KR100628510B1 - Bricks wall reforcing method - Google Patents

Bricks wall reforcing method Download PDF

Info

Publication number
KR100628510B1
KR100628510B1 KR1020040046406A KR20040046406A KR100628510B1 KR 100628510 B1 KR100628510 B1 KR 100628510B1 KR 1020040046406 A KR1020040046406 A KR 1020040046406A KR 20040046406 A KR20040046406 A KR 20040046406A KR 100628510 B1 KR100628510 B1 KR 100628510B1
Authority
KR
South Korea
Prior art keywords
masonry
masonry wall
brick
bracket
replacement section
Prior art date
Application number
KR1020040046406A
Other languages
Korean (ko)
Other versions
KR20050121764A (en
Inventor
이완섭
Original Assignee
이완섭
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이완섭 filed Critical 이완섭
Priority to KR1020040046406A priority Critical patent/KR100628510B1/en
Publication of KR20050121764A publication Critical patent/KR20050121764A/en
Application granted granted Critical
Publication of KR100628510B1 publication Critical patent/KR100628510B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0222Replacing or adding wall ties
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4178Masonry wall ties

Abstract

본 발명은 외부 치장 쌓기한 조적벽체의 보강 공법에 관한 것으로, 보다 상세하게는 조적벽체의 외부 벽돌들을 일부 철거하고, 그 부분을 보강용 브래킷 등을 이용하여 조적벽체의 수직 하중을 효율적으로 내력벽체로 전달함으로써 조적벽체의 강도를 보강하는 조적벽체 보강 공법에 관한 것이다.The present invention relates to a method of reinforcing a masonry wall piled up externally, and more particularly, to remove some of the external bricks of the masonry wall, the portion of the masonry wall using a reinforcing bracket, etc. It relates to a masonry wall reinforcement method to reinforce the strength of the masonry wall by transmitting.

본 발명은, 균열이 발생한 조적벽체의 일부구간을 교체하여 보강하는 조적벽체 보강 공법에 있어서,The present invention, in the masonry reinforcement method to replace and reinforce a part of the masonry wall in which the crack is generated,

벽돌 교체 구간을 선정하여 그 상단에 보강핀을 이용하여 조적벽체와 내력벽체를 연결하는 보강핀 압입 단계; 교체 구간 벽돌의 줄눈을 파쇄하여 교체 구간 벽돌을 제거하는 교체 벽돌 제거 단계; 교체 구간 상단에 위치한 상부 조적벽체의 하단면에 맞추어 보강용 브래킷을 내력벽체에 고정하는 보강용 브래킷 설치 단계;Reinforcing pin press-fit step of connecting the masonry wall and the bearing wall using a reinforcement pin on the top of the brick replacement section; A replacement brick removing step of removing the replacement section brick by crushing the joint of the replacement section brick; Reinforcing bracket installation step of fixing the reinforcing bracket to the bearing wall in accordance with the lower surface of the upper masonry wall located in the upper portion of the replacement section;

상인방 부위 세워 쌓기한 벽돌을 앵글과 행거를 이용하여 매달아 고정하는 앵글 및 행거 설치 단계; 및 상기 앵글위에 벽돌을 쌓아 교체 구간에 벽돌을 새로 쌓아 마감하는 마감 조적 단계;를 포함하는 조적벽체 보강 공법으로 이루어진다.An angle and a hanger installation step of fixing the bricks stacked on the lintel by using an angle and a hanger; And a finishing masonry step of stacking bricks on the replacement section and stacking bricks on the replacement section.

Description

조적벽체 보강 공법{Bricks wall reforcing method}Brick wall reforcing method

도 1은 벽돌 교체 구간 상단에 전동 드릴로 천공한 상태를 나타낸 사시도 및 단면도,1 is a perspective view and a cross-sectional view showing a state drilled with an electric drill on the top of the brick replacement section,

도 2는 전동 드릴로 천공한 통공에 보강핀을 압입하여 조적벽체를 내력벽체에 고정한 상태를 나타낸 사시도 및 단면도,2 is a perspective view and a cross-sectional view showing a state in which the masonry wall is fixed to the bearing wall by inserting a reinforcing pin into the through-hole drilled with an electric drill;

도 3은 교체 구간의 벽돌을 제거하고 보강용 브래킷을 설치한 상태를 나타낸 사시도 및 단면도,3 is a perspective view and a cross-sectional view showing a state in which the brick of the replacement section is removed and the reinforcing bracket is installed;

도 4는 본 발명에서 사용되는 보강용 브래킷의 구조를 나타낸 분리 사시도,Figure 4 is an exploded perspective view showing the structure of the reinforcing bracket used in the present invention,

도 5는 상인방 부위에 세워쌓기 한 벽돌을 앵글과 행거를 이용하여 고정한 상태를 나타낸 단면도,5 is a cross-sectional view showing a state of fixing the bricks stacked on the lintel using an angle and a hanger,

도 6은 도 5의 상태에서 벽돌을 마저 쌓아 마감하는 상태를 나타낸 사시도임.FIG. 6 is a perspective view illustrating a state in which bricks are stacked and finished in the state of FIG. 5. FIG.

< 도면의 주요 부분에 관한 부호의 설명 ><Description of the code | symbol about the principal part of drawing>

B : 조적벽체 BU : 상부 조적벽체B: Masonry Wall BU: Upper Masonry Wall

I : 내력벽체 P : 보강핀I: bearing wall P: reinforcement pin

100 : 보강용 브래킷 200 : 와이어부재100: reinforcing bracket 200: wire member

300 : 앵글 310 : 행거300: angle 310: hanger

320 : 봉부재 400 : 방수지320: bar member 400: waterproof paper

410 : 배수구410: drain

본 발명은 외부 치장 쌓기한 조적벽체의 보강 공법에 관한 것으로, 보다 상세하게는 조적벽체의 외부 벽돌들을 일부 철거하고, 그 부분을 보강용 브래킷 등을 이용하여 조적벽체의 수직 하중을 효율적으로 내력벽체로 전달함으로써 조적벽체의 강도를 보강하는 조적벽체 보강 공법에 관한 것이다.The present invention relates to a method of reinforcing a masonry wall piled up externally, and more particularly, to remove some of the external bricks of the masonry wall, the portion of the masonry wall using a reinforcing bracket, etc. It relates to a masonry wall reinforcement method to reinforce the strength of the masonry wall by transmitting.

일반적으로 조적벽체의 외부 치장 쌓기시에는 매 층마다 콘크리트 턱이나 철제 브래킷을 본체 구조물에 설치 또는 정착시킨 후 그 상부에 치장 벽돌 쌓기를 하여 콘크리트 턱이나 철체 브래킷이 치장벽돌의 수직하중을 부담하여 본체 구조물로 전달되도록 시공되었다.In general, when stacking the external stucco of masonry walls, concrete jaws or steel brackets are installed or fixed on the main structure for each floor, and then the bricks are stacked on the upper part of them so that the concrete jaws or steel brackets bear the vertical load of the stucco bricks. It was constructed to be delivered to the structure.

그런데, 콘크리트 구조체 공사시 수직도가 맞지 않는 경우에는 브래킷을 생략하고 외부 치장벽돌 쌓기를 하게 되므로, 치장벽돌 자하중에 의한 조적벽체의 침하 및 균열발생, 배부름 현상 등의 하자가 발생하고, 심할 경우 외부의 치장벽돌이 탈락하여 주차된 차량의 파손이나 통행인의 안전사고를 유발시키는 경우가 종종 발생되었다.However, if the verticality does not match when constructing the concrete structure, the external bricks are stacked without the brackets, so the flaw of the masonry subsidence, cracking, and batching occurs due to the self-loading of the bricks. It was often the case that exterior stucco bricks were dropped off, causing damage to parked vehicles or accidents for pedestrians.

또한, 창문의 바로 윗부분인 상인방 부분은 구조적인 취약성으로 인하여 균열이나 벽돌의 탈락 현상이 자주 발생하는 문제점을 가지고 있었다.In addition, the lintel portion immediately above the window had a problem that the crack or dropout of the brick frequently occurs due to structural fragility.

본 발명은 상술한 문제점을 해결하기 위한 것으로, 특히 하자가 발생한 상인방 부위를 보강하기 위한 보강 공법을 제공한다.The present invention is to solve the above-mentioned problems, and in particular, to provide a reinforcing method for reinforcing the lintel portion where the defect occurs.

본 발명은 일부에 균열이 발생한 외장 조적벽체를 견고하게 보강할 수 있도록 하는 보강 공법을 제공함에 그 목적이 있다.It is an object of the present invention to provide a reinforcement method that can firmly reinforce an exterior masonry wall in which cracks have occurred.

본 발명의 다른 목적은 외장 조적벽체의 하중을 내력벽체 측으로 효과적으로 분산시킴으로써 외장 조적벽체의 내구성을 향상시키기 위한 조적벽체 보강 공법을 제공함에 있다.Another object of the present invention is to provide a masonry wall reinforcing method for improving the durability of the exterior masonry wall by effectively distributing the load of the exterior masonry wall to the bearing wall side.

본 발명의 다른 목적은 상인방 부분에 세워 쌓기한 벽돌을 내력벽체에 고정된 앵글에 매달아 고정함으로써 상인방 부위의 벽돌이 이탈하지 않도록 하는 조적벽체 보강 공법을 제공함에 있다.Another object of the present invention is to provide a masonry wall reinforcement method to prevent the bricks of the lintel portion from leaving by fixing the bricks stacked on the lintel portion to the angle fixed to the bearing wall.

이러한 목적을 달성하기 위한 본 발명은, 균열이 발생한 조적벽체의 일부구간을 교체하여 보강하는 조적벽체 보강 공법에 있어서,In order to achieve the above object, the present invention provides a masonry wall reinforcement method for replacing and reinforcing a part of a masonry wall in which a crack has occurred.

벽돌 교체 구간을 선정하여 그 상단에 보강핀을 이용하여 조적벽체와 내력벽체를 연결하는 보강핀 압입 단계; 교체 구간 벽돌의 줄눈을 파쇄하여 교체 구간 벽돌을 제거하는 교체 벽돌 제거 단계; 교체 구간 상단에 위치한 상부 조적벽체의 하단면에 맞추어 보강용 브래킷을 내력벽체에 고정하는 보강용 브래킷 설치 단계;Reinforcing pin press-fit step of connecting the masonry wall and the bearing wall using a reinforcement pin on the top of the brick replacement section; A replacement brick removing step of removing the replacement section brick by crushing the joint of the replacement section brick; Reinforcing bracket installation step of fixing the reinforcing bracket to the bearing wall in accordance with the lower surface of the upper masonry wall located in the upper portion of the replacement section;

상인방 부위 세워 쌓기한 벽돌을 앵글과 행거를 이용하여 매달아 고정하는 앵글 및 행거 설치 단계; 및 상기 앵글위에 벽돌을 쌓아 교체 구간에 벽돌을 새로 쌓아 마감하는 마감 조적 단계;를 포함하는 조적벽체 보강 공법으로 이루어진다.An angle and a hanger installation step of fixing the bricks stacked on the lintel by using an angle and a hanger; And a finishing masonry step of stacking bricks on the replacement section and stacking bricks on the replacement section.

이하, 본 발명의 바람직한 실시예를 첨부된 도면들에 의거하여 상세하게 설명한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

조적벽체의 보강 작업은 교체할 구간을 선정한 후, 교체할 구간의 상단을 내력벽체에 고정하는 것에서 부터 시작된다.The reinforcement work of the masonry walls begins with selecting the sections to be replaced and then fixing the top of the sections to the bearing walls.

도 1은 벽돌 교체 구간 상단에 전동 드릴(D)로 천공한 상태를 나타낸 사시도 및 단면도이고, 도 2는 상기 전동 드릴로 천공한 통공에 보강핀을 압입하여 조적벽체를 내력벽체에 고정한 상태를 나타낸 사시도 및 단면도이다.1 is a perspective view and a cross-sectional view showing a state drilled with an electric drill (D) on the upper end of the brick replacement section, Figure 2 is a state in which the masonry wall is fixed to the bearing wall by pressing a reinforcement pin into the through hole drilled by the electric drill. Perspective and sectional views.

도시된 바와 같이, 건물의 벽은 외장을 이루는 조적벽체(B)와 그 내부에서 건물을 지탱하는 내력벽체(I)로 이루어진다. 도면은 하자가 자주 발생하는 창문(W) 위쪽의 상인방 부위를 나타낸 것으로, 교체 구간으로는 창문(W) 위쪽의 5단(해칭으로 표시한부분)이 선정된 상태를 예를 들어 나타낸 것이다.As shown, the wall of the building consists of a masonry wall forming an exterior and a bearing wall I supporting the building therein. The drawing shows the lintel part on the upper side of the window (W) where defects frequently occur, and shows a state in which five stages (marked by hatching) on the upper side of the window (W) are selected as a replacement section.

교체 구간이 선정 되면 교체 구간 바로 윗단의 벽돌(B1)에 일정간격(대략 벽돌 5개)마다 전동 드릴(D)을 이용하여 통공(H)을 천공한 후 스크류 형상의 보강핀(P)을 압입한다. 보강핀(P)은 상부 조적벽체(BU)의 가장 아랫단인 B1에서 4∼6단 위쪽에도 추가적으로 설치하는 것이 바람직한데, 이때 설치 위치(P1)는 B1단 보강핀(P)들의 중앙 위치에 설치하는 것이 바람직하다.When the replacement section is selected, drill the through hole (H) using the electric drill (D) at a predetermined interval (approximately five bricks) to the brick (B1) immediately above the replacement section, and press-fit the reinforcement pin (P) in the shape of a screw. do. The reinforcement pins P may be additionally installed at the bottom of the upper masonry wall BU from the uppermost part B1 to 4 to 6 steps. In this case, the installation position P1 is installed at the center of the B1 reinforcement pins P. It is desirable to.

보강핀(P)은 조적벽체의 구조적인 특성상 역삼각형 형상의 하중을 지지하기 때문에 B1단 아래쪽에 위치한 보강핀(P)들이 지지하는 하중이 겹쳐지는 부분에 추가로 보강핀(P)을 압입하게 되면 B1단에 설치된 보강핀이 받는 하중을 감소시켜 주 어 하중 분산의 효과를 가져온다. 이러한 보강핀을 압입하는 열의 개수는 교체 구간 상부 조적벽체의 높이 및 하중에 따라서 결정된다.Since the reinforcement pin (P) supports the load of the inverted triangle shape due to the structural characteristics of the masonry wall, the reinforcement pin (P) is additionally pressed into the portion where the loads supported by the reinforcement pins (P) located below the B1 end overlap. If this happens, the load applied to the reinforcement pins installed in the B1 stage is reduced, resulting in the effect of load distribution. The number of rows for pressing the reinforcement pins is determined according to the height and load of the upper masonry wall of the replacement section.

이렇게 보강핀(P)을 압입하게 되면 교체 구간 상부의 조적벽체(BU)가 내력벽체(I)와 보강핀(P)을 통하여 연결되므로, 교체 구간의 벽돌을 제거하여도 상부의 조적벽체(BU)가 무너져 내리지 않게 된다. 또 교체 시공 후에도 상기 보강핀(P)은 제거하지 않고 그대로 남아 있으므로, 교체 구간 상단의 하중을 지속적으로 내력벽체(I)로 분산해 주는 효과를 가져오게 되어 조적벽체의 자중으로 인한 배부름 현상 등의 발생을 예방할 수 있다.When the reinforcement pins P are press-fitted in this way, the masonry wall BU of the upper portion of the replacement section is connected through the bearing wall I and the reinforcement pins P, so that the masonry wall of the upper portion BU is removed even if the brick of the replacement section is removed. ) Will not collapse. In addition, since the reinforcement pins (P) remain unremoved even after replacement construction, the load of the upper end of the replacement section is continuously distributed to the bearing wall (I), resulting in a full load due to the weight of the masonry wall. The occurrence of can be prevented.

상기 스크류 형상의 보강핀(P)의 직경보다 통공(H)의 직경이 작아서 보강핀(P)이 통공에 견고하게 고정될 수 있도록 하는 것이 바람직하다.The diameter of the through hole (H) is smaller than the diameter of the screw-shaped reinforcing pin (P) so that the reinforcing pin (P) can be firmly fixed to the through hole.

도 3은 교체 구간의 벽돌을 제거하고 보강용 브래킷을 설치한 상태를 나타낸 사시도 및 단면도이다.3 is a perspective view and a cross-sectional view showing a state in which the brick of the replacement section is removed and the reinforcing bracket is installed.

도시된 바와 같이, 보강핀(P)이 삽입되어 교체 구간 상부 조적벽체(BU)를 내력벽체(I)에 연결하고 있으므로, 교체 구간의 벽돌이 제거되어도 그 상부 조적벽체(BU)가 무너져 내리지 않고 유지될 수 있다. 교체 구간 벽돌의 제거는 그라인더등의 도구를 이용하여 줄눈을 파쇄한 후, 교체 구간의 벽돌을 빼내는 방식으로 이루어진다. 줄눈의 파쇄하며 일정 간격마다 쐐기를 박아서 줄눈이 파쇄된 부분도 일정간격을 유지하도록 하여야 그라인더의 날이 줄눈사이에 끼이지 않게 된다.As shown, since the reinforcing pin P is inserted to connect the upper masonry wall BU to the replacement section with the bearing wall I, the upper masonry wall BU does not collapse even when the brick of the replacement section is removed. Can be maintained. The replacement section brick is removed by crushing the joint using a tool such as a grinder, and then removing the brick in the replacement section. The shredding of joints and wedges at regular intervals ensure that the broken parts of the joints are kept at regular intervals so that the blade of the grinder is not caught between the joints.

도시된 바와 같이, 보강핀(P)을 이용하여 고정한 교체 구간 상부 조적벽체(BU)의 하단을 다시 한번 보강용 브래킷(100)을 이용하여 받쳐주게 된다. 보강용 브래킷(100)은 대략 ㄱ자 형상의 단면을 가지고 있어서 수직부를 내력벽체(I)에 고정하여 수평부가 교체 구간 상부의 조적벽체의 하단을 지지하게 된다. 보강용 브래킷(100)은 일정 간격으로 설치되며 각각의 보강용 브래킷(100)을 와이어부재(200)로 연결하여, 보강용 브래킷(100)과 와이어부재(200)가 B1단 전체의 바닥을 지탱하는 구조를 제공한다.As shown, the lower end of the replacement section upper masonry wall (BU) fixed using the reinforcement pin (P) is supported by the reinforcement bracket 100 once again. The reinforcing bracket 100 has a substantially L-shaped cross section so that the vertical portion is fixed to the bearing wall I so that the horizontal portion supports the lower end of the masonry wall in the upper portion of the replacement section. The reinforcement bracket 100 is installed at regular intervals and connects each reinforcement bracket 100 with a wire member 200 so that the reinforcement bracket 100 and the wire member 200 support the bottom of the entire B1 end. Provides a structure to

도 4는 본 발명에서 사용되는 보강용 브래킷의 구조를 나타낸 분리 사시도이다.Figure 4 is an exploded perspective view showing the structure of the reinforcing bracket used in the present invention.

본 발명에 사용되는 조적벽체 보강용 브래킷(100)은 ㄱ자 형상의 메인 브래킷(110)과, 상기 메인 브래킷(110)에 결합하는 보조 브래킷(120)으로 이루어진다.The masonry wall reinforcement bracket 100 used in the present invention is composed of an L-shaped main bracket 110 and an auxiliary bracket 120 coupled to the main bracket 110.

메인 브래킷(110)은 내력벽체(I)에 부착되는 수직부(112)와 보조 브래킷(120)과 결합하는 수평부(114)로 이루어지며, 상기 수직부(112)와 수평부(114)가 합쳐져 대략 ㄱ자 형상의 단면을 가진다. 상기 수평부(114)에는 길이 방향으로 형성된 체결공(115)이 형성되어 있으며, 보조 브래킷(120)에도 상기 체결공(115)에 대응하는 길이조절공(122)이 형성되어 있다.The main bracket 110 is composed of a vertical portion 112 attached to the bearing wall (I) and a horizontal portion 114 coupled with the auxiliary bracket 120, the vertical portion 112 and the horizontal portion 114 is Combined to have approximately L-shaped cross sections. The horizontal portion 114 is formed with a fastening hole 115 formed in the longitudinal direction, the length adjustment hole 122 corresponding to the fastening hole 115 is also formed in the auxiliary bracket 120.

상기 체결공(115)과 길이조절공(122)은 길이 방향으로 긴 슬릿 형상을 가지고 있어서, 메인 브래킷(110)의 수평부(114) 상에서 보조 브래킷(120)을 이동시켜 전체 보강용 브래킷(100)의 수평길이가 가변하는 구조를 제공한다. 상기 체결공(115)과 길이조절공(122)을 관통하여 수평부(114)와 보조 브래킷(120)을 결합시키는 체결수단으로는 도시된 바와 같이 볼트(130)와 너트(132)가 사용될 수 있으며, 리벳 등이 다른 종류의 체결 수단으로 사용될 수도 있다.The fastening hole 115 and the length adjustment hole 122 has a long slit shape in the longitudinal direction, by moving the auxiliary bracket 120 on the horizontal portion 114 of the main bracket 110, the entire reinforcement bracket 100 It provides a structure in which the horizontal length of) is variable. The bolt 130 and the nut 132 may be used as the fastening means for coupling the horizontal portion 114 and the auxiliary bracket 120 through the fastening hole 115 and the length adjusting hole 122. Rivets and the like may be used as other types of fastening means.

상기 보조 브래킷(120)의 앞쪽에는 횡방향의 안착홈(125)이 복수개 형성되어 있다. 상기 안착홈(125)은 와이어부재(도 3의 200)를 수용하기 위한 것으로, 일정 간격마다 보강용 브래킷(100)을 설치하고, 이들의 사이를 와이어부재(200)로 연결함으로써 상단부의 조적벽체 전체를 지탱할 수 있도록 하는 것이다. 상기 와이어부재(200)를 안착홈(155)에 결합한 후 접착제등을 도포하여 와이어부재(200)가 상기 보강용 브래킷(100)에서 이탈하는 것을 방지하는 것이 바람직하다.The front side of the auxiliary bracket 120 is formed with a plurality of mounting grooves 125 in the transverse direction. The seating groove 125 is for accommodating a wire member (200 in FIG. 3), and installs a reinforcing bracket 100 at regular intervals, and connects them with the wire member 200 to connect the masonry wall at the upper end thereof. To support the whole. It is preferable to prevent the wire member 200 from detaching from the reinforcing bracket 100 by applying an adhesive or the like after coupling the wire member 200 to the seating groove 155.

수직부(112)는 내력벽체(I)에 고정되고 수평부(114)는 외장 조적벽체의 하중을 지지하는 것이기 때문에 수평부(114)가 많은 하중을 받으면 수평부(114)가 수직부(112)측으로 처지는 현상이 발생한다. 이러한 현상을 방지하기 위해 메인 브래킷(110)의 수직부(112)와 수평부(114)가 만나는 연결부에는 안쪽으로 압입된 압입부(116)를 구비하고 있다. 상기 압입부(116)는 수직부(112)와 수평부(114)의 연결부를 보강하여 수직부(112)와 수평부(114)가 일정한 각도를 유지한 채로 하중에 저항할 수 있도록 해준다. 따라서 상기 압입부(116)는 하중의 굽힘하중을 견디도록 폴드된 형상을 가지므로 수직부(112)와 수평부(114)가 일정한 각도를 유지하는데 유리한 효과를 가져온다.Since the vertical part 112 is fixed to the bearing wall I and the horizontal part 114 supports the load of the exterior masonry wall, when the horizontal part 114 receives a large load, the horizontal part 114 is vertical part 112. A phenomenon that sag toward the side occurs. In order to prevent this phenomenon, the connection part where the vertical part 112 and the horizontal part 114 of the main bracket 110 meet is provided with a press-fit part 116 that is press-fitted inward. The press-fit portion 116 reinforces the connecting portion of the vertical portion 112 and the horizontal portion 114 to allow the vertical portion 112 and the horizontal portion 114 to resist the load while maintaining a constant angle. Therefore, the press-fit portion 116 has a shape folded to withstand the bending load of the load, thereby bringing an advantageous effect to maintain a constant angle between the vertical portion 112 and the horizontal portion 114.

도 5는 상인방 부위에 세워쌓기 한 벽돌을 앵글과 행거를 이용하여 고정한 상태를 나타낸 단면도이고, 도 6은 도 5의 상태에서 벽돌을 마저 쌓아 마감하는 상태를 나타낸 사시도이다.Figure 5 is a cross-sectional view showing a state of fixing the bricks stacked on the lintel using an angle and a hanger, Figure 6 is a perspective view showing a state of finishing the stacked bricks in the state of FIG.

도시된 바와 같이, 교체 구간의 최하단은 창문(W)의 바로 위쪽이어서 세워쌓기를 하는데, 몰타르의 접착력만을 이용하여 부착할 수도 있겠지만, 본 발명에서는 그 위에 앵글(300)을 설치하여 세워쌓기 한 벽돌들을 앵글(300)에 행거(310)를 이용하여 매달아 준다. 상기 앵글(300)은 ㄴ자 형상의 단면을 가지며 수직부가 보강용 브래킷과 마찬가지로 내력벽체(I)에 고정된다. 따라서 세워쌓기한 벽돌들이 모르타르의 접착력과 더불어 앵글(300)에 매달려 있게 되므로 상인방 부위 벽돌의 이탈 현상을 방지하는 효과가 더욱 커진다.As shown, the bottom end of the replacement section is to be stacked directly above the window (W), but may be attached using only the adhesive force of the mortar, but in the present invention, the bricks stacked by installing the angle 300 thereon Hanging them using the hanger 310 to the angle (300). The angle 300 has a c-shaped cross section and the vertical portion is fixed to the bearing wall body I like the reinforcing bracket. Therefore, the stacked bricks are suspended in the angle 300 together with the adhesive force of the mortar, so that the effect of preventing the detachment phenomenon of the lintel portion brick becomes even greater.

행거(310)의 구조를 살펴보면, 행거(310)는 앵글(300)의 저면에서 결합하여 세워쌓기한 벽돌을 향하게 된다. 상기 행거(310)의 하부는 고리 형상으로 이루어져 상기 고리에 봉부재(320)를 삽입할 수 있는 구조를 제공한다. 상기 봉부재(320)가 벽돌에 형성된 통공(340)을 통과하여 세워쌓기한 벽돌이 앵글(300)에 매달리는 구조를 제공하게 된다.Looking at the structure of the hanger 310, the hanger 310 is oriented toward the bricks stacked by combining at the bottom of the angle (300). The lower portion of the hanger 310 has a ring shape to provide a structure capable of inserting the rod member 320 in the ring. The rod member 320 is provided to pass through the through hole 340 formed in the brick to provide a structure that the brick is suspended on the angle (300).

창문(W) 바로 윗단을 세워 쌓기 한 후 앵글(300)과 행거(310)를 이용하여 달아맨 후, 내력벽체(I)로 부터 앵글(300)의 상면까지 비투수성의 방수지(400)를 부착하고 일정 간격 마다 벽돌의 줄눈사이에 배수구(410)를 배치하는 것이 바람직하다. 이는 조적벽체 상부로부터 스며들거나 흘러들어온 물이 상기 방수지(400)에 닿으면 상기 방수지(400)를 타고 흘러 배수구(410)를 통하여 조적벽체 외부로 배출시키기 위한 것이다.After stacking the upper end just above the window (W), and using the angle (300) and hanger (310), after attaching, the waterproof paper (400) from the bearing wall (I) to the upper surface of the angle (300) is attached. And it is preferable to arrange the drain 410 between the joints of the bricks at regular intervals. This is to allow the water penetrating or flowing from the top of the masonry wall to the waterproof paper 400 to flow through the waterproof paper 400 to be discharged to the outside of the masonry wall through the drain hole 410.

도 6의 사시도에 도시된 바와 같이, 배수구(410)는 벽돌의 줄눈 사이에 배치되어 미관을 해치지 않도록 하는 것이 바람직하며, 배구수(410)를 배치하며 나머지 부분의 벽돌을 차레로 쌓아올려 교체 구간의 벽돌 쌓기를 마감하면 보강 작업이 완료된다. 앵글(300)은 상인방 부위에 전체에 해당하는 길이 모두에 설치 될수도 있 으나, 일부 구간에만 설치하여도 상호간에 봉부재(320)로 연결되므로 상인방에 위치하는 세워쌓기한 벽돌 전체의 이탈을 방지할 수 있다. 세워 쌓기한 윗 부분은 일반적인 쌓기를 통해서 제거된 교체 부분 전체를 채우게 된다.As shown in the perspective view of Figure 6, the drain 410 is preferably disposed between the joints of the brick so as not to harm the aesthetics, arranging the volleyball number 410 and stacking the rest of the bricks in the replacement section Finishing the brickwork will complete the reinforcement. The angle 300 may be installed in all the length corresponding to the entire lintel part, but even if only installed in a certain section is connected to each other by the rod member 320 to prevent the separation of the whole stacked bricks located in the lintel. Can be. The top pile up fills the entire replacement that was removed through normal stacking.

이러한 본 발명의 조적벽체 보강 공법은 균열이 발생한 부위를 제거하고 그 부분에 새로 벽돌을 쌓음으로써 보강하는 공법으로, 새로 쌓는 교체 구간의 상부 조적벽체(BU)를 보강핀(P)을 이용하여 내력벽체(I)에 고정하고, 다시 그 아래쪽에 보강용 브래킷(100)으로 지탱하며, 상인방 부위의 세워 쌓기 한 벽돌은 앵글(300)과 행거(310)를 이용하여 매달아 개별 벽돌의 이탈을 방지하게 된다. 따라서 전체적인 조적벽체의 구조를 더욱 견고히 할 수 있는 구조를 제공한다.The masonry reinforcement method of the present invention is a method of reinforcing by removing a cracked portion and stacking a new brick in the portion, the strength of the upper masonry wall (BU) of the newly replaced replacement section using a reinforcement pin (P). It is fixed to the wall (I), and supported by the reinforcing bracket 100 at the bottom thereof, and the stacked bricks of the lintel part are suspended by using the angle 300 and the hanger 310 to prevent the separation of individual bricks. do. Therefore, it provides a structure that can further strengthen the structure of the overall masonry wall.

본 발명은 구조가 취약한 상인방 부위에 세워 쌓기한 벽돌을 앵글과 행거를 이용하여 매달아 주기 때문에, 이 부분 벽돌의 이탈을 효과적으로 방지할 수 있으며, 또 앵글의 표면에 방수지를 부착하여 세워 쌓기한 부분으로 수분이 유입되는 것을 방지하는 구조를 제공한다.The present invention can be effectively prevented from detachment of the brick part by using the angle and the hanger to hang the stacked brick standing on the fragile lintel part, and also by attaching a waterproof paper on the surface of the angle to the stacked part It provides a structure to prevent the ingress of moisture.

이와 같이 이루어지는 본 발명의 조적벽체 보수 및 보강 공법에 의하면, 조적벽체와 내력벽체를 보강핀을 이용하여 연결함으로써 조적벽체의 하중을 내력벽체 측으로 분산하고, 더불어 보강용 브래킷을 내력벽체에 고정하여 보강용 브래킷이 조적벽체를 떠 받치도록 하며, 다른 한편으로 상인방 부위의 세워 쌓기 한 벽돌은 앵글과 행거를 이용하여 매달아 줌으로써 전체적인 조적벽체가 더욱 견고한 구조를 가지도록 하는 효과를 가져온다.According to the masonry wall repair and reinforcement method of the present invention thus formed, by connecting the masonry wall and the bearing wall by using a reinforcement pin, the load of the masonry wall is distributed to the bearing wall side, and the reinforcing bracket is fixed to the bearing wall for reinforcement. The dragon bracket supports the masonry wall, while the erected bricks on the lintel area are hung using angles and hangers to give the overall masonry a more robust structure.

Claims (7)

균열이 발생한 조적벽체의 일부구간을 교체하여 보강하는 조적벽체 보강 공법에 있어서,In the masonry wall reinforcement method of reinforcing by replacing part of the masonry wall where the crack has occurred, 벽돌 교체 구간을 선정하여 그 상단에 보강핀을 이용하여 조적벽체와 내력벽체를 연결하는 보강핀 압입 단계;Reinforcing pin press-fit step of connecting the masonry wall and the bearing wall using a reinforcement pin on the top of the brick replacement section; 교체 구간 벽돌의 줄눈을 파쇄하여 교체 구간 벽돌을 제거하는 교체 벽돌 제거 단계;A replacement brick removing step of removing the replacement section brick by crushing the joint of the replacement section brick; 교체 구간 상단에 위치한 상부 조적벽체의 하단면에 맞추어 보강용 브래킷을 내력벽체에 고정하는 보강용 브래킷 설치 단계;Reinforcing bracket installation step of fixing the reinforcing bracket to the bearing wall in accordance with the lower surface of the upper masonry wall located in the upper portion of the replacement section; 창문 위쪽 상인방 부위에 세워 쌓기한 벽돌을 앵글과 행거를 이용하여 매달아 고정하는 앵글 및 행거 설치단계; 및An angle and hanger installation step of fixing the bricks stacked on the lintel area above the window by using the angle and the hanger; And 상기 앵글위에 벽돌을 차례로 쌓아 넣어 교체 구간을 새로운 벽돌로 채워 넣음으로써 마감하는 마감 조적 단계;를 포함하는 것을 특징으로 하는 조적벽체 보강 공법.The masonry wall reinforcement method comprising a; finishing the masonry finishing step by stacking the bricks on the angle in turn to fill the replacement section with a new brick. 제 1항에 있어서,The method of claim 1, 상기 보강용 브래킷 설치단계에서 사용되는 보강용 브래킷은,The reinforcing bracket used in the reinforcing bracket installation step, 내력벽체에 부착되는 수평부와 수직부가 ㄱ자 형상을 이루는 메인 브래킷과, 상기 메인 브래킷의 수평부에 결합하는 보조 브래킷으로 이루어지고, 상기 메인 브래킷과 보조 브래킷의 결합 길이가 가변할 수 있는 것을 특징으로 하는 조적벽체 보강 공법.The horizontal bracket and the vertical portion attached to the bearing wall is formed of a main bracket having an L-shape, and an auxiliary bracket coupled to the horizontal portion of the main bracket, and the coupling length of the main bracket and the auxiliary bracket may vary. Masonry reinforcement method. 제 2항에 있어서,The method of claim 2, 상기 보조 브래킷은 전방에 와이어부재를 수용할 수 있는 횡방향의 홈을 복수개 구비하여, 상기 홈에 와이어부재를 수용하는 것을 특징으로 하는 조적벽체 보강 공법.The auxiliary bracket is provided with a plurality of transverse grooves for accommodating the wire member in the front, masonry wall reinforcement method characterized in that to accommodate the wire member in the groove. 제 2항에 있어서,The method of claim 2, 상기 메인 브래킷은 수평부와 수직부의 사이에 압입부를 구비하여 수평부와 수직부가 굽힘 하중에 저항하도록 한 것을 특징으로 하는 조적벽체 보강 공법.The main bracket has a press-fitting portion between the horizontal portion and the vertical portion so that the horizontal portion and the vertical portion to resist the bending load. 삭제delete 제 1항에 있어서,The method of claim 1, 상기 행거는 앵글의 저면에서 결합하며, 그 하부에 고리를 구비하여 상기 고리에 봉부재를 고정하고, 상기 봉부재는 세워 쌓기한 벽돌에 형성된 통공을 관통하는 것을 특징으로 하는 조적벽체 보강 공법.The hanger is coupled to the bottom surface of the angle, having a ring at the bottom to secure the rod member to the ring, the rod member is masonry wall reinforcement method characterized in that it penetrates the through hole formed in the stacked bricks. 제 1항 또는 제 6항에 있어서,The method according to claim 1 or 6, 상기 앵글 및 행거 설치단계에서, 앵글의 표면에 방수지를 부착하고,In the angle and hanger installation step, attach the waterproof paper on the surface of the angle, 마감 조적 단계에서, 벽돌의 줄눈 사이에 배수구를 배치하는 것을 특징으로 하는 조적벽체 보강 공법.In the finishing masonry step, the masonry wall reinforcement method, characterized in that the drain is arranged between the joints of the brick.
KR1020040046406A 2004-06-22 2004-06-22 Bricks wall reforcing method KR100628510B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040046406A KR100628510B1 (en) 2004-06-22 2004-06-22 Bricks wall reforcing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040046406A KR100628510B1 (en) 2004-06-22 2004-06-22 Bricks wall reforcing method

Publications (2)

Publication Number Publication Date
KR20050121764A KR20050121764A (en) 2005-12-28
KR100628510B1 true KR100628510B1 (en) 2006-09-26

Family

ID=37293764

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040046406A KR100628510B1 (en) 2004-06-22 2004-06-22 Bricks wall reforcing method

Country Status (1)

Country Link
KR (1) KR100628510B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101187668B1 (en) * 2011-11-15 2012-10-04 한가람건설 주식회사 Repair method of brisk wall
KR101978501B1 (en) 2018-11-08 2019-05-15 (주)정우구조엔지니어링 Reinforcement device for masonry wall
KR20200008337A (en) * 2018-07-16 2020-01-28 주식회사 대도벽돌시스템 Maintenance apparatus for Brick wall and maintenance method of using the same
KR102466352B1 (en) 2021-12-14 2022-11-14 고준형 Exterior wall reinforcement structure and exterior wall reinforcement method using the same

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100790018B1 (en) * 2007-02-23 2008-01-02 선진산업개발(주) Steel wire used for bricks wall reinforcement
KR101654332B1 (en) 2015-08-13 2016-09-09 전원경 Maintenance apparatus for Brick wall and maintenance method of brick wall using the same
KR101854769B1 (en) 2015-10-06 2018-05-04 전원경 Maintenance apparatus for Brick wall and maintenance method of brick wall using the same
CA3107451A1 (en) * 2020-01-31 2021-07-31 Mitek Holdings, Inc. Facade support system
KR102459242B1 (en) * 2021-04-08 2022-10-27 김성겸 Brick wall structure stiffening bracket and stiffening method by using the same
CN113668493A (en) * 2021-08-18 2021-11-19 中建一局集团建设发展有限公司 Construction method of prestressed pipe pile reinforcement system in soft soil geology

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200201182Y1 (en) 2000-05-26 2000-11-01 고대석 Connection a coupling device for wall
KR100382299B1 (en) 2002-07-04 2003-05-09 Yang Jung Kim Method for reinforcing brick wall

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200201182Y1 (en) 2000-05-26 2000-11-01 고대석 Connection a coupling device for wall
KR100382299B1 (en) 2002-07-04 2003-05-09 Yang Jung Kim Method for reinforcing brick wall

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
1020000052019 *
2001638910000 *
2003351000000 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101187668B1 (en) * 2011-11-15 2012-10-04 한가람건설 주식회사 Repair method of brisk wall
KR20200008337A (en) * 2018-07-16 2020-01-28 주식회사 대도벽돌시스템 Maintenance apparatus for Brick wall and maintenance method of using the same
KR102170536B1 (en) * 2018-07-16 2020-10-29 원도연 Maintenance apparatus for Brick wall and maintenance method of using the same
KR101978501B1 (en) 2018-11-08 2019-05-15 (주)정우구조엔지니어링 Reinforcement device for masonry wall
KR102466352B1 (en) 2021-12-14 2022-11-14 고준형 Exterior wall reinforcement structure and exterior wall reinforcement method using the same

Also Published As

Publication number Publication date
KR20050121764A (en) 2005-12-28

Similar Documents

Publication Publication Date Title
KR100628510B1 (en) Bricks wall reforcing method
KR101681139B1 (en) Bracket for concrete structure repair-strengthen construction and method thereof
US20090025309A1 (en) Seismic support and reinforcement systems
US20080202064A1 (en) Bracket and method for supoprting a platform from concrete form tabs
CN102016195A (en) Drop panel structure of lattice-form and construction method thereof
CN211341176U (en) Connecting structure of precast concrete stairs and steel structure building main body
KR200360267Y1 (en) Reinforcing bracket for bricks wall
CN105133854A (en) Replacement unloading structure and construction method for vertical component
JP6890212B2 (en) Building materials
KR101346702B1 (en) Structure with supporter and safe rail for mold
KR102249999B1 (en) bottom joint for knocked-down building
KR101079048B1 (en) The repair or reinforcement method of face brick construction
KR102049927B1 (en) finishing frame structure of waterproof corners of concrite structure
JP5356010B2 (en) Foundation reinforcement structure
KR100402030B1 (en) Concrete form for src slim floor
JP2003221868A (en) Wall of building
KR100785312B1 (en) Mounting structure for steel-frame stair
KR102505922B1 (en) the improved brick support structure
CN205369874U (en) Elevartor shaft outer wall cantilever frame
KR102541549B1 (en) Expansion Footbridge for Bridge and Slope Installation
CN219671761U (en) Prefabricated inner wallboard
CN220521797U (en) Novel PC stair and girder steel connected node
KR102130369B1 (en) Upper lintel structure of brick wall and construction method thereof
CN214785196U (en) Pre-assembly type combined floor bearing plate and floor
KR100683506B1 (en) Stairway assembly and installing method of the same

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120917

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20130916

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140915

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20151019

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20160919

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20170919

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20181119

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20191021

Year of fee payment: 14