KR100597530B1 - A railing install method - Google Patents

A railing install method Download PDF

Info

Publication number
KR100597530B1
KR100597530B1 KR1020050008487A KR20050008487A KR100597530B1 KR 100597530 B1 KR100597530 B1 KR 100597530B1 KR 1020050008487 A KR1020050008487 A KR 1020050008487A KR 20050008487 A KR20050008487 A KR 20050008487A KR 100597530 B1 KR100597530 B1 KR 100597530B1
Authority
KR
South Korea
Prior art keywords
panel
installing
wire
support rod
railing
Prior art date
Application number
KR1020050008487A
Other languages
Korean (ko)
Inventor
정윤수
Original Assignee
정윤수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정윤수 filed Critical 정윤수
Priority to KR1020050008487A priority Critical patent/KR100597530B1/en
Application granted granted Critical
Publication of KR100597530B1 publication Critical patent/KR100597530B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3276Arrangements on buildings for connecting safety-lines

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 난간 설치방법에 관한 것으로, 이러한 본 발명은 터파기 된 지하 공간의 입구 주변에 난간을 설치하는 방법에 있어서, 터파기 된 지하 공간의 입구 테두리를 소정 깊이를 가지며 평탄하게 굴착하는 단계; 패널에 앵커볼트와 지지봉을 착탈 가능하게 설치하는 단계; 앵커볼트와 지지봉이 설치된 패널을 상기 테두리에 적당한 간격을 두고 개재시키는 단계; 상기 테두리에 콘크리트를 타설하는 단계; 및 상기 지지봉에 와이어를 설치하는 단계;를 포함하여 이루어진다.The present invention relates to a method for installing a railing, and the present invention provides a method for installing a railing around an entrance of a burrowed underground space, the method comprising: excavating the entrance edge of the burrowed underground space with a predetermined depth and flattening it; Detachably installing the anchor bolt and the support rod on the panel; Interposing a panel having anchor bolts and support rods installed at appropriate intervals on the edge; Placing concrete on the rim; And installing a wire on the support rod.

패널, 앵커볼트, 지지봉, 와이어, 턴버클Panel, Anchor Bolt, Support Rod, Wire, Turnbuckle

Description

난간 설치방법 {A railing install method} Railing install method {A railing install method}             

도 1은 종래의 난간 설치방법에 이용되는 난간의 구성을 나타낸 도면이고,1 is a view showing the configuration of a railing used in a conventional railing installation method,

도 2는 본 발명에 따른 난간 설치방법에 이용되는 난간의 구성을 나타낸 분해사시도이며,Figure 2 is an exploded perspective view showing the configuration of the handrail used in the handrail installation method according to the present invention,

도 3은 본 발명에 따른 난간 설치방법에 이용되는 난간의 구성을 나타낸 결합사시도이고,Figure 3 is a combined perspective view showing the configuration of the handrail used in the handrail installation method according to the present invention,

도 4a 내지 도 4d는 본 발명에 따른 난간 설치방법에 이용되는 난간의 설치 상태를 도면이다.4A to 4D are diagrams illustrating an installation state of the railing used in the railing installation method according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10 : 난간10: handrail

20 : 패널20: panel

30 : 앵커볼트30: anchor bolt

40 : 지지봉40: support rod

50 : 와이어50: wire

본 발명은 난간 설치방법에 관한 것으로, 보다 상세하게는 터파기 된 지하 공간의 입구 테두리에 난간을 설치하는 방법에 있어서, 앵커볼트와 지지봉이 조립된 패널을 지하 공간의 입구 테두리에 적정한 간격을 두고 위치시킨 후, 콘크리트를 타설하여 상기 패널을 고정하고 상기 지지봉에 와이어를 설치함으로써, 설치가 용이하고 작업시간이 줄어드는 난간 설치방법에 관한 것이다.The present invention relates to a method for installing a railing, and more particularly, in a method for installing a railing at an entrance edge of a burrowed underground space, a panel in which anchor bolts and support rods are assembled at an appropriate interval at an entrance edge of an underground space. After positioning, by placing concrete to fix the panel and install a wire to the support rod, the installation of the handrail is easy and the working time is reduced.

일반적으로, 건축물의 터파기 공사현장에는 작업자 또는 행인들의 추락사고를 방지하기 위해 도 1에 도시한 바와 같이 패널(2), 앵커볼트(3), 지지봉(4), 와이어(5)로 구성된 난간(1)을 설치한다. Generally, in order to prevent the accident of a worker or a pedestrian from falling through the construction site of a building, a handrail composed of a panel 2, an anchor bolt 3, a support rod 4, and a wire 5 as shown in FIG. Install (1).

