KR101240417B1 - Precast concrete block for retaining wall and construction method of the same - Google Patents

Precast concrete block for retaining wall and construction method of the same Download PDF

Info

Publication number
KR101240417B1
KR101240417B1 KR1020110057458A KR20110057458A KR101240417B1 KR 101240417 B1 KR101240417 B1 KR 101240417B1 KR 1020110057458 A KR1020110057458 A KR 1020110057458A KR 20110057458 A KR20110057458 A KR 20110057458A KR 101240417 B1 KR101240417 B1 KR 101240417B1
Authority
KR
South Korea
Prior art keywords
slope
block
anchor
vegetation
precast
Prior art date
Application number
KR1020110057458A
Other languages
Korean (ko)
Other versions
KR20120138131A (en
Inventor
이인석
Original Assignee
이인석
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이인석 filed Critical 이인석
Priority to KR1020110057458A priority Critical patent/KR101240417B1/en
Publication of KR20120138131A publication Critical patent/KR20120138131A/en
Application granted granted Critical
Publication of KR101240417B1 publication Critical patent/KR101240417B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/025Containers and elements for greening walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental Sciences (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

본 발명은 사면에 정착되는 프리캐스트 사면블럭과 사면블럭에 정착되는 프리캐스트 식생블럭을 미리 제조하여 설치가 쉬우면서도 외부환경에 영향을 받지않도록 하는 사면보호용 프리캐스트 옹벽블럭을 제공하는데 그 목적이 있다.
상기의 목적을 달성하기 위한 본 발명의 사면보호용 프리캐스트 옹벽블럭은,
판체로 되어 사면에 놓이는 제1베이스를 가지며, 상기 제1베이스의 상부면에 가로방향으로 한 쌍의 돌부가 일체로 형성되고, 상기 돌부 사이에 형성된 홈부의 가운데 부분에는 지반에 정착된 앵커를 관통시켜 정착하기 위한 제1앵커홀이 형성된 프리캐스트 사면블럭;
상기 사면블럭에 수직방향으로 놓이는 제2베이스의 하단부에 상기 사면블럭의 돌부와 치합되기 위한 한 쌍의 홈부가 일체로 형성되고, 상기 홈부의 가운데 부분에 상기 제1앵커홀과 연통되면서 앵커가 연장삽입되어 정착되도록 제2앵커홀이 형성되며, 베이스의 상측단부에는 지면에 대해 상측방향으로 연장된 상측 연장부가 일체로 형성되어 사면블럭과 상측연장부 사이에 식생공간이 형성되도록 한 프리캐스트 식생블럭;으로 구성된다.
An object of the present invention is to provide a precast retaining wall block for protecting the slope so that the precast vegetation block settled on the slope and the precast vegetation block settled on the slope block is easy to install and is not affected by the external environment. .
Slope protection precast retaining wall block of the present invention for achieving the above object,
It has a first base which is formed into a plate body and is placed on a slope, and a pair of protrusions are integrally formed on the upper surface of the first base in a horizontal direction, and a center portion of the groove portion formed between the protrusions penetrates the anchor fixed to the ground. A precast slope block on which a first anchor hole for fixing is formed;
A pair of grooves are formed integrally with the lower end of the second base which is perpendicular to the slope block to be engaged with the protrusion of the slope block, and the anchor extends while communicating with the first anchor hole in the center portion of the groove. A second anchor hole is formed to be inserted and fixed, and a precast vegetation block is formed at an upper end of the base to form an upper extension part extending upwardly with respect to the ground to form a vegetation space between the slope block and the upper extension part. It consists of;

Description

사면보호용 프리캐스트 옹벽블럭 및 그 시공방법{Precast concrete block for retaining wall and construction method of the same}Precast concrete block for retaining wall and construction method of the same}

본 발명은 경사지의 사면을 보호하기 위한 옹벽구조에 관한 것으로, 특히 미리 프리캐스트 옹벽블럭을 제조하여, 현장에서 쉽게 조립할 수 있도록 한 사면보호용 프리캐스트 옹벽블럭 및 그 시공방법에 관한 것이다.
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a retaining wall structure for protecting a slope of a slope, and more particularly, to a precast retaining wall block for a slope protection and a construction method thereof, which are manufactured in advance and are easily assembled in the field.

일반적으로 지반 거동으로 인한 수압이나 토압 등에 저항하여 사면이 무너지지 않도록 예방하는 벽체 구조물인 옹벽을 이용하여 사면을 보호 또는 보강하게 된다.In general, the slope is protected or reinforced by using a retaining wall, which is a wall structure that prevents the slope from collapsing by resisting water pressure or soil pressure caused by ground behavior.

이러한 옹벽은 벽 자체의 무게와 바닥면의 마찰력 등을 이용하여 안정을 유지하는 항토압 구조물이며, 벽에 작용하는 수압이나 토압과 그 흙 위에 실린 하중, 지지력, 지반의 지지력 등을 조건으로 하여 구조부재의 안전성과 벽 전체가 쓰러지거나 미끄러지는 데 대한 안정성이 확보되도록 설계된다.The retaining wall is an anti-earth pressure structure that maintains stability by using the weight of the wall itself and the frictional force of the bottom surface, and is constructed on the condition of hydraulic pressure or earth pressure acting on the wall, loads on the soil, support force, and support force of the ground. It is designed to ensure the safety of the members and the stability of the whole wall to collapse or slip.

따라서 이러한 옹벽이 사면을 견고하게 지지하도록 하여 사면에서 발생될 수 있는 안전사고를 방지하도록 하였다.Therefore, the retaining wall firmly supports the slope to prevent safety accidents that may occur on the slope.

사면 보호를 위해 가장 많이 사용하는 옹벽구조는 콘크리트 블럭담식 옹벽으로서, 콘크리트 블럭을 쌓아 올린 것이므로 시공이 용이하여 널리 이용되어 왔다.Retaining wall structure that is most used for slope protection is a concrete block wall retaining wall, because it is a stack of concrete blocks have been widely used for easy construction.

그런데, 이러한 옹벽은 사면에 시공 후 그 외관이 흉물스러워 이를 해소하기 위해 전면을 페인팅하거나 별도의 녹화공사를 시행하여 주변 경관과의 조화를 이루도록 하였으나, 콘크리트 옹벽은 콘크리트의 특성상 녹화공사가 용이하지 못할 뿐만 아니라 녹화 효과마저도 크게 떨어지는 문제점이 있었다.By the way, the retaining wall was painted on the slope and its appearance was ugly so that the front was painted or a separate greening work was done to harmonize it with the surrounding landscape. In addition, there was a problem that the recording effect is also greatly reduced.

특히, 도로 옆 사면공사의 경우에는 교통의 흐름 등을 원활하게 하기 위하여 신속하게 시공하여 공사기간을 단축하여야 하지만 사면 보호 및 보강 공사와 녹화공사가 별도로 이루어지므로 공사 기간이 길어지는 문제점 있었다.In particular, in the case of the roadside slope construction, the construction period should be shortened by the rapid construction to smooth the flow of traffic, but the construction period is long because the slope protection and reinforcement construction and the greening construction are performed separately.

아울러, 현장에서 타설되는 콘크리트 구조물은 계절, 습도, 온도 등에 영향을 받아 제작되는 구조물이므로 외부환경에 의해 공사기간이 연장되는 문제점을 가지게 된다.
In addition, since the concrete structure to be cast on the site is a structure produced under the influence of seasons, humidity, temperature, etc., the construction period is extended by the external environment.

본 발명은 이러한 문제점을 감안하여 사면에 정착되는 프리캐스트 사면블럭과 사면블럭에 정착되는 프리캐스트 식생블럭을 미리 제조하여 설치가 쉬우면서도 외부환경에 영향을 받지않도록 하는 사면보호용 프리캐스트 옹벽블럭 및 그 시공방법을 제공하는데 그 목적이 있다.
In view of the above problems, the present invention manufactures precast slope blocks settled on slopes and precast vegetation blocks settled on sloped blocks in advance, so that the precast retaining wall blocks for slope protection so as not to be affected by the external environment and their installation are easy. The purpose is to provide a construction method.

상기의 목적을 달성하기 위한 본 발명의 사면보호용 프리캐스트 옹벽블럭은,Slope protection precast retaining wall block of the present invention for achieving the above object,

판체로 되어 사면에 놓이는 제1베이스를 가지며, 상기 제1베이스의 상부면에 가로방향으로 한 쌍의 돌부가 일체로 형성되고, 상기 돌부 사이에 형성된 홈부의 가운데 부분에는 지반에 정착된 앵커를 관통시켜 정착하기 위한 제1앵커홀이 형성된 프리캐스트 사면블럭;It has a first base which is formed into a plate body and is placed on a slope, and a pair of protrusions are integrally formed on the upper surface of the first base in a horizontal direction, and a center portion of the groove portion formed between the protrusions penetrates the anchor fixed to the ground. A precast slope block on which a first anchor hole for fixing is formed;

상기 사면블럭에 수직방향으로 놓이는 제2베이스의 하단부에 상기 사면블럭의 돌부와 치합되기 위한 한 쌍의 홈부가 일체로 형성되고, 상기 홈부의 가운데 부분에 상기 제1앵커홀과 연통되면서 앵커가 연장삽입되어 정착되도록 제2앵커홀이 형성되며, 베이스의 상측단부에는 지면에 대해 상측방향으로 연장된 상측 연장부가 일체로 형성되어 사면블럭과 상측연장부 사이에 식생공간이 형성되도록 한 프리캐스트 식생블럭;으로 구성된다.
A pair of grooves are formed integrally with the lower end of the second base which is perpendicular to the slope block to be engaged with the protrusion of the slope block, and the anchor extends while communicating with the first anchor hole in the center portion of the groove. A second anchor hole is formed to be inserted and fixed, and a precast vegetation block is formed at an upper end of the base to form an upper extension part extending upwardly with respect to the ground to form a vegetation space between the slope block and the upper extension part. It consists of;

또한, 본 발명의 사면보호용 프리캐스트 옹벽블럭의 시공방법은In addition, the construction method of the precast retaining wall block for the slope protection of the present invention

프리캐스트 옹벽블럭을 설치하기 위하여 사면을 고르게 정리하는 제1과정;A first step of evenly arranging the slope to install the precast retaining wall block;

사면을 따라 일정간격마다 앵커홀을 천공하여 어스앵커를 정착하는 제2과정;A second process of anchoring the earth anchors by drilling anchor holes at predetermined intervals along the slope;

본 발명의 사면블럭을 사면에 놓은 다음 어스앵커를 제1앵커홀에 관통시켜 정착하는 제3과정;A third step of placing the slope block of the present invention on the slope and then fixing the earth anchor through the first anchor hole;

본 발명의 식생블럭을 상기 사면블럭의 상부에 위치시켜 각각 돌부와 홈부가 치합되도록 하는 제4과정;A fourth step of placing the vegetation block of the present invention on an upper side of the slope block so that the protrusion and the groove are respectively engaged;

사면블럭에 정착된 어스앵커를 식생블럭의 제2앵커홀에 관통시켜 연장한 다음 정착시키는 제5과정;A fifth process of extending the earth anchors fixed on the slope block through the second anchor holes of the vegetation block and then fixing them;

사면블럭과 식생블럭 사이에 형성된 식생공간에 조경용 토사를 정지한 다음 조경을 행하는 제6과정;으로 구성된다.
And a sixth process of stopping the landscaping soil in the vegetation space formed between the slope block and the vegetation block and then performing the landscaping.

이와같이 구성된 본 발명은 프리캐스트 사면블럭과 식생블럭을 미리 성형함로써 품질관리가 용이하고, 아울러 제품의 품질을 확보할 수 있으며, 하절기, 우기철, 동절기, 혹한기 등의 계절이나 시기, 장소 등에 관계없이 제조가 가능하므로 긴급공사에도 곧바로 제품의 공급이 가능한 장점이 있다.The present invention configured as described above is easy to quality control by securing the precast slope block and vegetation block in advance, and also to ensure the quality of the product, regardless of the season, season, location, such as summer, rainy season, winter, cold Since manufacturing is possible, there is an advantage that the product can be supplied immediately in emergency construction.

또한, 프리캐스트에 의해 옹벽블럭이 제조되어 현장에서 쉽게 설치가 가능하므로 공사기간의 단축 효과를 가지며, 아울러 작업자의 숙련도와 관계없이 누구나 쉽게 설치가 가능하므로 부실시공이나 조잡시공 등의 문제점을 해결한 장점도 갖는다.
In addition, since the retaining wall blocks are manufactured by precast, they can be easily installed in the field, which shortens the construction period, and anyone can install them easily regardless of the skill of the workers. It also has advantages.

도1은 본 발명에 의한 사면블럭의 외관 형태를 보인 도.
도2는 도1의 단면도.
도3은 본 발명에 의한 식생블럭의 외관 형태를 보인 도.
도4는 도3의 단면도.
도5는 사면블럭과 식생블럭이 결합되어 사면에 정착된 상태를 보인 도.
도6은 본 발명을 시공하기 위한 방법을 설명하기 위한 도.
1 is a view showing the appearance form of a slope block according to the present invention.
2 is a cross-sectional view of FIG.
Figure 3 is a view showing the appearance of the vegetation block according to the present invention.
4 is a cross-sectional view of FIG.
5 is a view showing a state in which the slope block and vegetation block is coupled to the slope settled.
6 is a view for explaining a method for constructing the present invention.

이러한 본 발명을 첨부한 도면을 참조하여 상세히 설명한다.The present invention will be described in detail with reference to the accompanying drawings.

도1은 본 발명의 프리캐스트 사면블럭(110)의 외관을 보인 도이고, 도2는 도1의 사면블럭(110)의 A-A'부분의 단면도로서, 사면블럭(110)은 절개 또는 절토지의 사면에 어스앵커에 의해 정착되는 구조물이며, 사면에 놓이는 평판의 제1베이스(111)를 가진다.1 is a view showing the appearance of the precast slope block 110 of the present invention, Figure 2 is a cross-sectional view of the AA 'portion of the slope block 110 of Figure 1, the slope block 110 is cut or cut It is a structure that is settled by an earth anchor on the slope of the land, and has a first base 111 of a flat plate placed on the slope.

또한, 상기 제1베이스(110)의 상부면에는 가로방향 즉, 지면과 평행하게 폭방향으로 제1돌부(112)가 일체로 형성되고, 상기 제1돌부(112)와 나란히 제2돌부(114)가 상측방향으로 돌출되어 형성되며, 그 제1돌부(112)와 제2돌부(114)의 사이에 형성되는 제1홈부(113)의 가운데 부분에는 어스앵커가 제1베이스(110)의 하측으로부터 상측으로 관통되어 정착되기 위한 제1앵커홀(115)이 형성된다.In addition, a first protrusion 112 is integrally formed on the upper surface of the first base 110 in a horizontal direction, that is, in a width direction parallel to the ground, and a second protrusion 114 is parallel to the first protrusion 112. ) Is formed to protrude upwards, and an earth anchor is formed on the lower side of the first base 110 in the middle portion of the first groove portion 113 formed between the first protrusion 112 and the second protrusion 114. A first anchor hole 115 for penetrating upward from the upper side is formed.

이러한 제1앵커홀(115)은 제1베이스(111)의 정중앙 부분이 되는 것이 바람직하다.The first anchor hole 115 may be a central portion of the first base 111.

그리고, 상기 제1돌부(112)와 제2돌부(114)에는 세로방향 즉, 제1베이스(111)의 길이방향으로 배수공(116)이 관통되어 형성된다.
In addition, the first protrusion 112 and the second protrusion 114 are formed by passing through the drain hole 116 in the longitudinal direction, that is, the longitudinal direction of the first base 111.

도3 및 도4는 프리캐스트 식생블럭(120)의 외관과 단면을 보인 도로서, 식생블럭(110)의 상부면에 놓이는 제2베이스(121)가 형성되는데, 상기 제2베이스(121)는 식생블럭(110)에 수직방향으로 놓이게 되며, 그 하단부에 사면블럭(110)의 제1돌부(112)와 제2돌부(114)가 삽입되어 치합되기 위한 제2홈부(123)와 제3홈부(125)가 일체로 형성된다.3 and 4 show the appearance and cross section of the precast vegetation block 120, the second base 121 is placed on the upper surface of the vegetation block 110 is formed, the second base 121 is The first groove 112 and the second protrusion 114 of the slope block 110 are inserted into the vegetation block 110 in a vertical direction, and the second groove portion 123 and the third groove portion are inserted into and engaged with each other. 125 is integrally formed.

또한 상기 제2홈부(123)와 제3홈부(125)의 사이에는 제2돌부(124)가 자연스럽게 형성되어 사면블럭(110)의 제1홈부(113)에 삽입되며, 이때 제2돌부(124)에는 제1앵커홀(115)과 동일한 위치에 제2앵커홀(126)이 형성된다.In addition, a second protrusion 124 is naturally formed between the second groove 123 and the third groove 125 and is inserted into the first groove 113 of the slope block 110. ), The second anchor hole 126 is formed at the same position as the first anchor hole 115.

따라서, 제1앵커홀(115)에 정착된 어스앵커가 제2앵커홀(126)에 연장되어 관통됨으로써 제2앵커홀(126)과 연통된 상측의 정착공(128)에서 재차 정착되어 식생블럭(120)이 사면블럭(110)에 정착될 수 있다.Accordingly, the earth anchor anchored in the first anchor hole 115 extends and penetrates the second anchor hole 126 to be fixed again in the upper fixing hole 128 communicating with the second anchor hole 126, thereby providing a vegetation block. 120 may be fixed to the slope block 110.

그리고, 제2홈부(123)와 제3홈부(125)를 제외한 부분에는 사면블럭(110)의 배수공(116)과 동일한 위치에 홈 형태의 배수공(127)이 형성됨으로써 사면블럭(110)과 식생블럭(120)을 상하방향으로 관통하는 배수공이 형성되는 것이다.In addition, the sloped block 110 and the vegetation are formed by forming the grooved drainage hole 127 at the same position as the drainage hole 116 of the sloped block 110 except for the second grooved portion 123 and the third grooved portion 125. A drain hole penetrating the block 120 in the vertical direction is formed.

아울러 제2베이스(121)의 상측에는 지면과 수직한 방향으로 벽체로 된 상측 연장부(122)가 일체로 형성되어 있다.
In addition, the upper side of the second base 121, the upper portion 122 is formed integrally with the wall in a direction perpendicular to the ground.

도5는 이러한 본 발명의 프리캐스트 사면블럭(110)과 식생블럭(120)이 결합되어 사면에 설치된 상태를 보인 도로서, 사면에 어스앵커(130)에 의해 사면블럭(110)이 정착되고, 사면블럭(110)의 상부면에 식생블럭(120)이 돌부와 홈부에 의해 치합되어 결합됨과 아울러 연장된 어스앵커(130)에 의해 정착됨으로써 사면의 아랫방향으로 미끄러지지 않도록 안정적을 정착이 완료된다.5 is a view showing a state in which the precast slope block 110 and the vegetation block 120 of the present invention is installed on the slope, the slope block 110 is fixed by the earth anchor 130 on the slope, The vegetation block 120 is coupled to the upper surface of the slope block 110 by the protrusion and the groove portion, and is fixed by the elongated earth anchor 130, so that the stable settlement is completed so as not to slide downward.

따라서, 사면블럭(110)과 식생블럭(120) 사이에 식생공간(140)이 형성되어, 그 식생공간(140)에 조경을 할 수 있게 된다.Accordingly, the vegetation space 140 is formed between the slope block 110 and the vegetation block 120, so that the vegetation space 140 can be landscaped.

결국, 공장에서 프리캐스트 사면블럭(110)과 식생블럭(120)을 미리 성형하여 현장에 공급함으로써 각 블럭을 어스앵커에 정착하는 과정으로 쉽게 설치가 가능한 것이며, 사면블럭(110)과 식생블럭(120) 사이에 식생공간(140)이 자연스럽게 형성되어 조경이 가능하게 되는 것이다.As a result, the precast slope block 110 and the vegetation block 120 are pre-molded in the factory and supplied to the site, so that the blocks can be easily installed in the process of fixing each block to the earth anchor, and the slope block 110 and the vegetation block ( The vegetation space 140 is naturally formed between the 120 to enable landscaping.

또한, 사면블럭(110)과 식생블럭(120)의 치합에 의해 배수로가 형성됨으로써 식생공간(140)으로 배수된 물이 배수로를 따라 하측으로 흘러내림으로써 월한할 배수에 따른 식생능력이 향상되는 것이다.
In addition, the drainage path is formed by the engagement of the slope block 110 and the vegetation block 120, so that the water drained to the vegetation space 140 flows downward along the drainage path to improve the vegetation capacity according to the excess drainage. .

도6은 이러한 본 발명의 프리캐스트 옹벽블럭 즉 사면블럭(110)과 식생블럭(120)을 시공하기 위한 방법을 설명하는 도로서, 먼저 본 발명의 사면블럭(110)을 설치하기 위하여 사면을 고르게 정리한 다음, (a)와 같이 사면의 일정간격마다 앵커홀을 천공하여 인장재인 어스앵커(130)를 정착시키게 된다.6 is a view illustrating a method for constructing the precast retaining wall block, that is, the slope block 110 and the vegetation block 120, according to the present invention. First, the slope is evenly set to install the slope block 110 of the present invention. After arranging, as shown in (a), anchor holes are drilled at predetermined intervals of the slope to fix the anchor anchor 130 as a tension member.

어스앵커(130)를 정착시킨 다음 정리된 사면을 그라우팅하고, 다음으로 사면블럭(110)을 정리되어 그라우팅된 사면을 따라 나란히 설치함으로써 사면블럭(110)이 사면에 정착력을 가지도록 한다.After fixing the earth anchor 130 and grouting the cleaned slope, and next to install the slope block 110 side by side along the grouted slope so that the slope block 110 has a fixing force on the slope.

이후 (b)와 같이 어스앵커(130)가 제1앵커홀(115)을 관통하여 사면블럭(110)의 상측으로 연장시킨 후 어스앵커(130)에 인장력을 가해서 지반과 사면블럭(110)이 일체로 거동되도록 하여 사면블럭(110)을 정착시킨다.Thereafter, as shown in (b), the earth anchor 130 extends through the first anchor hole 115 to the upper side of the slope block 110 and then applies a tensile force to the earth anchor 130 to thereby ground and slope block 110. The four-sided block 110 is fixed so as to be integrated.

또한, (c)와 같이 정착된 사면블럭(110)의 상부면에 식생블럭(120)을 위치시킨 다음 제2앵커홀(126)을 통해 어스앵커(130)를 연장시키게 되며, 정착공(128)에서 재차 정착됨으로써 사면블럭(110)와 식생블럭(120)이 안정적으로 정착이 이루어진다.In addition, the vegetation block 120 is positioned on the upper surface of the slope block 110 fixed as shown in (c), and then the earth anchor 130 is extended through the second anchor hole 126, and the fixing hole 128 By being settled again at), the slope block 110 and the vegetation block 120 are stably settled.

즉, 2번의 정착과정을 거침으로써 어스앵커의 긴장력의 잠재적 손실을 차단하여 사면의 안정성을 확보한 것이다.In other words, the two settlement process prevented the potential loss of the tension of the earth anchor to secure the slope.

이렇게 정착된 사면블럭(110)과 식생블럭(120) 사이에 형성된 식생공간(140)에 조경용 토사를 정지한 다음 나무 등을 식재하여 조경을 마무리하게 된다.
The landscaping soil is stopped in the vegetation space 140 formed between the settled block 110 and the vegetation block 120 thus fixed, and then the trees are planted to finish the landscaping.

110 : 사면블럭 111 : 제1베이스
112,114 : 돌부 113 : 홈부
115 : 제1앵커홀 116 : 배수공
120 : 식생블럭 121 : 제2베이스
122 : 상측연장부 123,125 : 홈부
124 : 돌부 126 : 제2앵커홀
127 : 배수공 130 : 어스앵커
140 : 식생공간
110: slope block 111: first base
112,114 protrusions 113 grooves
115: first anchor hole 116: drain hole
120: vegetation block 121: second base
122: upper extension 123,125: groove
124: protrusion 126: second anchor hole
127: drain hole 130: earth anchor
140: vegetation space

Claims (2)

판체로 되어 사면에 놓이는 제1베이스를 가지며, 상기 제1베이스의 상부면에 가로방향으로 한 쌍의 돌부가 일체로 형성되고, 상기 돌부 사이에 형성된 홈부의 가운데 부분에는 지반에 정착된 앵커를 관통시켜 정착하기 위한 제1앵커홀이 형성된 프리캐스트 사면블럭;
상기 사면블럭에 수직방향으로 놓이는 제2베이스의 하단부에 상기 사면블럭의 돌부와 치합되기 위한 한 쌍의 홈부가 일체로 형성되고, 상기 홈부의 가운데 부분에 상기 제1앵커홀과 연통되면서 앵커가 연장삽입되어 정착되도록 제2앵커홀이 형성되며, 상기 제2베이스의 상측단부에는 지면에 대해 상측방향으로 연장된 상측 연장부가 일체로 형성되어 사면블럭과 상측연장부 사이에 식생공간이 형성되도록 한 프리캐스트 식생블럭;으로 구성된 것을 특징으로 하는 사면보호용 프리캐스트 옹벽블럭.
It has a first base which is formed into a plate body and is placed on a slope, and a pair of protrusions are integrally formed on the upper surface of the first base in a horizontal direction, and a center portion of the groove portion formed between the protrusions penetrates the anchor fixed to the ground. A precast slope block on which a first anchor hole for fixing is formed;
A pair of grooves are formed integrally with the lower end of the second base which is perpendicular to the slope block to be engaged with the protrusion of the slope block, and the anchor extends while communicating with the first anchor hole in the center portion of the groove. A second anchor hole is formed to be inserted and settled, and the upper end of the second base is integrally formed with an upper extension extending upwardly with respect to the ground to form a vegetation space between the slope block and the upper extension. Slope protection precast retaining wall block, characterized in that consisting of;
프리캐스트 옹벽블럭을 설치하기 위하여 사면을 고르게 정리하는 제1과정;
사면을 따라 일정간격마다 앵커홀을 천공하여 어스앵커를 정착하는 제2과정;
청구항 제1항의 사면블럭을 사면에 놓은 다음 어스앵커를 제1앵커홀에 관통시켜 정착하는 제3과정;
청구항 제1항의 식생블럭을 상기 사면블럭의 상부에 위치시켜 각각 돌부와 홈부가 치합되도록 하는 제4과정;
사면블럭에 정착된 어스앵커를 식생블럭의 제2앵커홀에 관통시켜 연장한 다음 정착시키는 제5과정;
사면블럭과 식생블럭 사이에 형성된 식생공간에 조경용 토사를 정지한 다음 조경을 행하는 제6과정;으로 구성된 것을 특징으로 하는 사면보호용 프리캐스트 옹벽블럭의 시공방법.

A first step of evenly arranging the slope to install the precast retaining wall block;
A second process of anchoring the earth anchors by drilling anchor holes at predetermined intervals along the slope;
A third process of placing the slope block of claim 1 on a slope and then fixing the earth anchor through the first anchor hole;
Placing a vegetation block of claim 1 on an upper portion of the slope block so that the protrusions and the grooves engage with each other;
A fifth process of extending the earth anchors fixed on the slope block through the second anchor holes of the vegetation block and then fixing them;
And a sixth process of stopping the landscaping soil in the vegetation space formed between the slope block and the vegetation block, and then performing the landscaping. 6.

KR1020110057458A 2011-06-14 2011-06-14 Precast concrete block for retaining wall and construction method of the same KR101240417B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110057458A KR101240417B1 (en) 2011-06-14 2011-06-14 Precast concrete block for retaining wall and construction method of the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110057458A KR101240417B1 (en) 2011-06-14 2011-06-14 Precast concrete block for retaining wall and construction method of the same

Publications (2)

Publication Number Publication Date
KR20120138131A KR20120138131A (en) 2012-12-24
KR101240417B1 true KR101240417B1 (en) 2013-03-11

Family

ID=47905009

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110057458A KR101240417B1 (en) 2011-06-14 2011-06-14 Precast concrete block for retaining wall and construction method of the same

Country Status (1)

Country Link
KR (1) KR101240417B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11117313A (en) 1997-10-16 1999-04-27 Toei Shoko Kk Protection block for surface of slope
KR200403150Y1 (en) 2005-09-06 2005-12-09 (주)한국해외기술공사 Earth Slip Protection Structure for Road Side of Slope
KR100549498B1 (en) 2005-10-18 2006-02-08 주식회사 건정종합건축사사무소 Construction assembly breast wall pul lek establishment structure
KR100866335B1 (en) 2008-06-12 2008-11-06 (주)대영구조기술단 Reinforcement structure for slanting surface using pro-environment block of yellow soil

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11117313A (en) 1997-10-16 1999-04-27 Toei Shoko Kk Protection block for surface of slope
KR200403150Y1 (en) 2005-09-06 2005-12-09 (주)한국해외기술공사 Earth Slip Protection Structure for Road Side of Slope
KR100549498B1 (en) 2005-10-18 2006-02-08 주식회사 건정종합건축사사무소 Construction assembly breast wall pul lek establishment structure
KR100866335B1 (en) 2008-06-12 2008-11-06 (주)대영구조기술단 Reinforcement structure for slanting surface using pro-environment block of yellow soil

Also Published As

Publication number Publication date
KR20120138131A (en) 2012-12-24

Similar Documents

Publication Publication Date Title
KR101707523B1 (en) Precast concrete block for cascade retaining wall for slope protection And method of constructing a retaining wall using the same
KR101105092B1 (en) A precast retaining panel and construction method of the same with half pc type backfill
KR100795084B1 (en) Post supporting base
CN209568379U (en) A kind of road prevention structure for blocking falling rocks
KR101661320B1 (en) Assembly Penetrating Type Check Dam
KR100899037B1 (en) Block assembly
KR101495997B1 (en) Upright type rainwater storaging structure and Rainwater storaging facility having the structure and Method for building the facility
KR101240417B1 (en) Precast concrete block for retaining wall and construction method of the same
KR101342130B1 (en) Eco greening and reinforcing facilities for slope of road
KR101501733B1 (en) The eco-friendly precast l type retaining wall fixed with an anchor
KR101194043B1 (en) Prefabricated Revet Construction and Method for Constructing the same
KR101334749B1 (en) Vegetation block in tiers for retaining wall and method for construction of retaining wall using the same
KR100523965B1 (en) Landscape block
KR102100590B1 (en) Cut slope wall comprized of vegetation panel
CN204626424U (en) Step polygon for Channel slope plants raw building block
KR101328027B1 (en) Cutting the ground area breast wall and slant safe-guard structure
KR20070104111A (en) Bridge with pile and construction method thereof
KR100697637B1 (en) Retaining wall structure for pleasant environment
KR101498190B1 (en) the Infrastructure of Rockfall protection post
JP4834649B2 (en) Construction structure of embankment structure, retaining wall block for construction of embankment structure and construction method of embankment structure
KR100970494B1 (en) Protective block for drainage on slopes
KR20100001503U (en) Latticed block works for stabilizing slope
KR102519112B1 (en) Lattice structures for slope stability
KR100562225B1 (en) Slope construction of building
KR101307403B1 (en) The slope reinforcement method using a blocks of natural stone texture

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee