KR100747483B1 - Stone root mass and its manufacture method - Google Patents

Stone root mass and its manufacture method Download PDF

Info

Publication number
KR100747483B1
KR100747483B1 KR1020060092785A KR20060092785A KR100747483B1 KR 100747483 B1 KR100747483 B1 KR 100747483B1 KR 1020060092785 A KR1020060092785 A KR 1020060092785A KR 20060092785 A KR20060092785 A KR 20060092785A KR 100747483 B1 KR100747483 B1 KR 100747483B1
Authority
KR
South Korea
Prior art keywords
binding
stone
root
key
cap
Prior art date
Application number
KR1020060092785A
Other languages
Korean (ko)
Inventor
나성민
Original Assignee
나성민
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 나성민 filed Critical 나성민
Priority to KR1020060092785A priority Critical patent/KR100747483B1/en
Application granted granted Critical
Publication of KR100747483B1 publication Critical patent/KR100747483B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/14Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B3/00Producing shaped articles from the material by using presses; Presses specially adapted therefor

Abstract

A stone root mass having a vegetation unit is provided to form a riverside and a cutting slope natural-friendlily by having a loess vegetation unit provided with a vegetation space and cultivating plants. The stone root mass having a vegetation unit comprises many stones(10), a root unit binding the stones, and a loess vegetation unit(30) filled in the root unit to form a vegetation space between the stones, wherein the root unit is composed of a root projection projected upward and driven in a binding hole of the stone to bind together with a binder, a rectangular frame binding the root projections, and a stone root mass connection(24) formed on the corner of the frame to bind together with another stone root mass by a stone root binder and provided with a connecting bar(24a) projected upward.

Description

식생부를 갖는 석근조 및 그 제조방법{STONE ROOT MASS AND ITS MANUFACTURE METHOD}Stone root jaw with vegetation and its manufacturing method {STONE ROOT MASS AND ITS MANUFACTURE METHOD}

도 1 은 본 발명에 따른 일 실시예를 보인 사시도.1 is a perspective view showing an embodiment according to the present invention.

도 2 는 본 발명에 따른 일 실시예를 보인 측 단면도.Figure 2 is a side cross-sectional view showing an embodiment according to the present invention.

도 3 은 본 발명에 따른 3 is in accordance with the present invention

석근결속수단을 연결결속부로 실시한 예를 보인 사시도.Perspective view showing an example of the stone binding means as a connection binding.

도 4 는 도 3 에 따른 측 단면도.4 is a side cross-sectional view according to FIG. 3.

도 5 는 도 3 에 있어서 지면결속핀을 구비한 예를 보인 측 단면도.Figure 5 is a side cross-sectional view showing an example with a ground binding pin in FIG.

도 6 은 본 발명에 따른 6 is according to the invention

석근결속수단을 구속편과 결속클립으로 실시한 예를 보인 사시도.A perspective view showing an example in which the stone binding means is carried out with a restraint piece and a binding clip.

도 7 은 도 6 에 있어서 걸이구를 구비한 것을 보인 사시도.FIG. 7 is a perspective view showing that the hook is provided in FIG. 6. FIG.

도 8 은 6 에 따른 정 단면도.8 is a sectional view according to 6;

도 9 는 본 발명에 따른 9 is in accordance with the present invention

석근결속수단을 구속봉으로 실시한 예를 보인 사시도.Perspective view showing an example of the stone binding means with a restraint rod.

도 10 은 도 9 에 따른 정 단면도.10 is a cross-sectional view according to FIG. 9.

도 11 은 도 9 에 있어서 11 is in FIG. 9.

구속키를 걸림 결속제로 실시한 예를 보인 측 단면도.Side cross-sectional view showing an example where a restraint key is used as a locking binder.

도 12 는 본 발명의 호형 시공에 따른 평면도.12 is a plan view according to the arc construction of the present invention.

도 13 은 본 발명의 제조과정도.13 is a manufacturing process diagram of the present invention.

도 14 는 본 발명의 제조과정에 있어서 천공셋팅과정을 보인 과정도.14 is a process showing the drilling setting process in the manufacturing process of the present invention.

도 15 는 본 발명의 제조과정에 있어서 황토식생부 형성과정을 보인 과정도. Figure 15 is a process showing the loess vegetation forming process in the manufacturing process of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10 : 돌 11 : 결속공 12 : 지지공10: stone 11: binding ball 12: support ball

20 : 근부 20: root

21 : 뿌리돌기 22 : 지지봉 23 : 틀부21: root projection 22: support rod 23: mold

24 : 석근조연결부 24a: 연결바24: stone root connection 24a: connecting bar

30 : 황토식생부 31 : 씨앗30: ocher vegetation part 31: seeds

110 : 결속키 111 : 키돌기 112 : 구속돌기 113 : 지면결속핀110: binding key 111: key projection 112: restraint projection 113: ground binding pin

120 : 결속캡 121 : 연결결속부 122 : 채움공120: binding cap 121: connection tie 122: filling hole

130 : 채움결속제130: Filling binder

141 : 구속편 141: restraint

142 : 구속봉 142a: 결속홈142: restraining rod 142a: binding groove

141a,142b: 걸림홈141a, 142b: locking groove

151 : 결속클립 151a: 걸림턱 151b: 걸이구151: binding clip 151a: locking jaw 151b: hook

152 : 걸림키 153 : 걸림결속제152: Jam Key 153: Jam Binder

160 : 결속판 161 : 결합공160: binding plate 161: coupling hole

210 : 지그함체 220 : 지지부 221 : 지지액츄에이터210: jig housing 220: support 221: support actuator

230 : 천공부 231 : 천공기230: punching unit 231: punching machine

240 : 황토상자 240: ocher box

250 : 황토반죽250: Yellow Clay Dough

500 : 천공셋팅과정500: drilling setting process

510 : 돌 수납과정 520 : 지지 접촉과정 530 : 돌지지과정510: stone storage process 520: support contact process 530: stone support process

600 : 천공과정600: drilling process

700 : 근부설치과정700: Root Installation Process

800 : 황토식생부 형성과정800: formation process of ocher vegetation

810 : 황토상자 설치과정 820 : 틀부함침과정810: ocher box installation process 820: mold impregnation process

830 : 건조과정830: drying process

본 발명은 식생부를 갖는 석근조 및 그 제조방법에 관한 것으로, 더욱 상세하게는 석근조와 같은 비탈면 보호블럭에 있어서, 다수의 돌과 상기 돌을 결속하는 근부와 상기 근부에 채워져 돌과 돌 사이에 식생공간을 형성하는 황토부로 구성하여서, 풀과 같은 식물의 식생이 가능한 자연 친화적인 석근조와 같은 비탈면 보호블럭을 제공할 수 있도록 함을 목적으로 한 것이다.The present invention relates to a stone root jaw having a vegetation part and a method of manufacturing the same, and more particularly, in a slope protection block such as stone roots, a plurality of stones and the roots that bind the stones and the roots are filled between the stones It is intended to provide a slope-protective block such as natural stone roots to enable vegetation of plants such as grass to constitute a loess part forming a vegetation space.

일반적으로, 석근조는 특허 제485052호에 소개된 바와 같이 돌을 철근 등으로 사용연결시켜 하나의 블럭체를 형성한 비탈면 보호블럭으로서 하천 또는 절개지 등에 시공되어서 하천변의 유실 및 절개지의 붕괴를 방지할 수 있도록 하는 것이다.In general, stone roots as a slope protection block formed by forming a block body by connecting the stone to the reinforcing bar, etc. as introduced in Patent No. 450552, which is installed in rivers or incisions to prevent the loss of riversides and collapse of the incisions To make it possible.

그러나, 상기한 바와 같은 종래의 석근조는 블럭체를 형성하는 돌과 돌 사이에 공간이 형성되어 있지 않고 근부가 콘크리트로 형성되어 있어서 시공시 풀과 같은 식물이 식생하지 못하여 주변환경이 황폐화되어 생태환경이 조성되지 못하는 문제점이 있었다.However, in the conventional stone root bath as described above, the space between the stone and the stone forming the block body is not formed, and the root part is made of concrete, so that plants such as grass cannot be vegetated during construction, so that the surrounding environment is degraded and ecological. There was a problem that the environment is not created.

이에, 본 발명은 상술한 바와 같이 종래의 석근조는 근부가 콘크리트체로 이루어짐으로 인하여 자연친화적이지 못하고 식물의 식생이 이루어지지 않는 문제점을 해결할 수 있도록 한 것이다.Thus, the present invention is to solve the problem that the conventional stone roots as described above is not natural friendly and the vegetation of the plant is not made because the root portion is made of a concrete body.

즉, 본 발명은 석근조에 있어서, 다수의 돌과 상기 돌을 결속하는 근부와 상기 근부에 채워져 돌과 돌 사이에 식생공간을 형성하는 황토부로 구성한 것이다.In other words, the present invention is composed of a stone roots, the roots that bind the plurality of stones and the stone, and the ocher part which fills the roots and forms a vegetation space between the stones.

따라서, 본 발명은 근부에 채워져 식생공간을 형성하는 황토식생부를 구비함으로써 식물의 식생이 가능한 자연 친화적인 하천변 및 절개지의 환경이 형성되게 되는 것이다.Therefore, the present invention is to provide a natural environment for river vegetation and incisions that can be vegetated by providing a loess vegetation portion filled in the vicinity to form a vegetation space.

이하, 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.Hereinafter, described in detail by the accompanying drawings as follows.

본 발명은 하천변 및 절개지에 석근조를 시공함에 있어 식물의 식생이 가능한 자연 친화적인 환경이 조성될 수 있도록 한 것이다.The present invention is to allow the creation of a natural environment for the vegetation of plants in the construction of stone roots on riversides and incisions.

즉, 본 발명은 석근조에 있어서, 도 1 과 도 2 에 도시된 바와 같이 다수의 돌(10)과 상기 돌을 결속하는 근부(20)와 상기 근부에 채워져 돌과 돌 사이에 식생공간을 형성하는 황토식생부(30)로 구성한 것이다.That is, in the stone root bath, as shown in FIGS. 1 and 2, a plurality of stones 10 and a root portion 20 to bind the stones and the root portion are filled to form a vegetation space between the stones and the stones. It is composed of loess vegetation part (30).

여기서, 상기 근부(20)는 도 2 에 도시된 바와 같이 상부로 돌출되어 돌(10)에 형성한 결속공(11)에 박혀져 결합제를 매개로 결속되는 뿌리돌기(21)와, 상기 뿌리돌기를 상호 결속시키는 사각 형상의 틀부(23) 및 상기 틀부의 모서리에서 연장 구비되어 다른 석근조와 석근결속수단에 의하여 결속되며 상부로 돌출되는 연결바(24a)를 구비한 석근조연결부(24)로 구성한 것으로서,Here, the root portion 20 is projected to the top as shown in Figure 2 is embedded in the binding hole (11) formed in the stone 10, the root projection 21 is bound via a binder, and the root projection To the frame connecting portion 24 having a rectangular frame portion 23 and the connection bar 24a protruding upwards is provided by extending from the corner of the frame portion and the other frame and stone binding means to bind to each other As configured,

상기 뿌리돌기(21)의 일측 틀부(23)에는 결합된 돌(10)이 자중에 의하여 회전 유동되는 것을 방지할 수 있게 돌의 결속공(11) 측부에 형성한 지지공(12)에 결합되는 지지봉(22)을 형성하여 실시할 수 있는 것이다.One side frame portion 23 of the root protrusion 21 is coupled to the support hole 12 formed on the side of the binding hole 11 of the stone to prevent the coupled stone 10 is rotated by the own weight It can form and implement the support rod 22.

한편, 상기 석근결속수단은 도 3 내지 도 11 에 도시된 바와 같이 시공에 의하여 모아진 네 개의 석근조연결부(24)의 연결바(24a) 중앙부에 앉착되는 결속키(110)와, 상기 결속키(110)의 상부에서 씌워져 모아진 네 개의 연결바(24a)를 구속하는 결속캡(120) 및 상기 결속키와 결속캡 사이에 충진되어 결속캡(120)의 풀림 이 방지되게 하는 채움결속제(130)로 구성한 것이다.On the other hand, the stone binding means as shown in Figure 3 to 11 binding key 110 is seated on the center of the connection bar (24a) of the four stonework connection portion 24 collected by the construction and the binding key ( The binding cap 120 is filled between the binding cap 120 and the binding key and the binding cap to restrain the four binding bars 24a collected and covered from the upper portion of the 110 to prevent the loosening of the binding cap 120. It is composed of.

여기서, 상기 결속키(110)는 도 3 에 도시된 바와 같이 원형판상의 몸체 하부에 모아진 네 개의 연결바 사이에 끼워지게 돌출된 키돌기(111)와 상기 몸체의 상부에 돌출되어 채움결속제(130)를 매개로 결속캡(120)이 회전 제한되게 구속하는 구속돌기(112)로 구성하여 실시할 수 있는 것으로서, 상기 키돌기(111)와 구속돌기(112)는 일자 또는 십자 중 하나를 선택적으로 실시할 수 있는 것이다.Here, the binding key 110 is a key protrusion 111 protruded to fit between the four connecting bars collected in the lower body of the circular plate-shaped body as shown in FIG. The binding cap 120 can be implemented as a constraining protrusion 112 that is constrained to be restricted rotationally through the), and the key protrusion 111 and the constraining protrusion 112 selectively select one of a date or a cross. It can be done.

또한, 상기 결속키(110)의 몸체 하부에는 도 5 에 도시된 바와 같이 지면과의 결속을 위하여 길게 돌출되는 지면결속핀(113)을 구비하여 실시할 수 있는 것이다.In addition, the bottom of the body of the binding key 110, as shown in Figure 5 can be implemented with a ground binding pin 113 protruding long for binding with the ground.

그리고, 상기 결속캡(120)은 도 3 과 도 4 에 도시된 바와 같이 하부가 개구되며 상부가 밀폐된 원형 관체로서 모아진 석근조연결부(24)를 끼움 후 회전 구속할 수 있게 측벽에 하부에서 중앙부까지 절개되어서 직각방향으로 절개 형성한 네 개의 연결결속부(121)를 구비하고, 상면에는 결속키(110)와의 사이에 채워진 채움결속제(130)의 일부가 돌출되어 결속캡(120)의 회전이 제한되게 결속할 수 있게 한 채움공(122)을 형성하여 실시할 수 있는 것이다.And, as shown in Figure 3 and 4, the binding cap 120 has a lower portion of the center portion at the bottom side wall to be constrained to rotate after inserting the stone-join connection portion 24 collected as a circular tube with a closed upper portion It is provided with four connection binders 121 cut to form a cut in a perpendicular direction, the upper surface of the portion of the filling binder 130 filled between the binding key 110 and the rotation of the binding cap 120 This can be carried out by forming the filling hole 122 that can be bound to this limited.

또한, 상기 결속캡(120)의 다른 실시 예로는 도 6 내지 도 11 에 도시된 바와 같이 하부가 개구되며 상부가 밀폐된 원형 관체로서 모아진 석근조연결부(24)를 구속할 수 있게 외측에 등 간격으로 돌출되는 구속바와 상기 구속바에 결합된 선근조연결부를 구속하는 구속키로 구성하여 실시할 수 있는 것으로서,In addition, as another embodiment of the binding cap 120 is shown in Figures 6 to 11, the bottom is opened and the upper interval is equidistant to the outside so as to constrain the stone root connections 24 collected as a closed circular tube It can be carried out by consisting of a restraining bar protruding to and a restraining key restraining the abutment bar connection portion coupled to the restraining bar,

상기 구속바의 일 실시 예로는 도 6 내지 도 8 에 도시된 바와 같이 외측으 로 수평을 이루게 돌출되며 상, 하부에 다수의 걸림홈(141a)을 구비한 두 개의 구속편(141)으로 구성하고, 상기 구속키는 두 개의 구속편(141) 사이에 끼워 결합된 석근조연결부(24)가 이탈 방지되게 구속편(141)의 측면에서 결합되어 걸림홈(141a)에 걸려 구속되는 C 형의 결속클립(151)으로 구성하여 실시할 수 있는 것이며,An embodiment of the restraining bar is configured to include two restraining pieces 141 protruding outwardly horizontally as shown in FIGS. , The restraint key is coupled to the side of the restraint piece 141 is inserted between the two restraining pieces 141 is coupled to the side of the restraint piece 141 to prevent the separation of the C-shaped binding is caught in the locking groove (141a) It can be implemented by the clip 151,

상기 결속클립(151) 내면에 상기 걸림홈(141a)에 대응되는 걸림턱(151a)을 형성하고, 하부에는 도 7 에 도시된 바와 같이 처진 석근조연결부(24)를 걸어 지지할 수 있는 걸이구(151b)를 구비하여 실시할 수 있는 것이다.The hooking jaw 151a corresponding to the locking groove 141a is formed on the inner surface of the binding clip 151, and a hook that can support the drooping stone root connection part 24 as shown in FIG. 151b is provided and can be implemented.

상기 구속바의 다른 실시 예로는 도 9 내지 도 10 에 도시된 바와 같이 관체로서 상부가 길이방향으로 절개되어 결속홈(142a)을 형성하며 상기 결속홈의 내벽에 걸림홈(142b)을 형성한 구속봉(142)으로 구성하고, 상기 구속키는 구속봉(142)에 끼워 구속된 선근조연결부가 이탈되지 않게 상기 결속홈(142a)에 끼워 결합되어서 걸림홈(142b)에 걸려지는 봉 또는 판형의 걸림키(152)로 형성하거나 도 11 에 도시된 바와 같이 상기 걸림홈(142b)에 걸림결속제(153)를 채워 결속되게 실시할 수 있는 것이다.Another embodiment of the restraining bar is a constriction in which the upper part is cut in the longitudinal direction as a tubular body to form a binding groove 142a and a locking groove 142b is formed on an inner wall of the binding groove as shown in FIGS. 9 to 10. Rod 142, the restraint key is inserted into the binding groove (142a) so that the restraint bar connection connected to the restraint bar 142 is restrained by the rod or plate-shaped Formed by the locking key 152 or as shown in Figure 11 can be carried out by filling the locking binder 153 in the locking groove 142b.

한편, 상기 채움결속제(130,153)는 콘크리트몰탈 또는 수지접착제 중 필요에 따라 선택적으로 사용할 수 있는 것이다.On the other hand, the filling binder (130,153) is to be selectively used as necessary among the concrete mortar or resin adhesive.

또한, 볼 발명의 실시에 있어서 도 12 에 도시된 바와 같이 호형 조적시 석근조연결부(24)가 어긋남으로 인하여 상호 결속력 저하를 방지할 수 있게 각 변에 석근조연결부(24)를 형성하고, 상기 어긋난 석근조연결부(24)를 결속시킬 수 있게 다수의 결합공(161)을 형성한 결속판(160)을 구비하여 실시할 수 있는 것이다.In addition, in the implementation of the ball invention, as shown in FIG. 12, when the arc-shaped masonry is formed, the stone-joined connection part 24 is formed on each side so as to prevent mutual binding force decrease due to misalignment. It can be carried out with a binding plate 160 having a plurality of coupling holes 161 formed to bind the shifted stone root connection portion 24.

또한, 본 발명의 실시에 있어서, 도 2 에 도시된 바와 같이 황토식생부(30)에 씨앗(31)을 파종하여 시공시 바로 풀이 자라 식생 환경이 조성되게 실시할 수 있는 것이다.In addition, in the practice of the present invention, as shown in Figure 2 sowing the seeds 31 to the ocher vegetation part 30 will be able to be carried out to create a vegetation environment to grow immediately upon construction.

이하, 본 발명의 제조과정에 대하여 설명하면 다음과 같다.Hereinafter, the manufacturing process of the present invention will be described.

도 13에 도시된 바와 같이 판상의 지그함체(210)에 돌(10)을 수납한 후 돌들이 동일한 돌출높이를 유지하게 지지하는 천공셋팅과정(500)과, As shown in FIG. 13, after the stones 10 are accommodated in the plate-shaped jig box 210, the punching setting process 500 supports the stones to maintain the same height of protrusion, and

상기 천공셋팅과정(500)을 통하여 상부가 일정높이로 지지된 각 돌(10)에 구멍을 뚫는 천공과정(600)과, A punching process 600 for drilling a hole in each stone 10 whose upper portion is supported at a predetermined height through the punching setting process 500,

상기 천공과정(600)을 통하여 뚫어진 돌(10)에 근부(20)의 뿌리돌기(21)가 상기 돌의 결속공(11)에 끼워 결합되어 결합제를 매개로 결속되게 설치하는 근부설치과정(700)과,Rooting process 21 of the root protrusion 20 of the root portion 20 is coupled to the binding hole 11 of the stone to the stone 10 drilled through the drilling process (600) to be installed to bind through the binder medium 700 )and,

상기 근부설치과정(700)을 통하여 근부(20)의 설치완료된 상태에서 상기 가압에 의하여 근부(20)가 황토반죽(250)에 함침되게한 후 이를 건조시켜 황토식생부(30)가 형성되게 하는 황토식생부 형성과정(800)으로 이루어진 것이다.When the root portion 20 is impregnated in the loess dough 250 by the pressure in the state in which the root portion 20 is installed through the root portion installation process 700, the loess vegetation portion 30 is formed by drying it. Ocher vegetation is formed by the process (800).

여기서, 상기 천공셋팅과정(500)은 Here, the drilling setting process 500 is

도 14 에 도시된 바와 같이 일정 규격의 판상 지그함체(210)에 돌(10)을 수납하는 돌 수납과정(510)과, 상기 돌이 수납된 판상 지그함체(210)의 상부에서 내부에 다수의 지지액츄에이터(221)가 구비된 지지부(220)로 지그함체(210)에 수납된 돌(10)의 지지를 위하여 돌출 접촉하는 지지 접촉과정(520)과, 상기 지그함체(210) 와 지지부(220)를 함께 회전시켜 지지부(220)의 지지액츄에이터(221)가 지그함체(210)의 돌을 지지하게 하는 돌지지과정(530)으로 이루어진 것이다.As shown in FIG. 14, a stone receiving process 510 for storing the stones 10 in a plate-shaped jig box 210 having a predetermined size, and a plurality of supports therein at an upper portion of the plate-shaped jig box 210 in which the stones are received. A support contact process 520 for protruding contact for the support of the stone 10 accommodated in the jig box 210 by the support unit 220 having the actuator 221, and the jig box 210 and the support unit 220. Rotating together, the support actuator 221 of the support unit 220 is made of a stone support process 530 to support the stone of the jig box 210.

그리고, 상기 천공과정(600)은And, the drilling process 600 is

상기 지지부(220)에 의하여 지그함체(210)의 돌(10)이 지지된 상태에서 다수의 천공기(231)가 구비되어 승강되는 천공부(230)를 지그함체(210)의 상부에 위치시켜 각 돌(10)에 대응되는 천공기(231)를 동작시켜서 각 돌(10)의 중앙부위까지 천공을 하는 것이다.In the state where the stone 10 of the jig enclosure 210 is supported by the support 220, a plurality of perforators 231 are provided and positioned to place the perforated portions 230 on the upper part of the jig enclosure 210. By operating the perforator 231 corresponding to the stone 10 to the perforation to the central portion of each stone (10).

또한, 상기 근부설치과정(700)은 In addition, the root installation process 700 is

상기 천공과정(600)을 통하여 결속공(11)이 천공된 돌(10)에 틀부(23)의 뿌리돌기(21)가 결합재를 매개로 끼워 결합되어 결속되게 하여 실시하는 것이다.Through the drilling process 600, the binding hole 11 is to be carried out by binding the root projection 21 of the mold 23 to the punched stone 10 to be bound by the binding material.

또한, 상기 황토식생부 형성과정(800)은In addition, the loess vegetation forming process 800 is

도 15 에 도시된 바와 같이 상기 근부설치과정(700)을 통하여 틀부(23)가 결합된 상태에서 그 상부에 황토반죽(250)이 담아진 황토상자(240)를 올려놓는 황토상자 설치과정(810)과, 상기 황토상자 설치과정(810)을 통하여 설치된 황토상자(240)와 함께 지그함체(210)를 뒤집어 회전시킨 후 황토상자(240)의 뚜껑을 슬라이딩 제거하고 지지액츄에이터(221)에 의하여 돌(10)을 가압하여서 틀부(23)가 상기 황토반죽에 함침되게 하는 틀부함침과정(820)과, 상기 틀부함침과정(820) 후 황토반죽(250)을 건조시키는 건조과정(830)으로 이루어진 것이다.As shown in FIG. 15, the ocher box installation process of placing the ocher box 240 containing the ocher dough 250 on its upper part in the state where the frame part 23 is coupled through the root installation process 700 is shown (810). And, after turning the jig box 210 with the ocher box 240 installed through the ocher box installation process 810 is rotated by removing the lid of the ocher box 240 and the stone by the support actuator 221 (10) by pressing the mold part 23 is impregnated in the ocher dough, a mold impregnation process 820, and after the mold impregnation process 820 is made of a drying process 830 to dry the ocher dough 250 .

상기한 바와 같이 다수의 돌(10)과 상기 돌을 결속하는 근부(20)와 상기 근 부에 채워져 돌과 돌 사이에 식생공간을 형성하는 황토식생부(30)로 구성한 본 발명에 따른 석근조의 제조는 천공셋팅과정(500)을 통하여 박스형상의 지그함체(210)에 돌(10)을 수납하되 돌과 돌 사이에 황토식생부(30)가 형성되게 배열하여 수납하고 상기 지그함체(210)의 상부에 다수의 지지액츄에이터(221)가 구비된 지지부(220)를 배치시킨 후 상기 지지액츄에이터(221)를 하강 동작시켜 각각의 돌 상부를 접촉 지지한 후 상기 지지부(220)와 지그함체(210)를 함께 180도 회전시킨다. 이때, 상기 지지액츄에이터(221)는 돌을 더이상 가압하지 않고 돌이 일정 높이를 유지하게 지지하는 상태를 유지하는 것이다.Stone roots according to the present invention composed of a plurality of stones 10 and the root portion 20 for binding the stone and the ocher vegetation portion 30 filled in the root portion to form a vegetation space between the stone and the stone. The manufacturing of the stone 10 is accommodated in the box-shaped jig box 210 through the punching setting process 500, but arranged to accommodate the loess vegetation portion 30 is formed between the stone and the jig box 210 The support unit 220 is provided with a plurality of support actuators 221 on the top of the) and then the support actuators 221 are moved downward to contact and support the upper portions of the stones, and then the support unit 220 and the jig box ( And rotate the 210 together 180 degrees. At this time, the support actuator 221 is to maintain the state to support the stone to maintain a certain height without further pressing the stone.

그리고, 상기 천공셋팅과정(500)을 통하여 돌의 수납과 같은 셋팅이 완료되면, 천공과정(600)을 통하여 바닥면이 상부로 향하게 형성된 지그함체(210)의 상부에 다수의 천공기(231)를 구비한 천공부(230)를 위치시킨 후 하강 동작시키면서 상기 천공기(231)가 지그함체(210)의 바닥에 형성한 구멍을 관통하여 돌에 결속공(11)을 천공 형성하게 하는 것이다.Then, when the setting, such as the storage of the stone is completed through the punching setting process 500, a plurality of punching machine 231 on the top of the jig box 210 formed with the bottom face upward through the punching process 600 After positioning the drilled portion 230 is provided with the lowering operation while the punching machine 231 is to penetrate through the hole formed in the bottom of the jig box 210 to form the binding hole 11 in the stone.

또한, 상기 천공과정(600)을 통하여 돌에 결속공(11)의 천공이 완료되면, 근부설치과정(700)을 통하여 지그함체(210)의 바닥판을 측 방향으로 이탈시킨 후 상기 돌의 결속공(11)에 시멘트 또는 합성수지 몰탈과 같은 결합재를 채우고 근부(20)의 뿌리돌기(21)를 결속공(11)에 삽입 결속시켜 돌(10)과 근부(20)가 결속되게 하는 것이다.In addition, when the drilling of the binding hole 11 to the stone is completed through the drilling process 600, the bottom plate of the jig box 210 is laterally separated through the root installation process 700 to bind the stone. Filling the ball 11 with a binder such as cement or synthetic mortar, and inserting and binding the root projection 21 of the root portion 20 into the binding hole 11 to bind the stone 10 and the root portion 20.

또한, 상기 근부설치과정(700)을 통하여 근부(20)와 돌(10)의 결속이 완료되면, 황토식생부(30) 설치과정을 통하여 근부(20)가 결합된 지그함체(210)의 상부에 황토반죽(250)이 채워진 황토상자(240)를 위치시킨 후 상기 황토상자(240)와 지그함체(210) 및 지지부(220)를 함께 180도 회전시키고 상기 황토상자(240)의 뚜껑을 슬라이딩 제거시키고 돌(10)을 접촉 지지하고 있는 지지액츄에이터(221)를 돌출 작동시켜 돌을 가압하여서 근부(20)와 돌(10)이 황토상자(240)의 황토반죽(250)에 함침 되게하여 돌과 돌 사이에 식물의 식생이 가능한 황토식생부(30)가 형성되게 하는 것이다.In addition, when the binding of the root 20 and the stone 10 is completed through the root installation process 700, the upper part of the jig box 210 to which the root 20 is coupled through the ocher vegetation part 30 installation process. After placing the ocher box 240 filled with the ocher dough 250, the ocher box 240 and the jig box 210 and the support 220 are rotated 180 degrees together and sliding the lid of the ocher box 240 By removing and then protruding the support actuator 221 holding and contacting the stone 10 to pressurize the stone so that the root portion 20 and the stone 10 are impregnated in the loess dough 250 of the ocher box 240. Ocher vegetation part 30 is possible to form vegetation between the stone and the stone.

이상과 같은 방법을 통하여 제조된 석근조는 하천변 또는 절개지 등으로 운반한 후 연속 배열하여 시공을 하는 것이다.Stone roots manufactured by the above method is to be carried out to the stream side or incision and then arranged in a continuous arrangement.

이때, 시공된 석근조가 유동되지 않게 모아진 석근조연결부(24)에 결속키(110)을 결합하고 그 상부에 결속캡(120)을 씌워 모아진 석근조연결부(24)를 상기 결속캡(120)으로 구속하여 이탈되지 않게 한 후 상기 결속캡(120)의 상부 채움공(122)에 채움결속제(130)을 넣어서 결속키(110)와 결속캡(120)이 일체를 이루게 함으로써 그 시공이 완료되는 것이다.At this time, the binding stone 110 is coupled to the binding key 110 to the collected stone root connection 24 so that the construction does not flow and the binding cap 120 is put on the binding cap 120, the binding cap 120 After constrained to prevent the separation and put the filling binder 130 in the upper filling hole 122 of the binding cap 120 to complete the construction by the binding key 110 and the binding cap 120 to form an integral. Will be.

한편, 상기한 바와 같은 결속키(110)의 시공에 있어서 설치면에 석근조가 견고하게 설치될 수 있게 하부에 지면결속핀(113)을 형성한 결속키(110)를 일 정 간격으로 설치 시공함으로써 석근조가 상호 결속됨과 더불어 설치면 견고하게 설치되는 것이다.On the other hand, in the construction of the binding key 110 as described above, the installation of the binding key 110 is formed at regular intervals to form a ground binding pin 113 in the lower portion so that the stone can be firmly installed on the installation surface As a result, the stone roots are bound together and installed firmly.

또한, 본 발명의 시공에 있어서 호형 설치가 일루어져 석근조연결부(24)가 모아지지 않을 경우에는 다수의 결합공(161)을 형성한 결속판(160)을 연결하여 석 근조가 상호결속되게 실시할 수 있는 것이다.In addition, in the construction of the present invention, when the arc-shaped installation is performed and the stone-join connection part 24 is not collected, the connection of the stone roots is performed by connecting the binding plate 160 having a plurality of coupling holes 161. You can do it.

따라서, 본 발명은 근부에 채워져 식생공간을 형성하는 황토식생부를 구비함으로써 식물의 식생이 가능한 자연 친화적인 하천변 및 절개지의 환경이 형성되게 되는 것이다.Therefore, the present invention is to provide a natural environment for river vegetation and incisions that can be vegetated by providing a loess vegetation portion filled in the vicinity to form a vegetation space.

Claims (6)

석근조에 있어서,In stone root, 다수의 돌(10)과 상기 돌을 결속하는 근부(20)와 상기 근부에 채워져 돌과 돌 사이에 식생공간을 형성하는 황토식생부(30)로 구성하고,It consists of a plurality of stones (10) and the root portion 20 to bind the stone and the loess vegetation portion 30 is filled in the root portion to form a vegetation space between the stones, 상기 근부(20)는 상부로 돌출되어 돌(10)에 형성한 결속공(11)에 박혀져 결합제를 매개로 결속되는 뿌리돌기(21)와, 상기 뿌리돌기를 상호 결속시키는 사각 형상의 틀부(23) 및 상기 틀부의 모서리에서 연장 구비되어 다른 석근조와 석근결속수단에 의하여 결속되며 상부로 돌출되는 연결바(24a)를 구비한 석근조연결부(24)로 구성한 것을 특징으로 하는 식생부를 갖는 석근조.The root portion 20 protrudes upwards and is lodged in the binding hole 11 formed in the stone 10 to bind the root protrusion 21 to be bound by a binder, and a rectangular frame portion to bind the root protrusion to each other ( 23) and a stone having a vegetation part, characterized in that it is provided extending from the corner of the frame portion is connected by the other stone roots and stone roots binding means and comprises a stone root connection portion 24 having a connection bar (24a) protruding upwards. Rooting. 제 1 항에 있어서,The method of claim 1, 상기 석근결속수단은 시공에 의하여 모아진 네 개의 석근조연결부(24)의 연결바(24a) 중앙부에 앉착되는 결속키(110)와, 상기 결속키(110)의 상부에서 씌워져 모아진 네 개의 연결바(24a)를 구속하는 결속캡(120) 및 상기 결속키와 결속캡 사이에 충진되어 결속캡(120)의 풀림이 방지되게 하는 채움결속제(130)로 구성하되,The stone binding means is a binding key (110) seated on the center of the connecting bar (24a) of the four stone-joint connection portion 24 collected by the construction, and the four connecting bars collected from the top of the binding key (110) ( Consists of a binding cap 120 for constraining 24a) and a filling binder 130 that is filled between the binding key and the binding cap to prevent loosening of the binding cap 120. 상기 결속키(110)는 원형판상의 몸체 하부에 모아진 네 개의 연결바 사이에 끼워지게 돌출된 키돌기(111)와 상기 몸체의 상부에 돌출되어 채움결속제(130)를 매개로 결속캡(120)이 회전 제한되게 구속하는 구속돌기(112)로 구성하고,The binding key 110 is a key cap 111 protruding between the four connecting bars collected in the lower body of the circular plate and the binding cap 120 is protruded to the upper portion of the body to fill the binding agent 130 Consists of the constraining protrusion 112 to constrain the rotation limited, 상기 결속캡(120)은 하부가 개구되며 상부가 밀폐된 원형 관체로서 모아진 석근조연결부(24)를 끼움 후 회전 구속할 수 있게 측벽에 하부에서 중앙부까지 절개되어서 직각방향으로 절개 형성한 네 개의 연결결속부(121)를 구비하고, 상면에는 결속키(110)와의 사이에 채워진 채움결속제(130)의 일부가 돌출되어 결속캡(120)의 회전이 제한되게 결속할 수 있게 한 채움공(122)을 형성한 것을 특징으로 하는 식생부를 갖는 석근조.The binding cap 120 has four openings formed in a right angled direction by cutting from the lower portion to the center portion of the side wall so as to restrict rotation after inserting the stone-join connection portion 24 collected as a round tube whose upper portion is closed and the upper portion is closed. A fastening hole 122 having a binding portion 121 and having a top portion of the filling binder 130 filled between the binding keys 110 protruding from each other to allow the rotation of the binding cap 120 to be restricted. Stone root having a vegetation portion, characterized in that) formed. 제 1 항에 있어서;The method of claim 1; 상기 석근결속수단은 시공에 의하여 모아진 네 개의 석근조연결부(24)의 연결바(24a) 중앙부에 앉착되는 결속키(110)와, 상기 결속키(110)의 상부에서 씌워져 모아진 네 개의 연결바(24a)를 구속하는 결속캡(120) 및 상기 결속키와 결속캡 사이에 충진되어 결속캡(120)의 풀림이 방지되게 하는 채움결속제(130)로 구성하되,The stone binding means is a binding key (110) seated on the center of the connecting bar (24a) of the four stone-joint connection portion 24 collected by the construction, and the four connecting bars collected from the top of the binding key (110) ( Consists of a binding cap 120 for constraining 24a) and a filling binder 130 that is filled between the binding key and the binding cap to prevent loosening of the binding cap 120. 상기 결속키(110)는 원형판상의 몸체 하부에 모아진 네 개의 연결바 사이에 끼워지게 돌출된 키돌기(111)와 상기 몸체의 상부에 돌출되어 채움결속제(130)를 매개로 결속캡(120)이 회전 제한되게 구속하는 구속돌기(112)로 구성하고,The binding key 110 is a key cap 111 protruding between the four connecting bars collected in the lower body of the circular plate and the binding cap 120 is protruded to the upper portion of the body to fill the binding agent 130 Consists of the constraining protrusion 112 to constrain the rotation limited, 상기 결속캡(120)은 하부가 개구되며 상부가 밀폐된 원형 관체로 상면에는 결속키(110)와의 사이에 채워진 채움결속제(130)의 일부가 돌출되어 결속캡(120)의 회전이 제한되게 결속할 수 있게 한 채움공(122)을 형성하고, 모아진 석근조연결부(24)를 구속할 수 있게 외측에 등 간격으로 돌출되는 구속바와 상기 구속바에 결 합된 선근조연결부를 구속하는 구속키로 구성하며,The binding cap 120 is a lower portion is opened and the upper portion is a closed circular tube on the upper surface of the filling binder 130 filled between the binding key 110 is projected so that the rotation of the binding cap 120 is limited. Forms a filling hole (122) to be bound, consisting of a restraining bar protruding at equal intervals on the outside to restrain the collected stone root connections 24 and a restraining key restraining the abutment connection connected to the restraining bar, , 상기 구속바는 외측으로 수평을 이루게 돌출되며 상, 하부에 다수의 걸림홈(141a)을 구비한 두 개의 구속편(141)으로 구성하고, The restraining bar protrudes horizontally outward and consists of two restraining pieces 141 having a plurality of locking grooves 141a on the upper and lower sides thereof. 상기 구속키는 두 개의 구속편(141) 사이에 끼워 결합된 석근조연결부(24)가 이탈 방지되게 구속편(141)의 측면에서 결합되어 걸림홈(141a)에 걸려 구속되는 C 형의 결속클립(151)으로 구성한 것을 특징으로 하는 식생부를 갖는 석근조.The restraint key is a C-shaped binding clip coupled to the side of the restraint piece 141 by being inserted between the two restraint pieces 141 to be prevented from being separated from the restraint piece 141. Stone root tank having a vegetation portion, characterized in that (151). 제 1 항에 있어서;The method of claim 1; 상기 석근결속수단은 시공에 의하여 모아진 네 개의 석근조연결부(24)의 연결바(24a) 중앙부에 앉착되는 결속키(110)와, 상기 결속키(110)의 상부에서 씌워져 모아진 네 개의 연결바(24a)를 구속하는 결속캡(120) 및 상기 결속키와 결속캡 사이에 충진되어 결속캡(120)의 풀림이 방지되게 하는 채움결속제(130)로 구성하되,The stone binding means is a binding key (110) seated on the center of the connecting bar (24a) of the four stone-joint connection portion 24 collected by the construction, and the four connecting bars collected from the top of the binding key (110) ( Consists of a binding cap 120 for constraining 24a) and a filling binder 130 that is filled between the binding key and the binding cap to prevent loosening of the binding cap 120. 상기 결속키(110)는 원형판상의 몸체 하부에 모아진 네 개의 연결바 사이에 끼워지게 돌출된 키돌기(111)와 상기 몸체의 상부에 돌출되어 채움결속제(130)를 매개로 결속캡(120)이 회전 제한되게 구속하는 구속돌기(112)로 구성하고,The binding key 110 is a key cap 111 protruding between the four connecting bars collected in the lower body of the circular plate and the binding cap 120 is protruded to the upper portion of the body to fill the binding agent 130 Consists of the constraining protrusion 112 to constrain the rotation limited, 상기 결속캡(120)은 하부가 개구되며 상부가 밀폐된 원형 관체로 상면에는 결속키(110)와의 사이에 채워진 채움결속제(130)의 일부가 돌출되어 결속캡(120)의 회전이 제한되게 결속할 수 있게 한 채움공(122)을 형성하고, 모아진 석근조연결부(24)를 구속할 수 있게 외측에 등 간격으로 돌출되는 구속바와 상기 구속바에 결 합된 선근조연결부를 구속하는 구속키로 구성하며,The binding cap 120 is a lower portion is opened and the upper portion is a closed circular tube on the upper surface of the filling binder 130 filled between the binding key 110 is projected so that the rotation of the binding cap 120 is limited. Forms a filling hole (122) to be bound, consisting of a restraining bar protruding at equal intervals on the outside to restrain the collected stone root connections 24 and a restraining key restraining the abutment connection connected to the restraining bar, , 상기 구속바는 관체로서 상부가 길이방향으로 절개되어 결속홈(142a)을 형성하며 상기 결속홈의 내벽에 걸림홈(142b)을 형성한 구속봉(142)으로 구성하고,The constraining bar is formed of a constraining rod 142 having an upper portion cut in the longitudinal direction to form a binding groove 142a and a locking groove 142b formed on an inner wall of the binding groove. 상기 구속키는 구속봉(142)에 끼워 구속된 선근조연결부가 이탈되지 않게 상기 결속홈(142a)에 끼워 결합되어서 걸림홈(142b)에 걸려지는 걸림키(152)와 상기 걸림홈(142b)에 채워 결속되는 걸림결속제(153) 중 어느 하나를 선택적으로 구비한 것을 특징으로 하는 식생부를 갖는 석근조.The restraint key is fitted into the binding groove 142a so that the restraint bar connection part, which is restrained by the restraint bar 142, is not detached from the restraint key 152 and the catching groove 142b. Stone root jaw having a vegetation portion, characterized in that it is provided with any one of the locking binding agent (153) to be filled in the binding. 제 1 항 내지 제 4 항 중 어느 하나의 항에 있어서;The method according to any one of claims 1 to 4; 상기 뿌리돌기(21)의 일측 틀부(23)에는 결합된 돌(10)이 자중에 의하여 회전 유동되는 것을 방지할 수 있게 돌의 결속공(11) 측부에 형성한 지지공(12)에 결합되는 지지봉(22)을 형성하고,One side frame portion 23 of the root protrusion 21 is coupled to the support hole 12 formed on the side of the binding hole 11 of the stone to prevent the coupled stone 10 is rotated by the own weight Form a support rod (22), 상기 황토식생부(30)에 시공시 바로 풀이 자라 식생 환경이 조성되게 씨앗(31)을 파종 형성하고,When the construction on the ocher vegetation part 30, the grass grows immediately so that the seeds 31 are formed so that the vegetation environment is formed, 상기 결속키(110)의 몸체 하부에는 지면과의 결속을 위하여 길게 돌출되는 지면결속핀(113)을 구비하며,The lower portion of the body of the binding key 110 is provided with a ground binding pin 113 protruding long for binding with the ground, 호형 조적시 석근조연결부(24)가 어긋남으로 인하여 상호 결속력 저하를 방지할 수 있게 각 변에 석근조연결부(24)를 형성하고, 상기 어긋난 석근조연결부(24)를 결속시킬 수 있게 다수의 결합공(161)을 형성한 결속판(160)을 구비한 것 을 특징으로 하는 식생부를 갖는 석근조.When the arc-shaped masonry is connected to each other so that the stone root connections 24 are formed to prevent the mutual binding force is lowered due to the displacement of the stone root connections 24, the plurality of couplings to bind the stone root connections (24) Stone root jaw having a vegetation portion, characterized in that provided with a binding plate 160 formed a ball (161). 판상의 지그함체(210)에 돌(10)을 수납한 후 돌들이 동일한 돌출높이를 유지하게 지지하는 천공셋팅과정(500)과, And a punching setting process 500 for storing the stones 10 in the plate-shaped jig box 210 to support the stones to maintain the same height. 상기 천공셋팅과정(500)을 통하여 상부가 일정높이로 지지된 각 돌(10)에 구멍을 뚫는 천공과정(600)과, A punching process 600 for drilling a hole in each stone 10 whose upper portion is supported at a predetermined height through the punching setting process 500, 상기 천공과정(600)을 통하여 뚫어진 돌(10)에 근부(20)의 뿌리돌기(21)가 상기 돌의 결속공(11)에 끼워 결합되어 결합제를 매개로 결속되게 설치하는 근부설치과정(700)과,Rooting process 21 of the root protrusion 20 of the root portion 20 is coupled to the binding hole 11 of the stone to the stone 10 drilled through the drilling process (600) to be installed to bind through the binder medium 700 )and, 상기 근부설치과정(700)을 통하여 근부(20)의 설치완료된 상태에서 상기 가압에 의하여 근부(20)가 황토반죽(250)에 함침되게한 후 이를 건조시켜 황토식생부(30)가 형성되게 하는 황토식생부 형성과정(800)으로 이루어지되,When the root portion 20 is impregnated in the loess dough 250 by the pressure in the state in which the root portion 20 is installed through the root portion installation process 700, the loess vegetation portion 30 is formed by drying it. Ocher vegetation is formed by the process (800), 상기 천공셋팅과정(500)은 The punching setting process 500 is 일정 규격의 판상 지그함체(210)에 돌(10)을 수납하는 돌 수납과정(510)과, 상기 돌이 수납된 판상 지그함체(210)의 상부에서 내부에 다수의 지지액츄에이터(221)가 구비된 지지부(220)로 지그함체(210)에 수납된 돌(10)의 지지를 위하여 돌출 접촉하는 지지 접촉과정(520)과, 상기 지그함체(210)와 지지부(220)를 함께 회전시켜 지지부(220)의 지지액츄에이터(221)가 지그함체(210)의 돌을 지지하게 하는 돌지지과정(530)으로 이루어지고,A stone accommodating process 510 for accommodating the stone 10 in the plate-shaped jig box 210 of a predetermined standard, and a plurality of support actuators 221 are provided therein at an upper portion of the plate-shaped jig box 210 in which the stone is accommodated. A support contact process 520 is provided to support the protrusions 520 to support the stones 10 accommodated in the jig box 210 by the support 220, and the jig box 210 and the support 220 are rotated together to support the support 220. The support actuator 221 of the) is made of a stone support process 530 to support the stone of the jig box 210, 상기 황토식생부 형성과정(800)은 상기 근부설치과정(700)을 통하여 틀부(23)가 결합된 상태에서 그 상부에 황토반죽(250)이 담아진 황토상자(240)를 올려놓는 황토상자 설치과정(810)과, 상기 황토상자 설치과정(810)을 통하여 설치된 황토상자(240)와 함께 지그함체(210)를 뒤집어 회전시킨 후 황토상자(240)의 뚜껑을 슬라이딩 제거하고 지지액츄에이터(221)에 의하여 돌(10)을 가압하여서 틀부(23)가 상기 황토반죽에 함침되게 하는 틀부함침과정(820)과, 상기 틀부함침과정(820) 후 황토반죽(250)을 건조시키는 건조과정(830)으로 이루어한 것을 특징으로 하는 식생부를 갖는 석근조의 제조방법.The ocher vegetation forming process 800 is the ocher box installation to put the ocher box 240 containing the ocher dough 250 in the upper part in the state in which the frame portion 23 is coupled through the root installation process 700 After turning the jig case 210 with the ocher box 240 installed through the process 810 and the ocher box installation process 810, the lid of the ocher box 240 is removed by sliding the support actuator 221. By pressing the stone (10) by the mold part 23 to impregnate the ocher dough, the mold impregnation process (820), and the drying process of drying the ocher dough (250) after the mold impregnation process (820) Method for producing stone root having vegetation characterized in that the end.
KR1020060092785A 2006-09-25 2006-09-25 Stone root mass and its manufacture method KR100747483B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060092785A KR100747483B1 (en) 2006-09-25 2006-09-25 Stone root mass and its manufacture method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060092785A KR100747483B1 (en) 2006-09-25 2006-09-25 Stone root mass and its manufacture method

Publications (1)

Publication Number Publication Date
KR100747483B1 true KR100747483B1 (en) 2007-08-08

Family

ID=38602294

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060092785A KR100747483B1 (en) 2006-09-25 2006-09-25 Stone root mass and its manufacture method

Country Status (1)

Country Link
KR (1) KR100747483B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11323945A (en) 1998-05-14 1999-11-26 Nagai Concrete Kogyo Kk Connecting structure of slope lining precast concrete block
KR20000025849A (en) * 1998-10-15 2000-05-06 나성민 Constructing method of environment for protecting ecology of river side and construction thereof
JP2003113605A (en) 2001-06-04 2003-04-18 Kankyo Kogaku Kk Civil engineering block, structure of civil engineering construction, method of constructing structure of civil engineering construction, and method of manufacturing civil engineering block
KR200318140Y1 (en) 2003-03-18 2003-06-27 원 회 양 Protection block for embankment slope
JP2003245911A (en) 2002-02-26 2003-09-02 Kanto Regional Development Bureau Ministry Of Land Infrastructure & Transport Manufacturing method for stone-pasted block
KR20190000930A (en) * 2014-05-28 2019-01-03 가부시키가이샤 스크린 홀딩스 Tablet printing device and tablet printing method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11323945A (en) 1998-05-14 1999-11-26 Nagai Concrete Kogyo Kk Connecting structure of slope lining precast concrete block
KR20000025849A (en) * 1998-10-15 2000-05-06 나성민 Constructing method of environment for protecting ecology of river side and construction thereof
JP2003113605A (en) 2001-06-04 2003-04-18 Kankyo Kogaku Kk Civil engineering block, structure of civil engineering construction, method of constructing structure of civil engineering construction, and method of manufacturing civil engineering block
JP2003245911A (en) 2002-02-26 2003-09-02 Kanto Regional Development Bureau Ministry Of Land Infrastructure & Transport Manufacturing method for stone-pasted block
KR200318140Y1 (en) 2003-03-18 2003-06-27 원 회 양 Protection block for embankment slope
KR20190000930A (en) * 2014-05-28 2019-01-03 가부시키가이샤 스크린 홀딩스 Tablet printing device and tablet printing method

Similar Documents

Publication Publication Date Title
US20070036615A1 (en) Freestanding wall structures made using sandbags
CA2517669A1 (en) Retaining wall constructed using sandbags
KR100577979B1 (en) Revetment construction method
KR100747483B1 (en) Stone root mass and its manufacture method
KR101659168B1 (en) Rock cutting slope revegetation method
KR20100092837A (en) Plantable block and a plantable retaining wall construction method which uses the plantable block
KR100807271B1 (en) Vegetation revetment wall block structure
JPWO2005124034A1 (en) Vegetation block and outer layer for vegetation block
KR100841978B1 (en) The manufacture and constructional method of plant matrix
KR20050118109A (en) Civil engineering method for manufacturing and installing vegetation blocks so that through hole of Sanghyup light is formed on the slope of incision or embankment
KR20060099187A (en) Plant mat
JP3118346U (en) Seawall block
KR100317471B1 (en) Block for public works having a multiple coupling structure and carrying out method of using it
KR101818562B1 (en) Reinforced retainaing wall and construction method thereof
KR100725941B1 (en) Block retaining wall construction
JP7146621B2 (en) Slope stabilization method and slope stabilization structure
KR100317472B1 (en) Landscape architecture block for protecting a slop side and carrying out method of using it
JP2002327444A (en) Earth retaining concrete block
JP2014195415A (en) Nursery bed for wall surface greening in structure, unit for wall surface greening and device for wall surface greening
KR200408101Y1 (en) The Plant life flange
KR200412272Y1 (en) Retaining Wall Vegetation Block
KR200446445Y1 (en) Block for plants
KR100371808B1 (en) A planter box for ecology protection environment of river side make
KR100430246B1 (en) Production method of vegetation block using vegitable materials
KR20110040594A (en) Cast-in-place plant mat and its constructing method

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20100824

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee