KR100674264B1 - A pile for reinforcing soft ground - Google Patents

A pile for reinforcing soft ground Download PDF

Info

Publication number
KR100674264B1
KR100674264B1 KR1020060060640A KR20060060640A KR100674264B1 KR 100674264 B1 KR100674264 B1 KR 100674264B1 KR 1020060060640 A KR1020060060640 A KR 1020060060640A KR 20060060640 A KR20060060640 A KR 20060060640A KR 100674264 B1 KR100674264 B1 KR 100674264B1
Authority
KR
South Korea
Prior art keywords
pile
mortar
pile body
hole
soft ground
Prior art date
Application number
KR1020060060640A
Other languages
Korean (ko)
Inventor
김희철
Original Assignee
주식회사 토펙엔지니어링 건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 토펙엔지니어링 건축사사무소 filed Critical 주식회사 토펙엔지니어링 건축사사무소
Priority to KR1020060060640A priority Critical patent/KR100674264B1/en
Application granted granted Critical
Publication of KR100674264B1 publication Critical patent/KR100674264B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • E02D3/123Consolidating by placing solidifying or pore-filling substances in the soil and compacting the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A base pile for reinforcing a soft ground is provided to construct the pile easily by inserting a pile body to a pile hole without interference, and to reinforce the soft ground efficiently by increasing friction between the pile body and mortar. A base pile(100) for reinforcing a soft ground(1) includes a pile body inserted to a pile hole(2) of the ground, mortar(20) charged in the pile hole through the pile body and cured, and a blade sill(30) formed in an outer periphery of the pile body to restrict the pile body from being displaced by supporting the pile body. A hollow is formed in the pile body and filled with mortar. A mortar injection hole(12) is formed in an upper part of the pile body to inject mortar, and a mortar discharge hole(13) is communicated and formed in a circumference of the pile body. The mortar discharge hole is wound by a counter flow prevention band(14) to prevent counter flow of mortar discharged through the mortar discharge hole out of the pile body.

Description

연약지반 보강용 기초말뚝{A PILE FOR REINFORCING SOFT GROUND}Foundation pile for soft ground reinforcement {A PILE FOR REINFORCING SOFT GROUND}

도 1은 본 발명의 실시예 1에 따른 연약지반 보강용 기초말뚝의 사시도.1 is a perspective view of a foundation pile for soft ground reinforcement according to the first embodiment of the present invention.

도 2는 본 발명의 실시예 1에 따른 연약지반 보강용 기초말뚝의 설치 상태 종단면도.Figure 2 is a longitudinal cross-sectional view of the installation state of the foundation pile for soft ground reinforcement according to the first embodiment of the present invention.

도 3과 도 4는 각각 본 발명의 실시예 2에 따른 연약지반 보강용 기초말뚝의 작동 상태를 도시한 종단면도.Figure 3 and Figure 4 is a longitudinal sectional view showing an operating state of the foundation pile for soft ground reinforcement according to the second embodiment of the present invention, respectively.

<도면의 주요부분에 대한 부호의 설명><Description of Symbols for Main Parts of Drawings>

1 : 지중, 2 : 말뚝공1: underground, 2: pile ball

10 : 말뚝몸체, 11 : 첨예부10: pile body, 11: sharpening

12 : 몰탈주입공, 13 : 몰탈배출공12: mortar injection hole, 13: mortar discharge hole

14 : 역류방지밴드, 15 : 스토퍼14: backflow prevention band, 15: stopper

20 : 몰탈, 30 : 날개턱20: mortar, 30: wing jaw

40 : 날개편,40: wing piece,

본 발명은 연약지반 보강용 기초말뚝에 관한 것으로, 더욱 상세하게는 연약지반을 보강하기 위하여 연약지반에 시공되는 기초말뚝에 의한 보강력을 크게 할 수 있고, 기초말뚝의 인발을 방지할 수 있으며, 말뚝공을 무리하게 크게 하지 않고 기초말뚝을 시공할 수 있도록 한 연약지반 보강용 기초말뚝에 관한 것이다.The present invention relates to a foundation pile for reinforcing soft ground, and more particularly, to increase the reinforcement by the foundation pile constructed in the soft ground to reinforce the soft ground, and to prevent the drawing of the foundation pile, The present invention relates to a foundation foundation for soft ground reinforcement, which enables construction of foundation piles without excessively increasing the pile ball.

이전부터 지상구조물의 하중을 지반층에 효율적으로 전달하기 위한 대책으로 다양한 말뚝공사 방법들이 개발되어 건설공사현장에서 유용하게 활용되고 있는바, 도심지 건설공사현장에서는 진동과 소음이 상대적으로 적은 현장치기 말뚝공사를 주로 채택하여 왔다.In the past, various pile construction methods have been developed to effectively transfer the loads of ground structures to the ground floor, and have been utilized at construction sites. The construction has been mainly adopted.

상기한 현장치기 말뚝공사는 일례로, 해당위치의 지중을 소요깊이로 천공하여서 말뚝공을 형성하고, 천공된 말뚝공 내에 강관과 함께 심재를 삽입하여서 위치시킨 후에, 상기 말뚝공 내에 주입호스로서 몰탈(그라우트액)을 주입하여서 지반층에 기초말뚝을 설치 시공하는 기술이 있다.For example, the above-mentioned field drilling pile construction is to form a pile hole by drilling the ground of the corresponding position to the required depth, and after placing the core material together with the steel pipe in the drilled pile hole, mortar as an injection hose in the pile hole There is a technique of installing foundation piles on the ground layer by injecting (grout liquid).

이와 같이 시공된 상기 기초말뚝은 주변지반과 적정한 마찰력을 유지하여서, 지상구조물의 하중을 효율적으로 감당하는 장점을 가지는 것이 사실이다.It is true that the foundation pile constructed as described above has an advantage of efficiently bearing the load of the ground structure by maintaining an appropriate friction force with the surrounding ground.

그러나, 연약지반은 연약지반을 형성하고 있는 점성토내에 수분이 다량으로 포화되어 있으므로 외압에 의한 지지력과 지반의 강도가 약하여 하중이 가하여지게 되면 전단파괴로 인하여 구조물이 건설중에 파괴되므로 구조물을 설치할 수가 없으며, 또한 지표면이 어느 정도 침하될 경우에는 구조물의 설치가 가능하더라도 연약지반의 특성상 대량의 압밀침하현상이 장기간에 걸쳐서 계속적으로 진행되게 되므로 시간의 흐름에 따라 연약지반상에 설치한 구조물의 피해가 커지게 되었으므로 일반토사와 같이 느슨하거나 연약한 지반층에서는 현장치기로서 시공된 상기 기초말뚝이 주변지반과 적정한 마찰력을 유지하기 어렵다. However, the soft ground is saturated with a large amount of water in the viscous soil forming the soft ground, so if the load is applied due to the weak bearing capacity and the strength of the ground, the structure is destroyed during shearing, so the structure cannot be installed. In addition, if the ground surface is settled to some extent, even if the structure can be installed, the large scale of consolidation settlement will continue for a long time due to the characteristics of the soft ground. Since the ground piles are loose or soft ground layers such as earth and sand, it is difficult to maintain the proper pile friction with the surrounding ground.

즉, 종래 기술에 의한 연약지반 보강용 기초말뚝에 따르면, 기초말뚝의 외주면이 직선형이기 때문에 기초말뚝과 몰탈과의 마찰력이 미약하여 기초말뚝을 통해 연약지반을 효과적으로 보강할 수 없는 것이다.That is, according to the foundation pile for soft ground reinforcement according to the prior art, because the outer peripheral surface of the foundation pile is straight, the friction between the foundation pile and mortar is weak, so that the soft ground can not be effectively reinforced through the foundation pile.

본 발명은 상기한 종래 문제점을 해결하기 위한 것으로서, 연약지반의 보강을 위하여 지중에 박히는 말뚝과 몰탈과의 마찰력을 크게 하여 연약지반을 효과적으로 보강할 수 있도록 한 연약지반 보강용 기초말뚝을 제공하려는데 그 목적이 있다.The present invention is to solve the above-mentioned problems, to provide a foundation for reinforcing soft ground to effectively reinforce the soft ground by increasing the friction between the pile and mortar embedded in the ground for the reinforcement of the soft ground. There is a purpose.

상기 목적을 달성하기 위하여 제공되는 본 발명에 따른 연약지반 보강용 기초말뚝은, 지중의 말뚝공에 박히는 말뚝몸체와, 상기 말뚝몸체의 내부를 경유하여 상기 말뚝공에 충진됨으로써 상기 말뚝몸체를 설치하는 몰탈과, 상기 말뚝몸체의 둘레부에 벌어지도록 설치되어 상기 말뚝몸체의 인발에 저항하는 날개부로 이루어진 것을 특징으로 한다.The foundation pile for soft ground reinforcement according to the present invention provided to achieve the above object is to install the pile body by being piled in the pile body and the pile body via the inside of the pile body, and piled into the pile hole in the ground; Mortar and, characterized in that consisting of the wing portion which is installed to open to the circumference of the pile body to resist the drawing of the pile body.

본 발명의 특징 및 이점들은 첨부도면에 의거한 다음의 상세한 설명으로 더욱 명백해질 것이다. 이에 앞서, 본 명세서 및 청구범위에 사용된 용어나 단어는 발명자가 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다. The features and advantages of the present invention will become more apparent from the following detailed description based on the accompanying drawings. Prior to this, the terms or words used in the present specification and claims are defined in the technical spirit of the present invention on the basis of the principle that the inventor can appropriately define the concept of the term in order to explain his invention in the best way. It must be interpreted to mean meanings and concepts.

< 실시예 1 ><Example 1>

도 1 및 도 2에서 보이는 것처럼, 본 실시예에 의한 연역지반 보강용 기초말뚝(100)은, 지중(1)의 말뚝공(2)(도 2에 도시됨)에 삽입되는 말뚝몸체(10)와, 말뚝몸체(10)의 내부를 경유하여 말뚝공(2) 내부에 충진되어 양생되는 몰탈(20)과, 그리고, 말뚝몸체(10)의 외주면에 형성되어 말뚝몸체(10)가 인발되지 않도록 지지하는 날개턱(30)으로 구성된다.As shown in Figures 1 and 2, the foundation pile 100 for deductive ground reinforcement according to the present embodiment, the pile body 10 is inserted into the pile hole 2 (shown in Figure 2) of the ground (1) And, the mortar 20 is filled and cured in the pile ball (2) via the interior of the pile body 10, and formed on the outer peripheral surface of the pile body 10 so that the pile body 10 is not drawn out It consists of a wing jaw 30 to support.

말뚝몸체(10)는 길이가 긴 형태이면서 하단부에 첨예부(11)가 형성되어, 이 첨예부(11)를 통해 지중(1)에 박혀 세워진 상태를 유지한다. The stake body 10 has a long shape and a sharp portion 11 is formed at the lower end thereof, thereby maintaining a state of being embedded in the ground 1 through the sharp portion 11.

말뚝몸체(10)는 몰탈(20)이 그 내부를 경유한 후 말뚝공(2)에 충진될 수 있도록 내부에 공간을 갖는 중공형이며, 몰탈(20)의 주입을 위하여 상부측에는 몰탈주입공(12)이 형성됨과 아울러 둘레부에는 내부와 외부가 연통되는 몰탈배출공(13)이 형성된다. 몰탈배출공(13)은 말뚝몸체(10)의 길이방향에 대한 전영역이 말뚝공(2)에 견고하게 설치될 수 있도록 동일간격을 두고 다단으로 형성된다. 이때, 몰탈주입공(12)이 말뚝몸체(10)의 상부에 배치되기 때문에 몰탈배출공(13)들이 동일 직경으로 이루어지면 말뚝몸체(10)로부터 먼 곳의 몰탈배출공(13)으로 갈수록 몰탈(20)의 주입량이 적을 수 있으며, 모든 높이의 몰탈배출공(13)을 통해 몰탈(20)이 균일하게 배출될 수 있도록 몰탈배출공(13)은 몰탈주입공(12)으로부터 먼 곳으 로 갈수록 그 직경이 점진적으로 커진다.The pile body 10 is hollow having a space therein so that the mortar 20 may be filled in the pile hole 2 after passing through the inside thereof, and a mortar injection hole is formed at the upper side for the injection of the mortar 20. 12) is formed and the mortar discharge hole 13 is formed in the circumferential portion and communicate with the outside. The mortar discharge hole 13 is formed in multiple stages at equal intervals so that the entire area of the pile body 10 in the longitudinal direction can be firmly installed in the pile hole 2. At this time, since the mortar injection hole 12 is disposed in the upper portion of the pile body 10, when the mortar discharge holes 13 have the same diameter, mortar toward the mortar discharge hole 13 far from the pile body 10 The injection amount of the 20 may be small, and the mortar discharge hole 13 may be farther away from the mortar injection hole 12 so that the mortar 20 may be uniformly discharged through the mortar discharge hole 13 of all heights. Its diameter gradually increases.

몰탈(20)이 몰탈배출공(13)을 통해 말뚝몸체(10)의 내부에서 외부로 배출된 후 다시 내부로 역류하지 않도록 몰탈배출공(13)에는 역류방지밴드(14)가 감긴다.The mortar discharge hole 13 is wound around the mortar discharge hole 13 so that the mortar 20 is discharged to the outside from the inside of the pile body 10 through the mortar discharge hole 13.

날개턱(30)은 말뚝몸체(10)의 외주면에 돌출 형성되어 말뚝몸체(10)가 말뚝공(2)에서 인발되지 않도록 하는 것이다. The wing jaw 30 is formed to protrude on the outer circumferential surface of the pile body 10 so that the pile body 10 is not drawn out of the pile hole (2).

이와 같이 구성된 본 실시예에 의한 연약지반 보강용 기초말뚝의 작용은 다음과 같다.The action of the foundation pile for soft ground reinforcement according to this embodiment configured as described above is as follows.

연약지반 위에 건축물을 건축할 경우 연약지반의 보강을 위하여 다수의 말뚝공(2)(말뚝공(2)의 수량은 지반상태에 달라짐)을 천공하고, 크레인 또는 수작업 등으로 각 말뚝공(2)에 본 실시예에 의한 기초말뚝(100)을 삽입한 후 첨예부(11)를 말뚝공(2)의 바닥부 지중에 박아 기초말뚝(100)을 말뚝공(2) 내부에 세운다.When building on the soft ground, drill a large number of pile holes (2) (the number of pile holes (2) depends on the ground state) for reinforcement of the soft ground, and each pile hole (2) by crane or manual work, etc. After inserting the foundation pile 100 according to the present embodiment, the sharp part 11 is driven into the bottom of the pile hole 2 to establish the foundation pile 100 inside the pile hole 2.

이어서, 몰탈주입구(2)에 몰탈주입기(미도시)를 연결하여 말뚝몸체(10) 내부에 몰탈(20)을 주입한다. 몰탈(20)은 말뚝몸체(10) 내부에 채워진 후 주입압력에 의해 몰탈배출공(13)들을 통과하여 말뚝몸체(10) 외부(말뚝몸체(10)와 말뚝공(2)의 사이)로 배출됨으로써 말뚝공(2) 내부에 채워지게 된다. 몰탈(20)의 주입시 몰탈주입구(12)에서 먼 곳으로 갈수록 몰탈배출공(13)의 직경이 커지기 때문에 모든 몰탈배출공(13)들을 통해 균일한 양의 몰탈(20)의 배출되어 말뚝공(2)의 모든 영역에 동일한 양의 몰탈(20)이 채워지게 되고, 몰탈배출공(13)이 역류방지밴드(14)에 의해 막혀 있지만, 몰탈(20) 주입압력에 의해 역류방지밴드(14)가 탄성변형되어 몰탈(20)이 말뚝몸체(10) 외부로 자연스럽게 배출된다.Subsequently, a mortar injector (not shown) is connected to the mortar injector 2 to inject the mortar 20 into the pile body 10. After the mortar 20 is filled in the pile body 10, the mortar 20 passes through the mortar discharge holes 13 by the injection pressure and is discharged to the outside of the pile body 10 (between the pile body 10 and the pile hole 2). As a result it is filled in the pile hole (2). Since the diameter of the mortar discharge hole 13 increases as the distance from the mortar inlet 12 to the mortar injection hole 12 increases, a uniform amount of mortar 20 is discharged through all the mortar discharge holes 13 to pile holes. The same amount of mortar 20 is filled in all areas of (2), and the mortar discharge hole 13 is blocked by the backflow prevention band 14, but the backflow prevention band 14 by the mortar 20 injection pressure ) Elastic deformation and mortar 20 is naturally discharged to the outside of the pile body (10).

몰탈(20)의 주입이 완료되면(몰탈(20)이 말뚝공(2)의 입구를 통해 넘치면 몰탈(20)이 더 이상 채워지지 않는 것으로 판단) 몰탈(20)의 주입을 중지하고, 양생완료를 대기한다. 몰탈(20)의 주입이 중지되면 역류방지밴드(14)가 자체 탄성력에 의해 원상태로 복귀되어 몰탈배출공(13)이 막히게 되어 몰탈(20)이 말뚝몸체(10) 내부로 역류되지 않는다.When the injection of the mortar 20 is completed (the mortar 20 is no longer filled when the mortar 20 overflows through the inlet of the pile hole 2), the injection of the mortar 20 is stopped, and curing is completed. Wait for When the injection of the mortar 20 is stopped, the non-return band 14 is returned to its original state by its elastic force so that the mortar discharge hole 13 is blocked so that the mortar 20 does not flow back into the pile body 10.

즉, 몰탈(20)이 말뚝몸체(10)의 외부에만 채워지는 것이 아니라, 말뚝몸체(10)의 내부와 외부에 채워지면서 이들이 서로 연결(몰탈배출공(12)에 몰탈(20)이 채워지므로 말뚝몸체(10) 내외부의 몰탈(20)이 서로 연결됨)되어 기초말뚝(100)에 의해 연약지반을 보강할 수 있으며, 날개턱(30)들을 통해 버팀력이 확보되어 외력이 가해지더라도 기초말뚝(100)은 말뚝공(2)에서 인발되지 않게 된다.That is, the mortar 20 is not filled only on the outside of the pile body 10, but is filled inside and outside the pile body 10 are connected to each other (mortar mortar 20 is filled in the mortar discharge hole (12) Mortars 20 inside and outside the pile body 10 are connected to each other) to reinforce the soft ground by the foundation pile 100, and even when an external force is applied to the foundation pile through the wing jaws 30 100 is not drawn from the pile ball (2).

< 실시예 2 ><Example 2>

도 3과 도 4에서 보이는 것처럼, 본 실시예에 따른 연약지반 보강용 기초말뚝(100)은, 실시예 1의 날개턱(30)이 날개편(40)으로 대체된 것으로, 기초말뚝(100)을 말뚝공(2) 내에 삽입할 때 말뚝공(2)에 간섭되지 않도록 날개편(40)이 말뚝몸체(10)로부터 돌출되지 않으면서 필요시 벌어져 버팀력을 발생하는 특징이 있다.3 and 4, the foundation pile 100 for soft ground reinforcement according to the present embodiment, the wing jaw 30 of the first embodiment is replaced by the wing piece 40, the foundation pile 100 When it is inserted into the pile hole (2), so that the wing piece 40 does not protrude from the pile body (10) so as not to interfere with the pile hole (2) has a feature that generates a brace force when necessary.

날개편(40)은 일측(도면 기준 상단부)이 말뚝몸체(10)에 힌지(41) 결합되어 자유단부(도면 기준 하부)가 회전하면서 몰탈배출공(13)을 폐쇄하다가 몰탈(20)의 주입시 몰탈주입압력에 의해 자유단부가 강제로 밀려 몰탈(20)이 배출되도록 함과 더불어 말뚝몸체(10)로부터 벌어져 말뚝몸체(10)의 버팀력을 제공한다.The wing piece 40 is closed on the mortar discharge hole 13 while one side (the upper end of the drawing reference) is coupled to the pile 41 by the hinge 41 and the free end (the lower reference of the drawing) rotates, thereby injecting the mortar 20. When the free end is forcibly pushed by the mortar injection pressure during mortar 20 is discharged from the pile body 10 to provide a holding force of the pile body (10).

날개편(40)의 기능상 날개편(40)이 일정 각도이상으로는 벌어지지 않도록 말뚝몸체(10)의 몰탈배출공(13)의 천정측에는 스토퍼(15)가 형성된다. 스토퍼(15)는 날개편(40)의 회전궤적 내에 돌출 형성되어 날개편(40)의 회전을 구속하는 것이다.The stopper 15 is formed on the ceiling side of the mortar discharge hole 13 of the pile body 10 so that the wing piece 40 does not open at a predetermined angle or more due to the function of the wing piece 40. The stopper 15 protrudes in the rotational trajectory of the wing piece 40 to restrain the rotation of the wing piece 40.

본 실시예에 의한 연약지반 보강용 기초말뚝에 의한 작용은 전술한 실시예 1과 동일하며, 여기서는 신규한 작용만을 설명하기로 한다.The action by the foundation pile for soft ground reinforcement according to the present embodiment is the same as in Example 1 described above, only the novel action will be described.

본 실시예에 의한 기초말뚝에 의하면, 날개편(40)이 몰탈배출공(13)에 삽입되어 기초말뚝(100)의 삽입시에는 말뚝몸체(10)로부터 돌출되지 않으므로 말뚝공(2)의 직경을 무리하게 크게 하지 않더라도 말뚝공(2)과 간섭되지 않으며, 말뚝몸체(10)를 말뚝공(2)에 삽입한 후, 몰탈(20)을 주입하면 몰탈(20)의 주입압력에 의해 날개편(40)이 회전에 의해 말뚝공(2)측으로 벌어지게 되어 몰탈(20)이 자연스럽게 말뚝몸체(20)의 내부에서 외부로 배출된다. 날개편(40)이 벌어지다가 스토퍼(15)에 접촉되면 날개편(40)은 더 이상 벌어지지 못하고 벌어진 상태를 유지하게 된다.According to the foundation pile according to the present embodiment, the blade piece 40 is inserted into the mortar discharge hole 13, so that when the foundation pile 100 is inserted does not protrude from the pile body 10, the diameter of the pile hole (2) It does not interfere with the pile ball (2) even if it is not excessively large, and after inserting the pile body (10) into the pile hole (2), when the mortar 20 is injected into the wing piece by the injection pressure of the mortar (20) 40 is opened to the pile hole (2) by the rotation so that the mortar 20 is naturally discharged from the inside of the pile body (20). When the wing piece 40 is opened and in contact with the stopper 15, the wing piece 40 is no longer opened and maintains the open state.

이상에서 설명한 바와 같이, 본 발명에 따른 연약지반 보강용 기초말뚝에 의하면, 기초말뚝의 내외부에 몰탈이 채워지면서 기초말뚝과 몰탈간의 마찰력이 커지게 되어 이 마찰력에 의해 연약지반을 보강할 수 있으며, 또한, 날개부(날개턱, 날개편)에 의해 말뚝몸체와 몰탈간의 마찰력이 더욱 커지게 되어 연약지반을 효과적으로 보강할 수 있다.As described above, according to the foundation pile for soft ground reinforcement according to the present invention, as the mortar is filled in and out of the foundation pile, the friction force between the foundation pile and the mortar is increased, the soft ground can be reinforced by this friction force, In addition, the wing portion (wing jaw, wing piece) is to increase the friction between the pile body and the mortar is more able to effectively reinforce the soft ground.

그리고, 날개편이 필요시에만 말뚝몸체에서 돌출되어 말뚝공의 직경을 무리하게 크게 하지 않더라도 말뚝몸체를 간섭없이 말뚝공에 삽입할 수 있으므로 시공성이 우수한 효과 등이 있다.And, the wing piece is protruded from the pile body only when necessary, even if the diameter of the pile hole is not excessively large, so that the pile body can be inserted into the pile hole without interference, such as excellent workability.

이상, 본 발명을 본 발명의 원리를 예시하기 위한 바람직한 실시예와 관련하여 설명하고 도시하였지만, 본 발명은 그와 같이 도시되고 설명된 그대로의 구성 및 작용으로 한정되는 것이 아니다. 오히려, 첨부된 청구범위의 사상 및 범주를 일탈함이 없이 본 발명에 대한 다수의 변경 및 수정이 가능함을 당업자들은 잘 이해할 수 있을 것이다. 따라서, 그러한 모든 적절한 변경 및 수정과 균등물들도 본 발명의 범위에 속하는 것으로 간주되어야 할 것이다.While the invention has been described and illustrated in connection with a preferred embodiment for illustrating the principles of the invention, the invention is not limited to the configuration and operation as such is shown and described. Rather, it will be apparent to those skilled in the art that many changes and modifications to the present invention are possible without departing from the spirit and scope of the appended claims. Accordingly, all such suitable changes and modifications and equivalents should be considered to be within the scope of the present invention.

Claims (3)

삭제delete 내부가 중공이면서 하단부에 첨예부가 구비되며 연약지반에 천공된 말뚝공에 삽입된 후 상기 말뚝공과의 사이에 양생되는 몰탈에 의해 상기 말뚝공에 설치되는 말뚝몸체와; 상기 말뚝몸체에 내외부가 연통됨과 아울러 원주방향을 따라 등간격으로 형성되는 다수의 몰탈배출공과; 상기 몰탈배출공의 외부에 감겨 상기 몰탈이 상기 말뚝몸체 내부로 역류되지 않도록 차단하는 역류방지밴드로 이루어진 연약지반 보강용 기초말뚝에 있어서,A peg body which is hollow inside and is provided with a sharp part at the lower end and is inserted into the pile hole drilled in the soft ground and installed in the pile hole by mortar cured between the pile hole; A plurality of mortar discharge holes formed at equal intervals along the circumferential direction while communicating with the pile body; In the foundation pile for soft ground reinforcement consisting of a backflow prevention band wound around the outside of the mortar discharge hole to block the mortar from flowing back into the pile body, 상기 말뚝몸체의 둘레면에 원주방향 및 다단에 등간격으로 배치되며 상기 몰탈배출공을 통해 상기 말뚝공 내부에 양생되는 상기 몰탈 내에 배치되어 상기 말뚝몸체가 인발되지 않도록 버팀력을 발생하는 날개부를 포함하여 구성된 것을 특징으로 하는 연약지반 보강용 기초말뚝.It is disposed in the circumferential direction and the multistage at the circumferential surface of the pile body and is disposed in the mortar that is cured in the pile hole through the mortar discharge hole is to include a wing for generating a holding force so that the pile body is not drawn out Foundation foundation for soft ground reinforcement, characterized in that configured. 삭제delete
KR1020060060640A 2006-06-30 2006-06-30 A pile for reinforcing soft ground KR100674264B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060060640A KR100674264B1 (en) 2006-06-30 2006-06-30 A pile for reinforcing soft ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060060640A KR100674264B1 (en) 2006-06-30 2006-06-30 A pile for reinforcing soft ground

Publications (1)

Publication Number Publication Date
KR100674264B1 true KR100674264B1 (en) 2007-01-24

Family

ID=38014851

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060060640A KR100674264B1 (en) 2006-06-30 2006-06-30 A pile for reinforcing soft ground

Country Status (1)

Country Link
KR (1) KR100674264B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016021781A1 (en) * 2014-08-08 2016-02-11 (주)삼일이엔씨 Front-end extendable pile and construction method therefor
WO2016021780A1 (en) * 2014-08-08 2016-02-11 (주)삼일이엔씨 Front-end continuously extendable pile
KR101735818B1 (en) * 2016-09-01 2017-05-15 (주)서진보강기술공사 Pressure-type anchor unit
KR101793980B1 (en) * 2017-04-14 2017-11-06 (주)한나래종합건설 Pole For Reinforcing Soft Ground And Construction Method Using The Same
CN108301397A (en) * 2018-01-31 2018-07-20 山东建筑大学 A kind of multiple wing sheet-pile structure and construction method suitable for soft soil foundation
KR102262175B1 (en) * 2020-08-07 2021-06-09 김성걸 Apparatus for fixing post of road facility
CN115288112A (en) * 2022-08-17 2022-11-04 北京市市政一建设工程有限责任公司 River course soft soil foundation reinforced structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62138741U (en) 1986-02-24 1987-09-01
JPS63251519A (en) 1987-04-04 1988-10-19 Oyo Chishitsu Kk Friction pile
JP2001164566A (en) 1999-12-08 2001-06-19 Kokudo Kiso:Kk Steel pipe pile and its embedding method
KR100331969B1 (en) 1999-07-23 2002-04-17 최홍기 An apparatus and method for multi-step grouting using FRP tube
KR100402952B1 (en) 2000-10-12 2003-10-22 최용기 Slope-Geo FRP (Fiberglass Reinforced Plastics) Reinforced System
KR200344961Y1 (en) 2003-11-20 2004-03-11 김기백 Steel pipe one-shot grouting structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62138741U (en) 1986-02-24 1987-09-01
JPS63251519A (en) 1987-04-04 1988-10-19 Oyo Chishitsu Kk Friction pile
KR100331969B1 (en) 1999-07-23 2002-04-17 최홍기 An apparatus and method for multi-step grouting using FRP tube
JP2001164566A (en) 1999-12-08 2001-06-19 Kokudo Kiso:Kk Steel pipe pile and its embedding method
KR100402952B1 (en) 2000-10-12 2003-10-22 최용기 Slope-Geo FRP (Fiberglass Reinforced Plastics) Reinforced System
KR200344961Y1 (en) 2003-11-20 2004-03-11 김기백 Steel pipe one-shot grouting structure

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016021781A1 (en) * 2014-08-08 2016-02-11 (주)삼일이엔씨 Front-end extendable pile and construction method therefor
WO2016021780A1 (en) * 2014-08-08 2016-02-11 (주)삼일이엔씨 Front-end continuously extendable pile
KR101735818B1 (en) * 2016-09-01 2017-05-15 (주)서진보강기술공사 Pressure-type anchor unit
KR101793980B1 (en) * 2017-04-14 2017-11-06 (주)한나래종합건설 Pole For Reinforcing Soft Ground And Construction Method Using The Same
CN108301397A (en) * 2018-01-31 2018-07-20 山东建筑大学 A kind of multiple wing sheet-pile structure and construction method suitable for soft soil foundation
CN108301397B (en) * 2018-01-31 2023-12-15 山东建筑大学 Multi-wing-plate pile structure suitable for soft soil foundation and construction method
KR102262175B1 (en) * 2020-08-07 2021-06-09 김성걸 Apparatus for fixing post of road facility
CN115288112A (en) * 2022-08-17 2022-11-04 北京市市政一建设工程有限责任公司 River course soft soil foundation reinforced structure
CN115288112B (en) * 2022-08-17 2024-02-23 北京市市政一建设工程有限责任公司 River course weak soil foundation reinforced structure

Similar Documents

Publication Publication Date Title
KR100674264B1 (en) A pile for reinforcing soft ground
KR101147510B1 (en) Complex pile with improved end bearing capacity and piling method of complex pile using the same
KR101522900B1 (en) Micropile of pressure injection and it&#39;s construction method
KR20160025260A (en) Complex pile with improved end bearing capacity and its construction method
KR20090013368A (en) Ground enhansing apparatus with anchor rod and method thereof
KR101023477B1 (en) Pressed grouting soil nailing body
KR101141526B1 (en) Pressure Grouting Method
KR0136958B1 (en) Piles comprising both precast concrete portions and concrete portions cast in situ
JP3754506B2 (en) Prestressed concrete pile construction method
KR100674356B1 (en) Foundation strengthening method of concrete dam
KR101270832B1 (en) Concrete-Filled Tube Type Rotary File
KR20090109282A (en) Foundation construction method of micro pile using pack and pile used in the same
KR20180131042A (en) Pile and method for constucting same
KR101375155B1 (en) Construction Method of Reinforced Bar Insert Type in-situ Concrete Pile
KR100628980B1 (en) The soft ground improvement agitation system add the excavtor
KR200416650Y1 (en) The soft ground improvement agitation system add the excavtor
KR20090112431A (en) Reinforcement device for marine pile and forming method thereof
KR100869369B1 (en) The ground reinforcement apparatus and method grouting type using bundle steel pipe
KR101072215B1 (en) pile constructing method for reinforcing ends and the pile constructed by this
KR100549456B1 (en) Structure of Erecton reinforcing bar for Grouted Bored File
JP3619841B2 (en) Pile fixing construction method
US11613864B2 (en) Secant concrete shoring using helical piles for depth
KR102506699B1 (en) Ground Reinforcement Pile
KR200375610Y1 (en) Cast in place concrete pile using vibro magnetic shovel hammer
KR101184534B1 (en) Ground reinforcing construction method and the auger device used for it

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130115

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140117

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150119

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160113

Year of fee payment: 10

LAPS Lapse due to unpaid annual fee