KR100583983B1 - Method for constructing air dome on soft ground - Google Patents

Method for constructing air dome on soft ground Download PDF

Info

Publication number
KR100583983B1
KR100583983B1 KR1020040023941A KR20040023941A KR100583983B1 KR 100583983 B1 KR100583983 B1 KR 100583983B1 KR 1020040023941 A KR1020040023941 A KR 1020040023941A KR 20040023941 A KR20040023941 A KR 20040023941A KR 100583983 B1 KR100583983 B1 KR 100583983B1
Authority
KR
South Korea
Prior art keywords
air dome
cable
fixing
support
support plate
Prior art date
Application number
KR1020040023941A
Other languages
Korean (ko)
Other versions
KR20050098985A (en
Inventor
정일용
Original Assignee
(주)에어돔
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)에어돔 filed Critical (주)에어돔
Priority to KR1020040023941A priority Critical patent/KR100583983B1/en
Publication of KR20050098985A publication Critical patent/KR20050098985A/en
Application granted granted Critical
Publication of KR100583983B1 publication Critical patent/KR100583983B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/20Tents or canopies, in general inflatable, e.g. shaped, strengthened or supported by fluid pressure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/32Parts, components, construction details, accessories, interior equipment, specially adapted for tents, e.g. guy-line equipment, skirts, thresholds
    • E04H15/62Pegs, stakes or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/20Tents or canopies, in general inflatable, e.g. shaped, strengthened or supported by fluid pressure
    • E04H2015/209Structures with a netting or similar for anchorage

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 연약지반에서의 에어돔 설치방법에 관한 것이다. 이의 한 예는 에어돔이 점유할 설치면 테두리를 따라 천공홀을 다수 천공하는 천공단계와; 상기 천공홀에 어스앙카를 삽입시키고 천공홀내에 고정하는 어스앙카 고정단계와; 상기 천공홀의 상부에 중량물을 설치하는 중량물 설치단계와; 상기 각 중량물을 베이스케이블로 연결하는 베이스케이블 고정단계와; 상기 베이스케이블이 구획하는 내측 영역에 에어돔막재를 펼치고 상기 베이스케이블에 에어돔막재의 하단 테두리부를 연결 지지시키는 제 1연결단계와; 상기 제 1연결단계를 통해 그 하단 테두리가 베이스케이블에 지지된 에어돔 막재 위에 지지케이블을 소정패턴으로 펼쳐 위치시키고 각 케이블의 단부는 상기 중량물에 고정시키는 제 2연결단계와; 상기 제 2연결단계를 통해 지지케이블이 설치된 상태로 에어돔막재의 내부에 공기를 송풍하여 막재를 부양시켜 에어돔이 내부공간을 제공토록 하는 송풍단계를 포함하는 구성을 갖는다.The present invention relates to a method for installing an air dome in a soft ground. One example of this is a drilling step of drilling a plurality of holes along the rim of the installation surface to be occupied by the air dome; An earth anchor fixing step of inserting an earth anchor into the drilling hole and fixing it in the drilling hole; A heavy weight installation step of installing a heavy weight on an upper portion of the drilling hole; A base cable fixing step of connecting each heavy object with a base cable; A first connection step of spreading the air dome film material in the inner region partitioned by the base cable and supporting the lower edge portion of the air dome film material to the base cable; A second connection step of unfolding and placing the support cable in a predetermined pattern on the air dome membrane material whose lower edge is supported by the base cable through the first connection step, and fixing the end of each cable to the heavy material; In the state in which the support cable is installed through the second connection step has a configuration including a blowing step to blow the air to the inside of the air dome membrane material to support the membrane material to provide the inner space.

상기와 같이 이루어지는 본 발명은, 에어돔을 전제적으로 지지하는 지지케이블의 단부에 중량물을 연결 고정함은 물론 더 나아가 상기 중량물을 지중(地中)에 깊게 박아 고정한 어스앙카에 연결함으로써 케이블이 강력한 지지력을 제공할 수 있는 구조를 가져, 예컨대 성토층이나 매립지는 물론 진흙바닥에도 에어돔을 견고히 설치할 수 있게 한다.The present invention made as described above, as well as connecting and fixing the heavy material to the end of the support cable that entirely supports the air dome, and furthermore, by connecting the earth weight anchored deeply anchored in the ground (heavy ground), the cable has a strong supporting force It has a structure that can provide, for example, it is possible to firmly install the air dome in the soil layer or landfill as well as mud floor.

Description

연약지반에서의 에어돔 설치방법{Method for constructing air dome on soft ground}Air dome installation method in soft ground {Method for constructing air dome on soft ground}

도 1은 연약지반에 설치된 본 발명에 따른 에어돔을 도시한 도면이다.1 is a view showing an air dome according to the present invention installed on the soft ground.

도 2는 본 발명의 제 1실시예에 따른 에어돔의 설치방법을 설명하기 위하여 도시한 도면이다.2 is a view for explaining the installation method of the air dome according to the first embodiment of the present invention.

도 3은 상기 도 2에 도시한 지지구조를 보다 자세히 도시한 단면도이다.3 is a cross-sectional view showing in more detail the support structure shown in FIG.

도 4는 상기 도 3의 지지플레이트의 구성을 설명하기 위하여 도시한 사시도이다.4 is a perspective view for explaining the configuration of the support plate of FIG.

도 5는 상기 도 2에 도시한 베이스케이블에 대한 스틸플레이트의 결합구조를 나타내 보인 단면도이다.5 is a cross-sectional view showing a coupling structure of the steel plate to the base cable shown in FIG.

도 6은 본 발명의 제 1실시예에 따른 연약지반에서의 에어돔 설치방법을 정리하여 나타내 보인 블록도이다.Figure 6 is a block diagram showing the air dome installation method in the soft ground according to the first embodiment of the present invention.

도 7 및 도 8은 본 발명의 제 2실시예에 따른 연약지반에서의 에어돔 설치방법을 설명하기 위하여 도시한 도면이다.7 and 8 are diagrams for explaining the air dome installation method in the soft ground according to the second embodiment of the present invention.

도 9는 본 발명의 제 2실시예에 따른 에어돔 설치방법을 나타내 보인 블록도이다.9 is a block diagram showing a method for installing an air dome according to a second embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

11:에어돔 13:막재 15:지지케이블11: Air Dome 13: Membrane 15: Support Cable

17:베이스케이블 19:턴버클 21:스틸플레이트17: Base cable 19: Turnbuckle 21: Steel plate

23:복공판 25:샤클(shackle) 25a:볼트23: Return plate 25: Shackle 25a: Bolt

25b:너트 27:지지플레이트 25b: Nut 27: Support plate

29:어스앙카(earth anchor) 31:콘크리트 33:천공홀 29: earth anchor 31: concrete 33: drilling hole

35:U볼트 37:웨지소켓(wedge socket)35: U bolt 37: wedge socket

39:관통구멍 41:아이볼트 51:콘크리트39: through-hole 41: eye bolt 51: concrete

59:베이스케이블지지구 55:지지로드 57:가압블록59: base cable support 55: support rod 57: pressure block

59:지지케이블지지구 59a:아이볼트 61:거터(gutter)59: support cable support 59a: eye bolt 61: gutter

63:콘크리트 63: concrete

본 발명은 연약지반에서의 에어돔 설치방법에 관한 것이다.The present invention relates to a method for installing an air dome in a soft ground.

에어돔(air dome)은 보통 섬유로 이루어진 막재의 테두리부를 지면에 밀착 고정시킨 후 막재의 내부에 공기를 송풍시킴으로써 막재를 부양시켜 이루어진 구조물이다. 이는 기둥이나 대들보가 없어 매우 넓은 공간을 제공하므로 실내 스포츠시설이나 대형 공연장 또는 전시장이나 각종 창고 등으로 활용되고 있다. 아울러 일반 건축물보다 건축비용이 훨씬 저렴하고 설치 및 철거가 간편하며 나름대로의 안 전성과 내구성을 갖추고 있다.Air dome (air dome) is a structure made by supporting the membrane by blowing air to the inside of the membrane after fixing the rim of the membrane usually made of fiber in close contact with the ground. It is used as an indoor sports facility, a large performance hall, an exhibition hall or various warehouses because it provides a very large space without pillars or girders. In addition, the construction cost is much lower than that of general buildings, it is easy to install and dismantle, and has its own safety and durability.

그러나 이러한 에어돔은 공기의 압력을 이용하여 공간을 유지하는 것이므로 돌풍이나 태풍 또는 폭설 등의 악천우에 대비하여야 한다. 그 일환으로써 에어돔의 외측면에 적절하게 설계된 보강용 케이블을 커버하고 각 케이블을 지면에 고정시키는 기술이 일반화 되어왔다. 상기 케이블은 에어돔 막재의 외부면을 전체적으로 커버하며 에어돔에 가해지는 각종 하중을 분산 및 흡수하여 에어돔의 변형이나 붕괴를 막는다.However, the air dome is to maintain the space by using the pressure of the air, so should be prepared for bad weather such as gusts, typhoons or heavy snow. As part of this, techniques for covering reinforcing cables properly designed on the outer surface of the air dome and fixing each cable to the ground have been common. The cable covers the entire outer surface of the air dome membrane and disperses and absorbs various loads applied to the air dome to prevent deformation or collapse of the air dome.

한편 상기한 바와같이 에어돔을 지지하는 케이블은 그 단부가 지면에 대해 견고히 고정되어야 에어돔을 안정적으로 지지할 수 있는 것이므로 지면과 케이블과의 강력한 고정이 매우 중요한 선결 과제이기도 하다.Meanwhile, as described above, the cable supporting the air dome is stably fixed to the ground so that the air dome can be stably supported, so that the strong fixing between the ground and the cable is a very important prerequisite.

상기 케이블은 지반이 견고할 경우에는 지반에 대해 강하게 결합을 유지할 수 있으므로 별 문제가 없지만, 지반 자체가 연약하여 지반에 대한 케이블의 결합이 강하게 유지되지 못하는 경우에는 케이블이 지반에 대해 쉽게 뽑힐 수 있다. 따라서 예컨대 강풍이나 돌풍이 휩쓸 경우 케이블이 에어돔을 잡아두지 못하고 지면으로부터 뽑혀 에어돔이 뒤집어지거나 날라갈 수 도 있다.The cable is not a problem because it can maintain a strong bond to the ground when the ground is firm, but the cable can be easily pulled out to the ground if the ground itself is weak and the bond of the cable to the ground is not kept strong. . Thus, for example, if a strong wind or gust is swept, the cable may not catch the air dome and may be pulled out of the ground, causing the air dome to tip over or fly away.

본 발명은 상기 문제점을 해소하고자 창출한 것으로서, 에어돔을 전제적으로 지지하는 지지케이블의 단부에 중량물을 연결 고정함은 물론 더 나아가 상기 중량물을 지중(地中)에 깊게 박아 고정한 어스앙카에 연결함으로써 케이블이 강력한 지지력을 제공할 수 있는 구조를 가져, 예컨대 성토층이나 매립지는 물론 진흙바닥에 도 에어돔을 견고히 설치할 수 있게 하는 연약지반에서의 에어돔 설치방법을 제공함에 목적이 있다.The present invention has been made to solve the above problems, by connecting and fixing the heavy material to the end of the support cable that entirely supports the air dome, and further by connecting the heavy material deeply embedded in the ground (earth) by anchoring The cable has a structure that can provide a strong supporting force, for example, to provide a method of installing the air dome in the soft ground that can be installed firmly in the ground or landfill as well as mud floor.

상기 목적을 달성하기 위하여 본 발명은, 지면의 에어돔이 점유할 설치면 테두리를 따라 소정깊이의 천공홀을 다수 천공하는 천공단계와; 상기 천공홀에 어스앙카를 삽입시킨 상태로 어스앙카를 천공홀내에 고정하는 어스앙카 고정단계와; 상기 천공홀의 상부에 중량물을 위치시키고 상기 중량물을 어스앙카에 연결 고정시키는 중량물 설치단계와; 상기 각 중량물을 베이스케이블로 직렬 연결하되 베이스케이블을 중량물에 대해 고정하는 베이스케이블 고정단계와; 상기 베이스케이블이 구획하는 내측 영역에 에어돔막재를 펼치고 상기 베이스케이블에 에어돔막재의 하단 테두리부를 연결 지지시키는 제 1연결단계와; 상기 제 1연결단계를 통해 그 하단 테두리가 베이스케이블에 지지된 에어돔 막재 위에 지지케이블을 소정패턴으로 펼쳐 위치시키고 각 케이블의 단부는 상기 중량물에 고정시키는 제 2연결단계와; 상기 제 2연결단계를 통해 지지케이블이 설치된 상태로 에어돔막재의 내부에 공기를 송풍하여 막재를 부양시켜 에어돔이 내부공간을 제공토록 하는 송풍단계를 포함하는 것을 특징으로 한다.In order to achieve the above object, the present invention, the drilling step of drilling a plurality of drilling holes of a predetermined depth along the rim of the installation surface to be occupied by the air dome; An earth anchor fixing step of fixing the earth anchor in the drilling hole while the earth anchor is inserted into the drilling hole; A weight installation step of placing a heavy weight on an upper portion of the drilling hole and fixing the heavy weight to an earth anchor; A base cable fixing step of connecting each of the heavy materials in series with a base cable, and fixing the base cable to the heavy materials; A first connection step of spreading the air dome film material in the inner region partitioned by the base cable and supporting the lower edge portion of the air dome film material to the base cable; A second connection step of unfolding and placing the support cable in a predetermined pattern on the air dome membrane material whose lower edge is supported by the base cable through the first connection step, and fixing the end of each cable to the heavy material; And a blowing step of blowing air into the air dome membrane while the support cable is installed through the second connection step to support the membrane to provide the internal space.

또한 상기 목적을 달성하기 위한 본 발명의 다른 실시예로는, 지면의 에어돔이 점유할 설치면 테두리를 따라 소정폭 및 깊이의 거터(gutter)를 파내는 굴착단계와; 상기 굴착단계를 통해 마련된 거터의 바닥면에 소정깊이의 천공홀을 거터의 길이방향을 따라 다수 천공하는 천공단계와; 상기 천공홀에 어스앙카를 삽입시킨 상태로 어스앙카를 천공홀내에 고정하는 어스앙카 고정단계와; 상기 거터의 상부로 연장되며 외부에 지지력을 제공하는 걸이구 및 고정구를 갖는 지지플레이트를 거터의 바닥면에 위치시키고 어스앙카의 상단부와 결합시키는 지지플레이트 설치단계와; 상기 지지플레이트가 장착된 거터의 내부에 콘크리트를 가하되 상기 걸이구 및 고정구의 상단부가 콘크리트의 상부로 돌출되도록 하는 중량물 설치단계와; 상기 콘크리트의 상면으로 돌출된 고정구를 베이스케이블로 직렬 연결하되 베이스케이블을 고정구에 대해 고정시키는 베이스케이블 고정단계와; 상기 베이스케이블이 구획하는 내측 영역에 에어돔막재를 펼치고 상기 베이스케이블에 에어돔막재의 하단 테두리부를 연결 지지시키는 제 1연결단계와; 상기 제 1연결단계를 통해 그 하단 테두리가 베이스케이블에 지지된 에어돔 막재 위에 다수의 지지케이블을 소정패턴으로 펼쳐 위치시키고 각 지지케이블의 단부를 상기 걸이구에 고정시키는 제 2연결단계와; 상기 제 2연결단계를 통해 지지케이블이 설치된 상태로 에어돔막재의 내부에 공기를 송풍하여 막재를 부양시켜 에어돔이 내부공간을 제공토록 하는 송풍단계를 포함하는 것을 특징으로 한다.In addition, another embodiment of the present invention for achieving the above object, the excavation step of digging a gutter (gutter) of a predetermined width and depth along the installation surface edge to be occupied by the air dome of the ground; A perforating step of drilling a plurality of perforation holes of a predetermined depth in the longitudinal direction of the gutter on the bottom surface of the gutter provided through the excavating step; An earth anchor fixing step of fixing the earth anchor in the drilling hole while the earth anchor is inserted into the drilling hole; A support plate installation step of placing a support plate having a hook and a fastener extending to the top of the gutter and providing support to the outside on the bottom surface of the gutter and engaging with the upper end of the earth anchor; A weight installation step of applying concrete to the inside of the gutter on which the support plate is mounted, wherein the upper end of the hook and the fixture are protruded to the upper portion of the concrete; A base cable fixing step of connecting the fasteners protruding to the upper surface of the concrete in series with a base cable, and fixing the base cable to the fasteners; A first connection step of spreading the air dome film material in the inner region partitioned by the base cable and supporting the lower edge portion of the air dome film material to the base cable; A second connection step of unfolding and positioning a plurality of support cables in a predetermined pattern on the air dome membrane material whose lower edge is supported by the base cable through the first connection step, and fixing end portions of the support cables to the hooks; And a blowing step of blowing air into the air dome membrane while the support cable is installed through the second connection step to support the membrane to provide the internal space.

이하, 본 발명에 따른 바람직한 실시예들을 첨부된 도면을 참조하여 보다 상세히 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 연약지반에 설치된 본 발명에 따른 에어돔을 도시한 도면이다.1 is a view showing an air dome according to the present invention installed on the soft ground.

도시한 바와같이, 연약지반(A) 상에 에어돔(11)이 설치되어 있다. 상기 에어돔(11)은 외부로부터 공급된 공기에 의해 부양하여 내부공간을 제공하는 공지의 막재(13)와, 상기 막재(13)의 상부를 커버하며 에어돔(11)에 가해지는 각종 하중을 분산 및 흡수하여 에어돔의 변형이나 붕괴를 막는 지지케이블(15)과, 상기 막재(15)의 하단부측에 수평으로 위치하며 상기 지지케이블(15)의 단부를 잡아 하향 지지하는 베이스케이블(17)과, 지면 고정된 상태로 베이스케이블(17)에 연결되어 베이스케이블을 견고히 지지하는 케이블지지수단으로 이루어진다. As shown, the air dome 11 is provided on the soft ground A. As shown in FIG. The air dome 11 is supported by the air supplied from the outside of the known membrane material 13 to provide an internal space, and covers the upper portion of the membrane material 13 and various loads applied to the air dome 11 A support cable 15 that is dispersed and absorbed to prevent deformation or collapse of the air dome, and a base cable 17 that is horizontally positioned at the lower end side of the membrane member 15 and holds the end of the support cable 15 downwardly. And, it is made of a cable support means connected to the base cable 17 in the ground fixed state to firmly support the base cable.

도 2는 본 발명의 제 1실시예에 따른 에어돔의 설치방법을 설명하기 위하여 도시한 도면이다.2 is a view for explaining the installation method of the air dome according to the first embodiment of the present invention.

도면을 참조하면, 막재(13)의 하단부에 상기 베이스케이블(17)이 수평으로 연장되어 있음을 알 수 있다. 상기 베이스케이블(17)은 인장된 상태로 고정되어 공지의 샤클(25)과 스틸플레이트(21)를 통해 막재(13)에 지지력을 제공한다. Referring to the drawings, it can be seen that the base cable 17 extends horizontally at the lower end of the membrane material 13. The base cable 17 is fixed in a tensioned state to provide supporting force to the membrane material 13 through the known shackle 25 and the steel plate 21.

상기 스틸플레이트(21)는 소정폭 및 두께를 갖는 막대형 부재로서 다수의 체결부속을 통해 막재(13)에 대해 고정된다. 또한 상기 샤클(25)은 도 5를 통해 후술하는 바와같이 개방된 고리형 부재로서 그 내부에 베이스케이블(17)을 통과시킨 상태로 양단부가 상기 스틸플레이트(21)에 볼트(25a)와 너트(25b)를 통해 고정된다. The steel plate 21 is a rod-shaped member having a predetermined width and thickness and fixed to the membrane material 13 through a plurality of fastening parts. In addition, the shackle 25 is an annular member which is opened as described below with reference to FIG. 5, and both ends thereof are connected to the steel plate 21 with a bolt 25a and a nut ( Through 25b).

따라서 상기 스틸플레이트(21)의 높이를 일정하게 맞출 경우 상기 베이스케이블(17)은 수평으로 연장 설치된다. 아울러 상기 베이스케이블(17)은 에어돔(11)을 전체적으로 한 바퀴 돌아 폐곡선을 이룬다.Therefore, when the height of the steel plate 21 is constantly adjusted, the base cable 17 is horizontally installed. In addition, the base cable 17 forms a closed curve by turning the air dome 11 as a whole.

한편 각 지지케이블(15)의 하단부에는 턴버클(19)을 통해 복공판(23)이 고정되어 있다. 상기 복공판(23)은 일반적인 복공판으로서 지지케이블(15)에 중량을 제공하는 기본 기능을 가진다. 즉 각 지지케이블(15)을 그 무게로 당겨 지지케이블(15)이 에어돔 막재(13)를 견고히 지지할 수 있게 하는 것이다.On the other hand, at the lower end of each support cable 15 is fixed through the turnbuckle 19, the perforated plate 23 is fixed. The perforated plate 23 has a basic function of providing weight to the support cable 15 as a general perforated plate. That is, by pulling the respective support cables 15 to the weight, the support cable 15 is to enable to firmly support the air dome membrane material (13).

상기 지지케이블(15)과 복공판(23)을 연결하기 위하여 복공판(23)의 상부에는 지지플레이트(27)가 고정되어 있다. 상기 지지플레이트(27)는 도 4에 도시한 바와같이 일정두께를 갖는 사각판으로서 그 중앙부에는 관통구(27a)가 형성되어 있다.The support plate 27 is fixed to the upper portion of the porous plate 23 in order to connect the support cable 15 and the porous plate 23. As shown in FIG. 4, the support plate 27 is a rectangular plate having a constant thickness, and a through hole 27a is formed at the center thereof.

특히 상기 관통구(27a)의 일측에는 아이볼트(도 4의 41)가 고정되어 있고 반대측에는 두 개의 U볼트(35)가 고정되어 있다. 상기 아이볼트(41)는 상기 턴버클(19)에 연결됨으로써 지지케이블(15)을 지지플레이트(27)에 대해 연결시킨다. 또한 상기 U볼트(35)는 지지플레이트(27) 위로 지나가는 베이스케이블(17)을 지지플레이트(27)에 고정시키는 것이다. 상기 아이볼트(25) 및 U볼트(35)는 공지의 기계요소이다.In particular, the eye bolt (41 in FIG. 4) is fixed to one side of the through hole 27a, and two U bolts 35 are fixed to the opposite side. The eye bolt 41 is connected to the turnbuckle 19 to connect the support cable 15 to the support plate 27. In addition, the U bolt 35 is to fix the base cable 17 passing over the support plate 27 to the support plate 27. The eye bolts 25 and the U bolts 35 are known mechanical elements.

또한 상기 복공판(23)의 중앙부에도 관통구멍(도 3의 39)이 마련되어 있다. 상기 관통구멍(39)은 지지플레이트(27)의 관통구(27a)에 대응하는 것으로 후술헐 어스앙카(29)를 상향 통과시킨다.In addition, a through hole (39 in FIG. 3) is also provided in the center portion of the above-mentioned double hole plate 23. The through hole 39 corresponds to the through hole 27a of the support plate 27 and passes upward through the hull earth anchor 29.

상기 각 복공판(23)의 하부에는 천공홀(33)이 형성되어 있고 각 천공홀(33)의 내부에는 세 가닥의 어스앙카(29)가 삽입 고정되어 있다. 상기 천공홀(33)은 지면의 에어돔이 점유할 설치면 테두리를 따라 형성된 구멍으로서 소정간격을 갖는다. 상기 천공홀(33)의 깊이는 10 미터 내지 18 미터가 되도록 함이 좋으나 견고한 지반이 더 깊이 있으면 더 깊이 파고 낮게 있으면 굳이 상기 깊이 까지 천공할 필요는 없다.A perforation hole 33 is formed at the lower portion of each of the plurality of perforated plates 23, and three earth anchors 29 are inserted into and fixed to the inside of each perforation hole 33. The drilling hole 33 is a hole formed along the edge of the installation surface to be occupied by the air dome on the ground has a predetermined interval. The depth of the drilling hole 33 is preferably 10 meters to 18 meters, but if the solid ground is deeper, it is not necessary to dig deeper and to lower the depth.

상기 어스앙카(29)는 토목이나 건설공사에 많이 사용하는 철심이다. 상기 어 스앙카(29)는 각 천공홀(33)에 삽입되되 그 상단부가 지면으로부터 상부로 소정길이 만큼 연장되어 상기 복공판(23)의 관통구멍(39)과 지지플레이트(27)의 관통구멍(39)을 상향 통과한다.The earth anchor 29 is an iron core used in civil engineering or construction. The anchor 29 is inserted into each of the drilling holes 33, the upper end of which extends from the ground to the upper portion by a predetermined length so that the through hole 39 and the through hole of the support plate 27 are formed. 39) pass upwards.

상기 어스앙카(29)를 천공홀(33)내에 고정시키기 위해서는 천공홀(33)에 필요한 만큼의 어스앙카(29)를 삽입한 상태로 천공홀(33)에 콘크리트액을 채우는 것이다. 상기 콘크리트액은 천공홀(33)의 내부에 주입된 상태로 굳어져 어스앙카(29)가 지면에 박힌 상태가 되도록 한다. In order to fix the earth anchor 29 in the drilling hole 33, the concrete liquid is filled in the drilling hole 33 in a state in which as many earth anchors 29 are inserted into the drilling hole 33 as necessary. The concrete liquid is hardened in the state injected into the drilling hole 33 so that the earth anchor 29 is embedded in the ground.

상기와 같이 지중에 박힌 어스앙카(29)는 복공판(23) 및 지지플레이트(27)를 상향 통과한 후 지지플레이트(27)의 상부에서 웨지소켓(wedge socket)(도 3의 37)에 결합한다. 상기 웨지소켓(37)은 와이어의 일단부를 잡아 지지하는 공지의 기계요소로서 상기 지지플레이트(27)에 지지된 상태로 상기 어스앙카(29)를 당겨 복공판(23)을 지면에 대해 강력하게 압박한다.Earth anchor 29 embedded in the ground as described above is coupled to the wedge socket (37 in Fig. 3) in the upper portion of the support plate 27 after passing through the perforated plate 23 and the support plate 27. . The wedge socket 37 is a known mechanical element that grasps and supports one end of a wire, and pulls the earth anchor 29 in a state of being supported by the support plate 27 to force the perforated plate 23 against the ground. .

한편 상기 어스앙카(29)를 웨지소켓(37)에 연결시키기 전에 상기 어스앙카(29)를 20톤 내지 30톤의 힘으로 상부로 당겼다 놓는다. 이와같이 어스앙카(29)를 당겼다 놓은 후 웨지소켓(37)에 연결함으로써 어스앙카(29)로 하여금 복공판(23)을 지면에 한층 더 견고히 밀착시킬 수 있다.Meanwhile, before the earth anchor 29 is connected to the wedge socket 37, the earth anchor 29 is pulled to the top with a force of 20 to 30 tons. In this way, the ground anchor 29 is pulled and released, and then connected to the wedge socket 37 to allow the ground anchor 29 to more closely adhere to the ground plate 23 on the ground.

도 3은 상기 도 2에 도시한 지지구조를 보다 자세히 도시한 부분 단면도이다.3 is a partial cross-sectional view showing in more detail the support structure shown in FIG.

도면을 참조하면, 천공홀(33)에 고정되어 있는 어스앙카(29)가 복공판(23)과 지지플레이트(27)를 상향 통과하여 지지플레이트(27)의 상부에서 웨지소켓(37)에 결합하고 있음을 알 수 있다.Referring to the drawings, the earth anchor 29, which is fixed to the drilling hole 33, passes upwardly through the perforated plate 23 and the support plate 27, and is coupled to the wedge socket 37 at the upper portion of the support plate 27. It can be seen that.

아울러 상기 지지플레이트(27)의 상부에 고정되어 있는 아이볼트(41)에는 턴버클(19)을 통해 지지케이블(15)이 지지되어 있고, U볼트(35)에는 수평으로 연장된 지지케이블(17)이 고정되어 있다. In addition, the support bolt 15 is supported on the eye bolt 41 fixed to the upper portion of the support plate 27 through the turnbuckle 19, and the support cable 17 extending horizontally to the U bolt 35. Is fixed.

결국 상기와 같이 복공판이 지면에 대해 강력하게 압착되어 있는 상태에서 턴버클(19)을 죄어 상기 지지케이블(15)을 적절한 인장력으로 당길 수 있게 되는 것이다. 또한 상기 베이스케이블(17)도 상기 지지플레이트(27)에 고정된 상태로 수평을 유지하며 상기 스틸플레이트(21)를 지지할 수 있다.As a result, it is possible to pull the support cable 15 with an appropriate tensile force by tightening the turnbuckle 19 in the state that the perforated plate is strongly pressed against the ground as described above. In addition, the base cable 17 may maintain the horizontal while being fixed to the support plate 27 and support the steel plate 21.

도 4는 상기 복공판에 고정되어 있는 상태의 지지플레이트를 도시한 사시도이다.4 is a perspective view showing a support plate in a state of being fixed to the perforated plate.

도시한 바와같이, 지지플레이트(27)의 중앙부에는 상기 어스앙카(29)를 상향 통과시키는 관통구(27a)가 형성되어 있고, 상기 관통구(27a)의 일측에는 아이볼트(410가 타측에는 두 개의 U볼트(35)가 고정되어 있다. 상기 복공판(23)에 대해 지지플레이트(27)는 용접 결합함이 좋다.As shown, a through hole 27a is formed at the center of the support plate 27 to allow the earth anchor 29 to pass upward, and one eye bolt 410 is provided at one side of the through hole 27a. Two U bolts 35 are fixed, and the support plate 27 is preferably welded to the perforated plate 23.

도 5는 상기 도 2에 도시한 베이스케이블에 대한 스틸플레이트의 결합구조를 나타내 보인 단면도이다.5 is a cross-sectional view showing a coupling structure of the steel plate to the base cable shown in FIG.

도시한 바와같이, 샤클(25)의 개방구내에 스틸플레이트(21)가 삽입된 상태로 볼트(25a)가 샤클(25) 및 스틸플레이트(21)를 관통하여 너트(25b)에 결합하고 있다. 이 때 상기 샤클(25)의 내부에 베이스케이블(17)이 미리 삽입되어 있어야 함은 물론이다.As shown in the figure, the bolt 25a penetrates the shackle 25 and the steel plate 21 and engages with the nut 25b with the steel plate 21 inserted into the opening of the shackle 25. At this time, it is a matter of course that the base cable 17 is inserted into the shackle 25 in advance.

도 6은 본 발명의 제 1실시예에 따른 연약지반에서의 에어돔 설치방법을 정리하여 나타내 보인 블록도이다.Figure 6 is a block diagram showing the air dome installation method in the soft ground according to the first embodiment of the present invention.

도면을 참조하면, 본 실시예에 따른 에어돔 설치방법은, 천공단계(100)와 어스앙카고정단계(102)와 중량물설치단계(104)와 베이스케이블고정단계(106)와 제 1,2연결단계(108,110)와 송풍단계(112) 및 인장력조절단계(114)로 구성된다.Referring to the drawings, the air dome installation method according to the present embodiment, the drilling step 100 and earth anchor fixing step 102 and the heavy material installation step 104 and the base cable fixing step 106 and the first and second connection It consists of steps 108 and 110, a blowing step 112, and a tension force adjusting step 114.

상기 천공단계(100)는 지면(A)의 에어돔이 점유할 설치면 테두리를 따라 상기한 천공홀(33)을 다수 천공하는 단계이다. The drilling step 100 is a step of drilling a plurality of the above-described hole hole 33 along the edge of the installation surface to be occupied by the air dome of the ground (A).

또한 상기 어스앙카고정단계(102)는, 상기 천공홀(33)에 어스앙카(29)를 삽입시킨 상태로 어스앙카(29)를 천공홀(33)에 고정하는 단계이다. 이는 상기 천공홀(33)의 내부에 어스앙카(29)의 상단부가 지면으로부터 상부로 연장되게 위치시키는 삽입공정(102a)과, 상기 어스앙카(29)가 삽입되어 있는 상태의 천공홀(33)내에 콘크리트액을 주입하여 어스앙카를 고정하는 고정공정(102b)을 포함하여 이루어진다.In addition, the earth anchor fixing step 102 is a step of fixing the earth anchor 29 to the drilling hole 33 while the earth anchor 29 is inserted into the drilling hole 33. This is an insertion process 102a for positioning the upper end of the earth anchor 29 to extend upward from the ground inside the drilling hole 33, and the drilling hole 33 in which the earth anchor 29 is inserted. It comprises a fixing step (102b) for fixing the earth anchor by injecting the concrete solution in the.

또한 상기 중량물 설치단계(104)는, 관통구멍(39)을 갖는 복공판(23)을 상기 천공홀(33)의 상부에 위치시켜 상기 어스앙카(29)의 상단부가 복공판(23)의 관통구멍(39)을 상향 통과하도록 하는 복공판 설치공정(104a)과, 상기 복공판(23)의 상부로 올라온 어스앙카(29)의 상단부를 잡아 소정 인장력으로 당긴 후 복공판(23)에 고정하는 세팅공정(104b)과, 상기 아이볼트(41) 및 U볼트(35)를 갖는 지지플레이트(27)를 복공판(23)의 상면에 고정하는 지지플레이트 장착공정(104c)으로 이루어진다. 경우에 따라 상기 지지플레이트 장착공정(104c)을 세팅공정(104b) 보다 먼저 시행할 수 도 있다. 이 경우 상기 어스앙카(29)의 상단부가 지지플레이트(27)에 고정되게 됨은 물론이다.In addition, in the heavy material installation step 104, the through-hole plate 23 having the through-hole 39 is located on the upper portion of the drilling hole 33 so that the upper end of the earth anchor 29 is the through-hole (23) 39, the step of installing a multi-hole plate (104a) to pass upward, and the setting step (104b) of holding the upper end of the earth anchor 29 raised to the upper portion of the multi-hole plate 23, pulled with a predetermined tensile force and fixed to the multi-hole plate 23 And a support plate mounting step 104c for fixing the support plate 27 having the eye bolts 41 and the U bolts 35 to the upper surface of the porous plate 23. In some cases, the support plate mounting step 104c may be performed before the setting step 104b. In this case, of course, the upper end of the earth anchor 29 is fixed to the support plate 27.

또한 상기 베이스케이블 고정단계(106)는, 상기 지지플레이트(27)에 설치되어 있는 U볼트(35)에 베이스케이블(17)을 고정하는 단계이다. 상기 U볼트(35)로 지지플레이트(27)를 죌 때 베이스케이블(17)을 인장시킨 상태로 죄어 베이스케이블(17)이 전체적으로 인장된 상태의 폐곡선이 되도록 한다.In addition, the base cable fixing step 106 is a step of fixing the base cable 17 to the U bolt 35 installed on the support plate 27. When the support plate 27 is squeezed by the U bolt 35, the base cable 17 is tightened in the tensioned state so that the base cable 17 becomes a closed curve in the overall tensioned state.

상기 제 1연결단계(108)는 상기 베이스케이블(17)이 구획하는 내측 영역에 아직 공기가 채워지지 않은 에어돔막재(13)를 펼치고 상기 스틸플레이트(21) 및 샤클(25)을 이용해 베이스케이블(17)에 에어돔 막재(13)의 하단 테두리부를 연결하는 단계이다.In the first connection step 108, the air dome membrane material 13, which is not yet filled with air, is unfolded in the inner region defined by the base cable 17, and the base cable is formed by using the steel plate 21 and the shackle 25. Step 17 is connected to the lower edge of the air dome membrane (13).

또한, 제 2연결단계(110)는 상기 제 1연결단계(108)를 통해 그 하단 테두리가 베이스케이블(17)에 지지된 에어돔 막재(13) 위에 지지케이블(15)을 소정패턴으로 펼쳐 위치시킴과 아울러 각 케이블(15)의 단부을 상기 아이볼트(41)에 고정시키는 단계이다.In addition, in the second connecting step 110, the support cable 15 is unfolded in a predetermined pattern on the air dome film material 13 whose lower edge is supported by the base cable 17 through the first connecting step 108. In addition, the end of each cable 15 is fixed to the eye bolt 41.

상기 송풍단계(112)는 상기 제 2연결단계(110)를 통해 지지케이블(15)이 설치된 상태의 에어돔 막재(13) 내부에 공기를 송풍하여 막재(13)를 부양시켜 에어돔이 내부공간을 제공토록 하는 단계이다.The blowing step 112 blows air into the air dome membrane material 13 in a state in which the support cable 15 is installed through the second connection step 110 to support the membrane material 13 so that the air dome has an internal space. It is a step to provide.

또한 상기 인장력조절단계(114)는, 에어돔의 막재(13)가 80% 내지 90% 부양된 상태로 상기 턴버클(19)을 이용하여 지지케이블(15)의 인장력을 조절하는 단계이다.In addition, the tensile force adjusting step 114 is a step of adjusting the tensile force of the support cable 15 using the turnbuckle 19 in a state where the membrane 13 of the air dome is supported by 80% to 90%.

도 7 및 도 8은 본 발명의 제 2실시예에 따른 연약지반에서의 에어돔 설치방법을 설명하기 위하여 도시한 도면이다.7 and 8 are diagrams for explaining the air dome installation method in the soft ground according to the second embodiment of the present invention.

기본적으로 제 2실시예에 따른 에어돔 설치방법은, 상기한 제 1실시예에서의 복공판을 대신하여 콘크리트(51) 구조체를 중량물로 이용할 수 있다는 견해에 기초한 것이다. 아울러 상기한 도면부호와 동일한 도면부호는 동일한 기능의 동일한 부재임을 밝혀둔다.Basically, the air dome installation method according to the second embodiment is based on the view that the concrete 51 structure can be used as a weight instead of the perforated plate in the first embodiment. In addition, it is noted that the same reference numerals as the above reference numerals are the same members having the same function.

도 7을 참조하면, 에어돔이 위치하는 지면의 에어돔이 점유할 설치면 테두리를 따라 소정폭 및 깊이의 거터(61)가 마련되어 있고, 상기 거터(61)의 내부에 콘크리트구조체(63)가 위치하고 있음을 알 수 있다Referring to FIG. 7, a gutter 61 having a predetermined width and depth is provided along an edge of an installation surface to be occupied by the air dome of the ground on which the air dome is located, and the concrete structure 63 is formed inside the gutter 61. I can see that it is located

상기 콘크리트구조체(63)는 콘크리트액을 주입하여 굳힌 것으로서 그 상면은 지면으로부터 돌출되거나 함몰되지 않게 지면과 같은 레벨을 가지도록 함이 좋다.The concrete structure 63 is hardened by injecting the concrete solution, the upper surface is preferably to have the same level as the ground so as not to protrude or dent from the ground.

상기 콘크리트구조체(63)의 상부에는 베이스케이블지지구(53) 및 아이볼트(59a)가 돌출 위치하고 있다. 상기 베이스케이블지지구(53)는 상기 베이스케이블(17)을 지지하는 것이고, 아이볼트(59a)는 지지케이블(15)의 단부에 연결되어 지지케이블(15)을 당겨 지지하는 것이다.The base cable support 53 and the eye bolt 59a protrude from the upper portion of the concrete structure 63. The base cable support 53 supports the base cable 17, and the eye bolt 59a is connected to the end of the support cable 15 to pull and support the support cable 15.

상기 베이스케이블지지구(53)는 상기한 제 1실시예에서의 U볼트(도 4의 35)와 동일한 기능을 담당하며, 아이볼트(59a)는 제 1실시예에서의 아이볼트(도 4의 41)와 동일한 기능을 하는 것으로 그에 관한 설명은 생략하기로 한다.The base cable support 53 has the same function as the U bolt (35 in FIG. 4) in the first embodiment described above, and the eye bolt 59a is the eye bolt (FIG. 4 in the first embodiment). 41) and the description thereof will be omitted.

도 8을 참조하면, 막재(13)의 테두리부 하부에 소정 폭 및 깊이의 거터(61)가 마련되어 있다. 또한 상기 거터(61)의 바닥면에는 천공홀(33)이 위치되어 있음 을 알 수 있다. 상기 거터(61)는 베이스케이블(17)을 따라 에어돔을 한 바퀴 돌아 폐곡선을 이룬다. 상기 천공홀(33)은 거터(61)의 바닥면에서 거터(61)의 길이방향을 따라 다수 형성된 구멍으로서 그 내부에 다수의 어스앙카(29)를 갖는다.Referring to FIG. 8, a gutter 61 having a predetermined width and depth is provided below the edge portion of the membrane material 13. In addition, it can be seen that the drilling hole 33 is located on the bottom surface of the gutter 61. The gutter 61 forms a closed curve by turning the air dome around the base cable 17 once. The hole 33 is a hole formed in the longitudinal direction of the gutter 61 in the bottom surface of the gutter 61 has a plurality of earth anchors 29 therein.

또한 상기 각 천공홀(33)의 상부에는 거터(61)의 바닥면에 지지된 상태로 지지플레이트(27)가 구비된다. 상기 지지플레이트(27)는 제 1실시예의 지지플레이트와 동일한 것으로 상기 어스앙카(29)를 상향 통과시켜 웨지소켓(37)으로 하여금 어스앙카(29)의 상단부를 고정하도록 한다. 상기 웨지소켓(27)에 어스앙카(29)를 고정시키기에 앞서 어스앙카(29)를 20톤 내지 30톤의 힘으로 당겨 올린다. 이와같이 어스앙카(29)를 인장하는 이유는 상기한 제 1실시예와 동일하다.In addition, the support plate 27 is provided at the upper portion of each of the drilling holes 33 in a state of being supported on the bottom surface of the gutter 61. The support plate 27 is the same as the support plate of the first embodiment, and passes upward through the earth anchor 29 to allow the wedge socket 37 to fix the upper end of the earth anchor 29. Prior to fixing the earth anchor 29 to the wedge socket 27, the earth anchor 29 is pulled up with a force of 20 to 30 tons. The reason for tensioning the earth anchor 29 in this way is the same as in the first embodiment described above.

한편, 상기 지지플레이트(27)의 일측에는 지지플레이트지지구(59)와 베이스케이블지지구(53)가 구비되어 있다. 상기 지지플레이트지지구(59)는 지지플레이트(27)에 결합하며 상부로 연장되는 연장로드(59b)와, 상기 연장로드(59b)의 상단부에 결합하는 아이볼트(59a)로 구성된다. On the other hand, one side of the support plate 27 is provided with a support plate support 59 and the base cable support 53. The support plate support 59 is composed of an extension rod 59b coupled to the support plate 27 and extending upward, and an eye bolt 59a coupled to an upper end of the extension rod 59b.

상기 지지플레이트지지구(59)는 상기 지지케이블(15)을 지지할 수 있는 한 그 구성을 얼마든지 다르게 변경할 수 있음은 물론이다. 여하튼 상기 지지플레이트지지구(59)의 상단부에 위치하는 아이볼트(59a)는 콘크리트구조체(63)의 상면으로부터 돌출되어 턴버클(19)에 연결된다.As long as the support plate support 59 can support the support cable 15, the configuration can be changed as many as possible. In any case, the eye bolt 59a positioned at the upper end of the support plate support 59 protrudes from the upper surface of the concrete structure 63 and is connected to the turnbuckle 19.

또한 상기 베이스케이블지지구(53)는, 그 하단이 지지플레이트(27)에 고정된 상태로 상향 연장되고 그 상단부는 콘크리트구조체(63)의 상부로 돌출되는 두 개의 지지로드(55)와, 상기 지지로드(55)의 사이에 베이스케이블(17)을 위치시킨 상태로 지지로드(55)에 결합하여 베이스케이블(17)을 하부로 압착하는 가압블록(57)을 포함하여 이루어진다. 상기 가압블록(57)과 지지로드(55)는 나사 결합한다.In addition, the base cable support 53, the lower end thereof is extended upward in a state fixed to the support plate 27 and the upper end of the two support rods 55 protruding to the upper portion of the concrete structure 63 and the It comprises a pressing block 57 for pressing the base cable 17 by coupling to the support rod 55 in a state in which the base cable 17 is located between the support rods 55. The pressure block 57 and the support rod 55 is screwed.

한편, 상기 콘크리트구조체(63)는 거터(61)에 콘크리트액을 부어 양생시킨 중량물로서 상기 지지플레이트(27)를 하부로 눌러 압박한다. 사실 상기 지지플레이트(27)는 어스앙카(29)에 의해 이미 고정되어 있으므로 콘크리트구조체(63)가 꼭 필요한 것은 아니지만 상기 지지케이블지지구(59) 및 베이스케이블지지구(53)를 수직으로 지지함과 아울러 그 상면으로 베이스케이블(17)을 지지하기 위해 필요하다.On the other hand, the concrete structure 63 is pressed by pressing the support plate 27 as a heavy material by curing the concrete liquid poured on the gutter 61. In fact, since the support plate 27 is already fixed by the earth anchor 29, the concrete structure 63 is not necessary, but supports the support cable support 59 and the base cable support 53 vertically. In addition, it is necessary to support the base cable 17 to the upper surface.

결국 상기 아이볼트(59a)에 턴버클(29)을 연결하고 또한 지지로드(55)의 사이에 베이스케이블(17)을 고정시킴으로서 지반에 대한 에어돔의 고정이 완료된다.Eventually, the fixing of the air dome to the ground is completed by connecting the turnbuckle 29 to the eye bolt 59a and fixing the base cable 17 between the support rods 55.

도 9는 본 발명의 제 2실시예에 따른 에어돔 설치방법을 나타내 보인 블록도이다.9 is a block diagram showing a method for installing an air dome according to a second embodiment of the present invention.

도시한 바와같이, 제 2실시예에 따른 에어돔 설치방법은, 굴착단계(200)와 천공단계(102)와 어스앙카고정단계(104)와 지지플레이트설치단계(206)와 중량물설치단계(208)와 베이스케이블 고정단계(209)와 제 1,2연결단계(210,212)와 송풍단계(112) 및 인장력조절단계(114)로 이루어져 있다.As shown, the air dome installation method according to the second embodiment, the excavation step 200, the drilling step 102, the earth anchor fixing step 104, the support plate installation step 206 and the heavy material installation step 208 ) And the base cable fixing step 209 and the first and second connection steps (210, 212) and the blowing step 112 and the tension force adjustment step (114).

상기 굴착단계(200)는, 지면의 에어돔이 점유할 설치면 테두리를 따라 상기 거터(61)를 소정폭 및 깊이로 파내는 단계이다. 상기 거터(61)는 포크레인이나 다른 건설 장비로 수행한다. 특히 상기 거터(61)의 바닥면은 수평이 되도록 하여 콘크리트액이 한 쪽으로 몰리지 않도록 한다.The excavation step 200 is a step of digging the gutter 61 to a predetermined width and depth along the installation surface edge to be occupied by the air dome of the ground. The gutter 61 is performed with a fork crane or other construction equipment. In particular, the bottom surface of the gutter 61 is to be horizontal so that the concrete liquid is not driven to one side.

상기 천공단계(100) 및 어스앙카고정단계(102)는 상기한 제 1실시예와 동일 하다.The drilling step 100 and earth anchoring step 102 is the same as the first embodiment described above.

상기 지지플레이트설치단계(206)는, 상기 베이스케이블지지구(53) 및 지지케이블지지구(59)를 갖는 지지플레이트(27)를 거터(61)의 바닥면에 위치시키고, 지지플레이트(27)와 어스앙카(29)의 상단부를 결합시키는 단계로서, 상기 지지플레이트(27)를 각 천공홀(33)의 상부에 위치시키되 어스앙카(29)의 상단부가 지지플레이트(27)의 관통구멍을 상향 통과하도록 하는 지지플레이트 안착공정(206a)과, 상기 지지플레이트(27)의 상부로 올라온 어스앙카(29)를 소정 인장력으로 당긴후 지지플레이트에 고정시키는 세팅공정(206b)을 포함한다.In the support plate installation step 206, the support plate 27 having the base cable support 53 and the support cable support 59 is positioned on the bottom surface of the gutter 61, and the support plate 27 is provided. And engaging the upper end of the earth anchor 29, wherein the support plate 27 is positioned above each of the perforation holes 33, and the upper end of the earth anchor 29 raises the through hole of the support plate 27. The support plate seating step (206a) to pass through, and the setting step (206b) for pulling the earth anchor 29 raised to the upper portion of the support plate 27 with a predetermined tensile force and then fixed to the support plate.

또한 상기 중량물설치단계(208)는, 상기 지지플레이트(27)가 장착된 거터(61)의 내부에 콘크리트액을 가하되 상기 지지로드(55)의 상단부와 아이볼트(59a)가 콘크리트구조체(63)의 상부로 돌출되도록 하는 단계이다.In addition, the heavy material installation step 208, the concrete liquid is applied to the inside of the gutter 61 is mounted on the support plate 27, the upper end of the support rod 55 and the eye bolt (59a) is a concrete structure 63 This is to protrude to the top of the).

상기 베이스케이블 고정단계(209)는, 상기 콘크리트구조체(63)의 상면으로 돌출된 지지로드(55)의 사이에 상기 베이스케이블(17)을 위치시킨 상태로 상기 가압블록(57)으로 베이스케이블(17)을 죄어 베이스케이블(17)을 고정시키고 베이스케이블(17)이 전체적으로 폐곡선을 이루게 하는 단계이다.The base cable fixing step (209), the base cable to the pressing block 57 in a state in which the base cable 17 is located between the support rods 55 protruding to the upper surface of the concrete structure 63 ( 17) to fix the base cable 17 and to make the base cable 17 form a closed curve as a whole.

또한, 상기 제 1연결단계(210)는, 상기 베이스케이블(17)이 구획하는 내측 영역에 에어돔 막재(13)를 펼치고 상기 베이스케이블(17)에 에어돔 막재(13)의 하단 테두리부를 스틸플레이트(21) 및 샤클(25)로 연결 지지시키는 단계이며, 제 2연결단계(212)는 상기 제 1연결단계(210)를 통해 그 하단 테두리가 베이스케이블(17)에 지지된 에어돔 막재(13) 위에 다수의 지지케이블(15)을 소정패턴으로 펼쳐 위치 시키고 각 지지케이블(15)의 단부를 상기 아이볼트(59a)에 고정시키는 단계이다.In addition, in the first connection step 210, the air dome membrane material 13 is spread on the inner region partitioned by the base cable 17, and the lower edge portion of the air dome membrane material 13 on the base cable 17 is steel. It is a step of connecting and supporting the plate 21 and the shackle 25, the second connection step 212 is the air dome membrane material whose lower edge is supported on the base cable 17 through the first connection step 210 ( 13) a plurality of support cables 15 are unfolded and positioned in a predetermined pattern and the ends of each support cable 15 are fixed to the eye bolts 59a.

상기 제 2연결단계(212)에 이어지는 송풍단계(112) 및 인장력조절단계(114)는 제 1실시예와 동일하다.The blowing step 112 and the tension force adjusting step 114 following the second connecting step 212 are the same as in the first embodiment.

결국 상기 방법으로 구축된 에어돔은 지중(地中)에 박힌 어스앙카(29)에 에어돔을 지지시켜 지지케이블이 강력한 지지력을 발휘할 수 있게 함으로써 연약한 지반에서도 에어돔을 견고하게 설치할 수 있게 한다.Eventually, the air dome constructed by the above method supports the air dome on the earth anchor 29 embedded in the ground, so that the support cable can exert a strong supporting force, thereby making it possible to firmly install the air dome in the soft ground.

이상, 본 발명을 구체적인 실시예를 통하여 상세하게 설명하였으나, 본 발명은 상기 실시예에 한정하지 않고, 본 발명의 기술적 사상의 범위내에서 통상의 지식을 가진 자에 의하여 여러 가지 변형이 가능하다.As mentioned above, although this invention was demonstrated in detail through the specific Example, this invention is not limited to the said Example, A various deformation | transformation is possible for a person with ordinary knowledge within the scope of the technical idea of this invention.

상기와 같이 이루어지는 본 발명의 연약지반에서의 에어돔 설치방법은, 에어돔을 전제적으로 지지하는 지지케이블의 단부에 중량물을 연결 고정함은 물론 더 나아가 상기 중량물을 지중(地中)에 깊게 박아 고정한 어스앙카에 연결함으로써 케이블이 강력한 지지력을 제공할 수 있는 구조를 가져, 예컨대 성토층이나 매립지는 물론 진흙바닥에도 에어돔을 견고히 설치할 수 있게 한다.Air dome installation method in the soft ground of the present invention made as described above, as well as connecting and fixing the heavy material to the end of the support cable supporting the air dome premise and further deeply fixed the heavy material in the ground (ground) By connecting to earth anchors, the cable has a structure that can provide strong support, allowing for firm installation of air domes, for example in fill layers, landfills and mud floors.

Claims (8)

지면의 에어돔이 점유할 설치면 테두리를 따라 소정깊이의 천공홀을 다수 천공하는 천공단계와;A drilling step of drilling a plurality of drilling holes of a predetermined depth along an edge of the installation surface to be occupied by the air dome; 상기 천공홀에 어스앙카를 삽입시킨 상태로 어스앙카를 천공홀내에 고정하는 어스앙카 고정단계와;An earth anchor fixing step of fixing the earth anchor in the drilling hole while the earth anchor is inserted into the drilling hole; 상기 천공홀의 상부에 중량물을 위치시키고 상기 중량물을 어스앙카에 연결 고정시키는 중량물 설치단계와;A weight installation step of placing a heavy weight on an upper portion of the drilling hole and fixing the heavy weight to an earth anchor; 상기 각 중량물을 베이스케이블로 직렬 연결하되 베이스케이블을 중량물에 대해 고정하는 베이스케이블 고정단계와;A base cable fixing step of connecting each of the heavy materials in series with a base cable, and fixing the base cable to the heavy materials; 상기 베이스케이블이 구획하는 내측 영역에 에어돔막재를 펼치고 상기 베이스케이블에 에어돔막재의 하단 테두리부를 연결 지지시키는 제 1연결단계와;A first connection step of spreading the air dome film material in the inner region partitioned by the base cable and supporting the lower edge portion of the air dome film material to the base cable; 상기 제 1연결단계를 통해 그 하단 테두리가 베이스케이블에 지지된 에어돔 막재 위에 지지케이블을 소정패턴으로 펼쳐 위치시키고 각 케이블의 단부는 상기 중량물에 고정시키는 제 2연결단계와;A second connection step of unfolding and placing the support cable in a predetermined pattern on the air dome membrane material whose lower edge is supported by the base cable through the first connection step, and fixing the end of each cable to the heavy material; 상기 제 2연결단계를 통해 지지케이블이 설치된 상태로 에어돔막재의 내부에 공기를 송풍하여 막재를 부양시켜 에어돔이 내부공간을 제공토록 하는 송풍단계를 포함하는 것을 특징으로 하는 연약지반에서의 에어돔 설치방법.The air dome in the soft ground, characterized in that it comprises a blowing step to provide an internal space by the air dome by blowing air to the inside of the air dome membrane with the support cable is installed through the second connection step How to install. 제 1항에 있어서,The method of claim 1, 상기 어스앙카고정단계는; The earth anchoring step is; 상기 천공홀의 내부에 적어도 한 가닥의 어스앙카를 삽입하되 어스앙카의 상단부가 지면으로부터 소정길이 상부로 연장되게 위치시키는 삽입공정과, Inserting at least one strand of earth anchors into the boring hole, wherein an upper end portion of the anchor anchors is positioned to extend from the ground to a predetermined length; 상기 어스앙카가 삽입되어 있는 상태의 천공홀내에 콘크리트를 주입하여 어스앙카를 천공홀 내에 굳혀 고정하는 고정공정을 포함하는 것을 특징으로 하는 연약지반에서의 에어돔 설치방법.And a fixing step of injecting concrete into the drilling hole in which the earth anchor is inserted to fix the ground anchor in the drilling hole. 제 1항 또는 제 2항에 있어서,The method according to claim 1 or 2, 상기 중량물설치단계는;The weight installation step is; 관통구멍을 갖는 복공판을 상기 천공홀의 상부에 위치시켜 상기 어스앙카의 상단부가 복공판의 관통구멍을 상향 통과하도록 하는 복공판 설치공정과;A perforated plate installation step of placing a perforated plate having a through hole in an upper portion of the perforated hole so that an upper end of the earth anchor passes through the through hole of the perforated plate; 상기 복공판의 상부로 올라온 어스앙카의 상단부를 잡아 소정 인장력으로 당긴 후 복공판에 고정하는 세팅공정을 포함하는 것을 특징으로 하는 연약지반에서의 에어돔 설치방법.And a setting step of holding the upper end of the earth anchor raised to the upper portion of the perforated plate and pulling it with a predetermined tensile force and then fixing it to the perforated plate. 제 3항에 있어서,The method of claim 3, wherein 상기 중량물설치단계에는,In the heavy material installation step, 상기 각 지지케이블의 단부와 결합하여 지지력을 제공하는 걸이구와, 상기 베이스케이블을 지지하는 고정구를 갖는 지지플레이트를 복공판의 상면에 고정하는 지지플레이트 장착공정을 더 포함하는 것을 특징으로 하는 연약지반에서의 에어돔 설치방법.In the soft ground, characterized in that it further comprises a support plate mounting step of fixing the support plate having a fastener for supporting the base cable and the support plate coupled to the end of each support cable on the upper surface of the perforated plate How to install the air dome. 지면의 에어돔이 점유할 설치면 테두리를 따라 소정폭 및 깊이의 거터(gutter)를 파내는 굴착단계와;An excavation step of digging a gutter of a predetermined width and depth along an edge of the installation surface to be occupied by the air dome of the ground; 상기 굴착단계를 통해 마련된 거터의 바닥면에 소정깊이의 천공홀을 거터의 길이방향을 따라 다수 천공하는 천공단계와;A perforating step of drilling a plurality of perforation holes of a predetermined depth in the longitudinal direction of the gutter on the bottom surface of the gutter provided through the excavating step; 상기 천공홀에 어스앙카를 삽입시킨 상태로 어스앙카를 천공홀내에 고정하는 어스앙카 고정단계와;An earth anchor fixing step of fixing the earth anchor in the drilling hole while the earth anchor is inserted into the drilling hole; 상기 거터의 상부로 연장되며 외부에 지지력을 제공하는 걸이구 및 고정구를 갖는 지지플레이트를 거터의 바닥면에 위치시키고 어스앙카의 상단부와 결합시키는 지지플레이트 설치단계와;A support plate installation step of placing a support plate having a hook and a fastener extending to the top of the gutter and providing support to the outside on the bottom surface of the gutter and engaging with the upper end of the earth anchor; 상기 지지플레이트가 장착된 거터의 내부에 콘크리트를 가하되 상기 걸이구 및 고정구의 상단부가 콘크리트의 상부로 돌출되도록 하는 중량물 설치단계와;A weight installation step of applying concrete to the inside of the gutter on which the support plate is mounted, wherein the upper end of the hook and the fixture are protruded to the upper portion of the concrete; 상기 콘크리트의 상면으로 돌출된 고정구를 베이스케이블로 직렬 연결하되 베이스케이블을 고정구에 대해 고정시키는 베이스케이블 고정단계와;A base cable fixing step of connecting the fasteners protruding to the upper surface of the concrete in series with a base cable, and fixing the base cable to the fasteners; 상기 베이스케이블이 구획하는 내측 영역에 에어돔막재를 펼치고 상기 베이스케이블에 에어돔막재의 하단 테두리부를 연결 지지시키는 제 1연결단계와;A first connection step of spreading the air dome film material in the inner region partitioned by the base cable and supporting the lower edge portion of the air dome film material to the base cable; 상기 제 1연결단계를 통해 그 하단 테두리가 베이스케이블에 지지된 에어돔 막재 위에 다수의 지지케이블을 소정패턴으로 펼쳐 위치시키고 각 지지케이블의 단부를 상기 걸이구에 고정시키는 제 2연결단계와;A second connection step of unfolding and positioning a plurality of support cables in a predetermined pattern on the air dome membrane material whose lower edge is supported by the base cable through the first connection step, and fixing end portions of the support cables to the hooks; 상기 제 2연결단계를 통해 지지케이블이 설치된 상태로 에어돔막재의 내부에 공기를 송풍하여 막재를 부양시켜 에어돔이 내부공간을 제공토록 하는 송풍단계를 포함하는 것을 특징으로 하는 연약지반에서의 에어돔 설치방법.The air dome in the soft ground, characterized in that it comprises a blowing step to provide an internal space by the air dome by blowing air to the inside of the air dome membrane with the support cable is installed through the second connection step How to install. 제 5항에 있어서,The method of claim 5, 상기 어스앙카고정단계는;The earth anchoring step is; 상기 천공홀의 내부에 적어도 한 가닥의 어스앙카를 삽입하되 어스앙카의 상단부가 거터 바닥면으로부터 소정길이 만큼 상부로 연장되게 위치시키는 어스앙카삽입공정과, An earth anchor insertion process for inserting at least one strand of earth anchors into the boring hole, the upper end of the earth anchors extending upward from the bottom of the gutter by a predetermined length; 상기 어스앙카가 삽입되어 있는 상태의 천공홀내에 콘크리트를 주입하여 어스앙카를 천공홀 내에 굳혀 고정하는 고정공정을 포함하는 것을 특징으로 하는 연약지반에서의 에어돔 설치방법.And a fixing step of injecting concrete into the drilling hole in which the earth anchor is inserted to fix the ground anchor in the drilling hole. 제 6항에 있어서,The method of claim 6, 상기 지지플레이트는 그 중앙부에 관통구멍이 형성되어 있는 소정두께의 금속판이며,The support plate is a metal plate of a predetermined thickness having a through hole formed in the center thereof, 상기 지지플레이트 설치단계는;The support plate installation step; 지지플레이트를 상기 천공홀의 상부에 위치시키되 어스앙카의 상단부가 지지플레이트의 관통구멍을 상향 통과하도록 하는 지지플레이트 안착공정과,A support plate seating process of placing a support plate on an upper portion of the drilling hole and allowing an upper end of the earth anchor to pass through a through hole of the support plate; 상기 지지플레이트의 상부로 올라온 어스앙카를 소정 인장력으로 당긴후 지 지플레이트에 고정시키는 세팅공정을 포함하는 것을 특징으로 하는 연약지반에서의 에어돔 설치방법.And a setting step of pulling the ground anchor raised to the upper portion of the support plate with a predetermined tensile force and then fixing the ground anchor to the support plate. 제 1항 또는 제 5항에 있어서,The method according to claim 1 or 5, 상기 송풍단계를 통해 에어돔의 막재가 80% 내지 90% 부양된 상태로 상기 지지케이블의 인장력을 조절하는 인장력 조절단계를 더 포함하는 것을 특징으로 하는 연약지반에서의 에어돔 설치방법.The air dome installation method of the soft ground, characterized in that further comprising the step of adjusting the tensile force of the support cable in the state of the 80% to 90% of the air dome of the air dome through the blowing step.
KR1020040023941A 2004-04-08 2004-04-08 Method for constructing air dome on soft ground KR100583983B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040023941A KR100583983B1 (en) 2004-04-08 2004-04-08 Method for constructing air dome on soft ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040023941A KR100583983B1 (en) 2004-04-08 2004-04-08 Method for constructing air dome on soft ground

Publications (2)

Publication Number Publication Date
KR20050098985A KR20050098985A (en) 2005-10-12
KR100583983B1 true KR100583983B1 (en) 2006-05-26

Family

ID=37278207

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040023941A KR100583983B1 (en) 2004-04-08 2004-04-08 Method for constructing air dome on soft ground

Country Status (1)

Country Link
KR (1) KR100583983B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847208A (en) * 2019-11-27 2020-02-28 北京约顿气膜建筑技术股份有限公司 Air film foundation structure suitable for plateau frozen soil and construction method thereof
KR102423628B1 (en) 2021-08-05 2022-07-22 주식회사 틸레아코리아 Construction structure of airdome

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102026084B1 (en) * 2019-06-18 2019-09-27 주식회사 국제기구에어돔 Air dome
CN114977066B (en) * 2022-06-14 2024-03-12 国网黑龙江省电力有限公司牡丹江供电公司 Support arrangement for expand cable pit usefulness

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6120852U (en) 1984-07-10 1986-02-06 丸満産業株式会社 Transparent window device for buildings with air-supported membrane structure
JPH07279487A (en) * 1994-04-06 1995-10-27 Pro Tekunika Japan:Kk Sheet fixing method for air dome and sheet fixing channel
US5675938A (en) 1996-04-23 1997-10-14 Fabric Enclosures, Inc. Desert envitalization system with variable volume pneumatic polydome enclosure
KR100187834B1 (en) 1996-07-05 1999-06-01 박옥연 Air dome construction
US6651685B2 (en) 2001-09-24 2003-11-25 Kevin T. Connelly Childrens' play area sunshade canopy

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6120852U (en) 1984-07-10 1986-02-06 丸満産業株式会社 Transparent window device for buildings with air-supported membrane structure
JPH07279487A (en) * 1994-04-06 1995-10-27 Pro Tekunika Japan:Kk Sheet fixing method for air dome and sheet fixing channel
US5675938A (en) 1996-04-23 1997-10-14 Fabric Enclosures, Inc. Desert envitalization system with variable volume pneumatic polydome enclosure
KR100187834B1 (en) 1996-07-05 1999-06-01 박옥연 Air dome construction
US6651685B2 (en) 2001-09-24 2003-11-25 Kevin T. Connelly Childrens' play area sunshade canopy

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847208A (en) * 2019-11-27 2020-02-28 北京约顿气膜建筑技术股份有限公司 Air film foundation structure suitable for plateau frozen soil and construction method thereof
CN110847208B (en) * 2019-11-27 2022-05-17 北京约顿气膜建筑技术股份有限公司 Air film foundation structure suitable for plateau frozen soil and construction method thereof
KR102423628B1 (en) 2021-08-05 2022-07-22 주식회사 틸레아코리아 Construction structure of airdome

Also Published As

Publication number Publication date
KR20050098985A (en) 2005-10-12

Similar Documents

Publication Publication Date Title
US5384993A (en) Tie down for building structures
US4043133A (en) Structure and method of constructing and test-loading pile anchored foundations
CA2539466C (en) Concrete post anchor
US20090094916A1 (en) Masonry wall tension device and method for installing same
JPH0333309A (en) Columnar and panel wall structure and its construction
JP3479516B2 (en) Slope stabilization method and slope stabilization device
KR100583983B1 (en) Method for constructing air dome on soft ground
KR100773920B1 (en) Pre-tention soil nailing system and method for reinforcing inclined earth using the same
JP2700811B2 (en) Construction method of structure including super frame
KR100862387B1 (en) Tensional kit for top-down constructing of acupressure lasting anchor and top-down constructing method of acupressure lasting anchor using this
JPS5910623A (en) Foundation structure of selfsupported type stationary crane
KR20110125010A (en) Prefabricated revet construction and method for constructing the same
KR100467234B1 (en) Retaining wall and its construction method of steel panel
US10801176B1 (en) Anchor structure and method for pole barn uplift protection
KR100597530B1 (en) A railing install method
KR102043124B1 (en) Functional anchor plate
JPH1082057A (en) Method of earthquake-resisting pile foundation construction
JP3351663B2 (en) Anchor anchoring pedestal used for slope stabilization method
JP2000017644A (en) Installation method of underwater structure
KR100462925B1 (en) Method for reinforcing bridges using external steel wires and steel wire anchoring device applied to the same
KR20050050732A (en) Anchor for ground and retaining wall structure using anchor
JP2006348480A (en) Building and building forming method
JPH1082056A (en) Method of earthquake-resisting pile foundation construction
JP2523234B2 (en) Anchor retaining wall
KR102560642B1 (en) Composite pile using micro pile and its construction method

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130521

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140428

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150428

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20160411

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20170310

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20180410

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20190312

Year of fee payment: 14