KR100427588B1 - An afforestation-construction method of the existing concrete structure - Google Patents

An afforestation-construction method of the existing concrete structure Download PDF

Info

Publication number
KR100427588B1
KR100427588B1 KR10-2002-0040730A KR20020040730A KR100427588B1 KR 100427588 B1 KR100427588 B1 KR 100427588B1 KR 20020040730 A KR20020040730 A KR 20020040730A KR 100427588 B1 KR100427588 B1 KR 100427588B1
Authority
KR
South Korea
Prior art keywords
concrete
natural
slope
vegetation
concrete structure
Prior art date
Application number
KR10-2002-0040730A
Other languages
Korean (ko)
Other versions
KR20020063545A (en
Inventor
오왕석
장현미
Original Assignee
(합)정주산업건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (합)정주산업건설 filed Critical (합)정주산업건설
Priority to KR10-2002-0040730A priority Critical patent/KR100427588B1/en
Publication of KR20020063545A publication Critical patent/KR20020063545A/en
Application granted granted Critical
Publication of KR100427588B1 publication Critical patent/KR100427588B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/14Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G13/00Protecting plants
    • A01G13/02Protective coverings for plants; Coverings for the ground; Devices for laying-out or removing coverings
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/28Raised beds; Planting beds; Edging elements for beds, lawn or the like, e.g. tiles

Landscapes

  • General Engineering & Computer Science (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Revetment (AREA)

Abstract

본 발명은 강이나 하천의 제방 경사면 등의 법면(法面) 또는 사면(斜面)에 시공되어 있는 기존 콘크리트 구조물의 녹화시공 방법에 관한 것으로서, 더욱 상세하게는 절개지, 뚝의 경사진 면, 암벽사면, 제방 등의 법면 또는 사면의 붕괴를 방지하기 위해 시공되어 있는 기존의 콘크리트 호안블록이나 콘크리트 매트 등의 콘크리트 구조물에 일정한 간격과 크기의 식생구멍을 다수개 천공하여 식생공간을 형성하고, 천공된 콘크리트 구조물 상부에 고정망을 설치한 후 고정핀으로 고정망을 고정한 다음 잔디, 구절초, 패랭이, 달맞이꽃, 억새풀, 기생초 등의 초본식물의 종자가 포함되어 있는 자연친화토를 식생구멍에 취부하고 기존 콘크리트 구조물 상부에도 전체적으로 5 ~ 7cm 정도의 두께로 자연친화토를 취부한 후 일정기간 살수관리함으로써 법면 또는 사면에 시공되어 있는 기존 콘크리트 구조물을 저비용으로 간단하게 녹화시공할 수 있는 방법에 관한 것이다.The present invention relates to the greening method of the existing concrete structure that is installed on the surface or slope of the bank or river bank slope, more specifically, incision, sloped slope, rock slope To form vegetation space by drilling a plurality of vegetation holes with regular intervals and sizes in concrete structures such as concrete revetment blocks or concrete mats that are constructed to prevent the collapse of the slopes or slopes of concrete, embankments, etc. After the fixing net is installed on the upper part of the structure, fix the fixing net with fixing pins, and then install natural-friendly soil containing the seeds of herbaceous plants such as grass, gujeolcho, dianthus, evening primrose, pampas grass, and parasitic herb in the vegetation hole. Even if the natural friendly soil is attached to the upper part of the structure with the thickness of about 5 ~ 7cm, it can be sprayed and managed for a certain period of time. The present invention relates to a method of simply greening existing concrete structures installed on a slope at low cost.

Description

기존 콘크리트 구조물의 녹화시공방법{An afforestation-construction method of the existing concrete structure}An afforestation-construction method of the existing concrete structure}

본 발명은 강이나 하천의 제방 경사면 등의 법면(法面) 또는 사면(斜面)에 시공되어 있는 기존 콘크리트 구조물의 녹화시공 방법에 관한 것으로서, 더욱 상세하게는 강이나 하천 등의 법면 또는 사면의 붕괴를 방지하기 위해 시공되어 있는 기존 콘크리트 구조물에 일정한 간격과 크기의 식생구멍을 다수개 천공하여 식생공간을 형성하고, 천공된 콘크리트 구조물 상부에 고정망을 설치한 후 고정핀으로 고정망을 고정한 다음 잔디, 구절초, 패랭이, 달맞이꽃, 억새풀, 기생초 등의 초본식물의 종자가 포함되어 있는 자연친화토를 식생구멍에 취부하고 기존 콘크리트 구조물 상부에도 전체적으로 자연친화토를 취부한 후 일정기간 살수관리함으로써 법면 또는 사면에 시공되어 있는 기존 콘크리트 구조물을 간단하게 녹화시공할 수 있는 방법에 관한 것이다.The present invention relates to the greening method of the existing concrete structure that is installed on the surface or slope of the bank or river bank slope, more specifically, collapse of the surface or slope of the river or river, etc. To prevent vegetation, the vegetation space is formed by drilling a plurality of vegetation holes having a predetermined interval and size in the existing concrete structure, and after installing a fixed net on the top of the perforated concrete structure, fix the fixed net with a pin. Natural friendly soils containing seeds of herbaceous plants such as gujeolcho, dianthus, evening primrose, pampas grass, and parasitic herb are installed in the vegetation hole, and the natural friendly soil is also installed in the upper part of the existing concrete structure. The simple method of greening existing concrete structures on slopes All.

일반적으로 강이나 하천의 경사면, 절개지, 뚝의 경사진 면, 암벽사면, 제방 등의 법면(法面) 또는 사면(斜面)의 붕괴, 침식, 토사유실 등을 방지하기 위하여 콘크리트 호안블록이나 콘크리트 매트 등의 콘크리트 구조물을 시공하였는데, 콘크리트 호안블록을 시공하는 경우에는 일정형상으로 제조된 콘크리트 호안블록을 법면이나 사면위에 덮어 씌우듯이 콘크리트 호안블록을 연속적으로 짜맞추고 앙카나 고정핀 등을 이용하여 인접 블록들을 상호 고정 연결함으로써 견고하게 접합 시공하였으며, 콘크리트 매트를 시공하는 경우에는 제방 등의 사면에 콘크리트를 부어 일정 두께의 콘크리크 매트를 형성한 후 일정기간 양생함으로써 콘크리트 구조물을 형성하였다.In general, in order to prevent the collapse of eroded surfaces or slopes, erosion, earth and sand loss, etc. of concrete slopes, incisions, slopes of banks or banks, rock slopes, dikes, etc. In the case of constructing concrete revetment blocks, the concrete revetment blocks are continuously assembled together with the anchor blocks or anchor pins. They were firmly joined by fixing them together, and in the case of constructing concrete mats, concrete concrete was formed by pouring concrete on slopes such as embankments and curing concrete mats for a certain period of time.

그러나, 이러한 콘크리트 구조물로 시공된 하천의 생태계는 고유한 자연 환경기능이 파괴되어 생태계 파괴 및 환경오염 등의 문제점을 유발하였으며, 특히 강이나 하천의 경사면은 생태적 생산성과 생물종의 다양성이 매우 높은 곳으로 자연 하천 생태계에 있어서 수중과 육상의 경계가 되는 부분으로, 이 부분을 콘크리트화하게 되면 수중 생태계와 육상 생태계의 연결고리가 끓어지게 되므로 강이나 하천 동식물의 멸종으로 인하여 하천 생태계 전반에 악영향을 끼치게 된다.However, the ecosystems of rivers constructed with such concrete structures have caused problems such as ecosystem destruction and environmental pollution due to their inherent natural environmental functions. Especially, slopes of rivers or rivers have high ecological productivity and diversity of species. As a part of the boundary between underwater and terrestrial ecosystems in natural stream ecosystems, the concrete linkages between the aquatic and terrestrial ecosystems will boil, causing the entire river ecosystem to be adversely affected by the extinction of rivers and river flora and fauna. do.

상기와 같은 문제점을 해소하고자 다양한 형태의 호안블럭들이 고안되어 시공되고 있으나, 정작 기존의 콘크리트 구조물이 시공되어 있는 곳은 기존 콘크리트 구조물을 완전히 철거한 후 식생공간이 형성되어 있는 개량된 형태의 호안블럭 등을 재시공하여야 하므로 재시공시 시공이 복잡하며, 시공기간이 장기화되고, 시공비용이 과다하게 소모되는 문제점으로 인하여 그대로 방치되고 있는 실정이다.In order to solve the above problems, various types of revetment blocks have been devised and constructed, but where the existing concrete structures are constructed, the renovated revetment blocks are formed after vegetation space is completely removed from the existing concrete structures. Since the re-construction is required, the construction is complicated, the construction period is prolonged, and the construction cost is excessively neglected due to the problem of excessive consumption.

본 발명은 기존 시공되어 있는 콘크리트 구조물의 재시공시 발생되는 상기와 같은 문제점을 해소하기 위한 것으로 기존 콘크리트 구조물을 철거하지 않고 기존 콘크리트 구조물에 소정의 크기를 가진 식생구멍을 일정간격으로 천공한 후 자연친화토를 식생구멍에 취부함으로써 법면이나 사면을 간단하고 빠른 시일내에 녹화시공이 가능하도록 재시공하는 것에 그 목적이 있다.The present invention is to solve the above problems caused by the reconstruction of the existing concrete structure to be natural after drilling the vegetation hole having a predetermined size in the existing concrete structure at regular intervals without removing the existing concrete structure The purpose of this is to reconstruct the surface or slope so that greening can be done quickly and easily by attaching the soil to the vegetation hole.

이와 같은 목적을 달성하기 위하여 기존 콘크리트 구조물에 일정한 간격으로 식생구멍을 천공하고, 식생구멍이 천공된 콘크리트 구조물 상부에 고정망을 설치한 후 고정핀으로 고정한 다음 잔디, 구절초, 패랭이, 달맞이꽃, 억새풀, 기생초 등의 초본식물의 종자가 포함되어 있는 자연친화토를 식생구멍에 취부하고 기존 콘크리트 구조물 상부에 전체적으로 5 ~ 7cm 정도의 두께로 자연친화토를 취부한 후 일정기간 살수관리하는 것에 본 발명의 특징이 있다.In order to achieve this purpose, the vegetation hole is drilled at regular intervals in the existing concrete structure, and the fixing net is installed on the concrete structure where the vegetation hole is perforated, and then fixed with fixing pins, and then grass, gujeolcho, dianthus, evening primrose, pampas grass, The natural friendly soil containing the seeds of herbaceous plants such as parasitic plants is attached to the vegetation hole, and the natural friendly soil is attached to the upper part of the existing concrete structure with a thickness of about 5 to 7 cm, and then spraying management is carried out for a certain period of time. There is a characteristic.

도 1 A은 법면 또는 사면에 시공되어 있는 기존 콘크리트 호안블록의 상태를 도시한 개략도Figure 1 A is a schematic diagram showing the state of the existing concrete relief block is constructed on the slope or slope

B는 법면 또는 사면에 시공되어 있는 기존 콘크리트 매트의 상태를 도시한 개략도B is a schematic diagram showing the state of the existing concrete mats installed on the slope or slope

도 2는 법면 또는 사면에 시공되어 있는 기존 콘크리트 호안블록에 식생구멍을 천공한 상태의 개략도Figure 2 is a schematic diagram of the state of drilling the vegetation hole in the existing concrete raft block is constructed on the slope or slope

도 3은 법면 또는 사면에 시공되어 있는 기존 콘크리트 구조물을 녹화시공하는 상태를 도시한 개략도Figure 3 is a schematic diagram showing a state of greening the existing concrete structure that is constructed on the slope or slope

도 4는 기존 콘크리트 구조물을 녹화시공하여 식물이 생육되는 상태를 도시한 단면 개략도4 is a schematic cross-sectional view showing a state in which plants are grown by greening existing concrete structures.

< 도면의 주요부분에 대한 부호의 설명 ><Description of Symbols for Major Parts of Drawings>

1. 콘크리트 호안블록1. Concrete raft block

2. 콘크리트 매트2. concrete mat

3. 식생구멍3. Vegetation hole

4. 지반4. Ground

5. 고정망5. Fixed Net

6. 자연친화토6. Nature friendly soil

7. 초본식물7. Herbaceous Plants

8. 고정핀8. Push pin

이하 본 발명의 바람직한 구성을 도면에 의하여 상세히 설명하면 다음과 같다.Hereinafter, the preferred configuration of the present invention will be described in detail with reference to the drawings.

도 1내지 도 4에 도시된 바와 같이 본 발명은 강이나 하천의 경사면, 절개지, 뚝의 경사진 면, 암벽사면, 제방 등의 법면 또는 사면의 붕괴, 침식, 토사유실 등을 방지하기 위하여 콘크리트 호안블록(1)이나 콘크리트 매트(2) 등의 기존 콘크리트 구조물이 시공되어 있는 곳을 간단하고 빠른 시일내에 녹화시공하는 방법에 관한 것으로 구체적인 녹화시공방법은 다음과 같다.As shown in Figures 1 to 4, the present invention provides a concrete revetment to prevent the collapse of eroded or eroded surface of slopes, slopes, banks of slopes, banks, banks, etc. The present invention relates to a simple and quick greening process for existing concrete structures such as blocks (1) or concrete mats (2). The specific greening methods are as follows.

< 식생구멍 천공단계 ><Vegetation hole drilling stage>

기존 시공되어 있는 콘크리트 호안블록(1) 또는 콘크리트 매트(2) 등의 콘크리트 구조물에 식생구멍(3)을 천공하여 법면이나 사면에 식물이 자랄 수 있는 식생공간을 형성하고 기존 지반(4)과 콘크리트 구조물 상부의 통기성 확보 및 유수의 흐름을 원활히 하기 위한 것으로 상기 식생구멍(3)은 기존 시공된 콘크리트 구조물의 1㎡ 면적당 직경이 35 ~ 40 mm 인 원통형의 식생구멍(3)을 20 ~ 30개 정도 일정간격으로 천공한다.Boring vegetation holes (3) in concrete structures such as concrete revetment blocks (1) or concrete mats (2), which are already constructed, form vegetation spaces where plants can grow on the surface or slope and existing ground (4) and concrete The vegetation hole (3) is about 20 to 30 cylindrical vegetation holes (3) having a diameter of 35 to 40 mm per square meter of the existing concrete structure to secure air permeability and smooth flow of flowing water. Drill at regular intervals.

식생구멍(3)의 천공시에는 전기드릴 등의 장비를 이용하여 천공하게 되며 상기 식생구멍(3)을 너무 많이 천공하거나 식생구멍(3)의 직경이 너무 크게 천공되면 시공되어 있는 기존 콘크리트 구조물의 안정성이 떨어지게 되어 강이나 하천의 범람시나 악천후시에 콘크리트 구조물의 일부가 쉽게 유실되거나 붕괴되므로 적정 수의 식생구멍(3)을 일정간격으로 천공한다.When the vegetation hole 3 is drilled, it is drilled using equipment such as an electric drill, and if the hole of the vegetation hole 3 is too much or the diameter of the vegetation hole 3 is too large, the construction of the existing concrete structure Since the stability is reduced and a part of the concrete structure is easily lost or collapsed during flooding or bad weather of the river or river, a proper number of vegetation holes 3 are drilled at regular intervals.

또한, 기존 콘크리트 호안블록(1)에 식생구멍(3)을 천공시 호안블록과 호안블록이 접하는 경계면에 식생구멍(3)을 천공하게 되면 콘크리트 구조물의 안정성이 떨어지게 되므로 콘크리트 호안블록(1)의 가운데 부분에 식생구멍(3)을 천공한다.In addition, when the vegetation hole (3) in the existing concrete revetment block (1) when the vegetation hole (3) is drilled on the interface where the revetment block and the revetment block is in contact with each other, the stability of the concrete structure is reduced, so that the Drill the vegetation hole (3) in the center.

< 고정망 설치단계 ><Fixed Network Installation Steps>

식생구멍(3)이 천공된 콘크리트 구조물 상부에는 고정망(5)을 설치하는데, 이 고정망(5)은 금속 또는 섬유 등의 다양한 재질로 되어 있는 능형(菱形)의 망으로서 콘크리트 구조물 상부에 전체적으로 취부되는 자연친화토(6)가 악천후시 쓸려 내려가지 않도록 고정시켜줌과 동시에 자연친화토(6)에 포함되어 있는 초본식물 종자가 생육되어 초본식물(7)의 뿌리가 고정망(5)에 엉키는 등 착지하여 안착되도록 하는 것이다.A fixed net 5 is installed at the upper part of the concrete structure in which the vegetation hole 3 is perforated. The fixed net 5 is a ridged net made of various materials such as metal or fiber, and the upper part of the concrete structure as a whole. The natural friendly soil (6) to be mounted is fixed so as not to be swept away in bad weather, and at the same time the herbaceous plant seeds contained in the natural friendly soil (6) are grown so that the roots of the herbaceous plants (7) are entangled in the fixed net (5). It is to be seated by landing.

상기 고정망(5)은 통상적으로 천공된 식생구멍(3)보다 크거나 비슷한 크기의 그물눈이 형성되어 있는 것을 사용하고, 식생구멍(3)이 천공된 콘크리트 구조물의 상부에 전체적으로 설치되며 앙카핀 등의 고정핀(8)으로 콘크리트 구조물의 상단에 고정 부착된다.The fixed net (5) is generally used that the mesh of the size or larger than the perforated vegetation hole (3) is formed, the vegetation hole (3) is installed as a whole on the top of the perforated concrete structure, such as an anchor pin It is fixed to the top of the concrete structure with a fixing pin (8) of.

< 자연친화토 취부단계 ><Natural ecological soil installation stage>

천공된 식생구멍(3) 및 식생구멍(3)이 천공된 콘크리트 구조물 상부에 전체적으로 자연친화토(6)를 취부하는 단계로 먼저 식생구멍(3)에 자연친화토(6)를 완전히 채워 넣은 후 고정망(5)이 설치된 콘크리트 구조물의 상부에 5 ~ 7cm 두께로 자연친화토(6)를 전체적으로 취부한다.The natural vegetation soil 6 is generally mounted on the perforated vegetation hole 3 and the upper part of the concrete structure where the vegetation hole 3 is perforated. Mounting the natural earth (6) as a whole 5 ~ 7cm thick on the top of the concrete structure is installed fixed net (5).

상기 자연친화토(6)는 식생기반재로서 사용되며 부식된 종이 또는 펄프 18 ~ 22중량%, 목재가 부식된 토탄 8 ~ 12중량%, 부식된 코코넛 껍질 13 ~ 17중량%, 퍼라이트 8 ~ 12중량%, 낙엽부식토 13 ~ 17중량%, 퇴비 및 거름 등의 유기질원 25 ~ 35중량%가 혼합되나 시공조건에 따라 이들을 가감할 수 있으며, 여기에 잔디, 구절초, 패랭이, 달맞이꽃, 억새풀, 기생초 등의 초본식물의 종자가 다량 포함되어 있다.The natural earth (6) is used as a vegetation base material and 18 to 22% by weight of corroded paper or pulp, 8 to 12% by weight of wood corroded peat, 13 to 17% by weight of corroded coconut shell, 8 to 12 perlite By weight, 13 ~ 17% by weight of deciduous soil, 25 ~ 35% by weight of organic matter such as compost and manure are mixed, but can be added or subtracted depending on the construction conditions, including grass, gujeolcho, dianthus, evening primrose, silver grass, parasitic herb It contains a lot of seeds of herbaceous plants, such as.

필요에 따라서는 상기 자연친화토(6)가 취부된 상부에 본 출원인에 의해 고안된 특허출원 제 10-2002-0036856호의 매트화된 초본식물 묘상 등을 덮어 녹화작업을 효율적으로 진행시킬 수도 있다.If necessary, the above-mentioned natural affinity soil 6 may be covered with a mated herbaceous plant seedling, etc. of Patent Application No. 10-2002-0036856, which is designed by the applicant.

< 물다짐 및 살수관리 단계 ><Stage of compaction and watering management>

콘크리트 구조물 상부에 전체적으로 취부된 자연친화토(6)에 물을 공급하여 물다짐하여 주고, 자연친화토(6)에 포함된 초본식물 종자가 발아할 때까지 지속적으로 살수관리하는데, 대략 20 ~ 30일간 살수관리하게 된다.It supplies water to the natural friendly soil (6) mounted on the upper part of the concrete structure and keeps water, and continuously sprays and manages until the seeds of herbaceous plants contained in the natural friendly soil (6) germinate. Daily watering management.

강이나 하천의 저수주변에는 수변식물 및 씨드 스프레이(seed spray) 작업을 통해 녹화시공을 보강해 준다.Reservoir construction is reinforced by water plants and seed spraying around river or river reservoirs.

상기와 같이 녹화시공된 기존 콘크리트 구조물은 초본식물 종자가 빠르게 생장하면서 초본식물(7)의 뿌리가 고정망(5)에 엉키면서 안착되어 강우나 악천후시에도 자연친화토(6)가 쓸려가지 않아 안정된 법면이나 사면을 형성하게 된다.Existing concrete structures, which were constructed as described above, are planted with herbaceous plant seeds growing rapidly, and the roots of the herbaceous plant (7) are entangled in the fixed net (5) so that the natural friendly soil (6) is not swept away even during rainfall or bad weather. It will form a stable surface or slope.

기존 콘크리트 구조물을 녹화시공하는 방법에 관한 구체적인 실시예는 다음과 같다.Specific embodiments of the method for greening existing concrete structures are as follows.

< 실시예 ><Example>

기존 시공되어 있는 콘크리트 호안블럭의 가운데 부분을 전기드릴을 이용하여 콘크리트 호안블럭의 1㎡ 면적당 직경이 37 mm인 원통형의 식생구멍을 25개 천공하며, 상기 식생구멍들 사이의 간격은 160mm로 유지하여 천공한다.Drilling 25 cylindrical vegetation holes with a diameter of 37 mm per 1㎡ area of the concrete relief block by using an electric drill in the center of the existing concrete relief block, and maintaining the gap between the vegetation holes at 160 mm Perforate.

식생구멍이 천공된 콘크리트 호안블록의 상부에는 철재로 되어 있고 그물눈의 크기가 40mm인 능형(菱形)의 고정망을 전체적으로 설치하여 앙카핀으로 고정 부착한다.The upper part of the concrete revetment block where the vegetation hole is drilled is made of iron and fixedly attached with an anchor pin by installing a ridge net having a mesh size of 40 mm as a whole.

천공된 식생구멍에 자연친화토를 완전히 채워 넣은 후 고정망이 설치된 콘크리트 호안블록의 상부에도 6cm 두께로 자연친화토를 전체적으로 취부하며, 상기 자연친화토는After filling the natural vegetation soil completely into the perforated vegetation hole, the natural affinity soil is also attached to the upper part of the concrete revetment block with the fixed net with 6cm thickness.

부식된 종이 또는 펄프 20중량%, 목재가 부식된 토탄 10중량%, 부식된 코코넛 껍질 15중량%, 퍼라이트 10중량%, 낙엽부식토 15중량%, 퇴비 및 거름 등의 유기질원 30중량%가 혼합된 것에 잔디, 구절초, 패랭이, 달맞이꽃, 억새풀, 기생초의 초본식물의 종자가 다량 포함된 것을 사용하고, 자연친화토에 포함된 초본식물 종자가 발아할 때까지 지속적으로 물다짐 및 살수 관리한다.20% by weight of corroded paper or pulp, 10% by weight of corroded peat, 15% by weight of corroded coconut shell, 10% by weight of perlite, 15% by weight of deciduous soil, and 30% by weight of organic matter such as compost and manure It contains grass, gujeolcho, dianthus, evening primrose, pampas grass, and parasitic herbaceous seed containing a large amount of seeds, and herbaceous and watering management is continuously managed until the germination of herbaceous plants contained in the natural earth.

이와 같이 본 발명에 의하면 기존 콘크리트 구조물만으로 되어 있는 강이나 하천 등의 법면이나 사면을 저비용으로 간단한 공정과 짧은 시일내에 녹화시공할 수 있고, 기존 시공되어 있는 콘크리트 호안블록이나 콘크리트 매트 등의 콘크리트구조물을 철거하지 않고 재활용할 수 있어 경제적 측면에서 매우 저렴하고 시공의 측면에서도 효율적이며, 또한 자연친화토에 포함된 초본식물이 빠르고 쉽게 안착되어 자연적으로 이루어진 환경에 버금가는 법면이나 사면을 조성함으로써 수질정화 및 자연 생태계를 복원 육성할 수 있는 효과가 있다.As described above, according to the present invention, the surface or slope of a river or river, which is made up of only existing concrete structures, can be greened in a short time and with a simple process at low cost, and existing concrete structures such as concrete revetment blocks or concrete mats can be used. It can be recycled without demolition, so it is very inexpensive in terms of economics and efficient in terms of construction, and the herbaceous plants included in the natural earth are quickly and easily settled, creating a surface or slope that is comparable to the environment of natural environment. It is effective to restore and nurture natural ecosystems.

Claims (3)

종자가 포함된 자연친화토와 고정망을 사용하여 기존 콘크리트 구조물로 된법면이나 사면을 녹화시공하는 방법에 있어서, 기존 시공되어 있는 콘크리트 호안블록(1)이나 콘크리트 매트(2)와 같은 콘크리트 구조물에 기존 지반(4)과 콘크리트 구조물 상부의 통기성 확보 및 유수의 흐름을 원활히 하도록 다수개의 식생구멍(3)을 천공하고, 상기 식생구멍(3)이 천공된 콘크리트 구조물 상부에는 자연친화토(6)가 악천후시 쓸려 내려가지 않도록 고정시켜줌과 동시에 자연친화토(6)에 포함되어 있는 초본식물 종자가 생장되어 그 뿌리가 착지하여 안착되도록 하기 위한 고정망(5)을 콘크리트 구조물의 상단에 고정 부착시킨 다음, 상기 식생구멍(3)에 자연친화토(6)를 완전히 채워 넣고 고정망(5)이 설치된 콘크리트 구조물의 상부에도 5 ~ 7cm 두께로 자연친화토(6)를 취부한 후 물다짐하고 자연친화토(6)에 포함된 초본식물 종자가 발아할 때까지 지속적으로 살수관리하여 녹화시공하는 것을 특징으로 하는 기존 콘크리트 구조물 녹화시공방법.In the method of greening the slopes or slopes of existing concrete structures using a natural earth and seeding net containing seeds, the concrete structures such as concrete revetment blocks (1) or concrete mats (2) A plurality of vegetation holes 3 are drilled to secure air permeability of the existing ground 4 and the upper part of the concrete structure and the flow of running water, and a natural friendly soil 6 is formed on the concrete structure on which the vegetation holes 3 are perforated. A fixed net (5) is fixed to the top of the concrete structure to fix it so as not to be swept away in bad weather, and at the same time, to grow the herbaceous seed contained in the natural friendly soil (6) and to ground and settle the roots. The natural affinity soil 6 is completely filled in the vegetation hole 3, and the natural affinity soil 6 has a thickness of 5 to 7 cm even on an upper portion of the concrete structure in which the fixed net 5 is installed. After mounting a commitment to environmentally friendly water Sat 6 existing concrete record construction method characterized by continuously recording the construction and management of flood until a herbaceous plant seed germination contained. 삭제delete 삭제delete
KR10-2002-0040730A 2002-07-12 2002-07-12 An afforestation-construction method of the existing concrete structure KR100427588B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0040730A KR100427588B1 (en) 2002-07-12 2002-07-12 An afforestation-construction method of the existing concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0040730A KR100427588B1 (en) 2002-07-12 2002-07-12 An afforestation-construction method of the existing concrete structure

Publications (2)

Publication Number Publication Date
KR20020063545A KR20020063545A (en) 2002-08-03
KR100427588B1 true KR100427588B1 (en) 2004-04-28

Family

ID=27727285

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0040730A KR100427588B1 (en) 2002-07-12 2002-07-12 An afforestation-construction method of the existing concrete structure

Country Status (1)

Country Link
KR (1) KR100427588B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100889378B1 (en) 2009-01-06 2009-03-19 (주)케이이씨건설 Shore protection block with echo pocket and curve river shore protection making method therewith
KR101282279B1 (en) 2011-05-19 2013-07-10 이종원 Organic Compound Soil for Concrete structure and Afforestation Method Thereof
KR20160079490A (en) 2014-12-26 2016-07-06 박대용 Mold appartus for manufacturing waterway pipe and method produced thereby

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070103245A (en) * 2006-04-18 2007-10-23 주식회사 케이.씨 리버텍 Plantation process on the surface of the concrete block installed around the river side
KR100682302B1 (en) * 2006-10-31 2007-02-16 천백조경 주식회사 Vegetation structure of the revetment block upper field

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0748840A (en) * 1993-08-10 1995-02-21 Dan Makino Vegetation method on hard slant face
KR960017819A (en) * 1994-11-17 1996-06-17 김영구 Artificial soil composition and greening method of inclined surface using the same
JPH09125422A (en) * 1995-11-06 1997-05-13 Chika Nakaya Retaining wall for planting
KR19980082029A (en) * 1998-08-17 1998-11-25 박우학 River Greening Method Using Porous Vegetation Block
KR20020011954A (en) * 2001-12-18 2002-02-09 최두영 A artificial seed growing soil for slope and therefor construction method
KR20020064710A (en) * 2002-04-08 2002-08-09 (자)새롬건설 An equipment of cultivation for a matted herbaceous plant and a method thereof
KR200284839Y1 (en) * 2001-10-23 2002-08-10 부국공영(주) Shore block using fiber network

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0748840A (en) * 1993-08-10 1995-02-21 Dan Makino Vegetation method on hard slant face
KR960017819A (en) * 1994-11-17 1996-06-17 김영구 Artificial soil composition and greening method of inclined surface using the same
JPH09125422A (en) * 1995-11-06 1997-05-13 Chika Nakaya Retaining wall for planting
KR19980082029A (en) * 1998-08-17 1998-11-25 박우학 River Greening Method Using Porous Vegetation Block
KR200284839Y1 (en) * 2001-10-23 2002-08-10 부국공영(주) Shore block using fiber network
KR20020011954A (en) * 2001-12-18 2002-02-09 최두영 A artificial seed growing soil for slope and therefor construction method
KR20020064710A (en) * 2002-04-08 2002-08-09 (자)새롬건설 An equipment of cultivation for a matted herbaceous plant and a method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100889378B1 (en) 2009-01-06 2009-03-19 (주)케이이씨건설 Shore protection block with echo pocket and curve river shore protection making method therewith
KR101282279B1 (en) 2011-05-19 2013-07-10 이종원 Organic Compound Soil for Concrete structure and Afforestation Method Thereof
KR20160079490A (en) 2014-12-26 2016-07-06 박대용 Mold appartus for manufacturing waterway pipe and method produced thereby

Also Published As

Publication number Publication date
KR20020063545A (en) 2002-08-03

Similar Documents

Publication Publication Date Title
KR100748602B1 (en) The greening mat for revetment, afforestation revetment structure using the mat, and the method of construction thereof
KR100723260B1 (en) Method for planting the willow
KR100665965B1 (en) Vegetation mat for revetment block afforestation
KR20100063881A (en) The vegetation mat for shore and slope protection, and the fixing apparatus of this
WO2008026855A1 (en) A seed line net for greening
KR20070033301A (en) Cellular Block Of A Plant Community Type
KR20070103245A (en) Plantation process on the surface of the concrete block installed around the river side
KR100427588B1 (en) An afforestation-construction method of the existing concrete structure
KR100671902B1 (en) Method of constructing levee with ecological environment
KR200420824Y1 (en) Plantation structure on the surface of the concrete block installed around the river side
CN111886959A (en) Ecological greening method for steep slope of mine
KR200412590Y1 (en) Greening mat of slope
KR100949714B1 (en) Mixed soil composition greening slopeside and greening method of slopeside using the same
KR200403507Y1 (en) Cellular Block Of A Plant Community Type
CN1807772A (en) Greening construction structure using single-layered, multilayered nonwoven fabric to protect slope groundmass
KR100518943B1 (en) A method of constructing gabion mattress with cylinder coir roll
KR101074565B1 (en) Method for green planting a slope by jute-net and pulp
KR100618279B1 (en) Plants Mat for Botanical Environment on Slope
KR101062680B1 (en) Eco-friendly erosion mat
JP3032861B2 (en) Revegetation method of flooded slope using wave-dissipating basket
KR100466007B1 (en) Seed bed Gabion
KR200195287Y1 (en) plant fixing material protecting slant will
KR101104956B1 (en) Vegetation block and manufacturing method thereof
KR200290542Y1 (en) I omitted
KR200390868Y1 (en) Vegetation mat for revetment block afforestation

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120405

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee