KR100753694B1 - Folding apparatus of work lifter for vehicle for working of bridge slab - Google Patents

Folding apparatus of work lifter for vehicle for working of bridge slab Download PDF

Info

Publication number
KR100753694B1
KR100753694B1 KR1020070027219A KR20070027219A KR100753694B1 KR 100753694 B1 KR100753694 B1 KR 100753694B1 KR 1020070027219 A KR1020070027219 A KR 1020070027219A KR 20070027219 A KR20070027219 A KR 20070027219A KR 100753694 B1 KR100753694 B1 KR 100753694B1
Authority
KR
South Korea
Prior art keywords
handrail
bridge
work
adjusting means
vertical
Prior art date
Application number
KR1020070027219A
Other languages
Korean (ko)
Other versions
KR20070040352A (en
Inventor
나병근
Original Assignee
주식회사 엠코리아
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 엠코리아 filed Critical 주식회사 엠코리아
Priority to KR1020070027219A priority Critical patent/KR100753694B1/en
Publication of KR20070040352A publication Critical patent/KR20070040352A/en
Application granted granted Critical
Publication of KR100753694B1 publication Critical patent/KR100753694B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges

Abstract

본 발명은 교량 슬래브 작업차의 작업리프트 접이장치에 관한 것으로서, 교량의 상판 바닥면에 바퀴(1a)가 설치된 새들(1)과, 상기 새들(1)의 상면에 안착되어 작업자가 그 위에 서서 작동 조절하는 크레인 등이 상면에 설치된 상판 프레임(2)과, 상기 상판 프레임(2)의 일단에 수직 하방인 교량의 측면으로 높이 조절가능하도록 연결된 수직높이조절수단(30)과, 상기 수직높이조절수단(30)의 하단에 수평으로 다수의 인장볼트(4a)를 수평으로 체결하여 연결하고, 그 위에 작업자가 교량 하단의 거푸집을 해체하는 작업을 하도록 작업자의 작업리프터(40)를 수평으로 이동 가능하도록 연결된 수평길이 조절수단(50)과, 상기 수평길이 조절수단(50)을 좌우로 회전시키는 회전수단(60)과, 상기 상판 프레임(2)의 타측 상면에는 설치된 밸런스 웨이트(5)와, 상기 밸런스 웨이트(5)의 상면에 설치되어 수직높이 조절수단(30) 및 수평길이 조절수단(50)에 전원을 공급하도록 설치된 발전기(6)로 구성된 교량 슬래브 작업차에 있어서, 상기 작업리프터(40)는 바닥판(41)과; 상기 바닥판(41)의 사방면에 세워진 난간대(42)와; 상기 난간대(42)의 수직난간대(42a)의 하부에 연결되어 상기 난간대(42)를 모두 접는 접이수단(43)으로 이루어진 것을 특징으로 한다. 이와 같이 구성된 본 발명은 전원이 인가된 모터의 정역 회전에 의해 수평 및 수직 난간대를 접었다 폈다 할 수 있도록 구성하여 난간대의 세움 높이를 조절하는 것이 가능할 뿐만 아니라 교량 슬래브 작업자의 작업 위치로 접근하기 용이하여 작업의 효율성이 있다.The present invention relates to a work lift folding device of a bridge slab work vehicle, which includes a saddle (1) having wheels (1a) installed on the bottom surface of a bridge and a top surface of the saddle (1) to be operated by an operator standing thereon. An upper plate frame (2) having a crane or the like to be adjusted to the upper surface, a vertical height adjusting means (30) connected to the side of the bridge that is vertically downward to one end of the upper frame (2), and the vertical height adjusting means A plurality of tension bolts 4a are horizontally fastened and connected to the bottom of the 30, and the worker's work lifter 40 can be moved horizontally so that the worker can dismantle the formwork at the bottom of the bridge thereon. Connected horizontal length adjusting means 50, a rotating means 60 for rotating the horizontal length adjusting means 50 to the left and right, a balance weight 5 provided on the other upper surface of the upper frame 2, and the balanceIn the bridge slab work vehicle, which is provided on the upper surface of the sheet (5) and composed of a generator (6) installed to supply power to the vertical height adjusting means (30) and the horizontal length adjusting means (50), the work lifter (40) is Bottom plate 41; A handrail 42 erected on all sides of the bottom plate 41; It is characterized in that the folding means 43 is connected to the lower portion of the vertical handrail 42a of the handrail 42 to fold all of the handrail 42. The present invention configured as described above is configured to be able to fold and unfold the horizontal and vertical handrails by the forward and reverse rotation of the motor is not only possible to adjust the height of the handrail stand, but also easy to access the working position of the bridge slab worker There is efficiency of work.

Description

교량 슬래브 작업차의 작업리프트 접이장치{Folding apparatus of work lifter for vehicle for working of bridge slab}Folding apparatus of work lifter for vehicle for working of bridge slab}

도1은 종래의 교량 슬래브 작업차를 도시한 측면도,1 is a side view showing a conventional bridge slab working vehicle;

도2a 및 도2b는 종래의 교량 슬래브 작업차의 인장응력 발생으로 연결부가 파괴되는 상태를 도시한 단면도,2A and 2B are cross-sectional views showing a state in which a connection part is broken by generation of tensile stress in a conventional bridge slab working vehicle;

도3은 본 발명에 의한 교량 슬래브 작업차를 도시한 단면도,3 is a cross-sectional view showing a bridge slab working vehicle according to the present invention;

도4는 본 발명에 의한 교량 슬래브 작업차를 도시한 사시도,4 is a perspective view showing a bridge slab working vehicle according to the present invention;

도5는 본 발명의 교량 슬래브 작업차의 수직 및 수평 조절 수단의 연결부를 도시한 단면도,5 is a cross-sectional view showing the connecting portion of the vertical and horizontal adjusting means of the bridge slab work vehicle of the present invention;

도6은 본 발명의 교량 슬래브 작업차의 수직 높이 조절수단을 상세 도시한 사시도,Figure 6 is a perspective view showing in detail the vertical height adjustment means of the bridge slab work vehicle of the present invention,

도7은 본 발명에 의한 교량 슬래브 작업차를 도시한 측면 사시도,7 is a side perspective view showing a bridge slab working vehicle according to the present invention;

도8은 본 발명에 의한 교량 슬래브 작업차의 작업리프트를 도시한 사시도,8 is a perspective view showing a work lift of a bridge slab work vehicle according to the present invention;

도8a는 도8의 A-A 선에 따른 단면도,8A is a cross-sectional view taken along the line A-A of FIG. 8;

도9는 본 발명에 의한 교량 슬래브 작업차의 작업리프트의 난간이 접힌 상태를 도시한 정면도이다.Fig. 9 is a front view showing a state where the handrail of the work lift of the bridge slab work vehicle according to the present invention is folded.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for main parts of the drawings>

10 : 리어데크 11 : 양측면 게이트 부재10: rear deck 11: both side gate member

1 : 새들 2 : 상판 프레임1: saddle 2: top frame

5 : 밸런스 웨이트 6 : 발전기5: balance weight 6: generator

30 : 수직높이조절수단 31 : 마스터 아우터부재30: vertical height adjustment means 31: master outer member

32 : 마스터 인너부재 33 : 유압실린더32: master inner member 33: hydraulic cylinder

40 : 작업리프터 41 : 바닥판40: work lifter 41: bottom plate

42 : 난간대 42a : 수직난간대42: handrail 42a: vertical handrail

42b : 수평난간대 42c : 양측난간대42b: horizontal railings 42c: bilateral railings

42d : 중앙난간대 43 : 접이수단42d: Central railing 43: Folding means

43a : 기어형상의 홈 43b : 기어 43a: gear groove 43b: gear

43c : 기어 축 43d : 모터43c: gear shaft 43d: motor

43e : 전선 43e: Wire

본 발명은 교량 슬래브 작업차의 작업리프트 접이장치에 관한 것으로서, 더욱 상세하게는, 수평붐대와 회전하도록 하여 작업차의 이동설치가 용이하도록 하여 공기를 단축시킴과 동시에 시공 비용을 절감하도록 하며, 작업 난간대를 손쉽게 접이 가능하도록 하여 교량 하부 거푸집 제거 작업시 접근성이 용이하도록 한 교량 슬래브 작업차의 작업리프트 접이장치에 관한 것이다. The present invention relates to a work lift folding device for a bridge slab work vehicle, and more particularly, to rotate with a horizontal boom to facilitate the installation and movement of the work vehicle to shorten the air and at the same time reduce the construction cost, work The present invention relates to a worklift folding device for a bridge slab work vehicle, which makes the handrail easily foldable, thereby making it easy to access when removing the formwork under the bridge.

일반적으로, 종래의 건물 가설에 따른 교량 상부 슬래브 콘크리트 타설을 위해 거푸집을 설치하는 데, 교각 상단에 설치되는 다수개의 교량 거더 하부 플랜지의 돌출 부위에 목재 브레싱 동바리공을 설치한 후, 종방향으로 목재빔을 깔고, 바닥판 거푸집을 설치하며, 상기 거푸집의 목재빔 상단부에 합판을 교량 거더 높이와 일치되게 고정 설치한 상태에서 교량 거더와 거푸집 상부에 콘크리트 타설이 완료되면 거푸집을 해체하는 작업을 실시하고 있다.In general, the formwork is installed for the concrete slab of the upper bridge slab according to the conventional building hypothesis, after installing a wood-bracing copper ball on the protruding portion of the lower bridge girder flange installed on the top of the bridge, the wood in the longitudinal direction After laying the beam, install the bottom plate formwork, and dismantle the formwork when concrete placing is completed on the bridge girder and the formwork with the plywood fixed to the bridge beam girder at the upper end of the wooden beam. have.

이러한 거푸집을 해체하는 작업차는 도1, 도2a 및 도2b에 도시된 바와 같이, 교량의 상판 바닥면에 바퀴(1a)가 설치된 새들(1)과, 상기 새들(1)의 상면에 안착되어 작업자가 그 위에 서서 작동 조절하는 크레인 등이 상면에 설치된 상판 프레임(2)과, 상기 상판 프레임(2)의 일단에 수직 하방인 교량의 측면으로 연결되어 수직붐대(3)와, 상기 수직붐대(3)의 하단에 수평으로 인장볼트(4a)를 수직으로 체결하여 연결하고, 그 위에 작업자가 교량 하단의 거푸집을 해체하는 작업을 하도록 하는 수평붐대(4)와, 상기 상판 프레임(2)의 타측 상면인 교량의 상측에는 상기 수직 및 수평붐대(3, 4)의 하중에 대응하여 유지되도록 밸런스 웨이트(5)가 설치되어 있다.As shown in Figures 1, 2a and 2b, the work vehicle for dismantling such a formwork is provided with saddles (1) having wheels (1a) installed on the bottom surface of the bridge, and seated on the upper surface of the saddle (1) A crane or the like for operating and standing thereon is connected to the upper frame 2 provided on the upper surface, and to the side of the bridge that is vertically downward to one end of the upper frame 2, the vertical boom 3 and the vertical boom 3 And horizontally tighten the tension bolt (4a) to the bottom of the vertical connection, and the horizontal boom (4) for the operator to dismantle the formwork at the bottom of the bridge thereon, and the upper surface of the other side of the upper frame (2) On the upper side of the bridge, a balance weight 5 is provided so as to be maintained in response to the loads of the vertical and horizontal booms 3 and 4.

상기한 바와 같이 구성된 종래의 교량 슬래브 작업차는 수직붐대(3)와 수평붐대(4)의 연결부가 하중에 의해 파손되는 문제점이 있고, 수평붐대(4)를 회전시키는 장치가 없어 수직붐대(3)와 수평붐대(4)가 일체로 붐대를 설치하는 데, 작업 시간이 많이 소요되고, 이 작업차를 이동설치시 교각에 걸려 작업차의 붐대를 해체후 다시 설치해야 하는 등 작업이 어렵고 공사 기간이 많이 소요되어 교량의 시공 기 간이 길어져 많은 비용이 소요되는 문제점이 있다.Conventional bridge slab working vehicle configured as described above has a problem that the connection portion of the vertical boom 3 and the horizontal boom 4 is damaged by the load, there is no device for rotating the horizontal boom 4 vertical boom (3) And the horizontal boom (4) to install the boom integrally, it takes a lot of work time, it is difficult to work, such as the need to dismantle and re-install the boom of the work vehicle when the work vehicle is hung on the pier There is a problem in that it takes a lot of cost because the construction period of the bridge is long.

따라서, 본 발명은 상기와 같은 문제점을 해결하기 위한 것으로써, 본 발명의 목적은 수직붐대와 수평붐대의 연결부를 견고하게 구성하였고, 수직붐대가 상하 작동되도록 하고, 수평붐대와 회전하도록 하여 작업차의 이동설치가 용이하도록 하여 공기를 단축시킴과 동시에 시공 비용을 절감하도록 하며, 작업 난간대를 손쉽게 접이 가능하도록 하여 교량 하부 거푸집 제거 작업시 접근성이 용이하도록 한 교량 슬래브 작업차의 작업 난간대 접이장치를 제공하는 데 있다. Therefore, the present invention is to solve the above problems, the object of the present invention is to firmly configure the connecting portion of the vertical boom and the horizontal boom, the vertical boom to operate up and down, and to rotate with the horizontal boom working vehicle Provides a work railing folding device for a bridge slab work car that makes it easy to move and install, shortens air and at the same time reduces construction costs, and allows easy access to the work railings for easy access when removing the formwork under the bridge. There is.

따라서, 상기와 같은 목적을 실현하기 위하여 본 발명에 따른 교량 슬래브 작업차의 작업리프트 접이장치는, 교량의 상판 바닥면에 바퀴(1a)가 설치된 새들(1)과, 상기 새들(1)의 상면에 안착되어 작업자가 그 위에 서서 작동 조절하는 크레인 등이 상면에 설치된 상판 프레임(2)과, 상기 상판 프레임(2)의 일단에 수직 하방인 교량의 측면으로 높이 조절가능하도록 연결된 수직높이조절수단(30)과, 상기 수직높이조절수단(30)의 하단에 수평으로 다수의 인장볼트(4a)를 수평으로 체결하여 연결하고, 그 위에 작업자가 교량 하단의 거푸집을 해체하는 작업을 하도록 작업자의 작업리프터(40)를 수평으로 이동 가능하도록 연결된 수평길이 조절수단(50)과, 상기 수평길이 조절수단(50)을 좌우로 회전시키는 회전수단(60)과, 상기 상판 프레임(2)의 타측 상면에는 설치된 밸런스 웨이트(5)와, 상기 밸런스 웨이트(5)의 상면에 설치되어 수직높이 조절수단(30) 및 수평길이 조절수단(50)에 전원을 공급하도록 설치된 발전기(6)로 구성된 교량 슬래브 작업차에 있어서, 상기 작 업리프터(40)는 바닥판(41)과; 상기 바닥판(41)의 사방면에 세워진 난간대(42)와; 상기 난간대(42)의 수직난간대(42a)의 하부에 연결되어 상기 난간대(42)를 모두 접는 접이수단(43)으로 이루어진 것을 특징으로 한다. Accordingly, in order to achieve the above object, the work lift folding device of a bridge slab work vehicle according to the present invention includes a saddle 1 having wheels 1a installed on the bottom surface of a bridge and an upper surface of the saddle 1. Vertical height adjusting means connected to the upper frame (2) installed on the upper surface and the crane is mounted on the upper surface and the side of the bridge that is vertically downward to one end of the upper frame (2) 30) and a plurality of tension bolts (4a) horizontally connected to the bottom of the vertical height adjustment means 30 horizontally, and the worker's work lifter to work to dismantle the formwork at the bottom of the bridge thereon Horizontal length adjusting means 50 connected to be movable horizontally 40, a rotating means 60 for rotating the horizontal length adjusting means 50 to the left and right, and the other side of the upper frame 2 is installed On the bridge slab work vehicle composed of a balance weight (5) and a generator (6) installed on the upper surface of the balance weight (5) and installed to supply power to the vertical height adjusting means (30) and the horizontal length adjusting means (50). The work lifter 40 includes: a bottom plate 41; A handrail 42 erected on all sides of the bottom plate 41; It is characterized in that the folding means 43 is connected to the lower portion of the vertical handrail 42a of the handrail 42 to fold all of the handrail 42.

이하, 본 발명의 실시예를 첨부된 도면을 참조하면서 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도3은 본 발명에 의한 교량 슬래브 작업차를 도시한 단면도이며, 도4는 본 발명에 의한 교량 슬래브 작업차를 도시한 사시도이며, 도5는 본 발명의 교량 슬래브 작업차의 수직 및 수평 조절 수단의 연결부를 도시한 단면도이며, 도6은 본 발명의 교량 슬래브 작업차의 수직 높이 조절수단을 상세 도시한 사시도이며, 도7은 본 발명에 의한 교량 슬래브 작업차를 도시한 측면 사시도이며, 도8은 본 발명에 의한 교량 슬래브 작업차의 작업리프트를 도시한 사시도이며, 도8a는 도8의 A-A 선에 따른 단면도이며, 도9는 본 발명에 의한 교량 슬래브 작업차의 작업리프트의 난간이 접힌 상태를 도시한 정면도이다.Figure 3 is a cross-sectional view showing a bridge slab working vehicle according to the present invention, Figure 4 is a perspective view showing a bridge slab working vehicle according to the present invention, Figure 5 is a vertical and horizontal adjustment means of the bridge slab working vehicle of the present invention 6 is a perspective view showing in detail the vertical height adjustment means of the bridge slab work vehicle of the present invention, Figure 7 is a side perspective view showing a bridge slab work vehicle according to the present invention, Figure 8 Is a perspective view showing a work lift of a bridge slab work vehicle according to the present invention, FIG. 8A is a cross-sectional view taken along line AA of FIG. 8, and FIG. 9 is a state in which the handrail of the work lift of a bridge slab work vehicle according to the present invention is folded. It is a front view showing.

본 발명에 의한 교량 슬래브 작업차는, 도3 내지 도7에 도시된 바와 같이, 교량의 상판 바닥면에 바퀴(1a)가 설치된 새들(1)과, 상기 새들(1)의 상면에 안착되어 작업자가 그 위에 서서 작동 조절하는 크레인 등이 상면에 설치된 상판 프레임(2)과, 상기 상판 프레임(2)의 일단에 수직 하방인 교량의 측면으로 높이 조절가능하도록 연결된 수직높이조절수단(30)과, 상기 수직높이조절수단(30)의 하단에 수평으로 다수의 인장볼트(4a)를 수평으로 체결하여 연결하고, 그 위에 작업자가 교량 하단의 거푸집을 해체하는 작업을 하도록 작업자의 작업리프터(40)를 수평으로 이동 가능하도록 연결된 수평길이 조절수단(50)과, 상기 수평길이 조절수단(50)을 좌우로 회전시키는 회전수단(60)과, 상기 상판 프레임(2)의 타측 상면에는 설치된 밸런스 웨이트(5)와, 상기 밸런스 웨이트(5)의 상면에 설치되어 수직높이 조절수단(30) 및 수평길이 조절수단(50)에 전원을 공급하도록 설치된 발전기(6)로 구성된다.Bridge slab working vehicle according to the present invention, as shown in Figures 3 to 7, the saddle 1 is provided with a wheel (1a) is installed on the top plate bottom surface of the bridge, and the worker is seated on the upper surface of the saddle (1) The upper plate frame (2) installed on the upper surface and the crane to operate and adjust thereon, the vertical height adjusting means (30) connected to the height of the side of the bridge that is vertically downward to one end of the upper frame (2), and A plurality of tension bolts 4a are horizontally fastened and connected to the bottom of the vertical height adjusting means 30, and the work lifter 40 of the worker is horizontal so that the worker dismantles the formwork at the bottom of the bridge. Horizontal length adjusting means (50) connected to be movable in the movement, the rotating means 60 for rotating the horizontal length adjusting means 50 to the left and right, and the balance weight (5) installed on the other upper surface of the upper frame (2) With the balance Installed on the upper surface of the site (5) is configured to power the control means of the vertical height 30 and the horizontal length adjusting means (50) to the generator (6) provided so as to supply.

상기 수직높이 조절수단(30)은 마스터 아우터부재(31)와, 상기 마스터 아우터부재(31)의 내측에 설치된 마스터 인너부재(32)와, 상기 마스터 인너부재(33)의 외주면에 일측이 고정되고, 타측은 마스터 아우터부재(31)에 고정되어 유압에 의해 작동되면서 상기 마스터 인너부재(32)를 상하 작동시키는 유압실린더(33)로 이루어진다.The vertical height adjusting means 30 is fixed to one side of the master outer member 31, the master inner member 32 installed inside the master outer member 31, and the outer circumferential surface of the master inner member 33, , The other side is fixed to the master outer member 31 is operated by the hydraulic pressure is made of a hydraulic cylinder 33 to operate the master inner member 32 up and down.

상기 수평길이 조절수단(50)은 상기 마스터 아우터부재(31)의 하단에 수평으로 연결 고정된 아우터붐(51)과, 상기 아우터붐(51) 내에 설치되어 서로 와이어로 연결되어 와이어를 잡아당김에 따라 교량의 하부에서 좌우로 이동하는 인너붐(52)으로 이루어진다.The horizontal length adjusting means 50 is connected to the outer boom 51 and the outer boom 51 fixed to the lower end of the master outer member 31 and the outer boom 51 is connected to each other by a wire to pull the wire In accordance with the inner boom 52 to move from side to side in the lower portion.

상기 회전수단(60)은 상기 마스터 인너부재(32)의 상단에 연결되어 마스터 인너부재(32)를 회전시킴에 따라 마스터 아우터부재(31)가 회전하여 아우터붐(51)과 인너붐(52)을 좌우로 회전시키는 스윙기어(61)로 이루어진다.The rotation means 60 is connected to the upper end of the master inner member 32 to rotate the master inner member 32, the master outer member 31 is rotated to the outer boom 51 and the inner boom 52 It consists of a swing gear 61 to rotate left and right.

상기 상판 프레임(2)에는 상기 작업리프터(40)에서 작업하는 작업자의 상태를 CCD카메라(71)로 감시한 것을 디스플레이하는 LCD모니터(70)가 설치되어 있고, 상기 CCD카메라(71)는 마스터 아우터부재(31)의 하측면에 설치된다.The upper frame 2 is provided with an LCD monitor 70 for displaying a monitor of the state of the worker working in the work lifter 40 with the CCD camera 71, and the CCD camera 71 has a master outer. It is provided in the lower surface of the member 31.

상기 작업리프터(40)는 도8 및 도9에 도시된 바와 같이, 바닥판(41)과, 상기 바닥판(41)의 사방면에 세워진 난간대(42)와, 상기 난간대(42)의 수직난간대(42a)의 하부에 연결되어 상기 난간대(42)를 모두 접는 접이수단(43)으로 이루어진다.As shown in FIGS. 8 and 9, the work lifter 40 includes a bottom plate 41, a handrail 42 erected on all sides of the bottom plate 41, and a vertical handrail of the handrail 42. It is connected to the lower portion of (42a) consists of folding means 43 for folding all of the handrail 42.

상기 난간대(42)는 상기 바닥판(41)의 두 가로면과 세로면에 동일하게 설치되어 있으되, 수평난간대(42b)와, 상기 수평난간대(42b)의 하부에 회전가능하게 연결된 수직난간대(42a)로 이루어진다. The balustrade 42 is installed on the two horizontal and vertical surfaces of the bottom plate 41 in the same manner, a horizontal balustrade 42b and a vertical balustrade 42a rotatably connected to the lower portion of the horizontal balustrade 42b. )

상기 수평난간대(42b)는 양측에 사각봉 형상의 양측난간대(42c)와, 상기 양측난간대(42c)의 중앙에 삽입된 중앙난간대(42d)로 이루어지고, 상기 양측난간대(42c)의 하부면에는 볼트(98) 및 너트(99)가 삽입되어 상기 수직난간대(42a)를 상기 접이수단(43)에 의해 회전 가능하도록 연결되어 있다.The horizontal handrail 42b is composed of a square bar-shaped both handrails 42c on both sides, and a central handrail 42d inserted into the center of the both handrails 42c, and on the lower surfaces of the both handrails 42c. A bolt 98 and a nut 99 are inserted into the vertical handrail 42a so as to be rotatable by the folding means 43.

상기 접이수단(43)은 상기 수직난간대(42a)의 하부에 형성된 기어형상의 홈(43a)과, 상기 기어형상의 홈(43a)에 삽입되는 기어(43b)와, 상기 기어(43b)의 회전 중심에 일체로 연결된 축(43c)과, 상기 축(43c)을 정역 회전시키는 모터(43d)와, 상기 모터(43d)에 전원을 인가하는 전선(43e)으로 이루어진다.The folding means 43 is a gear-shaped groove 43a formed in the lower portion of the vertical handrail 42a, a gear 43b inserted into the gear-shaped groove 43a, and the rotation of the gear 43b. A shaft 43c integrally connected to the center, a motor 43d for forward and reverse rotation of the shaft 43c, and an electric wire 43e for applying power to the motor 43d.

상기 바닥판(41)의 가로면의 경우는 하부에 접이수단(43)을 구비하지 않고 상기 바닥판(41)에 힌지부재(42e)로 힌지 결합된 수직난간대(42a)가 추가로 설치된다.In the case of the horizontal surface of the bottom plate 41 is provided with a vertical handrail 42a hinged to the bottom plate 41 by a hinge member 42e without a folding means 43 at the bottom.

상기한 바와 같이 구성된 본 발명의 교량 슬래브 작업차는, 한 쌍의 새들(1)의 하단에 바퀴(1a)가 설치되어 교량 상판 위에서 이동 가능하도록 설치된다. 좌우조향 시스템에 의해 좌우로 이동 가능하게 되어 있다. 이러한 작업차는 수직높이 조절수단(30)의 상단에 설치된 회전수단(60)의 스윙기어(61)에 의해 교량의 측면으로 내려진 수평 길이 조절 수단(50)을 작업하고자 하는 교량의 하부에 위치하도록 회전시킨다.Bridge slab working vehicle of the present invention configured as described above, the wheel (1a) is installed on the lower end of the pair of saddle (1) is installed to be movable on the bridge top plate. The left and right steering system makes it possible to move from side to side. This work vehicle is rotated so that the horizontal length adjusting means 50 lowered to the side of the bridge by the swing gear 61 of the rotating means 60 installed on the upper end of the vertical height adjusting means 30 is located under the bridge to be worked. Let's do it.

상기 수평길이 조절수단(50)의 아우터붐(51) 내의 인너붐(52)은 서로 와이어로 연결되어 와이어를 잡아당김에 따라 교량의 하부에서 좌우로 이동한다. 상기 인너붐(52)의 상면에는 자체 상하 작동하는 작업리프터(40)가 작업자가 작업하는 위치로의 이동이 편리하고, 교량의 하부에서 좌우로 이동하는 것이 가능하다.The inner booms 52 in the outer boom 51 of the horizontal length adjusting means 50 are connected to each other by wires and move left and right at the bottom of the bridge as the wires are pulled. On the upper surface of the inner boom 52, the work lifter 40 which operates itself up and down is convenient to move to the position where the worker works, and it is possible to move left and right from the bottom of the bridge.

또한, 상기 마스터 아우터부재(31)의 하측면에는 CCD카메라(71)가 설치되어 상기 작업리프터(40)에서 작업하는 작업자의 상태를 LCD모니터(70)에서 디스플레이하여 작업자의 위치에 따른 안전 상태를 감시하게 된다.In addition, a CCD camera 71 is installed on the lower side of the master outer member 31 to display the state of the worker working on the work lifter 40 on the LCD monitor 70 to display the safety state according to the position of the worker. Will be monitored.

상기 작업리프터(40)는 그 바닥판(41)의 사방에 난간대(42)가 설치되는 바, 이 난간대(42)는 접었다 펴는 것이 가능한 바, 상기 바닥판(41)의 가로면 양측에 설치된 각각의 모터(43d)에 전원을 인가하여 모터 축(43c)을 회전시키면, 이 축(43c)에 연결된 기어(43b)가 하나는 시계 반대 방향으로 다른 하나는 시계 방향으로 회전하여 수직난간대(42a)가 그 하단을 중심으로 하나는 시계 반대 방향으로 다른 하나는 시계 방향으로 각각 회전하게 된다. 이와 같이 회전하면, 수평난간대(42b) 중 양측난간대(42c)는 각각 중앙측으로 수평이동하면서 그 중앙난간대(42d)가 양측난간대(42c) 내로 삽입되면서 하측으로 내려오게 되어 도9와 같이 접힌 상태로 된다. 반대로 난간대(42)를 펼 경우에는 상기한 작동과 반대로 하면 된다.The work lifter 40 is provided with a handrail 42 on all sides of the bottom plate 41, and the handrail 42 can be folded and unfolded, respectively provided on both sides of the bottom surface of the bottom plate 41. When the motor shaft 43c is rotated by applying power to the motor 43d, one of the gears 43b connected to the shaft 43c rotates in the counterclockwise direction and the other clockwise in the vertical handrail 42a. It rotates around its bottom one counterclockwise and the other clockwise. When rotated in this way, the two handrails 42c of the horizontal handrail 42b are horizontally moved toward the center, respectively, while the middle handrail 42d is inserted into both handrails 42c and lowered to the lower side as shown in FIG. 9. do. On the contrary, when the handrail 42 is extended, the above operation may be reversed.

상기한 바와 같은 본 발명의 교량 슬래브 작업차의 작업리프트 접이장치에 의하면, 전원이 인가된 모터의 정역 회전에 의해 수평 및 수직 난간대를 접었다 폈다 할 수 있도록 구성하여 난간대의 세움 높이를 조절하는 것이 가능할 뿐만 아니라 교량 슬래브 작업자의 작업 위치로 접근하기 용이하여 작업의 효율성이 있다. According to the work lift folding device of the bridge slab work vehicle of the present invention as described above, it is possible to adjust the height of the railing stand by configuring the horizontal and vertical handrails to be folded and unfolded by the forward and reverse rotation of the motor to which the power is applied. In addition, it is easy to access the working position of the bridge slab operator, which makes the work more efficient.

Claims (5)

교량의 상판 바닥면에 바퀴(1a)가 설치된 새들(1)과; 상기 새들(1)의 상면에 안착되어 작업자가 그 위에 서서 작동 조절하는 크레인 등이 상면에 설치된 상판 프레임(2)과; 상기 상판 프레임(2)의 일단에 수직 하방인 교량의 측면으로 높이 조절가능하도록 연결된 수직높이조절수단(30)과; 상기 수직높이조절수단(30)의 하단에 수평으로 다수의 인장볼트(4a)를 수평으로 체결하여 연결하고, 그 위에 작업자가 교량 하단의 거푸집을 해체하는 작업을 하도록 작업자의 작업리프터(40)를 수평으로 이동 가능하도록 연결된 수평길이 조절수단(50)과; 상기 수평길이 조절수단(50)을 좌우로 회전시키는 회전수단(60)과, 상기 상판 프레임(2)의 타측 상면에는 설치된 밸런스 웨이트(5) 및; 상기 밸런스 웨이트(5)의 상면에 설치되어 수직높이 조절수단(30) 및 수평길이 조절수단(50)에 전원을 공급하도록 설치된 발전기(6)로 구성된 교량 슬래브 작업차에 있어서, Saddle (1) provided with a wheel (1a) on the bottom surface of the bridge; A top frame (2) seated on an upper surface of the saddle (1) and provided with a crane or the like on the upper surface of which an operator stands and adjusts the operation; Vertical height adjusting means (30) connected to one end of the upper frame (2) so as to be height-adjustable to the side of the bridge that is vertically downward; A plurality of tension bolts 4a are horizontally fastened and connected to the lower end of the vertical height adjusting means 30, and the worker's work lifter 40 is operated so that the worker dismantles the formwork at the bottom of the bridge. Horizontal length adjusting means (50) connected to be movable horizontally; A rotating means (60) for rotating the horizontal length adjusting means (50) left and right, and a balance weight (5) provided on the other upper surface of the upper frame (2); In the bridge slab working vehicle, which is provided on the upper surface of the balance weight (5) and composed of a generator (6) installed to supply power to the vertical height adjusting means (30) and the horizontal length adjusting means (50), 상기 작업리프터(40)는 바닥판(41)과;The work lifter 40 includes a bottom plate 41; 상기 바닥판(41)의 사방면에 세워진 난간대(42)와;A handrail 42 erected on all sides of the bottom plate 41; 상기 난간대(42)의 수직난간대(42a)의 하부에 연결되어 상기 난간대(42)를 모두 접는 접이수단(43)으로 이루어진 것을 특징으로 하는 교량 슬래브 작업차의 작업리프트 접이장치.The work lift folding device of the bridge slab work vehicle, characterized in that made of the folding means (43) connected to the lower portion of the vertical handrail (42a) of the handrail 42 to fold the handrail 42. 제1항에 있어서, The method of claim 1, 상기 난간대(42)는 상기 바닥판(41)의 두 가로면과 세로면에 동일하게 설치되어 있으되, 수평난간대(42b)와;The balustrade 42 is installed on the two horizontal and vertical surfaces of the bottom plate 41 in the same manner, but the horizontal balustrade 42b; 상기 수평난간대(42b)의 하부에 회전가능하게 연결된 수직난간대(42a)로 이루어진 것을 특징으로하는 교량 슬래브 작업차의 작업리프트 접이장치.The work lift folding device of the bridge slab work vehicle, characterized in that consisting of a vertical handrail (42a) rotatably connected to the lower portion of the horizontal handrail (42b). 제2항에 있어서, The method of claim 2, 상기 수평난간대(42b)는 양측에 사각봉 형상의 양측난간대(42c)와;The horizontal handrail 42b includes both side handrails 42c each having a rectangular bar shape on both sides thereof; 상기 양측난간대(42c)의 중앙에 삽입된 중앙난간대(42d)로 이루어지고;A central handrail 42d inserted into the center of the two handrails 42c; 상기 양측난간대(42c)의 하부면에는 볼트(98) 및 너트(99)가 삽입되어 상기 수직난간대(42a)를 상기 접이수단(43)에 의해 회전 가능하도록 연결된 것을 특징으로 하는 교량 슬래브 작업차의 작업리프트 접이장치.A bolt 98 and a nut 99 are inserted into lower surfaces of the both handrails 42c so that the vertical handrail 42a is rotatably connected by the folding means 43. Work lift folding device. 제3항에 있어서, The method of claim 3, 상기 접이수단(43)은 상기 수직난간대(42a)의 하부에 형성된 기어형상의 홈(43a)과;The folding means (43) comprises a gear-shaped groove (43a) formed in the lower portion of the vertical handrail (42a); 상기 기어형상의 홈(43a)에 삽입되는 기어(43b)와;A gear 43b inserted into the gear-shaped groove 43a; 상기 기어(43b)의 회전 중심에 일체로 연결된 축(43c)과;A shaft 43c integrally connected to the center of rotation of the gear 43b; 상기 축(43c)을 정역 회전시키는 모터(43d)와;A motor 43d for forward and reverse rotation of the shaft 43c; 상기 모터(43d)에 전원을 인가하는 전선(43e)으로 이루어진 것을 특징으로 하는 교량 슬래브 작업차의 작업리프트 접이장치.A work lift folding device for a bridge slab work vehicle, characterized by comprising a wire (43e) for applying power to the motor (43d). 제1항에 있어서, 상기 바닥판(41)의 가로면의 경우는 하부에 접이수단(43)을 구비하지 않고 상기 바닥판(41)에 힌지부재(42e)로 힌지 결합된 수직난간대(42a)가 추가로 설치된 것을 특징으로 하는 교량 슬래브 작업차의 작업리프트 접이장치.The vertical handrail 42a according to claim 1, wherein in the case of the horizontal surface of the bottom plate 41, a vertical handrail 42a hinged to the bottom plate 41 by a hinge member 42e is provided without a folding means 43 at the bottom thereof. The work lift folding device of the bridge slab work vehicle, characterized in that the additional installation.
KR1020070027219A 2007-03-20 2007-03-20 Folding apparatus of work lifter for vehicle for working of bridge slab KR100753694B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070027219A KR100753694B1 (en) 2007-03-20 2007-03-20 Folding apparatus of work lifter for vehicle for working of bridge slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070027219A KR100753694B1 (en) 2007-03-20 2007-03-20 Folding apparatus of work lifter for vehicle for working of bridge slab

Publications (2)

Publication Number Publication Date
KR20070040352A KR20070040352A (en) 2007-04-16
KR100753694B1 true KR100753694B1 (en) 2007-08-30

Family

ID=38176115

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070027219A KR100753694B1 (en) 2007-03-20 2007-03-20 Folding apparatus of work lifter for vehicle for working of bridge slab

Country Status (1)

Country Link
KR (1) KR100753694B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021057660A1 (en) * 2019-09-26 2021-04-01 汤军 Adjustable safety fence

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972522B (en) * 2019-03-07 2020-10-23 中交二航局第四工程有限公司 Self-falling type adjustable box girder installation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6418230A (en) * 1987-07-14 1989-01-23 Fuji Electric Co Ltd Manufacture of semiconductor device
KR200197359Y1 (en) * 2000-05-04 2000-09-15 영신기공주식회사 Moving facility for check, maintenance and construction of bridges
KR100377529B1 (en) * 2000-05-19 2003-03-29 (주)안 엔지니어링 Working platform for bridge construction
KR100407393B1 (en) * 2001-05-30 2003-12-03 주식회사동일기술공사 A movable working pulley
JP2005090072A (en) * 2003-09-17 2005-04-07 Jfe Engineering Kk Bridge equipment inspection device and bridge equipment inspection method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6418230A (en) * 1987-07-14 1989-01-23 Fuji Electric Co Ltd Manufacture of semiconductor device
KR200197359Y1 (en) * 2000-05-04 2000-09-15 영신기공주식회사 Moving facility for check, maintenance and construction of bridges
KR100377529B1 (en) * 2000-05-19 2003-03-29 (주)안 엔지니어링 Working platform for bridge construction
KR100407393B1 (en) * 2001-05-30 2003-12-03 주식회사동일기술공사 A movable working pulley
JP2005090072A (en) * 2003-09-17 2005-04-07 Jfe Engineering Kk Bridge equipment inspection device and bridge equipment inspection method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021057660A1 (en) * 2019-09-26 2021-04-01 汤军 Adjustable safety fence

Also Published As

Publication number Publication date
KR20070040352A (en) 2007-04-16

Similar Documents

Publication Publication Date Title
JP4966977B2 (en) Improved construction system, method and apparatus
JP6457405B2 (en) Hoist
US3302749A (en) Derrick scaffold structure
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN108002244B (en) Hoisting system and method for high pier column steel bar formwork
KR100753694B1 (en) Folding apparatus of work lifter for vehicle for working of bridge slab
KR100833751B1 (en) Moving and supporting apparatus of vehicle for working of bridge slab
PT2209731E (en) Portal device for use when mounting or servicing heavy parts of a transport device
KR20070040345A (en) Vehicle for working of bridge slab
KR101030053B1 (en) Movement type apparatus for constructing and detaching frame panel of a steel box bridge
CN106006455A (en) Hydraulic elevator capable of achieving formwork erecting without scaffold
KR100823859B1 (en) Inspection &amp; repair method and the device for an elevated road
CN212201223U (en) Vertically lifting large-span multi-group multi-layer bridge type lifting platform truss system
KR100727841B1 (en) Fabricated inspecting support of bridge using lever principle
KR200378217Y1 (en) Scaffolding for the high ground working
JP5356091B2 (en) Crane girder exchanging method and crane girder exchanging apparatus
KR100833750B1 (en) Rotating apparatus of vehicle for working of bridge slab
CN110939262B (en) External hanging type external scaffold
KR20020054259A (en) Bridge inspection device and construction method
JPH0348247Y2 (en)
KR200288007Y1 (en) Rail railing (scaffolding) clamping device in the construction site.
JP3177735B2 (en) An erect scaffold used to reinforce the perimeter of existing buildings
JP7116583B2 (en) Suspended scaffolding for beam construction
JP2008214062A (en) Lifting device and structural material mounting method
CN115613477B (en) Main girder cantilever trackless triangular hanging basket and construction method

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
G15R Request for early opening
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee