치되게 하되, 각 수직판(114-1)(114-2)에 동일중심을 이루는 샤프트홀(114a)이 수평으로 관통되게 하고, 제2수직판(114-2)의 샤프트홀(114a) 상부 양쪽에 구멍(114b)이 형성되게 하며, 상기 교각에 수평판(112)이 고정되는 하부브래킷(110)과; 수평판(122)의 하부면에 상기 제1 및 제2수직판(114-1)(114-2)의 사이에 위치하게 되는 수직판(124)이 설치되게 하되, 상기 샤프트홀(114a)과 동일 중심을 이루게 되는 샤프트홀(124a)이 수평으로 관통되게 하며, 상기 상판 하부의 빔에 상기 수평판(122)이 고정되는 상부브래킷(120)과; 원통체로 몸통(132)의 한 쪽에는 더 큰 직경의 머리부(134)가 형성되고, 반대편 쪽의 상부에는 키홈(132a)이 형성되며, 제1 및 제2수직판(114-1)(114-2)의 샤프트홀(114a)과 수직판(124)의 샤프트홀(124a)을 관통하여 상부브래킷(120)이 하부브래킷(110)에서 회동되게 하는 샤프트(130)와; 상기 제2수직판(114-2)의 구멍(114b)과 대응하는 구멍(140a)을 갖는 판체로 형성되고, 제2수직판(114-2)의 샤프트홀(114a)을 통과하는 샤프트(130)의 키홈(132a)에 하단부가 삽입되며, 볼트(140b)로 제2수직판(114-2)의 측면에 고정되어 샤프트(130)가 이탈됨이 방지되게 하는 키플레이트(140)로 구성되는 것과, 상기 제1수직판(114-1)과 수직판(124)의 일 측면, 제2수직판(114-2)과 수직판(124)의 반대편 일 측면 사이에 위치하는 샤프트(130)의 몸통(132)에는 스페이서(136)가 각각 설치되게 하여서 되는 것과, 상기 상부브래킷(120)의 수직판(124)에는 샤프트홀(124a)을 향하게 되는 윤활유주입구(124b)가 형성되게 하여서 되는 목재교의 교좌장치를 제공함에 있다.The present invention is configured between the bridge and the upper plate to achieve the above object in the configuration of the device for supporting the upper plate, the first vertical plate (114-1) and the upper surface of the horizontal plate (112) and The second vertical plate 114-2 is installed vertically in parallel at a distance, but the shaft hole 114a constituting the same center in each vertical plate (114-1) (114-2) horizontally through, A lower bracket (110) for forming holes (114b) in both upper portions of the shaft hole (114a) of the second vertical plate (114-2), and the horizontal plate (112) fixed to the piers; The vertical plate 124 positioned between the first and second vertical plates 114-1 and 114-2 is installed on the lower surface of the horizontal plate 122, but the shaft hole 114a and An upper bracket 120 through which the shaft hole 124a constituting the same center is horizontally penetrated and the horizontal plate 122 is fixed to the beam below the upper plate; The cylindrical body has a larger diameter head 134 is formed on one side of the body 132, the key groove 132a is formed on the upper side of the opposite side, the first and second vertical plate (114-1) (114) A shaft 130 penetrating the shaft hole 114a of -2) and the shaft hole 124a of the vertical plate 124 so that the upper bracket 120 rotates at the lower bracket 110; The shaft 130 is formed of a plate body having a hole 140a corresponding to the hole 114b of the second vertical plate 114-2, and passes through the shaft hole 114a of the second vertical plate 114-2. The lower end is inserted into the key groove 132a of the) and is fixed to the side of the second vertical plate 114-2 with the bolt 140b is composed of a key plate 140 to prevent the shaft 130 from being separated And one side of the first vertical plate 114-1 and the vertical plate 124, and one side of the shaft 130 positioned between the second vertical plate 114-2 and the opposite side of the vertical plate 124. The body 132 is to be provided with a spacer 136, respectively, and the vertical plate 124 of the upper bracket 120, the lubricating oil inlet (124b) to be directed toward the shaft hole 124a is formed of a wooden bridge To provide a teaching device.

본 발명은 목재교에 가해지는 하중 및 충격과, 이에 따른 진동을 하부브래킷에 샤프트로 결합되는 상부브래킷에 의해 흡수 완화되게 함으로써, 그 사용수명이 연장되게 하는 것과, 하부브래킷과 상부브래킷을 샤프트로 결합되게 하는 한편, 샤프트를 키플레이트로 고정되게 함으로써, 설치 및 보수 작업이 간단하고 편리하며 신속하게 될 수 있게 하는 것과, 온도 변화에 따라 H빔으로 된 대들보 및 샤프트의 열팽창 및 수축이 원활하게 진행되게 함으로써, 설치 후 안전에 따른 신뢰도를 향상시킬 수 있게 하는 효과가 있는 것이다.The present invention is to absorb and mitigate the load and impact applied to the wooden bridge, and the resulting vibration by the upper bracket coupled to the lower bracket, to extend the service life of the lower bracket and the upper bracket to the shaft By allowing the shaft to be held on the keyplate, the installation and maintenance can be made simple, convenient and quick, and the thermal expansion and contraction of the H-beam girder and shaft can be performed smoothly with temperature changes. By doing so, there is an effect to improve the reliability according to the safety after installation.

다음 본 발명을 도면에 의거하여 구체적으로 설명하겠다.Next, the present invention will be described in detail with reference to the drawings.

도 1 및 도 2 에는 본 발명에 따른 목재교의 교좌장치가 도시되어 있는데, 이 목재교의 교좌장치 본체(100)는 하부브래킷(110), 상부브래킷(120), 샤프트(130) 및 키플레이트(140)로 구성된다.1 and 2, the wooden bridge bridge device according to the present invention, the wooden bridge bridge device body 100 is the lower bracket 110, the upper bracket 120, the shaft 130 and the key plate 140 It is composed of

상기 하부브래킷(110)은 수평판체로 되는 수평판(112)의 상부면 중앙에 한 쌍의 수직판(114)이 설치된다.The lower bracket 110 is provided with a pair of vertical plates 114 in the center of the upper surface of the horizontal plate 112 to be a horizontal plate body.

상기 수직판(114)은 제1수직판(114-1)과 제2수직판(114-2)이 도 5 도시와 같이 일정한 거리를 두고 평행하게 수직 설치되게 된다.In the vertical plate 114, the first vertical plate 114-1 and the second vertical plate 114-2 are vertically installed in parallel with a predetermined distance as shown in FIG. 5.

상기 각 수직판(114-1)(114-2)에는 동일중심을 이루는 샤프트홀(114a)이 수평으로 관통되어 형성된다.Each of the vertical plates 114-1 and 114-2 is formed by horizontally passing shaft holes 114a constituting the same center.

상기 제2수직판(114-2)의 샤프트홀(114a) 상부 양쪽에는 구멍(114b)이 일정한 거리를 두고 형성된다.Holes 114b are formed at both sides of the shaft hole 114a of the second vertical plate 114-2 at a predetermined distance.

그리고 상기 수평판(112)에는 다수개의 구멍(112a)이 수직으로 관통되어 형성되며, 상기 제1수직판(114-1) 및 제2수직판(114-2)은 수직보조판(116)들에 의해 지지된다.A plurality of holes 112a are vertically penetrated in the horizontal plate 112, and the first vertical plate 114-1 and the second vertical plate 114-2 are formed in the vertical subsidiary plates 116. Is supported by.

상기의 하부브래킷(110)은 교각의 콘크리트블록(162) 상부면에 고정되는데, 설치면(160)과 콘크리트블록(162)에 미리 설치된 앵커볼트(164)가 수평판(112)의 구멍(112a)을 통과되게 한 후 너트(166)를 조임 함으로써, 고정 설치된다.The lower bracket 110 is fixed to the upper surface of the concrete block 162 of the piers, the mounting surface 160 and the anchor bolt 164 pre-installed in the concrete block 162 is a hole 112a of the horizontal plate 112 ), And then it is fixed by tightening the nut 166.

