KR100414802B1 - a piping to change method by groove digging method of construction and the hypocaust floor structure got fromit - Google Patents
a piping to change method by groove digging method of construction and the hypocaust floor structure got fromit Download PDFInfo
- Publication number
- KR100414802B1 KR100414802B1 KR10-2001-0020047A KR20010020047A KR100414802B1 KR 100414802 B1 KR100414802 B1 KR 100414802B1 KR 20010020047 A KR20010020047 A KR 20010020047A KR 100414802 B1 KR100414802 B1 KR 100414802B1
- Authority
- KR
- South Korea
- Prior art keywords
- pipe
- existing
- mortar
- mortar layer
- outer diameter
- Prior art date
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D3/00—Hot-water central heating systems
- F24D3/12—Tube and panel arrangements for ceiling, wall, or underfloor heating
- F24D3/14—Tube and panel arrangements for ceiling, wall, or underfloor heating incorporated in a ceiling, wall or floor
- F24D3/149—Tube-laying devices
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B41/00—After-treatment of mortars, concrete, artificial stone or ceramics; Treatment of natural stone
- C04B41/0018—Coating or impregnating "in situ", e.g. impregnating of artificial stone by subsequent melting of a compound added to the artificial stone composition
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/12—Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F2290/00—Specially adapted covering, lining or flooring elements not otherwise provided for
- E04F2290/02—Specially adapted covering, lining or flooring elements not otherwise provided for for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets
- E04F2290/023—Specially adapted covering, lining or flooring elements not otherwise provided for for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets for heating
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Ceramic Engineering (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Physics & Mathematics (AREA)
- Organic Chemistry (AREA)
- Thermal Sciences (AREA)
- Civil Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
본 발명은 본인이 선출원한 특허등록출원 제99-30668호인 홈파기 공법에 의한 온돌파이프 교체방법 및 그로부터 얻어진 온돌바닥구조에서 발전하여 보다 진보된 신규한 홈파기 공법에 의한 홈파기 공법 배관파이프 교체방법 및 그 방법으로 배관된 온돌바닥구조에 관한 것으로, 시공하고자 하는 배관위치를 정확하게 선정하여 먹줄 등으로 표시함으로서 배관의 간격이 일정하게 시공하도록 표시하는 배관위치표시공정과, 배관하고자하는 건물바닥면 몰탈층에 배관을 하기에 알맞게 폭은 배관파이프의 외경보다 1~3mm 크고 깊이는 배관파이프가 매몰되고 그 위에 몰탈층을 형성할 수 있도록 배관파이프의 외경보다 1~3cm 깊게 홈을 파는 배관홈파기공정과, 상기한 공정에서 적당한 폭과 깊이로 형성된 배관홈에 설비하고자하는 배관파이프를 깊숙이 끼워 넣어서 설치하는 배관파이프설치공정과, 바닥몰탈층에 물을 붓으로 뿌리거나 발라서 절단홈 주변을 꼼꼼하게 젖게 하여 수분을 보강하고 배관홈 내면에 수용액을 발라주어 기존의 몰탈층의 모세공을 막아서 새로운 몰탈의 수분이 기존의 몰탈층으로 흡수되지 않게 하는 수분이탈방지처리공정과, 상기 배관파이프가 배관된 배관홈에 몰탈을 채워서 충진하는 몰탈충진공정과, 상기한 방법으로 배관홈에 충진된 몰탈의 표면을 기존의 몰탈층과 일치하도록 매끄럽게 마감하는 마감처리공정으로 이루어지거나, 상기한 공법에서 기존에 배관된 관로에 뜨거운 물을 넣어 열감지로 관로를 탐지하거나 배관이 동 파이프등 금속일 때는 금속탐지기를 이용하여 기존배관의 위치를 정확하게 찾아내는 기존배관관로 탐사공정을 더 포함하여 이루어지거나, 이와 같이 찾아낸 기존의 배관에 잔여하는 물을 콤프레샤를 이용한 고압의 에어로 불어서 제거하거나, 진공펌프를 이용하여 고압으로 흡입하여 제거하는 공정을 더포함하거나, 스펀지나 부직포에 적당량의 물을 먹여서 만든 습식포를 시공하고자 하는 바닥면의 커팅날이 지나가는 부위에 깔아주는 습식포설치공정을 더 포함하는 방법으로, 기존의 노후된 배관에는 수분이 제거되고 건축물 바닥층에 형성한 배관파이프 매몰홈에 설치된 배관파이프 위에 기존의 바닥몰탈층과 일치하도록 새로운 몰탈층이 형성되어 배관을 매몰하게 구성한 온돌바닥구조로서, 배관파이프가 고장나거나 낡아서 교체하고자 할 때 기존의 미장몰탈층을 전부 들어내지 않고 배관파이프가 배관되는 부위만을 배관파이프의 시공에 알맞도록 폭을 배관파이프의 외경보다 1~3mm 크고 깊이는 배관파이프의 외경보다 1~3cm 깊게 요홈을 파내고, 새로운 배관을 하고서 새로운 몰탈과 기존의 몰탈 사이가 갈라지지 않도록 처리한 후, 시멘트로 배관파이프가 배관된 배관홈을 충진하여 시공을 마감함으로서 신속한 배관작업이 이루어져 공사기간이 기존의 공법으로 7일정도 걸려야 하는 것이 단 하루만에 끝나는 것은 물론이고, 작업시 먼지나 소음발생을 최소화하여 기타 작업이 보다 아주 간단한 방법으로 신속하면서도 견고하게 온돌파이프의 교체작업을 할 수 있음은 물론 시공비용이 절감되며 건축물자체에도 과중한 하중을 주지 않게 된다.The present invention is a method for replacing the ondol pipes by the digging method of patent registration application No. 99-30668, which is filed by the applicant, and the groove digging method by the new digging method, which is developed from the ondol floor structure obtained therefrom. And an on-floor floor structure piped in such a manner, wherein the pipe position display process displays the pipe spacing uniformly by accurately selecting the pipe position to be constructed and displaying it with a feed line, and the mortar of the building floor to be piped. The pipe groove digging process is suitable for the pipe to be layered. The width is 1 ~ 3mm larger than the outer diameter of the pipe and the depth is 1 ~ 3cm deeper than the outer diameter of the pipe so that the pipe can be buried and a mortar layer can be formed thereon. And deeply insert the pipe pipe to be installed in the pipe groove formed in a suitable width and depth in the above process The pipe installation process is installed and the bottom mortar layer is sprayed with water or applied with a brush to thoroughly wet the area around the cutting groove to reinforce the moisture and apply an aqueous solution to the inner surface of the pipe groove to block the capillary hole of the existing mortar layer. Water escape prevention process to prevent the moisture of the existing mortar layer is absorbed, the mortar filling step of filling the mortar filled in the pipe groove piped with the pipe pipe, and the surface of the mortar filled in the pipe groove by the above method Is a finishing process that finishes smoothly to match the existing mortar layer, or hot water is inserted into the existing pipe line in the above-mentioned method to detect the pipe line by heat detection, or use a metal detector when the pipe is metal such as copper pipe. By further including an exploration process to the existing pipe to find the position of the existing pipe accurately, or Remove the residual water in the existing pipe by blowing with high pressure air using a compressor, or suction and remove it with a high pressure using a vacuum pump, or construct a wet cloth made by feeding an appropriate amount of water to a sponge or nonwoven fabric. The method further includes a wet cloth installation process that is applied to the area where the cutting edge of the floor to be passed passes. Existing old pipes are removed with water and the existing pipes are installed on the pipe pipes installed in the pipe pipe investment grooves formed on the floor of the building. It is an on-floor floor structure in which a new mortar layer is formed to coincide with the mortar layer, and the pipe is buried. When the pipe pipe is broken or worn out, only the portion where the pipe pipe is piped without lifting all the existing plaster mortar layer is needed. 1 ~ 3mm wider than the outer diameter of pipe By digging the groove 1 ~ 3cm deeper than the outer diameter of the pipe pipe, making a new pipe to prevent the crack between the new mortar and the existing mortar, and filling the pipe groove piped with the cement pipe to finish the construction. It takes about 7 days with the existing construction method due to rapid piping work, and it ends in only one day, and minimizes the occurrence of dust or noise during the work, so that other work can be done quickly and firmly in a simpler way. Not only can the replacement work be done, but the construction cost is reduced and the building itself is not overloaded.
Description
본 발명은 본인이 선출원한 특허등록출원 제99-30668호인 홈파기 공법에 의한 온돌파이프 교체방법 및 그로부터 얻어진 온돌바닥구조에서 발전하여 보다 진보된 신규한 홈파기 공법에 의한 홈파기 공법 배관파이프 교체방법 및 그 방법으로 배관된 온돌바닥구조에 관한 것으로, 더욱 상세하게는 온돌파이프나 수도관, 배수관등을 고장으로 교체하여야 하거나 이들 배관이 노후하여서 전면적으로 교체하여야 할 때 기존의 미장몰탈층에 새로운 배관파이프를 배관할 부분만을 콘크리트절단기로 폭을 배관파이프의 외경보다 1~3mm 크고 깊이는 배관파이프의 외경보다 1~3cm 깊게 절단하고 파내어서 요홈을 형성한 후, 여기에 새로운 배관파이프를 삽입하여 배관하고 시멘트 등의 몰탈을 이용하여 기존의 미장몰탈층의 상면과 일치하도록 배관된 요홈을 메워서 단시간 내에 마감하는 아주 간단한 방법으로 배관파이프를 교체하도록 한 홈파기 공법 배관파이프 교체방법 및 그 방법으로 배관된 온돌바닥구조에 관한 것이다.The present invention is a method for replacing the ondol pipes by the digging method of patent registration application No. 99-30668, which is filed by the applicant, and the groove digging method by the new digging method, which is developed from the ondol floor structure obtained therefrom. And it relates to an on-floor floor structure piped in such a way, more specifically, new pipe pipe to the existing plaster mortar layer when the on-pipe pipe, water pipe, drain pipe, etc. must be replaced by failure or replace these pipes in full Only the part to be piped is cut with a concrete cutter 1 ~ 3mm wider than the outer diameter of the pipe and deeper 1 ~ 3cm deeper than the outer diameter of the pipe. Fill the grooves piped to match the upper surface of the existing plaster mortar layer using mortar such as cement It relates to a slotting method pipe pipe replacement method and the on-floor floor structure piped in that way to replace the pipe pipe in a very simple way to finish in a short time.
우리 나라를 비롯한 중국의 일부는 온돌문화권으로서 예로부터 바닥면을 데워서 주거하는 습관을 가지고 생활하고 있는바, 최초에는 토굴이나 주거지의 바닥면에 모닥불을 피워서 바닥면을 데우고 습기를 제거하여 이용하다가 여기서 발전한 것이 주거지의 바닥에 온돌판(구둘)을 깔고 아궁이로 불을 지펴서 온돌을 가열하는 방법으로 그 연료가 목재에서 석탄 →기름 →가스 순의 고급 연료로 변화되면서 온돌 가열방법 또한 연료가 많이 사용되고 지속적인 난방이 어려운 직접가열 방식에서 벗어나 온돌 바닥면에 온돌 배관을 하고 그 배관 내부에 가열된 온수를 순환시켜서 온돌을 가열하는 순환수를 이용한 간접가열 방식으로 발전되어 실생활에 많은 편리함을 주고 있는 실정이다.Some of China, including our country, have been living on the habit of warming the floor and staying on the ground as an ondol culture.In the beginning, a bonfire was burned on the crypt or the floor of the house to heat the floor and remove moisture. The development is the method of heating the ondol by laying ondol plates (shoes) on the floor of a residential area and burning the fire with a firewood.The fuel is changed from wood to coal → oil → gas, and the ondol heating method also uses a lot of fuel. It is a situation that it is developed indirect heating method using circulating water that heats the ondol by circulating the heated hot water inside the ondol floor and circulating the heated hot water inside the ondol floor, which is difficult for continuous heating. .
따라서 최근에는 주거용 건축물의 바닥면의 일측으로 수도관과 배수관을 배관한 다음, 1차로 열 손실을 방지하는 단열재로 단열하여 열 손실을 최소화 한후 그 위에 난방수를 데워주는 보일러와 연결된 온돌파이프를 난방에 알맞은 간격으로 배관하고 상기한 배관을 미장몰탈층으로 덮어서 마감하는 방법으로 온돌바닥을 시공하였는바, 이와 같은 건물 배관을 시공후 사용하던 중 이상이 발생하거나, 오랜 기간이 경과하여 배관된 파이프가 노후가 되면 가족의 건강과 직결되는 관계로 즉시 새로운 온돌파이프로 교체하여야만 한다.Therefore, in recent years, water pipes and drain pipes are piped to one side of the floor of a residential building, and heat insulation is firstly insulated with an insulating material that prevents heat loss, thereby minimizing heat loss. The underfloor was constructed in such a way that the pipes were spaced at reasonable intervals and covered with a plaster mortar layer to finish. The new ondol pipe should be replaced immediately as it is directly related to the family's health.
이에 기존의 온돌파이프교체방법을 살펴보면 첫째로는 낡고 이상이 있는 기존배관(30)이 설치된 기존바닥몰탈층(10)을 깨어 기존배관(30)과 기존바닥몰탈층(10)을 전부 들어낸 후 새로운 온돌파이프를 적당한 간격으로 배열하고 그 상면에 미장몰탈층을 형성하여서 새로운 온돌파이프로 교체하거나, 둘째로는 내부에 낡은 온돌파이프가 설치된 기존바닥몰탈층(10)을 원형그대로 둔 상태에서 기존바닥몰탈층(10) 상면에 온돌파이프를 올려놓고 새롭게 마감몰탈층을 형성하는 새로운 온돌파이프로 시공하는 방법이 사용되고 있으나, 전자의 경우에는 미장몰탈층의 특성상 표면이 매우 튼튼하여 이를 깨어서 들어내기가 매우 힘들고 번거로웠음은 물론 이때의 충격으로 인한 건축물의 균열등 안전에도 문제가 있었으며, 소음과 먼지를 심하게 유발하며, 건축물쓰레기가 다량으로 방출되어 이를 치워야 하므로 온돌파이프의 교체작업시 시간이 많이 걸리고 비용 또한 많이 소요되며, 건축물 쓰레기가 다량으로 발생하여 환경오염의 원인이 되는 등 많은 문제점이 있었다.In this regard, the existing method of replacing the ondol pipe first breaks the existing floor mortar layer 10 in which the old pipe 30 is installed, which is old and abnormal, and lifts the existing pipe 30 and the existing floor mortar layer 10 after all. Arrange the new ondol pipes at appropriate intervals and form a plaster mortar layer on the upper surface to replace them with new ondol pipes, or, secondly, the existing floor mortar layer (10) with the old ondol pipe installed inside, while leaving the original floor intact. The construction of a new ondol pipe that puts an ondol pipe on the top surface of the mortar layer 10 and forms a new finish mortar layer is used. However, in the former case, the surface of the plaster mortar layer is very strong, so it is very difficult to lift it. Not only was it difficult and cumbersome, but there were also problems with safety, such as cracks in buildings due to the impact of this time. The waste is released in large quantities clean up because it takes a lot also consuming replacement of the floor heating pipe-work time costs, there are many problems, such as the construction waste that causes pollution to occur in large quantities.
그리고 후자의 경우에는 미장몰탈층을 깬 다음 전부를 들어내는 번거로움은 전혀 없으나 이는 낡은 온돌파이프가 설치된 기존의 미장몰탈층 상면에 새로운 온돌파이프가 배열된 마감몰탈층을 형성하는 관계로 전체 바닥면의 두께가 상당히 두꺼워져 그만큼 중량이 많이 나가기 때문에 건축물자체에 무리한 하중이 작용하여 건축물 전체의 수명에 막대한 영향을 끼치게됨으로써 안전사고의 위험이 뒤따를 수밖에 없었으며, 배관후 건물의 천장이 낮아져서 건물을 사용하는데 불편함이 뒤따르는 등, 문제점이 있었다.In the latter case, there is no hassle of breaking the plaster mortar layer and lifting all of it, but this is because the entire mortar layer is formed on the upper surface of the existing plaster mortar layer in which the old ondol pipe is installed. As the thickness of the material is considerably thick, the weight is so heavy that the excessive load on the building itself affects the life of the building as a whole, which inevitably leads to the risk of safety accidents. There was a problem, such as inconvenience to use.
본 발명은 상기와 같은 문제점을 고려하여 안출된 본인의 선 출원 발명인 특허등록출원 제99-30668호의 기술내용을 개량하여 더욱 완벽하게 진보시킴으로서, 기존의 낡은 배관파이프를 새로운 파이프로 교체하는 작업을 더욱 신속하게 하는 것은 물론, 시공시 발생하는 소음이나 먼지를 최소화하고 건축쓰레기의 발생을 최소화하면서도 배관이 바르게 정렬되고 시공이 완료된 후 기존의 바닥과 새로이 시공한 바닥면이 서로 완벽하게 접착되어 갈라지지 않도록 함에 그 목적을 둔 것이다.The present invention improves the technical details of the patent application No. 99-30668, which is a pre-applied inventor of the present invention in consideration of the above problems, and more fully advances, replacing the old pipe pipes with new pipes. In addition to speeding up construction, it minimizes the noise and dust generated during construction and minimizes the generation of building garbage while ensuring that the pipes are properly aligned and that the existing floor and the newly constructed floor do not completely adhere to each other after the construction is completed. The purpose is to.
도1 본 발명을 실시하기위한 공정의 흐름도.1 is a flowchart of a process for practicing the present invention.
도2는 본 발명의 다른 실시를 위한 공정의 흐름도.2 is a flow chart of a process for another implementation of the present invention.
도3은 본 발명의 또 다른 실시를 위한 공정의 흐름도.3 is a flow chart of a process for yet another implementation of the present invention.
도4는 본 발명의 또 다른 실시를 위한 공정의 흐름도.4 is a flow chart of a process for another implementation of the present invention.
도5는 본 발명을 실시하기 위하여 홈파기공정을 실시한 예시도.Figure 5 is an exemplary view of performing a grooving process to implement the present invention.
도6은 본 발명을 완성한 온돌구조를 나타낸 예시도.Figure 6 is an exemplary view showing an ondol structure completing the present invention.
♣도면의 주요 부분에 대한 부호의 설명♣♣ Explanation of symbols for the main parts of the drawing
10: 기존바닥몰탈층. 30: 기존배관.10: Existing bottom mortar layer. 30: Existing piping.
100: 배관홈. 200: 새로운몰탈. 300: 배관파이프.100: piping groove. 200: new mortar. 300: piping pipe.
상기와 같은 목적을 달성하기 위한 본 발명은 시공하고자 하는 기존바닥몰탈층(10)에 배관위치를 정확하게 선정하여 먹줄 등으로 표시함으로서 배관의 간격이 일정하게 시공하도록 표시하는 배관위치표시공정과, 배관하고자하는 기존바닥몰탈층(10)에 배관을 하기에 알맞게 폭은 배관파이프(300)의 외경보다 1~3mm 크고 깊이는 배관파이프가 매몰되고 그 위에 몰탈층을 형성할 수있도록 배관파이프의 외경보다 1~3cm 깊게 배관홈(100)을 파는 배관홈파기공정과, 상기한 공정에서 폭은 배관파이프의 외경보다 1~3mm 크고 깊이는 배관파이프의 외경보다 1~3cm 깊게 형성된 배관홈(100)에 설비하고자하는 배관파이프(300)를 깊숙이 끼워 넣어서 설치하는 배관파이프설치공정과, 바닥몰탈층에 물을 붓으로 묻혀 뿌리거나 발라서 절단홈 주변이 꼼꼼하게 젖게 하여 수분을 보강하고 배관홈(100) 내면에 수용액을 발라주어 기존바닥몰탈층(10)의 모세공을 막아서 새로운몰탈(200)의 수분이 기존바닥몰탈층(10)으로 흡수되지 않게 하는 수분이탈방지처리공정과, 상기 배관파이프(300)가 배관된 배관홈(100)에 새로운몰탈(200)을 채워서 충진하는 몰탈충진공정과, 상기한 방법으로 배관홈(100)에 충진된 몰탈의 표면을 기존바닥몰탈층(10)과 일치하도록 매끄럽게 마감하는 마감처리공정으로 이루어지거나, 상기한 공법에서 기존에 배관된 기존배관(30)에 뜨거운 물을 넣어 열감지로 관로를 탐지하거나 기존의 배관(30)이 동 파이프등 금속일 때는 금속탐지기를 이용하여 기존배관(30)의 위치를 정확하게 찾아내는 기존배관관로탐사공정을 더 포함하여 이루어지거나, 이와 같이 찾아낸 기존배관(30)에 잔여하는 물을 콤프레샤를 이용한 고압의 에어로 불어서 제거하거나, 진공펌프를 이용하여 고압으로 흡입하여 제거하는 공정을 더 포함하여 이루어지거나, 스펀지나 부직포에 적당량의 물을 먹여서 만든 습식포를 시공하고자 하는 바닥면의 커팅날이 지나가는 부위에 깔아주는 습식포설치공정을 더 포함하여 이루어지는 방법으로, 기존의 노후된 기존배관(30)에는 수분이 제거되고 기존바닥몰탈층(10)에 형성한 배관홈(100)에 설치된 배관파이프(300) 위에 기존바닥몰탈층(10)과 일치하도록 새로운몰탈층(200)이 형성되어 배관을 매몰하게 구성한 배관구조로서, 이를 각 공정별로 실시되는 실시 예를 상세히 설명하면 다음과 같다.The present invention for achieving the above object is a pipe position display process to display the pipe intervals by constantly selecting the pipe position on the existing floor mortar layer (10) to be installed by the ink line, etc. The width is 1 to 3mm larger than the outer diameter of the pipe pipe 300 and the depth is larger than the outer diameter of the pipe pipe so that the pipe is buried and a mortar layer can be formed thereon. In the pipe groove digging step of digging the pipe groove 100 deeply 1 to 3 cm, and in the above process, the width is 1 to 3 mm larger than the outer diameter of the pipe pipe and the depth is 1 to 3 cm deeper than the outer diameter of the pipe pipe. Piping pipe installation process to install the pipe pipe 300 to be installed deeply to install, and spray or spray the water on the bottom mortar layer so that the cutting groove around meticulously wet Reinforcement and apply an aqueous solution to the inner surface of the pipe groove 100 to block the capillary hole of the existing bottom mortar layer 10 so that the moisture of the new mortar 200 is not absorbed into the existing bottom mortar layer (10) Process, the mortar filling process of filling the new mortar 200 in the piping groove 100, the pipe pipe 300 is piped, and the surface of the mortar filled in the piping groove 100 by the above method existing floor It consists of a finishing process to finish smoothly to match the mortar layer 10, or by inserting hot water into the existing pipe 30 piped in the existing method in the above-described method to detect the pipe line by heat detection or the existing pipe 30 is moved. In the case of metals such as pipes, the method may further include an existing pipe line exploration process for accurately finding the position of the existing pipe 30 using a metal detector, or use the compressor to extract water remaining in the existing pipe 30. Blowing by air of pressure, or suctioning at high pressure by using a vacuum pump to remove the step, or the area where the cutting blade of the bottom surface to be applied to the wet cloth made by feeding the appropriate amount of water to the sponge or nonwoven fabric In addition to the wet cloth installation process laid on the method, the old pipe (300), the old pipe (300) installed in the pipe groove (100) formed in the existing bottom mortar layer (10) is removed moisture The new mortar layer 200 is formed to coincide with the existing bottom mortar layer 10, and the piping structure is buried, and the embodiment to be performed for each process will be described in detail as follows.
"기존배관관로 탐사공정""Existing pipeline exploration process"
기존에 배관된 관로에 뜨거운 물을 넣어 열감지로 관로를 탐지하거나 배관이 동 파이프등 금속일 때는 금속탐지기를 이용하여 기존배관의 위치를 정확하게 찾아낸다.Hot water is inserted into the existing pipe line to detect the pipe line by heat detection, or when the pipe is made of metal such as copper pipe, use a metal detector to accurately locate the existing pipe.
이렇게 하는데에는 첫째; 기존의 배관과 작업하는 위치가 일치함으로서 발생하는 작업공구의 마모와 작업방해 등의 요인으로 작업능률이 저하되는 것을 방지하기 위하여 기존의 배관을 피해서 공사하기에 유리하도록 하기 위함이며, 둘째; 기존의 배관이 고르게 되었을 때는 기존의 배관위치를 정확하게 파내어 기존의 배관을 제거하고 새로운 배관을 함으로서 건물의 바닥면을 보호하고 배관후 기존의 배관을 따라 열량이 누설되는 것을 방지하므로 열효율이 저하되는 것을 방지하거나 기존의 배관위치를 피하여 작업능률을 향상시키기 위함이며, 셋째; 기존의 배관이 동파이프 등 고가의 재생 가능한 소재일 경우 회수 할 수 있으며, 넷째; 바닥면에 함께 시공된 수도관 등 을 손상시키지 않기 위한 것이다.To do this firstly; In order to prevent the work efficiency from being lowered due to the wear of work tools and the interruption of work caused by the same working position with the existing pipe, it is to be advantageous to construct the existing pipe. When the existing pipe is uniform, the existing pipe location is precisely dug up to remove the existing pipe and make a new pipe to protect the floor of the building and to prevent the leakage of heat along the existing pipe after piping. To improve the work efficiency by preventing or avoiding the existing pipe position; If the existing pipe is an expensive renewable material such as copper pipe can be recovered, fourth; The purpose is not to damage the water pipes and the like that are installed together on the floor.
"기존배관배수공정""Existing Pipe Drainage Process"
기존의 배관에 잔여하는 물을 콤프레샤를 이용한 고압의 에어로 불어서 제거하거나, 진공펌프를 이용하여 고압으로 흡입하는 방법으로 제거한다.Water remaining in the existing pipe is removed by blowing with high pressure air using a compressor, or by suctioning at a high pressure using a vacuum pump.
이와 같이 하는 데에는 첫째; 시공중 기존의 배관에 들어있는 많은 양의 물이 누수 되어 작업환경이나 실내환경을 더럽히는 것은 물론, 바닥면으로 스며들어 아래층으로 누수 됨으로서 아래층의 천장을 더럽히는 문제점을 방지하기 위함이고, 둘째; 시공후 기존의 파이프에 남아있는 많은 양의 물이 바닥면 전체에 스며들어 서서히 증발하면서 방바닥에 습기가 차는 원인이 되는 것을 방지하기 위함이다.There are first to do this; In order to prevent the problem of dirtying the ceiling of the lower floor by leaking a large amount of water in the existing pipe during construction, as well as polluting the working environment or indoor environment, as well as seeping into the floor and leaking to the lower floor. After construction, a large amount of water remaining in the existing pipe penetrates the entire floor surface and gradually evaporates to prevent causing moisture on the floor.
"배관위치표시공정""Plumbing position display process"
시공하고자 하는 배관위치를 정확하게 선정하여 먹줄 등으로 표시함으로서 배관의 간격이 일정하게 시공하도록 표시하는 것이다.By selecting the pipe position to be installed correctly and marking it with a webbing line, it is to display the pipe space uniformly.
"습식포설치공정""Wet cloth installation process"
스펀지나 부직포에 물을 먹여서 눅눅한 정도로 수분을 갖도록 만든 습식포를 시공하고자 하는 바닥면의 커팅날이 지나가는 부위에 깔아준다.Apply a damp cloth to the sponge or non-woven fabric so that it is moist enough to apply moisture to the area where the cutting blade on the bottom passes.
이때 습식포의 두께는 홈파기 작업시 사용하는 물의 량에 따라 다르게 하여서 작업시 톱날에 공급되는 물을 흡수하도록 하는 것이 가장 중요하다.At this time, it is most important that the thickness of the wet cloth is varied depending on the amount of water used during the grooving work to absorb the water supplied to the saw blade during the work.
상기와 같이 습식포를 깔아주는 것은, 첫째; 홈파기 작업의 하나인 커팅작업시 톱날에 공급되는 물을 흡수하여 작업용수가 바닥면(방열층, 단열층)으로 스며드는 것을 방지하기 위함이고, 둘째; 커팅작업시 발생하는 분진 등의 미세한 먼지를 흡수하여 작업환경을 청결하게 함은 물론, 작업먼지가 실내를 오염시키는 것을 최소화하고, 작업에 사용하는 기계의 오염을 최소화하여 기계의 사용수명을 연장시키기 위한 것이다.To spread the wet cloth as described above, first; In order to prevent water from penetrating to the bottom surface (heat insulation layer, heat insulation layer) by absorbing the water supplied to the saw blade during the cutting operation, one of the slotting operation, second; Absorbs fine dust such as dust generated during cutting operations to clean the work environment, minimizes work dust from contaminating the room, and minimizes contamination of the machine used for work, thus extending the service life of the machine. It is for.
"배관홈파기공정""Pipe groove digging process"
본 공정은 배관하고자하는 건물바닥면 몰탈층에 배관을 하기에 알맞게 폭은 배관파이프의 외경보다 1~3mm 크고 깊이는 배관파이프가 매몰되고 그 위에 몰탈층을 형성할 수있도록 배관파이프의 외경보다 1~3cm 깊게 홈을 파는 것으로, 홈파기 작업을 위하여 장비의 이동을 안내하는 레일을 설치하는 레일설치공정과, 상기한 레일을 따라 이동하면서 난방 바닥면을 배관에 용이한 크기 폭은 배관파이프의 외경보다 1~3mm 크고, 깊이는 배관파이프의 외경보다 1-3cm 깊게 하여 배관파이프가 끼워지도록로 절단하는 절단공정과, 절단된 부위를 해머드릴이나 정으로 떼어 내거나 스크레이퍼로 폭은 배관파이프의 외경보다 1~3mm 크고, 깊이는 배관파이프의 외경보다 1~3cm 깊게 홈을 파는 공정으로 이루어진다.In this process, the width is 1 ~ 3mm larger than the outer diameter of the pipe pipe and the depth is 1 mm larger than the outer diameter of the pipe so that the pipe can be buried and a mortar layer can be formed thereon. The slot installation process is to install a rail that guides the movement of the equipment for the grooving work by deepening the groove by ~ 3cm deep, and the size width which is easy to pipe the heating bottom surface while moving along the above-mentioned rail is the outer diameter of the pipe 1 ~ 3mm larger than the pipe pipe, the depth is 1-3cm deeper than the pipe pipe's outer diameter, and the cutting process is carried out so that the pipe pipe is fitted. 1 ~ 3mm big, the depth is made by digging a groove 1 ~ 3cm deeper than the outer diameter of the pipe.
여기서 장비의 종류는 크게 한정되지 않고 바닥면을 절단하고 파낼 수 있는 것이면 어떤 것이든 무방하다. 그러므로 레일을 설치하지 않고 장비에 달린 바퀴로 이동할 수 도 있으나 그러면 직선작업이 어려워 안내레일을 이용하면 더욱 효과적이다 전문적인 장비가 아닌 핸드그라인드나, 핸드드릴을 사용할 수 도있다. 그리고 장비의 직선이동을 안내하는 레일 역시 기존에 많이 쓰이는 H빔이나 기타 장비의 이동을 안내할 수 있는 장비이면 무관하다.The type of equipment is not limited to any type of material, as long as it can cut and dig a floor. Therefore, it is possible to move with wheels on the machine without installing rails, but then it is difficult to use straight lines, so it is more effective to use guide rails. You can also use hand grind or hand drill. And the rail that guides the linear movement of the equipment is also irrelevant as long as the equipment can guide the movement of the H-beam or other equipment that is commonly used.
"배관파이프설치공정""Pipe pipe installation process"
상기한 공정에서 폭은 배관파이프의 외경보다 1~3mm 크고, 깊이는 배관파이프의 외경보다 1~3cm 깊게 형성된 배관홈에 설비하고자하는 배관파이프를 깊숙이 끼워 넣어서 설치한다.In the above process, the width is 1 to 3mm larger than the outer diameter of the pipe pipe, the depth is installed by inserting the pipe pipe to be installed deeply in the pipe groove formed to be 1 to 3 cm deeper than the outer diameter of the pipe pipe.
이때 배관파이프의 외경과 배관홈의 폭이 거의 일치하도록 하면 배관파이프가 홈에 끼어서 고정되므로 별도의 배관파이프 고정수단이 필요하지 않다.At this time, if the outer diameter of the pipe pipe and the width of the pipe grooves almost coincide, the pipe pipe is clamped in the groove so that no additional pipe pipe fixing means is required.
" 수분이탈방지처리공정""Water escape prevention process"
배관홈을 형성한 기존의 바닥몰탈층에 물을 붓으로 뿌리거나 발라서 절단홈 주변을 꼼꼼하게 젖게 하여 수분을 보강하고 배관홈 내면에 수용액을 발라주어 기존의 몰탈층의 모세공을 막아서 새로운 몰탈의 수분이 기존의 몰탈층으로 흡수되지 않게 하는 것으로, 먼저 물을 붓으로 뿌리거나 발라서 절단면이 수분을 머금게 함으로서 배관파이프 주변에 새로운 몰탈을 채워서 충전할 때 새로운 몰탈에 함유된 수분을 기존의 몰탈층이 흡수하지 못하도록 기존시멘트의 모공을 막아주는데, 이때 물을 너무 많이 뿌리거나 바르면 기존의 몰탈층이 흡수하고 남은 물이 단열층으로 스며들어 부작용을 일으킬 염려가 있으므로 조심하여야 하며, 만약 물을 너무 뿌리거나 발라주면 새로운 몰탈을 충진하기도 전에 수분이 증발하여 마르므로 새로운 몰탈층을 충진시 수용액이 제기능을 다하지 못하고 새로운 몰탈에 함유된 수분이 기존의 몰탈로 흡수되면서 새로운몰탈이 급격히 수축되어 기존의몰탈과 새로운몰탈의 사이에 크랙이 생기는 원인이 된다.Water is sprayed on or applied to the existing bottom mortar layer that formed the pipe grooves to thoroughly wet the surroundings of the cutting grooves to reinforce moisture and to apply an aqueous solution to the inner surface of the pipe grooves to block the capillary holes of the existing mortar layer. The existing mortar layer absorbs the moisture contained in the new mortar when the new mortar is filled and filled around the pipe pipe by first spraying or applying water with a brush so that the cutting surface contains moisture. It prevents the pores of the existing cement, but if you spray or apply too much water, the existing mortar layer will absorb and the remaining water may seep into the insulation layer, causing side effects, so be careful if you spray or apply too much water. The moisture evaporates and dries before the new mortar is filled, thus filling the new mortar layer. As the solution when a not to fulfill its function the moisture contained in the new mortar absorbed by traditional mortar is a mortar new rapid shrinkage causes a crack occurs between the existing and new mortar mortar.
다음으로 상기한 방법에 의하여 수분을 머금고 있는 기존의 몰탈의 배관홈 내면에 수용액을 발라주어 기존의 몰탈층의 모세공을 막아주어 새로운 몰탈을 배관홈에 충진시 새로운 몰탈의 수분이 기존의 몰탈층으로 흡수되지 않게 하는데, 이때 사용되는 수용액은 기존의 몰탈층에 형성되어있는 미세한 모세공을 막아줄 수 있는 수용성 수용액이나 기타 기존의 몰탈층과 화합할 수 있는 수용성 화합물이면 모두 사용할 수 있으며, 여기에 접착제를 섞어서 처리하면 기존의 몰탈층과 새로운 몰탈층이 보다 완벽하게 접착된다.Next, by applying the aqueous solution to the inner surface of the existing mortar pipe groove containing water by the method described above to block the capillary hole of the existing mortar layer to fill the pipe groove with a new mortar moisture of the new mortar is In this case, the aqueous solution used may be used as long as it is a water-soluble aqueous solution capable of blocking the fine capillaries formed in the existing mortar layer or a water-soluble compound that can be combined with other existing mortar layers. When the adhesive is mixed and treated, the existing mortar layer and the new mortar layer are more perfectly bonded.
이와 같이 기존몰탈층의 배관홈 내면에 수용액을 바르는 것은 기존의 몰탈층에 미세한 모세공이 막히어서 새로운 몰탈을 충진시 모세관 현상으로 새로운 몰탈의 수분이 기존의 몰탈층에 형성된 모세공을 통하여 흡수되어 새로운 몰탈의 미세량이 이탈되면서 급격히 수축되어서 기존의 몰탈층과 새로운 몰탈 사이에 틈새가 발생하는 것을 미연에 방지하므로 기존의 몰탈층과 새로운 몰탈층이 서로 일체가 되어 하나가 되게 되는 것이다.Applying an aqueous solution to the inner surface of the pipe groove of the existing mortar layer is a capillary phenomenon when the new mortar is filled because the fine capillary is blocked in the existing mortar layer, and the moisture of the new mortar is absorbed through the capillary hole formed in the existing mortar layer. As the fine amount of mortar shrinks rapidly, it prevents a gap between the existing mortar layer and the new mortar in advance, so that the existing mortar layer and the new mortar layer become one with each other.
"몰탈충진공정""Mortal Filling Process"
상기한 공정이 완료되면 배관파이프가 배관된 배관홈에 시멘트를 개어서 시멘트가 경화작용을 시작하기 전에 충진한다.When the above process is completed, the cement pipe is filled in the pipe groove where the pipe pipe is piped before the cement starts to harden.
이때 주의하여야 할 것은 시멘트가 경화작용을 일으키기 전에 배관홈에 채우는 것이 중요하다.In this case, it is important to fill the pipe grooves before the cement hardens.
"마감처리공정""Finishing process"
상기한 방법으로 배관홈에 충진된 시멘트가 완전히 경화가 되기 전에 금속 미장칼이나 헤라 등을 이용하여 표면을 매끄럽게 마감하고, 그래도 표면의 거친 부분이 있으면, 완전히 경화된 이후에 연마석이나 기타 연마제로 표면을 갈아내어서 마감처리를 한다.Before the cement filled in the pipe groove is completely hardened by the above method, finish the surface smoothly with a metal plaster or hera, and if there is a rough part of the surface, then surface it with abrasive stones or other abrasives after it is completely hardened. Grind and finish.
상기와 같은 본 발명은 배관파이프가 고장나거나 낡아서 교체하고자 할 때 기존의 미장몰탈층을 전부 들어내지 않고 배관파이프가 배관되는 부위만을 배관파이프의 시공에 알맞도록 폭은 배관파이프의 외경보다 1~3mm 크게 깊이는 배관파이프의 외경보다 1~3cm 깊게 요홈을 파내고, 새로운 배관을 하고서 새로운 몰탈과 기존의 몰탈 사이가 갈라지지 않도록 처리한 후, 시멘트로 배관파이프가 배관된 배관홈을 충진하여 시공을 마감함으로서 신속한 배관작업이 이루어져 공사기간이 기존의 공법으로 7일정도 걸려야 하는 것이 단 하루만에 끝나는 것은 물론이고, 작업시 먼지나 소음발생을 최소화하여 기타 작업이 아주 간단한 방법으로 신속하면서도 견고하게 온돌파이프의 교체작업을 할 수 있음은 물론 시공비용이 절감되며 건축물자체에도 과중한 하중을 주지 않게 된다.The present invention as described above is 1 to 3mm wider than the outer diameter of the pipe pipe so as to fit the construction of the pipe pipe only the portion where the pipe pipe is piped without lifting all the existing plaster mortar layer when trying to replace the pipe pipe is broken or worn out Deeply cut the groove into 1 ~ 3cm deeper than the outer diameter of the pipe, process the new pipe so that it does not split between the new mortar and the existing mortar, and fill the pipe groove with the pipe pipe piped with cement. As a result of the finishing work, the piping work is done quickly and the construction period should take about 7 days with the existing construction method in just one day. Not only can the pipe be replaced, but the construction cost is reduced, and the building itself is heavy. It is not so.
그리고 온돌파이프의 교체작업시 미장몰탈층을 깨내는 것이 아니라 요홈부분만 절단함으로 해서 건축물의 바닥에 심한 충격을 주지 않아도 되므로 충격으로 인한 건물의 균열 등이 발생할 염려가 전혀 없음은 물론 충격소음을 줄여 주는 등 안심하고 공사를 할 수 있는 등 온돌파이프를 교체하는 공사에서는 없어서는 아니 될 매우 획기적인 발명이다.In addition, it is not necessary to break the mortar layer at the time of replacing the ondol pipe, but by cutting only the groove part, so that the floor of the building does not have to be severely impacted. It is a very innovative invention that is indispensable in constructions that replace ondol pipes, such as giving construction works with confidence.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0020047A KR100414802B1 (en) | 2001-04-14 | 2001-04-14 | a piping to change method by groove digging method of construction and the hypocaust floor structure got fromit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0020047A KR100414802B1 (en) | 2001-04-14 | 2001-04-14 | a piping to change method by groove digging method of construction and the hypocaust floor structure got fromit |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20020079259A KR20020079259A (en) | 2002-10-19 |
KR100414802B1 true KR100414802B1 (en) | 2004-01-14 |
Family
ID=27701127
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2001-0020047A KR100414802B1 (en) | 2001-04-14 | 2001-04-14 | a piping to change method by groove digging method of construction and the hypocaust floor structure got fromit |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100414802B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102197844B1 (en) | 2020-06-26 | 2021-01-04 | 안우현 | How to replace ondol floor piping using cutting method |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102408861B1 (en) * | 2020-06-01 | 2022-06-15 | 김근수 | Building piping replacement construction method |
KR102391541B1 (en) * | 2020-06-01 | 2022-04-29 | 김근수 | Building piping replacement construction method |
-
2001
- 2001-04-14 KR KR10-2001-0020047A patent/KR100414802B1/en active IP Right Grant
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102197844B1 (en) | 2020-06-26 | 2021-01-04 | 안우현 | How to replace ondol floor piping using cutting method |
Also Published As
Publication number | Publication date |
---|---|
KR20020079259A (en) | 2002-10-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110805455A (en) | Tunnel disease comprehensive treatment method | |
CN113323440A (en) | Concrete gap repairing and anti-seepage treatment method | |
CN101096850A (en) | Plastics water discharge plate application method for underground engineering wall surface, bottom plating and top board | |
CN204080841U (en) | The fixed structure of basis GRC fetal membrane | |
KR100414802B1 (en) | a piping to change method by groove digging method of construction and the hypocaust floor structure got fromit | |
CN105442861A (en) | Method for restoring water leakage air face of toilet drainage pipeline | |
Hetreed | The damp House: A Guide to the causes and Treatment of Dampness | |
NO335635B1 (en) | Device for removing loose-bore material | |
KR100414801B1 (en) | a piping to change method by groove digging method of construction and the hypocaust floor structure got fromit | |
CN109653526A (en) | Accomodation ground leak leak-blocking construction method | |
KR100672240B1 (en) | Method for carrying out water-proof on the roof of old and new buildings | |
KR20000039774A (en) | Repairing and waterproofing method | |
TWM638668U (en) | Water guide wall structure of basement interior wall | |
KR102408861B1 (en) | Building piping replacement construction method | |
JP5580181B2 (en) | Method of repairing sloped roof and sloped roof | |
KR102391541B1 (en) | Building piping replacement construction method | |
CN204419202U (en) | A kind of tunnel slot repair structure | |
JP4144010B2 (en) | Wastewater repair method, wastewater repair system and drainage repair parts. | |
KR102197844B1 (en) | How to replace ondol floor piping using cutting method | |
KR101606867B1 (en) | Method for repairing waterproofing layer on rooftop applying moisture exhaust passage | |
KR200261668Y1 (en) | a piping to change method by groove digging method of the hypocaust floor structure got fromit | |
KR20020079258A (en) | a piping to change method by groove digging method of construction and the hypocaust floor structure got fromit | |
CN219033600U (en) | Infusion cementation structure of outer wall heat insulation layer | |
RU2725347C1 (en) | Method of device of cutoff waterproofing at reconstruction of buildings and structures for reconstruction and re-profiling of industrial enterprises | |
CN109457925B (en) | Veneer paving method and paving structure for wet area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20121031 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20131119 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20141202 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20151222 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20181231 Year of fee payment: 16 |
|
FPAY | Annual fee payment |
Payment date: 20191212 Year of fee payment: 17 |