KR100543450B1 - Mounting method of slab using rail supportor of bridge - Google Patents

Mounting method of slab using rail supportor of bridge Download PDF

Info

Publication number
KR100543450B1
KR100543450B1 KR1020030048199A KR20030048199A KR100543450B1 KR 100543450 B1 KR100543450 B1 KR 100543450B1 KR 1020030048199 A KR1020030048199 A KR 1020030048199A KR 20030048199 A KR20030048199 A KR 20030048199A KR 100543450 B1 KR100543450 B1 KR 100543450B1
Authority
KR
South Korea
Prior art keywords
bridge
top plate
rail
bridge top
hydraulic jack
Prior art date
Application number
KR1020030048199A
Other languages
Korean (ko)
Other versions
KR20050008296A (en
Inventor
성수복
이경범
Original Assignee
성수복
이경범
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 성수복, 이경범 filed Critical 성수복
Priority to KR1020030048199A priority Critical patent/KR100543450B1/en
Publication of KR20050008296A publication Critical patent/KR20050008296A/en
Application granted granted Critical
Publication of KR100543450B1 publication Critical patent/KR100543450B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 레일 받침대을 이용한 교량 상판을 조립식으로 밀어넣어 거치하는 공법에 관한 것으로, 더욱 상세하게는 교량 상판을 단시간에 안전하게 거치할 수 있고 공사 비용 및 유지관리가 용이한 구조를 가지는 레일 받침대을 이용한 교량 상판 조립식 밀어넣기 거치공법에 관한 것이다.The present invention relates to a method of prefabricating a bridge top plate using a rail support in a prefabricated manner, and more particularly, bridge top plate using a rail support having a structure that can safely mount the bridge top plate in a short time and easy construction cost and maintenance It relates to a prefabricated push mounting method.

본 발명은, 교각 고핑(100)에는, 양측면을 절곡하여 형성한 안착부(110)에 고압력 유압잭(300)과 측면 레일(130)이 설치되고, 그 교각 고핑(100)의 상부에 교량 받침슈(200)가 설치되는 단계; 상기 교각 고핑(100)의 고압력 유압잭(300)의 상부에 안착되어 교량 상판을 가이드하는 한편, 트러스 구조물로, 상부에 이동 레일(420)이 설치되고, 길이방향 일측면에 각각 측면 레일틀(440)이 설치된 레일 받침대(400)가 안착되는 단계; 상기 레일 받침대(400)에는, 일측 교대로 부터 상부에 교량 상판(700)이 안착된 상태에서 교량 상판(700)이 각자의 위치로 이동시키는 단계; 및 상기 교량 상판(700)이 정위치에 오면, 고압력 유압잭(300)을 하강하여 교량 상판(700)을 정위치에 고정시키는 단계;로 구성된다.According to the present invention, the high pressure hydraulic jack 300 and the side rails 130 are installed in the seating portion 110 formed by bending both side surfaces of the pier goping 100, and the bridge bearing shoe on the top of the pier goping 100. 200 is installed; While seated on the upper portion of the high pressure hydraulic jack 300 of the pier goping 100 to guide the bridge top plate, as a truss structure, the moving rail 420 is installed on the upper side, each side rail frame 440 on one side in the longitudinal direction A rail stand 400 is installed; The rail pedestal 400, the bridge top plate 700 is moved to its position in a state in which the bridge top plate 700 is seated from one side to the top; And when the bridge top plate 700 is in the correct position, lowering the high pressure hydraulic jack 300 to fix the bridge top plate 700 in place.

레일 받침대, 교량 상판, 밀어넣기 거치공법Rail support, bridge deck, push mounting method

Description

레일 받침대을 이용한 교량 상판 조립식 밀어넣기 거치공법{MOUNTING METHOD OF SLAB USING RAIL SUPPORTOR OF BRIDGE}Bridge plate assembly push method using rail support {MOUNTING METHOD OF SLAB USING RAIL SUPPORTOR OF BRIDGE}

도 1은 본 발명에 의해 교량 상판이 거치된 일측 단면 상태를 나타내는 도면.1 is a view showing a one side cross-sectional state in which the bridge top plate is mounted by the present invention.

도 2는 본 발명에 의한 교량 상판이 거치된 측면 상태를 나타내는 도면.Figure 2 is a view showing a side state on which the bridge top plate according to the present invention.

