KR20200008337A - Maintenance apparatus for Brick wall and maintenance method of using the same - Google Patents

Maintenance apparatus for Brick wall and maintenance method of using the same Download PDF

Info

Publication number
KR20200008337A
KR20200008337A KR1020180082359A KR20180082359A KR20200008337A KR 20200008337 A KR20200008337 A KR 20200008337A KR 1020180082359 A KR1020180082359 A KR 1020180082359A KR 20180082359 A KR20180082359 A KR 20180082359A KR 20200008337 A KR20200008337 A KR 20200008337A
Authority
KR
South Korea
Prior art keywords
brick
wall
horizontal
brick wall
anchor body
Prior art date
Application number
KR1020180082359A
Other languages
Korean (ko)
Other versions
KR102170536B1 (en
Inventor
원종균
Original Assignee
주식회사 대도벽돌시스템
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 대도벽돌시스템 filed Critical 주식회사 대도벽돌시스템
Priority to KR1020180082359A priority Critical patent/KR102170536B1/en
Publication of KR20200008337A publication Critical patent/KR20200008337A/en
Application granted granted Critical
Publication of KR102170536B1 publication Critical patent/KR102170536B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0222Replacing or adding wall ties
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4178Masonry wall ties

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Finishing Walls (AREA)

Abstract

The present invention relates to a maintenance and repair device for a brick wall and a maintenance and repair method using the same, and more specifically, to a maintenance and repair device for a brick wall and a maintenance and repair method using the same, which, in a process of removing a damaged portion on a brick wall before accumulating a new brick to maintain and repair the damaged portion, can prevent bricks at an upper part of the damaged portion from sagging or being broken even when the damaged portion is removed, by reinforcing a bearing wall at the upper part of the damaged portion, thereby performing a maintenance and repair work in a structurally stable manner. To this end, the maintenance and repair device for a damaged portion formed on a brick wall comprises: a horizontal reinforcing material which is installed to be inserted into a horizontal joint on a brick wall at an upper part of the damaged portion, in order to prevent the brick wall from sagging even when the damaged portion is removed; a brick wall fixating anchor which penetrates the horizontal joint at which the horizontal reinforcing material is installed, and of which one end is installed at a bearing wall and the other end is coupled to the horizontal reinforcing material, thereby connecting the brick wall to the bearing wall to support the same; and a bracket which is installed to be fixated to the bearing wall in a space formed after bricks of the damaged portion are removed, in order to support the bricks at the upper part of the damaged portion.

Description

벽돌벽 유지보수장치 및 이를 이용한 유지보수방법{Maintenance apparatus for Brick wall and maintenance method of using the same}Maintenance apparatus for Brick wall and maintenance method of using the same}

본 발명은 벽돌벽 유지보수장치 및 이를 이용한 유지보수방법에 관한 것으로, 벽돌벽에 형성된 손상부위를 제거하고 재 설치하는 과정에서 손상부위 상측 벽돌벽의 처짐이나 파손을 방지하면서 안정적으로 손상부위를 제거한 후 재설치 할 수 있도록 하는 벽돌벽 유지보수장치 및 이를 이용한 유지보수방법에 관한 것이다.The present invention relates to a maintenance device for a brick wall and a maintenance method using the same, and stably removes damaged parts while preventing sagging or damage of the upper brick wall in the process of removing and reinstalling the damaged parts formed on the brick wall. The present invention relates to a brick wall maintenance device and a maintenance method using the same.

일반적으로 건축물의 외벽은 건축물의 하중을 지지할 뿐만 아니라, 외기에 대하여 건물의 내부를 보호하는 역할을 한다. 이러한, 보호역할은 보온이나 통기, 차양 등이 가장 대표적인 예이다.In general, the outer wall of the building not only supports the load of the building, but also serves to protect the inside of the building against the outside air. This protection role is the most representative example of the warmth, ventilation, shade.

상기 외벽은 내력벽과 상기 내력벽에 단열재를 대고 단열재와 일정간격 떨어지도록 벽돌을 쌓아 형성되는 외부벽돌벽을 포함하여 구성된다.The outer wall is configured to include a bearing wall and an outer brick wall formed by stacking bricks with a heat insulating material on the bearing wall to be spaced apart from the insulating material by a predetermined distance.

상기 외부벽돌벽은 낱개로 된 벽돌을 쌓아 벽체를 이루는 것으로, 오랜 시간에 걸친 마모 또는 하중에 의해 일부분이 손상되는 경우도 있고, 시공 구조에서 오는 내, 외부간의 온도차로 내벽에 응집된 습기가 스며들어 백화 현상이 발생하여 이 부분이 시각적으로 혐오감을 유발하게 되고 장기간 방치할 경우에는 이부분에서 벽돌벽의 수축 및 팽창으로 쉽게 균열이 발생하게 된다.The external brick wall is formed by stacking the bricks to form a wall, partly damaged by a long time wear or load, and the moisture condensed on the inner wall due to the temperature difference between the internal and external from the construction structure For example, whitening occurs, which causes visual disgust, and if left for a long time, cracking occurs easily due to contraction and expansion of the brick wall.

이러한 손상부위의 외부벽돌벽을 보수하기 위해서 외부벽돌벽을 전체적으로 보수하고자 하면 대공사가 될 수밖에 없고, 외부벽돌벽 전체의 보수는 상당한 시간과 비용이 소요되므로 바람직하지 않다.If you want to repair the external brick wall as a whole in order to repair the external brick wall of the damaged part, it is inevitable to be a major construction, and the repair of the entire external brick wall is not preferable because it takes considerable time and cost.

종래의 벽체의 보수방법은 상기와 같은 위험성 및 작업의 어려움으로 인하여 임시변통의 보수방법으로써, 손상부위인 균열부분에는 시멘트몰탈을 충전하고 그 위에 기존의 벽체와 동일 색상의 페인트로 도장 처리하거나, 균열부위에 에폭시본드로 충전하여 정착하는 방법 또는 탈락된 부분에는 시멘트몰탈로서 미장처리하고 상기와 같은 페인트 도장처리로 보수하는 방법이 적용되고 있으나, 이러한 보수방법의 손상부위의 근본적인 원인이 제거되지 않기 때문에 얼마후 다시 균열이나 탈락현상이 발생하여 그 다지 큰 효과를 거두지 못하고 있는 실정이다.Conventional wall repair method is a temporary repair method due to the above-mentioned risks and difficulties of work, filling the damaged part with cement mortar and coating it with paint of the same color as the existing wall, The method of filling with cracks and fixing with epoxy bond or dropping parts is applied by cement mortar and repaired by the above paint coating process, but the root cause of the damaged part of the repair method is not removed. As a result, cracks or dropouts occur after a while, and thus do not have much effect.

등록특허번호 제10-0739840호Patent Registration No. 10-0739840

상기와 같은 문제점을 해결하기 위한 본 발명의 목적은, 벽돌벽에 형성된 손상부위를 제거하고 신설벽돌을 조적하여 손상부위를 유지보수하는 과정에서 손상부위 상부의 내력벽을 보강하여 손상부위를 제거한다 하더라도 손상부위 상부의 벽돌들이 처지거나 파손되는 것을 방지하여 구조적으로 안정적인 유지보수 작업을 수행할 수 있도록 하며 열교현상을 차단하여 구조적인 강성 저하를 방지할 수 있도록 하는 벽돌벽 유지보수장치 및 이를 이용한 유지보수방법을 제공함에 있다.An object of the present invention for solving the above problems, even if removing the damaged portion formed on the brick wall and reinforce the bearing wall of the upper portion of the damaged portion in the process of maintaining the damaged site by masonry new bricks to remove the damaged site Brick wall maintenance device and maintenance using the same to prevent structural degradation of stiffness by preventing thermal bridge phenomenon by performing structurally stable maintenance work by preventing sagging or damage of bricks on the damaged part. In providing a method.