상기 상부브래킷(120)은 수평판체로 되는 수평판(122)의 하부면 중앙에 수직판(124)이 설치된다.The upper bracket 120 is provided with a vertical plate 124 in the center of the lower surface of the horizontal plate 122 to be a horizontal plate body.

상기 수직판(124)에는 도 4 도시와 같이 샤프트홀(124a)이 수평으로 관통되어 형성된다.As shown in FIG. 4, the shaft 124a penetrates the vertical plate 124 horizontally.

그리고 상기 수평판(122)에는 도 3 도시와 같이 다수개의 구멍(122a)이 수직으로 관통되어 형성되는 수직판(124)은 수직보조판(126)들에 의해 지지된다.In addition, a vertical plate 124 formed by vertically penetrating a plurality of holes 122a in the horizontal plate 122 is supported by the vertical auxiliary plates 126.

상기에 있어, 수직판(124)은 상기 제1 및 제2수직판(114-1)(114-2)의 사이공간에 삽입되는 상태로 위치하게 되고, 상기 샤프트홀(124a)을 상기 제1 및 제2수직판(114-1)(114-2)의 샤프트홀(114a)과 동일 중심을 이루면서 형성된다.In the above, the vertical plate 124 is positioned to be inserted into the space between the first and second vertical plate (114-1) (114-2), and the shaft hole (124a) is the first And forming the same center as the shaft hole 114a of the second vertical plates 114-1 and 114-2.

상기의 상부브래킷(120)은 교량의 대들보(Girder)(152)에 고정되는데,The upper bracket 120 is fixed to the girders (Girder) 152 of the bridge,

상부브래킷(120)의 수평판(122)과 대들보(152)의 사이에 수평보조판(150)이 개재되게 하여 볼트(154)가 상기 구멍(122a)과, 수평보조판(150)의 구멍(도시 없음), 대들보(152)의 구멍(도시 없음)을 통과되게 한 후 너트(156)를 조임 함으로써, 고정 설치된다.The horizontal subplate 150 is interposed between the horizontal plate 122 and the girder 152 of the upper bracket 120 so that the bolt 154 has the hole 122a and the hole of the horizontal subplate 150 (not shown). ), The nut 156 is fixed by passing the hole (not shown) of the girder 152 and then fixedly installed.

상기 샤프트(130)는 원통체로 형성되는 몸통(132)의 한 쪽에는 더 큰 직경의 머리부(134)가 형성되고, 반대편 쪽의 상부 둘레면에는 키홈(132a)이 형성된다.The shaft 130 has a larger diameter head 134 on one side of the body 132 is formed of a cylindrical body, the key groove 132a is formed on the upper peripheral surface of the opposite side.

상기 샤프트(130)는 제1수직판(114-1)의 샤프트홀(114a), 수직판(124)의 샤프트홀(124a), 제2수직판(114-2)의 샤프트홀(114a)을 관통함으로써, 상기 상부브래 킷(120)이 하부브래킷(110)에서 회동되게 한다.The shaft 130 may include the shaft hole 114a of the first vertical plate 114-1, the shaft hole 124a of the vertical plate 124, and the shaft hole 114a of the second vertical plate 114-2. By penetrating, the upper bracket 120 is rotated in the lower bracket 110.

상기에 있어 샤프트(130)의 머리부(134)는 제1수직판(114-1)의 일 측면에 걸림된 상태로 위치하게 되고, 키홈(132a)은 제2수직판(114-2)의 샤프트홀(114a)을 통과하는 상태로 위치하게 된다.In the above, the head portion 134 of the shaft 130 is positioned in a state of being locked to one side of the first vertical plate 114-1, and the key groove 132a is formed of the second vertical plate 114-2. It is positioned in the state passing through the shaft hole (114a).

그리고 상기 제1수직판(114-1)과 수직판(124)의 일 측면, 제2수직판(114-2)과 수직판(124)의 반대편 일 측면 사이에 위치하는 샤프트(130)의 몸통(132)에는 스페이서(136)가 각각 설치되게 하여서 된다.And the body of the shaft 130 is located between one side of the first vertical plate 114-1 and the vertical plate 124, the opposite side of the second vertical plate 114-2 and the vertical plate 124 The spacers 136 are provided at 132, respectively.

상기 키플레이트(140)는 직사각의 판체로 형성되는데, 상기 제2수직판(114-2)의 구멍(114b)과 대응하는 구멍(140a)이 형성된다.The key plate 140 is formed of a rectangular plate body, and a hole 140a corresponding to the hole 114b of the second vertical plate 114-2 is formed.

그리고 상기 제2수직판(114-2)의 샤프트홀(114a)을 통과하는 샤프트(130)의 키홈(132a)에 하단부가 삽입되며, 키플레이트(140)의 구멍(140a)과 제2수직판(114-2)의 구멍(114b)이 대응되게 한 후 볼트(140b)가 조임 되게 함으로써, 도 6 및 도 7 도시와 같이 제2수직판(114-2)의 측면에 고정되는 동시에 샤프트(130)의 키홈(132a)에 고정되어 샤프트(130)가 이탈되는 것이 방지되게 한다.The lower end portion is inserted into the key groove 132a of the shaft 130 passing through the shaft hole 114a of the second vertical plate 114-2, and the hole 140a of the key plate 140 and the second vertical plate. By fitting the holes 114b of the 114-2 and then tightening the bolt 140b, the shaft 130 is fixed to the side surface of the second vertical plate 114-2 as shown in FIGS. 6 and 7. It is fixed to the key groove 132a of the) to prevent the shaft 130 from being separated.

이렇게 구성되는 본 발명은 하부브래킷(110)의 수평판(112)을 교각의 설치면(160)과 콘크리트블록(162)에 미리 설치된 앵커볼트(164)에 너트(166)로 고정되게 하고, 이어서 하부브래킷(110)의 제1수직판(114-1)과 제2수직판(114-2)의 사이에 상부브래킷(120)의 수직판(124)이 삽입되는 상태로 위치되게 하되, 각 샤프트홀(114a)(124a)이 일치되게 하고, 이어서 샤프트(130)의 몸통(132)이 각 샤프트홀(114a)(124a)을 관통되게 하고, 이어서 제2수직판(114-2)을 통과한 샤프트(130) 의 키홈(132a)에 키플레이트(140)의 하단부가 삽입되게 하는 동시에 제2수직판(114-2)의 외측면에 고정되게 하고, 상부브래킷(120)의 수평판(112)에 수평보조판(150)이 중첩되게 한 후, 대들보(152)에 볼트(154)와 너트(156)로 고정되게 하면 설치 작업이 완료되는데, 상기 상부브래킷(120)의 수직판(124) 양쪽에 위치하게 되는 샤프트(130)에는 스페이서(136)가 각각 설치되게 하면 된다.The present invention constituted as described above allows the horizontal plate 112 of the lower bracket 110 to be fixed with the nut 166 to the anchor bolt 164 pre-installed on the installation surface 160 and the concrete block 162 of the piers, and then While the vertical plate 124 of the upper bracket 120 is inserted between the first vertical plate 114-1 and the second vertical plate 114-2 of the lower bracket 110, each shaft The holes 114a and 124a coincide, and then the body 132 of the shaft 130 passes through each shaft hole 114a and 124a, and then passes through the second vertical plate 114-2. The lower end of the key plate 140 is inserted into the key groove 132a of the shaft 130 and fixed to the outer surface of the second vertical plate 114-2, and the horizontal plate 112 of the upper bracket 120. After the horizontal auxiliary plate 150 is superimposed on the girder 152, the bolt 154 and the nut 156 fixed to the installation work is completed, the vertical plate 124 of the upper bracket 120 In position Is when the shaft 130 is to be installed with spacers 136 respectively.

따라서 목재교에 가해지는 하중 및 충격과 이에 따른 진동이 대들보(152)를 통해 전달되면, 상부브래킷(120)이 샤프트(130)를 중심으로 회동하게 되어 흡수 완화되게 할 수 있게 된다.Therefore, when the load and impact applied to the wooden bridge and the vibration accordingly transmitted through the girders 152, the upper bracket 120 is rotated about the shaft 130 to be absorbed to relax.

그리고, 샤프트(130)를 키플레이트(140)로 고정되게 함으로써, 설치 및 보수 작업이 간단하고 편리하며 신속하게 될 수 있게 하는 것이다.In addition, the shaft 130 is fixed by the key plate 140, so that the installation and maintenance work can be simple, convenient, and quick.

또한 샤프트(130)는 한 쪽 끝부분이 키플레이트(140)로 고정되는 한편, H빔으로 된 대들보(152)가 상부브래킷(120)에 의해 지지됨으로써, 온도 변화에 따른 열 팽창 및 수축이 원활하게 흡수 완화되게 할 수 있게 되어 설치 후 안정에 따른 신뢰도를 향상시킬 수 있게 하는 것이다.In addition, one end of the shaft 130 is fixed to the key plate 140, while the girder 152 made of H beam is supported by the upper bracket 120, so that the thermal expansion and contraction according to the temperature change is smooth. It is to be able to be absorbed to ease the absorption to improve the reliability of the post-installation stability.

도 1은 본 고안 장치가 설치된 상태의 일 측면도,1 is a side view of a state of the present device is installed,

도 2는 본 고안 장치의 분해사시도,2 is an exploded perspective view of the device of the present invention,

도 3은 본 고안에 따른 상부브래킷의 저면도,3 is a bottom view of the upper bracket according to the present invention,

도 4는 본 고안에 따른 상부브래킷의 측면도,4 is a side view of the upper bracket according to the present invention,

도 5는 본 고안에 따른 하부브래킷의 평면도,5 is a plan view of the lower bracket according to the present invention,

도 6은 본 고안 장치의 결합단면도,6 is a cross-sectional view of the device of the present invention,

도 7은 본 고안 장치가 설치된 상태의 다른 일 측면도이다.7 is another side view of the device of the present invention installed.

*도면의주요부분에대한부호의설명** Explanation of symbols on the main parts of the drawings *

100 : 본체 110 : 하부브래킷100: main body 110: lower bracket

112 : 수평판 114 : 수직판112: horizontal plate 114: vertical plate

114-1 : 제1수직판 114-2 : 제2수직판114-1: First Vertical Plate 114-2: Second Vertical Plate

114a : 샤프트홀 116 : 수직보조판114a: shaft hole 116: vertical auxiliary plate

120 : 상부브래킷 122 : 수평판120: upper bracket 122: horizontal plate

124 : 수직판 124a : 샤프트홀124: vertical plate 124a: shaft hole

126 : 수직보조판 130 : 샤프트126: vertical auxiliary plate 130: shaft

132 : 몸통 132a : 키홈132: torso 132a: keyway

134 : 머리부 136 : 스페이서134: head 136: spacer

140 : 키플레이트 150 : 수평보조판140: key plate 150: horizontal auxiliary plate

152 : 대들보 160 : 설치면152: girders 160: mounting surface

162 : 콘크리트블록162: Concrete Block

Claims (3)

교각과 상판의 사이에 설치되어 상판을 지지하여주는 교좌장치를 구성함에 있어서, In constructing a bridge device installed between the bridge and the top plate to support the top plate, 수평판의 상부면에 제1수직판과 제2수직판이 거리를 두고 평행하게 수직 설치되게 하되, 각 수직판에 동일중심을 이루는 샤프트홀이 수평으로 관통되게 하고, 제2수직판의 샤프트홀 상부 양쪽에 구멍이 형성되게 하며, 상기 교각에 수평판이 고정되는 하부브래킷과; The first vertical plate and the second vertical plate are installed vertically parallel to the upper surface of the horizontal plate at a distance, and the shaft holes forming the same center on each vertical plate are horizontally penetrated, and the upper portion of the shaft hole of the second vertical plate. A lower bracket for forming holes in both sides and having a horizontal plate fixed to the piers; 수평판의 하부면에 상기 제1 및 제2수직판의 사이에 위치하게 되는 수직판이 설치되게 하되, 상기 샤프트홀과 동일 중심을 이루게 되는 샤프트홀이 수평으로 관통되게 하며, 상기 상판 하부의 빔에 상기 수평판이 고정되는 상부브래킷과; A vertical plate positioned between the first and second vertical plates is installed on the lower surface of the horizontal plate, and the shaft hole, which is co-centered with the shaft hole, is horizontally penetrated. An upper bracket to which the horizontal plate is fixed; 원통체로 몸통의 한 쪽에는 더 큰 직경의 머리부가 형성되고, 반대편 쪽의 상부에는 키홈이 형성되며, 제1 및 제2수직판의 샤프트홀과 수직판의 샤프트홀을 관통하여 상부브래킷이 하부브래킷에서 회동되게 하는 샤프트와; The cylindrical body is formed with a larger diameter head on one side of the body, and a key groove is formed on the upper side on the opposite side, and the upper bracket passes through the shaft hole of the first and second vertical plates and the shaft hole of the vertical plate. A shaft to pivot in; 상기 제2수직판의 구멍과 대응하는 구멍을 갖는 판체로 형성되고, 제2수직판의 샤프트홀을 통과하는 샤프트의 키홈에 하단부가 삽입되며, 볼트로 제2수직판의 측면에 고정되어 샤프트가 이탈됨이 방지되게 하는 키플레이트로 구성되는 목재교의 교좌장치.A lower end portion is inserted into a key groove of a shaft passing through the shaft hole of the second vertical plate, and is fixed to the side of the second vertical plate by a bolt. A wooden bridge stairway device consisting of keyplates to prevent disengagement. 제 1 항에 있어서, 상기 제1수직판과 수직판의 일 측면, 제2수직판과 수직판의 반대편 일 측면 사이에 위치하는 샤프트의 몸통에는 스페이서가 각각 설치되게 하여서 됨을 특징으로 하는 목재교의 교좌장치.The wooden bridge of claim 1, wherein a spacer is provided on a body of a shaft positioned between one side of the first vertical plate and the vertical plate and one side of the second vertical plate and the opposite side of the vertical plate. Device. 제 1 항에 있어서, 상기 상부브래킷의 수직판에는 샤프트홀을 향하게 되는 윤활유주입구가 형성됨을 특징으로 하는 목재교의 교좌장치.The method of claim 1, wherein the vertical plate of the upper bracket lubricating oil inlet that is directed toward the shaft hole is characterized in that the wooden bridge bridge device.
KR1020070076639A 2007-07-31 2007-07-31 A prop system for wooden bridge KR100767172B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070076639A KR100767172B1 (en) 2007-07-31 2007-07-31 A prop system for wooden bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070076639A KR100767172B1 (en) 2007-07-31 2007-07-31 A prop system for wooden bridge

Publications (1)

Publication Number Publication Date
KR100767172B1 true KR100767172B1 (en) 2007-10-15

Family

ID=39420271

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070076639A KR100767172B1 (en) 2007-07-31 2007-07-31 A prop system for wooden bridge

Country Status (1)

Country Link
KR (1) KR100767172B1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100885817B1 (en) * 2008-09-10 2009-02-26 매크로드 주식회사 A bearing for monorail
KR100912836B1 (en) * 2009-02-26 2009-08-18 주식회사 지오환경 Support structure for monorail
KR100990801B1 (en) 2010-07-15 2010-10-29 김종창 Wooden structure have a clearance prevention meterial
KR101260982B1 (en) * 2012-03-14 2013-05-06 이창남 Shoe for wooden bridge
KR101621457B1 (en) * 2013-12-13 2016-05-16 (주)태인이앤씨 Assembly type protective apparatus for bridge bearing
CN105951585A (en) * 2016-06-20 2016-09-21 中山市公路钢结构制造有限公司 Support structure of integrated steel-framed bridge
CN106702887A (en) * 2016-12-30 2017-05-24 上海建工集团股份有限公司 Sliding friction damper for bridge
CN109722986A (en) * 2018-12-11 2019-05-07 九江职业技术学院 A kind of pivoting friction damping support device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030034850A (en) * 2001-10-29 2003-05-09 조영철 A Structural Bearing with a Double Shock Absorbing Device
KR20040077214A (en) * 2003-02-28 2004-09-04 동일고무벨트주식회사 Structural bearing having a fiber-optic sensor and method for measuring the supporting load in use of the same

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030034850A (en) * 2001-10-29 2003-05-09 조영철 A Structural Bearing with a Double Shock Absorbing Device
KR20040077214A (en) * 2003-02-28 2004-09-04 동일고무벨트주식회사 Structural bearing having a fiber-optic sensor and method for measuring the supporting load in use of the same

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100885817B1 (en) * 2008-09-10 2009-02-26 매크로드 주식회사 A bearing for monorail
KR100912836B1 (en) * 2009-02-26 2009-08-18 주식회사 지오환경 Support structure for monorail
KR100990801B1 (en) 2010-07-15 2010-10-29 김종창 Wooden structure have a clearance prevention meterial
KR101260982B1 (en) * 2012-03-14 2013-05-06 이창남 Shoe for wooden bridge
KR101621457B1 (en) * 2013-12-13 2016-05-16 (주)태인이앤씨 Assembly type protective apparatus for bridge bearing
CN105951585A (en) * 2016-06-20 2016-09-21 中山市公路钢结构制造有限公司 Support structure of integrated steel-framed bridge
CN106702887A (en) * 2016-12-30 2017-05-24 上海建工集团股份有限公司 Sliding friction damper for bridge
CN109722986A (en) * 2018-12-11 2019-05-07 九江职业技术学院 A kind of pivoting friction damping support device

Similar Documents

Publication Publication Date Title
KR100767172B1 (en) A prop system for wooden bridge
KR100948359B1 (en) The bridge upper structure lifting method for which bridge upper structure lifter which does the bridge shue function and this were used
KR101464460B1 (en) load spread preclusion tool for soundproofed wall
KR100995820B1 (en) Temporary bridge construction methods absorbing longtidudinal displacement and live load impact
KR100964729B1 (en) Bridge lifting apparatus for changing bridge bearings
KR101172650B1 (en) Eccentric load-preventive u-head jack
KR100961547B1 (en) Hydraulic lifting device, the bracket and the method for changing bridge bearings using them
GB2558272A (en) Balcony structures
CN210529715U (en) Detachable deep foundation pit excavation braced system
KR100845028B1 (en) The earthquake resistant reinforcement method for preexistence bridges
JP2011021332A (en) Construction method for base isolation structure
KR101131079B1 (en) Multi U-head Support Apparatus For Bridge Construction
JP3175075U (en) Solar cell module mount
KR102253508B1 (en) Expansion joint apparatus
KR102134745B1 (en) Bridge support and installing method thereof
CN115354582B (en) Mounting bracket for prefabricated sectional capping beam and using method thereof
KR20110113840A (en) Bearing and constructing method for bridge
KR102433336B1 (en) Steel pipe girder with guide-plate and the construction method thereof
JP5386214B2 (en) Foundation structure
KR20120003729U (en) System support Head
CN113417395A (en) Shock insulation floor system suitable for steel structure with function capable of being restored after earthquake
JP4190334B2 (en) Repair structure and repair method to repair a function-separated type support device using the base plate of the existing elastic support device
KR101840822B1 (en) Earthquake resistant reinforcement apparatus for bridge using prestress
KR20130065941A (en) Arch type system scaffolding and the construction method of the same
KR102123528B1 (en) Installing method of the seismic damping device on exiting falling prevention device

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121008

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20130722

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140925

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20170925

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20190725

Year of fee payment: 13