KR101606867B1 - Method for repairing waterproofing layer on rooftop applying moisture exhaust passage - Google Patents

Method for repairing waterproofing layer on rooftop applying moisture exhaust passage Download PDF

Info

Publication number
KR101606867B1
KR101606867B1 KR1020150115803A KR20150115803A KR101606867B1 KR 101606867 B1 KR101606867 B1 KR 101606867B1 KR 1020150115803 A KR1020150115803 A KR 1020150115803A KR 20150115803 A KR20150115803 A KR 20150115803A KR 101606867 B1 KR101606867 B1 KR 101606867B1
Authority
KR
South Korea
Prior art keywords
moisture
layer
guide path
rooftop
roof
Prior art date
Application number
KR1020150115803A
Other languages
Korean (ko)
Inventor
김진수
Original Assignee
(주)펜테크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)펜테크 filed Critical (주)펜테크
Priority to KR1020150115803A priority Critical patent/KR101606867B1/en
Application granted granted Critical
Publication of KR101606867B1 publication Critical patent/KR101606867B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0296Repairing or restoring facades
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/625Sheets or foils allowing passage of water vapor but impervious to liquid water; house wraps
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/64Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D11/00Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
    • E04D11/02Build-up roofs, i.e. consisting of two or more layers bonded together in situ, at least one of the layers being of watertight composition

Abstract

The present invention relates to a method for repairing a waterproofing layer on a rooftop applying a moisture guide path. The present invention comprises: a moisture guide path forming step of partially scraping the floor of the rooftop and constructing the moisture guide path to have a depth for accepting the moisture, confined in the lower part of an insulation layer, into the internal space of the moisture guide path; a moisture guide member setting step of arranging a moisture guide member into the internal space of the moisture guide path; an air vent installation step of installing air vents, communicating with the internal space of the moisture guide path, on the moisture guide path; and a finishing layer construction step of stacking a finishing layer on the floor of the rooftop after the air vent installation step is completed. The method for repairing a waterproofing layer on a rooftop applying a moisture guide path, having the above-described configuration, forms the moisture guide path, extended in a longitudinal direction, on the floor of the rooftop and installs the air vents on the upper part of the moisture guide path to horizontally move the moisture, distributed on the overall surface of the rooftop, via the moisture guide path and then discharge the moisture, thereby having excellent moisture removing efficiency and being capable of rapidly removing the moisture as much. In addition, the present invention scraps only a part of the floor for forming the moisture guide path without scraping all the floor of the rooftop, thereby preventing a construction size from growing larger, and accordingly maximizing reduction of the number of air vents as well as drastically lowering construction costs.

Description

습기유도로를 적용한 옥상 방수층 보수공법{Method for repairing waterproofing layer on rooftop applying moisture exhaust passage}BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a roofing waterproofing layer,

본 발명은 습기유도로를 적용한 옥상 방수층 보수공법에 관한 것이다. BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a roof waterproofing layer repairing method using a moisture induction furnace.

건물 옥상의 방수를 위해 행해지는 여러 가지 방수공법 중, 도막방수공법은 액상의 방수제를 옥상 바닥에 도포하여 일정두께의 방수도막이 형성되도록 하는 시공방법이다. 이는 방수제를 액상상태로 도포하기 때문에, 구조가 복잡한 부분의 시공에 알맞고 이음매 없는 시공이 가능하다. 또한 방수제의 층간 접착력은 물론 옥상 바닥인 모르타르층과의 밀착성이 좋다는 장점이 있다. Among various waterproofing methods used for waterproofing the roof of a building, the coating waterproofing method is a construction method in which a liquid waterproofing agent is applied on the floor of the roof to form a waterproof coating of a certain thickness. This is because the waterproofing agent is applied in a liquid state, it is suitable for construction of complicated part and it is possible to construct seamlessly. In addition, the interlaminar adhesion between the waterproofing agent and the mortar layer, which is the floor of the roof, is good.

하지만, 도막방수층은, 모르타르층의 표면에 밀착형으로 시공되기 때문에, 모르타르층의 갈라짐이나 변형 등에 의해 쉽게 박리되거나 찢어질 수 있다. 도막방수층이 찢어지면 더 이상 방수의 기능을 하지 못하고, 가령 강우시 빗물이 모르타르층과 그 하부의 단열층으로 고스란히 스며들게 된다.However, since the coating film waterproof layer is applied to the surface of the mortar layer in a close contact manner, it can easily peel off or tear due to cracking or deformation of the mortar layer. If the waterproof layer is torn, it will no longer function as a waterproofing, and rainwater will be evenly absorbed into the mortar layer and the insulation layer below it.

또한, (건물 신축시 처음부터 포함되어 있거나, 세월이 가면서 도막방수층의 갈라진 부분으로 스며들었거나 하여) 모르타르층이나 단열층에 포함되어 있는 수분은, 가령 여름철에 증발 팽창하여 방수층이 모르타르층으로부터 부풀어 들뜨게 함은 물론 경우에 따라 방수층을 파열시키기도 하고, 겨울철에는 해빙과 결빙을 반복하여 모르타르층의 파손을 가속화하는 등 여러 가지 문제를 야기한다.In addition, the water contained in the mortar layer or the insulating layer is evaporated and expanded in the summer, and the waterproof layer is swollen from the mortar layer (for example, from the beginning when the building is newly built or since the water has permeated into the cracks of the waterproof layer) In some cases, the waterproof layer is ruptured, and in winter, sea water and ice are repeated to accelerate the breakage of the mortar layer.

상기한 문제를 해소하기 위하여, 종래에는, 옥상 바닥의 크랙부분, 즉 그 하부에 물이 고여 있을만한 지점에, 모르타르층을 관통하는 구멍을 형성하고 구멍에 탈기반(Air Vent)을 설치하였다. In order to solve the above-mentioned problem, conventionally, a hole penetrating the mortar layer is formed at a crack part of the roof bottom, that is, a place where water is to be accumulated in the lower part thereof, and an air vent is provided in the hole.

탈기반은, 모르타르층 하부의 공간을 대기중으로 개방시키는 통로이다. 즉, 모르타르층이나 단열층에 갇혀있는 습기를 외부로 빼내기 위한 수단이다.The de-base is a passage for opening the space below the mortar layer to the atmosphere. That is, it is a means for extracting the moisture trapped in the mortar layer or the heat insulating layer to the outside.

이러한 탈기반에도 다양한 종류가 있으며, 그 중에는 가령 국내등록특허공보 제10-1306620호(슬림형 탈기반)도 제안된 바 있다. 상기 슬림형 탈기반은, 중앙부에 관통부가 형성되어 있는 받침플레이트와, 상기 중앙부에 설치되는 방습필름과, 받침플레이트 상부에 씌워지는 커버플레이트의 구조를 가진다.There are various kinds of such de-base, among which, for example, Korean Patent Registration No. 10-1306620 (slim de-base) has been proposed. The slim type debris base has a structure of a support plate having a penetration portion formed at a central portion thereof, a moisture-proof film provided at the central portion, and a cover plate covering the upper portion of the support plate.

그런데 상기한 슬림형 탈기반을 포함하는 종래의 탈기반은, 그 커버면적에 한계가 있다는 단점을 갖는다. 즉 하나의 탈기반으로서는 국지적인 부분에서의 수분제거만 가능한 것이다. 그 이유는 단열층의 하부에 고여있는 수분이 평면적으로 단절됨 없이 넓게 퍼져 있는 것이 아니라, 드문드문 위치하기 때문이다.However, the conventional de-base including the above-mentioned slim de-base has a disadvantage that its cover area is limited. In other words, it is only possible to remove moisture in the local part as a de-base. The reason for this is that the water accumulated in the lower part of the insulating layer does not spread widely without being cut in a plane, but is scattered rarely.

그렇다고, 수분이 고여 있을 것으로 예상되는 지점 모두에 탈기반을 설치할 수 도 없는 일이다. 만약 그렇게 할 경우 옥상 바닥이 탈기반으로 채워져 옥상의 기능을 상실하게 될 것이다. 결국 종래의 탈기반만으로는 옥상의 전체면에 걸쳐 넓게 분포하고 있는 수분을 효과적으로 제거하는데 한계가 있는 것이다.However, it is not possible to install de-infrastructures at all points where water is expected to accumulate. If you do so, the rooftop floor will be filled with debris and will lose its function. As a result, the conventional de-molding only has a limitation in effectively removing moisture distributed over the entire surface of the roof.

본 발명은 상기 문제점을 해소하고자 창출한 것으로서, 옥상 바닥에 길이방향으로 연장된 습기유도로를 형성하고 습기유도로 상부에 탈기반을 설치하여, 옥상 전체면에 걸쳐 분포하는 수분이 습기유도로를 통해 수평방향으로 이동한 후 탈기반을 거쳐 배기되도록 함으로써, 수분제거 효율이 매우 뛰어나고 수분을 그만큼 신속하게 제거할 수 있는 습기유도로를 적용한 옥상 방수층 보수공법을 제공함에 목적이 있다.The present invention has been made in order to solve the above problems, and it is an object of the present invention to provide a moisture induction furnace which is formed on a rooftop floor and which has a longitudinally extending moisture induction furnace, The present invention is directed to a roof waterproofing layer repairing method using a moisture induction furnace which is capable of removing moisture quickly as much as possible by removing moisture through a debris foundation after moving in a horizontal direction.

또한, 본 발명은, 옥상 바닥을 전체적으로 모두 걷어내는 것이 아니라, 습기유도로를 형성할 부분만 걷어내는 것이므로 공사규모가 커지지 않고 시공단가를 현저히 낮출 수 있음은 물론 탈기반의 사용 갯수도 최대한 줄일 수 있는 습기유도로를 적용한 옥상 방수층 보수공법을 제공함에 목적이 있다.In addition, since the present invention does not entirely remove all of the rooftop bottom but only the portion for forming the moisture induction furnace is removed, the construction scale is not increased, the construction cost can be significantly lowered, The present invention provides a roof waterproofing layer repair method using a moisture induction furnace.

상기 목적을 달성하기 위한 본 발명의 습기유도로를 적용한 옥상 방수층 보수공법은, 모르타르층과 단열층을 포함하는 건물 옥상바닥의 파손된 부분을 보수하기 위해 행해지는 공법으로서, 보수작업을 수행할 옥상 위의 장애물을 제거하고 청소하는 옥상바닥청소단계와; 상기 옥상바닥청소단계의 완료 후, 옥상바닥에서 보수할 부분의 모르타르층 및 단열층을 파쇄하고 걷어내어, 단열층 하부에 갇혀있는 습기를 그 내부공간으로 받아들일 수 있는 깊이의 습기유도로를 형성하는 습기유도로형성단계와; 상기 습기유도로형성단계를 통해 상부로 개방되도록 형성된 습기유도로의 내부공간에, 습기유도부재를 배치하는 습기유도부재세팅단계와; 상기 습기유도부재세팅단계의 완료 후, 습기유도부재의 상부에 되메움층을 충전하여 습기유도로와 옥상바닥면과의 단차를 없애는 메우기단계와; 상기 습기유도로의 내부공간에 연통하며 습기유도로를 따라 수평 이동하는 습기를 그 내부로 통과시켜 대기로 방출시키는 탈기반을, 상기 되메움층을 하향 관통시켜 습기유도로 상에 설치하는 탈기반설치단계와; 상기 탈기반설치단계가 완료된 후, 옥상 바닥면 상에 마감층을 적층 형성하는 마감층시공단계를 포함하는 것을 특징으로 한다.To achieve the above object, a roof waterproofing layer repairing method using a moisture induction furnace according to the present invention is a method for repairing a damaged part of a roof top floor of a building including a mortar layer and a heat insulating layer, A rooftop floor cleaning step of removing and cleaning the obstacle of the roof; After completion of the roof top floor cleaning step, the mortar layer and the heat insulating layer of the roof top floor to be repaired are crushed and rolled off to form a moisture induction furnace having a depth capable of receiving the moisture trapped in the lower portion of the heat insulating layer as its internal space An induction furnace forming step; A moisture inducing member setting step of disposing a moisture inducing member in an internal space of the moisture induction furnace formed to open upward through the moisture inducing path forming step; Filling the upper portion of the moisture-inducing member with a backfill layer after completing the moisture-inducing member setting step to eliminate a step between the moisture guide path and the roof bottom surface; A debris foundation which communicates with the inner space of the moisture guide path and horizontally moves along the moisture guide path to pass through the inside of the moisture guide path to the atmosphere, Installation steps; And a finish layer forming step of forming a finish layer on the rooftop bottom surface after the de-based mounting step is completed.

삭제delete

삭제delete

아울러, 상기 습기유도로형성단계시 함께 수행되는 과정으로서, 상기 습기유도로와 같은 깊이를 가지며 옥상에 기설치되어 있는 배수관의 상단부를 그 내부 영역에 포함하는 습기유도공간부를 형성하는 습기유도공간부형성단계가 더 포함되고, 상기 습기유도로형성단계에는, 습기유도로를 습기유도공간부에 연결하는 과정을 포함하는 것을 특징으로 한다.The moisture induction space forming step may include a step of forming a moisture induction space part having a depth equal to that of the moisture induction path and forming a moisture induction space part including an upper end of a drain pipe installed on the roof, Wherein the moisture induction furnace forming step includes the step of connecting the moisture induction furnace to the moisture inducing space portion.

또한, 상기 습기유도부재는; 습기유도로의 바닥 및 내측벽에 접한 상태로, 습기가 습기유도로의 길이방향을 따라 이동하도록 가이드하며, 그 저면에 습기의 유동을 가이드하는 가이드통로를 구비한 것을 특징으로 한다.The moisture-inducing member may include: And a guide passage guiding the moisture to flow along the longitudinal direction of the moisture guide path and guiding the flow of moisture to the bottom surface of the guide path in contact with the bottom and the inner wall of the moisture guide path.

또한, 상기 습기유도로는 수평의 폐회로를 구성하고, 상기 탈기반은 두 개 이상이 설치되는 것을 특징으로 한다.In addition, the moisture guiding path constitutes a horizontal closed circuit, and two or more of the debris bases are installed.

상기와 같이 이루어지는 본 발명의 습기유도로를 적용한 옥상 방수층 보수공법은, 옥상 바닥에 길이방향으로 연장된 습기유도로를 형성하고 습기유도로에 탈기반을 연결하여, 옥상 전체면에 걸쳐 분포하는 수분이 습기유도로를 통해 수평방향으로 이동한 후 탈기반을 거쳐 배기되도록 함으로써, 수분제거 효율이 매우 뛰어나고 수분을 그만큼 신속하게 제거할 수 있다.The roof waterproofing layer repairing method using the moisture induction furnace according to the present invention as described above is characterized in that a moisture induction furnace extending in the longitudinal direction is formed on the roof top floor and a debris foundation is connected to the moisture induction furnace, Is moved in the horizontal direction through the moisture guide path and then exhausted through the debris foundation, so that the water removal efficiency is excellent and the moisture can be removed as quickly as possible.

또한, 본 발명은, 옥상 바닥을 전체적으로 모두 걷어내는 것이 아니라, 습기유도로를 형성할 부분만 걷어내는 것이므로 공사규모가 커지지 않고 그에 따라 시공단가를 현저히 낮출 수 있음은 물론 탈기반의 사용 갯수도 최대한 줄일 수 있다.In addition, since the present invention does not entirely remove all of the roof top floor, but only the portion for forming the moisture induction furnace is removed, the construction scale is not increased and the construction unit cost can be remarkably reduced accordingly. Can be reduced.

도 1은 본 발명의 일 실시예에 따른 습기유도로를 적용한 옥상 방수층 보수공법을 설명하기 위하여 도시한 블록도이다.
도 2는 본 발명의 일 실시예에 따른 습기유도로를 적용한 옥상 방수층 보수공법에 있어서, 옥상바닥에 습기유도로를 형성한 모습을 도시한 사시도이다.
도 3a 및 도 3b는 상기 도 2에 도시한 습기유도로에 설치될 수 있는 습기유도부재를 예로서 나타내 보인 일부 사시도이다.
도 4 내지 도 6은 본 발명의 일 실시예에 따른 옥상 방수층 보수공법의 일부 과정을 설명하기 위하여 도시한 도면이다.
도 7은 본 발명의 일 실시예에 따른 옥상 방수층 보수공법에서 습기유도로와 습기유도부재와 탈기반의 작용을 설명하기 위한 측단면도이다.
도 8은 본 발명의 일 실시예에 따른 습기유도로를 적용한 옥상 방수층 보수공법에 있어서 마감층시공단계의 직전 모습을 도시한 도면이다.
도 9는 본 발명의 일 실시예에 따른 습기유도로를 적용한 옥상 방수층 보수공법을 완료한 후의 방수층의 적층구조를 나타내보인 단면도이다.
1 is a block diagram for explaining a roof waterproofing layer repairing method to which a moisture induction furnace according to an embodiment of the present invention is applied.
2 is a perspective view showing a state in which a moisture induction furnace is formed on a roof top in a roof waterproofing layer repairing method using a moisture induction furnace according to an embodiment of the present invention.
3A and 3B are partial perspective views showing, by way of example, a moisture inducing member which can be installed in the moisture guiding path shown in FIG.
4 to 6 are views for explaining a part of the process of the roof waterproofing layer repairing method according to an embodiment of the present invention.
7 is a side cross-sectional view for explaining a dehumidification action of a moisture induction furnace, a moisture inducing member, and a deck in the roof waterproofing layer repairing method according to an embodiment of the present invention.
8 is a view showing a state immediately before a finish layer construction step in a roof waterproofing layer repairing method to which a moisture induction furnace according to an embodiment of the present invention is applied.
FIG. 9 is a cross-sectional view showing a laminated structure of a waterproof layer after completion of a roof waterproofing layer repair method using a moisture guide path according to an embodiment of the present invention.

이하, 본 발명에 따른 하나의 실시예를 첨부된 도면을 참조하여 보다 상세히 설명하기로 한다.Hereinafter, one embodiment according to the present invention will be described in detail with reference to the accompanying drawings.

기본적으로, 본 실시예에 따른 옥상 방수층 보수공법은, 옥상 바닥의 파손된 방수층내에 고여있는 수분이나 습기를 끌어내어 수평 이동시킨 후 공기중으로 유도 배출시키기 위해 습기유도로를 적용한다는 특징을 갖는다. Basically, the roof waterproofing layer repairing method according to the present embodiment is characterized in that a moisture induction furnace is applied in order to draw moisture and moisture accumulated in the broken waterproof layer on the roof top, horizontally move it, and then induce and discharge it into the air.

상기 습기유도로는 방수층내부에 시공되는 수평의 공기 통로로서, 그 내부로 스며나온 습기를 수평으로 유도하여 탈기반으로 올려 보내는 역할을 한다. 이러한 습기유도로는, 옥상 바닥의 일부를 일정폭 및 깊이로 걷어내되 상기 모르타르층은 물론 방수층까지 걷어내어 형성된 트랜치형 홈이다. The moisture induction furnace is a horizontal air passage installed inside the waterproofing layer. The moisture induction furnace horizontally guards the moisture leaking into the moisture induction furnace and raises it to the debris base. The moisture induction furnace is a trench-type groove formed by cutting a part of the roof top to a certain width and depth, but also to the waterproof layer as well as the mortar layer.

모르타르층과 방수층의 두께면이 습기유도로의 폭방향 양측벽으로 노출되므로, 방수층이 머금고 있는, 또는 방수층의 저면에 스며들어있는 수분이 습기유도로의 내부로 매우 신속히 흘러나오게 된다.The thickness of the mortar layer and the waterproof layer is exposed to the both side walls in the width direction of the moisture guide path so that the moisture permeable to the waterproof layer or penetrating into the bottom of the waterproof layer flows out very quickly into the moisture guide path.

상기 습기유도로는 직선으로 연장시킬 수 도 있고 곡선으로 형성할 수 도 있다. 또한, 더 나아가 습기유도로의 일단부와 타단부를 서로 만나게 구성하여 이를테면 습기유도로를 폐회로 형태로 구현할 수 도 있다. 폐회로라 함은 예컨대, 관찰자가 바닥을 내려다 봤을 때 습기유도로가 다각형이나 타원 또는 원형의 형태를 취하는 형상을 의미한다. The moisture guide path may be formed by a straight line or a curved line. Furthermore, the moisture induction furnace may be configured to meet one end and the other end of the moisture induction furnace, for example, a moisture induction furnace in the form of a closed loop. Closed loop means, for example, a shape in which a moisture guide path takes the form of a polygon, an ellipse or a circle when an observer looks down on the floor.

또한 다수의 습기유도로를 상호 교차시켜 바둑판 형태나 격자 형태로 만들 수 도 있다.Also, a plurality of moisture induction furnaces may be crossed to form a checkerboard pattern or a lattice pattern.

도 1은 본 발명의 일 실시예에 따른 습기유도로를 적용한 옥상 방수층 보수공법을 설명하기 위하여 도시한 블록도이다.1 is a block diagram for explaining a roof waterproofing layer repairing method to which a moisture induction furnace according to an embodiment of the present invention is applied.

도시한 바와같이, 본 실시예에 따른 습기유도로를 적용한 옥상방수층 보수공법은, 옥상바닥청소단계(100)와, 습기유도로형성단계(102), 습기유도공간부형성단계(103), 습기유도부재세팅단계(104), 메우기단계(106), 탈기반설치단계(108), 마감층시공단계(110)를 포함한다.As shown in the figure, the roof waterproofing layer repair method using the moisture guide path according to the present embodiment includes a roof top floor cleaning step 100, a moisture guide path forming step 102, a moisture guide space part forming step 103, An induction member setting step 104, a fill step 106, a de-based installation step 108, and a finish layer construction step 110.

먼저, 상기 옥상바닥청소단계(100)는 작업할 옥상의 여러 장애물을 제거하고 옥상 바닥을 깨끗하게 정리하는 과정이다. 이 때 옥상바닥에 들떠 있는 방수층은 모두 박리시킨다. 또한 옥상바닥을 청소하면서 바닥면의 크랙 부분이 주로 어디에 분포하는지 등을 파악한다.First, the rooftop floor cleaning step 100 is a process of removing various obstacles on the roof to be cleaned and arranging the rooftop floor cleanly. At this time, all the watertight floors floating on the roof top are peeled off. In addition, cleaning the floor of the roof, where the cracks on the floor are mainly distributed, and so on.

상기 옥상바닥청소단계(100)가 완료되었다면 습기유도로형성단계(102)와 더불어 습기유도공간부형성단계(103)를 수행한다. When the rooftop bottom cleaning step 100 is completed, a moisture induction space forming step 103 and a moisture inducing space forming step 102 are performed.

습기유도로는 옥상 바닥면을 일정폭 및 깊이로 파쇄하고 들어내어 형성한 트랜치(trench)형 홈이다. 또한 습기유도공간부는 옥상에 시설되어 있는 배수관의 주변을 둥글게 파낸 홈이다.The moisture induction furnace is a trench-shaped groove formed by crushing and ingressing the roof bottom surface to a certain width and depth. In addition, the moisture induction space is a groove formed by rounding the periphery of the drain pipe provided on the roof.

도 2는 상기 습기유도로(13) 및 습기유도공간부(14)의 일 형태를 나타내 보인 사시도이고, 도 4는 상기 도 2의 Ⅳ-Ⅳ선 단면도이다.FIG. 2 is a perspective view showing one embodiment of the moisture guiding passage 13 and the moisture guiding space portion 14, and FIG. 4 is a sectional view taken along line IV-IV of FIG.

도면을 참조하면, 건물의 옥상(11) 바닥에 길이방향으로 연장된 습기유도로(13)와 원형의 습기유도공간부(14)가 시공되어 있음을 알 수 있다.Referring to the drawings, it can be seen that a moisture guide path 13 extending in the longitudinal direction and a circular moisture guide space 14 are formed on the floor of the roof 11 of the building.

상기 습기유도로(13)는 일정폭 및 깊이로 형성된 홈으로서, 모르타르층(19)을 깨어내고 모르타르층 하부에 위치한 단열층(17)을 들어내어 형성된 것이다. 이와같이 모르타르층(19)과 단열층(17)을 걷어낸 것이므로, 당연히 습기유도로(13)의 깊이는 모르타르층(19)과 단열층(17)의 두께와 같다. The moisture guide path 13 is a groove formed with a predetermined width and depth and is formed by breaking the mortar layer 19 and inserting the heat insulating layer 17 located under the mortar layer. The depth of the moisture guide path 13 is equal to the thickness of the mortar layer 19 and the heat insulating layer 17 since the mortar layer 19 and the heat insulating layer 17 are thus cut off.

상기 단열층(17)을 구성하는 단열재는 스티로폼이나 부직포일 수 있다. 상기 스티로폼은 모르타르층(19)의 크랙(미도시)을 통해 스며든 수분을 그 내부에 보유하거나 하부로 통과시켜 건축시방수층(33)과의 사이에 유지한다. 또한 부직포는 스며들어온 수분을 받아 머금고 있다. The heat insulating material constituting the heat insulating layer 17 may be a styrofoam or a nonwoven fabric. The styrofoam retains the moisture permeated through cracks (not shown) of the mortar layer 19 inside it or passes it downward to be held between the styrofoam and the waterproof layer 33 during construction. In addition, the nonwoven fabric is faded by the permeated moisture.

상기 건축시방수층(33)은 건물을 신축할 때 옥상슬라브(31) 위에 적용한 기본 방수층이다. 건물에 따라 건축시방수층(33)이 없는 경우도 있다. 이 경우 습기유도로(13)나 습기유도공간부(14)의 바닥은 옥상슬라브(31)가 된다. The building waterproof layer 33 is a basic waterproof layer applied on the roof slab 31 when the building is expanded and contracted. Depending on the building, there may be no waterproof layer (33) at the time of construction. In this case, the bottom of the moisture induction furnace 13 or the moisture inducing space 14 becomes a roof slab 31. [

본 실시예에 따른 옥상 방수층 보수공법은, 상기 건축시방수층(33)이 없는 경우에도 얼마든지 적용가능한 공법이다.The roof waterproofing layer repairing method according to the present embodiment is applicable even when there is no waterproofing layer 33 at the time of construction.

상기 습기유도공간부(14)는 배수관(21)의 주변에 형성한 홈으로서 상기 습기유도로(13)와 함께 시공된다. 상기 배수관(21)은 보통 옥상의 한쪽 귀퉁이부에 위치되며, 옥상에서 발생하는 하수를 받아 건물 하부로 내려 보내는 일반적인 수직 파이프이다.The moisture guide space 14 is formed in the periphery of the water pipe 21 together with the moisture guide path 13. The drain pipe (21) is usually located at one corner of the roof, and is a general vertical pipe that receives the sewage generated on the roof and sends it down to the bottom of the building.

이와같이 배수관(21)의 주변에 습기유도공간부(14)를 형성한 이유는, 배수관(21)의 사용목적상, 평상시(가령, 강우시 또는 옥상 물청소시) 배수관(21)측으로 물이 모여들어, 배수관(21) 주변의 모르타르층(19)과 단열층(17)으로 물이 스며들 확률이 높기 때문이다. The reason why the moisture guide space 14 is formed in the vicinity of the water pipe 21 is that the water collects toward the water pipe 21 at the time of usual (for example, at the time of rainfall or rooftop cleaning) for the purpose of using the water pipe 21 This is because the probability of water permeating into the mortar layer 19 and the heat insulating layer 17 around the water pipe 21 is high.

한편, 습기유도로(13)는, 도 2에 도시한 바와같이, 직사각 패턴으로 시공할 수 도 있지만, 옥상 상태에 기초하여 필요한 형태로 얼마든지 시공할 수 있다. 습기유도로(13)의 형상은 당연히 방수층의 파손 형태에 따라 달라진다. On the other hand, the moisture induction furnace 13 can be installed in a rectangular pattern as shown in Fig. 2, but can be applied in any desired form based on the rooftop state. The shape of the moisture induction furnace 13 naturally depends on the type of breakage of the waterproof layer.

상기한 바와같이, 습기유도로형성단계(102)와 습기유도공간부형성단계(103)를 통해, 습기유도로(13)와 습기유도공간부(14)의 시공이 완료되었다면, 이어서 습기유도부재세팅단계(104)를 수행한다.If the construction of the moisture induction passage 13 and the moisture induction space portion 14 is completed through the moisture induction passage forming step 102 and the moisture inducing space portion forming step 103 as described above, The setting step 104 is performed.

상기 습기유도부재세팅단계(104)는, 습기유도로(13) 및 습기유도공간부(14) 내부에 습기유도부재(25,27)를 배치하는 과정이다. 즉 도 5에 도시한 바와같이, 습기유도로(13)와 습기유도공간부(14) 내에 습기유도부재(25,27)를 장착하는 단계이다. The moisture guiding member setting step 104 is a process of disposing the moisture guiding members 25 and 27 in the moisture guiding passage 13 and the moisture guiding space portion 14. That is, as shown in Fig. 5, the step of mounting the moisture guiding members 25 and 27 in the moisture guiding passage 13 and the moisture guiding space portion 14 is carried out.

상기 습기유도부재(25)는 길이방향으로 연장된 막대형 부재로서 습기유도로(13)의 내부에 채워져, 습기가 습기유도로(13)의 길이방향을 따라 원활하게 이동하도록 가이드한다. The moisture guide member 25 is filled in the moisture guide passage 13 as a rod-like member extending in the longitudinal direction to guide moisture to move smoothly along the longitudinal direction of the moisture guide passage 13.

도 3a는 습기유도로(13)에 설치되는 습기유도부재(25)를 도시한 부분 사시도이다. 3A is a partial perspective view showing a moisture inducing member 25 installed in the moisture induction furnace 13. Fig.

도 3에 도시한 바와같이, 상기 습기유도부재(25)는 길이방향으로 연장되며 그 하부에 다수의 가이드통로(25a)를 갖는다. 상기 가이드통로(25a)는 습기유도부재(25)의 길이방향을 따라 형성된 통로로서, 그 내부로 들어온 습기를 습기유도로(13)의 길이방향으로 이동시킨다.As shown in Fig. 3, the moisture guide member 25 extends in the longitudinal direction and has a plurality of guide passages 25a at a lower portion thereof. The guide passage 25a is a passage formed along the longitudinal direction of the moisture guide member 25 and moves the moisture introduced into the guide passage 25a in the longitudinal direction of the moisture guide passage 13. [

아울러, 상기 습기유도부재(25)의 길이방향 중간 중간에는 측향통로(25b)가 마련되어 있다. 상기 측향통로(25b)는 습기유도부재(25)의 길이방향에 직교하는 방향으로 형성된 틈으로서, 상기 가이드통로(25a)를 측부로 개방한다.In addition, a lateral passage 25b is provided in the middle of the longitudinal direction of the moisture guide member 25. The lateral passage 25b is a gap formed in a direction perpendicular to the longitudinal direction of the moisture guide member 25, and opens the guide passage 25a to the side.

상기 측향통로(25b)는, 습기유도로(13)의 내부로 스며나오는 수분이나 습기를 가이드통로(25a)로 진입시키는 통로이다. 수분이나 습기가 상기 측향통로(25b)를 통해 가이드통로(25a)로 진입하여, 가이드통로(25a)를 통과하는 메인 스트림라인에 합류하게 되는 것이다.The lateral passage 25b is a passage for allowing moisture or moisture exuding into the moisture guide passage 13 to enter the guide passage 25a. Moisture or moisture enters the guide passage 25a through the lateral passage 25b and joins the main stream line passing through the guide passage 25a.

습기유도부재(25)의 상면은 평평한 지지면부(25c)로서 후술할 되메움층(도 6의 35)을 지지한다. 되메움층(35)은 모르타르나 콘크리트로서 습기유도부재(25)에 지지된 상태로 옥상바닥(23)에 단차 없이 이어진다.The upper surface of the moisture guiding member 25 supports the back layer (35 in Fig. 6), which will be described later, as a flat supporting surface portion 25c. The backfill layer 35 is supported by the moisture-inducing member 25 as a mortar or a concrete, and is stepped on the roof bottom 23 without a step.

상기 습기유도부재(25)는 고무나 합성수지로 제작되며 필요에 따라 원하는 길이로 절단하여 사용한다.The moisture guide member 25 is made of rubber or synthetic resin, and is cut to a desired length if necessary.

한편, 상기 습기유도공간부(14)에는 도 3b에 도시한 형태의 습기유도부재(27)를 설치한다. 상기 습기유도부재(27)는 일정두께를 갖는 합성수지판을 프레싱 가공하여 형성한 것으로서, 수평의 지지면부(27a)와 돌출부(27b)로 이루어진다.On the other hand, the moisture guide member 27 of the type shown in FIG. The moisture guide member 27 is formed by pressing a synthetic resin plate having a predetermined thickness, and includes a horizontal support surface 27a and a protrusion 27b.

상기 돌출부(27b)는 지지면부(27a)의 하부로 돌출되어, 지지면부(27a)를 건축시방수층(33)으로부터 띄움으로써 지지면부(27a) 하부에 가이드통로(27d)를 확보한다. 상기 가이드통로(27d)는 습기가 통과할 수 있는 공간이다.The protruding portion 27b protrudes to the lower side of the support surface portion 27a and secures the guide path 27d below the support surface portion 27a by floating the support surface portion 27a from the waterproof layer 33 at the time of construction. The guide passage 27d is a space through which moisture can pass.

상기 습기유도부재(27)도, 습기유도부재(27)가 안착될 지점의 형상에 맞추어 적절히 절단하여 사용한다. 가령 상기 습기유도공간부(14)에 습기유도부재(27)를 설치하기 위해서는 습기유도부재(27)를 원형으로 절단하고 중앙에 파이프구멍(도 5의 27c)을 천공하여 사용한다.The moisture guide member 27 is also cut appropriately in accordance with the shape at which the moisture guide member 27 is to be seated. For example, in order to install the moisture guide member 27 in the moisture guide space 14, the moisture guide member 27 is cut into a circular shape and the pipe hole (27c in FIG.

상기 습기유도부재세팅단계(104)는, 도 5에 도시한 바와같이, 적절한 사이즈로 절단된 습기유도부재(25,27)를 습기유도로(13)와 습기유도공간부(14)에 안착하는 공정이다.The moisture guide member setting step 104 is a step of setting the moisture guide members 25 and 27 cut into an appropriate size in the moisture guide path 13 and the moisture guide space 14, Process.

특히 상기 습기유도부재(25)의 양측부는 습기유도로(13)의 내향벽면에 근접하도록 설치함이 좋다. 그 이유는 단열층(17)과 측향통로(25b)를 최대한 근접시켜야 습기의 배출이 원활하기 때문이다. In particular, both side portions of the moisture guide member 25 may be disposed so as to be close to the inward wall surface of the moisture guide passage 13. The reason for this is that the discharge of the moisture is smooth because the heat insulating layer 17 and the lateral passage 25b are brought close to each other as much as possible.

만일, 현장 상황에 따라, 습기유도부재(25)의 폭에 비해 습기유도로(13)의 폭이 넓어, 습기유도부재(25)의 양측부가 내향벽면에 근접하지 못할 경우에는, 다른 습기유도부재(25)를 길이방향으로 절단하여 습기유도부재(25)와 내향벽면 사이에 끼워 넣는다.If the width of the moisture guide passage 13 is wider than the width of the moisture guide member 25 and the both side portions of the moisture guide member 25 are not close to the inward wall surface depending on the situation of the site, (25) is cut in the longitudinal direction and sandwiched between the moisture guide member (25) and the inward wall surface.

아울러 습기유도로(13)의 폭이 습기유도부재(25)의 폭보다 두 배 이상 넓을 경우에는, 습기유도부재(25)를 길이방향으로 배열함과 아울러 폭방향으로 병렬 배치한다.When the width of the moisture guide passage 13 is twice as wide as the width of the moisture guide member 25, the moisture guide members 25 are arranged in the longitudinal direction and in parallel in the width direction.

습기유도공간부(14)에 설치되는 습기유도부재(27)의 경우에도, 지지면부(27a)의 테두리부가 모르타르층(19)의 내향면에 최대한 근접하도록 설치한다.The edge of the supporting surface portion 27a is provided so as to be as close as possible to the inward surface of the mortar layer 19 even in the case of the moisture inducing member 27 provided in the moisture inducing space portion 14. [

상기 습기유도로(13)에 설치되는 습기유도부재(25)는, 적절한 길이로 절단되어 다수개가 길이방향으로 배치된다. 특히 길이방향으로 이어진 습기유도부재(25)의 연접부위는 상호 밀착시켜, 습기유도부재(25)의 가이드통로(25a)가 막히지 않도록 한다.The moisture guide member 25 provided in the moisture guide path 13 is cut to an appropriate length, and a plurality of the moisture guide members 25 are arranged in the longitudinal direction. In particular, the connecting portions of the moisture guiding member 25 extending in the longitudinal direction are brought into close contact with each other so that the guide passage 25a of the moisture guiding member 25 is not blocked.

하지만, 도 7에 도시한 바와같이, 습기유도부재(25)의 연접부위에 후술할 탈기반(도 7의 41)을 설치해야 할 경우에는, 습기유도부재(25)를 얼마간 이격시켜 놓아야 한다.However, as shown in Fig. 7, when a de-molding base (41 in Fig. 7) to be described later is to be provided at a connecting portion of the moisture guiding member 25, the moisture guiding member 25 should be spaced apart.

상기 과정을 통해 습기유도부재세팅단계(104)가 완료되었다면 메우기단계(106)를 이어간다.If the moisture inducing member setting step 104 is completed through the above process, the filling step 106 is continued.

상기 메우기단계(106)는, 도 6에 도시한 바와같이, 습기유도부재(25,27)의 상부에 되메움층(35)을 충전하여 습기유도로(13) 및 습기유도공간부(14)의 내부공간을 채우는 과정이다.The filling step 106 is a step of filling the backflowing layer 35 on the moisture inducing members 25 and 27 to form the moisture induction path 13 and the moisture inducing space part 14, The process of filling in the inner space of FIG.

상기 되메움층(35)은 모르타르나 콘크리트로서 그 표면은 옥상바닥(23)과 단차없이 이어진다. 경우에 따라 되메움층(35)의 하부에 자갈이나 모래 등의 골재를 먼저 채워 넣을 수 도 있다.The backfill layer 35 is a mortar or a concrete, and the surface of the backfill layer 35 is not stepped from the roof bottom 23. In some cases, aggregate such as gravel or sand may be filled first in the lower part of the backfill layer 35.

특히 상기 습기유도공간부(14)에 채워지는 되메움층(35)의 표면은 배수관(21)을 향하여 하향 경사지도록 형성하여야 한다. 당연히 물빠짐을 원활하게 하기 위한 것이다.Particularly, the surface of the backfill layer 35 to be filled in the moisture guide space 14 should be formed so as to be inclined downward toward the water pipe 21. Naturally, it is to smooth out the water.

아울러 탈기반(41)을 설치할 지점에는 설치구멍(도 7의 35b)을 남겨놓아야 한다. 설치구멍(35b)을 어디에 위치시킬지는, 습기유도로(13)와 습기유도공간부(14)의 길이와 위치 및 수분의 분포특성에 따라 적절히 고려된다.In addition, the installation hole (35b in Fig. 7) should be left at the point where the descaling base 41 is to be installed. The position of the mounting hole 35b is appropriately determined according to the length and position of the moisture guide passage 13 and the moisture guide space portion 14 and distribution characteristics of water.

상기 과정을 통해 옥상바닥(23)의 내부에는 속이 빈 가이드통로(25a,27d)가 마련되게 된다.Through the above process, hollow guide passages 25a and 27d are provided in the roof bottom 23.

이어지는 탈기반설치단계(108)는 상기 메우기단계(106)시 형성한 설치구멍(35b)에 탈기반(41)을 세우는 과정이다.The subsequent de-based installation step (108) is a step of erecting the debris foundation (41) on the installation hole (35b) formed in the filling step (106).

도 7에 도시한 바와같이, 상기 탈기반(41)은, 설치구멍(35b)에 끼워지며 수직으로 연장된 수직파이프(41a)와, 상기 수직파이프(41a)의 상단부에 씌워진 커버(41b)로 구성된다. 7, the de-base 41 includes a vertically extending vertical pipe 41a fitted to the mounting hole 35b and a cover 41b covering the upper end of the vertical pipe 41a .

상기 탈기반(41)은 습기유도부재(25)의 가이드통로(25a)를 통과한 습기를 받아들여 상부로 유도한 후 대기로 방출하는 역할을 한다. 이러한 역할을 할 수 있는 한 탈기반(41)의 타입이나 사이즈는 얼마든지 변경 가능하다.The de-base (41) receives the moisture passing through the guide passage (25a) of the moisture guiding member (25a), guides the moisture to the upper portion, and discharges the moisture to the atmosphere. The type or size of the debris base 41 can be changed as long as it can perform such a role.

도 8은 상기 탈기반설치단계(108)가 완료된 후의 상태를 나타내 보인 옥상바닥(23)의 사시도이다.8 is a perspective view of the roof bottom 23 showing the state after the de-based installation step 108 is completed.

도면을 참조하면, 상기 되메움층(35)이 습기유도로(13)와 습기유도공간부(14)에 채워져 있음을 알 수 있다. 상기 되메움층(35)의 하부에 습기유도부재(25,27)가 위치되어 있음은 물론이다.Referring to the drawing, it is understood that the backflow layer 35 is filled in the moisture induction passage 13 and the moisture induction space portion 14. It is a matter of course that the moisture inducing members 25 and 27 are located below the backflow layer 35.

아울러 상기 습기유도로(13)에 두 개의 탈기반(41)이 설치되어 있다. 상기 탈기반(41)은 습기유도로(13)와 연통하여 습기유도로(13) 내부의 습기를 빨아올려 대기중으로 배출한다.In addition, two debris bases 41 are provided in the moisture induction furnace 13. The debris 41 communicates with the moisture induction furnace 13 to suck the moisture in the moisture induction furnace 13 and discharge it to the atmosphere.

특히, 도시한 바와같이 탈기반(41)을 두 개 (또는 그 이상) 설치할 경우 옥상바닥(23) 하부의 습기 제거효과가 더욱 뛰어나다. 가령 일측의 탈기반(41)을 통해 내부의 습기가 빠질 때 타측 탈기반(41)으로 대기의 건공기가 습기유도로(13)로 들어갈 수 있기 때문이다. 이는, 필요에 따라 탈기반(41)의 설치갯수와 설치 위치를 조절할 경우 습기유도로의 성능을 크게 향상시킬 수 있다는 의미이다.In particular, as shown in the drawing, when two (or more) debris bases 41 are installed, the moisture removal effect of the lower portion of the roof bottom 23 is more excellent. This is because the dry air in the atmosphere can enter the moisture induction furnace 13 through the debris removal base 41 when moisture is released through the debris base 41 on one side. This means that the performance of the moisture induction furnace can be greatly improved by adjusting the number of mounts and mounting positions of the de-base 41 as necessary.

이어지는 마감층시공단계(110)는 탈기반의 설치가 완료된 후, 옥상바닥(23)의 전체면에 마감층(55)을 씌우는 과정이다.The subsequent finish layer construction step 110 is a process of covering the entire surface of the roof top 23 with a finish layer 55 after the de-based installation is completed.

상기 마감층(55)은, 도 9에 도시한 바와같이, 옥상바닥(23) 및 되메움층(35) 표면에 도포되는 하도층(43)과, 상기 하도층(43)의 상부에 차례로 적층되는 제 1중도층(45), 함침시트층(47), 제 2중도층(49), 제 3중도층(51), 상도층(53)의 구조를 갖는다.9, the finish layer 55 includes a lower layer 43 applied to the surface of the rooftop 23 and the back filler layer 35, The impregnated sheet layer 47, the second intermediate layer 49, the third intermediate layer 51, and the upper layer 53. The first intermediate layer 45, the impregnated sheet layer 47, the second intermediate layer 49,

상기 하도층(43)은 옥상바닥(23)에 대한 제 1중도층(45)의 강력한 접착을 유지한다. 이러한 하도층과 제 1,2,3중도층은 일반적인 방수작업시 사용되는 도료를 사용해도 무방하다.The undercoat layer 43 maintains strong adhesion of the first intermediate layer 45 to the roof top 23. The undercoat layer and the first, second and third intermediate layers may be paints used in general waterproofing operations.

상기 함침시트층(47)은, 아크릴게 폴리머 방수액에 함침시킨 고밀도 폴리에스터 섬유층으로서 제 1중도층(45)의 상부에 적층된다. 상기 함침시트층(47)은 완성된 옥상방수층의 내구성을 크게 향상시킨다.The impregnated sheet layer 47 is laminated on top of the first intermediate layer 45 as a high-density polyester fiber layer impregnated with an acrylate polymer waterproofing liquid. The impregnated sheet layer 47 greatly improves the durability of the completed roof waterproof layer.

또한 상기 제 2중도층(49)과 제 3중도층(51)을 도포할 때에는 옥상의 구석이나 코너부 등을 마감한다.When the second intermediate layer 49 and the third intermediate layer 51 are applied, the corners and corners of the roof are closed.

상기 상도층(53)은 차열도료로 이루어진 차열층이다. 차열도료는 열의 이동을 차단하는 기능을 가지므로. 이와같이 마감층(55)을 차열도료로 마감함으로써 건물의 단열효과를 증대 시킬 수 있다.The upper layer 53 is a heat insulating layer made of heat-shading paint. The heat paints have a function to block the movement of heat. In this way, the thermal insulation effect of the building can be increased by finishing the finish layer 55 with heat shielding paint.

이상, 본 발명을 구체적인 실시예를 통하여 상세하게 설명하였으나, 본 발명은 상기 실시예에 한정하지 않고, 본 발명의 기술적 사상의 범위내에서 통상의 지식을 가진 자에 의하여 여러 가지 변형이 가능하다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims.

11:옥상 13:습기유도로 14:습기유도공간부
17:단열층 19:모르타르층 21:배수관
23:옥상바닥 25:습기유도부재 25a:가이드통로
25b:측향통로 25c:지지면부 27:습기유도부재
27a:지지면부 27b:돌출부 27c:파이프구멍
27d:가이드통로 31:옥상슬라브 33:건축시방수층
35:되메움층 35b:설치구멍 41:탈기반
41a:수직파이프 41b:커버 43:하도층
45:제 1중도층 47:함침시트층 49:제 2중도층
51:제 3중도층 53:상도층 55:마감층
11: Rooftop 13: Moisture induction furnace 14: Moisture inducing space part
17: insulation layer 19: mortar layer 21: drain pipe
23 rooftop bottom 25 moisture guide member 25a guide passage
25b: a side passage 25c: a support surface portion 27:
27a: Support surface portion 27b: Projection portion 27c: Pipe hole
27d: guide passage 31: rooftop slab 33: waterproof layer
35: back fill layer 35b: mounting hole 41:
41a: vertical pipe 41b: cover 43: underside layer
45: first intermediate layer 47: impregnated sheet layer 49: second intermediate layer
51: third intermediate layer 53: upper layer 55: finish layer

Claims (6)

모르타르층과 단열층을 포함하는 건물 옥상바닥의 파손된 부분을 보수하기 위해 행해지는 공법으로서,
보수작업을 수행할 옥상 위의 장애물을 제거하고 청소하는 옥상바닥청소단계와;
상기 옥상바닥청소단계의 완료 후, 옥상바닥에서 보수할 부분의 모르타르층 및 단열층을 파쇄하고 걷어내어, 단열층 하부에 갇혀있는 습기를 그 내부공간으로 받아들일 수 있는 깊이의 습기유도로를 형성하는 습기유도로형성단계와;
상기 습기유도로형성단계를 통해 상부로 개방되도록 형성된 습기유도로의 내부공간에, 습기유도부재를 배치하는 습기유도부재세팅단계와;
상기 습기유도부재세팅단계의 완료 후, 습기유도부재의 상부에 되메움층을 충전하여 습기유도로와 옥상바닥면과의 단차를 없애는 메우기단계와;
상기 습기유도로의 내부공간에 연통하며 습기유도로를 따라 수평 이동하는 습기를 그 내부로 통과시켜 대기로 방출시키는 탈기반을, 상기 되메움층을 하향 관통시켜 습기유도로 상에 설치하는 탈기반설치단계와;
상기 탈기반설치단계가 완료된 후, 옥상 바닥면 상에 마감층을 적층 형성하는 마감층시공단계를 포함하는 것을 특징으로 하는 습기유도로를 적용한 옥상 방수층 보수공법.
As a method for repairing a damaged portion of a building roof top floor including a mortar layer and a heat insulating layer,
A rooftop floor cleaning step for removing and cleaning obstacles on the roof to perform maintenance work;
After completion of the roof top floor cleaning step, the mortar layer and the heat insulating layer of the roof top floor to be repaired are crushed and rolled off to form a moisture induction furnace having a depth capable of receiving the moisture trapped in the lower portion of the heat insulating layer as its internal space An induction furnace forming step;
A moisture inducing member setting step of disposing a moisture inducing member in an internal space of the moisture induction furnace formed to open upward through the moisture inducing path forming step;
Filling the upper portion of the moisture-inducing member with a backfill layer after completing the moisture-inducing member setting step to eliminate a step between the moisture guide path and the roof bottom surface;
A debris foundation which communicates with the inner space of the moisture guiding path and horizontally moves along the moisture guiding path to pass through the inside of the moisture guiding path to the atmosphere, Installation steps;
And a finish layer forming step of forming a finish layer on the roof bottom surface after the de-based installation step is completed.
삭제delete 삭제delete 제 1항에 있어서,
상기 습기유도로형성단계시 함께 수행되는 과정으로서, 상기 습기유도로와 같은 깊이를 가지며 옥상에 기설치되어 있는 배수관의 상단부를 그 내부 영역에 포함하는 습기유도공간부를 형성하는 습기유도공간부형성단계가 더 포함되고,
상기 습기유도로형성단계에는, 습기유도로를 습기유도공간부에 연결하는 과정을 포함하는 것을 특징으로 하는 습기유도로를 적용한 옥상 방수층 보수공법.
The method according to claim 1,
Forming a moisture induction space portion having a depth equal to the depth of the moisture induction passage and forming a moisture induction space portion including an upper end portion of a drain pipe installed in the roof on the roof, Lt; / RTI >
Wherein the moisture induction furnace forming step includes the step of connecting the moisture induction furnace to the moisture inducing space part.
제 1항에 있어서,
상기 습기유도부재는;
습기유도로의 바닥 및 내측벽에 접한 상태로, 습기가 습기유도로의 길이방향을 따라 이동하도록 가이드하며, 그 저면에 습기의 유동을 가이드하는 가이드통로를 구비한 것을 특징으로 하는 습기유도로를 적용한 옥상 방수층 보수공법.
The method according to claim 1,
The moisture guide member comprises:
And a guide passage guiding the moisture to flow along the longitudinal direction of the moisture guide path and guiding the flow of the moisture to the bottom surface in a state of being in contact with the bottom and the inner wall of the moisture guide path. Rooftop waterproofing repair method applied.
제 1항에 있어서,
상기 습기유도로는 수평의 폐회로를 구성하고, 상기 탈기반은 두 개 이상이 설치되는 것을 특징으로 하는 습기유도로를 적용한 옥상 방수층 보수공법.
The method according to claim 1,
Wherein the moisture induction furnace constitutes a horizontal closed circuit and at least two of the debris bases are installed.
KR1020150115803A 2015-08-18 2015-08-18 Method for repairing waterproofing layer on rooftop applying moisture exhaust passage KR101606867B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020150115803A KR101606867B1 (en) 2015-08-18 2015-08-18 Method for repairing waterproofing layer on rooftop applying moisture exhaust passage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150115803A KR101606867B1 (en) 2015-08-18 2015-08-18 Method for repairing waterproofing layer on rooftop applying moisture exhaust passage

Publications (1)

Publication Number Publication Date
KR101606867B1 true KR101606867B1 (en) 2016-03-28

Family

ID=57007716

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020150115803A KR101606867B1 (en) 2015-08-18 2015-08-18 Method for repairing waterproofing layer on rooftop applying moisture exhaust passage

Country Status (1)

Country Link
KR (1) KR101606867B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101703553B1 (en) * 2016-11-17 2017-02-08 이필선 Vent structure for removing moisture of underground floor
KR102432040B1 (en) * 2021-08-24 2022-08-18 포에이시스템 주식회사 Drain infiltrating water structure of underground parking

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR870000649B1 (en) * 1984-04-27 1987-04-03 주식회사 코리아 코팅 엔지니어링 Water-proofing and insulation construction method for concrete floor
KR100945719B1 (en) * 2009-09-16 2010-03-05 창일건설(주) Structure of compound roof waterproof
KR20120107213A (en) * 2011-03-21 2012-10-02 박연진 Non exposure waterproof and the waterproof method
KR20150025652A (en) * 2013-08-29 2015-03-11 디씨텍건설주식회사 Waterproof structure for rooftop and constructing method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR870000649B1 (en) * 1984-04-27 1987-04-03 주식회사 코리아 코팅 엔지니어링 Water-proofing and insulation construction method for concrete floor
KR100945719B1 (en) * 2009-09-16 2010-03-05 창일건설(주) Structure of compound roof waterproof
KR20120107213A (en) * 2011-03-21 2012-10-02 박연진 Non exposure waterproof and the waterproof method
KR20150025652A (en) * 2013-08-29 2015-03-11 디씨텍건설주식회사 Waterproof structure for rooftop and constructing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101703553B1 (en) * 2016-11-17 2017-02-08 이필선 Vent structure for removing moisture of underground floor
KR102432040B1 (en) * 2021-08-24 2022-08-18 포에이시스템 주식회사 Drain infiltrating water structure of underground parking

Similar Documents

Publication Publication Date Title
US5845456A (en) Basement waterproofing
CN107060226A (en) A kind of construction method of planted roof construction
KR20090006398A (en) Roof waterproof system and constructing method thereof
KR101336807B1 (en) non exposure waterproof and the waterproof method
KR20180042683A (en) A floor construction method of noise reduction type underground parkinglot
CN104153521A (en) Roof waterproof structure and roof maintenance method
KR101606867B1 (en) Method for repairing waterproofing layer on rooftop applying moisture exhaust passage
KR200383509Y1 (en) Anti-dewing drain board
KR101595860B1 (en) Drying apparatus for Inside the floor rooftop
KR102277939B1 (en) Structure and construction Method of outer water and Exterior insulation Drainage plate on the roof plate roof
CN204252414U (en) Roof covering water-proof structure
KR101328678B1 (en) self-assembly roof garden
KR101502476B1 (en) Waterproof structure for rooftop
JP3560921B2 (en) Water leakage treatment method
CN108442649B (en) Ground structure capable of draining and seeping water in underground space and construction method thereof
KR101275273B1 (en) apparatus for draining subsurface water
KR102049494B1 (en) Roof leakage prevention structure and leakage prevention method
KR100661018B1 (en) Double floor type inducing waterproof system and green roof structure using the same
CN211473123U (en) A water repellent structure for roofing
CN212926518U (en) Water leakage prevention structure at deformation joint of outdoor balcony of building
CN109138467B (en) Water interception component and construction method thereof
KR20220000650A (en) Method for performing waterproof of the roof of a building
KR101654781B1 (en) Moisture exhaust induction waterproof system and method of the structure
CN110670418A (en) Ballastless track roadbed surface layer slurry turning and finishing method
KR101739747B1 (en) Repair Method for Floor Leak of Building Basement

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20190225

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20200310

Year of fee payment: 5