상기한 바와 같은 목적을 달성하고 종래의 결점을 제거하기 위한 과제를 수행하는 본 발명은, 벽돌벽에 형성되어 있는 손상부위의 유지보수 장치에 있어서, 상기 손상부위 상측의 벽돌벽에서 수평줄눈에 삽입되도록 설치되어 손상부위를 제거하더라도 벽돌벽의 처짐을 방지하는 수평보강재; 상기 수평보강재가 설치된 수평줄눈을 관통하여 일측단이 내력벽에 설치되고 타측단은 상기 수평보강재에 결합되어 벽돌벽을 내력벽에 연결하여 지지해주는 벽돌벽 고정앵커; 상기 손상부위의 벽돌들을 제거하여 형성된 공간에서 내력벽에 고정되도록 설치되어 손상부위 상측의 벽돌을 지지해주는 브래킷;을 포함하여 구성된 것을 특징으로 한다.The present invention to achieve the object as described above and to perform the problem for eliminating the conventional defects, in the maintenance device of the damaged area formed on the brick wall, inserted into the horizontal joint in the brick wall above the damaged site Horizontal reinforcement to prevent the deflection of the brick wall even if installed to remove the damage; A brick wall fixing anchor for supporting one side end of the horizontal wall by installing the horizontal reinforcement member, the one end of which is connected to the bearing wall, and the other end of the horizontal reinforcing member connected to the horizontal reinforcing member to connect the brick wall to the bearing wall; And a bracket that is installed to be fixed to the bearing wall in a space formed by removing the bricks of the damaged part and supports the bricks above the damaged part.

또한 상기 벽돌벽 고정앵커, 상기 내력벽에 일측단이 고정되고 타측단은 수평줄눈에 놓여지며, 내부에는 중공부가 형성되고 중공부의 일측이 길이방향으로 개방되도록 구성되는 앵커몸체; 상기 앵커몸체의 중공부로 체결되어 앵커몸체를 확장시켜 내력벽에 고정되도록 하되, 상기 앵커몸체와의 사이에 상기 수평보강재가 개재되도록 한 상태에서 앵커몸체에 체결되어 수평보강재를 앵커몸체에 가압고정하면서 앵커몸체를 확장 고정해주는 나사못; 상기 나사못에 끼워져 나사못의 두부와 수평보강재 사이에 개재되도록 위치하고, 링형태로 형성되어 어느 한 부분이 절개되어 폐합되지 않으며 절개된 단부는 서로 어긋나게 뒤틀려지도록 구성되어 나사못을 통한 수평보강재의 가압시 수평보강재를 탄력적으로 가압하여 수평보강재의 유동을 방지해주는 가압링;을 포함하여 구성된 것을 특징으로 한다.In addition, one side end is fixed to the brick wall fixing anchor, the bearing wall and the other end is placed on the horizontal joint, the hollow body is formed inside and one side of the hollow body is configured to open in the longitudinal direction; The anchor body is fastened to the anchor body by expanding the anchor body by being fastened to the hollow part of the anchor body, and the horizontal reinforcing material is interposed between the anchor body and the anchor body while being fastened to the anchor body while pressing and fixing the horizontal reinforcing material to the anchor body. Screws to expand and secure the body; The screw is inserted into the screw and positioned between the head of the screw and the horizontal reinforcement, and is formed in a ring shape so that any one portion is not cut and closed, and the cut end is configured to be distorted to be displaced from each other. It characterized in that it comprises a; pressure ring to elastically press the pressure to prevent the flow of the horizontal reinforcement.

또한 상기 브래킷은, 내력벽에 앵커를 통해 결합되는 수직판과, 상기 수직판으로부터 상향 경사지게 연장되는 받침판으로 이루어진 내력벽결합부; 상기 내력벽결합부의 받침판에서 벽돌벽 방향을 향해 이동 가능하게 설치되도록 슬롯홀이 형성되어 있는 결합판과, 상기 결합판의 일측단에서 결합판의 폭 보다 넓게 형성되어 적어도 2개 이상의 벽돌을 받쳐주게 되는 확장형받침판으로 이루어진 벽돌받침부;로 구성된 것을 특징으로 한다.In addition, the bracket, the bearing wall engaging portion consisting of a vertical plate coupled to the bearing wall through the anchor, and a support plate extending inclined upwardly from the vertical plate; A coupling plate having a slot hole is formed to be installed to move in the direction of the brick wall from the bearing plate of the bearing wall coupling portion, and is formed wider than the width of the coupling plate at one end of the coupling plate to support at least two bricks Characterized in that consisting of; brick support portion consisting of an extended support plate.

또한 본 발명은 상기 내력벽결합부의 수직판과 내력벽 사이에 설치되어 열교현상을 차단하는 제2열교차단 가스켓 및 상기 내력벽결합부의 받침판과 벽돌받침부의 결합판 사이에개재되도록 설치되는 제1열교차단 가스켓을 더 포함하여 구성된 것을 특징으로 한다.In addition, the present invention is installed between the vertical plate and the bearing wall of the load-bearing wall coupling portion and the second heat cross-linking gasket to block the thermal bridge phenomenon and the first heat cross-linking gasket is installed so as to be interposed between the bearing plate and the bearing plate of the bearing wall coupling portion Characterized in that further comprises.

또한 상기 수평줄눈에 설치되고 이웃하는 수평보강재의 일측 단부가 삽입되어 벽돌벽의 신축 작용시 자유 거동할 수 있도록 하여 벽돌벽의 균열이 방지되도록 하는 슬립조인트;를 더 포함하여 구성된 것을 특징으로 한다.In addition, the one side end of the horizontal reinforcing member is installed in the horizontal joint is inserted so that the free joint during the expansion and contraction action of the brick wall to prevent the crack of the brick wall; characterized in that the configuration further comprises a.

한편 본 발명은 벽돌벽에 형성된 손상부위 상측에서 벽돌벽의 수평줄눈을 일부 제거하여 설치홈을 형성하고 설치홈에 수평보강재를 설치하여 손상부위 상측을 보강해주는 수평보강재 설치단계; 상기 수평줄눈을 관통하여 내력벽에 앵커몸체를 설치하고, 상기 앵커몸체에 형성된 중공으로 나사못을 설치하여 앵커몸체를 확장시켜 내력벽에 고정하되, 나사못의 두부와 앵커몸체 사이에 수평보강재가 위치하도록 구성하여 나사못의 설치시 수평보강재가 앵커몸체와 나사못의 두부 사이에 가압고정되도록 하는 벽돌벽 고정앵커 설치단계; 상기 제거된 수평줄눈 부분에 모르타르를 도포하여 수평줄눈을 메워주는 수평줄눈 채움단계; 상기 손상부위의 벽돌들을 일부 제거하고 수직판과 수직판으로부터 상향 경사지게 연장되는 받침판으로 이루어진 내력벽결합부를 수직판이 내력벽에 결합되도록 하여 설치하고, 상기 받침판에 슬롯홀이 형성되어 있는 결합판을 설치하여 손상부위 상측의 벽돌을 쐐기 형태로 받쳐주는 브래킷 설치단계; 상기 손상부위의 벽돌의 벽돌을 모두 제거하는 벽돌 제거단계; 상기 벽돌이 제거된 손상부위에 벽돌을 재 조적하여 손상부위를 보수하는 벽돌 재 조적단계;를 포함하여 구성된 것을 특징으로 한다.Meanwhile, the present invention provides a horizontal reinforcement installation step of removing the horizontal joint of the brick wall from the damaged part formed on the brick wall to form an installation groove, and installing a horizontal reinforcement on the installation groove to reinforce the damaged site. The anchor body is installed on the bearing wall by passing through the horizontal joint, and the anchor body is installed in the anchor body to expand the anchor body to be fixed to the bearing wall, and the horizontal reinforcement is positioned between the head of the screw and the anchor body. A step of installing a brick wall anchor in which the horizontal reinforcement is pressurized and fixed between the anchor body and the head of the screw when the screw is installed; Filling the horizontal joint by applying a mortar to the removed horizontal joint portion of the horizontal joint; Remove the bricks of the damaged part and install the bearing wall engaging portion consisting of the vertical plate and the supporting plate extending inclined upwardly from the vertical plate so that the vertical plate is coupled to the bearing wall, and the coupling plate having the slot hole formed in the supporting plate is damaged. Bracket installation step of supporting the bricks in the upper portion of the site in the form of wedge; Brick removal step of removing all the bricks of the brick of the damaged area; And rebuilding the brick to repair the damaged part by rebuilding the brick on the damaged part from which the brick has been removed.

이상에서 설명한 바와 같이 본 발명에 의하면, 손상부위를 보수하는 과정에서 손상부위 상측에 위치한 벽돌벽에 수평보강재 및 벽돌벽 고정앵커를 설치하여 손상부위 상측을 구조적으로 안정화시킨 상태에서 손상부위의 벽돌을 제거한 후 손상부위 보수가 이루어지도록 함으로써 구조적으로 안정화 시킨 상태에서의 보수가 이루어져 시공성이 매우 우수한 효과가 있다.As described above, according to the present invention, in the process of repairing the damaged site by installing a horizontal reinforcing material and a brick wall fixing anchor on the brick wall located above the damaged site, the brick of the damaged site is structurally stabilized. After removal, the damaged parts are repaired, so the repair is made in a structurally stabilized state, and thus the workability is very excellent.

또한 브래킷의 벽돌받침부가 내력벽결합부의 받침판에 경사지게 결합되어 벽돌의 하부에 쐐기 형태로 맞물리면서 벽돌들 받쳐주게 됨으로써 제거되지 않은 벽돌을 받쳐주는 과정에서 오차 없이 벽돌을 견고하게 받쳐주는 효과가 있다.In addition, the brick support part of the bracket is inclinedly coupled to the support plate of the bearing wall coupling part, thereby supporting the bricks while being engaged in a wedge shape at the bottom of the brick to support the bricks that have not been removed.

또한 가압링을 통해 수평보강재를 탄력적으로 가압하게 됨으로써 수평보강재의 유동을 방지하여 벽돌벽의 구조적인 안정효율을 향상시켜 주게 되는 효과가 있다.In addition, it is possible to elastically press the horizontal reinforcement through the pressure ring to prevent the flow of the horizontal reinforcement has the effect of improving the structural stability efficiency of the brick wall.

또한 벽돌벽 고정앵커를 설치하는 과정에서 수평보강재를 가압 고정한 상태로 설치하게 됨으로서 벽돌벽의 구조적인 안정화 효율이 더욱 향상되는 효과가 있다.In addition, since the horizontal reinforcement is installed in a state in which the horizontal reinforcing material is pressed and fixed in the process of installing the brick wall anchor anchor, the structural stabilization efficiency of the brick wall is further improved.

또한 내력벽과 벽돌벽 사이의 열교를 차단하여 결로 발생을 최소화시켜줌으로써 벽돌벽의 구조적인 강성 저하를 방지해주는 매우 유용한 발명이다.In addition, it is a very useful invention that prevents the degradation of the structural rigidity of the brick wall by minimizing the occurrence of condensation by blocking the thermal bridge between the bearing wall and the brick wall.

도 1 은 본 발명에 의한 벽돌벽 유지보수장치를 나타낸 단면도,
도 2 는 본 발명에 의한 브래킷을 나타낸 사시도,
도 3 은 본 발명에 의한 수평보강재와 벽돌벽 고정앵커의 결합구조를 나타낸 사시도,
도 4 는 본 발명에 의한 슬립조인트의 설치 상태를 나타낸 예시도,
도 5 는 본 발명에 의한 벽돌벽 유지보수장치를 이용하여 손상부위를 유지보수하는 과정을 나타낸 예시도.
1 is a cross-sectional view showing a brick wall maintenance apparatus according to the present invention,
2 is a perspective view of a bracket according to the present invention;
Figure 3 is a perspective view showing a coupling structure of the horizontal reinforcement and the brick wall anchor anchor according to the present invention,
4 is an exemplary view showing an installation state of a slip joint according to the present invention;
Figure 5 is an exemplary view showing a process of maintaining the damaged site by using a brick wall maintenance apparatus according to the present invention.

이하 본 발명의 실시 예인 구성과 그 작용을 첨부도면에 연계시켜 상세히 설명하면 다음과 같다. 또한 본 발명을 설명함에 있어서, 관련된 공지기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명은 생략한다.Hereinafter, the configuration and the operation of the embodiments of the present invention will be described in detail with reference to the accompanying drawings. In describing the present invention, when it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description thereof will be omitted.

도 1 은 본 발명에 의한 벽돌벽 유지보수장치를 나타낸 단면도, 도 2 는 본 발명에 의한 브래킷을 나타낸 사시도, 도 3 은 본 발명에 의한 수평보강재와 벽돌벽 고정앵커의 결합구조를 나타낸 사시도, 도 4 는 본 발명에 의한 슬립조인트의 설치 상태를 나타낸 예시도, 도 5 는 본 발명에 의한 벽돌벽 유지보수장치를 이용하여 손상부위를 유지보수하는 과정을 나타낸 예시도로서,1 is a cross-sectional view showing a brick wall maintenance apparatus according to the present invention, Figure 2 is a perspective view showing a bracket according to the present invention, Figure 3 is a perspective view showing a coupling structure of the horizontal reinforcement and the brick wall fixing anchor according to the present invention, Figure 4 is an exemplary view showing an installation state of the slip joint according to the present invention, Figure 5 is an exemplary view showing a process of maintaining the damaged area by using a brick wall maintenance apparatus according to the present invention,

본 발명은 손상부위(30) 상측의 벽돌벽(20)에 형성된 수평줄눈을 일부 제거하여 설치홈을 형성하고 설치홈에 삽입되도록 설치되어 손상부위(30)의 벽돌을 제거한다 하더라도 벽돌들의 처짐을 방지하는 수평보강재(200)와, 상기 수평보강재(200)가 설치된 수평줄눈을 통해 일측단이 내력벽(10)에 설치되고 타측단은 상기 수평보강재(200)에 결합되어 벽돌벽(20)을 내력벽(10)에 연결하여 지지해주는 벽돌벽 고정앵커(300)와, 상기 손상부위(30)의 벽돌(40)들을 제거하여 형성된 공간에서 내력벽(10)에 고정되도록 설치되어 손상부위(30) 상측의 벽돌(40)을 지지해주는 브래킷(100)을 포함하여 구성된다.The present invention removes some of the horizontal joint formed on the brick wall 20 above the damaged part 30 to form an installation groove, and is installed to be inserted into the installation groove to remove the deflection of the brick even if the brick of the damaged area 30 is removed. The horizontal reinforcement 200 to prevent, and the horizontal joint through which the horizontal reinforcement 200 is installed, one end is installed in the bearing wall 10 and the other end is coupled to the horizontal reinforcement 200 to the brick wall 20 load bearing wall The brick wall fixing anchor 300 connected to the support 10 and the brick 40 of the damaged part 30 are installed to be fixed to the load bearing wall 10 in a space formed by removing the brick 40 of the damaged part 30. It is configured to include a bracket 100 for supporting the brick 40.

상기 수평보강재(200)는 평판 형태의 금속재를 일정한 피치를 갖도록 나선형으로 꼬아 형성됨으로써 구조적인 강성이 매우 뛰어나다.The horizontal reinforcement 200 is formed by twisting a spiral plate to have a predetermined pitch in the form of a metal material is very excellent in structural rigidity.

이러한 수평보강재(200)는 벽돌벽(20)에 형성된 수평줄눈에 그라인더와 같은 공구를 이용하여 벽돌벽(20)의 폭 방향으로 설치홈을 형성하고 상기 설치홈의 내부에 삽입되도록 설치한다.The horizontal reinforcement 200 is installed to form an installation groove in the width direction of the brick wall 20 by using a tool such as a grinder on the horizontal joint formed on the brick wall 20 to be inserted into the installation groove.

상기 벽돌벽 고정앵커(300)는, 내력벽(10)에 형성되는 설치홀에 일측단이 삽입되도록 설치되고 타측단은 수평줄눈에 놓여지도록 설치되며, 내부에는 중공부(311)가 형성되고 중공부(311)의 일측에는 길이방향으로 개방되도록 절개면(312)이 형성되어 있는 앵커몸체(310)와, 상기 앵커몸체(310)의 중공부(311)로 삽입되어 앵커몸체(310)를 확장시켜 줌으로써 앵커몸체(310)가 내력벽(10)에 고정되도록 하되, 상기 앵커몸체(310)와의 사이에 상기 수평보강재(200)가 개재되도록 한 상태에서 앵커몸체(310)에 체결되어 수평보강재(200)를 앵커몸체(310)에 가압고정하면서 앵커몸체(310)를 확장 고정해주는 나사못(320)과, 상기 나사못(320)에 끼워지도록 설치되어 나사못(320)을 통한 수평보강재(200)의 가압시 수평보강재(200)를 탄력적으로 가압하여 수평보강재(200)의 유동을 방지해주는 가압링(330)을 포함하여 구성된다.The brick wall fixing anchor 300 is installed so that one end is inserted into the installation hole formed in the bearing wall 10 and the other end is placed in a horizontal joint, and a hollow part 311 is formed therein and a hollow part. One side of the 311 is inserted into the anchor body 310 and the hollow body 311 of the anchor body 310, the incision surface 312 is formed to open in the longitudinal direction to extend the anchor body 310 By anchoring the anchor body 310 is fixed to the bearing wall 10, the horizontal reinforcing material 200 is interposed between the anchor body 310 and the anchor body 310 is fastened to the anchor body 310 to the horizontal reinforcing material 200 And a screw 320 to expand and fix the anchor body 310 and fixed to the anchor body 310, and is installed to be fitted to the screw 320, the horizontal when pressing the horizontal reinforcement 200 through the screw 320 By elastically pressing the reinforcement 200 to prevent the flow of the horizontal reinforcement (200) It is configured to include a press ring (330).

상기 가압링(330)은 링형태로 형성되되, 어느 한 부분이 절개되어 폐합되지 않도록 구성되고 절개된 단부는 서로 어긋나 뒤틀려져지도록 구성된다.The pressure ring 330 is formed in a ring shape, which is configured so that any part is not cut and closed, and the cut ends are configured to be distorted and distorted.

이러한 가압링(330)은 상기 나사못(320)의 체결시 나사못(320)의 두부에 닿은 상태에서 나사못(302)의 체결방향으로 밀려져 수평보강재(200)를 앵커몸체(310)와의 사이에서 가압 고정해주게 되며, 이때 가압링(330)의 형상에 의해 수평보강재(200)를 탄력적으로 가압하여 견고히 고정해주게 되는 것이다.The pressure ring 330 is pushed in the fastening direction of the screw 302 in contact with the head of the screw 320 when the screw 320 is fastened to press the horizontal reinforcement 200 between the anchor body 310 and the anchor body 310. In this case, the horizontal reinforcement 200 is elastically pressed by the shape of the pressure ring 330 to be firmly fixed.

한편 본 발명의 내력벽 고정앵커(300)는 상기 앵커몸체(310)를 합성수지 재질로 구성함으로써 금속재질로 이루어지는 나사못(320)을 설치한다 하더라도 내력벽(10)과 벽돌벽(20) 사이에서 발생되는 열교현상을 최소화하여 결로의 발생을 줄여주게 되는 것이다.On the other hand, the bearing wall fixing anchor 300 of the present invention is made of a synthetic resin material by the anchor body 310, even if the screw 320 made of a metal material is installed between the bearing wall 10 and the brick wall 20 Minimize the phenomenon to reduce the occurrence of condensation.

한편 상기 브래킷(100)은, 내력벽(10)에 앵커를 통해 설치되는 내력벽결합부(110)와, 상기 내력벽결합부(110)에 슬라이딩 가능하도록 설치되어 벽돌(40)들을 받쳐주는 벽돌받침부(120)를 포함하여 구성된다.On the other hand, the bracket 100, the bearing wall coupling portion 110 which is installed on the bearing wall 10 through the anchor, and the brick support portion that is installed to be slidable to the bearing wall coupling portion 110 to support the brick 40 ( 120).

상기 내력벽결합부(110)는 내력벽(10)에 밀착되도록 설치되고 앵커에 의한 고정이 가능하도록 관통홀(111a)이 형성되어 있는 수직판(111)과, 상기 수직판(111)으로부터 상향 경사지게 연장되는 받침판(112)으로 구성된다.The bearing wall coupling part 110 is installed to be in close contact with the bearing wall 10 and extends inclined upwardly from the vertical plate 111 and a vertical plate 111 having a through hole 111a formed thereon to be fixed by an anchor. It is composed of a supporting plate 112.

이러한 내력벽결합부(110)는 받침판(112)을 상향 경사지게 형성함으로서 받침판(112)이 벽돌(40)의 하부에서 쐐기형태로 맞물려 벽돌(40)을 받쳐주게 되어 벽돌의 안정적인 지지가 가능하게 된다.The bearing wall coupling portion 110 is formed to be inclined upwardly to the support plate 112 is supported by the support plate 112 in the wedge shape at the bottom of the brick 40 to support the brick 40 to enable a stable support of the brick.

상기 벽돌받침부(120)는 내력벽결합부(110)의 받침판(112)에 볼트 및 너트를 통해 결합 가능하도록 슬롯홀(121a)이 형성되어 있는 결합판(121)과, 상기 결합판(121)의 일측단에서 결합판(121)의 폭보다 넓게 형성되는 확장형 받침판(122)으로 포함하여 구성된다.The brick support portion 120 is a coupling plate 121 is formed with a slot hole 121a to be coupled to the support plate 112 of the bearing wall coupling portion 110 through bolts and nuts, and the coupling plate 121. It is configured to include an extended support plate 122 formed wider than the width of the coupling plate 121 at one side of the.

상기 벽돌받침부(120)는 결합판(121)에 슬롯홀(121a)을 형성함으로써 내력벽결합부(110) 상에서 벽돌받침부(120)의 설치 위치를 조절할 수 있어 현장에서 설치된 벽돌벽(20)과 내력벽(10)의 설치 간격에 맞도록 조절한 후 벽돌벽(20)을 받쳐주게 됨으로써 사용성이 매우 우수하다.The brick support portion 120 can adjust the installation position of the brick support portion 120 on the bearing wall coupling portion 110 by forming a slot hole (121a) in the coupling plate 121 brick wall 20 installed in the field And after adjusting to the installation interval of the load bearing wall 10 supports the brick wall 20 is very excellent in usability.

또한 확장형 받침판(122)을 형성함으로서 적어도 2개 이상의 벽돌(40)들을 받쳐주게 되어 손상부위(30)의 범위가 넓게 형성된다 하더라도 다수의 벽돌(40)들을 견고하게 받쳐줄 수 있게 된다.In addition, by forming the extended support plate 122 to support at least two or more bricks 40, even if the damage area 30 is formed in a wide range it is possible to firmly support a plurality of bricks (40).

이와 같이 구성되는 본 발명의 브래킷(100)은 내력벽결합부(110)의 받침판(112)를 경사지게 형성함으로써 벽돌벽받침부(120)를 받침판(112)에 결합하여 벽돌을 받쳐주는 과정에서 벽돌받침부(120)가 경사방향으로 이동가능하게 되어 손상부위 상측에서 제거되지 않은 상태로 고정되어 있는 벽돌(40)의 하부에 쐐기형태로 맞물리게 되어 벽돌(40)을 견고하게 받쳐줄 수 있게 되는 것이다.The bracket 100 of the present invention configured as described above forms the inclined support plate 112 of the bearing wall coupling part 110 so that the brick support in the process of supporting the brick by joining the brick wall support unit 120 to the support plate 112. The portion 120 is movable in an inclined direction so that the portion 120 is engaged in a wedge shape to the lower portion of the brick 40 which is fixed in a state where it is not removed above the damaged portion, thereby supporting the brick 40 firmly.

한편 본 발명의 브래킷(100)은 내력벽결합부(110)의 받침판(112)과 벽돌받침부(120)의 결합판(121) 사이에 설치되는 제1열교차단 가스켓(130)을 더 포함하여 구성할 수 있다.Meanwhile, the bracket 100 of the present invention further includes a first heat cross-linking gasket 130 installed between the support plate 112 of the bearing wall coupling unit 110 and the coupling plate 121 of the brick support unit 120. can do.

상기 제1열교차단 가스켓(130)은 벽돌벽(20)을 받쳐주는 벽돌받침부(120)와, 내력벽(10)에 결합되는 내력벽결합부(100) 사이의 열교현상을 차단하여 내력벽(10)과 벽돌벽(20) 사이의 결로현상을 방지할 수 있게 된다.The first heat cross-linking gasket 130 blocks the thermal bridge between the brick supporting part 120 supporting the brick wall 20 and the bearing wall coupling part 100 coupled to the bearing wall 10, thereby providing a load bearing wall 10. And condensation between the brick wall 20 can be prevented.

또한 본 발명의 브래킷(100)은 상기 내력벽결합부(110)의 수직판(111)과 내력벽(10) 사이에 개재되도록 설치되는 제2열교차단 가스켓(140)을 더 포함하여 구성할 수 있다.In addition, the bracket 100 of the present invention may further include a second heat cross-linking gasket 140 installed to be interposed between the vertical plate 111 and the bearing wall 10 of the bearing wall coupling unit 110.

이러한 제2열교차단 가스켓(140)은 내력벽결합부(110)와 내력벽(10) 사이의 열교현상을 차단해 주게 되고 이로 인해 결로현상을 최소화시켜 결로에 의한 벽돌벽(20)의 구조적인 강성저하를 방지해주게 된다.The second heat-blocking gasket 140 blocks the thermal bridge between the bearing wall coupling unit 110 and the bearing wall 10, thereby minimizing condensation, thereby reducing the structural rigidity of the brick wall 20 due to condensation. Will prevent.

한편 본 발명은 상기 수평줄눈에 설치되어 이웃하는 수평보강재(200)의 단부가 각각 삽입되어 벽돌벽(20)의 신축 작용시 자유 거동할 수 있도록 하는 슬립조인트(400)를 더 포함하여 구성된다.Meanwhile, the present invention further includes a slip joint 400 installed at the horizontal joint so that end portions of neighboring horizontal reinforcing members 200 are inserted to allow free movement during expansion and contraction of the brick wall 20.

상기 슬립조인트(400)는 수평보강재(200)의 단부가 삽입될 수 있도록 내부가 중공되도록 형성된다.The slip joint 400 is formed to be hollow inside so that the end of the horizontal reinforcement 200 can be inserted.

이때 상기 수평보강재(200)는 상기 슬립조인트(400)에 용이하게 삽입될 수 있도록 단부에 꼬이지 않은 상태의 평판부를 형성할 수 있다.In this case, the horizontal reinforcement 200 may form a flat portion of the end portion is not twisted so that it can be easily inserted into the slip joint 400.

이와 같이 슬립조인트(400)를 통해 수평보강재(200)를 연결해줌으로써 벽돌벽(20)에 신축이 발생할 경우 벽돌벽(20)이 자유 거동하여 균열을 방지할 수 있게 되는 것이다.As such, by connecting the horizontal reinforcement 200 through the slip joint 400, when the expansion and contraction occurs in the brick wall 20, the brick wall 20 may freely move to prevent cracking.

이와 같이 구성되는 본 발명의 벽돌벽 유지보수장치를 이용한 유지보수방법은, 수평보강재 설치단계와, 벽돌벽 고정앵커 설치단계와, 수평줄눈 채움단계와, 브래킷 설치단계와, 벽돌 제거단계와, 벽돌 재 조적단계를 포함하여 구성된다.Maintenance method using the brick wall maintenance apparatus of the present invention configured as described above, horizontal reinforcement installation step, brick wall fixing anchor installation step, horizontal joint filling step, bracket installation step, brick removal step, brick It includes a rebuilding phase.

상기 수평보강재 설치단계는 벽돌벽(20)에 형성된 손상부위(30)의 상측으로 벽돌벽(20)의 수평 줄눈을 일부 제거하여 설치홈을 형성하고 설치홈에 수평보강재(200)를 삽입하는 과정이다.The horizontal reinforcement installation step is a process of removing the horizontal joint of the brick wall 20 to the upper side of the damaged part 30 formed in the brick wall 20 to form an installation groove and insert the horizontal reinforcement 200 into the installation groove. to be.

상기 수평줄눈은 상, 하에 위치하는 벽돌(40)들 사이에 모르타르를 도포하여 형성되는 것으로 그라인더를 통해 일부 절개하여 설치홈을 형성하고 이 설치홈에 수평보강재(200)를 삽입하는 것이다.The horizontal joint is formed by applying mortar between the bricks 40 positioned above and below to form an installation groove by partially cutting through the grinder to insert the horizontal reinforcement 200 into the installation groove.

상기 수평보강재(200)는 도면에서와 같이 상, 하 방향으로 2개 라인이 형성되도록 설치할 수 있고 현장의 구조적인 여건에 따라 2개 라인 이상으로도 설치할 수도 있으며 이렇게 수평보강재(200)를 설치하게 됨으로써 손상부위(30)의 벽돌(40)을 제거한다 하더라도 벽돌벽(20)의 처짐이나 파손을 방지해주게 되는 것이다.The horizontal reinforcement 200 may be installed so that two lines are formed in the up and down directions as shown in the drawing, and may be installed in two or more lines according to the structural conditions of the site, and thus the horizontal reinforcement 200 may be installed. As a result, even if the brick 40 of the damaged part 30 is removed, sagging or damage of the brick wall 20 is prevented.

한편 상기 벽돌벽 고정앵커 설치단계는 상기 드릴과 같은 장비를 이용하여 수평줄눈을 관통한 후 내력벽(10)에 설치홀을 형성하고, 상기 설치홀에 앵커몸체(310)의 일측단을 삽입하고 타측단은 수평줄눈 상에 위치시켜 놓은 후 나사못(320)에 가압링(330)을 삽입한 상태에서 앵커몸체(310)에 형성된 중공부(311)로 나사못(320)을 설치하여 앵커몸체(310)를 확장시켜 앵커몸체(310)가 내력벽(10)에 고정되도록 하되, 나사못(320)의 두부와 앵커몸체(310)의 사이에 수평보강재(200)를 위치시켜 나사못(320)이 수평보강재(200)를 앵커몸체(310) 방향으로 가압하여 수평보강재(200)를 가압 고정하면서 앵커몸체(310)를 고정 설치하는 것이다.Meanwhile, in the brick wall fixing anchor installation step, the mounting hole is formed in the load bearing wall 10 after passing through the horizontal joint using the same equipment as the drill, and one end of the anchor body 310 is inserted into the installation hole. The side end is positioned on the horizontal joint, and then the screw body 320 is installed by the hollow part 311 formed in the anchor body 310 in the state in which the pressure ring 330 is inserted into the screw 320. The anchor body 310 is fixed to the bearing wall 10 by expanding the horizontal reinforcement 200 between the head of the screw 320 and the anchor body 310 by placing the screw 320 is a horizontal reinforcement 200 By pressing in the direction of the anchor body 310, while fixing the horizontal reinforcement (200) by pressing the anchor body 310 is fixed.

이와 같은 벽돌벽 고정앵커 설치단계는 벽돌벽 고정앵커(300)를 설치하는 과정에서 수평보강재(200)를 가압 고정하여 일체화한 상태에서 설치하게 됨으로써 벽돌벽(20)에 가해지는 처짐과 횡력을 지지함과 동시에 압축 및 인발력을 지지해주게 된다.In the brick wall fixing anchor installation step, the deflection and the lateral force applied to the brick wall 20 are supported by being installed in a state in which the horizontal reinforcement material 200 is pressed and fixed in the process of installing the brick wall fixing anchor 300. At the same time, it supports compression and drawing force.

한편 상기 수평줄눈 채움단계는, 수평보강재(200) 설치를 위해 형성된 설치홈을 모르타르를 통해 채워 넣는 과정이다.Meanwhile, the horizontal joint filling step is a process of filling the installation grooves formed for installing the horizontal reinforcement 200 through mortar.

상기 브래킷 설치단계는, 손상부위(30)의 벽돌(40)들을 일부 제거하고 벽돌(40)이 제거된 부분으로 내력벽(10)에 고정되도록 브래킷(100)을 설치하여 손상부위(30) 상측의 벽돌들을 지지해주는 과정이다.The bracket installation step, by removing a portion of the brick 40 of the damaged part 30 and the bracket 100 is installed to be fixed to the load bearing wall 10 to the removed portion of the brick 40 to the damaged part 30 The process of supporting the bricks.

이러한 브래킷 설치단계는, 먼저 내력벽(10)에 내력벽결합부(110)를 설치하고, 상기 내력벽결합부(110)에 벽돌(40)을 받쳐주기 위한 벽돌받침부(120)를 설치하여 구성되며, 상기 벽돌받침부(120)는 슬롯홀(121a)을 통해 내력벽결합부(110)의 받침판(112) 상에서 이동 가능하도록 구성되어 받쳐주기 위한 벽돌(40)의 위치에 대응하여 이동한 후 벽돌(40)들을 안정적으로 받쳐주게 된다.The bracket installation step is, first, the load bearing wall 110 is installed on the load bearing wall 10, and the brick bearing portion 120 for supporting the brick 40 to the load bearing wall coupling 110 is configured, The brick support part 120 is configured to be movable on the support plate 112 of the bearing wall coupling part 110 through the slot hole 121a and moves in correspondence with the position of the brick 40 to support the brick 40. ) To support them stably.

이때 상기 내력벽결합부(110)의 수직판(111)과 내력벽(10) 사이에 제2열교차단 가스켓(140)을 더 설치하여 열교현상을 차단해주고, 또한 상기 내력벽결합부의 받침판(112)과 벽돌받침부(120)의 결합판(121) 사이에도 제1열교차단 가스켓(130)을 더 설치하여 열교현상을 차단해 줄 수 있도록 한다.In this case, a second heat cross-linking gasket 140 is further installed between the vertical plate 111 and the bearing wall 10 of the bearing wall coupling unit 110 to block the thermal bridge phenomenon, and the support plate 112 and the brick of the bearing wall coupling part are further provided. The first thermal cross-linking gasket 130 is further installed between the coupling plates 121 of the support 120 to block the thermal bridge phenomenon.

한편 상기 벽돌 제거단계는 손상부위(30)의 벽돌(40)을 모두 제거하는 과정으로써 신설되는 벽돌(40)을 조적하기 위한 공간을 형성하게 되는 것이다.On the other hand, the brick removing step is to remove all of the bricks 40 of the damaged part 30 to form a space for masonry to be established brick 40.

상기 벽돌 재 조적단계는, 상시 손상부위(30)에 벽돌(40)을 재 조적하여 손상부위(30)를 보수하는 과정이다.The brick re-joining step is a process of repairing the damaged part 30 by re-building the brick 40 to the damaged part 30 at all times.

한편 본 발명은 상기 수평보강재 설치단계에서 슬립조인트(400)를 통해 이웃하는 수평보강재(200)가 양측으로 끼워지도록 하여 설치함으로써 벽돌벽(20)의 신축 작용시 자유 거동할 수 있도록 한다.Meanwhile, the present invention allows the neighboring horizontal reinforcement 200 to be fitted to both sides through the slip joint 400 in the horizontal reinforcement installation step to allow free movement during the stretching action of the brick wall 20.

이와 같이 구성되는 본 발명은 손상부위(30)를 보수하는 과정에서 손상부위(30) 상측에 위치한 벽돌벽(20)에 수평보강재(200) 및 벽돌벽 고정앵커(300)를 설치하여 손상부위(30) 상측을 구조적으로 안정화시킨 상태에서 손상부위(30)의 벽돌을 제거한 후 손상부위(30) 보수가 이루어지도록 함으로써 구조적으로 안정화 시킨 상태에서의 보수가 이루어져 시공성이 매우 우수하다.The present invention constituted as described above installs the horizontal reinforcing material 200 and the brick wall fixing anchor 300 on the brick wall 20 located above the damaged part 30 in the process of repairing the damaged part 30, thereby causing the damaged part ( 30) The structure is stabilized by removing the bricks of the damaged part 30 in the state where the upper side is structurally stabilized, thereby repairing the damaged part 30, and thus the construction is very excellent.

또한 벽돌벽 고정앵커(300)를 설치하는 과정에서 수평보강재(200)를 가압 고정한 상태로 설치하게 됨으로서 벽돌벽(20)의 구조적인 안정화 효율이 더욱 향상되는 것이다.In addition, the structural stabilization efficiency of the brick wall 20 is further improved by installing the horizontal reinforcement 200 under pressure while fixing the brick wall fixing anchor 300.

본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

(10) : 내력벽 (20) : 벽돌벽
(30) : 손상부위 (40) :벽돌
(100) : 브래킷 (110) : 내력벽결합부
(111) : 수직판 (111a) : 관통홀
(112) : 받침판 (112a) : 관통홀
(120) : 벽돌받침부 (121) : 결합판
(121a) : 슬롯홀 (122) : 확장형 받침판
(130) : 제1열교차단 가스켓 (140) : 제2열교차단 가스켓
(200) : 수평보강재 (300) : 벽돌벽 고정앵커
(310) : 앵커몸체 (311) : 중공부
(312) : 절개면 (320) : 나사못
(330) : 가압링 (400) : 슬립조인트
(10): bearing wall (20): brick wall
(30): damaged area (40): brick
(100): bracket (110): bearing wall joint
111: vertical plate 111a: through hole
(112): base plate 112a: through hole
120: brick support portion 121: bonding plate
(121a): slot hole (122): extended base plate
(130): first heat-crossing gasket 140: second heat-crossing gasket
(200): horizontal reinforcement (300): brick wall fixed anchor
(310): anchor body 311: hollow part
(312): Incision side (320): Screw
(330): pressure ring (400): slip joint

Claims (6)

벽돌벽에 형성되어 있는 손상부위의 유지보수 장치에 있어서,
상기 손상부위 상측의 벽돌벽에서 수평줄눈에 삽입되도록 설치되어 손상부위를 제거하더라도 벽돌벽의 처짐을 방지하는 수평보강재;
상기 수평보강재가 설치된 수평줄눈을 관통하여 일측단이 내력벽에 설치되고 타측단은 상기 수평보강재에 결합되어 벽돌벽을 내력벽에 연결하여 지지해주는 벽돌벽 고정앵커;
상기 손상부위의 벽돌들을 제거하여 형성된 공간에서 내력벽에 고정되도록 설치되어 손상부위 상측의 벽돌을 지지해주는 브래킷;을 포함하여 구성된 것을 특징으로 하는 벽돌벽 유지보수장치.
In the maintenance apparatus of the damaged part formed in the brick wall,
Horizontal reinforcement is installed so as to be inserted into the horizontal joint in the brick wall on the upper side of the damaged portion to prevent the deflection of the brick wall even if the damaged portion is removed;
A brick wall fixing anchor for supporting one side end of the horizontal wall by installing the horizontal reinforcement member, the one end of which is connected to the bearing wall, and the other end of the horizontal reinforcing member connected to the horizontal reinforcing member to connect the brick wall to the bearing wall;
And a bracket which is installed to be fixed to the bearing wall in the space formed by removing the bricks of the damaged part and supports the bricks above the damaged part.
제 1 항에 있어서,
상기 벽돌벽 고정앵커는,
상기 내력벽에 일측단이 고정되고 타측단은 수평줄눈에 놓여지며, 내부에는 중공부가 형성되고 중공부의 일측이 길이방향으로 개방되도록 구성되는 앵커몸체;
상기 앵커몸체의 중공부로 체결되어 앵커몸체를 확장시켜 내력벽에 고정되도록 하되, 상기 앵커몸체와의 사이에 상기 수평보강재가 개재되도록 한 상태에서 앵커몸체에 체결되어 수평보강재를 앵커몸체에 가압고정하면서 앵커몸체를 확장 고정해주는 나사못;
상기 나사못에 끼워져 나사못의 두부와 수평보강재 사이에 개재되도록 위치하고, 링형태로 형성되어 어느 한 부분이 절개되어 폐합되지 않으며 절개된 단부는 서로 어긋나게 뒤틀려지도록 구성되어 나사못을 통한 수평보강재의 가압시 수평보강재를 탄력적으로 가압하여 수평보강재의 유동을 방지해주는 가압링;을 포함하여 구성된 것을 특징으로 하는 벽돌벽 유지보수장치.
The method of claim 1,
The brick wall fixed anchor,
One end is fixed to the load-bearing wall and the other end is placed in a horizontal joint, the hollow body is formed therein and configured to open one side of the hollow portion in the longitudinal direction;
The anchor body is fastened to the anchor body by expanding the anchor body by being fastened to the hollow part of the anchor body, and the horizontal reinforcing material is interposed between the anchor body and the anchor body while being fastened to the anchor body while pressing and fixing the horizontal reinforcing material to the anchor body. Screws to expand and secure the body;
The screw is inserted into the screw so as to be interposed between the head of the screw and the horizontal reinforcement, and formed in a ring shape so that any part is not cut and closed, and the cut end is configured to be distorted to each other, so that the horizontal reinforcement is pressed when the horizontal reinforcement is pressed through the screw. Brick wall maintenance device comprising a; pressure ring elastically pressurized to prevent the flow of the horizontal reinforcement.
제 1 항에 있어서,
상기 브래킷은,
내력벽에 앵커를 통해 결합되는 수직판과, 상기 수직판으로부터 상향 경사지게 연장되는 받침판으로 이루어진 내력벽결합부;
상기 내력벽결합부의 받침판에서 벽돌벽 방향을 향해 이동 가능하게 설치되도록 슬롯홀이 형성되어 있는 결합판과, 상기 결합판의 일측단에서 결합판의 폭 보다 넓게 형성되어 적어도 2개 이상의 벽돌을 받쳐주게 되는 확장형받침판으로 이루어진 벽돌받침부;로 구성된 것을 특징으로 하는 벽돌벽 유지보수장치.
The method of claim 1,
The bracket,
A bearing wall engaging portion including a vertical plate coupled to the bearing wall through an anchor, and a support plate extending upwardly inclined from the vertical plate;
A coupling plate having a slot hole is formed to be installed to move in the direction of the brick wall from the bearing plate of the bearing wall coupling portion, and is formed wider than the width of the coupling plate at one end of the coupling plate to support at least two bricks Brick wall maintenance device, characterized in that consisting of;
제 3 항에 있어서,
상기 내력벽결합부의 수직판과 내력벽 사이에 설치되어 열교현상을 차단하는 제2열교차단 가스켓 및 상기 내력벽결합부의 받침판과 벽돌받침부의 결합판 사이에개재되도록 설치되는 제1열교차단 가스켓을 더 포함하여 구성된 것을 특징으로 하는 벽돌벽 유지보수장치.
The method of claim 3, wherein
And a second thermal cross-link gasket installed between the vertical plate and the bearing wall of the load-bearing wall coupling portion to block thermal bridges, and a first heat-crossing gasket installed to be interposed between the bearing plate of the load-bearing wall coupling portion and the coupling plate of the brick support portion. Brick wall maintenance device, characterized in that.
제 1 항에 있어서,
상기 수평줄눈에 설치되고 이웃하는 수평보강재의 일측 단부가 삽입되어 벽돌벽의 신축 작용시 자유 거동할 수 있도록 하여 벽돌벽의 균열이 방지되도록 하는 슬립조인트;를 더 포함하여 구성된 것을 특징으로 하는 벽돌벽 유지보수장치.
The method of claim 1,
Brick wall further comprises a slip joint installed in the horizontal joint and one side end of the neighboring horizontal reinforcing material is inserted to allow free movement during expansion and contraction of the brick wall to prevent cracking of the brick wall. Maintenance device.
벽돌벽에 형성된 손상부위 상측에서 벽돌벽의 수평줄눈을 일부 제거하여 설치홈을 형성하고 설치홈에 수평보강재를 설치하여 손상부위 상측을 보강해주는 수평보강재 설치단계;
상기 수평줄눈을 관통하여 내력벽에 앵커몸체를 설치하고, 상기 앵커몸체에 형성된 중공으로 나사못을 설치하여 앵커몸체를 확장시켜 내력벽에 고정하되, 나사못의 두부와 앵커몸체 사이에 수평보강재가 위치하도록 구성하여 나사못의 설치시 수평보강재가 앵커몸체와 나사못의 두부 사이에 가압고정되도록 하는 벽돌벽 고정앵커 설치단계;
상기 제거된 수평줄눈 부분에 모르타르를 도포하여 수평줄눈을 메워주는 수평줄눈 채움단계;
상기 손상부위의 벽돌들을 일부 제거하고 수직판과 수직판으로부터 상향 경사지게 연장되는 받침판으로 이루어진 내력벽결합부를 수직판이 내력벽에 결합되도록 하여 설치하고, 상기 받침판에 슬롯홀이 형성되어 있는 결합판을 설치하여 손상부위 상측의 벽돌을 쐐기 형태로 받쳐주는 브래킷 설치단계;
상기 손상부위의 벽돌들을 모두 제거하는 벽돌 제거단계;
상기 벽돌이 제거된 손상부위에 벽돌을 재 조적하여 손상부위를 보수하는 벽돌 재 조적단계;를 포함하여 구성된 것을 특징으로 하는 벽돌벽 유지보수장치를 이용한 유지보수방법.
A horizontal reinforcement installation step of forming an installation groove by removing a part of the horizontal joint of the brick wall from the damaged part formed on the brick wall and installing a horizontal reinforcement in the installation groove to reinforce the upper part of the damaged part;
The anchor body is installed on the bearing wall by passing through the horizontal joint, and the anchor body is installed in the anchor body to expand the anchor body to be fixed to the bearing wall, and the horizontal reinforcement is positioned between the head of the screw and the anchor body. A step of installing a brick wall anchor in which horizontal reinforcement is pressed and fixed between the anchor body and the head of the screw when the screw is installed;
Filling the horizontal joint by applying a mortar to the removed horizontal joint part of the horizontal joint filling step;
Remove the bricks of the damaged part and install the bearing wall engaging portion consisting of the vertical plate and the supporting plate extending inclined upwardly from the vertical plate so that the vertical plate is coupled to the bearing wall, and the coupling plate having the slot hole formed in the supporting plate is damaged. Bracket installation step of supporting the brick in the upper portion of the site in the wedge shape;
Brick removal step of removing all the bricks of the damaged area;
And rebuilding the brick to repair the damaged part by rebuilding the brick on the damaged part from which the brick has been removed; and a maintenance method using the brick wall maintenance device, characterized in that it comprises a.
KR1020180082359A 2018-07-16 2018-07-16 Maintenance apparatus for Brick wall and maintenance method of using the same KR102170536B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180082359A KR102170536B1 (en) 2018-07-16 2018-07-16 Maintenance apparatus for Brick wall and maintenance method of using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180082359A KR102170536B1 (en) 2018-07-16 2018-07-16 Maintenance apparatus for Brick wall and maintenance method of using the same

Publications (2)

Publication Number Publication Date
KR20200008337A true KR20200008337A (en) 2020-01-28
KR102170536B1 KR102170536B1 (en) 2020-10-29

Family

ID=69370595

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180082359A KR102170536B1 (en) 2018-07-16 2018-07-16 Maintenance apparatus for Brick wall and maintenance method of using the same

Country Status (1)

Country Link
KR (1) KR102170536B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102505922B1 (en) * 2022-02-21 2023-03-06 김도곤 the improved brick support structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102423474B1 (en) 2022-02-09 2022-07-20 곽은경 Tools for maintaining gaps and forming a joint when building a brick wall on the upper side of a window frame of a building, and a construction method using the same

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200360267Y1 (en) * 2004-06-02 2004-08-26 이완섭 Reinforcing bracket for bricks wall
KR200415963Y1 (en) * 2006-02-10 2006-05-09 이완섭 Fix-holder used at bricks wall reinforcement
KR100628510B1 (en) * 2004-06-22 2006-09-26 이완섭 Bricks wall reforcing method
KR100739840B1 (en) 2006-01-16 2007-07-16 이완섭 Bricks wall reinforcing method using subsidiary supporter
KR101854769B1 (en) * 2015-10-06 2018-05-04 전원경 Maintenance apparatus for Brick wall and maintenance method of brick wall using the same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200360267Y1 (en) * 2004-06-02 2004-08-26 이완섭 Reinforcing bracket for bricks wall
KR100628510B1 (en) * 2004-06-22 2006-09-26 이완섭 Bricks wall reforcing method
KR100739840B1 (en) 2006-01-16 2007-07-16 이완섭 Bricks wall reinforcing method using subsidiary supporter
KR200415963Y1 (en) * 2006-02-10 2006-05-09 이완섭 Fix-holder used at bricks wall reinforcement
KR101854769B1 (en) * 2015-10-06 2018-05-04 전원경 Maintenance apparatus for Brick wall and maintenance method of brick wall using the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102505922B1 (en) * 2022-02-21 2023-03-06 김도곤 the improved brick support structure

Also Published As

Publication number Publication date
KR102170536B1 (en) 2020-10-29

Similar Documents

Publication Publication Date Title
KR101643734B1 (en) A Expansion Joint Filler
KR20200008337A (en) Maintenance apparatus for Brick wall and maintenance method of using the same
KR101854769B1 (en) Maintenance apparatus for Brick wall and maintenance method of brick wall using the same
KR101170956B1 (en) Reinforcing assembly and method of structure using micro pile and hydraulic system
KR101224160B1 (en) Methode and structure for intergarally formed with wall and external insulation
AU2010214742B2 (en) Expansion joints
CN114341445B (en) Outer plate arrangement structure
KR101650365B1 (en) An Expansion Joint Filler
KR101272601B1 (en) A joint structure for sculpture of rooftop
KR102100751B1 (en) An exterior material fixing device for constructing the exterior material on the building
KR101847827B1 (en) Exterior panel anchorage for building, and outer wall and exterior panel install method with form combined with insulation
KR100525196B1 (en) A Method for Build in Outer Wall Ornamental
KR101789676B1 (en) Reparing method of rail joint apparatus for slab using vertical steel plate
KR102104428B1 (en) Brick structure for connecting open top of brick wall and construction method thereof
KR100655143B1 (en) A construction method for supporting of cable tray hanger
KR100316276B1 (en) A wall repairing method
KR101407990B1 (en) Replacement method for post-placing concrete of expansion joint, and post-placing structure of expansion joint
KR200222905Y1 (en) Support device for repairing brick wall
CN205604750U (en) A clamped beam device that is used for opening behind masonry structure wall body hole
KR20160080619A (en) The Method For Repairing Joint Part Of Concrete Structure With Multi-Layer
KR100672071B1 (en) A devce for holding the stone pannel in open joint method
KR100926049B1 (en) The expansion joint change method of construction for which a bracket was used
KR200335100Y1 (en) Support device for repairing the brickwall of a building
KR100765055B1 (en) Electric box establishment structure and method of apartment house of common top class ceiling
JP2020063589A (en) Reinforcement structure of tunnel inner peripheral surface and reinforcement method of tunnel inner peripheral surface

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant