KR100589328B1 - Breast wall construction of road - Google Patents
Breast wall construction of road Download PDFInfo
- Publication number
- KR100589328B1 KR100589328B1 KR1020050103804A KR20050103804A KR100589328B1 KR 100589328 B1 KR100589328 B1 KR 100589328B1 KR 1020050103804 A KR1020050103804 A KR 1020050103804A KR 20050103804 A KR20050103804 A KR 20050103804A KR 100589328 B1 KR100589328 B1 KR 100589328B1
- Authority
- KR
- South Korea
- Prior art keywords
- retaining wall
- wall structure
- vertical plate
- vertical
- foundation block
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/025—Retaining or protecting walls made up of similar modular elements stacked without mortar
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B11/00—Drainage of soil, e.g. for agricultural purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0266—Retaining or protecting walls characterised by constructional features made up of preformed elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/13—Geometrical or physical properties having at least a mesh portion
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Agronomy & Crop Science (AREA)
- Mechanical Engineering (AREA)
- Retaining Walls (AREA)
Abstract
본 발명은 도로와 인접한 옹벽 구조물에 관한 것으로서, 더욱 상세하게는 옹벽 구조물을 조립식으로 구성하여 제작 시공이 용이하고, 옹벽 구조물의 전면에 녹화 구조를 제공하여 친환경적인 요소를 가미한 도로의 녹화용 옹벽 구조물에 관한 것이다.The present invention relates to a retaining wall structure adjacent to a road. More specifically, the retaining wall structure is prefabricated to facilitate the fabrication and construction of the retaining wall structure, and to provide a greening structure to the front surface of the retaining wall structure. It is about.
본 발명은, 비탈면 일측 도로에 시공되는 옹벽 구조물에 있어서, 사각판으로, 상부면에 이격된 2개의 사각홈(110)이 형성되고, 그 사각홈(110)의 일측 전방에 토사 적재부(120)가 형성되며, 그 토사 적재부(120)의 전방에 배수홀(122)이 관통되도록 형성된 기초 블록(100); 상기 기초 블록(100)의 사각홈(110)에 수직 삽입부(210)가 삽입되어 입설되는 한편, 사각판으로, 하부에 내측으로 절곡되는 수직 삽입부(210)가 돌출되고, 사각판의 모서리에 체결홀(220)이 형성된 수직판(200); 상기 수직판(200)의 체결홀(220)에 다수개가 체결되어 일정거리 이격되도록 설치되는 한편, 원형의 머리부(310)와 그 머리부(310)의 일측에 돌출된 수평봉(320)이 일체로 형성되고, 머리부(310)의 내측 중앙이 관통되며, 수평봉(320)의 길이방향에 양측과 중앙에 각각 나사부(322)가 형성된 앵커 볼트(300); 상기 앵커 볼트(300)의 일측 전방에 체결되어 너트(350)로 고정되는 한편, 입설된 2개의 수직판(200)중 도로 측으로 입설된 수직판(200)의 전방에 설치되고, 사각형 프레임(410)의 내측에 그물망(420)이 일체로 형성되고, 그 프레임(410)의 모서리에 각각 체결홀(412)이 형성된 앵커 녹화대(400); 상기 기초 블록(100)과 수직판(200)이 다수개 길이방향 으로 연장되고 수직판(200)을 앵커 볼트(300)로 고정한 내측에 타설되는 콘크리트(C); 및 상기 수직판(200)의 상부에 안착되어 콘크리트(C)와 밀착되도록 설치되는 한편, T자형 형태로, 폭 방향 양측에 내측으로 절곡되는 절곡 단부(510)가 형성된 덮개 블록(500);으로 구성됨을 특징으로 하는 도로의 녹화용 옹벽 구조물(700)을 제공한다.According to the present invention, in the retaining wall structure constructed on one side of the slope, two rectangular grooves 110 spaced apart from the upper surface of the retaining wall structure are formed on a slope, and the soil stacking portion 120 is located at one side of the square groove 110. Is formed, and the foundation block 100 is formed so that the drainage hole 122 penetrates in front of the soil stacking portion 120; The vertical inserting portion 210 is inserted into the square groove 110 of the foundation block 100 and is inserted therein, while the vertical inserting portion 210 bent inwardly into the lower portion is protruded into the square plate, and the corner of the square plate is formed. A vertical plate 200 having fastening holes 220 formed therein; A plurality of fastening holes 220 are fastened to the fastening holes 220 of the vertical plate 200, and are installed to be spaced apart by a predetermined distance, while the circular head part 310 and the horizontal bar 320 protruding from one side of the head part 310 are integrated. Anchor bolt 300 is formed in, the inner center of the head 310 is penetrated, and the threaded portions 322 are formed at both sides and the center in the longitudinal direction of the horizontal bar 320, respectively; It is fastened to one side of the anchor bolt 300 is fixed with a nut 350, while being installed in front of the vertical plate 200 entered into the road side of the two vertical plates 200, the rectangular frame 410 Anchor recording table 400 is formed integrally with the inner side of the mesh 420, the fastening holes 412 are formed in the corner of the frame 410, respectively; A concrete (C) in which the foundation block 100 and the vertical plate 200 extend in a plurality of longitudinal directions and are fixed inside the vertical plate 200 with the anchor bolts 300 fixed thereto; And a cover block 500 that is seated on an upper portion of the vertical plate 200 to be in close contact with the concrete C, and has a bent end portion 510 that is bent inward on both sides in a width direction in a T-shaped shape. It provides a retaining wall structure 700 for greening the road, characterized in that configured.
도로, 옹벽, 녹화대 Road, retaining wall, greening
Description
도 1은 본 발명의 조립식 옹벽 구조물 조립 상태를 나타내는 분해 사시도.1 is an exploded perspective view showing the assembled retaining wall structure assembly state of the present invention.
도 2는 본 발명의 조립식 옹벽 구조물의 전방에 녹화대가 설치된 상태를 나타내는 도면.Figure 2 is a view showing a state where the greening table is installed in front of the prefabricated retaining wall structure of the present invention.
도 3은 본 발명의 조립식 옹벽 구조물의 측단면 상태를 나타내는 도면.Figure 3 is a view showing a side cross-sectional state of the prefabricated retaining wall structure of the present invention.
도 4는 본 발명의 조립식 옹벽 구조물의 전면 녹화 상태를 나타내는 도면.4 is a view showing a front greening state of the prefabricated retaining wall structure of the present invention.
< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>
100: 기초 블록 150: 토사100: basic block 150: earth and sand
200: 수직판 300: 앵커 볼트200: vertical plate 300: anchor bolt
350: 너트 400: 녹화대350: nut 400: recording stand
500: 덮개 블록 700: 옹벽 구조물500: cover block 700: retaining wall structure
P : 식물P: Plant
본 발명은 도로와 인접한 옹벽 구조물에 관한 것으로서, 더욱 상세하게는 옹벽 구조물을 기초 블록, 수직판, 앵커 볼트, 녹화대, 및 덮개 블록으로 조립식으로 구성시켜 결합된 상태에서 콘크리트를 타설하므로 옹벽 구조물에 대한 제작 시공이 용이하고, 옹벽 구조물을 구성하는 수직판의 전면에 설치된 녹화대에 덩굴 나무 등을 식재하여 녹화 구조를 제공하므로 친환경적인 요소를 가미할 수 있도록 구성된 도로의 녹화용 옹벽 구조물에 관한 것이다.The present invention relates to a retaining wall structure adjacent to a road, and more particularly, the retaining wall structure is prefabricated with a foundation block, a vertical plate, an anchor bolt, a greening table, and a cover block, so that concrete is poured in a combined state, so that the retaining wall structure is installed in the retaining wall structure. This invention relates to a greening retaining wall structure for roads that is designed to add eco-friendly elements by providing a greening structure by planting vines on the greening table installed on the front of the vertical plate constituting the retaining wall structure. .
우리나라는 산악이 많은 관계로 도로를 시공시 일측에 옹벽을 시공하여 비탈면에서 발생되는 토사의 침하를 방지하게 된다.Due to the mountainous nature of Korea, when the road is constructed, the retaining wall is installed on one side to prevent settlement of soils generated on the slope.
즉, 도로를 시공시 절토 또는 성토 작업이 진행되고, 그 비탈면에 인접되게 옹벽 구조물이 설치된다.That is, when the road is constructed, cutting or filling work is performed, and the retaining wall structure is installed adjacent to the slope.
상기 옹벽 구조물은, 지반에 대한 다짐 작업을 실시한 후, 현장에서 거푸집을 제작하고 콘크리트를 타설하여 콘크리트 옹벽을 시공하게 된다.The retaining wall structure, after the compaction work on the ground, to form the formwork on the site and to cast concrete to construct a concrete retaining wall.
이러한 옹벽 구조물은, 그 구조상 절토 또는 성토 사면에 시공되는 경우, 토사에 대한 지지력은 강화되는 장점을 가지는 반면에, 콘크리트를 타설하여 입설되는 바, 주변 환경과 조화를 이루지 못하는 문제점이 있다.When the retaining wall structure is constructed on cut or fill slopes, the retaining wall structure has the advantage of strengthening the support for the earth and sand, and is installed by placing concrete, and there is a problem in that it is not in harmony with the surrounding environment.
즉, 상기 옹벽 구조물은, 도로를 주행하는 차량의 운전자 또는 승객들이 그 주변을 주행하는 경우 삭막한 느낌을 받는 문제점이 있다.That is, the retaining wall structure has a problem that the driver or passengers of the vehicle traveling on the road feel depressed when driving around it.
본 발명은 상술한 문제점을 감안하여 안출된 것으로, 본 발명은, 조립식 형태로 각각의 부재를 제작하여 현장에서 조립하고, 조립된 부재의 내측에 콘크리트를 타설하여 제작되는 바, 시공의 용이성이 있고, 또한 전면에 녹화대를 설치하여 덩굴 나무 등을 식재할 수 있는 구조를 제공하는 바, 주변의 환경과 자연 친화적인 느낌을 제공하는 도로의 녹화용 옹벽 구조물을 제공함을 그 목적으로 한다.The present invention has been made in view of the above-described problems, the present invention is produced by assembling each member in the form of a prefabricated form, and cast concrete on the inside of the assembled member, there is easy construction In addition, it provides a structure for planting vine trees by installing a green planting table in the front, and the object of the present invention is to provide a retaining wall structure for the greening of the road that provides a feeling of environment and nature friendly.
본 발명은 상술한 목적 달성을 위해, 본 발명은, 상부면에 이격된 2개의 사각홈이 형성되고, 그 사각홈의 일측 전방에 토사 적재부가 형성되며, 그 토사 적재부의 전방에 배수홀이 관통되도록 형성된 기초 블록; 상기 기초 블록의 사각홈에 수직 삽입부가 삽입되어 입설되는 수직판; 상기 수직판의 체결홀에 다수개가 체결되어 일정거리 이격되도록 설치되는 앵커 볼트; 상기 앵커 볼트의 일측 전방에 체결되어 너트로 고정되는 앵커 녹화대; 상기 기초 블록과 수직판이 다수개 길이방향으로 연장되고 수직판을 앵커 볼트로 고정한 내측에 타설되는 콘크리트; 및 상기 수직판의 상부에 안착되어 콘크리트와 밀착되도록 설치되는 덮개 블록;으로 구성됨을 특징으로 하는 도로의 녹화용 옹벽 구조물이 제시된다.The present invention, in order to achieve the above object, the present invention, two rectangular grooves are formed on the upper surface spaced apart, the earthenware loading portion is formed in front of one side of the rectangular grooves, the drainage hole penetrates in front of the earthenware loading portion A foundation block formed to be; A vertical plate into which the vertical insertion portion is inserted and inserted into the square groove of the foundation block; A plurality of anchor bolts fastened to the fastening holes of the vertical plate and spaced apart from each other by a predetermined distance; An anchor recording stand fastened to one side of the anchor bolt and fixed with a nut; Concrete in which the foundation block and the vertical plate extend in a plurality of longitudinal directions and are placed inside the fixing of the vertical plate with anchor bolts; And a cover block seated on an upper portion of the vertical plate and installed to be in close contact with concrete, wherein the retaining wall structure for greening of the road is provided.
이하, 첨부 도면을 참조하여 본 발명의 구성을 설명한다.EMBODIMENT OF THE INVENTION Hereinafter, the structure of this invention is demonstrated with reference to an accompanying drawing.
도 1은 본 발명의 조립식 옹벽 구조물 조립 상태를 나타내는 분해 사시도이고, 도 2는 본 발명의 조립식 옹벽 구조물의 전방에 녹화대가 설치된 상태를 나타내는 도면이며, 도 3은 본 발명의 조립식 옹벽 구조물의 측단면 상태를 나타내는 도면이고, 도 4는 본 발명의 조립식 옹벽 구조물의 전면 녹화 상태를 나타내는 도면이다.1 is an exploded perspective view showing a prefabricated retaining wall structure assembled state of the present invention, Figure 2 is a view showing a state in which the greening table is installed in front of the prefabricated retaining wall structure of the present invention, Figure 3 is a side cross-sectional view of the prefabricated retaining wall structure of the present invention. It is a figure which shows a state, and FIG. 4 is a figure which shows the front greening state of the assembled retaining wall structure of this invention.
참고로, 본 발명을 설명함에 있어 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단될 경우에는 그 상세한 설명을 생략하였다.For reference, in describing the present invention, when it is determined that a detailed description of related known functions or configurations may unnecessarily obscure the gist of the present invention, the detailed description thereof is omitted.
또한, 후술 되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자와 운영자의 의도 또는 관례 등에 따라 달라질 수 있다.In addition, terms to be described below are terms defined in consideration of functions in the present invention, which may vary according to intentions or customs of users and operators.
그러므로, 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.Therefore, the definition should be made based on the contents throughout the specification.
옹벽 구조물(700)은, 크게 기초 블록(100), 수직판(200), 앵커 볼트(300), 너트(350), 녹화대(400) 및 덮개 블록(500)으로 구성되어 기초 블록(100)의 일측 상부로 적재된 토사(150)에 식물(P)이 식재되어 녹화대(400)를 통해 식생할 수 있도록 구성된 옹벽과 녹화 구조를 함께 제공하게 된다.The
상기 기초 블록(100)은, 콘크리트를 타설하여 제작된 사각판으로, 상부면에 일정거리 이격된 2개의 사각홈(110)이 형성되고, 그 사각홈(110)의 일측 전방으로 토사 적재부(120)가 형성되며, 그 토사 적재부(120)의 전방에 배수홀(122)이 관통되도록 형성된다.The
즉, 상기 기초 블록(100)은, 2개의 사각홈(110)에 수직판(200)이 삽입되어 입설되고, 토사 적재부(120)에 토사(150)가 적재되어 덩굴 나무, 담쟁이 넝굴 등과 같은 식물(P)이 식재된다.That is, the
상기 수직판(200)은, 콘크리트를 타설한 사각판으로, 하부에 내측으로 절곡되도록 형성된 수직 삽입부(210)가 돌출되고, 사각판의 모서리에 체결홀(220)이 형성된다.The
즉, 상기 수직판(200)은, 돌출된 수직 삽입부(210)가 기초 블록(100)의 사각홈(110)에 삽입되고, 체결홀(220)에 앵커 볼트(300)가 관통되어 너트(350)로 체결되어 2개 1조의 수직판(200)을 기초 블록(100)의 상부에 일정거리 이격되도록 입설시키게 된다.That is, the
상기 앵커 볼트(300)는, 원형의 머리부(310)와 그 머리부(310)의 일측에 돌출된 수평봉(320)이 일체로 형성된 부재로, 머리부(310)의 내측 중앙이 관통되고, 수평봉(320)의 길이방향에 양측과 중앙에 각각 나사부(322)가 형성되어 수직판(200)에 고정된다.The
즉, 상기 앵커 볼트(300)의 양측과 중앙에 형성된 나사부(322)는 수직판(200)에 형성된 체결홀(220)의 내측으로 나사부가 형성되어 결합이 용이하고, 그 수직판(200)의 이격 거리에 동일하게 나사부(322)가 형성된다.That is, the
상기 녹화대(400)는, 입설된 2개의 수직판(200)중 도로 측으로 입설된 수직판(200)의 전방에 앵커 볼트(300)로 체결되는 부재로, 사각형 프레임(410)의 내측에 그물망(420)이 일체로 형성되고, 그 프레임(410)의 모서리에 각각 체결홀(412)이 형성되어 앵커 볼트(300)가 관통되어 너트(350)로 체결된다.The greening table 400 is a member that is fastened by the
즉, 상기 녹화대(400)는, 기초 블록(100)에 식재된 담쟁이 넝굴, 덩굴 나무 등의 식물(P)이 타고 올라갈 수 있도록 그물망(420)이 형성되어 도 4와 같이 전면 녹화 구조를 제공하게 된다.That is, the greening table 400, the
상기 덮개 블록(500)은, T자형 형태로, 폭 방향 양측에 내측으로 절곡되는 절곡 단부(510)가 형성되어, 입설된 2개의 수직판(200)의 최상부를 마감시키게 된다.The
즉, 상기 옹벽 구조물(700)은, 기초 블록(100)의 상부에 수직으로 입설된 2 개의 수직판(200)을 앵커 볼트(300)로 일정거리 이격시킴과 아울러, 그 수직판(200)의 내측에 콘크리트(C)를 타설하여 옹벽을 구성시키며, 수직판(200)의 일측 전방으로 돌출된 앵커 볼트(300)에 녹화대(400)를 체결하여 너트(350)로 고정시켜 식물이 생장할 수 있는 조건을 제시하게 된다.That is, the
상기 식물(P)은 담쟁이 넝굴, 넝굴 나무 등과 같이 상부로 타고 올라갈 수 있는 식생 조건을 가지는 식물이 식재되게 되어 옹벽 구조물(700)에 대한 자연 환경을 제공하게 된다.The plant (P) is to be planted with vegetation conditions that can ride up to the top, such as ivy oysters, oyster tree, such as ivy oysters to provide a natural environment for the
한편, 상기 기초 블록(100)은, 토사 적재부(120)에 다수개의 배수홀(122)이 형성되어 토사(150)가 적재된 후 물을 공급하게 되면 토사(150)를 통과한 물이 외부로 배출될 수 있는 구조를 제공하게 된다.On the other hand, the
상술한 구성에서 알 수 있듯이, 상기 기초 블록(100), 수직판(200), 덮개 블록(500)은 모두 콘크리트를 이용하여 제작된 부재로, 기성 조립이 가능한 바, 옹벽 구조물(700)을 설치할 위치에서 조립하여 콘크리트(C)를 타설하여 시공되는 바, 시공에 소요되는 기간을 단축할 수 있게 된다.As can be seen in the above-described configuration, the
또한, 상기 기초 블록(100)에 적재된 토사(150)에 식물(P)이 식재되어 수직판(200)의 전면에 녹화대(400)를 설치하는 바, 식물(P)이 녹화대(400)의 그물망(420)을 따라 상부로 식생할 수 있는 조건이 제시되는 바, 옹벽 구조물(700)에 대한 전면 녹화를 효율적으로 구성시킬 수 있게 된다.In addition, the plant P is planted in the earth and
또한, 도 4에서 알 수 있듯이, 상기 기초 블록(100), 수직판(200), 덮개 블록(500)은 길이방향을 따라 다수개가 연설되고, 상기 덮개 블록(500)을 설치하기 전 내부에 콘크리트(C)를 타설하여 옹벽 구조물(700)이 길이방향을 따라 시공되는 구조는 당연하다 할 것이다.In addition, as can be seen in Figure 4, the
또한, 상기 기초 블록(100)은, 지반의 다짐 작업을 한 상부면에 안착되어 설치되는 바, 길이방향으로 다수개를 설치시 길이방향 양측면에 원형홈을 형성하여 앵커봉을 통해 연장설치하여 기초 블록(100)의 이탈을 방지시킬 수 있는 구조를 제공할수도 있다.In addition, the
참고로, 본 발명은 다양하게 변형 실시될 수 있고, 여러 가지의 형태를 취할 수 있으나 상기 발명의 상세한 설명에서는 그에 따른 특별한 실시 예에 대해서만 기술하였다.For reference, the present invention may be variously modified and may take various forms, but the detailed description of the present invention has been described only with respect to specific embodiments thereof.
그러므로, 본 발명은 상세한 설명에서 언급되는 특별한 형태로만 한정되는 것이 아닌 것으로 이해되어야 하며, 오히려 첨부된 청구범위에 의해 정의되는 본 발명의 정신과 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다.Therefore, it is to be understood that the invention is not limited to the specific forms referred to in the description, but rather includes all modifications, equivalents and substitutions that fall within the spirit and scope of the invention as defined by the appended claims. It must be understood.
상술한 구성에 따른 본원 발명의 효과를 설명한다.The effect of this invention by the structure mentioned above is demonstrated.
본 발명은, 기초 블록, 수직판, 앵커 볼트, 녹화대 및 덮개 블록으로 구성된 옹벽 구조물을 조립 방식으로 현장에서 길이방향으로 조립한 후 기초 블록의 상부에 입설된 수직판을 앵커 볼트로 일정거리 이격시켜 내측에 콘크리트를 타설하여 시공하는 바, 옹벽 구조물을 시공하는데 소요되는 기간을 최소화할 수 있는 효과를 가지며, 이는 단위 블록체의 장점과 현장 타설 옹벽의 문제점을 해결하기 위한 옹벽 구조물의 시공상 유용한 효과를 갖게 된다.The present invention, after assembling the retaining wall structure consisting of the foundation block, vertical plate, anchor bolt, greening table and the cover block in the longitudinal direction in the field in an assembly manner, the vertical plate placed on top of the foundation block spaced apart by a certain distance with the anchor bolt When the concrete is installed inside, it is effective to minimize the time required for constructing the retaining wall structure, which is useful for the construction of the retaining wall structure to solve the problems of the unit block body and the problem of the site placing retaining wall. Will have an effect.
또한, 상기 수직판의 일측 전방에 녹화대를 앵커 볼트에 체결시켜 기초 블록의 상부 토사 적재부에 식재된 식물을 식생할 수 있는 조건을 제공하는 바, 도로의 삭막한 느낌을 배제시킬 수 있는 자연 친화적인 도로 시설물을 제공하는 효과를 갖는다.In addition, by fastening the greening table to the anchor bolt on one side of the vertical plate to provide a condition for vegetation planted in the upper soil stacking portion of the foundation block, natural friendly to eliminate the depressed feeling of the road Has the effect of providing phosphorus facilities.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050103804A KR100589328B1 (en) | 2005-11-01 | 2005-11-01 | Breast wall construction of road |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050103804A KR100589328B1 (en) | 2005-11-01 | 2005-11-01 | Breast wall construction of road |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100589328B1 true KR100589328B1 (en) | 2006-06-14 |
Family
ID=37182680
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020050103804A KR100589328B1 (en) | 2005-11-01 | 2005-11-01 | Breast wall construction of road |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100589328B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115107159A (en) * | 2022-06-08 | 2022-09-27 | 源龙建设集团有限公司 | Building pouring template for building engineering and assembling method thereof |
-
2005
- 2005-11-01 KR KR1020050103804A patent/KR100589328B1/en active IP Right Grant
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115107159A (en) * | 2022-06-08 | 2022-09-27 | 源龙建设集团有限公司 | Building pouring template for building engineering and assembling method thereof |
CN115107159B (en) * | 2022-06-08 | 2024-05-07 | 源龙建设集团有限公司 | Building pouring template for building engineering and assembly method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100813236B1 (en) | The structure for a slope reinforcement and eco slope reinforcement method | |
KR20100100093A (en) | Revetment panel for planting | |
KR100536620B1 (en) | A block for a retaining wall and a residences of fishes | |
KR100795084B1 (en) | Post supporting base | |
KR100589328B1 (en) | Breast wall construction of road | |
KR200401368Y1 (en) | Protector for tree on the road | |
KR100943222B1 (en) | Plant block and the construction methord there of | |
KR20150019110A (en) | Terraced retaining wall and construction method for slope vegetation | |
KR100408850B1 (en) | The Landscape Block With Receiving Rainwater And Construction Method Within Retaining Wall | |
KR100543799B1 (en) | Breast wall structure of slope for road | |
KR100968518B1 (en) | Construction method of reinforced green retaining wall | |
KR101012655B1 (en) | Block for a breast wall can live plant | |
JP2008237056A (en) | Installation panel for greening and weed suppression, and installation method for greening and weed suppression | |
KR200446723Y1 (en) | Reinforced soil retaining wall with vegetation function of vine plants and shrub plants | |
KR101058881B1 (en) | Retaining wall block | |
KR101127630B1 (en) | Box for planting | |
KR101877024B1 (en) | Civil Block for Vegetation | |
KR100763874B1 (en) | Retaining wall block | |
JPS6011168Y2 (en) | Earth retaining wall structure for slopes | |
KR101160679B1 (en) | Retaining structures | |
JP6608614B2 (en) | Plant protection material and plant protection system | |
KR101071406B1 (en) | Security fence for building housing complexeswhich used tree of landscape architecture | |
KR100504361B1 (en) | A breast wall for road | |
KR101041683B1 (en) | Block for revetment construction | |
JP4886822B2 (en) | Assembly block and chain structure using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
N231 | Notification of change of applicant | ||
A302 | Request for accelerated examination | ||
N231 | Notification of change of applicant | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130607 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20140605 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20150605 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20160602 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20170607 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20180605 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20190603 Year of fee payment: 14 |