KR100549498B1 - Construction assembly breast wall pul lek establishment structure - Google Patents
Construction assembly breast wall pul lek establishment structure Download PDFInfo
- Publication number
- KR100549498B1 KR100549498B1 KR1020050098337A KR20050098337A KR100549498B1 KR 100549498 B1 KR100549498 B1 KR 100549498B1 KR 1020050098337 A KR1020050098337 A KR 1020050098337A KR 20050098337 A KR20050098337 A KR 20050098337A KR 100549498 B1 KR100549498 B1 KR 100549498B1
- Authority
- KR
- South Korea
- Prior art keywords
- block
- slope
- vegetation
- drainage
- fastening
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/205—Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B11/00—Drainage of soil, e.g. for agricultural purposes
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Agronomy & Crop Science (AREA)
- Mechanical Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
본 발명은 특히 일정한 경사로 이루어진 사면의 유동으로 인한 붕괴를 방지하기 위하여 연장 끼움되어 배열되는 사면블럭을 사면에 시공하는 구조로써 사면의 면적에 따라 보강블럭의 시공개수를 조절하여 시공이 가능하며, 사면에 매입 고정된 정착대에 보강블럭을 끼움작업으로 시공이 완료되어 시공이 간단하며, 공사기간의 단축과 미관과 친환경적인 측면을 고려하여 식생식물을 식생시킨 건축용 조립식 옹벽블럭의 설치구조에 관한 것으로, 더욱 상세하게는 상기한 목적을 달성하기 위하여 본 발명은 사면의 조립식블럭구조에 있어서, The present invention is a structure for constructing a slope block that is extended and fitted in order to prevent collapse due to the flow of the slope made of a certain slope in particular, the construction is possible by adjusting the number of construction of the reinforcement block according to the area of the slope, The construction is simple by fitting the reinforcement block to the fixing fixture fixed to the building. In consideration of an environmentally friendly aspect relates to the installation structure of the prefabricated retaining wall block for building vegetation vegetation, the present invention in order to achieve the above object in more detail in the prefabricated block structure of the slope,
중앙부가 융기되고 좌,우측은 지붕형의 경사면이 형성되며, 상기 경사면의 끝단에 종방향으로 체결돌기가 단턱 형성된 수평 윙부가 형성되어 일체의 블럭몸체가 형성되며, 중앙은 배수를 위한 배수로가 종방향으로 형성되되 상기 양측 경사면에 식생을 위한 식생식물, 배양토, 자갈등이 포설되는 식생부가 형성된 보강블럭과, 역오각형의 좌, 우면에 종방향의 체결홈 형성되고, 상기 체결홈의 저부로 사면에 매입되는 역삼각형상의 매입단으로 형성된 정착대로 구성되는 것으로서, 상기 정착대를 사면에 체결홈에 보강블럭의 체결돌기가 체결되어 조립시공되는 것을 특징으로 한다.The central part is raised and left and right sides are formed with a roof-shaped inclined surface, and a horizontal wing portion formed with a fastening protrusion in the longitudinal direction is formed at the end of the inclined surface to form an integral block body. Reinforcing block is formed on both sides of the vegetation for vegetation, vegetation soil, gravel, etc. for vegetation on both inclined surface, and the left and right sides of the inverted pentagonal groove is formed in the longitudinal direction, the bottom of the coupling groove on the slope It is composed of a fixing station formed by a buried end of the inverted triangle of the buried, characterized in that the fastening projection of the reinforcing block is fastened to the fastening groove on the four sides of the fixing unit is assembled.
사면, 사면블럭, 보강블록, 배수구, 식생부 Slope, slope block, reinforcement block, drain hole, vegetation part
Description
도 1은 종래의 사면 안전 보강되는 암거배수용 수로관를 나타낸 단면사시도1 is a cross-sectional perspective view showing a conventional culvert drainage waterway pipe reinforced safety
도 2는 본 발명에 따른 건축용 조립식 옹벽블럭의 설치구조를 나타낸 분해사시도,Figure 2 is an exploded perspective view showing the installation structure of the prefabricated retaining wall block for building according to the present invention,
도 3은 본 발명에 따른 건축용 조립식 옹벽블럭의 설치구조를 나타낸 결합사시도,3 is a perspective view showing the installation structure of the prefabricated retaining wall block for building according to the present invention;
도 4는 본 발명에 따른 건축용 조립식 옹벽블럭의 식생상태를 나타낸 분해사시도,Figure 4 is an exploded perspective view showing the vegetation state of the prefabricated retaining wall block for building according to the present invention,
도 5는 본 발명에 따른 건축용 조립식 옹벽블럭의 식생상태를 나타낸 결합사시도,5 is a perspective view showing a vegetation state of the prefabricated retaining wall block for building according to the present invention;
도 6은 본 발명에 따른 건축용 조립식 옹벽블럭의 설치상태를 나타낸 단면도,6 is a cross-sectional view showing the installation state of the prefabricated retaining wall block for building according to the present invention;
도 7은 본 발명에 따른 건축용 조립식 옹벽블럭의 설치상태를 나타낸 설치사시도,7 is an installation perspective view showing the installation state of the prefabricated retaining wall block for building according to the present invention;
< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>
10 : 사면블럭 11 : 보강블럭10: slope block 11: reinforcement block
12 : 정착대 111 : 블럭몸체12: fixing station 111: block body
111a : 배수로 111b : 경사면111a:
111b' : 윙부 111b" : 체결돌기111b ':
111c : 식생부 111d : 배수홀111c:
121 : 체결홈 121a : 배수홀121:
122 : 매입단 123 : 배수구122: purchase end 123: drain
100 : 사면 200 : 외부배수로100: slope 200: external drainage
a : 식생식물 b : 자갈 a: vegetation b: gravel
c : 배양토c: culture soil
본 발명은 건축용 조립식 옹벽블럭의 설치구조에 관한 것으로, 특히 일정한 경사로 이루어진 사면의 유동으로 인한 붕괴를 방지하기 위하여 연장 끼움되어 배열되는 사면블럭을 사면에 시공하는 구조로써 사면의 면적에 따라 보강블럭의 시공개수를 조절하여 시공이 가능하며, 사면에 매입 고정된 정착대에 보강블럭을 끼움작업으로 시공이 완료되어 시공이 간단하며, 공사기간의 단축과 미관과 친환경적인 측면을 고려하여 식생식물을 식생시킨 건축용 조립식 옹벽블럭의 설치구조에 관한 것이다.The present invention relates to an installation structure of a prefabricated retaining wall block for building, and in particular, to install a slope block arranged on the slope in order to prevent collapse due to the flow of the slope consisting of a predetermined slope of the reinforcement block according to the area of the slope The construction is possible by adjusting the number of construction, and the construction is simple by inserting the reinforcement block into the fixed fixing unit on the slope, and the construction is simple. Considering the environment-friendly aspect of the present invention relates to the installation structure of prefabricated retaining wall blocks for vegetation vegetation.
일반적으로 주택을 건설하기 위해서는 평지나 산을 절토하여 다단형태로 기 초지면을 형성하여 시공한다. 그러나 절토시 사면의 붕괴를 방지하기 위하여 지면에 대하여 일정경사로 사면(비탈면)을 형성시킨다.In general, in order to construct a house, the ground or the mountain is cut to form a foundation surface in a multi-stage form. However, in order to prevent the collapse of the slope during cutting, slopes (slopes) are formed with a certain slope to the ground.
상기 사면은 안정화된 경사로 시공되었다 하더라도 지면내에 수분을 과다 포함하는 포화함수상태가 되면 측방유동으로 인하여 붕괴되는 문제점이 있었다.Even if the slope is constructed with a stabilized slope, there is a problem that collapses due to lateral flow when the saturated function state includes excessive moisture in the ground.
이를 해결하기 위하여 과거 일반적으로 사면에 사면블럭을 시공하여 붕괴를 방지하고자 하였으나, 근본적인 문제점을 해결하지는 못 하였다.In order to solve this problem, in general, the slope block was installed on the slope to prevent collapse, but it did not solve the fundamental problem.
이러한 문제점을 보완하고자 대한민국 특허 등록번호 제 10-0455841호가 제안된바 있다.To compensate for this problem, Korean Patent Registration No. 10-0455841 has been proposed.
이와 같은 종래 사면 안전 보강되는 암거배수용 수로관의 전형적인 일례가 도 1에 도시되어 있다.A typical example of such a conventional slope safety reinforced culvert drainage channel is shown in FIG. 1.
도 1에서 부재번호 1은 배수로, 2는 수로관, 3은 배수관, 4는 천공구, 100은 사면, 101은 사면블럭을 각각 가리킨다.In Fig. 1,
이에 도시된 바와 같이 사면(100)을 보강하기 위해 전면으로 시공된 사면블럭(101)과 사면(100)의 상부로는 유입수의 흐름을 위한 배수로(1)와 상기 배수로(1)를 따라 흐르는 유입수가 저부로 흐르게 하는 다수 천공구(4)가 형성된 배수관(3)과 연결된 유입수의 배수를 위한 수로관(2)으로 구성된다. As shown therein, the inflow water flowing along the
상기와 같은 우수로 인한 유입수가 사면블럭(101)을 따라 배수로(1)을 따라 집수되어 배수관(3)을 통해 유입수의 배수를 위한 수로관(2)에 집진되어 배수되는 것이다.The inflow water due to the rainwater is collected along the
그러나 상기와 같은 종래의 배수관에는 다수 천공구가 형성되어 유입수가 배 수로로부터 수로관으로 이동하는 과정에서 사면에 수분을 공급하는 문제점이 있었으며, 사면블럭이 시공되지 않은 노출되어진 사면으로부터 수분이 유입되어 함수량이 증가하는 문제점이 있어 근본적인 사면내의 측방유동과 함수량을 감소시키지 못하는 문제점이 있었다.However, in the conventional drainage pipes as described above, a number of perforations are formed and there is a problem of supplying water to the slopes during the inflow of water from the drainage channel to the waterway pipe, and moisture is introduced from the exposed slopes where the sloped blocks are not constructed. There is a problem that this increase does not reduce the lateral flow and water content in the fundamental slope.
이에 본 발명은 상기와 같은 종래 기술의 문제점을 감안하여 안출한 것으로 시공될 사면에 정착대를 일정깊이 매입시켜 고정배열하고 상기 정착대 사이에 보강블럭을 끼워 시공한 후, 보강블럭에 양측으로 형성된 식생부에 식생식물이 성장할 수 있도록 자갈이나 배양토 등이 포설되어 식생환경을 제공하며, 우천으로 인한 수분함유량과 과대유량은 보강블럭에 형성된 배수로와 정착대의 배수구를 따라 배수되는 사면의 건축용 조립식 옹벽블럭의 설치구조를 제공하는데 그 목적이 있다.Therefore, the present invention has been made in view of the problems of the prior art as described above, and fixedly arranged by mounting a fixture on a slope to be constructed to a predetermined depth, and after installing the reinforcement block between the fixing rod, formed on both sides of the reinforcement block Gravel or cultured soil is installed to grow vegetation in the vegetation part, providing a vegetation environment, and the prefabricated retaining wall block for the construction of slopes along the drainage channel formed in the reinforcement block and the drainage port of the settlement The purpose is to provide an installation structure.
상기한 목적을 달성하기 위하여 본 발명은 사면의 조립식블럭구조에 있어서,In order to achieve the above object, the present invention is a prefabricated block structure of the slope,
중앙부가 융기되고 좌,우측은 지붕형의 경사면이 형성되며, 상기 경사면의 끝단에 종방향으로 체결돌기가 단턱 형성된 수평 윙부가 형성되어 일체의 블럭몸체가 형성되며, 중앙은 배수를 위한 배수로가 종방향으로 형성되되 상기 양측 경사면에 식생을 위한 식생식물, 배양토, 자갈등이 포설되는 식생부가 형성된 보강블럭과,The central part is raised and left and right sides are formed with a roof-shaped inclined surface, and a horizontal wing portion formed with a fastening protrusion in the longitudinal direction is formed at the end of the inclined surface to form an integral block body. A reinforcement block having a vegetation part formed with vegetation plants, culture soil, gravel, etc. for vegetation on both inclined surfaces;
역오각형의 좌, 우면에 종방향의 체결홈 형성되고, 상기 체결홈의 저부로 사면에 매입되는 역삼각형상의 매입단으로 형성된 정착대로 구성되는 것으로서, 상기 정착대를 사면에 체결홈에 보강블럭의 체결돌기가 체결되어 조립시공되는 것을 특 징으로 하며,A fastening groove in the longitudinal direction is formed on the left and right surfaces of the inverted pentagon, and consists of a fixing unit formed of an inverted triangular buried end that is embedded in the slope with the bottom of the fastening groove, and the reinforcing block is formed in the fastening groove on the slope. The fastening protrusions are fastened and assembled.
상기 보강블럭의 배수로의 양측면 중앙에 식생부에 관통되어 체결돌기의 중앙부에 관통 형성되는 배수홀이 구비되고, 상기 정착대는 배수홀과 연통되게 정착대의 체결홈 중앙에 배수홀이 형성되는 한편, 상기 배수홀와 직교연통되게 종방향으로 배수구가 형성되어 구성되는 것으로서, 상기 배수로로 흐르는 일부의 물이 순차적으로 배수로, 배수로, 배수구으로 배출되는 것을 특징으로 하는 건축용 조립식 옹벽블럭의 설치 구조를 제공한다.A drainage hole is formed at both centers of both sides of the drainage passage of the reinforcing block and is formed through the central portion of the fastening protrusion. The drainage hole is formed at the center of the fastening groove of the fixing unit so as to communicate with the drainage hole. The drainage hole is formed in a longitudinal direction so as to be in direct communication with the drainage hole, and a part of the water flowing into the drainage path is provided to install the prefabricated retaining wall block for building, characterized in that the drainage, drainage, drainage drain sequentially.
따라서 간단하게 시공이 가능하며, 식생식물이 생장시켜 친환경적인 면과 배수가 용이하여 사면의 안정화를 이룰 수 있다.Therefore, it is possible to simply install, and the vegetation is grown, so that the eco-friendly cotton and drainage can be easily achieved to stabilize the slope.
이에 상기한 바와 같은 본 발명의 바람직한 실시 예를 첨부도면에 의거하여 상세히 설명하면 다음과 같다.When described in detail on the basis of the accompanying drawings a preferred embodiment of the present invention as follows.
첨부된 도 2는 본 발명에 따른 건축용 조립식 옹벽블럭의 설치구조를 나타낸 분해사시도, 도 3은 본 발명에 따른 건축용 조립식 옹벽블럭의 설치구조를 나타낸 결합사시도, 도 4는 본 발명에 따른 건축용 조립식 옹벽블럭의 식생상태를 나타낸 분해사시도, 도 5는 본 발명에 따른 건축용 조립식 옹벽블럭의 식생상태를 나타낸 사시도, 도 6은 본 발명에 따른 건축용 조립식 옹벽블럭의 설치상태를 나타낸 단면도, 도 7은 본 발명에 따른 건축용 조립식 옹벽블럭의 설치상태를 나타낸 설치사시도이다.2 is an exploded perspective view showing the installation structure of the prefabricated retaining wall block for building according to the present invention, Figure 3 is a perspective view showing the installation structure of the prefabricated retaining wall block for building according to the present invention, Figure 4 is a prefabricated retaining wall for building according to the present invention Figure 5 is an exploded perspective view showing the vegetation state of the block, Figure 5 is a perspective view showing the vegetation state of the building retaining wall block according to the present invention, Figure 6 is a cross-sectional view showing the installation state of the building retaining wall block according to the invention, Figure 7 Installation perspective view showing the installation state of the prefabricated retaining wall block for building according to.
이에 도시된 바와 같이 본 발명의 건축용 조립식 옹벽블럭의 설치구조는 사 면(100)의 조립식블럭구조에 있어서,As shown in the building structure of the prefabricated retaining wall block of the present invention in the prefabricated block structure of the
도 2에 도시된 바와 같이 보강블럭(11)은 중앙부가 융기되고 좌,우측은 지붕형의 경사면(111b)이 형성된다.As shown in FIG. 2, the reinforcing
그리고 상기 경사면(111b)의 끝단에 종방향으로 체결돌기(111b")가 단턱 형성된 수평 윙부(111b')가 형성되어 일체의 블럭몸체(111)가 형성된다.In addition, a
상기 블럭몸체(111)의 중앙은 배수를 위한 배수로(111a)가 종방향으로 형성되되, 상기 양측 경사면(111b)에 식생을 위한 식생식물(a), 배양토(b), 자갈(c)등이 포설되는 식생부(111c)가 형성된다.The center of the
즉 도 4에 도시된 바와 같이 자갈(b)을 먼저 포설한 후, 상부에 배양토(c)를 적층하고, 식생식물(a)을 식생하게 되는 것이다. 그러나 이러한 식생 작업은 보강블럭(11)과 정착대(12)가 체결 조립시공된 후에 시행하는 것이 바람직 하겠다.That is, as shown in FIG. 4, the gravel (b) is first laid, then the culture soil (c) is stacked on top, and the vegetation (a) is to be planted. However, such vegetation work will be preferably carried out after the
그리고 상기 보강블럭(11)의 체결돌기(111b")와 체결되는 정착대(12)는 2개 1조로 설치가 되며 단부의 형상이 역오각형이며 좌, 우면에 종방향의 체결홈(121)이 형성된다.And the fixing table 12 is fastened to the fastening protrusion (111b ") of the reinforcing
이러한 상기 체결홈(121)의 저부로 사면(100)에 매입되는 역삼각형상의 매입단(122)으로 형성된다.The lower end of the
즉 상기와 같이 구성된 보강블럭(11)과 정착대(12)는 도 3에 도시된 바와 같이 체결홈(121)에 보강블럭(11)의 체결돌기(111b")가 체결되어 조립시공된다.That is, the reinforcing
그리고 전술한 도 4의 식생작업을 도 3에 대하여 수행하게 되면 도 5에 도시된 바와 같이 식생이 가능한 상태가 된다.When the vegetation operation of FIG. 4 is performed with respect to FIG. 3, vegetation is possible as shown in FIG. 5.
또한 상기 보강블럭(11)은 배수로(111a)의 양측면 중앙에 배수홀(111d)이 형성된다.In addition, the
그리고 상기 경사면(111b)와 동일한 경사를 지니며 식생부(111c)를 관통하여 체결돌기(111b")의 중앙부에 관통 형성된다.The
상기 배수홀(111d)은 보강블럭(11)과 정착대(12)가 체결되게 되면 정착대(12)의 체결홈(121) 중앙에 형성된 배수홀(121a)과 연통되게 된다.The
그리고 상기 배수홀(121a)과 직교연통되게 종방향으로 형성된 배수구(123)가 정착대(12)에 형성된 사면블럭(10)으로 구성된다.In addition, the
상기와 같이 구성된 본 발명의 작용 및 효과를 설명하면 다음과 같다.Referring to the operation and effects of the present invention configured as described above are as follows.
도 2에 도시된 보강블럭(11)과 정착대(12)를 사면(100)에 설치 시공하고, 이후 식생식물(a)을 식생하여 도 7과 같이 사면블럭(10)이 시공 완성되게 된다.After installing the
상기 사면블럭(10)은 도 6에 도시된 화살표 방향으로 사면(100)에 함수량이 많거나 우천시 유량이 증가되었을 경우, 배수로(111a)와 배수구(123)을 통해 직접 배출이 가능하며, 용출수 등으로 인하여 배수로(111a)에 물이 흐를 경우 상기 배수로(111a)에 형성된 배수홀(111d)로 물이 흘러들어 식생식물(a)에 생장에 필요한 수분을 공급하며, 잔류의 물은 경사를 따라 흘러 배수홀(121a)로 유입되어 배수구(123)을 통해 외부배수로(200)로 유입되어 배출되는 것이다.The
이상에서와 같이 본 발명은 사면에 매입되어 시공되는 정착대에 슬라이딩되어 체결되는 구조로써 시공이 간단하고 공사기간이 단축되며, 사면에서 발생되는 용출수나 우천으로 인한 빗물이 보강블럭에 형성된 배수로를 따라 배수되면서 친환경을 고려하여 형성된 식생부에 물을 공급하며, 잔류수분은 정착대로 연결된 배수로를 따라 배출되어 사면의 함수량 증가에 따른 유동을 방지하는 효과가 있다.As described above, the present invention is a structure that is fastened by sliding to the anchorage to be built on the slope, and the construction is simple and the construction period is shortened, along the drainage path formed by the rainwater due to the leaching water or rain from the slope reinforcement block While draining, water is supplied to the vegetation formed in consideration of eco-friendliness, and residual moisture is discharged along the drainage path connected to the anchorage to prevent flow due to an increase in water content of the slope.
이상에서는 본 발명을 특정의 바람직한 실시 예를 들어 도시하고 설명하였으나, 본 발명은 상기한 실시예에 한정되지 아니하며 본 발명의 정신을 벗어나지 않는 범위내에서 당해 발명이 속하는 기술분야에서 통상의 지식을 가진자에 의해 다양한 변경과 수정이 가능할 것이다.The present invention has been shown and described with reference to certain preferred embodiments, but the present invention is not limited to the above-described embodiments and has ordinary skill in the art to which the present invention pertains without departing from the spirit of the present invention. Various changes and modifications may be made by the user.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050098337A KR100549498B1 (en) | 2005-10-18 | 2005-10-18 | Construction assembly breast wall pul lek establishment structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050098337A KR100549498B1 (en) | 2005-10-18 | 2005-10-18 | Construction assembly breast wall pul lek establishment structure |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100549498B1 true KR100549498B1 (en) | 2006-02-08 |
Family
ID=37178650
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020050098337A KR100549498B1 (en) | 2005-10-18 | 2005-10-18 | Construction assembly breast wall pul lek establishment structure |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100549498B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101240417B1 (en) | 2011-06-14 | 2013-03-11 | 이인석 | Precast concrete block for retaining wall and construction method of the same |
KR20160019316A (en) * | 2014-08-11 | 2016-02-19 | 김성규 | Eco vegetation block |
CN105625441A (en) * | 2016-01-12 | 2016-06-01 | 中国水利水电第十二工程局有限公司 | Drainage type rhombic meshed ecological protection slope and construction method |
-
2005
- 2005-10-18 KR KR1020050098337A patent/KR100549498B1/en not_active IP Right Cessation
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101240417B1 (en) | 2011-06-14 | 2013-03-11 | 이인석 | Precast concrete block for retaining wall and construction method of the same |
KR20160019316A (en) * | 2014-08-11 | 2016-02-19 | 김성규 | Eco vegetation block |
KR102338195B1 (en) * | 2014-08-11 | 2021-12-10 | 김정수 | Eco vegetation block |
CN105625441A (en) * | 2016-01-12 | 2016-06-01 | 中国水利水电第十二工程局有限公司 | Drainage type rhombic meshed ecological protection slope and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5142498B2 (en) | Planting equipment and planting structure for plants | |
JP2008043241A5 (en) | ||
KR100576323B1 (en) | Rainwater member of concrete drainage for road | |
CN113250213B (en) | Slope protection structure with irrigation function for soil-rock mixed side slope and construction method | |
CN213709582U (en) | Roadbed slope protection structure | |
KR100549498B1 (en) | Construction assembly breast wall pul lek establishment structure | |
KR100868986B1 (en) | Sidewalk block that have function keeping water | |
KR101019776B1 (en) | Moisture restoring system of vegetation block | |
KR20110114438A (en) | UNDERGROUND WATERING&middot;DRAINING SYSTEM | |
CN209162849U (en) | A kind of compound tall earth fill drainage arrangement having firm bottom of slope function | |
KR100663207B1 (en) | Breast wall of building | |
KR20080006708A (en) | Landscaping supply and drainage device on the residential or road surface | |
KR101244804B1 (en) | Retaining law carbon eco-friendiy wall | |
RU2655799C1 (en) | Water circulating combined irrigation system | |
CN111535512B (en) | Planting building structure | |
KR20150027537A (en) | An irrigation gate for a rice field | |
KR200411792Y1 (en) | Waterway pipe | |
KR100893789B1 (en) | Retaining wall | |
CN208844710U (en) | A kind of up concave type greenbelt rainwater-collecting infiltration Box-shaped Drainage Culvert | |
KR100697637B1 (en) | Retaining wall structure for pleasant environment | |
KR100945595B1 (en) | Under ground water drainage apparatus | |
KR200316315Y1 (en) | water channel have a hole | |
KR20030001653A (en) | Drainage pipes for slope protection blocks | |
CN214938950U (en) | High-water-seepage pavement structure | |
CN211816760U (en) | Assembled greenbelt structure convenient to vegetation is grown |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
N231 | Notification of change of applicant | ||
A302 | Request for accelerated examination | ||
N231 | Notification of change of applicant | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20101115 Year of fee payment: 6 |
|
LAPS | Lapse due to unpaid annual fee |