KR100386696B1 - Foundation concrete pouring method of building structure - Google Patents
Foundation concrete pouring method of building structure Download PDFInfo
- Publication number
- KR100386696B1 KR100386696B1 KR10-2001-0004394A KR20010004394A KR100386696B1 KR 100386696 B1 KR100386696 B1 KR 100386696B1 KR 20010004394 A KR20010004394 A KR 20010004394A KR 100386696 B1 KR100386696 B1 KR 100386696B1
- Authority
- KR
- South Korea
- Prior art keywords
- concrete
- ground
- foundation
- independent
- underground
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
- E02D29/05—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Abstract
본 발명의 목적은 독립기초와 지중보 바닥콘크리트를 동시에 타설하는 것에의해 공기를 단축시키고, 구조물의 강도를 증대시킬 수 있는 건축 구조물의 기초 콘크리트 타설공법을 제공하는데 있다.SUMMARY OF THE INVENTION An object of the present invention is to provide a foundation concrete pouring method for building structures that can shorten the air and increase the strength of the structure by simultaneously placing independent foundations and underground concrete floor concrete.
연약지반에 기초콘크리트를 형성하는 방법에 있어서, 지반을 굴착한 바닥면에 독립기초를 세우기 위한 다수의 파일을 박고, 그 파일들을 중심으로 바닥면에 독립기초들을 형성하기 위한 버림콘크리트를 타설한 후 양생하는 단계; 상기 독립기초 및 이들을 사방으로 연결하는 지중보용 거푸집을 버림콘크리트 상부에 설치하고, 상기 지중보용 거푸집 내면에 각목을 설치한 후 상기 각목 내면에 스치로폼을 대면하여 설치하는 단계; 상기 독립기초를 사방으로 연결하고 있는 지중보 내측으로 형성된 공간에 지반을 굴착한 흙을 되메움하는 단계; 상기 되메움된 흙의 표면에 필름을 깔고, 상기 필름상면에 버림콘크리트를 타설하여 양생한 후 상기 스치로폼을 지지하고 있는 거푸집들을 해체하는 단계; 상기 거푸집들을 해체한 후 독립기초, 지중보 및 상기 지중보사이에 형성된 공간을 되메움한 흙의 표면에 타설된 버림콘크리트 상면으로 철근들을 배근하는 단계; 및 상기 철근들을 배근한 후 상기 독립기초, 지중보 및 슬라브용 바닥콘크리트를 동시에 타설하여 양생하는 단계;를 포함하는 것을 특징으로 하는 건축 구조물의 기초콘크리트 타설공법을 제공한다.In the method of forming the foundation concrete on the soft ground, a plurality of piles for independence foundations are put on the ground where the ground is excavated, and after casting cast concrete for forming independent foundations on the ground Curing step; Installing the independent foundations and the underground beam formwork connecting them in all directions on the discarded concrete, and installing wood beams on the inner surface of the underground beam formwork and installing Schirofoam on the inner surface of the wood beams; Backfilling soil excavated with ground in a space formed inside the underground beams connecting the independent foundations in all directions; Laying a film on the surface of the backfilled soil and casting the discarded concrete on the film upper surface to cure and dismantle the formwork supporting the styrofoam; Dismantling the formwork and reinforcing the reinforcing bars to the top of the cast concrete placed on the surface of the soil backfilling the space formed between the independent foundation, the ground beam and the ground beam; And placing and curing the independent foundation, underground beam, and slab floor concrete at the same time after the reinforcement of the reinforcing bar, thereby providing a foundation concrete pouring method for a building structure.
Description
본 발명은 기초콘크리트 타설공법에 관한 것으로, 상세하게는 지반에 박힌 파일 상단에 지지되는 독립기초와 이 독립기초들을 연결하는 지중보를 형성하기 위한 바닥콘크리트를 일체식으로 시공함으로써 공기를 단축할 수 있는 건축구조물의기초콘크리트 타설공법에 관한 것이다.The present invention relates to a foundation concrete placing method, and in detail, it is possible to shorten the air by integrally constructing an independent foundation supported on the upper end of the pile embedded in the ground and a bottom concrete for forming a ground beam connecting the independent foundations. A concrete concrete pouring method of a building structure.
종래 기초콘크리트 타설공법은 도 4와 같이 지반을 굴착한 후 그 굴착면에 파일(21)을 박고 상기 파일(21)을 중심으로 1차버림콘크리트(22)를 타설하여 양생한 후 이 버림콘크리트(22) 상면에 독립기초(23)와 지중보(24)를 형성하기 위한 거푸집(25)을 설치한 후 철근들을 배근하고, 상기 버림콘크리트(22)가 양생된 독립기초(23)와 지중보(24)에 기초콘크리트(25)를 타설하여 양생한다.Conventional foundation concrete casting method is to excavate the ground as shown in Figure 4, and then put the pile 21 on the excavation surface and cast the primary cast concrete 22 around the pile 21 and cured the discarded concrete ( 22) After installing the formwork 25 for forming the independent foundation 23 and the underground beams 24 on the upper surface and reinforce the reinforcement, the independent concrete 23 and the underground beams cured by the discarded concrete 22 ( The base concrete 25 is poured and cured in 24).
이후 거푸집을 해체하고, 상기 독립기초(23)와 지중보(24)에 의해 형성된 공간에 지반을 굴착한 흙을 되메우기한 후 폴리에틸렌 필름(26)을 되메움한 면에 깔고 2차버림콘크리트(27)를 타설한다.After dismantling the formwork, backfilling the soil excavated in the space formed by the independent foundation (23) and the underground beams (24) and lay the polyethylene film 26 on the back-filled surface and the secondary cast concrete (27) Pour).
그리고 상기 기초콘크리트가 양생된 상면과 상기 2차버림콘크리트(27) 타설면에 철근을 배근한 후 바닥콘크리트(28;슬라브)를 타설하여 양생하는 것에 의해 지상구조물을 축조하기 위한 기초 콘크리트 작업을 완료하게 된다.And after reinforcing the reinforcing bar on the upper surface and the secondary cast concrete 27, the cured surface of the foundation concrete is completed by laying the bottom concrete (28; slab) to finish the ground concrete work to build the ground structure Done.
그러나 상기한 종래 기초콘크리트 작업에 의하면, 1차버림콘크리트를 타설한후 양생될 때 까지 수 일이 걸리고, 이후 독립기초를 형성하기 위해 설치되는 거푸집 내측으로 지반을 굴착한 흙을 되메움한 후 그 상면에 2차버림콘크리트를 타설한후 양생된 후 비로소 바닥콘크리트를 타설할 수 있기 때문에 1차버림콘크리트 타설및 양생시간과 2차버림콘크리트 타설 및 양생까지의 많은 기일이 소요되어 전체적인 공기가 길어지게 되고, 기초와 슬라브를 2회 나누워 타설하는 등 콘크리트를 몇일 사이에 끊어치기 때문에 구조물 강도가 약할 뿐만 아니라 지중보 사이에 흙을 되메우기 할 때 중장비 작업으로 미리 축조된 지중보에 악영향을 미칠 수 있다.However, according to the conventional basic concrete work described above, it takes several days to cure after casting the first cast concrete, and then backfilled the soil excavated with the ground inside the formwork is installed to form an independent foundation Since it is possible to pour the bottom concrete after curing after casting the second cast concrete on the upper surface, it takes a lot of time until the first cast concrete casting and curing and the second cast concrete casting and curing to make the overall air longer. In addition, the concrete is broken in a few days, such as casting the foundation and slabs twice, so that not only the strength of the structure is weak, but also the bad impact on the prefabricated ground beams by heavy equipment work when the soil is refilled between the ground beams.
본 발명의 목적은 독립기초와 지중보 바닥콘크리트를 동시에 타설하는 것에의해 공기를 단축시키고, 구조물의 강도를 증대시킬 수 있는 건축 구조물의 기초 콘크리트 타설공법을 제공하는데 있다.SUMMARY OF THE INVENTION An object of the present invention is to provide a foundation concrete pouring method for building structures that can shorten the air and increase the strength of the structure by simultaneously placing independent foundations and underground concrete floor concrete.
이러한 목적을 달성하기 위한 본 발명은 연약지반에 기초콘크리트를 형성하는 방법에 있어서, 지반을 굴착한 바닥면에 독립기초를 세우기 위한 다수의 파일을 박고, 그 파일들을 중심으로 상기 바닥면에 독립기초들을 형성하기 위한 버림콘크리트를 타설한 후 양생하는 단계; 상기 독립기초 및 이들을 사방으로 연결하는 지중보용 거푸집을 상기 버림콘크리트 상부에 설치하고, 상기 지중보용 거푸집 내면에 각목을 설치한 후 상기 각목 내면에 스치로폼을 대면하여 설치하는 단계; 상기 독립기초를 사방으로 연결하고 있는 지중보 내측으로 형성된 공간에 지반을 굴착한 흙을 되메움하는 단계; 상기 되메움된 흙의 표면에 필름을 깔고, 상기 필름상면에 버림콘크리트를 타설하여 양생한 후 상기 스치로폼을 지지하고 있는 거푸집들을 해체하는 단계; 상기 거푸집들을 해체한 후 독립기초, 지중보 및 상기 지중보사이에 형성된 공간을 되메움한 흙의 표면에 타설된 버림콘크리트 상면으로 철근들을 배근하는 단계; 및 상기 철근들을 배근한 후 상기 독립기초, 지중보 및 슬라브용 바닥콘크리트를 동시에 타설하여 양생하는 단계;를 포함하는 것을 특징으로 하는 건축 구조물의 기초콘크리트 타설공법.In order to achieve the above object, the present invention provides a method for forming a foundation concrete on a soft ground, and puts a plurality of piles for establishing an independent foundation on the ground surface excavated, independent foundation on the ground around the pile Curing after casting the discarded concrete for forming the sacks; Installing the independent foundation and the underground beam formwork connecting them in all directions on the discarded concrete upper surface, and installing woodwork on the inner surface of the underground beam formwork to face the styrofoam on the inner surface of the woodwork; Backfilling soil excavated with ground in a space formed inside the underground beams connecting the independent foundations in all directions; Laying a film on the surface of the backfilled soil and casting the discarded concrete on the film upper surface to cure and dismantle the formwork supporting the styrofoam; Dismantling the formwork and reinforcing the reinforcing bars to the top of the cast concrete placed on the surface of the soil backfilling the space formed between the independent foundation, the ground beam and the ground beam; And placing and curing the independent foundation, underground beam, and slab floor concrete at the same time after the reinforcement of the reinforcing bars.
또한 본 발명은 단단한 지반에 기초콘크리트를 형성하는 방법에 있어서, 지반을 굴착한 바닥면에 독립기초를 세우기 위한 다수의 파일을 박고, 그 파일들을중심으로 상기 바닥면에 독립기초들을 형성하기 위한 버림콘크리트 타설면 내측으로 각목을 설치하는 단계; 상기 독립기초 및 이들을 사방으로 연결하는 지중보용 거푸집을 상기 각목 상부에 설치하고, 상기 지중보용 거푸집 내면에 스치로폼을 대면하여 설치하는 단계; 상기 독립기초를 사방으로 연결하고 있는 지중보 내측으로 형성된 공간에 지반을 굴착한 흙을 되메움하는 단계; 상기 되메움된 흙의 표면에 필름을 깔고, 상기 필름상면과 상기 독립기초를 세우기 위한 상기 지중보용 거푸집 외측으로 동시에 버림콘크리트를 타설하여 양생한 후 상기 스치로폼을 지지하고 있는 거푸집들을 해체하는 단계; 상기 거푸집들을 해체한 후 독립기초, 지중보 및 상기 지중보사이에 형성된 공간을 되메움한 흙의 표면에 타설된 버림콘크리트 상면으로 철근들을 배근하는 단계; 및 상기 철근들을 배근한 후 상기 독립기초, 지중보 및 슬라브용 바닥콘크리트를 동시에 타설하여 양생하는 단계;를 포함하는 것을 특징으로 한다.In another aspect, the present invention is a method for forming a foundation concrete on a solid ground, and puts a plurality of piles for establishing an independent foundation on the ground surface excavated, and discarded to form independent foundations on the ground surface based on the piles Installing lumber to the inside of the concrete pouring surface; Installing the independent foundation and the formwork for underground beams connecting them in all directions on the upper corners of wood, and installing styrofoam on the inner surface of the formwork for underground beams; Backfilling soil excavated with ground in a space formed inside the underground beams connecting the independent foundations in all directions; Laying the film on the surface of the backfilled soil, and simultaneously disposing of the concrete to support the styrofoam after casting and discarding concrete to the outside of the underground beam formwork for establishing the film upper surface and the independent foundation; Dismantling the formwork and reinforcing the reinforcing bars to the top of the cast concrete placed on the surface of the soil backfilling the space formed between the independent foundation, the ground beam and the ground beam; And after placing the reinforcing bar and the step of pouring the concrete for the independent foundation, underground beams and slabs at the same time; curing.
이러한 기초 콘크리트 공법에 의하면, 기초콘크리트와 슬라브용 바닥콘크리트를 각각 타설하지 않고 동시에 타설할 수 있어 공기를 단축할 수 있을 뿐만 아니라 구조물 강도를 향상시킬 수 있다.According to such a foundation concrete method, it is possible to pour the foundation concrete and slab floor concrete simultaneously without pouring, respectively, can shorten the air and improve the strength of the structure.
도 1은 건축구조물의 기초콘크리트를 타설하기 이전 상태의 평면도,1 is a plan view of a state before placing the foundation concrete of the building structure,
도 2는 기초콘크리트를 타설한 후 도 1의 A-A선 방향에서 바라본 단면도,2 is a cross-sectional view taken from the direction of line A-A of FIG. 1 after placing the foundation concrete;
도 3은 본 발명의 다른 실시예를 보인 단면도,3 is a cross-sectional view showing another embodiment of the present invention;
도 4는 종래 기초콘크리트를 타설공법을 보인 단면도.Figure 4 is a cross-sectional view showing a conventional casting method for the foundation concrete.
*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *
11;파일 12;독립기초11; File 12; Independent Basis
13;버림콘크리트 14;거푸집13; cast concrete 14; formwork
15;각목 16;스치로폼15; corner 16; styrofoam
17;지중보 18;필름17; Media News 18; Film
19;바닥콘크리트19; floor concrete
이하, 본 공법의 바람직한 실시예를 첨부된 도면을 통해 설명한다. 도 1은 건축구조물의 기초콘크리트를 타설하기 이전 상태의 평면도이고, 도 2는 기초콘크리트를 타설한 후 도 1의 A-A선 방향에서 바라본 단면도이다.Hereinafter, preferred embodiments of the present method will be described with reference to the accompanying drawings. 1 is a plan view of a state before placing the foundation concrete of the building structure, Figure 2 is a cross-sectional view seen from the line A-A of Figure 1 after placing the foundation concrete.
도면을 참조하면, 건축구조물을 축조하기 위해서는 일정한 면적과 깊이로 굴착한 후 기초콘크리트를 타설하고, 그 상부에 지상구조물을 축조하게 되는데, 본 발명은 상기 기초콘크리트 타설공법을 개시하고자 하는 것으로, 바닥다지기, 독립기초, 지중보를 설치하고, 그 상부에 콘크리트를 타설하여 슬라브를 형성하게 된다.Referring to the drawings, in order to build a building structure is excavated to a certain area and depth and then the foundation concrete is poured, and the ground structure is built on top of the above, the present invention is to disclose the foundation concrete pouring method, the floor Slabs are formed by installing choppers, independent foundations, underground beams, and placing concrete on top of them.
이하, 본 발명의 실시예를 연약지반일 경우와 단단한 지반일 경우를 구분하여 설명한다.Hereinafter, the embodiments of the present invention will be described separately from the case of soft ground and the case of hard ground.
연약지반에 기초콘크리를 타설할 경우 본 발명에 따른 기초콘크리트 공법은 굴착된 지하 굴착면에 다수의 파일(11)들을 일정한 간격으로 박아 바닥을 다지게 되며, 이때 굴착면에 박힌 파일(11)들의 간격은 통상 독립기초(12)를 형성하기 위한 간격으로 배열하되, 그 파일(11)들을 중심으로 독립기초(12)를 형성하게 된다.When the foundation concrete is placed on the soft ground, the foundation concrete method according to the present invention drives a plurality of piles 11 at regular intervals on the excavated underground excavation surface to make the bottom, and at this time, the spacing of the piles 11 embedded in the excavation surface Are usually arranged at intervals to form the independent foundations 12, and form the independent foundations 12 around the piles 11.
독립기초(12)는 상기 파일(11)들을 중심으로 그 주변에 1차버림콘크리트(13)를 타설하여 양생한 상태에서 시공하게 되는데, 본 발명은 상기 1차버림콘크리트(13) 상면에 상기 독립기초(12) 및 이들을 사방으로 연결하는 지중보용 거푸집(14)을 설치하고, 상기 지중보용 거푸집(14) 내측면에 각목(15)을 밀착하여 설치한 후 그 각목(15) 외측면에 스치로폼(16)을 밀착하여 설치하되 상기 스치로폼(16)의 상면은 지중보용 거푸집(14)보다 하부에 위치되게 함으로써 2차버림콘크리트(13a)의 두께만큼 공간을 확보한 상태에서 지중보(17) 내측으로 형성된 공간에 지반을 굴착한 흙을 스치로폼(16)의 상면과 일치되게 되메움한다.The independent foundation 12 is constructed in the state of curing by casting the primary cast concrete 13 around the pile 11, the present invention is the independent cast on the upper surface of the primary cast concrete (13) The base 12 and the underground beam formwork 14 connecting them in all directions are installed, and the wood beam 15 is installed in close contact with the inner surface of the underground beam formwork 14 and then installed on the outer surface of the wood beam 15. The styrofoam 16 is installed in close contact, but the upper surface of the styrofoam 16 is positioned below the underground formwork 14 so that the space is secured by the thickness of the secondary cast concrete 13a. ) Backfilled soil to excavate the ground in the space formed inward to match the upper surface of the styrofoam (16).
여기서 상기 각목(15)은 그 높이가 대략 20mm정도 폭이 대략 50mm 정도이며, 길이는 지중보용 거푸집(14)과 동일한 길이를 갖거나 또는 분할하여 일정한 간격으로 설치하여도 좋다. 또한 상기 스치로폼(16)이 설치된 상태는 그 하부(15)가 각목의 폭만큼 상부와 경사각을 이루므로 비슷듬하게 설치되지만 그 기울기는 무시할 정도로 미세하다.Here, the bark 15 may have a height of about 20 mm and a width of about 50 mm, and the length may have the same length as that of the underground beam formwork 14 or may be divided and installed at regular intervals. In addition, the state in which the styrofoam 16 is installed is similarly installed because the lower part 15 forms an inclination angle with the upper part by the width of the lumber, but its inclination is minutely fine.
이후 되메움된 흙의 상면에 필름(18)을 깔고, 2차버림콘크리트(13a)를 타설하여 양생시킨 후 지중보용 거푸집(14)을 해체한다.Later, the film 18 is laid on the top surface of the backfilled soil, the secondary cast concrete 13a is poured and cured, and then the formwork 14 for underground beams is dismantled.
이와 같이 2차버림콘크리트(13a)가 양생된 후 지중보용 거푸집(14)을 해체하게 되며, 스치로폼(16) 상면까지 타설된 2차버림콘크리트(13a)의 하중에 의해 스치로폼(16)의 하부가 각목(15)의 내측면과 밀착되어 되메움한 흙의 횡력에 의해 밀리 지 않게 된다. 이 결과 상기 스치로폼(16)은 상면에 타설된 2차버림콘크리트(13a)에 의해 수직방향으로 지지되고 동시에 하부는 각목(15)에 의해 폭방향으로 지지되므로 되메움된 흙의 횡력에 대항할 수 있어 무너짐을 방지할 수 있다.After the secondary cast concrete 13a is cured, the underground formwork 14 is dismantled, and the lower portion of the styrofoam 16 is loaded by the secondary cast concrete 13a placed up to the upper surface of the styrofoam 16. Is in close contact with the inner surface of the lumber 15 is not pushed back by the lateral force of the soil backfilled. As a result, the styrofoam 16 is supported in the vertical direction by the secondary cast concrete 13a placed on the upper surface, and at the same time, the lower part is supported in the width direction by the lumber 15 so as to counter the lateral force of the backfilled soil. Can prevent the fall.
이후 1차버림콘크리트(13), 지중보(17) 및 상기 지중보(17) 사이에 되메움된흙의 상면으로 타설된 2차버림콘크리트(13a) 상면으로 철근들을 배근하고, 그 상방에서 상기 독립기초(12), 지중보(17)를 형성하기 위한 콘크리트 및 슬라브용 바닥콘크리트(19)를 동시에 타설함으로써 공기를 단축시킬 수 있다.Thereafter, the reinforcing bars are disposed on the upper surface of the secondary cast concrete 13a, which is poured into the upper surface of the backfilled soil between the primary cast concrete 13, the underground beams 17, and the underground beams 17, The air can be shortened by simultaneously placing the independent foundation 12 and the concrete for forming the ground beam 17 and the slab bottom concrete 19.
이하, 굴착면이 단단한 지반일 경우에 적용되는 본 발명의 다른 실시예를 도 3을 참조하여 설명한다.Hereinafter, another embodiment of the present invention applied when the excavation surface is a hard ground will be described with reference to FIG. 3.
단단한 지반에 기초콘크리를 타설할 경우 본 발명에 따른 기초콘크리트 공법은 굴착된 지하 바닥면에 다수의 파일(11)들을 일정한 간격으로 박아 바닥을 다지게 되며, 이때 굴착면에 박힌 파일(11)들의 간격은 통상 독립기초(12)를 형성하기위한 간격으로 배열하되, 그 파일(11)들을 중심으로 독립기초(12)를 형성하는 것은 연약지반과 동일하다.When the foundation concrete is laid on a solid ground, the foundation concrete method according to the present invention drives a plurality of piles 11 at regular intervals on the excavated basement floor, thereby compacting the floor, and the spacing of piles 11 embedded in the excavation surface. Are usually arranged at intervals to form the independent foundations 12, and forming the independent foundations 12 around the piles 11 is the same as the soft ground.
다만, 본 발명의 다른 실시예에서는 연약지반과 달리 독립기초(12)를 형성하기 위해 버림콘크리트를 타설하지 않은 상태에서 지중보(17)를 설치할 위치에 각목(15)을 사각형상으로 설치하고, 상기 각목(15) 상면에 지중보용 거푸집(14)을 설치한다. 여기서 각목(15)은 그 높이를 버림콘크리트(13)의 두께와 일치하는 대략 50mm 정도의 각목을 사용하되 건축물의 구조의 기초콘크리트의 설계에 따라 변경가능하므로 그 높이는 경우에 따라 변동될 수 있다.However, in another embodiment of the present invention, unlike the soft ground, in order to form the independent foundation 12, the wood box 15 is installed in a rectangular shape at the position where the underground beams 17 are to be installed without pouring concrete. The underground beam formwork 14 is installed on the upper surface of the wood board 15. Here, the lumber board 15 uses a lumber of about 50 mm corresponding to the thickness of the discarded concrete 13, but may be changed depending on the design of the foundation concrete of the structure of the building.
그리고, 상기 지중보용 거푸집(14) 내측면에 대면되게 스치로폼(16)을 설치하되 그 하면이 굴착면과 밀착되게 설치함으로써 스치로폼(16)의 하부 외측면이 각목(15)과 밀접되게 한다.Then, the styrofoam 16 is installed to face the inner surface of the formwork 14 for the ground beam, and the lower surface of the schirofoam 16 is installed to be in close contact with the lumber 15 by installing the lower surface in close contact with the excavation surface.
이러한 상태에서 지중보용 거푸집(14) 내측으로 형성된 공간에 지반을 굴착한 흙을 스치로폼(16)의 상면과 일치되게 되메움한 후 그 상면에 필름(18)을 깔고, 이후 독립기초(12)를 형성하기 위한 부분과 되메움한 흙의 상면에 버림콘크리트(13)를 동시에 타설하여 양생한 후 지중보용 거푸집(14)을 해체한다.In such a state, the soil excavated in the ground formed inside the underground formwork 14 is backfilled to match the upper surface of the styrofoam 16, and then the film 18 is laid on the upper surface thereof, and then the independent foundation 12 At the same time, cast concrete 13 on the upper surface of the part and backfilled soil to form a curing and then dismantle the formwork for underground beams (14).
이러한 방법에 의해 지중보용 거푸집(14)을 해체할 경우 스치로폼(16)은 상면에 타설된 버림콘크리트(13)에 의해 수직방향으로 지지되고 동시에 하부는 각목(15)에 의해 폭방향으로 지지되므로 되메움된 흙의 횡력에 대항할 수 있어 무너짐을 방지할 수 있다.When dismantling the ground beam formwork 14 by this method, the styrofoam 16 is supported in the vertical direction by the cast concrete 13 placed on the upper surface, and at the same time, the lower part is supported in the width direction by the timber 15. It can counter the lateral forces of the backfilled soil to prevent it from falling.
이후 독립기초(12), 지중보(17) 및 상기 지중보(17) 사이에 되메움된 흙 상면으로 타설된 버림콘크리트(13) 상면으로 철근들을 배근하고, 그 상방에서 상기 독립기초(12), 지중보(17)를 형성하기 위한 콘크리트 및 슬라브용 바닥콘크리트(19)를 동시에 타설하는 것은 실시예와 동일하다.After reinforcing the reinforcing bars to the upper surface of the discarded concrete (13), which is poured into the top surface of the soil backfilled between the independent foundation (12), underground beam (17) and the underground beam (17), the independent foundation (12) above In order to form the concrete beam 17 and the concrete slab bottom concrete 19 at the same time is the same as the embodiment.
상기한 실시예들을 이용한 기초콘크리트 타설공법에 의하면, 상기 지중보용거푸집(14)은 지중보의 성형공간을 형성함과 동시에 스치로폼(16)을 지지하기 위해 설치되는 것으로, 이 거푸집(14)은 지중보(17) 사이를 흙으로 되메움한 후 해체되지만 스치로폼(16)은 해체하지 않고 그대로 콘크리트를 타설하여 그 속에 매설된다.According to the foundation concrete placing method using the above embodiments, the underground beam formwork 14 is formed to support the styrofoam 16 at the same time to form the molding space of the underground beam, the formwork 14 is After dismantling the soil between the underground beams 17, the dismantled, but the Styrofoam 16 is poured into the concrete as it is without disassembly and buried therein.
다시말해 흙을 되메움한 후 상기 거푸집(14)만을 해체하고 스치로폼(16)을 해체하지 않을 경우 이 스치로폼(16)이 지중보 내측으로 되메움된 흙의 횡력에 대항함으로써 되메움된 흙의 무너짐을 방지하게 되는 것이다.In other words, if the mold 14 is only dismantled after the backfilling of the soil and the styrofoam 16 is not dismantled, the backfilling soil collapses by countering the lateral force of the soil backfilled into the underground beam. Will be prevented.
이 결과 종래와 같이 흙을 되메움하기 위해 콘크리트를 타설하고 양생하여 지중보를 축조했던 시간을 단축할 수 있어 그만큼 건축 공기를 단축할 수 있는 것이다.As a result, it is possible to shorten the time for constructing underground beams by placing and curing concrete to backfill the soil as in the prior art, thereby shortening the construction air.
종래의 방법에 의하면, 지중보를 콘크리트로 타설한 후 양생한 상태에서 흙을 되메움하기 때문에 중장비로 흙을 되메움할 때 구조물에 손상을 입힐 수 있을 뿐만 아니라 되메움 흙을 다질 때 작용하는 횡력에 의해 지중보가 파손될 염려가 있었던 것에 비해 본 발명은 지중보를 커푸집(14)과 스치로폼(16)만으로 형성한 후 흙을 되메움하기 때문에 지중보의 파손을 방지할 수 있다.According to the conventional method, since the soil is backfilled in the curing state after placing the concrete beam in concrete, not only can the structure be damaged when the soil is backfilled with heavy equipment, but also the lateral force acting when the backfill soil is compacted. In the present invention, since the ground beams may be damaged due to the formation of the ground beams only with the mold 14 and the styrofoam 16, the soil may be backfilled to prevent the ground beams from being damaged.
본 발명에 따른 기초콘크리트 타설공법에 의하면, 종래에는 독립기초와 지중보를 형성하기 위해 흙을 되메우기 전에 이들 콘크리트 구조물 형성해야 했지만 본 발명은 이것을 생략한 상태에서 흙을 되메우는 작업을 수행할 수 있고, 더욱이 슬라브용 콘크리트를 타설할 때 동시에 독립기초와 지중보도 같이 타설하기 때문에 종래 콘크리트를 끊어 쳤던 것에 비해 동시에 콘크리트를 타설하고 양생하므로 콘크리트 강도를 향상시킬 수 있다.According to the foundation concrete placing method according to the present invention, in the prior art, these concrete structures had to be formed before backfilling the soil to form the independent foundation and the underground beam, but the present invention can perform the operation of filling the soil in the state of omitting this. In addition, when placing concrete for slabs at the same time as the independent foundation and underground footpaths are placed together, compared with the conventional concrete was cut, at the same time to cast concrete and curing, thereby improving the concrete strength.
이상에서 설명한 바와 같이 본 발명은 종래 지중보를 형성하기 위한 콘크리트 작업을 생략한 상태에서 되메움 작업을 할 수 있어 공기를 단축시킬 수 있고, 또한 기초와 슬라브를 2회 나눠 타설했던 것이 1회 타설로 가능하기 때문에 끊어치지 않아 구조물 강도를 향상시킬 수 있다.As described above, the present invention can be backfilled in the state of omitting the concrete work to form the conventional underground beams, which can shorten the air, and in addition, once placed two times the foundation and slab It is possible to improve the strength of the structure because it is not broken.
더욱이 흙되메움시 중장비 작업으로 구조물에 악영향이 발생할 가능성을 배재함으로써 바닥 구조물의 강도를 높일 수 있다.In addition, the strength of the floor structure can be increased by eliminating the possibility of adverse effects on the structure by heavy equipment work during backfilling.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0004394A KR100386696B1 (en) | 2001-01-30 | 2001-01-30 | Foundation concrete pouring method of building structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0004394A KR100386696B1 (en) | 2001-01-30 | 2001-01-30 | Foundation concrete pouring method of building structure |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20010035267A KR20010035267A (en) | 2001-05-07 |
KR100386696B1 true KR100386696B1 (en) | 2003-06-09 |
Family
ID=19705114
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2001-0004394A KR100386696B1 (en) | 2001-01-30 | 2001-01-30 | Foundation concrete pouring method of building structure |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100386696B1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114809603B (en) * | 2022-04-29 | 2023-12-01 | 中铁城建集团第二工程有限公司 | Construction method for awning facing bare concrete of special-shaped structure of high-speed rail station house |
CN114934497A (en) * | 2022-06-30 | 2022-08-23 | 中国二十二冶集团有限公司 | Construction method of disc-buckle type scaffold plain soil tamped foundation |
-
2001
- 2001-01-30 KR KR10-2001-0004394A patent/KR100386696B1/en active IP Right Grant
Also Published As
Publication number | Publication date |
---|---|
KR20010035267A (en) | 2001-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6503025B1 (en) | Precast concrete beam element and methods of making and installing same | |
KR102159832B1 (en) | Construction method of basic construction of buildings | |
JP7232714B2 (en) | how to build a foundation | |
KR101838244B1 (en) | Cast-in-place reinforced top pile and construction method thereof | |
JP4042153B2 (en) | Construction method of wall formwork block and wall structure and underground structure | |
KR100386696B1 (en) | Foundation concrete pouring method of building structure | |
JPH05500249A (en) | Formwork for forming structural beams | |
JP2009046942A (en) | Foundation block for retaining wall | |
JP3173701B2 (en) | Basic structure of building and its construction method | |
JP2021123961A (en) | Construction method of pile head part reinforcement structure, and mold | |
JP3059058U (en) | Solid foundation structure with stabilizer | |
KR200224739Y1 (en) | continuous footing block of assembly type | |
JP7149924B2 (en) | Level plate and foundation construction method | |
KR101645511B1 (en) | Precast type integral imbutment bridge and construction methode thereof | |
JPH10299003A (en) | Foundation work using precast concrete member | |
JP6255607B2 (en) | Foundation construction method | |
JP4344733B2 (en) | Seismic reinforcement structure for existing pile foundation structures | |
JP2797066B2 (en) | Solid foundation method with stabilizer | |
JPS60341Y2 (en) | stacked block foundation frame | |
JPH03228921A (en) | Execution method for concrete foundation work | |
JP3401282B2 (en) | Construction method of soil between unit type buildings | |
JPH11350500A (en) | Foundation structure of building and foundation work method | |
JP3567387B2 (en) | How to build an underground skeleton | |
JPH07233534A (en) | Precast concrete foundation construction, precast concrete foundation, and construction method for foundation | |
JP2023016600A (en) | Retaining wall structure and method for constructing retaining wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130513 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20140515 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20160422 Year of fee payment: 14 |
|
FPAY | Annual fee payment |
Payment date: 20170523 Year of fee payment: 15 |
|
FPAY | Annual fee payment |
Payment date: 20180405 Year of fee payment: 16 |