KR100429032B1 - Method for paving a sidewalk with afforestation using sidewalk-blocks for afforestation - Google Patents

Method for paving a sidewalk with afforestation using sidewalk-blocks for afforestation Download PDF

Info

Publication number
KR100429032B1
KR100429032B1 KR10-2001-0035554A KR20010035554A KR100429032B1 KR 100429032 B1 KR100429032 B1 KR 100429032B1 KR 20010035554 A KR20010035554 A KR 20010035554A KR 100429032 B1 KR100429032 B1 KR 100429032B1
Authority
KR
South Korea
Prior art keywords
sidewalk
greening
laying
green
seeds
Prior art date
Application number
KR10-2001-0035554A
Other languages
Korean (ko)
Other versions
KR20020096733A (en
Inventor
이근희
Original Assignee
이근희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이근희 filed Critical 이근희
Priority to KR10-2001-0035554A priority Critical patent/KR100429032B1/en
Publication of KR20020096733A publication Critical patent/KR20020096733A/en
Application granted granted Critical
Publication of KR100429032B1 publication Critical patent/KR100429032B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • E01C9/004Pavings specially adapted for allowing vegetation
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G13/00Protecting plants
    • A01G13/02Protective coverings for plants; Coverings for the ground; Devices for laying-out or removing coverings
    • A01G13/0256Ground coverings
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G20/00Cultivation of turf, lawn or the like; Apparatus or methods therefor
    • A01G20/20Cultivation on mats
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • E01C9/004Pavings specially adapted for allowing vegetation
    • E01C9/005Coverings around trees forming part of the road

Abstract

본 발명은 차도와 보도와의 경계에서 횡단보도를 제외한 보도가에 흙내음이 풍기는 녹지대를 조성하여 삭막한 도시의 거리분위기를 자연친화적으로 가꾸어 도시미관의 개선과 도시민의 정서함양에 이바지할 수 있는 녹화보도블록을 이용한 보도녹지화 포장방법을 제공하기 위한 것으로서, 보도의 차도측 일부를 할애하여 보도녹지대로 배정하고 지반을 다지는 과정과, 답면 사이에 지하로 빗물이 스며들기 쉬운 우수배수공을 가진 녹화보도블록을 상기 보도녹지대에 포설하되, 지반위에 두께 3∼5cm의 토사를 깔고, 토사층 위에 직물지나 부직포에 초본류 종자가 살포된 발아포를 포설하고, 발아포 위에 토사를 깔아 덮은 다음에 포설하는 단계와, 상기 우수배수공과 결속부 틈새에 토사를 채우고 잔디나 그 종자, 화초나 그 종자를 식재 또는 파종하여 가로변 녹지대를 조성하는 과정으로 진행하는 보도녹지화 포장방법을 특징으로 한다.The present invention creates a green zone with a scent of greenery on the sidewalk except for the crosswalk at the boundary between the driveway and the sidewalk, which makes the street environment of the desolate city friendly and greening, which can contribute to the improvement of urban aesthetics and the emotional development of the city. This is to provide a paving method for paving greening using sidewalk blocks.The process of assigning part of the sidewalk side of the sidewalk to the sidewalk greening area and compacting the ground, and the greening sidewalk block with rainwater drainage that is easy to see the rainwater between bases Laying on the sidewalk green belt, spreading soil of 3 to 5 cm thickness on the ground, laying germinated cloth sprayed with herbaceous seeds on woven paper or non-woven fabric on the soil layer, and laying the soil on the germinated cloth, and then laying; Fill the earth and sand in the gap between the rainwater drainage and the binding part, and planting or sowing grass or its seeds, flowers or its seeds. It features a sidewalk greening paving method that proceeds with the process of creating roadside green areas.

Description

녹화보도블록을 이용한 보도녹지화 포장방법{METHOD FOR PAVING A SIDEWALK WITH AFFORESTATION USING SIDEWALK-BLOCKS FOR AFFORESTATION}METHOD FOR PAVING A SIDEWALK WITH AFFORESTATION USING SIDEWALK-BLOCKS FOR AFFORESTATION

본 발명은 차도와 보도의 경계변에서 횡단보도를 제외한 부분에 흙내음이 풍기는 녹지대를 조성하여 삭막한 도시의 거리분위기를 자연친화적으로 가꾸어 도시미관개선과 도시민의 정서함양에 이바지할 수 있게 한 녹화보도블록을 이용한 보도녹지화 포장방법에 관한 것이다.The present invention is to create a green area with the smell of earthy soil at the boundary of the roadway and sidewalks to create a green environment to reduce the urban atmosphere and to contribute to the improvement of urban aesthetics and the emotional development of urban residents. The present invention relates to a pavement greening packaging method using blocks.

회색빛 시멘트제 보도블록이나 일반 콘크리트, 또는 유색 투수 콘크리트로 시공된 도시의 보도는 삭막함 그 자체다. 도무지 흙내음을 맡을 기회를 찾아보기 어렵다. 이러한 도시의 포장보도에서는 가로수변의 흙이 유일할 뿐이다. 그 적은 흙마저도 가로수 보호판에 가려지기 십상이라 진정한 의미의 도시 흙내음은 없다해도 지나친 말이 아니다.Urban sidewalks constructed of gray cement sidewalk blocks, plain concrete or colored pitched concrete are bleak itself. It is hard to find an opportunity to smell the mud. In this urban pavement, the roadside soil is the only soil. Even the soil is often hidden by roadside shrouds, so it is not too much to say if there is no true urban dust.

도시의 보도에서 흙내음을 맡을 수 없게 된 요인의 하나는 시공한 보도블록 자체는 물론 보도블록 사이에 기초인 바닥의 흙이 드러날 수 있는 공간이 존재하지 않는 다는 점이다.One of the factors that prevented the smell of dirt from the sidewalks of the city is that there is no space for the dirt on the floor, which is the foundation between the sidewalk blocks.

또, 보도블록 자체에 지면으로 통하는 공간이 존재하지 않고 보도블록 사이에도 지면으로 통하는 여유를 남기지 않고 시공하는 통상의 보도블록 시공방법은 빗물의 지하유입을 저지하기 때문에 가로수의 성장에 필요한 지하수 공급이 원활하지 못했다.In addition, since there is no space to the ground in the sidewalk block itself, and the construction of the sidewalk block without leaving the ground between the sidewalk blocks prevents the inflow of rainwater, the groundwater supply necessary for the growth of roadside trees is prevented. It was not smooth.

그리고 주철제 가로수 보호시설은 가격도 높고, 거기에 산재한 틈은 담배 꽁초, 휴지조각, 흙 쓰레기 등의 잡물이 들어가 도시의 쓰레기통으로 전락한지 오래며, 가로수 보호대의 틈으로 숨어든 토사는 보행자에게 밟혀다져지기 일쑤여서 비가 와도 그리로 스며들기 어려운 환경으로 변모되기 십상이어서 가로수 보호대로서의 제역할을 다하지 못한 점도 결코 간과할 수 없다.And the cast iron roadside shelter has a high price, and the gaps scattered there are miscellaneous items such as cigarette butts, scraps of paper, and earthen debris that have fallen into urban garbage cans. It is hard to overlook the fact that it was not able to fulfill its role as a roadside guard because it is easily changed into an environment that is difficult to see through rain.

본 발명의 과제는 차도와 보도의 경계변상에서 횡단보도를 제외한 부분에, 흙내음이 물씬 풍기고 아름답기도 한 녹지대를 조성함으로서 삭막하게 느껴져 온 도시거리의 풍경을 자연친화적 환경으로 가꾸어 도시미관을 개선함과 동시에 도시민의 정서함양에 기여할 수 있는 녹화보도블록을 이용한 보도녹지화 포장방법을 제공하는 것이다.The problem of the present invention is to improve the urban aesthetics by making the landscape of the city street, which has been felt desolate, into a nature-friendly environment by creating a beautiful green zone with a lot of earthy sounds in the part except the crosswalk at the boundary between the road and the sidewalk. At the same time, it provides a way of paving greenery using greened reporting blocks that can contribute to the emotional development of urban residents.

위의 과제는, 보도의 차도측 일부를 할애하여 보도녹지대로 배정하고 지반을 다지는 과정과, 답면 사이에 지하로 빗물이 스며들기 쉬운 우수배수공을 가진 녹화보도블록을 상기 보도녹지대에 포설하되, 지반위에 두께 3∼5cm의 토사를 깔고, 토사층 위에 직물지나 부직포에 초본류 종자가 살포된 발아포를 포설하고, 발아포 위에 토사를 깔아 덮은 다음에 포설하는 단계와, 상기 우수배수공과 결속부 틈새에 토사를 채우고 잔디나 그 종자, 화초나 그 종자를 식재 또는 파종하여 가로변 녹지대를 조성하는 과정으로 이루어지는 녹화보도블록을 이용한 보도녹지화 포장방법에 의해 달성할 수 있다.The above task is to allocate a part of the sidewalk side of the sidewalk to the sidewalk greenery and to lay the ground, and to install the greening block on the sidewalk green belt with rainwater drainage that is easy to seep into the basement between the sides. Laying soil 3 to 5 cm thick on top, laying germination cloth sprayed with herbaceous seeds on textile paper or non-woven fabric on the soil layer, and laying the soil on top of the germination cloth, and then laying it. It can be achieved by the pavement greening paving method using greening block that consists of filling the grass, its seeds, flowers or seeds and planting or sowing the roadside green belt.

도 1은 본 발명에 사용되는 녹화보도블록의 사시도1 is a perspective view of the greening block used in the present invention

도 2는 동 종단면도Figure 2 is a longitudinal cross-sectional view

도 3은 녹화보도블록의 조적상태를 나타낸 평면도3 is a plan view showing the masonry state of the recording coverage block

도 4는 녹화보도블록의 다른 조적상태를 나타낸 평면도4 is a plan view showing another masonry state of the recording coverage block

도 5는 본 발명에 의한 녹화보도블록을 이용한 보도녹지대의 횡단면도5 is a cross-sectional view of a sidewalk green zone using the greening block according to the present invention.

도 6은 보도녹지대의 평면예시도6 is a plan view of the sidewalk green zone

도 7은 다른 실시예에 의한 보도녹지대의 평면예시도7 is a plan view of the sidewalk green zone according to another embodiment

도 8은 본 발명의 다른 실시예에 의한 녹화보도블록을 이용한 보도녹지대의 횡단면도8 is a cross-sectional view of a sidewalk green zone using the greening block according to another embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1 : 녹화보도블록 2 : 답면1: Recording press block 2: Answer surface

3 : 우수배수공 4 : 경사면3: storm drainage 4: slope

8 : 골 a,a' : 보도녹지대8: Goal a, a ': Press Green Zone

c : 일반 보도블록대c: general sidewalk block

본 발명의 기본 개념은 차도와 보도의 경계변을 따라 보도블록 시공대에 보도녹지대를 조성하는 것이다. 보도녹지대란 녹화보도블록을 사용하여 기존의 가로수 외에 초지, 꽃밭 또는 초지-꽃밭과 흙을 포함한다. 다만 횡단보도의 진출입부는 제외한다. 보도녹지대를 조성하는 데 가장 중요한 구성 요소는 바로 녹화보도블록이다.The basic concept of the present invention is to create a sidewalk green zone on the sidewalk block construction platform along the boundary between the roadway and the sidewalk. The footpath green belt is used for greening blocks to include grassland, flower gardens or grassland-flower gardens and soil. However, entrance and exit of crosswalks are excluded. The most important component in creating a sidewalk green area is the green reporting block.

도 1 및 도 2에서, 위에서 말한 녹화보도블록(1)은 정방형 또는 마주보는 변이 다른 한 쌍의 변에 비해 2배의 길이로 된 직방형으로서, 판면에서 일정한 높이로 돌출된 답면(2)이 있고, 답면(2) 사이에는 종형 우수배수공(3)을 형성하고, 답면(2) 사이의 상면이 우수배수공(3)을 향해 일방적으로 구배진 경사면(4)을 가진 것이다. 경사면(4)은 그 위로 떨어지는 빗물 및 답면(2)과 그 주위의 상면(5)으로 떨어진 후 그리로 흘러드는 빗물이 우수배수공(3)으로 유입되도록 유도하는 역할을 한다.In FIG. 1 and FIG. 2, the above-mentioned green reporting block 1 is a rectangular shape having a square or an opposite side having a length twice as long as the pair of other sides. In addition, a vertical rainwater drainage hole 3 is formed between the answering surfaces 2, and the upper surface between the answering surfaces 2 has an inclined surface 4 that is unilaterally gradientd toward the drainage drainage 3. The inclined surface 4 serves to induce the rainwater falling on the rainwater and the answering surface 2 and the upper surface 5 around the rainwater flowing into the rainwater drainage hole 3.

또, 녹화보도블록(1)의 네 변에는 인접 시공되는 다른 녹화보도블록 또는 일반 보도블록과 상호 이맞춤에 의한 조적상태의 안정을 도모하기 위한 결속홈(6)과 결속돌기(7)도 형성되어 있다. 도면에는 단수의 결속홈(6)과 복수의 결속돌기(7)로 나타나 있으나 이는 어디까지나 하나의 실시예에 불과할 뿐이며, 결속홈(6)에 다른 녹화보도블록(1) 또는 이것과 동형의 일반 보도블록측 결속돌기(7)를 삽입하는 방법으로 시공했을 때 결속홈(15)과 결속돌기(6)와의 상호 결속에 의해 시공상태에 안정을 가져온다면 그 형태는 얼마든지 변화 가능하다.In addition, four sides of the greening block 1 are also provided with binding grooves 6 and binding projections 7 for promoting stabilization of the masonry state by mutually matching with other greening block blocks or general sidewalk blocks that are adjacently constructed. It is. Although shown in the figure as a single binding groove 6 and a plurality of binding projections 7, this is only one embodiment, and the other recording press block 1 or the same type as the general shape of the binding groove 6 is provided. When the construction is carried out by inserting the sidewalk side binding projections 7, the form can be changed as long as stability is achieved in the construction state by the mutual binding of the binding grooves 15 and the binding projections 6.

도 3은 답면(2)의 표면에 자연석과 같은 형태의 변화를 통하여 자연미를 한껏 살리고 답면(2)도 크고 작게 분할하고 그 사이에 골(8)을 내서 빗물을 받는 용적을 늘린 변경실시예의 녹화보도블록(1a)이다. 상기 골(8)의 바닥도 우수배수공(3)으로 일방 구배지게 경사면으로 형성하여 그리로 떨어지는 빗물이 우수배수공(3)으로 전량 유입되도록 한다.Figure 3 is a greening of the modified embodiment to increase the volume receiving rain water by making the natural beauty to the fullest through the change of the shape of natural stone on the surface of the answer surface (2), dividing the answer surface (2) big and small, and the valley (8) between them It is a sidewalk block 1a. The bottom of the valley (8) is also formed as an inclined surface to be one-sided to the rainwater drainage (3) so that the rainwater falling into the rainwater drainage (3) the entire amount.

도 4는 상기 녹화보도블록(1a)을 답면(2)이 일방향으로 나란하게 시공한 경우의 평면도이고, 도 5는 상기 녹화보도블록(1,1a)을 이용한 보도녹지대(a)의 일례를 나타낸 평면도이다. 그림과 같이 가로수(b) 주변은 상기의 녹화보도블록(1,1a)으로 보도녹지대(a)를 시공하는 것은 필수로 하고, 가로수(b) 사이의 도로변 보도는 점점이 보도녹지대(a)를 시공하는 것이다.FIG. 4 is a plan view when the recording sidewalk block 1a is constructed side by side in one direction, and FIG. 5 shows an example of a sidewalk green zone a using the recording sidewalk blocks 1 and 1a. Top view. As shown in the figure, it is mandatory to construct the sidewalk green area (a) with the above-mentioned greening block (1, 1a) around the roadside tree (b), and the sidewalk sidewalk between the roadside tree (b) gradually increases the sidewalk green area (a). It is construction.

도 6은 답면(2)이 종횡으로 엇갈리게 시공한 녹화보도블록(1a)의 사례를 나타낸 것이다. 이와 같이 답면(2)의 방향선택으로 녹화보도블록(1)의 시공미, 즉 보도녹지대의 시공미에 변화를 줄 수 있다.FIG. 6 shows an example of the greening report block 1a in which the answering surface 2 is staggered vertically and horizontally. In this way, the construction of the sidewalk green block 1, that is, the construction of the sidewalk green zone can be changed by selecting the direction of the answer surface (2).

이에 대하여 도 7은 가로수(b) 주변을 포함하여 노변을 따라 일정한 폭, 예를들면 보행자수가 적은 보도의 경우에는 기존 보도폭의 절반 가량을 할애한 띠상 보도녹지대(a')로 조성하고 보행자가 빈번히 오가는 보도의 경우 30% 정도를 보도녹지대(a')로 할애하여 녹화보도블록(1,1a)을 시공한 사례를 든 것이다.On the other hand, FIG. 7 shows a belt-shaped walkway green space (a ') devoted about half of the existing sidewalk width in the case of a sidewalk with a constant width, for example, a small number of pedestrian walkways along the roadside, including the street trees (b). Ogawa is an example of the construction of greening press blocks (1, 1a) with about 30% of the sidewalks devoted to the sidewalk green zone (a ').

이때, 우수배수공(3)과 결속부의 틈새에 블록 절반 높이만큼만 토사를 채우고 여기다 잔디씨나 밟히더라도 끈질긴 생명력을 가진 초본류의 종자, 키 작은 화초의 씨앗을 파종하여 생장케 함으로서 초본류가 활기차게 자라 푸른 공원화할 수있는 보도녹지대(a)로 조성한다.At this time, fill the soil with only half the height of the block in the gap between the rainwater drainage (3) and the binding part. Create a sidewalk green area (a).

또는, 도 8과 같이 보도의 지면에서 녹화보도블록(1,1a)을 시공할 지면을 고르고 그 위에 두께 3∼5cm의 토사(9)를 깔며, 토사(9)층 위에 직물지나 부직포에 초본류 종자를 살포한 이른 바 발아포(10)를 포설한 다음에 얇은 두께로 토사(11)를 깐 다음에 녹화보도블록(1,1a)을 시공한다.Alternatively, as shown in Fig. 8, the ground for the greening block (1, 1a) is selected from the ground of the sidewalk, and 3 to 5 cm thick soil (9) is laid thereon, and the herbaceous seeds are placed on fabric paper or nonwoven on the soil layer (9). After spreading the so-called germination cloth (10) sprayed with a thin layer of soil (11) and then the greening block (1, 1a) is constructed.

시공 후 발아된 초본류나 화초의 싹은 우수배수공(3)과 녹화보도블록(1,1a)의 결속틈 사이로 자라나서 보도상에 푸른 녹지대를 조성하게 된다.After sprouting, the sprouts of herbaceous plants or flowers grow between the gaps between rainwater drainage (3) and green walkway blocks (1, 1a), forming green greenery on the sidewalk.

또, 우수배수공(3)과 녹화보도블록(1,1a)의 결속틈 사이로 빗물이 원활히 스며들어 지하수를 풍부하게 함으로서 가로수(b)와 보도녹지대(a,a')의 잔디와 화초의 성장이 활발히 이루어지게 한다.In addition, rainwater penetrates smoothly between binding drainages of rainwater drainage (3) and greening sidewalk blocks (1,1a), enriching groundwater, thereby increasing the growth of grass and flowers in street trees (b) and footpaths (a, a '). Make it active.

이상 설명한대로 본 발명은 보도의 차도측 일부를 할애하여 보도녹지대로 배정하고, 보도녹지대에는 답면 사이에 지하로 빗물이 스며들기 쉬운 우수배수공을 가진 녹화보도블록을 포설하며, 상기 우수배수공과 녹화보도블록간 결속부 틈새에 잔디, 화초 등의 초본류 또는 그 종자를 식재하거나 파종하여 보도녹지대를 조성하는 것으로서, 시멘트 또는 아스콘제 보도에서도 흙내음이 물씬 풍기며 푸르고 형형색색의 꽃이 만발한 푸른 녹색대를 가꿀 수 있다. 또한, 블록하단은 지면 아래서 맞물려 있고 블록의 배수공과 복토공간은 우수를 투과시켜 토양의 건조를 방지함과 동시에 지하수가 고갈되는 것을 방지하면서 중소하천의 급격한 수위의 상승을 억제하는 효과를 가지며, 혹서기에 도심에 있어서 태양열에 의한 복사열을 줄이고 산소 공급역할을 하여 쾌적한 가로환경을 조성하면서 삭막했던 보도는 자연친화적 가로로 전환되어 도시미관도 개선되고 도시민의 정서함양에도 큰 도움을 주게 된다.As described above, the present invention devotes a part of the sidewalk side of the sidewalk to the sidewalk green area, and installs a sidewalk greening block with rainwater drainage that is easy to seep rainwater into the base between the slopes. Planting or planting herbs or seeds of grass, flowers, etc. in the gaps between blocks to create footpath green areas, and even green and green flowers with green and colorful flowers can be grown even with cement or asphalt concrete sidewalks. have. In addition, the lower end of the block is engaged under the ground, and the drainage hole and the cover of the block penetrate the rainwater, preventing the drying of the soil and preventing the depletion of the groundwater, while suppressing the rapid rise of the small and medium rivers. In the city center, the sidewalk, which was cut down by reducing radiant heat by solar heat and acting as oxygen supply, creating a pleasant street environment, is transformed into a nature-friendly street, which improves the aesthetics of the city and contributes to the emotional development of the citizens.

또, 주철제 가로수 보호대가 차지하던 곳마저 상기 녹화보도블록으로 시공하면 우선 시공비가 저렴하고, 가로수 주위의 토사가 보행자에게 밟혀 다져질 우려도 없어 그리로 떨어지는 우수가 원활히 지하로 스며들어 가로수에 공급, 활기찬 성장을 돕게 되는 부수효과도 기대된다.In addition, if the cast iron roadside guard was occupied by the greening block, the construction cost would be low, and there would be no risk of earthquake around the roadway being stepped on by pedestrians. A side effect is also expected to help the company grow actively.

Claims (3)

보도의 차도측 일부를 할애하여 보도녹지대로 배정하고 지반을 다지는 과정과, 답면 사이에 지하로 빗물이 스며들기 쉬운 우수배수공을 가진 녹화보도블록을 상기 보도녹지대에 포설하되, 지반위에 두께 3∼5cm의 토사를 깔고, 토사층 위에 직물지나 부직포에 초본류 종자가 살포된 발아포를 포설하고, 발아포 위에 토사를 깔아 덮은 다음에 포설하는 단계와, 상기 우수배수공과 결속부 틈새에 토사를 채우고 잔디나 그 종자, 화초나 그 종자를 식재 또는 파종하여 가로변 녹지대를 조성하는 과정으로 이루어지는 것을 특징으로 하는 녹화보도블록을 이용한 보도녹지화 포장방법.Allocate a part of the sidewalk side of the sidewalk to allocate it to the sidewalk greenery and lay the ground, and lay a greening block on the sidewalk greenery with rainwater drainage that is easily drained into the basement between the slopes. Laying earth and sand, spreading the germinated cloth sprayed with herbaceous seeds on the paper or non-woven fabric on the soil layer, and then laying the sand and sand on the germinated cloth, and filling the sand and sand in the gap between the storm drainage and the joint. Press planting paving method using a greening block, characterized in that the process of planting or sowing seeds, flowers or seeds to form a roadside green zone. 삭제delete 삭제delete
KR10-2001-0035554A 2001-06-21 2001-06-21 Method for paving a sidewalk with afforestation using sidewalk-blocks for afforestation KR100429032B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0035554A KR100429032B1 (en) 2001-06-21 2001-06-21 Method for paving a sidewalk with afforestation using sidewalk-blocks for afforestation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0035554A KR100429032B1 (en) 2001-06-21 2001-06-21 Method for paving a sidewalk with afforestation using sidewalk-blocks for afforestation

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020010018673U Division KR200248502Y1 (en) 2001-06-21 2001-06-21 Sidewalk afforestation structures using sidewalk-blocks for afforestation

Publications (2)

Publication Number Publication Date
KR20020096733A KR20020096733A (en) 2002-12-31
KR100429032B1 true KR100429032B1 (en) 2004-04-29

Family

ID=27710458

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0035554A KR100429032B1 (en) 2001-06-21 2001-06-21 Method for paving a sidewalk with afforestation using sidewalk-blocks for afforestation

Country Status (1)

Country Link
KR (1) KR100429032B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100847297B1 (en) * 2005-12-15 2008-07-18 유한회사 로드플랜 A structure of setting sidewalk-block
KR102400053B1 (en) 2021-02-08 2022-05-19 콘비젼스 주식회사 Green space pavement structure in automobile lanes

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020059300A (en) * 2002-06-12 2002-07-12 전형진 paving method of pavement-brick

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07150505A (en) * 1993-11-30 1995-06-13 Haseko Corp Planting pavement block
KR20000024480A (en) * 2000-02-16 2000-05-06 이은명 Organic top soil mat including seed useful for raising of seeding, and preparing method of the same

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07150505A (en) * 1993-11-30 1995-06-13 Haseko Corp Planting pavement block
KR20000024480A (en) * 2000-02-16 2000-05-06 이은명 Organic top soil mat including seed useful for raising of seeding, and preparing method of the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100847297B1 (en) * 2005-12-15 2008-07-18 유한회사 로드플랜 A structure of setting sidewalk-block
KR102400053B1 (en) 2021-02-08 2022-05-19 콘비젼스 주식회사 Green space pavement structure in automobile lanes

Also Published As

Publication number Publication date
KR20020096733A (en) 2002-12-31

Similar Documents

Publication Publication Date Title
US6715965B2 (en) Retaining wall blocks and retaining walls constructed from such blocks
EP3347523B1 (en) Tree frame and grate system
Jim Constraints to urban trees and their remedies in the built environment
US20180228094A1 (en) Tree Frame and Grate System with a Liner and Method to Improve Growth of Vegetation in an Urban Environment
KR100429032B1 (en) Method for paving a sidewalk with afforestation using sidewalk-blocks for afforestation
Grabosky et al. Preliminary findings from measuring street tree shoot growth in two skeletal soil installations compared to tree lawn plantings
Jim Rootability confinement and soil-husbandry solutions for urban trees in sealed and insular sites
KR101167978B1 (en) A buried type tree protecting device and method
KR200248502Y1 (en) Sidewalk afforestation structures using sidewalk-blocks for afforestation
KR100352143B1 (en) Planting belts construction method for street trees
CN213061572U (en) Landscape road bed course
KR101057646B1 (en) Natural grass packaging material using artificial structure
Craul Urban soil: Problems and promise
US20210029901A1 (en) Plant System with Water Storage Chambers
KR100872483B1 (en) Revegetation Pots for revegetating rock slopes
KR100353010B1 (en) A method for constructing environmental blocks for permeating rainwater into verges of a paved road
JPH047207Y2 (en)
JP2879190B2 (en) Weed control structure and concrete products used for it
CN108221555B (en) A kind of method for paving of garden path structure
JPH0860632A (en) Preventive structure against grass
JP2023062248A (en) Tree root guiding roadbed material and method for forming tree root rising preventive roadbed
Papakos et al. Redeveloping brownfields with LID design
Peets Street Trees in the Built-up Districts of Large Cities
KR100367884B1 (en) pedestrian street construction method
Gilman Urban design for a wind resistant Urban forest

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee