KR100661375B1 - Support braket structure for port bearing of bridge - Google Patents

Support braket structure for port bearing of bridge Download PDF

Info

Publication number
KR100661375B1
KR100661375B1 KR1020050084438A KR20050084438A KR100661375B1 KR 100661375 B1 KR100661375 B1 KR 100661375B1 KR 1020050084438 A KR1020050084438 A KR 1020050084438A KR 20050084438 A KR20050084438 A KR 20050084438A KR 100661375 B1 KR100661375 B1 KR 100661375B1
Authority
KR
South Korea
Prior art keywords
bracket
bridge
vertical plate
plate
support
Prior art date
Application number
KR1020050084438A
Other languages
Korean (ko)
Inventor
김진성
Original Assignee
김진성
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김진성 filed Critical 김진성
Priority to KR1020050084438A priority Critical patent/KR100661375B1/en
Application granted granted Critical
Publication of KR100661375B1 publication Critical patent/KR100661375B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A bracket structure for maintenance of a bridge bearing is provided to securely fix auxiliary brackets to a bridge, and enhance a supporting force for a hydraulic jack using connection members. A bracket structure(160) for maintenance of a bridge bearing(120) of a bridge(100) is provided. The bridge bearing is mounted by casting non-shrinkage concrete into an upper part of a pier(110). A beam(130) is mounted on an upper part of the bridge bearing. A slab(140) is formed on an upper part of the beam by casting concrete. The bracket is fixed by an anchor bolt to a lateral side of the pier. The beam is lifted up by mounting a hydraulic jack to an upper part of the bracket. The bracket comprises a vertical plate, a plurality of bolt holes, a horizontal plate, and a support plate. An auxiliary bracket(170) comprises a vertical plate, a plurality of bolt holes, and a support plate.

Description

교량의 교좌장치 유지보수용 브라켓 구조{SUPPORT BRAKET STRUCTURE FOR PORT BEARING OF BRIDGE}Bracket structure for bridge device maintenance {SUPPORT BRAKET STRUCTURE FOR PORT BEARING OF BRIDGE}

도 1은 본 발명의 교좌장치 유지보수용 브라켓 설치구조를 측면에서 본 상태를 나타내는 단면도.1 is a cross-sectional view showing a state of the bracket mounting structure for maintenance of the present invention as viewed from the side.

도 2는 본 발명의 교좌장치 유지보수용 브라켓의 평단면 상태를 나타내는 단면도.Figure 2 is a cross-sectional view showing a flat cross-sectional state of the bracket for maintenance of the present invention.

도 3은 본 발명의 교좌장치의 유지보수용 브라켓과 보조 브라켓의 분해 상세도.Figure 3 is an exploded detail of the maintenance bracket and auxiliary bracket of the teaching apparatus of the present invention.

< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>

100: 교량 110: 교각100: bridge 110: pier

120: 교좌장치 130: 빔120: bridge device 130: beam

140: 슬래브 150: 유압 잭140: slab 150: hydraulic jack

160: 브라켓 170: 보조 브라켓160: bracket 170: auxiliary bracket

180: 연결 부재1 190: 연결 부재2180: connection member 1 190: connection member 2

200: 앵커 볼트200: anchor bolt

본 발명은 교량을 구성하는 교각의 상부에 설치된 빔을 인상하고 교좌장치를 인상하기 위한 브라켓 및 보조 브라켓 구조에 관한 것으로서, 특히 교각 상부에 설치되는 교좌 장치의 상부에 안착되는 빔을 인상하는 경우 사용되는 유압 잭을 지지하기 위한 교량의 교좌장치 유지보수용 브라켓 구조에 관한 것이다.The present invention relates to a bracket and an auxiliary bracket structure for raising the beam installed on the upper part of the bridge constituting the bridge and the lifting device, particularly when the beam is mounted on the upper portion of the bridge device installed on the top of the bridge. It relates to a bridge structure maintenance bracket structure for supporting a hydraulic jack.

일반적으로 교량은 매년 정기적으로 유지보수를 위한 점검 작업을 실시하는데, 이때 대부분 교각과 빔 사이에 설치된 교좌장치에 대한 점검 작업을 진행하게 된다.In general, bridges are regularly inspected for maintenance every year, and most of the bridges are inspected for bridges installed between bridges and beams.

부연 하자면, 상기 교좌장치는 빔 상부의 콘크리트 슬래브에 대한 계절적 온도 변화에 따라 수축 및 팽창이 발생되면 내부에 설치된 베어링이 콘크리트 슬래브의 수축 및 팽창에 따라 함께 이동되는 구조로 설치되기 때문이다.In other words, since the bridge device is installed in a structure in which a bearing installed therein moves together as the concrete slab contracts and expands when contraction and expansion occur due to seasonal temperature change of the concrete slab on the upper portion of the beam.

그러나, 이러한 교좌장치의 유지보수를 위해서는 교각에 브라켓 또는 보조 브라켓이 설치되어야 하고, 어떠한 브라켓 또는 보조 브라켓이 교각에 설치되느냐에 따라 빔을 인상하는 경우 많은 차이를 가질 수 있기 때문이다.However, in order to maintain the bridge device, a bracket or an auxiliary bracket must be installed in the bridge piers, and there are many differences in raising the beam depending on which bracket or auxiliary bracket is installed in the bridge piers.

본 발명은 교각에 설치되는 브라켓의 하부에 2조의 보조 브라켓을 설치하고, 각각의 보조 브라켓을 교각에 견고하게 고정시킴과 아울러, 보조 브라켓의 길이방향 양측에 각각 연결 부재1,2를 결합시켜 유압 잭에 대한 지지력을 강화할 수 있도록 하는 교량의 교좌장치 유지보수용 브라켓 구조를 제공함을 그 목적으로 한다.According to the present invention, two sets of auxiliary brackets are installed at the lower part of the bracket to be installed on the piers, and each of the auxiliary brackets is firmly fixed to the piers. It is an object of the present invention to provide a bridge structure maintenance bracket structure for strengthening the bearing capacity of the jack.

이하, 첨부 도면을 참조하여 본 발명을 설명한다.Hereinafter, the present invention will be described with reference to the accompanying drawings.

도 1은 본 발명의 교좌장치 유지보수용 브라켓 설치구조를 측면에서 본 상태를 나타내는 단면도이고, 도 2는 본 발명의 교좌장치 유지보수용 브라켓의 평단면 상태를 나타내는 단면도이며, 도 3은 본 발명의 교좌장치의 유지보수용 브라켓과 보조 브라켓의 분해 상세도이다.Figure 1 is a cross-sectional view showing a state of the bracket mounting structure for maintenance of the present invention viewed from the side, Figure 2 is a cross-sectional view showing a flat cross-sectional state of the bracket for maintenance of the device of the present invention, Figure 3 This is an exploded view of the maintenance bracket and auxiliary bracket of the teaching device.

교량(100)은, 교각(110)의 상부에 무수축 콘크리트(118)가 타설되어 교좌장치(120)가 설치되고 그 교좌장치(120)의 상부에 빔(130)이 안착되며, 그 빔(130)의 상부에 콘크리트를 타설하여 제작한 슬래브(140)가 설치된 구조로 시공된다.The bridge 100, the non-contraction concrete 118 is placed on top of the bridge 110, the bridge device 120 is installed and the beam 130 is seated on the bridge device 120, the beam ( The slab 140 manufactured by pouring concrete on the upper portion of the 130 is installed in a structure installed.

즉, 상기 교량(100)은, 교좌장치(120)가 사각형 형태로 제작된 교각(110)과 빔(130)의 사이에 교좌 장치(120)가 설치되고, 교각(110)의 측면에 브라켓(160)과 보조 브라켓(170)이 앵커 볼트(200)에 의해 교각(110)에 고정되며, 브라켓(160)의 상부에 유압 잭(150)이 설치되어 빔(130)을 인상하여 유지보수 작업을 실시하게 된다.That is, the bridge 100, the bridge device 120 is provided between the bridge 110 and the beam 130, the bridge device 120 is formed in a rectangular shape, the bracket (side) on the side of the bridge (110) 160 and the auxiliary bracket 170 is fixed to the pier 110 by the anchor bolt 200, the hydraulic jack 150 is installed on the upper portion of the bracket 160 to raise the beam 130 to perform maintenance work Will be implemented.

상기 유압 잭(150)은, 원통 형태의 받침틀(152)의 상부에 하부틀(153)이 형성되고, 그 하부틀(153)의 상부에 상부틀(156)이 삽입되어 유압력에 의해 유압작동되며, 하부틀(153)의 측면에 형성된 연결구(154)에 손잡이(155)가 체결되어 손잡이(155)의 작동에 따라 상부틀(156)이 빔(130)을 인상시키게 된다.The hydraulic jack 150, the lower frame 153 is formed on the upper portion of the cylindrical support frame 152, the upper frame 156 is inserted into the upper portion of the lower frame 153 is hydraulic operation by the hydraulic force The handle 155 is fastened to the connector 154 formed on the side surface of the lower frame 153 so that the upper frame 156 raises the beam 130 according to the operation of the handle 155.

상기 브라켓(160)은, 다수개의 강재로 이루어진 판재가 용접된 부재로, 수직판(161)에 다수개의 볼트홀(162)이 형성되고, 그 수직판(161)의 상부에 수평판(163)이 용접되며, 그 수직판(161)과 수평판(163)의 측면에 지지판(164)이 지지되 는 형태로, 볼트홀(162)에 다른 앵커 볼트(200)가 체결되어 교각(110)에 고정된다.The bracket 160 is a member in which a plate made of a plurality of steels is welded, and a plurality of bolt holes 162 are formed in the vertical plate 161, and the horizontal plate 163 is formed on the vertical plate 161. Is welded, the support plate 164 is supported on the side of the vertical plate 161 and the horizontal plate 163, the other anchor bolt 200 is fastened to the bolt hole 162 to the piers 110 It is fixed.

상기 보조 브라켓(170)은, 교각(110)의 폭 방향과 일치되도록 수직판(171)이 형성되는 한편, 그 수직판(171)의 내측이 관통되고, 그 수직판(171)의 양측에 다수개의 볼트홀(172)이 형성되며, 그 수직판(171)의 상부에 수평판(173)이 용접되며, 후방에 지지판(174)이 지지되는 형태로, 그 수직판(711)의 양측에 각각 연결 고리(175)가 돌출되도록 형성되고, 그 연결 고리(175)에 연결 부재1,2(180)(190)가 고정된다.The auxiliary bracket 170 has a vertical plate 171 formed so as to match the width direction of the piers 110, while the inner side of the vertical plate 171 is penetrated, and a plurality of vertical brackets 171 on both sides of the vertical plate 171. Bolt holes 172 are formed, the horizontal plate 173 is welded to the upper portion of the vertical plate 171, the support plate 174 is supported on the rear, respectively on both sides of the vertical plate 711 The connecting ring 175 is formed to protrude, and the connecting members 1, 2 (180, 190) are fixed to the connecting ring 175.

즉, 상기 보조 브라켓(170)은, 2개 1조로, 사각 단면 형태로 형성된 교각(110)의 외측에 앵커 볼트(200)로 고정되는 한편, 2개 1조의 보조 브라켓(170)의 길이방향 양측에 각각 연결 부재1,2(180)(190)가 고정되어 2개 1조의 보조 브라켓(170)이 앵커 볼트(182)와 앵커대(192)로 체결고정된다.That is, the two auxiliary brackets 170 are fixed to the outer side of the bridge 110 formed in the form of a square cross-section in two sets of anchor bolts 200, while both sides of the two sets of auxiliary brackets 170 in the longitudinal direction. The connecting members 1, 2 (180) and 190 are fixed to each other so that two sets of auxiliary brackets 170 are fastened and fixed to the anchor bolt 182 and the anchor table 192.

상기 보조 브라켓(170)에는 측면 연결 고리(175)에 체인(181)을 이용해 연결 부재1(180)이 연결되고 대향측의 보조 브라켓(170)의 측면 연결 고리(175)에 체인(181)을 이용해 연결 부재2(190)가 형성되어 연결 부재1(180)과 연결 부재2(190)가 상호 체결되어 너트(184)로 체결되는 한편, 연결 부재1(180)은 쇠사슬로 제작된 체인(181)의 끝에 앵커 볼트(182)가 결합된 부재이고, 연결 부재2(190)는 체인(191)의 끝에 앵커대(192)가 결합된 부재로, 그 앵커 볼트(182)는 길이방향 양측에 각각 원형 고리부와 볼트부가 형성되어 원형 고리부에 체인(181)이 고정되고, 그 앵커대(192)는 90°각도로 절곡되어 원형 고리부와 볼트홀(194)이 형성된다.Connecting member 1 (180) is connected to the auxiliary bracket (170) using a chain (181) to the side connecting ring (175) and the chain (181) to the side connecting ring (175) of the auxiliary bracket (170) on the opposite side. The connection member 2 190 is formed so that the connection member 1 180 and the connection member 2 190 are fastened to each other and fastened by a nut 184, while the connection member 1 180 is a chain 181 made of a chain. Anchor bolt 182 is coupled to the end of the), the connecting member 2 (190) is a member coupled to the anchor bar 192 at the end of the chain 191, the anchor bolt 182 on both sides in the longitudinal direction, respectively The circular ring portion and the bolt portion are formed so that the chain 181 is fixed to the circular ring portion, the anchor rod 192 is bent at an angle of 90 ° to form a circular ring portion and the bolt hole 194.

상술한 설명에서 알 수 있듯이, 상기 브라켓(160)과 보조 브라켓(170)은, 강재를 이용하여 제작되는 한편, 교각(110)에 앵커 볼트(200)로 고정되고, 보조 브라켓(170)은 길이방향 측면에 각각 연결 부재1,2(180)(190)가 고정되어 2개의 보조 브라켓(170)이 체결되게 된다.As can be seen in the above description, the bracket 160 and the auxiliary bracket 170 is made of steel, while being fixed to the pier 110 with an anchor bolt 200, the auxiliary bracket 170 is a length The connecting members 1, 2 (180, 190) are fixed to the lateral side, respectively, so that the two auxiliary brackets 170 are fastened.

상기 브라켓(160)에는 상부에 유압 잭(150)이 설치되어 빔(130)을 인상시키는 한편, 이때 그 브라켓(160)의 하부에 보조 브라켓(170)을 고정시켜 브라켓(160)을 지지하게 된다.Hydraulic brackets 150 are installed on the brackets 160 to raise the beams 130, and at this time, the auxiliary brackets 170 are fixed to the lower portions of the brackets 160 to support the brackets 160. .

즉, 상기 브라켓(160)의 수직판(161)과 지지판(164)이 보조 브라켓(170)의 수평판(173)에 지지되어 유압 잭(150)을 견고하게 지지할 수 있는 구조를 제공하게 된다.That is, the vertical plate 161 and the support plate 164 of the bracket 160 is supported on the horizontal plate 173 of the auxiliary bracket 170 to provide a structure capable of firmly supporting the hydraulic jack 150. .

부연 하자면, 상기 보조 브라켓(170)은, 수직판(171)을 제작시 일체형 판을 이용하여 중앙을 직사각형으로 절개하여 사용하는 바, 그 수직판(171)을 제작시 양측에 사각판 2개와 중앙의 직사각형 형태로 형성된 연결판 2개를 용접하여 제작하여 사용할 수도 있다.In other words, the auxiliary bracket 170 is used to cut the center in a rectangular shape using an integrated plate when manufacturing the vertical plate 171, two square plates and the center on both sides when the vertical plate 171 is manufactured. It is also possible to produce and use two connecting plates formed in the rectangular shape of.

또한, 상기 보조 브라켓(170)은, 수직판(171)의 길이방향 양측에 각각 2개의 연결 고리(175)가 형성되는 바, 그 연결 고리(175)에 체인(181)(191)을 연결하여 이음부에 대한 용접 작업을 통해 견고한 지지 구조를 구성할 수 있고, 그 체인(181)(191)의 끝에 각각 앵커 볼트(182)와 앵커대(192)를 결합하고 이음부에 대한 용접을 행할 수 있다.In addition, the auxiliary bracket 170, two connecting rings 175 are formed on both sides of the vertical plate 171 in the longitudinal direction, respectively, by connecting the chain 181, 191 to the connecting ring 175 The welding operation on the joint can form a rigid support structure, and the anchor bolts 182 and the anchor bar 192 can be joined to the ends of the chains 181 and 191, respectively, and welded to the joint. have.

또한, 상기 브라켓(160)과 보조 브라켓(170)은, 수평판(163)(173)의 하부에 2개의 지지판(164)(174)이 용접되어 형성되었지만, 필요에 따라 2개 이상의 지지판을 수직판(161)(171)과 수평판(163)(173)과 밀착되도록 용접하여 사용가능하다 할 것이다.In addition, the bracket 160 and the auxiliary bracket 170 are formed by welding two support plates 164 and 174 to the lower portions of the horizontal plates 163 and 173, but may receive two or more support plates as necessary. The direct plates 161 and 171 and the horizontal plates 163 and 173 will be able to be used by welding in close contact.

상술한 본 발명의 구성에 따른 효과를 설명한다.The effect by the structure of this invention mentioned above is demonstrated.

본 발명은, 브라켓의 하부에 별도의 보조 브라켓을 설치하는 바, 브라켓의 상부에 유압 잭이 안착되어 빔을 상부로 인상하고 교좌 장치에 대한 유지보수 작업을 진행하는 경우에도 견고한 지지력을 제공할 수 있는 효과를 얻을 수 있다.According to the present invention, a separate auxiliary bracket is installed at the bottom of the bracket, and a hydraulic jack is mounted on the upper portion of the bracket to raise the beam to the upper side and provide solid support even when performing maintenance work on the chair device. You can get the effect.

즉, 브라켓의 하부를 지지하는 보조 브라켓은 길이방향 양측에 각각 연결 부재1,2가 설치되어 앵커 볼트와 앵커대가 체결되어 너트로 고정되는 바, 하부에서 견고한 지지력을 제공할 수 있게 되는 것이다.That is, the auxiliary bracket supporting the lower part of the bracket is provided with connecting members 1 and 2 on both sides in the longitudinal direction, so that the anchor bolt and the anchor rod are fastened to be fixed by a nut, thereby providing a firm supporting force at the lower part.

Claims (1)

강재로 제작된 브라켓이 교각 측면에 앵커 볼트로 고정되고, 그 브라켓의 상부에 유압 잭을 설치하여 교좌장치의 상부에 안착된 빔을 상부로 인상시켜 교좌 장치를 유지보수할 수 있도록 교량 상부를 인상함에 있어서, The bracket made of steel is fixed to the side of the bridge with anchor bolts, and the hydraulic jack is installed on the top of the bracket to raise the beam seated on the top of the bridge to the top to raise the bridge to maintain the bridge. In that, 브라켓(160)은 교각(100)의 측면에 다른 앵커 볼트로 고정되고 다수개의 강재로 이루어진 판재가 용접된 부재이며, 수직판(161)에 다수개의 볼트홀(162)이 형성되고, 그 수직판(161)의 상부에 수평판(163)이 용접되며, 그 수직판(161)과 수평판(163)의 측면에 지지판(164)이 지지되어 고정되며, Bracket 160 is a member that is fixed to the side of the pier 100 by another anchor bolt and a plate made of a plurality of steel welded, a plurality of bolt holes 162 are formed in the vertical plate 161, the vertical plate The horizontal plate 163 is welded to the upper portion of the 161, the support plate 164 is supported and fixed to the side of the vertical plate 161 and the horizontal plate 163, 보조 브라켓(170)은 교각(110)의 폭 방향과 일치되도록 수직판(171)이 형성되고, 그 수직판(171)의 내측이 관통되고, 그 수직판(171)의 양측에 다수개의 볼트홀(172)이 형성되며, 그 수직판(171)의 상부에 수평판(173)이 용접되며, 후방에 지지판(174)이 지지되도록 용접되어 제작되며, Auxiliary bracket 170 has a vertical plate 171 is formed to match the width direction of the bridge 110, the inner side of the vertical plate 171 is penetrated, a plurality of bolt holes on both sides of the vertical plate 171 172 is formed, the horizontal plate 173 is welded to the upper portion of the vertical plate 171, and is welded and manufactured to support the support plate 174 at the rear, 보조 브라켓(170)에는 수직판(171)의 양측에 각각 연결 고리(175)가 돌출되도록 형성되고 그 연결 고리(175)에 연결 부재1,2(180)(190)가 체결고정되어 브라켓(160)의 하부를 지지토록 설치되는 것을 특징으로 하는 교량의 교좌장치 유지보수용 브라켓 구조.The auxiliary bracket 170 is formed such that the connecting ring 175 protrudes on both sides of the vertical plate 171, and the connecting members 1, 2 (180, 190) are fastened and fastened to the connecting ring 175 by the bracket 160. Bridge structure maintenance bracket structure, characterized in that installed to support the lower part of the bridge.
KR1020050084438A 2005-09-10 2005-09-10 Support braket structure for port bearing of bridge KR100661375B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050084438A KR100661375B1 (en) 2005-09-10 2005-09-10 Support braket structure for port bearing of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050084438A KR100661375B1 (en) 2005-09-10 2005-09-10 Support braket structure for port bearing of bridge

Publications (1)

Publication Number Publication Date
KR100661375B1 true KR100661375B1 (en) 2006-12-27

Family

ID=37815563

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050084438A KR100661375B1 (en) 2005-09-10 2005-09-10 Support braket structure for port bearing of bridge

Country Status (1)

Country Link
KR (1) KR100661375B1 (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995571A (en) * 2012-09-05 2013-03-27 武汉二航路桥特种工程有限责任公司 Method for prepressing single large-tonnage temporary steel pipe support and then resisting beam bottom during dismantling bridge beam body, and device thereof
CN104328743A (en) * 2014-11-24 2015-02-04 上海天演建筑物移位工程股份有限公司 Bridge jacking temporary counter-force support device and counter-force support method
CN104562945A (en) * 2014-12-26 2015-04-29 哈尔滨金玉科技开发有限公司 Hydraulic bridge bearing column
CN104594202A (en) * 2014-12-26 2015-05-06 哈尔滨金玉科技开发有限公司 Bridge support pillar
CN106436593A (en) * 2016-12-05 2017-02-22 厦门合诚工程技术有限公司 Jack supporting platform for hollow slab beam jacking construction
KR101745548B1 (en) * 2016-11-01 2017-06-12 윤진석 Movable repair braket for port bearing of bridge
KR101878602B1 (en) * 2017-05-30 2018-07-13 심규숙 Jacking steel bracket unit for weight change and easy assembly/disassembly
CN108374355A (en) * 2018-05-09 2018-08-07 山西交科桥梁隧道加固维护工程有限公司 A kind of assembled T-type back rises auxiliary steel member and its application method
CN108842636A (en) * 2018-08-08 2018-11-20 江苏新锐塑料科技股份有限公司 A kind of High-speed Railway Bridges beam support installation equipment
CN109056559A (en) * 2018-09-04 2018-12-21 长江师范学院 A kind of bridge beam body lifting method based on bent cap
CN109457629A (en) * 2018-12-07 2019-03-12 杭州江润科技有限公司 Single column pier ruggedized construction and construction method
CN112062028A (en) * 2020-09-03 2020-12-11 孟子豪 Jacking equipment for bridge construction

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995571A (en) * 2012-09-05 2013-03-27 武汉二航路桥特种工程有限责任公司 Method for prepressing single large-tonnage temporary steel pipe support and then resisting beam bottom during dismantling bridge beam body, and device thereof
CN102995571B (en) * 2012-09-05 2015-06-24 武汉二航路桥特种工程有限责任公司 Method for prepressing single large-tonnage temporary steel pipe support and then resisting beam bottom during dismantling bridge beam body, and device thereof
CN104328743A (en) * 2014-11-24 2015-02-04 上海天演建筑物移位工程股份有限公司 Bridge jacking temporary counter-force support device and counter-force support method
CN104562945A (en) * 2014-12-26 2015-04-29 哈尔滨金玉科技开发有限公司 Hydraulic bridge bearing column
CN104594202A (en) * 2014-12-26 2015-05-06 哈尔滨金玉科技开发有限公司 Bridge support pillar
KR101745548B1 (en) * 2016-11-01 2017-06-12 윤진석 Movable repair braket for port bearing of bridge
CN106436593A (en) * 2016-12-05 2017-02-22 厦门合诚工程技术有限公司 Jack supporting platform for hollow slab beam jacking construction
KR101878602B1 (en) * 2017-05-30 2018-07-13 심규숙 Jacking steel bracket unit for weight change and easy assembly/disassembly
CN108374355A (en) * 2018-05-09 2018-08-07 山西交科桥梁隧道加固维护工程有限公司 A kind of assembled T-type back rises auxiliary steel member and its application method
CN108842636A (en) * 2018-08-08 2018-11-20 江苏新锐塑料科技股份有限公司 A kind of High-speed Railway Bridges beam support installation equipment
CN108842636B (en) * 2018-08-08 2020-03-31 江苏新锐塑料科技股份有限公司 High-speed railway bridge support erection equipment
CN109056559A (en) * 2018-09-04 2018-12-21 长江师范学院 A kind of bridge beam body lifting method based on bent cap
CN109457629A (en) * 2018-12-07 2019-03-12 杭州江润科技有限公司 Single column pier ruggedized construction and construction method
CN112062028A (en) * 2020-09-03 2020-12-11 孟子豪 Jacking equipment for bridge construction
CN112062028B (en) * 2020-09-03 2021-11-30 胡海明 Jacking equipment for bridge construction

Similar Documents

Publication Publication Date Title
KR100661375B1 (en) Support braket structure for port bearing of bridge
JP5178443B2 (en) Truss type setting beam
KR100726163B1 (en) Apparatus for supporting an upper structure of a bridge
JP2008163636A (en) Base isolation device exchanging method
KR100880708B1 (en) Adjustable bridge lifting apparatus and the method using the apparatus
KR101026012B1 (en) Bridge deck dismantling method by means of united pulling jack and pier
KR101458364B1 (en) Lifting device of girder for bridge for preventing bridge falling
JP6032625B2 (en) Precast concrete member pile head joining method and pile head support structure
KR101116345B1 (en) Holder for preventing conduction of beam bridge and maintaining spaces and method for constructing bridge using thereof
RU2309217C2 (en) Method and device for bridge pier reconstruction during pier girder repair or support parts replacement
KR102222019B1 (en) Camber Connection Supporter of bent pressed girder and Bridge construction method therewith
JP2016529424A (en) scaffold
JP2011020779A (en) Steel plate block reversing device and steel plate block reversion method
KR101586376B1 (en) Structure lifting method using steel pipe member with lifting jack
KR100559441B1 (en) Method for raising a bridge and the raising structure
CN214116300U (en) Template supporting structure of overhead concrete cantilever beam
KR20040076348A (en) Apparatus and method for pulling up and prevention of falling down of bridge beam
KR100734019B1 (en) Bridge construction method using a bridge girder supporting bracket which four or two-direction supporter is installed
KR101745548B1 (en) Movable repair braket for port bearing of bridge
KR200290739Y1 (en) Jacking system of bridge repair
KR200406524Y1 (en) Temporary Construction System
CN111122336A (en) Self-balancing type prefabricated cantilever component static test loading device
KR102003991B1 (en) Bridge lifting apparatus for repairing bridge shoe and lifing method using it
JP4382599B2 (en) Tension jack
KR102003990B1 (en) Bridge lifting apparatus for repairing bridge shoe and lifing method using it

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
A302 Request for accelerated examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
N231 Notification of change of applicant
FPAY Annual fee payment
FPAY Annual fee payment
FPAY Annual fee payment

Payment date: 20141118

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20151218

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20171219

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20191219

Year of fee payment: 14