도 3은 본 발명에 의한 교량 상판, 레일 받침대 및 교각의 분해 상태를 나타내는 도면.3 is a view showing an exploded state of the bridge deck, rail support and bridge piers according to the present invention.

도 4는 본 발명에 의한 레일 받침대을 이용한 교량 상판 조립식 밀어넣기 거치순서를 나타내는 도면으로서, (a)는 고압력 유압잭이 교각 고핑에 설치되는 상태를 나타내는 도면, (b)는 고압력 유압잭의 상부에 레일 받침대가 설치되는 상태를 나타내는 도면, (c)는 레일 받침대의 상부에 교량 상판이 안착되는 상태를 나타내는 도면, (d)는 교량 상판이 완전히 거치된 상태를 나타내는 도면.Figure 4 is a view showing the bridge top assembled push mounting sequence using the rail support according to the present invention, (a) is a view showing a state in which the high pressure hydraulic jack is installed in the pier ping, (b) is a rail support on the upper portion of the high pressure hydraulic jack (C) is a view showing a state in which the bridge top plate is seated on the upper portion of the rail support, (d) is a view showing a state in which the bridge top plate is completely mounted.

< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>

100: 교각 고핑 110: 안착부100: pier goping 110: seating portion

130: 측면 레일 200: 교량 받침슈130: side rail 200: bridge support shoe

300: 고압력 유압잭 400: 레일 받침대300: high pressure hydraulic jack 400: rail support

420: 이동 레일 700: 교량 상판420: moving rail 700: bridge deck

710: 이동 롤러710: moving roller

본 발명은 레일 받침대을 이용한 교량 상판을 조립식으로 밀어넣어 거치하는 공법에 관한 것으로, 더욱 상세하게는 교량 상판을 단시간에 안전하게 거치할 수 있고 공사 비용 및 유지 관리가 용이한 구조를 가지는 레일 받침대을 이용한 교량 상판 조립식 밀어넣기 거치공법에 관한 것이다.The present invention relates to a method for prefabricating and mounting a bridge top plate using a rail support, more specifically, bridge top plate using a rail support having a structure that can safely mount the bridge top plate in a short time and easy construction cost and maintenance It relates to a prefabricated push mounting method.

일반적으로 교량은, 교각의 상부에 형성된 교각 고핑에 교좌 장치가 안착된 상태에서 상부에 교량 상판이 거치된 후, 그 교량 상판의 이음부에 신축이음이 설치되면 시공이 완료된다.In general, the bridge is constructed when the bridge top plate is mounted on the top of the bridge in the state in which the bridge device is seated on the bridge goping formed on the top of the bridge, and the expansion joint is installed at the joint of the bridge top plate.

상기 교량 상판은, 대형 크레인을 이용해 교량 상판을 거치하는 방법과 미끄럼 판을 이용한 밀어넣기 공법으로 교량 상판이 교각 고핑의 상부에 안착된다.The bridge top plate, the bridge top plate is seated on the upper portion of the piercing by the method of mounting the bridge top plate using a large crane and the push method using a sliding plate.

상술한 교량 상판의 거치 공법은, 그 특성상 많은 장비와 인원이 필요하고, 거치하는 방법 또한 복잡하게 이루어져 거치 작업중 많은 사고가 발생되거나 정확한 위치에 교량 상판을 안착하는데 어려움을 갖는다.The above-described method of mounting the bridge deck requires a lot of equipment and personnel due to its characteristics, and the method of mounting is also complicated, which makes it difficult to cause many accidents or to mount the bridge deck at the correct position.

특히, 밀어넣기 공법은, 진행중 교각 고핑에 대한 균열 발생이 빈번하게 발생되는 관계로, 교량의 내구성 저하라는 문제점을 갖는다.In particular, the push method has a problem in that the durability of the bridge is lowered since the crack generation for the pier goping frequently occurs during the process.

본 발명은 상술한 문제점을 해결하기 위해, 본 발명은, 교각 고핑 측면에 고 압력 유압잭과 레일 받침대가 설치되고, 교량 상판의 하부에 이동 롤러가 설치되어 교량 상판이 레일 받침대의 상부를 수월하게 이동이 가능하여 교량 상판의 설치시공이 용이하며, 그로 인해 교량 상판을 단시간에 안전하게 거치할 수 있고 공사 비용 및 유지 관리가 용이한 구조를 가지는 레일 받침대를 이용한 교량 상판 조립식 밀어넣기 거치공법을 제공함을 그 목적으로 한다.The present invention, in order to solve the above problems, the present invention, the high pressure hydraulic jack and the rail support is installed on the side of the bridge goping, the moving roller is installed on the lower portion of the bridge top plate to facilitate the bridge top plate to move the top of the rail support This makes it easy to install and install the bridge deck, thereby providing a bridge deck prefabricated push-through method using the rail support that has a structure that allows the bridge deck to be safely mounted in a short time and has easy construction cost and easy maintenance. The purpose.

본 발명은 상술한 목적 달성을 위해, 본 발명은, 교각, 교각 고핑 및 교량 상판을 포함하는 교량을 시공시 교량 상판을 밀어넣기에 의해 거치하는 공법에 있어서, 교각 고핑에는, 양측면을 절곡하여 형성한 안착부에 고압력 유압잭과 측면 레일이 설치되고, 그 교각 고핑의 상부에 교량 받침슈가 설치되는 단계; 상기 교각 고핑의 고압력 유압잭의 상부에 안착되어 교량 상판을 가이드하는 한편, 트러스 구조물로, 상부에 이동 레일이 설치되고, 길이방향 일측면에 각각 측면 레일틀이 설치된 레일 받침대가 안착되는 단계; 상기 레일 받침대에는, 일측 교대로 부터 상부에 교량 상판이 안착된 상태에서 교량 상판이 각자의 위치로 이동시키는 단계; 및 상기 교량 상판이 정위치에 오면, 고압력 유압잭을 하강하여 교량 상판을 정위치에 고정시키는 단계;로 구성됨을 특징으로 하는 교량 상판 조립식 밀어넣기 거치공법을 제공한다.In order to achieve the above object, the present invention, in the construction method for mounting the bridge including the bridge, bridge piercing and bridge top plate by pushing the bridge top plate at the time of construction, in the bridge piercing is formed by bending both sides A high pressure hydraulic jack and side rails are installed on one seat, and a bridge bearing shoe is installed on an upper portion of the pier goping; Seating on an upper portion of the high-pressure hydraulic jack of the pier-going to guide the bridge top plate, and having a truss structure, a moving rail is installed on the upper side, and a rail support on each side of which is installed a side rail on the longitudinal side; The rail pedestal, the bridge top plate is moved to its position in a state in which the bridge top plate is seated on the upper side from one side alternately; And when the bridge top plate comes in place, the step of lowering the high pressure hydraulic jack to fix the bridge top plate in place; provides a bridge top plate prefabricated push mounting method characterized in that the configuration.

이하, 첨부 도면을 참조하여 본 발명의 구성을 설명한다.EMBODIMENT OF THE INVENTION Hereinafter, the structure of this invention is demonstrated with reference to an accompanying drawing.

도 1은 본 발명에 의해 교량 상판이 거치된 일측 단면 상태를 나타내는 도면이고, 도 2는 본 발명에 의한 교량 상판이 거치된 측면 상태를 나타내는 도면이다.1 is a view showing a one-side cross-sectional state in which the bridge top plate is mounted by the present invention, Figure 2 is a view showing a side state in which the bridge top plate according to the present invention is mounted.

교각 고핑(100)은, 양측에 측면 안착부(110)가 절곡되는 형태로 형성되고, 그 측면 안착부(110)에 고압력 유압잭(300)이 안착되며, 그 고압력 유압잭(300)의 상부에 레일 받침대(400)가 안착된다.Pier goping 100, the side seating portion 110 is formed in a form that is bent on both sides, the high pressure hydraulic jack 300 is seated on the side seating portion 110, the rail on the upper portion of the high pressure hydraulic jack 300 Pedestal 400 is seated.

상기 레일 받침대(400)에는, 상부의 이동 레일(420)에 교량 상판(700)의 이동 롤러(710)가 밀착되어 이동하는 방식으로 거치가 완료된다.Mounting is completed on the rail support 400 in such a manner that the moving roller 710 of the bridge upper plate 700 comes into close contact with the moving rail 420 of the upper portion.

도 3은 본 발명에 의한 교량 상판, 레일 받침대 및 교각의 분해 상태를 나타내는 도면으로서, 상기 교각 고핑(100)에는, 안착부(110)에 고압력 유압잭(300)이 설치되고, 그 안착부(110)의 측면 수직부에 측면 레일(130)이 설치되며, 상부에 다수개의 교량 받침슈(200)가 설치된다.3 is a view showing the disassembled state of the bridge top plate, rail support and pier according to the present invention, the piercing goping 100, the high pressure hydraulic jack 300 is provided on the seating portion 110, the seating portion 110 Side rails 130 are installed in the vertical portion of the side, a plurality of bridge receiving shoe 200 is installed on the top.

상기 레일 받침대(300)는, 트러스 구조물로, 모서리 부분에 장방향 지지틀이 형성되고, 그 지지틀의 내측에 트러스 구조로 보강대가 설치되며, 상기 레일 받침대(300)에는, 길이방향 측면에 측면 레일틀(440)이 형성된다.The rail support 300 is a truss structure, the support frame is formed in the corner portion in the longitudinal direction, the reinforcement is installed in the truss structure inside the support frame, the rail support 300, the side in the longitudinal side Rail frame 440 is formed.

상술한 바와 같이, 상기 교각 고핑(100)의 고압력 유압잭(300)에는, 상부에 레일 받침대(400)가 안착되면, 교각 고핑(100)의 안착부(110)의 수직부에 형성된 측면 레일(130)을 따라 레일 받침대(400)의 측면 레일틀(440)이 미끌어지게 되어 일측 교대 측에서 부터 타측 교대까지 손쉽게 레일 받침대(400)가 설치된다.As described above, when the rail support 400 is seated on the high pressure hydraulic jack 300 of the piercing goping 100, the side rail 130 formed at the vertical portion of the seating part 110 of the piercing goping 100. Side rail frame 440 of the rail support 400 is to be sliding along the rail support 400 is easily installed from one side shift to the other side shift.

상기 교각 고핑(100)의 안착부(110)에 레일 받침대(400)가 거치되면, 그 레일 받침대(400)의 상부로 교량 상판(700)이 거치된다.When the rail support 400 is mounted on the seating part 110 of the pier goping 100, the bridge upper plate 700 is mounted on the rail support 400.

상기 교량 상판(700)에는, 폭 방향 양측 직하부에 이동 롤러(710)가 다수개 설치되는 관계로, 레일 받침대(400)의 상부에 형성된 이동 레일(420)을 따라 이동 이 가능하게 된다.In the bridge top plate 700, a plurality of moving rollers 710 are provided directly below both sides in the width direction, and thus the movable plate 700 may move along the moving rails 420 formed on the rail support 400.

도 4는 본 발명에 의한 레일 받침대을 이용한 교량 상판 조립식 밀어넣기 거치순서를 나타내는 도면으로서, (a)는 고압력 유압잭이 교각 고핑에 설치되는 상태를 나타내는 도면, (b)는 고압력 유압잭의 상부에 레일 받침대가 설치되는 상태를 나타내는 도면, (c)는 레일 받침대의 상부에 교량 상판이 안착되는 상태를 나타내는 도면, (d)는 교량 상판이 완전히 거치된 상태를 나타내는 도면이다.Figure 4 is a view showing the bridge top assembled push mounting sequence using the rail support according to the present invention, (a) is a view showing a state in which the high pressure hydraulic jack is installed in the pier ping, (b) is a rail support on the upper portion of the high pressure hydraulic jack (C) is a figure which shows the state in which the bridge top plate is seated on the upper part of a rail stand, (d) is a figure which shows the state in which the bridge top plate was fully mounted.

도 4a에서 알 수 있듯이, 상기 교각 고핑(100)에는, 양측면 안착부(110)에 고압력 유압잭(300)과 측면 레일(130)이 설치되고, 그 교각 고핑(100)의 상부에 교량 받침슈(200)가 설치되는 단계이다.As can be seen in Figure 4a, the piercing goping 100, the high pressure hydraulic jack 300 and the side rails 130 is installed on both side mounting portion 110, the bridge support shoe (on the top of the piercing goping 100) 200) is installed.

도 4b에서 알 수 있듯이, 상기 교각 고핑(100)의 고압력 유압잭(300)에는, 직상부에 레일 받침대(400)가 설치되는데, 이때 다수개의 교각 고핑(100)의 고압력 유압잭(300)의 상부에는 교대 측에서 부터 순차적으로 레일 받침대(400)가 안착된다.As can be seen in Figure 4b, the high pressure hydraulic jack 300 of the piercing goping 100, a rail support 400 is installed on the upper portion, at this time, the upper portion of the high pressure hydraulic jack 300 of the plurality of piercing goping 100 The rail support 400 is sequentially seated from the alternating side.

상기 각각의 교각 고핑(100)에는 측면에 측면 레일(130)이 설치되는 바, 그 측면 레일(130)에 상기 레일 받침대(400)의 측면 레일틀(440)이 결합되어 고정된다.The side rails 130 are installed on the side of the pier goping 100, and the side rails 440 of the rail support 400 are coupled to and fixed to the side rails 130.

도 4c에서 알 수 있듯이, 상기 레일 받침대(400)에는, 상부에 교량 상판(700)이 안착된 상태에서 교량 상판(700)이 각자의 위치로 이동된다.As can be seen in FIG. 4C, the bridge top plate 700 is moved to its position in the state in which the bridge top plate 700 is seated thereon.

도 4d에서 알 수 있듯이, 상기 교량 상판(700)이 정위치에 오면, 고압력 유압잭(300)을 하강하여 교량 상판(700)을 정위치하여 고정하게 된다.As can be seen in Figure 4d, when the bridge top plate 700 is in place, the high pressure hydraulic jack 300 is lowered to fix the bridge top plate 700 in place.

상술한 바와 같이, 상기 교각 고핑(100)의 안착부(110)에 고압력 유압잭(300)과 측면 레일(130)이 고정되는 한편, 상기 고압력 유압잭(300)의 상부에 레일 받침대(400)가 안착되며, 상기 레일 받침대(400)에는 상부 이동 레일(420)에 교량 상판(700)이 안착되어 이동이 가능하여 정위치로 교량 상판(700)을 이동시킨 뒤 고압력 유압잭(300)을 하강시켜 교량 상판(700)을 안착시킬 수 있는 관계로, 교량 상판(700)을 교각 고핑(100)의 상부에 설치하기가 용이하게 된다.As described above, the high pressure hydraulic jack 300 and the side rail 130 are fixed to the seating portion 110 of the piercing goping 100, while the rail support 400 is seated on the high pressure hydraulic jack 300. The rail stand 400 has a bridge top plate 700 mounted on the upper moving rail 420 and is movable, and thus, the bridge top plate 700 is moved to a proper position, and then the high pressure hydraulic jack 300 is lowered to bridge the top plate. Since the 700 can be seated, it becomes easy to install the bridge top plate 700 on top of the piercing goping (100).

또한, 상기 교량 상판(700)과 접한 교량 받침슈(200)를 점검하는 경우에도, 고압력 유압잭(300)을 상부로 승강시키면 작업자들은 편안하게 교량의 하자를 보수하거나 점검이 가능하게 된다.In addition, even when checking the bridge support shoe 200 in contact with the bridge top plate 700, when the high-pressure hydraulic jack 300 is elevated to the upper level, workers can easily repair or inspect the defect of the bridge.

상술한 본 발명의 구성에 의한 효과를 설명한다.The effect by the structure of this invention mentioned above is demonstrated.

본 발명에 의하면, 교각 고핑 측면에 고압력 유압잭과 레일 받침대가 설치되고, 교량 상판의 하부에 이동 롤러가 설치되어 교량 상판이 레일 받침대의 상부를 수월하게 이동이 가능하여 교량 상판의 설치시공이 용이한 효과를 갖는다.According to the present invention, a high pressure hydraulic jack and a rail support are installed on the side of the bridge goping, and a moving roller is installed on the lower part of the bridge top plate so that the bridge top plate can be easily moved to the upper part of the rail support, so that the installation of the bridge top plate is easy. Has an effect.

그로 인해, 교량 상판을 단시간에 안전하게 거치할 수 있고 공사 비용 및 유지 관리가 용이한 효과를 갖는다.
As a result, the bridge deck can be safely mounted in a short time, and the construction cost and maintenance can be easily effected.

Claims (1)

교각, 교각 고핑 및 교량 상판을 포함하는 교량을 시공시 교량 상판을 밀어넣기에 의해 거치하는 공법에 있어서, In the method of mounting the bridge including the bridge, bridge piercing and bridge deck by pushing the bridge deck at construction, 교각 고핑(100)에는, 양측면을 절곡하여 형성한 안착부(110)에 고압력 유압잭(300)과 측면 레일(130)이 설치되고, 그 교각 고핑(100)의 상부에 교량 받침슈(200)가 설치되는 단계; The high pressure hydraulic jack 300 and the side rails 130 are installed in the seating portion 110 formed by bending both sides, and the bridge support shoe 200 is provided on the pier goping 100. Being installed; 상기 교대 측에서 부터 순차적으로 교각 고핑(100)의 고압력 유압잭(300)의 상부에 안착되어 교량 상판이 가이드되고 측면 레일(130)에 측면 레일틀(440)이 삽입되어 결합되는 한편, 트러스 구조물로, 상부에 이동 레일(420)이 설치되고, 길이방향 일측면에 각각 측면 레일틀(440)이 설치된 레일 받침대(400)가 안착되는 단계; From the alternating side is sequentially seated on the upper portion of the high-pressure hydraulic jack 300 of the piercing goping 100, the bridge top plate is guided and the side rail frame 440 is inserted into the side rail 130 is coupled to the truss structure Steps for mounting the rail rail 400 is installed on the upper rail, the side rail frame 440 on each side in the longitudinal direction; 상기 레일 받침대(400)에는, 일측 교대로 부터 상부에 교량 상판(700)이 안착된 상태에서 교량 상판(700)이 각자의 위치로 이동시키는 단계; 및 The rail pedestal 400, the bridge top plate 700 is moved to its position in a state in which the bridge top plate 700 is seated from one side to the top; And 상기 교량 상판(700)이 정위치에 오면, 고압력 유압잭(300)을 하강하여 교량 상판(700)을 정위치에 고정시키는 단계;로 구성됨을 특징으로 하는 교량 상판 조립식 밀어넣기 거치공법.When the bridge top plate 700 is in the correct position, the step of lowering the high pressure hydraulic jack 300 to fix the bridge top plate 700 in place; Bridge top plate prefabricated push mounting method, characterized in that consisting of.
KR1020030048199A 2003-07-15 2003-07-15 Mounting method of slab using rail supportor of bridge KR100543450B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030048199A KR100543450B1 (en) 2003-07-15 2003-07-15 Mounting method of slab using rail supportor of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030048199A KR100543450B1 (en) 2003-07-15 2003-07-15 Mounting method of slab using rail supportor of bridge

Publications (2)

Publication Number Publication Date
KR20050008296A KR20050008296A (en) 2005-01-21
KR100543450B1 true KR100543450B1 (en) 2006-01-20

Family

ID=37221566

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030048199A KR100543450B1 (en) 2003-07-15 2003-07-15 Mounting method of slab using rail supportor of bridge

Country Status (1)

Country Link
KR (1) KR100543450B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101074868B1 (en) 2008-10-30 2011-10-19 주식회사 교량과 고속철도 A multi-storied continuous rahmen bridge for additional longitudinal forces control of continuous welded rail and construction method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100699413B1 (en) * 2006-05-02 2007-03-23 삼표이앤씨 주식회사 Channel bridge construction method available to control channel bridge segment sag
KR100729391B1 (en) * 2006-11-20 2007-06-15 주식회사 누리플랜 A temporary bridge and method for construting thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5286244A (en) * 1976-01-10 1977-07-18 Kumagai Gumi Co Ltd Method of extrusion construction of p*c*girder and extrusion jack device
JPS57137612U (en) * 1981-02-20 1982-08-27
JPH10168828A (en) * 1996-12-11 1998-06-23 Tokyu Constr Co Ltd Construction method of erecting bridge beam
KR200274811Y1 (en) * 2001-10-31 2002-05-11 주식회사 도화종합기술공사 A constructing using an I beam in a method of constructing a bridge structure
JP2002180421A (en) * 2000-12-11 2002-06-26 Kawada Construction Co Ltd Construction method of floor slab
KR200283074Y1 (en) * 2002-04-06 2002-07-26 주식회사 동성엔지니어링 A guide assembly for Prestressed Concrete Girder to stepping forward using Incremental Launching Method
KR200286115Y1 (en) * 2002-05-29 2002-08-21 주식회사 진화기술공사 A Guide Roller for Steel Box Girder to step forward using Incremental Launching Method
KR200332711Y1 (en) * 2003-07-21 2003-11-07 휘선건설(주) Launching system for moving girder at the bridge being constructed by incremental launching method
KR100432436B1 (en) * 2000-07-28 2004-05-22 주식회사 비엔지컨설턴트 Seat device for upper plate launching of a bridge and method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5286244A (en) * 1976-01-10 1977-07-18 Kumagai Gumi Co Ltd Method of extrusion construction of p*c*girder and extrusion jack device
JPS57137612U (en) * 1981-02-20 1982-08-27
JPH10168828A (en) * 1996-12-11 1998-06-23 Tokyu Constr Co Ltd Construction method of erecting bridge beam
KR100432436B1 (en) * 2000-07-28 2004-05-22 주식회사 비엔지컨설턴트 Seat device for upper plate launching of a bridge and method
JP2002180421A (en) * 2000-12-11 2002-06-26 Kawada Construction Co Ltd Construction method of floor slab
KR200274811Y1 (en) * 2001-10-31 2002-05-11 주식회사 도화종합기술공사 A constructing using an I beam in a method of constructing a bridge structure
KR200283074Y1 (en) * 2002-04-06 2002-07-26 주식회사 동성엔지니어링 A guide assembly for Prestressed Concrete Girder to stepping forward using Incremental Launching Method
KR200286115Y1 (en) * 2002-05-29 2002-08-21 주식회사 진화기술공사 A Guide Roller for Steel Box Girder to step forward using Incremental Launching Method
KR200332711Y1 (en) * 2003-07-21 2003-11-07 휘선건설(주) Launching system for moving girder at the bridge being constructed by incremental launching method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101074868B1 (en) 2008-10-30 2011-10-19 주식회사 교량과 고속철도 A multi-storied continuous rahmen bridge for additional longitudinal forces control of continuous welded rail and construction method

Also Published As

Publication number Publication date
KR20050008296A (en) 2005-01-21

Similar Documents

Publication Publication Date Title
KR100634848B1 (en) Bridge construction method using main girder launching system with temporary scaffolding
EA200601376A1 (en) CONSTRUCTION FOR THE TRANSPORTATION, INSTALLATION AND DISMANTLING OF ELEMENTS OF THE STATIONARY OIL PRODUCING PLATFORM AND METHODS OF USE OF SUCH CONSTRUCTION
KR100964729B1 (en) Bridge lifting apparatus for changing bridge bearings
CN110549487A (en) Movable precast box girder web plate steel bar positioning jig frame and construction method thereof
CN105672638A (en) Scaffold with supporting and sliding functions and net rack mounting method
KR100543450B1 (en) Mounting method of slab using rail supportor of bridge
KR102368433B1 (en) Installation apparatus for replacement equipment of the bridge supporter
KR101095449B1 (en) Bridge deck dismembering method and its equipment
KR20130026102A (en) Installation method of bridge structure having long span
KR101193470B1 (en) Bearing and constructing method for bridge
KR20030001174A (en) Expansion joint for connecting slabs of a bridge structure
KR101284431B1 (en) Oil jack using shoe construction methodfor
KR100348632B1 (en) Apparatus bridge beam using the opposite direction temporary construction bracket and thereof method
JP4424744B2 (en) Bridge replacement method
KR20070010522A (en) Transferring vehicle for inspecting and repairing bridge
KR100505999B1 (en) Mounting method of slab using i-beam
KR200233184Y1 (en) Bridge Inspection Stand
KR200397441Y1 (en) Transferring vehicle for inspecting and repairing bridge
RU2553804C1 (en) Device for repair of vertical wall of steel scroll tank
KR200391232Y1 (en) Main Girder Launching System with Temporary Scaffolding
KR20150130098A (en) Launching apparatus for constructing rail through bridge, and construction method using the same
KR20040038522A (en) Apparatus for pulling up bridge composed of inside and outside bracket unit using steel plate, and constructing method for repairing and reinforcing bridge using the apparatus
KR20040039919A (en) Fabricated inspecting support of bridge using steel bar and installing method thereof
CN213038121U (en) Adjusting device for track precast slab
JP2929922B2 (en) Correction method of shear deformation of base-isolated bearing

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20090109

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee