KR100367884B1 - pedestrian street construction method - Google Patents

pedestrian street construction method Download PDF

Info

Publication number
KR100367884B1
KR100367884B1 KR10-2000-0020937A KR20000020937A KR100367884B1 KR 100367884 B1 KR100367884 B1 KR 100367884B1 KR 20000020937 A KR20000020937 A KR 20000020937A KR 100367884 B1 KR100367884 B1 KR 100367884B1
Authority
KR
South Korea
Prior art keywords
area
tree planting
planting area
ground
construction step
Prior art date
Application number
KR10-2000-0020937A
Other languages
Korean (ko)
Other versions
KR20010097133A (en
Inventor
권해용
Original Assignee
(주) 장맥엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 장맥엔지니어링 filed Critical (주) 장맥엔지니어링
Priority to KR10-2000-0020937A priority Critical patent/KR100367884B1/en
Publication of KR20010097133A publication Critical patent/KR20010097133A/en
Application granted granted Critical
Publication of KR100367884B1 publication Critical patent/KR100367884B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C15/00Pavings specially adapted for footpaths, sidewalks or cycle tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • E01C9/004Pavings specially adapted for allowing vegetation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

본 발명은 배수성과 인도에 식목된 가로수의 생육상태를 우수하게 유지할 수 있는 인도를 구현하기 위한 인도의 시공방법에 관한 것이다.The present invention relates to a construction method of India for realizing the delivery that can maintain the drainage and growth of the roadside trees planted in India.

본 발명은 지면을 통행영역(L1)과 가로수 식목영역(L2)으로 구획하되 가로수 식목영역(L2)의 저부에 배수촉진물(S)을 투입하고, 통행영역(L1)과 가로수 식목영역(L2)의 표면에 모래(S1)를 깔고, 통행영역(L1)과 가로수 식목영역(L2)의 경계선에 일직선의 경계블록(B3)을 배열하고, 통행영역(L1)에 보도블록(B1)을 배열함과 아울러 가로수 식목영역(L2)에 적어도 하나 이상의 배수공(H)을 구비하는 배수블록(B2)을 짜맞추기식으로 배열하고, 가로수 식목영역(L2)에는 소정간격을 유지하는 식목공간(P)을 지속적으로 형성하고, 가로수 식목영역(L2)에 배열된 배수블록(B2)의 배수공(H)상에 잔디를 식재하는 단계에 의해 보행자 도로가 구현될 수 있도록 한 것이다.The present invention divides the ground into a passage area (L1) and a row of tree planting area (L2), but puts the drainage accelerator (S) at the bottom of the row of tree planting area (L2), the passage area (L1) and a tree of tree planting area (L2) Sand (S1) is laid on the surface of), a straight boundary block (B3) is arranged at the boundary between the passage area (L1) and the tree planting area (L2), and the sidewalk block (B1) is arranged at the passage area (L1). In addition, arranging the drainage block (B2) having at least one or more drain holes (H) in the tree planting area (L2) in a frame, and the tree planting space (P) to maintain a predetermined interval in the tree planting area (L2). The pedestrian road is continuously formed by planting grass on the drain hole H of the drain block B2 arranged in the tree planting area L2.

본 발명에 의해 구현된 보행자 도로는 배수성과 도로에 식목된 가로수의 생육상태를 매우 우수하게 유지할 수 있으며, 또한 빗물이 지하(식목영역)로 즉시 유입될 수 있도록 함으로서 지하수의 보존에도 일조할 수 있는 효과가 있다.The pedestrian road implemented by the present invention can maintain the drainage and the growth of the roadside trees planted on the road very well, and can also help the preservation of the groundwater by allowing rainwater to immediately flow into the underground (planting area). It works.

Description

보행자 도로의 시공방법{pedestrian street construction method}Pedestrian street construction method

본 발명은 보행자 도로(인도)의 시공방법에 관한 것으로서, 좀더 상세히는 보행자 도로의 배수성과 보행자 도로에 식목된 가로수의 생육상태를 우수하게 유지할 수 있는 보행자 도로를 구현할 수 있도록 발명된 보행자 도로의 시공방법에 관한 것이다.The present invention relates to a construction method of a pedestrian road (India), and more specifically, to the construction of the pedestrian road invented to implement a pedestrian road that can maintain the drainage of the pedestrian road and the growth of roadside trees planted in the pedestrian road excellently. It is about a method.

통상의 보행자 도로는 지면에 굴토 또는 복토작업을 가하여 땅을 고른 상태에서 지면에 모래 등을 소정두께로 깔고 모래의 상면에 짜맞추기식으로 보도블록을 배열하되, 배열되는 보도블록의 중간 중간에 가로수의 식목을 위한 영역을 마련하는 과정을 통해 시공되도록 하였다.Ordinary pedestrian roads are laid with a predetermined thickness of sand on the ground in the state of leveling the ground by applying clay or cover work to the ground and arranging the sidewalk blocks in the form of a frame on the top of the sand, The construction was carried out through the preparation of the area for planting.

상기한 과정으로 시공된 종래의 보행자 도로는 강우 등에 대한 도로의 배수성이 떨어져 우천시는 보행자 등에게 상당한 불편을 끼쳤을 뿐만 아니라 보행자 도로의 여건상 가로수가 식목되는 공간(수분이 유입될 수 있는 공간)이 협소할 수밖에 없기 때문에 가로수의 생육에 필요한 적정한 수분의 공급이 이루어지지 않는 등의 문제점이 있어 왔다.Conventional pedestrian roads constructed by the above process have poor drainage of the road due to rain, etc. In rainy weather, there is considerable inconvenience to pedestrians, as well as a space where trees are planted (space where water can flow) due to pedestrian road conditions. Since there is no choice but to narrow it, there has been a problem in that proper water supply for growing trees is not provided.

또한, 도로상에 고여진 빗물은 그 즉시 지하로 유입되어야만 지하수의 보존이 원활하게 이루어지는 것이나 종래의 보행자 도로는 배수성이 떨어지기 때문에 빗물이 도로상에 고여진 상태를 유지하다가 대부분이 증발해버리게 된다In addition, the rainwater collected on the road should be introduced immediately to the basement, so that the groundwater is easily preserved. However, since the conventional pedestrian roads have poor drainage, the rainwater remains on the road and most of the water will evaporate.

이에 본 발명은 종래 시공방법에 의해 시공된 보행자 도로에서 발생되었던 제반 문제점을 일소하기 위해 창출된 것으로서 배수성을 현저하게 향상시킬 수 있도록 함과 아울러 지하수의 보존과 도로에 식목된 가로수의 생육상태를 우수하게 유지할 수 있는 보행자 도로를 구현할 수 있도록 함에 기술적 과제의 주안점을 두고 완성한 보행자 도로 시공방법을 제공하고자 한다.Therefore, the present invention was created to eliminate all the problems that occurred in the pedestrian roads constructed by the conventional construction method, to significantly improve the drainage, and to preserve the groundwater and grow the roadside trees grown on the road. The purpose of this study is to provide a completed pedestrian road construction method, which focuses on technical tasks, so that pedestrian roads can be maintained.

도 1은 본 발명에서 제시하는 시공방법에 따른 보행자 도로의 시공과정도1 is a construction process diagram of the pedestrian road according to the construction method proposed in the present invention

도 2는 가로수 식목영역상에 배열되는 배수블록의 일실시예를 도시한 사시도Figure 2 is a perspective view showing an embodiment of the drain block arranged on the tree planting area

도 3은 본 발명에 의해 시공된 보행자 도로의 일실시예를 도시한 평면도Figure 3 is a plan view showing an embodiment of a pedestrian road constructed by the present invention

도 4는 본 발명에 의해 시공된 보행자 도로의 다른 실시예를 도시한 평면도Figure 4 is a plan view showing another embodiment of a pedestrian road constructed by the present invention

도 5는 본 발명에 의해 시공된 보행자 도로의 또 다른 실시예를 도시한 평면도Figure 5 is a plan view showing another embodiment of a pedestrian road constructed by the present invention

◇도면의 주요부분에 대한 부호의 설명◇◇ Explanation of symbols for main parts of drawing ◇

B1: 보도블록B1: sidewalk block

B2: 배수블록B2: drain block

B3: 경계블록B3: Boundary Block

B4: 경계석B4: boundary stone

H: 배수공H: Drainer

L1: 통행영역L1: passage area

L2: 가로수 식목영역L2: Tree planting area

S: 배수촉진물S: Drainage Promoter

S1: 모래S1: sand

도 1은 본 발명에서 제시하는 시공방법에 따른 보행자용 도로의 시공과정도로서 도시된 바를 통해 본 발명의 바람직한 실시예를 상세히 설명하기로 한다.1 will be described in detail a preferred embodiment of the present invention through the bar as shown in the construction process of the pedestrian road according to the construction method proposed in the present invention.

제1 시공단계 - 본 시공단계에서는 보행자용 도로가 설치될 지면을 길이방향으로 양분하여 보행자 도로를 통행영역(L1)과 가로수 식목영역(L2)으로 구획하고, 상기 통행영역(L1)의 지면에 굴토 또는 복토작업을 가하여 평탄하게 땅고르기 작업을 진행하고, 상기 가로수 식목영역(L2)의 지면에 굴토작업을 가하여 가로수 식목영역(L2)의 지면이 통행영역(L1)의 지면보다 20센티미터 정도 낮아지도록 하고, 굴토된 가로수 식목영역(L2)의 단부에는 보행자 도로의 길이방향으로 일직선을 이루는 경계석(B5)을 배열하여 보행자 도로와 차도를 분리한다.First construction step-In this construction step, the ground on which the pedestrian road is to be installed is divided in the longitudinal direction to divide the pedestrian road into a traffic area L1 and a tree planting area L2, and to the ground of the traffic area L1. A flat soil leveling process is performed by applying a burial or cover work, and a ground surface of the roadside tree planting area L2 is about 20 centimeters lower than the ground of the passage area L1 by applying a burrowing operation to the ground of the roadside tree planting area L2. At the end of the tree-lined tree planting area (L2), the boundary stone (B5) is arranged in a longitudinal direction of the pedestrian road to separate the pedestrian road and the driveway.

제2 시공단계 - 본 시공단계에서는 굴토된 가로수 식목영역(L2)의 지면에 잡석 및 모래와 마사토 등의 혼합으로 이루어진 배수촉진물(S)을 투입하고, 상기 투입된 배수촉진물(S)에 다지기 작업과 고르기 작업을 가하여 배수촉진물(S)의 표면이 통행영역(L1)의 지면과 같은 높이를 유지하도록 한다.Second construction step-In this construction step, the waste promoting material (S) consisting of a mixture of rubble, sand and masato, etc. is added to the ground of the tree-lined tree planted area (L2), and compacted in the introduced drainage promoting material (S). The work and the picking operation are applied to maintain the surface of the drainage accelerator S at the same height as the ground of the passage area L1.

제3 시공단계 - 본 시공단계에서는 통행영역(L1)의 지면과 가로수식목영역(L2)에 다져진 배수촉진물(S)의 표면상에 모래(S1)를 3 내지 5센티미터 정도의 두께를 갖도록 분포시키되, 통행영역(L1)보다 가로수 식목영역(L2)이 다소 낮아지도록 하여 통행영역(L1)으로부터 가로수 식목영역(L2)에 이르기까지의 도로면이 완만한 하향 기울기를 갖도록 한다. 상기 모래(S1)층은 도로면의 기울기 설정과 보도블록(B1) 및 배수블록(B2)의 배열을 용이하게 진행할 수 있도록 함과 아울러 시공이 완료된 도로의 배수성을 향상시키는 기능을 수행하게 된다.Third construction step-In this construction step, the sand S1 is distributed to have a thickness of about 3 to 5 centimeters on the surface of the passage area L1 and the surface of the drainage accelerator S compacted in the tree planting area L2. However, the roadside tree planting area L2 is slightly lower than the passage area L1 so that the road surface from the road area L1 to the roadside tree area L2 has a gentle downward slope. The sand (S1) layer is to facilitate the setting of the slope of the road surface and the arrangement of the sidewalk block (B1) and the drainage block (B2) and to improve the drainage of the road is completed construction.

한편, 통행영역(L1)으로부터 가로수 식목영역(L2)에 이르며 형성되는 도로의 기울기는 보행자의 보행에 지장을 주지 않는 범위내에서 이루어지도록 한다.On the other hand, the inclination of the road formed from the passage area (L1) to the tree planting area (L2) is to be made within a range that does not interfere with the pedestrian walking.

제4 시공단계 - 본 시공단계에서는 전술한 바와 같은 시공단계를 통해 구획된 통행영역(L1)과 가로수 식목영역(L2)의 경계선에는 보행자 도로의 길이방향으로 일직선을 이루는 경계블록(B3)을 배열한다.Fourth construction step-In this construction step, boundary blocks B3 that form a straight line in the longitudinal direction of the pedestrian road are arranged on the boundary line between the passage area L1 and the tree planting area L2 partitioned through the construction steps as described above. do.

제5 시공단계 - 본 시공단계에서는 통행영역(L1)에 분포된 모래(S1)의 상면에 보도블록(B1)을 짜맞추기식으로 배열한다.Fifth construction step-In this construction step, the sidewalk block B1 is arranged on the top surface of the sand S1 distributed in the passage area L1 in a framed fashion.

제6 시공단계 - 본 시공단계에서는 가로수 식목영역(L2)에 분포된 모래(S)의 상면에는 적어도 하나 이상의 배수공(H)을 구비하는 배수블록(B2)을 짜맞추기식으로 배열하되, 가로수 식목영역(L2)에는 소정간격을 유지하는 식목공간(P)을 지속적으로 형성시켜 각각의 식목공간(P)이 경계블록(B4)에 의해 나머지의 가로수 식목영역(L2)과 구획되도록 한다.Sixth construction step-In this construction step, the drain block (B2) having at least one drain hole (H) is arranged on the top surface of the sand (S) distributed in the roadside tree planting area (L2), the roadside tree planting area Planting space (P) to maintain a predetermined interval (L2) is continuously formed in (L2) so that each planting space (P) is partitioned from the remaining tree planting area (L2) by the boundary block (B4).

제7 시공단계 - 본 시공단계에서는 가로수 식목영역(L2)에 배열된 배수블록(B2)의 배수공(H)상에 잔디를 식재하여 도로의 환경을 미려하게 함과 아울러 배수블록(B2)의 배수공(H)을 통해 흙이나 모래 등이 도로상으로 유출되는 것을 방지할 수 있도록 한다.7th construction step-In this construction step, grass is planted on the drain hole H of the drain block B2 arranged in the tree planting area L2 to make the environment of the road beautiful and the drain hole of the drain block B2. (H) to prevent soil or sand from spilling on the road.

이상과 같은 각각의 시공단계를 통해 가로수 식목영역(L2)과 보행자용 통행영역(L1)이 구획되는 보행자 도로를 구현할 수 있었으며,(도 3 참조) 상기 구현된 보행자 도로는 통행영역(L1)으로부터 가로수 식목영역(L2)까지 하향 기울기를 갖도록 시공한 것으로서 가로수 식목영역(L2)에 배수공(H)을 구비하는 배수블록(B2)을 깔고 배수블록(B2)의 저면에는 모래(S1)층과 배수촉진물(S)층을 형성(도 1 참조)하였기 때문에 우천시 통행영역(L1)에 떨어지는 빗물이 가로수 식목영역(L2)의 저부로 빠르게 유입되므로 도로 전체의 배수성을 우수하게 유지할 수 있을 뿐만 아니라 가로수의 생육에 필요한 충분한 수분이 공급되는 것이다.Through each construction step as described above it was possible to implement a pedestrian road partitioning the tree planting area (L2) and the pedestrian traffic area (L1) (see Figure 3), the implemented pedestrian road from the traffic area (L1) Constructed to have a downward slope to the roadside tree planting area (L2), the drainage block (B2) having a drainage hole (H) is laid in the roadside tree planting area (L2), and sand (S1) layer and drainage are disposed on the bottom of the drainage block (B2). Since the acceleration (S) layer is formed (see FIG. 1), rainwater falling into the passage area L1 during rainy weather quickly flows to the bottom of the roadside tree planting area L2, so that the drainage of the entire road can be maintained well and the roadside water can be maintained. Sufficient water is needed to grow.

한편, 본 발명이 향유하는 기술적 사상에 의해서는 도 4에 도시된 바와 같이 식목영역(L2)중 일부의 영역(식목공간(P)의 주변)을 구획블록(B6)으로 구획시켜 그 내부에 배수블록(B2)을 배열하고 그 나머지 영역은 보도블록(B1)을 배열하여 주변 환경에 따라 심미감을 달리할 수 있도록 시공할 수 있음은 물론이고, 도 5에 도시된 바와 같이 통행영역(L1)과 가로수 식목영역(L2)의 사이에 도로의 여건에 따라 소정폭의 투수성 콘크리트를 길이방향으로 타설시켜 보행자 도로상에 자전거 전용도로(R)가 마련되도록 시공할 수 있다.Meanwhile, according to the technical spirit of the present invention, as shown in FIG. 4, a part of the planting area L2 (the periphery of the planting space P) is partitioned into the partition block B6 and drained therein. Arrange the block (B2) and the rest of the area can be arranged to arrange the sidewalk block (B1) so as to vary the aesthetics according to the surrounding environment, as shown in Figure 5 and the passage area (L1) According to the road condition between the roadside tree planting area (L2) it can be constructed so that the bicycle-only road (R) is provided on the pedestrian road by pouring permeable concrete of a predetermined width in the longitudinal direction.

상술한 바와 같이 본 발명에서 제시하는 보행자 도로의 시공방법은 기존의 시공공정에 비해서도 공정상의 난점이 없는 것으로서 본 발명에 의해 시공된 보행자 도로는 가로수 식목영역에 배열된 배수블록과 그 저면에 시공한 배수촉진물층에 의해 도로표면의 배수성이 한층 향상됨은 물론이고 가로수의 생육상태를 매우 우수하게 유지할 수 있으며, 또한 빗물이 지하(식목영역)로 즉시 유입될 수 있도록 함으로서 지하수의 보존에도 일조할 수 있는 등 그 기대되는 효과가 실로 다대한 매우 유익한 발명인 것이다.As described above, the construction method of the pedestrian road proposed in the present invention has no difficulty in process compared to the existing construction process, and the pedestrian road constructed by the present invention is constructed in the drainage block arranged in the roadside tree planting area and the bottom thereof. The drainage facilitating layer not only improves the drainage of the road surface, but also maintains the growth of roadsides very well, and also contributes to the preservation of groundwater by allowing rainwater to immediately flow into the underground (planting area). The expected effect is indeed a very advantageous invention.

Claims (1)

보행자용 도로가 설치될 지면을 길이방향으로 양분하여 통행영역(L1)과 가로수 식목영역(L2)으로 구분한 상태에서 통행영역(L1)의 지면은 굴토 또는 복토하여 평탄하게 땅고르기 작업을 하고 가로수 식목영역(L2)의 지면은 굴토하여 가로수 식목영역(L2)의 지면이 통행영역(L1)의 지면보다 20센티미터 정도 낮아지도록 하고, 굴토된 가로수 식목영역(L2)의 단부에는 보행자 도로의 길이방향으로 일직선을 이루는 경계석(B5)을 배열하여 보행자 도로와 차도를 분리하는 제1 시공단계와;Dividing the ground on which the pedestrian road is to be installed in the longitudinal direction and dividing it into the traffic area L1 and the roadside tree planting area L2, the ground of the traffic area L1 is excavated or covered with soil to smooth the ground, The ground of the planting area (L2) is excavated so that the ground of the roadside planting area (L2) is about 20 centimeters lower than the ground of the passage area (L1). A first construction step of separating the pedestrian road and the driveway by arranging the boundary stones B5 forming a straight line; 상기 굴토된 가로수 식목영역(L2)의 지면에 잡석 및 모래와 마사토 등으로 이루어진 배수촉진물(S)을 투입한 상태에서 배수촉진물(S)에 다지기 작업과 고르기 작업을 가하여 배수촉진물(S)의 표면이 통행영역(L1)의 지면과 같은 높이를 유지하도록 하는 제2 시공단계와;In the state of the rubble tree planting area (L2) by applying the waste promoting material (S) consisting of rubble, sand and masato, etc. A second construction step of maintaining the surface of the same plane as the ground of the passage area L1; 통행영역(L1)의 지면과 가로수 식목영역(L2)에 다져진 배수촉진물(S)의 표면상에 모래(S1)를 3 내지 5센티미터 정도로 분포시키되, 통행영역(L1)보다 가로수 식목영역(L2)이 다소 낮아지도록 하여 통행영역(L1)으로부터 가로수 식목영역(L2)에 이르기까지의 도로면이 하향 기울기를 갖도록 하는 제3 시공단계와;The sand S1 is distributed about 3 to 5 centimeters on the ground of the passage area L1 and on the surface of the drainage accelerator S formed on the roadside tree planting area L2, but the roadside tree planting area L2 is larger than the passage area L1. A third construction step such that the road surface from the passage area L1 to the roadside tree planting area L2 has a downward slope so as to be slightly lowered; 통행영역(L1)과 가로수 식목영역(L2)의 경계선에는 일직선을 이루는 경계블록(B3)을 길이방향으로 배열하는 제4 시공단계와;A fourth construction step of arranging the boundary blocks B3 forming a straight line in the longitudinal direction at the boundary line between the passage area L1 and the tree planting area L2; 통행영역(L1)에 분포된 모래(S1)의 상면에 보도블록(B1)을 짜맞추기식으로 배열하는 제5 시공단계와;A fifth construction step of arranging the sidewalk blocks B1 on a top surface of the sand S1 distributed in the passage area L1 in a frame; 가로수 식목영역(L2)에 분포된 모래(S)의 상면에는 적어도 하나 이상의 배수공(H)을 구비하는 배수블록(B2)을 짜맞추기식으로 배열하되, 가로수 식목영역(L2)에는 소정간격을 유지하는 식목공간(P)을 지속적으로 형성시켜 각각의 식목공간(P)이 경계블록(B4)에 의해 나머지의 가로수 식목영역(L2)과 구획되도록 하는 제6 시공단계와;A drain block B2 having at least one drain hole H is arranged on the top surface of the sand S distributed in the roadside tree planting area L2 in a framed manner, while maintaining a predetermined interval in the roadside tree planting area L2. A sixth construction step of continuously forming the planting space P so that each planting space P is partitioned from the remaining tree planting area L2 by the boundary block B4; 가로수 식목영역(L2)에 배열된 배수블록(B2)의 배수공(H)상에 잔디를 식재하는 제7 시공단계를 포함하는 것을 특징으로 하는 보행자 도로의 시공방법.And a seventh construction step of planting grass on the drain hole (H) of the drain block (B2) arranged in the tree planting area (L2).
KR10-2000-0020937A 2000-04-20 2000-04-20 pedestrian street construction method KR100367884B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0020937A KR100367884B1 (en) 2000-04-20 2000-04-20 pedestrian street construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0020937A KR100367884B1 (en) 2000-04-20 2000-04-20 pedestrian street construction method

Publications (2)

Publication Number Publication Date
KR20010097133A KR20010097133A (en) 2001-11-08
KR100367884B1 true KR100367884B1 (en) 2003-01-15

Family

ID=19665805

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0020937A KR100367884B1 (en) 2000-04-20 2000-04-20 pedestrian street construction method

Country Status (1)

Country Link
KR (1) KR100367884B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020059300A (en) * 2002-06-12 2002-07-12 전형진 paving method of pavement-brick

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5131441U (en) * 1974-08-30 1976-03-08
JPS5257420U (en) * 1975-10-24 1977-04-26
JPS52149537U (en) * 1976-05-08 1977-11-12
JPS5696102U (en) * 1979-12-25 1981-07-30
JPH02174614A (en) * 1988-12-26 1990-07-06 Nisshoku Corp Method for protecting tree root with artificial turf
JPH0329504A (en) * 1989-06-27 1991-02-07 Anritsu Corp Voltage controlled oscillator
JPH08280260A (en) * 1995-04-18 1996-10-29 Hakubi Kensetsu Kk Plant growth suppressing mat and greening work using the same

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5131441U (en) * 1974-08-30 1976-03-08
JPS5257420U (en) * 1975-10-24 1977-04-26
JPS52149537U (en) * 1976-05-08 1977-11-12
JPS5696102U (en) * 1979-12-25 1981-07-30
JPH02174614A (en) * 1988-12-26 1990-07-06 Nisshoku Corp Method for protecting tree root with artificial turf
JPH0329504A (en) * 1989-06-27 1991-02-07 Anritsu Corp Voltage controlled oscillator
JPH08280260A (en) * 1995-04-18 1996-10-29 Hakubi Kensetsu Kk Plant growth suppressing mat and greening work using the same

Also Published As

Publication number Publication date
KR20010097133A (en) 2001-11-08

Similar Documents

Publication Publication Date Title
CN209584917U (en) A kind of sponge Greening Urban Road isolation strip
KR100367884B1 (en) pedestrian street construction method
KR102015523B1 (en) Eco-friendly vegetation drainage device
JP2646507B2 (en) Green belts and water retention equipment for green belts
KR102076482B1 (en) Vegetation Ditch Structure Using a Boundary Block
CN215223596U (en) Plant maintenance layer structure for municipal construction
KR100986930B1 (en) Boundary stone enabling to set plants for landscape
KR100352143B1 (en) Planting belts construction method for street trees
JPH07180103A (en) Parking lot using water permeable blocks
CN208009190U (en) Road surface drainage structure and Ecology Highway
KR200254952Y1 (en) Device for suppling water of tree
NZ542317A (en) Tree grate system
KR101057646B1 (en) Natural grass packaging material using artificial structure
KR100538541B1 (en) Early Vine-Planting Structure of Sound Absorbing Wall and Construction Methods
KR100429032B1 (en) Method for paving a sidewalk with afforestation using sidewalk-blocks for afforestation
CN216892233U (en) River course bank protection for hydraulic engineering
CN210561574U (en) Antiskid urban and rural landscape road
KR102594556B1 (en) Plant cultivation pots using rainwater as vegetation water
CN216040492U (en) Antiskid urban and rural landscape footpath
CN220685897U (en) Municipal road pavement structure
CN215906503U (en) Landscape garden road
JP2000032854A (en) Grass-protect system mat
KR200399881Y1 (en) Underground Road with Afforest
KR200368251Y1 (en) Water permeable interlocking block
KR200345989Y1 (en) Sidewalk block

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
N231 Notification of change of applicant
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee