KR100723600B1 - Method for analyzing national level control point survey result using a observation drawing self construction in geodetic surveying - Google Patents

Method for analyzing national level control point survey result using a observation drawing self construction in geodetic surveying Download PDF

Info

Publication number
KR100723600B1
KR100723600B1 KR1020060106810A KR20060106810A KR100723600B1 KR 100723600 B1 KR100723600 B1 KR 100723600B1 KR 1020060106810 A KR1020060106810 A KR 1020060106810A KR 20060106810 A KR20060106810 A KR 20060106810A KR 100723600 B1 KR100723600 B1 KR 100723600B1
Authority
KR
South Korea
Prior art keywords
observation
point
survey
calculating
information
Prior art date
Application number
KR1020060106810A
Other languages
Korean (ko)
Inventor
임상문
박기석
권오섭
신우람
이원춘
Original Assignee
(주)아세아항측
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)아세아항측 filed Critical (주)아세아항측
Priority to KR1020060106810A priority Critical patent/KR100723600B1/en
Application granted granted Critical
Publication of KR100723600B1 publication Critical patent/KR100723600B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B29/00Maps; Plans; Charts; Diagrams, e.g. route diagram

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Human Resources & Organizations (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Mathematical Physics (AREA)
  • Educational Technology (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

본 발명은 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법에 관한 것으로, 보다 상세하게는 데이터 처리장치에서 국가수준기준점 측량값인 측점, 기계 및 표척간 거리, 표척관측영상 및 국가기준점 지반고, 관측야장 성과와 속성정보를 입력받는 단계; 데이터 처리장치에서 상기 입력된 정보를 바탕으로, 다음의 단계를 거쳐 현장측량 데이터를 산출하는 단계: (i) 측점별 추가거리 및 기계고를 계산하는 단계; (ii) 각 측점별 지반고 및 시작점과 종료점의 편차를 계산하는 단계; 및 (iii) 후시의 총합 및 전시중 이기점의 총합을 계산하는 단계; 데이터 처리장치에서 상기 현장측량 데이터를 기초로, 상기 표척, 레벨 및 측점의 관계를 도시하는 관측도를 자동작도하는 단계: 및 상기 관측도를 이용하여 속성정보 및 영상정보를 영상표시장치에 표시하는 단계를 포함하는 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법에 관한 것이다. The present invention relates to a method for analyzing national level control point survey results using automatic plotting of survey data in geodetic surveys. Receiving reference point ground elevation, observation field performance and attribute information; On the basis of the input information in the data processing apparatus, calculating the site survey data through the following steps: (i) calculating additional distance and machine height for each point; (ii) calculating the ground elevation for each point and the deviation between the starting point and the ending point; And (iii) calculating the sum of backsight and the sum of selfish points during display; Automatically constructing an observation diagram showing the relationship between the scale, the level, and the station based on the field survey data in a data processing apparatus; and displaying attribute information and image information on the image display apparatus using the observation diagram. This study relates to a method for analyzing national level control point survey results using automatic plotting in observation surveying.

본 발명은 관측도 자동작도를 통하여 객관성 및 신뢰성이 향상된 관측성과를 제공하고, 검사 및 점검시간을 단축시켜 비용이 절감되고, 각종 속성정보 및 영상정보의 다양한 활용이 가능한 효과가 있다. The present invention provides the observation performance through improved automatic objectivity and reliability, the inspection and inspection time is shortened, the cost is reduced, and various attribute information and image information can be utilized in various ways.

관측도, 자동작도, 국가기준점측량, 수준측량, 수준기준점측량 Observation chart, automatic plot, national control point survey, level survey, level control point survey

Description

측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법 {Method for Analyzing National Level Control Point Survey Result using a Observation drawing Self construction in Geodetic Surveying}{Method for Analyzing National Level Control Point Survey Result using a Observation drawing Self construction in Geodetic Surveying}

도 1은 국가수준측량의 개념 등을 도시한 것이다.1 illustrates the concept of national level surveying and the like.

도 2는 측지측량에 사용되는 국가수준기준점의 형태, 속성정보 등을 도시한 것이다.Figure 2 shows the form, attribute information, etc. of the national level reference point used for geodetic surveying.

도 3은 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법을 도시한 것이다.Figure 3 illustrates a method of analyzing the national level control point survey results using the automatic plot of observation in the geodetic survey according to the present invention.

도 4 본 발명에 따른 국가수준기준점관측을 실시작업의 흐름도를 도시한 것이다.Figure 4 shows a flow chart of the implementation of the national level control point observation in accordance with the present invention.

도 5는 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법 중, 프로젝트 설정의 작업절차를 도시한 것이다.Figure 5 shows the working procedure of the project setting in the method of analysis of the national level control point survey results using the automatic drawing of the observation degree in the geodetic survey according to the present invention.

도 6은 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법 중, 현장측량성과입력의 작업절차를 도시한 것이다.Figure 6 shows the working procedure of field surveying performance and input in the method of analysis of the national level control point survey results using the automatic drawing of the observation chart in the geodetic survey according to the present invention.

도 7은 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법 중, 현장측량성과 계산 작업절차를 도시한 것이다.Figure 7 shows the field surveying and the calculation work procedure of the method of analysis of the national level control point survey results using the automatic plot of the observation degree in the geodetic survey according to the present invention.

도 8은 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법 중, 관측도 자동작도의 작업절차를 도시한 것이다.8 is a view illustrating a working procedure of an automatic map of observation degree in a method of analyzing national level control point survey results using an automatic diagram of surveying in geodetic surveying according to the present invention.

도 9는 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법 중, 관측 성과를 분석 및 점검하여 속성정보 및 영상정보를 출력의 작업종류를 도시한 것이다.FIG. 9 is a view illustrating a working type of outputting attribute information and image information by analyzing and checking observation performance in a method for analyzing national level control point survey results using an automatic drawing of a survey in geodetic surveying according to the present invention.

도 10은 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법의 형태를 도시한 것이다.FIG. 10 illustrates a form of a method for analyzing national level control point survey results using automatic plotting of observation charts in geodetic surveying according to the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

201: 국가수준기준점 202: 기준점성과표201: National Level Reference Points 202: Baseline Scorecard

1002: 관측도 1003: 야장테이블 및 계산테이블1002: Observation chart 1003: field table and calculation table

1004: 용역기간 및 발주처 정보 1005: 표척의 눈금과 시준선의 관계 1004: Service period and order information 1005: Relationship between scale of scale and collimation line

1006: 조회 정보버튼 1007: 작업종료버튼1006: Inquiry Information Button 1007: Job End Button

1008: 기능버튼1008: function button

발명의 분야Field of invention

본 발명은 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법에 관한 것으로, 보다 상세하게는 데이터 처리장치에서 국가수준기준점 측량값인 측점, 기계 및 표척간 거리, 표척관측영상 및 국가기준점 지반고, 관측야장 성과와 속성정보를 입력받는 단계; 데이터 처리장치에서 상기 입력된 정보를 바탕으로, 다음의 단계를 거쳐 현장측량 데이터를 산출하는 단계: (i) 측점별 추가거리 및 기계고를 계산하는 단계; (ii) 각 측점별 지반고 및 시작점과 종료점의 편차를 계산하는 단계; 및 (iii) 후시의 총합 및 전시중 이기점의 총합을 계산하는 단계; 데이터 처리장치에서 상기 현장측량 데이터를 기초로, 상기 표척, 레벨 및 측점의 관계를 도시하는 관측도를 자동작도하는 단계: 및 상기 관측도를 이용하여 속성정보 및 영상정보를 영상표시장치에 표시하는 단계를 포함하는 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법에 관한 것이다. The present invention relates to a method for analyzing national level control point survey results using automatic plotting of survey data in geodetic surveys. Receiving reference point ground elevation, observation field performance and attribute information; On the basis of the input information in the data processing apparatus, calculating the site survey data through the following steps: (i) calculating additional distance and machine height for each point; (ii) calculating the ground elevation for each point and the deviation between the starting point and the ending point; And (iii) calculating the sum of backsight and the sum of selfish points during display; Automatically constructing an observation diagram showing the relationship between the scale, the level, and the station based on the field survey data in a data processing apparatus; and displaying attribute information and image information on the image display apparatus using the observation diagram. This study relates to a method for analyzing national level control point survey results using automatic plotting in observation surveying.

발명의 배경Background of the Invention

국가수준기준점은 각종 건설공사의 설계, 지도제작 및 또 다른 기준점설치의 기준이 되므로 국가수준기준점을 이용한 측지측량시 정도가 높은 측량을 실시해야하고, 국가수준측량에 따른 관측성과는 객관적이고 신뢰성을 충분히 확보해야 한다. 국가수준측량(leveling; plane survey)은 3차원 좌표에서 높이를 결정하기위한 것으로, 표면에 있는 여러점들 사이의 고저차 또는 표고를 관측한다. 국가수준점측량의 기준은 평균해수면(지오이드)이며, 수준측량의 결과는 지도제작, 설계 및 시공에 필요한 자료를 제공하는 중요한 정보로, 도로, 철도, 운하의 설계, 계획된 높이의 건설구조물 설치, 배수특성조사, 지도제작 등의 분야에서 기준점을 제공하는 역할을 한다. 국가 기준수준기준점측량은 건설교통부고시 제2002-177호 제3장 수준측량 제39조 및 40조를 준용하여 작업계획, 선점, 측량표의 설치, 관측, 계산, 성과정리 단계를 거치는데, 본 발명은 관측단계에 있어 신속하고 정확한 국가수준기준점측량을 위한 것이다. 관측은 선점도를 기초로 작성된 관측계획도를 따라 레벨 및 수준표척 등에 의하여 관련점 사이의 고저차를 측정하는 작업이다. 이때 관측된 표척의 눈금은 수치로 종이형태의 야장에 기록되고, 상기 종이형태의 야장 기록은 관측시의 조건을 파악하기는 어려운 단점이 있으며, 성과에 대한 개선된 분석 및 관리 방법을 제안하였다. Since the national level reference point is the standard for designing, mapping, and establishing other reference points for various construction projects, high-level surveys should be carried out using the national level reference point, and the observation performance according to the national level survey is objective and reliable. It should be secured enough. Leveling (plane survey) is used to determine the height in three-dimensional coordinates and observes elevation or elevation between several points on the surface. The national benchmark is based on mean sea level (geoid), and the results of the level survey are important information that provides data for mapping, design, and construction.The design of roads, railways, canals, construction of planned structures, and drainage It serves as a reference point in the fields of characteristic research and mapping. The national standard level reference point survey is carried out in accordance with the provisions of Article 39 and 40 of Chapter 3 Level Survey No. 2002-177 of the Ministry of Construction and Transportation, and goes through the work planning, preemption, installation of the survey table, observation, calculation, and performance management. Is for fast and accurate national level control point surveys in the observation phase. Observation is the work of measuring the elevation difference between related points by level and level marking along the observation plan chart based on the preemptive diagram. At this time, the scale of the observed scale is recorded in the paper field yard as a numerical value, and the paper field yard record is difficult to grasp the conditions at the time of observation, and an improved analysis and management method for performance has been proposed.

이와 관련된 종래 특허로는 '측량 기준점 표지구를 이용한 측량 표지관리 시스템'(한국특허 등록번호 10-0564145, 2006.03.20) 등이 있으며, 관측 당시의 사용된 표척, 장비, 표척 읽음값, 표척과 기계간 거리, 시준선과 표척의 수치영상, 관측자의 정보 등 각종 속성정보와 영상정보를 제공하지 못하여 관측성과의 정확성이 감소되고, 종래 방법은 관측한 상세정보를 수치적으로 저장할 수 없으며, 측량 당시의 표척과 기계간의 상관관계를 파악할 수 없는 문제점이 있다. Related patents include 'surveying label management system using a survey reference point marker' (Korea Patent Registration No. 10-0564145, 2006.03.20), and the used scale, equipment, reading value, The accuracy of the observation results is reduced by not providing various attribute information and image information such as the distance between machines, the digital image of the line of sight and the standard, and the information of the observer, and the conventional method cannot numerically store the detailed information of the observation. There is a problem that can not determine the correlation between the surface and the machine.

이에, 본 발명자들은 종래 기술의 단점을 해결하기 위하여 예의 노력한 결과, 각종 속성정보와 영상정보를 자동으로 정확하게 계산하여 출력하고, 관측시 표척과 기계의 상관관계를 자동으로 작도된 관측도를 통하여 정확하고, 신뢰성이 향상된 관측성과의 분석정보 제공이 가능한 효과를 가지는 것을 확인함으로써, 본 발 명을 완성하게 되었다. Accordingly, the present inventors have made efforts to solve the shortcomings of the prior art, and as a result, automatically calculates and outputs various attribute information and image information, and accurately corrects the correlation between the surface and the machine during the observation. The present invention was completed by confirming that the analysis information provided with improved observation performance was improved.

결국, 본 발명의 주된 목적은 현장측량을 통하여 관측성과의 객관성 및 신뢰성이 향상된 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법을 제공하는데 있다.As a result, the main object of the present invention is to provide a method for analyzing national level control point survey results using automatic plotting of the degree of observation in geodetic surveying with improved objectivity and reliability of observational performance through field surveying.

상기와 같은 목적을 달성하기 위하여, 본 발명은 (a) 데이터 처리장치에서 국가수준기준점 측량값인 측점, 기계 및 표척간 거리, 표척관측영상 및 국가기준점 지반고, 관측야장 성과와 속성정보를 입력받는 단계; (b) 데이터 처리장치에서 상기 입력된 정보를 바탕으로, 다음의 단계를 거쳐 현장측량 데이터를 산출하는 단계: (i) 측점별 추가거리 및 기계고를 계산하는 단계; (ii) 각 측점별 지반고 및 시작점과 종료점의 편차를 계산하는 단계; 및 (iii) 후시의 총합 및 전시중 이기점의 총합을 계산하는 단계; (c) 데이터 처리장치에서 상기 현장측량 데이터를 기초로, 상기 표척, 레벨 및 측점의 관계를 도시하는 관측도를 자동작도하는 단계: 및(d) 상기 관측도를 이용하여 속성정보 및 영상정보를 영상표시장치에 표시하는 단계를 포함하는 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법을 제공한다. In order to achieve the above object, the present invention (a) receiving a national level reference point measurement value, the distance between the machine and the reference point, the standard observation image and the national reference point ground, observation field field performance and attribute information in the data processing device step; (b) calculating field survey data based on the inputted information in the data processing device by performing the following steps: (i) calculating additional distances and machine heights for each station; (ii) calculating the ground elevation for each point and the deviation between the starting point and the ending point; And (iii) calculating the sum of backsight and the sum of selfish points during display; (c) automatically constructing an observation diagram showing the relationship between the level, the level, and the point of view based on the field survey data in the data processing apparatus; and (d) using the observation diagram to display attribute information and image information. In the geodetic survey including the step of displaying on the image display device provides a method for analyzing the national level control point survey results using the automatic drawing of observation.

본 발명에 있어서, 상기 속성정보 및 영상정보는 관측도에 표시된 측점의 클릭을 통해 상기 측점에 관한 속성정보 및 영상정보를 출력하는 것을 특징으로 할 수 있다. In the present invention, the attribute information and the image information may be characterized by outputting the attribute information and the image information about the point by clicking on the point displayed in the observation diagram.

이하, 첨부된 도면을 참조하여 본 발명을 상세히 설명한다. Hereinafter, with reference to the accompanying drawings will be described in detail the present invention.

도 1은 국가수준측량의 개념을 도시한 것으로, 상기 국가수준측량의 개념자료는 우리나라 인천만의 평균해수면을 높이 0의 수치를 기준으로 하고, 평균해수면은 검조장에서 조석측량을 실시하여 얻어낸 값으로, 이를 기점으로 인하공전에 수준원점을 설치한다. 우리나라 수준원점의 높이값은 26.6871m로, 대한민국 모든 수준측량의 원점이다. 최초의 수준측량은 수준원점에서 시작하여 기지점에서 기지점 또는 기지점을 왕복하여 폐합하는 방식으로 또다른 국가수순기준점을 설치하게 된다. Figure 1 illustrates the concept of national level survey, the conceptual data of the national level survey is based on the value of 0 height of the average sea level of Incheon Bay, Korea, and the average sea level is obtained by performing tidal survey at the tide ground Based on this, the level origin is installed before the reduction and reduction. The height of Korea's level origin is 26.6871m, which is the origin of all level surveying in Korea. The first leveling survey starts with the level origin and establishes another national procedure reference point by closing the known point or known point at the known point.

도 2는 측지측량에 사용되는 국가수준기준점의 형태, 속성정보 등을 도시한 것으로, 국가수준점(201)은 석재 및 콘크리트의 재질로 제조되며, 상기 국가기준점은 신규 국가수준기준점의 기준이 되어, 성과 관리는 국가에서 엄격하게 관리하고 있다. 국가기준점성과표(202)는 국가수준점에 대한 속성정보로, 관측정보 및 날짜, 수준점의 높이값, 약도 등이 기록되어 있다. 측지측량에 사용되는 국가수준기준점을 이용하여 수준측량을 실시하는 자는 반드시 기준점 성과표를 이용해야한다.Figure 2 shows the shape, attribute information, etc. of the national level reference point used for geodetic survey, the national level point 201 is made of a material of stone and concrete, the national reference point is the reference of the new national level reference point, Performance management is strictly managed in the country. The national benchmark scorecard 202 is attribute information on the national level point, and the observation information and the date, the height value of the level point, and the directions are recorded. A person performing a level survey using the national level reference point used for the geodetic survey must use the baseline scorecard.

도 3은 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법을 도시한 것으로, 시작단계를 거쳐(301), 대상지역 내의 수준점 현황을 바탕으로, 수준노선 및 수준만을 고려하여 선점하고, 측량표를 설치 한다(302). 레벨을 이용하여 국가수준기준점관측실시하는데(303), 상기 국가수준기준점관측은 기계 및 표척간 거리를 기록하는 단계(303a), 상기 표척의 눈금과 시준선의 관계를 촬영한 표척관측영상을 저장하는 단계(303b) 및 사업명, 발주처, 날짜, 관측자, 장비, 전시 또는 후시 등을 포함하는 속성정보를 기록하는 단계(303c)로 구성된다. 다음으로, 현장측량성과를 분석하는데(304), 프로젝트를 설정(304b)한 다음, 측점, 수평거리 및 표척의 눈금과 시준선의 관계 촬영영상으로 구성된 현장측량성과를 입력 및 출력하고(304c), 관측도를 자동작도한다(304d). 상기 관측도를 이용하여 관측 성과를 분석 및 점검하여 속성정보 및 영상정보를 출력하고(304e), 상기 현장측량성과를 정리하여 저장한다(305).Figure 3 shows a method of analyzing the national level control point survey results using the automatic plotting of the observation figure in the geodetic survey according to the present invention, through the start step (301), based on the status of the level point in the target area, only the level line and level In consideration of preemption, a survey table is set up (302). A state level reference point observation is performed using a level (303), wherein the state level reference point observation records a distance between a machine and a mark (303a), and stores a point observation image photographing the relationship between the scale of the mark and the line of sight. Step 303b and step 303c of recording attribute information including a business name, ordering party, date, observer, equipment, exhibition or backsight, and the like. Next, in analyzing the field survey results (304), setting up the project (304b), inputting and outputting the field survey results consisting of the images of the relationship between the scale, the horizontal distance and the scale and the sight line (304c), Automatically construct the observation diagram (304d). The observation result is analyzed and checked using the observation diagram to output attribute information and image information (304e), and the field survey results are collectively stored (305).

본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법에서 데이터 처리장치 및 영상표시장치는 하나의 시스템으로 구현되고 있으며, 데이터 처리장치에 의한 결과값은 영상표시장치에 수신되어 표시된다. In the geodetic surveying method according to the present invention, the data processing apparatus and the image display apparatus are implemented as one system in the method for analyzing national level control point survey results using automatic plotting, and the result value received by the data processing apparatus is received by the image display apparatus. Is displayed.

도 4 본 발명에 따른 국가수준기준점관측을 실시작업의 흐름도를 도시한 것으로, 사업과 관련된 속성 정보를 입력하는 프로젝트를 설정하고(402), 측점, 수평거리, 표척의 눈금과 시준선의 관계 촬영영상 등 현장측량성과를 입력한다(403). 현장측량성과를 계산하여 출력하고(404), 표척과 장비 및 측점의 관계를 도시하는 관측도를 자동작도한다(405). 상기 관측도를 이용하여 관측 성과를 분석 및 점검하여 속성정보 및 영상정보를 출력하고(406), 상기 현장측량성과를 정리하여 저장한다(407).4 is a flowchart showing the operation of carrying out the national level reference point observation according to the present invention, setting up a project for inputting attribute information related to the project (402), and measuring the relationship between the point, the horizontal distance, the scale of the scale and the collimation line. Enter the field survey results, etc. (403). Calculate and output field survey results (404), and automatically plot observation charts that show the relationship between topography, equipment, and surveys (405). The observation result is analyzed and checked using the observation diagram to output attribute information and image information (406), and the field survey results are collectively stored (407).

도 5는 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법 중, 프로젝트 설정의 작업절차를 도시한 것으로, 용역 및 발주처를 입력하고(501), 용역기간 및 측량일을 입력하고(502), 관측자 및 장비를 입력하고(503), 프로젝트 작업자를 입력하고(504), 참여인력을 입력하고(505), 사용한 국가기준점을 입력한다(506).FIG. 5 is a diagram illustrating a procedure for setting up a project in a method for analyzing national level control point survey results using automatic plotting in surveying according to the present invention, inputting a service and a client (501), and a service period and a survey date. Input 502, input observer and equipment 503, input project worker 504, input participant input 505, and input the used national reference point 506.

도 6은 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법 중, 현장측량성과입력의 작업절차를 도시한 것으로, 측점을 입력하고(601), 기계 및 표척간 거리를 입력한다(602). 상기 표척의 눈금과 시준선의 관계를 촬영한 표척관측영상을 입력한다(603). 다음, 국가기준점지반고를 입력하고(604), 관측야장성과를 입력하고(605), 기타속성정보를 입력한다(606).FIG. 6 is a diagram illustrating a working procedure for field surveying and input of a national level control point survey result analysis method using an automatic drawing of observation maps in geodetic surveying according to the present invention. Enter (602). A scale observation image photographing the relationship between the scale of the scale and the collimation line is input (operation 603). Next, the national reference point elevation is input (604), the field field performance is input (605), and other attribute information is input (606).

도 7은 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법 중, 현장측량성과 계산 작업절차를 도시한 것으로, 테이블(야장계산표)에 관측성과를 출력하는 단계(700), 측점별 추가거리를 계산 및 출력하는 단계(701), 기계를 고정시켰을 때 지표면에서 망원경 시준선까지의 높이인 기계고를 계산 및 출력하는 단계(702), 각 측점별로 표척을 세운 여러 지점의 높이인 지반고를 계산 및 출력하는 단계(703), 시작점과 종료점의 편차를 계산 및 출력하는 단계(704), 후시의 총합을 계산 및 출력하는 단계(705), 전시중 이기점 총합을 계산 및 출력하는 단계(706) 및 검산단계(707)로 구성된다. 상기 전시는 표고를 구하려는 점에 세운 표척의 눈금을 읽는 것을 의미하고, 상기 후시는 공공기준점측량에서 그 성과가 기지의 값으로 사용되는 기지점에서 세운 표척의 눈금을 읽는 것을 의미한다.FIG. 7 is a diagram illustrating field surveying and calculation procedures in a method for analyzing national level control point survey results using automatic plotting in surveying according to the present invention, and outputting the observation results in a table (field calculation table) (700). Calculating and outputting the additional distance for each station (701), calculating and outputting the height of the machine which is the height from the ground surface to the telescope collimation line when the machine is fixed (702), and the height of the various points that are set for each station. Calculating and outputting a phosphorus elevation (703), calculating and outputting a deviation between a starting point and an ending point (704), calculating and outputting a sum of backsight (705), calculating and outputting a total of interest points during an exhibition It consists of a step 706 and a check step 707. The exhibition means reading the scale of the scale set at the point to obtain the elevation, and the backsight means reading the scale of the scale set at the known point whose performance is used as the known value in the public control point survey.

도 8은 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법 중, 관측도 자동작도의 작업절차를 도시한 것으로, 상기 관측도 자동작도는 시작점 좌표를 산정하고, 측점을 표기하는 단계(801), 중간점 좌표를 산정하고, 측점을 표기하는 단계(802), 종료점 좌표를 산정하고, 측점을 표기하는 단계(803), 측점별 수직방향 표척을 표기하는 단계(804), 기계점을 표기하는 단계(805), 표척과 기계간 시준선을 작도하는 단계(806), 상기 시준선에 대해 관측값을 표기하는 단계(807), 측점별 지반고를 표기하는 단계(808), 측점을 연결한 지반선을 작도하는 단계(809),상기 측점이 표기된 곳에 클릭명령어를 생성하고(810), 측점명과 영상정보를 연결하는 단계(811), 측점명과 속성정보를 연결하는 단계(812) 및 관측도 자동작도를 완료하는 단계(813)로 구성된다.FIG. 8 is a flowchart illustrating a procedure of automatically operating an observation figure in a method of analyzing national level control point survey results using an automatic drawing in a geodetic survey according to an embodiment of the present invention. Marking step 801, calculating the midpoint coordinates, marking the points 802, calculating the endpoint coordinates, marking the points 803, marking the vertical scale for each point (804) ), Marking a mechanical point (805), drawing a collimation line between the top and the machine (806), marking an observation value for the collimating line (807), marking a ground level for each point (808), A step 809 of constructing a ground line connecting the points, generating a click command where the point is indicated (810), connecting the station name and image information (811), connecting the station name and attribute information (812) ) And observations to complete the autograph It consists of the system 813.

도 9는 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법 중, 관측 성과를 분석 및 점검하여 속성정보 및 영상정보를 출력의 작업종류를 도시한 것이다.FIG. 9 is a view illustrating a working type of outputting attribute information and image information by analyzing and checking observation performance in a method for analyzing national level control point survey results using an automatic drawing of a survey in geodetic surveying according to the present invention.

도 10은 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법의 형태를 도시한 것이다. 레벨과 표척의 상관관계를 도시하는 관측도 표시 부분(1002), 야장테이블 및 계산테이블(1003), 용역명, 용역기간 및 발주처 정보 표시부분(1004), 표척의 눈금과 시준선 관계를 저장한 영상, 측점, 전후시, 읽음값 및 수평거리 표시부분(1005), 용역조회, 작업자조회, 기간조회 및 발주처조회 등 각종 조회 정보 버튼(1006), 성과를 외부에 전송하는 기능 및 작업종료 버튼(1007) 및 프로젝트설정, 성과입력, 성과계산, 성과분석점검, 성과저장, 성과출력 등 각종 기능 버튼(1008)으로 구성된다.FIG. 10 illustrates a form of a method for analyzing national level control point survey results using automatic plotting of observation charts in geodetic surveying according to the present invention. An image showing the correlation between the level and the scale, the observation diagram display portion 1002, the field table and calculation table 1003, the service name, the service period, and the order information display portion 1004, and the scale of the scale and the line of sight. , Station, before and after, reading value and horizontal distance display portion 1005, various inquiry information button 1006, such as service inquiry, worker inquiry, period inquiry and order inquiry, the function to send the result to the outside and the work termination button 1007 ) And various function buttons 1008 such as project setting, performance input, performance calculation, performance analysis check, performance storage, and performance output.

이상으로 본 발명의 특정한 부분을 상세히 기술하였는바, 당업계의 통상의 지식을 가진 자에게 있어서, 이러한 구체적 기술은 단지 바람직한 실시양태일 뿐이며, 이에 의해 본 발명의 범위가 제한되는 것이 아닌 점은 명백할 것이다. 따라서 본 발명의 실질적인 범위는 첨부된 청구항들과 그 것들의 등가물에 의하여 정의된다고 할 것이다.Having described the specific parts of the present invention in detail, it will be apparent to those skilled in the art that such specific descriptions are merely preferred embodiments, and thus the scope of the present invention is not limited thereto. will be. Therefore, the substantial scope of the present invention will be defined by the appended claims and equivalents thereof.

이상에서 상세히 설명한 바와 같이, 본 발명은 현장측량을 통하여 관측성과의 객관성 및 신뢰성이 향상된 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법을 제공하는 효과가 있다. 본 발명에 따른 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법은 입력, 처리, 분석, 점검, 저장 및 출력이 가능하고, 관측에 사용된 표척, 장비, 표척 읽음값, 표척과 기계간 거리, 시준선과 표척의 수치영상, 관측자의 정보 등 각종 속성정보와 영상정보를 자동으로 정확하게 계산하여 출력하며, 관측시 표척과 기계의 상관관계를 자동으로 작도된 관측도를 통하여 정확한 관측성과의 분석정보를 제공하는 효과가 있다. 또한, 수평거리 데이터를 이용하여 등거리 측량의 여부 파악이 용이하고, 상기 등거리 측량 여부의 파악을 통하여 기계적 오차를 줄일 수 있으며, 속성정보 및 영상정보의 입력을 통하여 수준측량시 관측정보의 제공이 가능하며, 상기 관측 정보는 디지털 형태로 관리가 용이하다. 뿐만 아니라, 검사 및 점검시간을 단축시켜 비용이 절감되고, 각종 속성정보 및 영상정보의 다양한 활용이 가능한 효과가 있다. As described in detail above, the present invention has an effect of providing a method for analyzing the national level control point survey results using the automatic plot of observation degree in the geodetic survey to improve the objectivity and reliability of observation performance through the field survey. In the geodetic survey according to the present invention, the method for analyzing the national level control point survey results using automatic plotting is capable of input, processing, analysis, inspection, storage and output, and the scales, equipment, scale readings, scales Automatically and accurately calculates and outputs various attribute information and image information such as distance between machines, numerical images of sight lines and marks, and observer information, and accurately calculates the correlation between the marks and machines. It is effective to provide analysis information of. In addition, it is easy to determine whether equidistant surveying is performed using horizontal distance data, the mechanical error can be reduced by identifying the equidistant surveying, and observation information can be provided during level surveying by inputting attribute information and image information. The observation information is easy to manage in digital form. In addition, the cost is reduced by reducing the inspection and inspection time, there is an effect that can be used for a variety of attribution information and image information.

Claims (2)

데이터 처리장치 및 영상처리장치가 구비된 측지측량 시스템에 있어서, 다음의 단계를 포함하는 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법:In a geodetic surveying system equipped with a data processing device and an image processing device, a method for analyzing national level control point survey results using automatic plotting of observations in geodetic surveying comprising the following steps: (a) 데이터 처리장치에서 국가수준기준점 측량값인 측점, 기계 및 표척간 거리, 표척관측영상 및 국가기준점 지반고, 관측야장 성과와 속성정보를 입력받는 단계;(a) receiving a national level reference point measurement value, a distance between a machine and a reference point, a recorded observation image and a national reference point elevation, observation field performance and attribute information in a data processing apparatus; (b) 데이터 처리장치에서 상기 입력된 정보를 바탕으로, 다음의 단계를 거쳐 현장측량 데이터를 산출하는 단계: (b) calculating field survey data based on the input information in the data processing device by performing the following steps: (i) 측점별 추가거리 및 기계고를 계산하는 단계; (ii) 각 측점별 지반고 및 시작점과 종료점의 편차를 계산하는 단계; 및 (iii) 후시의 총합 및 전시중 이기점의 총합을 계산하는 단계; (i) calculating additional distance and machine height for each station; (ii) calculating the ground elevation for each point and the deviation between the starting point and the ending point; And (iii) calculating the sum of backsight and the sum of selfish points during display; (c) 데이터 처리장치에서 상기 현장측량 데이터를 기초로, 상기 표척, 레벨 및 측점의 관계를 도시하는 관측도를 자동작도하는 단계: 및(c) automatically constructing an observation diagram showing the relationship between the level, the level and the station based on the field survey data in the data processing apparatus: and (d) 상기 관측도를 이용하여 속성정보 및 영상정보를 영상표시장치에 표시하는 단계.(d) displaying the attribute information and the image information on the image display apparatus using the observation diagram. 제1항에 있어서, 상기 속성정보 및 영상정보는 관측도에 표시된 측점의 클릭을 통해 상기 측점에 관한 속성정보 및 영상정보를 출력하는 것을 특징으로 하는 측지측량에서 관측도 자동 작도를 이용한 국가수준기준점측량 결과 분석방법.The national level reference point according to claim 1, wherein the attribution information and the image information output attribution information and image information about the point by clicking on the point displayed on the observation diagram. How to Analyze Survey Results.
KR1020060106810A 2006-10-31 2006-10-31 Method for analyzing national level control point survey result using a observation drawing self construction in geodetic surveying KR100723600B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060106810A KR100723600B1 (en) 2006-10-31 2006-10-31 Method for analyzing national level control point survey result using a observation drawing self construction in geodetic surveying

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060106810A KR100723600B1 (en) 2006-10-31 2006-10-31 Method for analyzing national level control point survey result using a observation drawing self construction in geodetic surveying

Publications (1)

Publication Number Publication Date
KR100723600B1 true KR100723600B1 (en) 2007-05-31

Family

ID=38278777

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060106810A KR100723600B1 (en) 2006-10-31 2006-10-31 Method for analyzing national level control point survey result using a observation drawing self construction in geodetic surveying

Country Status (1)

Country Link
KR (1) KR100723600B1 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101008398B1 (en) 2010-08-04 2011-01-14 (주)동광지엔티 Computer system for perfomring a method for estimating the nubmer of measuring points between two level points and computer-readable medium including the same method
KR101214087B1 (en) 2012-09-12 2012-12-20 (주)인화엔지니어링 Apparatus for measuring national level control point usingand visual information in geodetic surveying
KR101223185B1 (en) 2012-09-26 2013-01-17 주식회사 유성 Device for measuring national level control point using equal distance survey in geodetic surveying
KR101223243B1 (en) 2012-07-31 2013-01-17 삼부기술 주식회사 Geodetic survey data management system
KR101229466B1 (en) 2012-10-22 2013-02-04 중앙항업(주) System for measuring using equal distance survey in geodetic surveying
KR101233719B1 (en) * 2012-06-29 2013-02-18 주식회사 일도엔지니어링 Apparatus for measuring of national level control point usingand visual information in geodetic surveying
KR101388425B1 (en) * 2013-12-10 2014-04-23 뉴비전엔지니어링(주) Numerical map update system for updating numerical data in real time
KR101603157B1 (en) * 2015-01-30 2016-03-14 김용석 smartphone Equipped with auto leveling app
KR20160095371A (en) * 2015-02-03 2016-08-11 동아대학교 산학협력단 smartphone Equipped with leveling app
KR20160095372A (en) * 2015-02-03 2016-08-11 동아대학교 산학협력단 auto leveling device using Smart device

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101008398B1 (en) 2010-08-04 2011-01-14 (주)동광지엔티 Computer system for perfomring a method for estimating the nubmer of measuring points between two level points and computer-readable medium including the same method
KR101233719B1 (en) * 2012-06-29 2013-02-18 주식회사 일도엔지니어링 Apparatus for measuring of national level control point usingand visual information in geodetic surveying
KR101223243B1 (en) 2012-07-31 2013-01-17 삼부기술 주식회사 Geodetic survey data management system
KR101214087B1 (en) 2012-09-12 2012-12-20 (주)인화엔지니어링 Apparatus for measuring national level control point usingand visual information in geodetic surveying
KR101223185B1 (en) 2012-09-26 2013-01-17 주식회사 유성 Device for measuring national level control point using equal distance survey in geodetic surveying
KR101229466B1 (en) 2012-10-22 2013-02-04 중앙항업(주) System for measuring using equal distance survey in geodetic surveying
KR101388425B1 (en) * 2013-12-10 2014-04-23 뉴비전엔지니어링(주) Numerical map update system for updating numerical data in real time
KR101603157B1 (en) * 2015-01-30 2016-03-14 김용석 smartphone Equipped with auto leveling app
KR20160095371A (en) * 2015-02-03 2016-08-11 동아대학교 산학협력단 smartphone Equipped with leveling app
KR20160095372A (en) * 2015-02-03 2016-08-11 동아대학교 산학협력단 auto leveling device using Smart device
KR101653484B1 (en) * 2015-02-03 2016-09-01 동아대학교 산학협력단 auto leveling device using Smart device
KR101655013B1 (en) * 2015-02-03 2016-09-06 동아대학교 산학협력단 smartphone Equipped with leveling app

Similar Documents

Publication Publication Date Title
KR100723600B1 (en) Method for analyzing national level control point survey result using a observation drawing self construction in geodetic surveying
US7482973B2 (en) Precision GPS driven utility asset management and utility damage prevention system and method
CN1693854B (en) Measuring method and measuring system
CN103644896B (en) A kind of engineering geological mapping method based on 3 D laser scanning
KR100784251B1 (en) Method for measuring national level control point using equal distance survey in geodetic surveying
CN109508508B (en) Surface mine governance investigation design method
US20100045517A1 (en) Precision GPS Driven Utility Asset Management and Utility Damage Prevention System and Method
KR101180415B1 (en) system for Constructing road ledger using MMS
JP6979364B2 (en) Ground surface displacement observation device for tunnel route and ground surface displacement observation program for tunnel route
CN106247936A (en) Earth clearance object research method based on 3 D laser scanning and investigating system
CN110057344A (en) Settle detection method and platform
Schloderer et al. Application of GNSS-RTK derived topographical maps for rapid environmental monitoring: a case study of Jack Finnery Lake (Perth, Australia)
KR100819844B1 (en) Method for measuring national level control point using and visual information in geodetic surveying
Ganiyev et al. Examining the managerial structure and operational aspects of geodesy, cartography, and cadastre production
KR101217853B1 (en) Determination device of leveling survey route using digital elevation model and road data
JP4712202B2 (en) Survey drawing drawing system such as land parcel map
Gulyaev et al. Terrestrial methods for monitoring cliff erosion in an urban environment
PL204169B1 (en) Orientation system and method for use in underground mining and tunnel construction
JP6821379B2 (en) How to manage the embankment velocity on soft ground
El-Ashmawy Accuracy, time cost and terrain independence comparisons of levelling techniques
JP7242370B2 (en) Underground object management system
KR100705575B1 (en) Method for making a road register using gps
Metzger et al. A Platform for Proactive Risk-Based Slope Asset Management-Phase I
JP2002039749A (en) Three-dimensional shape measuring system
JPS6219712A (en) Positioning method

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130522

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140523

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150623

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160520

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170519

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20180523

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190401

Year of fee payment: 13