이러한 종래의 난간(1) 설치방법을 살펴보면, 터파기 된 지하 공간의 입구 주변를 굴착하는 단계와, 상기 굴착된 위치에 콘크리트(C)를 타설하는 단계와, 양생이 완료된 콘크리트(C)에 적정한 간격을 두고 패널(2)을 위치시키는 단계와, 앵커볼트(3)와 지지봉(4)을 설치 할 수 있도록 상기 패널(2)을 관통하여 콘크리트(C)에 설치공(6)을 형성하는 단계와, 상기 설치공(6)에 앵커볼트(3)와 지지봉(4)을 설치하는 단계와, 상기 지지봉(4)에 와이어(5)를 설치하는 단계로 이루어진다.Looking at the installation method of the conventional railing (1), the step of excavating the periphery of the opening of the exploded underground space, the step of placing the concrete (C) in the excavated position, and the appropriate spacing to the concrete (C) completed curing Positioning the panel (2) with the step, and penetrating the panel (2) to install the anchor bolt (3) and the support bar (4) to form a mounting hole (6) in the concrete (C) and In addition, the anchor bolt 3 and the support rods 4 are installed in the installation hole 6, and the support rods 4 are provided with the step of installing the wires 5.

그러나, 종래의 난간 설치방법은 양생이 완료된 콘크리트에 패널을 위치시킨 후, 패널과 콘크리트를 동시에 관통하여 설치공을 형성하고, 이 설치공에 앵커볼트와 지지봉을 설치하기 때문에 작업이 난해하고, 작업시간이 오래 걸리는 문제점이 있었다.However, the conventional railing installation method is difficult to work because after placing the panel in the concrete is cured, through the panel and the concrete at the same time to form the installation hole, and to install the anchor bolt and the support rod in the installation hole, There was a problem that took a long time.

또한, 콘크리트에 형성된 설치공에 앵커볼트를 삽입하여 패널을 고정함으로써, 난간을 장시간 사용하거나, 외부에서 충격을 받으면 설치공과 앵커볼트의 결속력이 약화되어 난간이 흔들리는 문제점도 있었다.In addition, by fixing the panel by inserting the anchor bolt to the installation hole formed in the concrete, when the railing is used for a long time, or when impacted from the outside, the binding force between the installation hole and the anchor bolt is weakened, there was also a problem that the railing shakes.


본 발명은 상기 종래 문제점을 해결하기 위하여 제안된 것으로, 난간을 설치하고자 하는 장소(예를들어, 터파기가 된 지하공간의 입구 테두리)를 굴착하고, 앵커볼트와 지지봉이 조립된 패널을 상기 굴착 위치에 적정한 간격을 두고 개재시킨 다음에, 콘크리트를 타설하여 상기 패널을 고정하고 상기 지지봉에 와이어를 설치함으로써, 설치가 용이하고 작업시간이 단축되는 난간 설치방법을 제공함에 그 기술적 과제가 있다.

The present invention has been proposed in order to solve the above problems, excavation of the place (for example, the entrance border of the burrow underground space) to install the railing, the anchor bolt and the support bar assembled panel to the excavation position There is a technical problem to provide a handrail installation method which is easy to install and shorten the working time by interposing the concrete at an appropriate interval, and then fixing the panel by installing concrete and installing a wire on the support rod.

상기 목적을 달성하기 위한 본 발명에 따른 난간 설치방법의 특징은, 터파기 된 지하 공간의 입구 주변에 난간을 설치하는 방법에 있어서, 터파기 된 지하 공간의 입구 테두리를 굴착하는 단계와, 패널에 앵커볼트와 지지봉을 설치하는 단계와, 앵커볼트와 지지봉이 설치된 패널을 상기 굴착 위치에 적당한 간격을 두고 개재시키는 단계와, 상기 굴착된 위치에 콘크리트를 타설하는 단계 및 상기 지지봉에 와이어를 설치하는 단계로 이루어진다.
Characteristic of the railing installation method according to the present invention for achieving the above object, in the method of installing the railing around the entrance of the burnished underground space, the step of excavating the entrance edge of the burnished underground space, and the panel Installing an anchor bolt and a support rod, interposing a panel having the anchor bolt and the support rod installed at an excavated position at appropriate intervals, placing concrete in the excavated position, and installing a wire in the support rod. Consists of.

이하, 본 발명에 따른 난간 설치방법의 바람직한 실시 예를 첨부한 도면을 참조하여 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings a preferred embodiment of the railing installation method according to the present invention.

도 2는 본 발명에 따른 난간 설치방법에 이용되는 난간의 구성을 나타낸 분해사시도이며, 도 3은 본 발명에 따른 난간 설치방법에 이용되는 난간의 구성을 나타낸 결합사시도이고, 도 4a 내지 도 4d는 본 발명에 따른 난간 설치방법에 이용되는 난간의 설치 상태를 도면이다.Figure 2 is an exploded perspective view showing the configuration of the railing used in the railing installation method according to the present invention, Figure 3 is a combined perspective view showing the configuration of the railing used in the railing installation method according to the present invention, Figures 4a to 4d Figure is a diagram illustrating the installation of the railing used in the railing installation method according to the present invention.

도 2 내지 도 3에 도시한 바와 같이, 본 발명에 따른 난간 설치방법에 사용되는 난간(10)의 구성은 크게 패널(20)과, 상기 패널(20)을 고정시켜주는 앵커볼트(30), 상기 패널(20)에 관통되게 조립되는 지지봉(40)과, 상기 지지봉(40)에 설치되는 와이어(50)로 구성된다.2 to 3, the configuration of the handrail 10 used in the handrail installation method according to the present invention is largely the panel 20, the anchor bolt 30 for fixing the panel 20, The support rod 40 is assembled to penetrate the panel 20, and the wire 50 is installed in the support rod 40.

상기 패널(20)은 설치하고자 하는 장소(예를들어 터파기 된 지하공간의 입구 테투리)에 적당한 간격을 두고 설치되며, 중앙에 구멍(21)과 모서리부에 구멍(23)이 형성된다.The panel 20 is installed at a suitable interval (for example, the entrance border of the exploded basement space) to be installed, and the hole 21 and the corner 23 are formed in the center.

상기 앵커볼트(30)는 패널(10)의 모서리부에 형성된 구멍(23)에 관통되도록 개재되며, 일반적으로 널리 이용되는 물품으로 상세한 설명은 생략한다.The anchor bolt 30 is interposed so as to penetrate the hole 23 formed in the corner portion of the panel 10, and a general description thereof will be omitted.

상기 지지봉(40)은 일정한 길이를 가지며, 상기 패널(20)의 중앙에 형성된 구멍(21)에 하단부가 관통되게 설치된다.The support rod 40 has a predetermined length and is installed so that the lower end penetrates the hole 21 formed in the center of the panel 20.

상기 와이어(50)는 적당한 간격을 두고 설치된 지지봉(40)에 각각 설치되어, 작업자 또는 행인들이 터파기 된 지하공간으로 추락하는 것을 방지한다.The wire 50 is installed on each of the support rods 40 provided at appropriate intervals, to prevent the worker or pedestrians from falling into the broken underground space.

여기서, 상기 와이어(50)의 장력을 조절하기 위하여 상기 와이어(50)에 적어도 1개 이상의 턴버클(51)이 설치되는 것이 좋다.Here, at least one turnbuckle 51 may be installed in the wire 50 to adjust the tension of the wire 50.

그리고, 상기 와이어(50)는 상기 지지봉(40)의 길이방향을 따라 일정간격을 두고 적어도 1열 이상 설치되는 것이 좋다.In addition, the wire 50 is preferably installed at least one row at a predetermined interval along the longitudinal direction of the support bar (40).

이와 같이 구성된 본 발명에 따른 난간 설치방법을 도 4a 내지 도 4d를 참조하여 설명하면 다음과 같다.The railing installation method according to the present invention configured as described above will be described with reference to FIGS. 4A to 4D.

먼저, 터파기가 된 지하 작업 공간의 입구 주변 테투리를 소정의 깊이를 가지며 평탄하게 굴착한다.First, the perimeter around the entrance of the burrowed underground work space is excavated flat with a predetermined depth.

그리고, 패널(20)의 모서리부에 형성된 구멍(23)에 앵커볼트(30)를 개재한다.The anchor bolt 30 is interposed between the holes 23 formed at the corners of the panel 20.

계속해서, 앵커볼트(30)가 개재된 패널(20)의 중앙에 형성된 구멍(21)에 지지봉(40)의 하부가 일정길이 돌출되도록 설치한다.Subsequently, the lower portion of the support bar 40 is installed in the hole 21 formed in the center of the panel 20 in which the anchor bolt 30 is interposed to protrude a predetermined length.

이와 같이, 조립된 다수개의 패널(20)을 상기 테두리에 적정한 간격을 두고 위치시킨다.As such, the assembled plurality of panels 20 are positioned at appropriate intervals on the edge.

그런 다음에, 콘크리트(C)를 상기 테두리에 타설한다.Then, concrete C is poured into the edge.

그리고, 와이어(50)의 양단부에 턴버클(51)을 설치한다.The turnbuckles 51 are provided at both ends of the wire 50.

계속해서, 적정한 간격을 두고 설치된 지지봉(40)에 와이어(50)의 양단부를 각각 묶는다.Subsequently, both ends of the wire 50 are tied to the supporting rods 40 provided at appropriate intervals.

그런 후에, 상기 턴버클(51)을 회전시켜 와이어(50)가 팽팽하게 되도록 조절한다.Thereafter, the turnbuckle 51 is rotated to adjust the tension of the wire 50.

이상에서 상술한 바와 같이, 본 발명은 앵커볼트와 지지봉이 조립된 패널을 설치하고자 하는 장소에 위치시킨 다음에 콘크리트를 타설하여 상기 패널을 고정하고 상기 지지봉에 와이어를 설치함으로써, 종래에 비해 작업 공정 수가 줄어들어 작업 시간이 단축되고, 설치가 용이한 효과가 있다.
As described above, the present invention by placing the anchor bolt and the support rod assembled in the place where you want to install the panel, then the concrete is fixed to the panel and install the wire to the support rod, compared to the conventional work process As the number is reduced, the work time is shortened and the installation is easy.

또한, 앵커볼트 일측부와 지지봉의 일측부가 패널의 하부에 위치하도록 조립 되고, 상기 패널의 하부로 콘크리트가 타설되어 양생됨으로써, 상기 패널 및 지지봉이 튼튼하게 고정 설치되는 효과가 있다.In addition, one side of the anchor bolt and one side of the support rod is assembled to be located at the bottom of the panel, the concrete is poured into the lower portion of the panel to cure, there is an effect that the panel and the support rod is firmly installed.

Claims (2)

터파기 된 지하 공간의 입구 주변에 난간을 설치하는 방법에 있어서,In the method of installing a railing around the entrance of the pitted underground space, 터파기 된 지하 공간의 입구 테두리를 소정 깊이를 가지며 평탄하게 굴착하는 단계;Digging the entrance edge of the trenched underground space to a predetermined depth and flat; 패널에 앵커볼트와 지지봉을 착탈 가능하게 설치하는 단계;Detachably installing the anchor bolt and the support rod on the panel; 앵커볼트와 지지봉이 설치된 패널을 상기 테두리에 적당한 간격을 두고 개재시키는 단계;Interposing a panel having anchor bolts and support rods installed at appropriate intervals on the edge; 상기 테두리에 콘크리트를 타설하는 단계; 및Placing concrete on the rim; And 상기 지지봉에 와이어를 설치하는 단계;를 포함하여 이루어진 것을 특징으로 하는 난간 설치방법.Installing the wire on the support rod; Balustrade installation method comprising a. 제 1항에 있어서,The method of claim 1, 상기 지지봉에 와이어를 설치하기 전에 상기 와이어의 장력 조절을 위하여 상기 와이어에 적어도 1개 이상의 턴버클을 설치하는 단계가 더 포함되는 것을 특징으로 하는 난간 설치방법.Handrail installation method further comprises the step of installing at least one turnbuckle on the wire for adjusting the tension of the wire before installing the wire on the support rod.
KR1020050008487A 2005-01-31 2005-01-31 A railing install method KR100597530B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050008487A KR100597530B1 (en) 2005-01-31 2005-01-31 A railing install method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050008487A KR100597530B1 (en) 2005-01-31 2005-01-31 A railing install method

Publications (1)

Publication Number Publication Date
KR100597530B1 true KR100597530B1 (en) 2006-07-05

Family

ID=37183685

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050008487A KR100597530B1 (en) 2005-01-31 2005-01-31 A railing install method

Country Status (1)

Country Link
KR (1) KR100597530B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100740316B1 (en) * 2007-02-02 2007-07-18 주식회사 아데코건축사사무소 Railing structure for apartment house
CN103061526A (en) * 2013-01-18 2013-04-24 中国十七冶集团有限公司 Safety protection method for limbs
KR20180111723A (en) * 2018-09-20 2018-10-11 유지씨 주식회사 How to install handrail and handrail for gable roof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60170452U (en) 1984-04-20 1985-11-12 勝村建設株式会社 Installation structure for protective fences in building openings
JPH01203566A (en) * 1988-02-09 1989-08-16 Tokyu Constr Co Ltd Handrail fitting anchor at slab opening section and its prefitting construction
JPH08158662A (en) * 1994-11-30 1996-06-18 Kunimoto Shokai:Kk Safety handrail fitting device for temporary installation
JPH09296611A (en) * 1996-04-30 1997-11-18 Satake Tekko Kk Support-fixing device for safety fence to be installed during construction of concrete structure
JPH1072873A (en) 1996-06-28 1998-03-17 Onoda Autoclaved Light Weight Concrete Co Ltd Anchor fitting for alc panel
KR19980031993U (en) * 1998-04-27 1998-08-17 이병호 Railing support
KR19990011981U (en) * 1998-12-30 1999-03-25 송정덕 Temporary Handrails for Veranda
KR200190081Y1 (en) 2000-03-03 2000-07-15 주식회사건축사사무소동우건축 Safety support of balcony in building construction site
KR200349955Y1 (en) 2004-02-09 2004-05-08 오흥국 Apparatus for fixing a steel tube of a safe handrail

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60170452U (en) 1984-04-20 1985-11-12 勝村建設株式会社 Installation structure for protective fences in building openings
JPH01203566A (en) * 1988-02-09 1989-08-16 Tokyu Constr Co Ltd Handrail fitting anchor at slab opening section and its prefitting construction
JPH08158662A (en) * 1994-11-30 1996-06-18 Kunimoto Shokai:Kk Safety handrail fitting device for temporary installation
JPH09296611A (en) * 1996-04-30 1997-11-18 Satake Tekko Kk Support-fixing device for safety fence to be installed during construction of concrete structure
JPH1072873A (en) 1996-06-28 1998-03-17 Onoda Autoclaved Light Weight Concrete Co Ltd Anchor fitting for alc panel
KR19980031993U (en) * 1998-04-27 1998-08-17 이병호 Railing support
KR19990011981U (en) * 1998-12-30 1999-03-25 송정덕 Temporary Handrails for Veranda
KR200190081Y1 (en) 2000-03-03 2000-07-15 주식회사건축사사무소동우건축 Safety support of balcony in building construction site
KR200349955Y1 (en) 2004-02-09 2004-05-08 오흥국 Apparatus for fixing a steel tube of a safe handrail

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100740316B1 (en) * 2007-02-02 2007-07-18 주식회사 아데코건축사사무소 Railing structure for apartment house
CN103061526A (en) * 2013-01-18 2013-04-24 中国十七冶集团有限公司 Safety protection method for limbs
KR20180111723A (en) * 2018-09-20 2018-10-11 유지씨 주식회사 How to install handrail and handrail for gable roof
KR101949194B1 (en) * 2018-09-20 2019-02-18 유지씨 주식회사 How to install handrail and handrail for gable roof

Similar Documents

Publication Publication Date Title
US7454872B2 (en) Concrete post anchor
US7024827B2 (en) Preconstruction anchoring system and method for buildings
KR100571102B1 (en) Device of Innovative Prestressed Scaffolding System for Improving Workability
US20140191174A1 (en) Removable safety barrier
CN104314167B (en) Prestressed assembly type building and assembly method thereof
KR100597530B1 (en) A railing install method
JP2008150947A (en) Wall structure in which permanent anchor is executed, and construction method of wall structure in which permanent anchor is executed
KR100726984B1 (en) Temporary system for land-side protection wall
KR20130087137A (en) Noise barrier basis and construction method thereof
JP4624867B2 (en) Seismic isolation repair method for existing buildings
KR20190014811A (en) Construction method for complex foundation
JP4958044B2 (en) Installation structure and installation method for shield tunnel approach
JPH0996197A (en) Structure of support wall and construction method therefor
JP2008255632A (en) Construction method for guard fence or soundproof wall against avalanche and rock fall, precast concrete block constituting upper section of retaining wall or foundation block, and temporary fixing member for support for use in construction method for guard fence or soundproof wall against avalanche and rock fall
KR101223268B1 (en) a bridge repair and reinforcement method
KR100190277B1 (en) A fabricated retaining wall apparatus
KR200329996Y1 (en) Pillar Socket of Roof Fall Supporter
KR200407047Y1 (en) Soundproof wall combined fall prevention
KR100583983B1 (en) Method for constructing air dome on soft ground
KR20040051182A (en) Temporary soil sheathing using prestress and pile thereof
KR20200122029A (en) Vertical underground structure and method for constructing the same
KR102626717B1 (en) Temporary earth retaining structure ivcluding preflex beam and construction method thereof
JP3022318B2 (en) How to repair existing structures
KR101085324B1 (en) Security a handrail prop apparatus and method for constructing using the same
JP3740607B2 (en) Building provisional receiving method and structure

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee