KR102159832B1 - Construction method of basic construction of buildings - Google Patents

Construction method of basic construction of buildings Download PDF

Info

Publication number
KR102159832B1
KR102159832B1 KR1020200077076A KR20200077076A KR102159832B1 KR 102159832 B1 KR102159832 B1 KR 102159832B1 KR 1020200077076 A KR1020200077076 A KR 1020200077076A KR 20200077076 A KR20200077076 A KR 20200077076A KR 102159832 B1 KR102159832 B1 KR 102159832B1
Authority
KR
South Korea
Prior art keywords
unit
groove
coupling
protrusion
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020200077076A
Other languages
Korean (ko)
Inventor
최경래
백옥순
Original Assignee
최경래
백옥순
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최경래, 백옥순 filed Critical 최경래
Priority to KR1020200077076A priority Critical patent/KR102159832B1/en
Application granted granted Critical
Publication of KR102159832B1 publication Critical patent/KR102159832B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2450/00Gaskets
    • E02D2450/10Membranes
    • E02D2450/105Membranes impermeable
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Retaining Walls (AREA)

Abstract

According to one aspect of the present invention, a construction method of foundation construction of a building comprises: an excavating step; a tamping step of tamping the ground in which excavation is completed; a step of reinforcing a reinforcing bar after spreading rubble stones on the tamped ground; a step of installing a mold; and a step of placing and curing concrete to complete a foundation. Also, the construction method of foundation construction of a building comprises a step of installing earth retaining on a border of an excavation section before the excavating step. The step of installing earth retaining can comprise the following steps of: embedding columns in each edge of the border of the excavation section; and connecting a plurality of wall units between the columns adjacent to each other. Therefore, the construction method of foundation construction of a building can shorten a construction period.

Description

건축물의 기초공사 시공방법{Construction method of basic construction of buildings}Construction method of basic construction of buildings}

본 발명은 건축물의 기초공사 시공방법에 관한 것으로, 더욱 상세하게는 공기를 단축할 수 있는 건축물의 기초공사 시공방법에 관한 것이다.The present invention relates to a method for constructing a foundation for a building, and more particularly, to a method for constructing a foundation for a building capable of shortening the construction period.

기초공사란 구조물의 초석으로서 건축물 등의 구조물을 지반 위에 구축할 시 구조물의 자체 무게에 의한 수직방향의 하중과 지진, 바람 등이 구조물에 가하는 수평방향의 하중을 지반에 전달하기 위한 공작물을 형성하는 작업을 일컫는다.Foundation work is the foundation stone of a structure, and when a structure such as a building is built on the ground, it forms a work to transmit the vertical load by the structure's own weight and the horizontal load applied to the structure by earthquakes and winds. Refers to work.

일반적인 기초공사의 공사 단계는 먼저 기초 공사를 위한 터파기를 한 다음, 터파기한 지점의 흙을 다지고, 그 위에 잡석과 비닐을 깐 다음 그 위에 철근을 배설한다. 이후, 거푸집을 설치하고, 거푸집의 내측에 콘크리트를 타설하여 양생시킨 다음 그 위에 골조공사를 진행함으로써 이루어진다.In the general foundation construction stage, first digging for the foundation work is carried out, then the soil at the excavated site is compacted, rubble and vinyl are laid on it, and rebar is laid on it. Thereafter, the formwork is installed, concrete is poured into the inside of the formwork to cure it, and then frame work is performed on it.

특히, 터파기 작업 전에는 외벽이 무너지지 않도록 지반의 안정화 및 지하수의 차수를 목적으로 흙막이 공사가 선행된다.In particular, prior to the excavation work, soil barrier work is preceded for the purpose of stabilizing the ground and ordering groundwater so that the outer wall does not collapse.

종래의 흙막이 공사 기술은 터파기 공사를 하기 위한 구간의 테두리 부위에 H 빔을 매설한다.In the conventional earthbreaking construction technology, an H-beam is buried at the edge of a section for digging.

이때, H 빔과 인접한 다른 H 빔 사이에는 터파기 공사의 깊이와 동일한 높이를 갖는 다수개의 토류벽이 삽입되어 고정된다.At this time, between the H beam and other adjacent H beams, a plurality of earth walls having the same height as the depth of the excavation construction are inserted and fixed.

즉, 먼저 H 빔을 매설한 후 H 빔이 매설된 부위에 굴착작업을 시행한다.In other words, the H-beam is first buried, and then excavation is performed on the area where the H-beam is buried.

이후, 굴착작업을 통해 외부로 나타나는 H 빔과 인접한 다른 H 빔 사이에 소정길이를 갖는 다수개의 토류벽을 굴착작업이 진행됨에 따라 순차적으로 적층 및 삽입하여 설치한다.Thereafter, a plurality of earth walls having a predetermined length between the H beam appearing to the outside through the excavation operation and other adjacent H beams are sequentially stacked and inserted and installed as the excavation operation proceeds.

이에 따라, H 빔과 인접한 다른 H 빔 사이에 설치된 토류벽에 의해 절토부의 흙이 무너져 내리는 것을 방지함과 아울러 지하수가 유입되는 것을 사전에 방지할 수 있게 된다.Accordingly, it is possible to prevent the soil from collapsing in the cut section from collapsing by the earth wall installed between the H beam and another H beam adjacent to the H beam, and to prevent inflow of groundwater in advance.

그러나 이런 종래의 기술은 기초 흙막이 구조는 토류벽을 양측에서 지지하기 위한 많은 수의 H 빔을 다수 개 박아 고정하는 항타 작업이 많아 항타기의 이동을 위한 넓은 이동공간이 먼저 확보되어야 하는 등의 많은 예비작업이 선행되어야 하므로 작업시간이 많이 소요되는 문제점이 있었다.However, in this conventional technology, the basic earth protection structure is a lot of preliminary work, such as a large number of driving operations in which a large number of H beams to support the earth wall from both sides are mounted and fixed, so that a large moving space for the movement of the driving machine must be secured first. Since this has to be preceded, there is a problem that it takes a lot of work time.

대한민국 등록특허공보 제10-0583939호(2006.05.26)Korean Registered Patent Publication No. 10-0583939 (2006.05.26)

본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로, 본 발명의 목적은 공기를 단축할 수 있는 건축물의 기초공사 시공방법을 제공하는 것이다.The present invention was conceived to solve the above problems, and an object of the present invention is to provide a method for constructing a foundation construction of a building that can shorten the time period.

상기와 같은 목적을 달성하기 위한 본 발명의 일 실시 예에 따른 건축물의 기초공사 시공방법은 터파기 단계와, 터파기가 완료된 지면을 다지는 다짐 단계와, 다져진 지면 위에 잡석을 깐 후 철근을 배근하는 단계와, 거푸집을 설치하는 단계와, 콘크리트를 타설 및 양생하여 기초를 완성하는 단계를 구비하고, 상기 터파기 단계 이전에는 터파기 구간의 테두리에 흙막이 설치 단계가 구비되고, 상기 흙막이 설치 단계는 터파기 구간 테두리의 각 모서리에 지주를 매설하는 단계와, 서로 이웃하는 지주 사이에 다수의 벽 유닛을 연결하는 단계를 구비할 수 있다.A method of constructing a foundation for a building according to an embodiment of the present invention for achieving the above object includes the steps of digging, compacting the ground on which the excavation has been completed, and reinforcing rebar after placing rubble on the ground Wow, installing a formwork, and pouring and curing concrete to complete the foundation, and prior to the digging step, a digging step is provided at the rim of the digging section, and the digging step is It may include a step of embedding a post in each corner of the section border, and a step of connecting a plurality of wall units between the adjacent posts.

상기 터파기 구간 테두리의 각 모서리에 지주를 매설하는 단계는 상기 지주의 상단에 위치하는 결합체가 지면상에 노출되도록 상기 지주의 하단에 위치하는 쐐기를 지면에 삽입하는 단계를 구비하고, 상기 결합체는 사각형태의 제1 본체와, 상기 제1 본체의 일면에 형성되는 제1 결합부위와, 상기 제1 결합부위와 수직을 형성하도록 상기 제1 본체의 타면에 형성되는 제2 결합부위를 구비하고, 상기 제1 결합부위는 상기 제1 본체의 일면 일측에 구비되는 제1 결합홈과, 상기 제1 결합홈과 나란히 위치하는 제1 결합돌기와, 상기 제1 결합홈보다 크게 형성되어 상기 제1 결합돌기와 나란히 위치하는 제2 결합홈과, 상기 제1 결합돌기와 동일한 형태 및 길이로 상기 제2 결합홈과 나란히 위치하는 제2 결합돌기를 구비하고, 상기 제2 결합부위는 상기 제1 본체의 타면 일측에 구비되는 제3 결합홈과, 상기 제3 결합홈과 나란히 위치하는 제3 결합돌기와, 상기 제3 결합홈보다 크게 형성되어 상기 제3 결합돌기와 나란히 위치하는 제4 결합홈과, 상기 제3 결합돌기와 동일한 형태 및 길이로 상기 제4 결합홈과 나란히 위치하는 제4 결합돌기를 구비할 수 있다.The step of embedding the posts at each corner of the edge of the digging section includes the step of inserting a wedge located at the lower end of the post into the ground so that the assembly located at the upper end of the post is exposed on the ground, and the assembly A first body having a rectangular shape, a first coupling portion formed on one surface of the first body, and a second coupling portion formed on the other surface of the first body so as to form perpendicular to the first coupling portion, The first coupling portion has a first coupling groove provided on one side of one surface of the first body, a first coupling protrusion positioned parallel to the first coupling groove, and is formed larger than the first coupling groove so that the first coupling protrusion and A second coupling groove positioned side by side, and a second coupling protrusion positioned parallel to the second coupling groove in the same shape and length as the first coupling projection, and the second coupling portion is on one side of the other surface of the first body. A third coupling groove provided, a third coupling protrusion positioned parallel to the third coupling groove, a fourth coupling groove formed larger than the third coupling groove and positioned parallel to the third coupling protrusion, and the third coupling protrusion It may be provided with a fourth coupling protrusion positioned parallel to the fourth coupling groove in the same shape and length.

상기 서로 이웃하는 지주 사이에 다수의 벽 유닛을 연결하는 단계는 상기 지주에 상기 벽 유닛을 연결하여 적층하는 단계와, 상기 지주에 연결된 상기 벽 유닛에 또 다른 벽 유닛을 연결하여 적층하는 단계를 구비하고, 상기 벽 유닛은 사각형태의 제2 본체와, 상기 제2 본체의 일면에 형성되는 제3 결합부위와 상기 제1 결합부위와 대응되도록 상기 제2 본체의 타면에 형성되는 제4 결합부위를 구비하고, 상기 제3 결합부위는 상기 제2 본체의 일면 일측에 구비되는 제1 유닛홈과, 상기 제1 유닛홈과 나란히 위치하는 제1 유닛돌기와, 상기 제1 유닛홈보다 크게 형성되어 상기 제1 유닛돌기와 나란히 위치하는 제2 유닛홈과, 상기 제1 유닛돌기와 동일한 형태 및 길이로 상기 제2 유닛홈과 나란히 위치하는 제2 유닛돌기를 구비하고. 상기 제4 결합부위는 상기 제2 본체의 타면 일측에 구비되는 제3 유닛홈과, 상기 제3 유닛홈과 나란히 위치하는 제3 유닛돌기와, 상기 제3 유닛홈보다 크게 형성되어 상기 제3 유닛돌기와 나란히 위치하는 제4 유닛홈과, 상기 제3 유닛돌기와 동일한 형태 및 길이로 상기 제4 유닛홈과 나란히 위치하는 제4 유닛돌기를 구비할 수 있다.The step of connecting a plurality of wall units between adjacent posts includes the steps of connecting and stacking the wall units to the posts, and connecting and stacking another wall unit to the wall units connected to the posts. And, the wall unit includes a second body in a rectangular shape, a third coupling portion formed on one surface of the second body, and a fourth coupling portion formed on the other surface of the second body so as to correspond to the first coupling portion. And the third coupling portion includes a first unit groove provided on one side of one surface of the second body, a first unit protrusion disposed parallel to the first unit groove, and the first unit groove is formed larger than the first unit groove. And a second unit groove disposed parallel to the first unit protrusion, and a second unit protrusion disposed parallel to the second unit groove in the same shape and length as the first unit protrusion. The fourth coupling portion includes a third unit groove provided on one side of the other surface of the second body, a third unit protrusion disposed parallel to the third unit groove, and a third unit protrusion formed larger than the third unit groove, A fourth unit groove disposed side by side and a fourth unit protrusion disposed side by side with the fourth unit groove having the same shape and length as the third unit protrusion may be provided.

상기 지주에 상기 벽 유닛을 연결하여 적층하는 단계는 상기 지주와 상기 벽 유닛을 일체화하는 단계를 구비하고, 상기 지주에 연결된 상기 벽 유닛에 또 다른 벽 유닛을 연결하여 적층하는 단계는 다수의 벽 유닛을 일체화하는 단계를 구비하고, 상기 지주의 상기 제2 결합홈과 상기 제4 결합홈에는 일 향으로 길게 형성된 제1 삽입홈이 형성되고, 상기 벽 유닛의 상기 제2 유닛홈과 상기 제4 유닛홈에는 일 방향으로 길게 형성되는 제2 삽입홈이 형성되고. 결합 된 상기 지주와 상기 벽 유닛에는 상기 제1 본체, 상기 제1 결합돌기, 상기 제2 본체 및 상기 제2 유닛돌기에 의해 둘러싸인 제1 내부공간이 형성되고, 상기 제1 내부공간에는 양단이 상기 제1 삽입홈과 상기 제2 삽입홈에 각각 삽입되어 상기 지주와 상기 벽 유닛을 일체화하는 제1 체결바가 구비되고, 좌우로 결합 된 한 쌍의 상기 벽 유닛에는 한 쌍의 제2 본체, 상기 제1 유닛돌기 및 상기 제2 유닛돌기에 의해 둘러싸인 제2 내부공간이 형성되고, 상기 제2 내부공간에는 양단이 서로 마주보는 한 쌍의 상기 제2 삽입홈에 각각 삽입되어 한 쌍의 상기 벽 유닛을 일체화하는 제2 체결바가 구비될 수 있다.The step of connecting and laminating the wall unit to the post includes the step of integrating the post and the wall unit, and the step of connecting and stacking another wall unit to the wall unit connected to the post includes a plurality of wall units A step of integrating, wherein a first insertion groove formed long in one direction is formed in the second coupling groove and the fourth coupling groove of the post, and the second unit groove and the fourth unit of the wall unit The groove is formed with a second insertion groove that is elongated in one direction. The combined post and the wall unit have a first inner space surrounded by the first body, the first coupling protrusion, the second main body and the second unit protrusion, and the first inner space has both ends of the A first fastening bar is provided which is respectively inserted into the first insertion groove and the second insertion groove to unify the post and the wall unit, and a pair of the wall units coupled to the left and right includes a pair of second bodies and the second body. A second inner space surrounded by the first unit protrusion and the second unit protrusion is formed, and in the second inner space, both ends are inserted into a pair of second insertion grooves facing each other to form a pair of wall units. A second fastening bar to be integrated may be provided.

상기 다수의 벽 유닛을 일체화하는 단계 이후에는 상기 벽 유닛에 토류판을 설치하는 단계가 구비되고, 상기 토류판은 상기 벽 유닛의 터파기 측 일면에 구비되어 다수의 상기 벽 유닛을 가리는 판재와, 상기 판재와 대응되도록 상기 벽 유닛의 타면에서 상기 판재 방향으로 삽입되어 상기 판재를 상기 벽 유닛에 고정하는 고정부재를 구비하고, 상기 고정부재는 상기 제1 유닛돌기 내지 상기 제4 유닛돌기 및 상기 제2 체결바를 관통하여 일단이 상기 판재와 결합하는 몸통부와, 상기 몸통부의 타단에 구비되어 상기 몸통부가 일정길이 이상 삽입되는 것을 방지하는 머리부를 구비하고, 상기 제1 유닛돌기 내지 상기 제4 유닛돌기 및 상기 제2 체결바는 상기 몸통부가 관통하는 관통홀을 각각 구비할 수 있다.After the step of integrating the plurality of wall units, a step of installing an earth plate on the wall unit is provided, and the earth plate is provided on one surface of the wall unit on the digger side to cover the plurality of wall units, and the plate member And a fixing member that is inserted in the direction of the plate from the other surface of the wall unit so as to correspond to and fixes the plate to the wall unit, and the fixing member includes the first unit protrusion to the fourth unit protrusion and the second fastening The first to fourth unit protrusions and the first unit protrusions to the fourth unit protrusions include a body portion penetrating the bar and having one end coupled to the plate material, and a head provided at the other end of the body portion to prevent insertion of the body portion over a predetermined length. The second fastening bar may each have a through hole through which the body portion passes.

본 발명의 따른 건축물의 기초공사 시공방법에 의하면, 공기를 단축할 수 있다.According to the method of constructing a foundation for a building according to the present invention, the construction period can be shortened.

도 1 및 도 2는 본 발명의 일 실시 예에 따른 건축물의 기초공사 시공방법을 나타낸 순서도.
도 3은 도 1 및 도 2에 도시된 지주와 벽 유닛이 설치된 모습을 나타낸 사시도.
도 4 및 도 5 는 도 2에 도시된 지주와 벽 유닛을 나타낸 도면.
도 6은 도 5에 도시된 벽 유닛에 토류판이 설치된 모습을 나타낸 도면.
1 and 2 are flow charts showing a method of constructing a foundation for a building according to an embodiment of the present invention.
3 is a perspective view showing a state in which the post and the wall unit shown in FIGS. 1 and 2 are installed.
4 and 5 are views showing the post and the wall unit shown in FIG. 2.
6 is a view showing a state in which the earth plate is installed in the wall unit shown in FIG. 5.

이하에서는 첨부된 도면을 참조하여 본 발명의 일 실시 예에 따른 건축물의 기초공사 시공방법에 대해 상세히 설명한다.Hereinafter, a method of constructing a foundation for a building according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 1 및 도 2는 본 발명의 일 실시 예에 따른 건축물의 기초공사 시공방법을 나타낸 순서도이고, 도 3은 도 1 및 도 2에 도시된 지주와 벽 유닛이 설치된 모습을 나타낸 사시도이다.1 and 2 are flow charts showing a method of constructing a foundation for a building according to an embodiment of the present invention, and FIG. 3 is a perspective view showing a state in which the posts and wall units shown in FIGS. 1 and 2 are installed.

도 1 내지 도 3을 참조하면, 본 발명의 일 실시 예에 따른 건축물의 기초공사 시공방법은 터파기 단계(S120), 터파기가 완료된 지면을 다지는 다짐 단계(S130), 다져진 지면 위에 잡석을 깐 후 철근을 배근하는 단계(S140), 거푸집을 설치하는 단계(S150) 및 콘크리트를 타설 및 양생하여 기초를 완성하는 단계(S160)를 구비할 수 있다.1 to 3, the method of constructing a foundation for a building according to an embodiment of the present invention includes the excavation step (S120), the compaction step (S130) of compacting the ground where the excavation is completed, and after spreading rubble on the ground It may include a step of reinforcing reinforcement (S140), a step of installing a formwork (S150), and a step (S160) of completing the foundation by pouring and curing concrete.

그리고 터파기 단계(S120) 이전에는 터파기 작업중이나 후에 터파기 주변 토사 또는 사면이 무너지는 것을 방지하기 위해 터파기 구간의 테두리에 흙막이 설치 단계(S110)가 구비될 수 있다.In addition, prior to the digging step (S120), a soil barrier installation step (S110) may be provided on the edge of the digging section in order to prevent the soil or slope around the dug from collapsing during or after the digging operation.

여기서, 흙막이 설치 단계(S110)는 터파기 구간 테두리의 각 모서리에 지주(100)를 매설하는 단계(S111)와 서로 이웃하는 지주(100) 사이에 다수의 벽 유닛(200)을 연결하는 단계(S112)를 구비할 수 있다.Here, the installation step (S110) is a step (S111) of embedding the struts 100 in each corner of the rim of the excavation section and the step of connecting a plurality of wall units 200 between the struts 100 adjacent to each other ( S112) may be provided.

터파기 구간 테두리의 각 모서리에 지주(100)를 매설하는 단계(S111)는 지주(100)의 상단에 위치하는 결합체(100a)가 지면상에 노출되도록 지주(100)의 하단에 위치하는 쐐기(100b)를 지면에 삽입하는 단계(S111a)를 구비하고, 서로 이웃하는 지주(100) 사이에 다수의 벽 유닛(200)을 연결하는 단계(S112)는 지주(100)에 벽 유닛(200)을 연결하여 적층하는 단계(S112a)와 지주(100)에 연결된 벽 유닛(200)에 또 다른 벽 유닛(200)을 연결하여 적층하는 단계(S112b)를 구비할 수 있다.The step (S111) of embedding the strut 100 in each corner of the rim of the excavation section is a wedge located at the bottom of the strut 100 so that the assembly 100a located at the top of the strut 100 is exposed on the ground ( In the step of inserting 100b) into the ground (S111a), and connecting a plurality of wall units 200 between the adjacent posts 100 (S112), the wall unit 200 is attached to the post 100 A step of connecting and stacking (S112a) and a step of connecting and stacking another wall unit 200 to the wall unit 200 connected to the post 100 (S112b) may be provided.

지주(100)는 터파기 구간 테두리의 각 모서리에 고정되어 흙막이의 기둥 역할을 하고, 다수의 벽 유닛(200)은 지주(100)와 지주(100) 사이에 구비되어 흙막이의 벽 역할을 할 수 있다.The post 100 is fixed to each corner of the rim of the excavation section to serve as a pillar of the earthen guard, and a plurality of wall units 200 are provided between the support 100 and the support 100 to serve as a wall of the earthen guard. have.

한편, 지주(100)에 벽 유닛(200)을 연결하여 적층하는 단계(S112a)는 지주(100)와 벽 유닛(200)을 일체화하는 단계(S112c)를 구비하고, 지주(100)에 연결된 벽 유닛(200)에 또 다른 벽 유닛(200)을 연결하여 적층하는 단계(S112b)는 다수의 벽 유닛(200)을 일체화하는 단계(S112d)를 구비할 수 있다.On the other hand, the step (S112a) of connecting and stacking the wall unit 200 to the post 100 includes a step (S112c) of integrating the post 100 and the wall unit 200, and the wall connected to the post 100 The step (S112b) of connecting and stacking another wall unit (200) to the unit (200) may include a step (S112d) of integrating the plurality of wall units (200).

상기의 단계를 통해 지주(100)와 지주(100)에 연결된 벽 유닛(200)의 결합력과 서로 연결된 벽 유닛(200) 간의 결합력을 높이는 효과를 발휘할 수 있다.Through the above steps, it is possible to exert an effect of increasing the bonding force between the pillars 100 and the wall units 200 connected to the pillars 100 and the wall units 200 connected to each other.

그리고 다수의 벽 유닛(200)을 일체화하는 단계(S112d) 이후에는 벽 유닛(200)에 토류판(700)을 설치하는 단계(S112e)가 구비될 수 있다.In addition, after the step of integrating the plurality of wall units 200 (S112d), a step (S112e) of installing the earth plate 700 to the wall unit 200 may be provided.

토류판(700)은 터파기가 이루어지는 지면 방향의 벽 유닛(200) 일면에 설치되며, 터파기 작업 시 사용되는 각종 장비 등에 의해 벽 유닛(200)에 충격이 직접적으로 전달되는 것을 방지하는 역할을 할 수 있다.The earth plate 700 is installed on one surface of the wall unit 200 in the direction of the ground where the excavation is made, and can play a role of preventing direct transmission of impact to the wall unit 200 by various equipment used during the digging operation. have.

다음은 본 발명의 일 실시 예에 따른 터파기 구간의 테두리에 흙막이 설치 단계(S110)에 사용되는 지주(100)와 벽 유닛(200)에 대해 자세히 살펴보도록 한다. 이하의 설명에서는 상술한 실시 예와 서로 다른 부분만을 상세하게 설명하며 동일하거나 극히 유사한 부분에 대해서는 상세한 설명을 생략한다.The following will take a closer look at the pillar 100 and the wall unit 200 used in the installation step (S110) of the earthen barrier on the rim of the dug section according to an embodiment of the present invention. In the following description, only parts different from those of the above-described embodiment will be described in detail, and detailed descriptions of the same or extremely similar parts will be omitted.

도 4 및 도 5 는 도 2에 도시된 지주와 벽 유닛을 나타낸 도면이다.4 and 5 are views showing the post and the wall unit shown in FIG. 2.

도 1 내지 도 5를 참조하면, 본 발명의 일 실시 예에 따른 건축물의 기초공사 시공방법은 터파기 구간의 테두리에 흙막이 설치 단계(S110), 터파기 단계(S120), 터파기가 완료된 지면을 다지는 다짐 단계(S130), 다져진 지면 위에 잡석을 깐 후 철근을 배근하는 단계(S140), 거푸집을 설치하는 단계(S150) 및 콘크리트를 타설 및 양생하여 기초를 완성하는 단계(S160)를 구비할 수 있다.1 to 5, the method of constructing a foundation for a building according to an embodiment of the present invention includes the installation step (S110), the excavation step (S120), and the ground where the excavation is completed. A compaction step (S130), a step (S140) of reinforcing reinforcement after placing rubble on the ground (S140), a step of installing a formwork (S150), and a step (S160) of completing the foundation by pouring and curing concrete .

그리고 흙막이 설치 단계(S110)는 터파기 구간 테두리의 각 모서리에 지주를 매설하는 단계(S111)와 서로 이웃하는 지주 사이에 다수의 벽 유닛(200)을 연결하는 단계(S112)를 구비할 수 있다.In addition, the installation step (S110) may include a step (S111) of embedding a post in each corner of the rim of the excavation section and a step (S112) of connecting a plurality of wall units 200 between adjacent posts. .

한편, 흙막이 설치 단계(S110)에서의 지주는 결합체(100a)와 쐐기(100b)를 구비할 수 있다.On the other hand, the support in the installation step (S110) of the soil barrier may be provided with a combination (100a) and a wedge (100b).

결합체(100a)는 지주의 상단을 형성하여 지면상에 노출되고, 쐐기(100b)는 지주의 하단을 형성하여 지면에 삽입되어 결합체(100a)가 지면상에 노출된 상태로 자립하도록 할 수 있다.The assembly 100a forms the upper end of the post and is exposed on the ground, and the wedge 100b forms the lower end of the post and is inserted into the ground so that the assembly 100a can be self-standing while being exposed on the ground.

그리고 결합체(100a)는 지면상에 노출되어 수직을 이루는 두 면에 벽 유닛(200)이 각각 연결될 수 있다.In addition, the wall unit 200 may be connected to two vertical surfaces of the assembly 100a exposed on the ground.

이를 위해, 결합체(100a)는 제1 본체(110), 제1 결합부위(120) 및 제2 결합부위(130)를 구비할 수 있다.To this end, the coupling body 100a may include a first body 110, a first coupling portion 120, and a second coupling portion 130.

제1 본체(110)는 사각형태로 형성되어 상하방향으로 길게 구비될 수 있다.The first body 110 may be formed in a rectangular shape and may be elongated in the vertical direction.

제1 결합부위(120)는 제1 본체(110)의 일면에 형성되며, 제1 본체(110)의 일면 일측에 구비되는 제1 결합홈(121), 제1 결합홈(121)과 나란히 위치하는 제1 결합돌기(122), 제1 결합돌기(122)와 나란히 위치하는 제2 결합홈(123) 및 제2 결합홈(123)과 나란히 위치하는 제2 결합돌기(124)를 구비할 수 있다.The first coupling portion 120 is formed on one surface of the first body 110 and is positioned parallel to the first coupling groove 121 and the first coupling groove 121 provided on one side of the first body 110 A first coupling protrusion 122, a second coupling groove 123 positioned in parallel with the first coupling protrusion 122, and a second coupling protrusion 124 positioned in parallel with the second coupling groove 123 may be provided. have.

여기서, 제2 결합홈(123)은 제1 결합홈(121)보다 두 배로 크게 형성되고, 제1 결합돌기(122)와 제2 결합돌기(124)는 서로 동일한 형태와 길이로 구비될 수 있다.Here, the second coupling groove 123 is formed twice as large as the first coupling groove 121, and the first coupling protrusion 122 and the second coupling protrusion 124 may be provided with the same shape and length. .

제2 결합부위(130)는 제1 결합부위(120)와 수직을 형성하도록 제1 본체(110)의 타면에 형성되며, 제1 본체(110)의 타면 일측에 구비되는 제3 결합홈(131), 제3 결합홈(131)과 나란히 위치하는 제3 결합돌기(132), 제3 결합돌기(132)와 나란히 위치하는 제4 결합홈(133) 및 제4 결합홈(133)과 나란히 위치하는 제4 결합돌기(134)를 구비할 수 있다.The second coupling portion 130 is formed on the other surface of the first body 110 so as to form perpendicular to the first coupling portion 120, and a third coupling groove 131 provided on one side of the other surface of the first body 110 ), the third coupling protrusion 132 positioned in parallel with the third coupling groove 131, the fourth coupling groove 133 positioned in parallel with the third coupling protrusion 132 and the fourth coupling groove 133 positioned in parallel A fourth coupling protrusion 134 may be provided.

여기서, 제4 결합홈(133)은 제3 결합홈(131)보다 두 배로 크게 형성되고, 제3 결합돌기(132)와 제4 결합돌기(134)는 서로 동일한 형태와 길이로 구비될 수 있다.Here, the fourth coupling groove 133 is formed twice as large as the third coupling groove 131, and the third coupling protrusion 132 and the fourth coupling protrusion 134 may be provided with the same shape and length. .

한편, 흙막이 설치 단계(S110)에서의 벽 유닛(200)은 블록형태로 제작되며, 제2 본체(210), 제3 결합부위(220) 및 제4 결합부위(230)를 구비할 수 있다.On the other hand, the wall unit 200 in the earth protection installation step (S110) is manufactured in a block shape, and may include a second body 210, a third coupling portion 220 and a fourth coupling portion 230.

제2 본체(210)는 제1 본체(110)와 마찬가지로 사각형태로 구비될 수 있다.Like the first body 110, the second body 210 may be provided in a rectangular shape.

제3 결합부위(220)는 제2 본체(210)의 일면에 형성되며, 제2 본체(210)의 일면 일측에 구비되는 제1 유닛홈(221), 제1 유닛홈(221)과 나란히 위치하는 제1 유닛돌기(222), 제1 유닛돌기(222)와 나란히 위치하는 제2 유닛홈(223) 및 제2 유닛홈(223)과 나란히 위치하는 제2 유닛돌기(224)를 구비할 수 있다.The third coupling portion 220 is formed on one surface of the second body 210 and is positioned parallel to the first unit groove 221 and the first unit groove 221 provided on one side of the second body 210 A first unit protrusion 222, a second unit groove 223 positioned in parallel with the first unit protrusion 222, and a second unit protrusion 224 positioned in parallel with the second unit groove 223 may be provided. have.

여기서, 제2 유닛홈(223)은 제1 유닛홈(221)보다 두 배로 크게 형성되고, 제1 유닛돌기(222)와 제2 유닛돌기(224)는 서로 동일한 형태와 길이로 구비될 수 있다.Here, the second unit groove 223 is formed twice as large as the first unit groove 221, and the first unit protrusion 222 and the second unit protrusion 224 may be provided with the same shape and length. .

제4 결합부위(230)는 제3 결합부위(220)와 수직을 형성하도록 제2 본체(210)의 타면에 형성되며, 제2 본체(210)의 타면 일측에 구비되는 제3 유닛홈(231), 제3 유닛홈(231)과 나란히 위치하는 제3 유닛돌기(232), 제3 유닛돌기(232)와 나란히 위치하는 제4 유닛홈(233) 및 제4 유닛홈(233)과 나란히 위치하는 제4 유닛돌기(234)를 구비할 수 있다.The fourth coupling portion 230 is formed on the other surface of the second body 210 so as to form perpendicular to the third coupling portion 220, and a third unit groove 231 provided on one side of the other surface of the second body 210 ), the third unit protrusion 232 positioned parallel to the third unit groove 231, the fourth unit groove 233 positioned parallel to the third unit protrusion 232, and the fourth unit groove 233 A fourth unit protrusion 234 may be provided.

여기서, 제4 유닛홈(233)은 제3 유닛홈(231)보다 두 배로 크게 형성되고, 제3 유닛돌기(232)와 제4 유닛돌기(234)는 서로 동일한 형태와 길이로 구비될 수 있다.Here, the fourth unit groove 233 is formed twice as large as the third unit groove 231, and the third unit protrusion 232 and the fourth unit protrusion 234 may be provided with the same shape and length. .

그리고 벽 유닛(200)의 제3 결합부위(220)는 이웃하는 또 다른 벽 유닛(200)의 제4 결합부위(230)와 결합하고, 제4 결합부위(230)는 결합체(100a)의 제1 결합부위(120), 제2 결합부위(130) 또는 이웃하는 또 다른 벽 유닛(200)의 제3 결합부위(220)와 결합할 수 있다.And the third coupling portion 220 of the wall unit 200 is coupled with the fourth coupling portion 230 of another neighboring wall unit 200, and the fourth coupling portion 230 is the first coupling body 100a. It may be combined with the first coupling portion 120, the second coupling portion 130, or the third coupling portion 220 of another adjacent wall unit 200.

한편, 지주의 제2 결합홈(123)과 제4 결합홈(133)에는 일 방향으로 길게 형성된 제1 삽입홈(134)이 형성되고, 벽 유닛(200)의 제2 유닛홈(223)과 제4 유닛홈(233)에는 일 방향으로 길게 형성된 제2 삽입홈(240)이 형성될 수 있다.On the other hand, in the second coupling groove 123 and the fourth coupling groove 133 of the post, a first insertion groove 134 formed long in one direction is formed, and the second unit groove 223 of the wall unit 200 and The fourth unit groove 233 may have a second insertion groove 240 formed to be elongated in one direction.

여기서, 제2 결합홈(123)은 제1 결합홈(121)보다 두 배로 크므로 제4 결합부위(230)의 제2 유닛돌기(224)가 제2 결합홈(123)에 삽입되고, 제1 결합돌기(122)가 제4 유닛홈(233)에 삽입되어 결합 된 지주와 벽 유닛(200)에는 제1 본체(110), 제1 결합돌기(122), 제2 본체(210) 및 제2 유닛돌기(224)에 의해 둘러싸인 제1 내부공간(300)이 형성될 수 있다.Here, since the second coupling groove 123 is twice as large as the first coupling groove 121, the second unit protrusion 224 of the fourth coupling portion 230 is inserted into the second coupling groove 123, 1 The first body 110, the first coupling protrusion 122, the second body 210 and the first body 110, the first coupling protrusion 122, the second body 210, and the post and the wall unit 200 are coupled by inserting the coupling protrusion 122 into the fourth unit groove 233. 2 A first internal space 300 surrounded by the unit protrusion 224 may be formed.

상기와 같이 형성된 제1 내부공간(300)에는 양단이 제1 삽입홈(134)과 제2 삽입홈(240)에 각각 삽입되는 제1 체결바(400)가 구비되어 지주와 벽 유닛(200)을 일체화하는 효과를 발휘할 수 있다.The first inner space 300 formed as described above is provided with a first fastening bar 400 having both ends inserted into the first insertion groove 134 and the second insertion groove 240, respectively, and the post and the wall unit 200 The effect of unifying

그리고 제4 결합홈(133)은 제2 결합홈(123)과 마찬가지로 제3 결합홈(131)보다 두 배로 크므로 제1 유닛돌기(222)가 제4 유닛홈(233)에 삽입되고, 제3 유닛돌기(232)가 제2 유닛홈(223)에 삽입되어 좌우로 결합 된 한 쌍의 벽 유닛(200)에는 한 쌍의 제2 본체(210), 제1 유닛돌기(222) 및 제2 유닛돌기(224)에 의해 둘러싸인 제2 내부공간(500)이 형성될 수 있다.And the fourth coupling groove 133 is twice as large as the third coupling groove 131, like the second coupling groove 123, so that the first unit protrusion 222 is inserted into the fourth unit groove 233, 3 The unit protrusion 232 is inserted into the second unit groove 223 and the pair of wall units 200 coupled to the left and right include a pair of the second main body 210, the first unit protrusion 222, and the second A second inner space 500 surrounded by the unit protrusion 224 may be formed.

상기와 같이 형성된 제2 내부공간(500)에는 양단이 서로 마주보는 한 쌍의 제2 삽입홈(240)에 각각 삽입되는 제2 체결바(600)가 구비되어 한 쌍의 벽 유닛(200)을 일체화하는 효과를 발휘할 수 있다.The second inner space 500 formed as described above is provided with second fastening bars 600 that are respectively inserted into a pair of second insertion grooves 240 facing each other at both ends, thereby providing a pair of wall units 200. The effect of integration can be exhibited.

이와 같이, 제1 결합부위(120) 내지 제4 결합부위(230)를 통해 지주와 벽 유닛(200)이 결합하고, 제1 체결바(400)와 제2 체결바(600)를 통해 지주와 벽 유닛(200)을 일체화하고 벽 유닛(200) 간을 일체화함으로써 견고한 흙막이를 제공할 수 있다.In this way, the post and the wall unit 200 are coupled through the first coupling part 120 to the fourth coupling part 230, and the post and the post through the first fastening bar 400 and the second fastening bar 600 By integrating the wall unit 200 and integrating between the wall units 200, a solid earth barrier can be provided.

다음은 본 발명의 일 실시 예에 따른 벽 유닛(200)에 설치되는 토류판(700)에 대해 설명하도록 한다. 이하의 설명에서는 상술한 실시 예와 서로 다른 부분만을 상세하게 설명하며 동일하거나 극히 유사한 부분에 대해서는 상세한 설명을 생략한다.The following describes the earth plate 700 installed on the wall unit 200 according to an embodiment of the present invention. In the following description, only parts different from those of the above-described embodiment will be described in detail, and detailed descriptions of the same or extremely similar parts will be omitted.

도 6은 도 5에 도시된 벽 유닛에 토류판이 설치된 모습을 나타낸 도면이다.6 is a view showing a state in which the earth plate is installed on the wall unit shown in FIG. 5.

도 1 내지 도 6을 참조하면, 본 발명의 일 실시 예에 따른 건축물의 기초공사 시공방법은 벽 유닛(200)에 토류판(700)을 설치하는 단계(S112e)를 구비할 수 있다.1 to 6, a method of constructing a foundation for a building according to an embodiment of the present invention may include a step (S112e) of installing an earth plate 700 on the wall unit 200.

그리고 벽 유닛(200)에 설치되는 토류판(700)은 벽 유닛(200)의 터파기 측 일면에 구비되어 다수의 벽 유닛(200)을 가리는 판재(710)와 판재(710)와 대응되도록 벽 유닛(200)의 타면에서 판재(710) 방향으로 삽입되어 판재(710)를 벽 유닛(200)에 고정하는 고정부재(720)로 이루어질 수 있다.And the earth plate 700 installed on the wall unit 200 is provided on one side of the excavation side of the wall unit 200 so as to correspond to the plate material 710 and the plate material 710 covering the plurality of wall units 200. It may be made of a fixing member 720 that is inserted in the direction of the plate material 710 from the other surface of the 200 and fixes the plate material 710 to the wall unit 200.

여기서, 고정부재(720)는 몸통부(721)와 머리부(722)를 구비하며, 몸통부(721)는 제1 유닛돌기(222) 내지 제4 유닛돌기(234) 및 제2 체결바(600)를 관통하여 일단이 판재(710)와 결합하도록 구비되어 판재(710)를 벽 유닛(200)에 고정함과 동시에 좌우로 이웃하는 한 쌍의 벽 유닛(200)과 제2 체결바(600)를 일체화하는 효과를 발휘할 수 있다.Here, the fixing member 720 includes a body portion 721 and a head portion 722, and the body portion 721 has a first unit protrusion 222 to a fourth unit protrusion 234 and a second fastening bar ( A pair of wall units 200 and a second fastening bar 600 adjacent to the left and right at the same time while penetrating through 600 and having one end coupled to the plate 710 to fix the plate 710 to the wall unit 200 ) Can be integrated.

그리고 머리부(722)는 몸통부(721)의 타단에 구비되어 몸통부(721)가 일정길이 이상 삽입되는 것을 방지하는 역할을 할 수 있다.In addition, the head portion 722 may be provided at the other end of the body portion 721 to prevent insertion of the body portion 721 over a predetermined length.

한편, 고정부재(720)의 몸통부(721)가 관통하는 제1 유닛돌기(222) 내지 제4 유닛돌기(234) 및 제2 체결바(600)는 몸통부(721)가 용이하게 관통하도록 하는 관통홀(250)을 각각 구비하여 토류판(700)의 설치가 용이하게 이루어지도록 할 수 있다.On the other hand, the first unit protrusion 222 to the fourth unit protrusion 234 and the second fastening bar 600 through which the body portion 721 of the fixing member 720 penetrates, so that the body portion 721 easily penetrates. Each of the through holes 250 may be provided to facilitate installation of the earth plate 700.

이상에서는 본 발명의 일 실시 예에 따른 건축물의 기초공사 시공방법에 대해 설명하였으나, 본 발명의 사상은 본 명세서에 제시되는 실시 예에 제한되지 아니한다. 그리고 본 발명의 사상을 이해하는 당업자는 동일한 사상의 범위 내에서 구성요소의 부가, 변경, 삭제, 추가 등에 의해서 다른 실시 예를 용이하게 제안할 수 있을 것이나, 이 또한 본 발명의 사상범위 내에 든다고 할 것이다.In the above, a method of constructing a foundation for a building according to an embodiment of the present invention has been described, but the spirit of the present invention is not limited to the embodiment presented herein. And those skilled in the art who understand the spirit of the present invention will be able to easily propose other embodiments by adding, changing, deleting, adding, etc., components within the scope of the same idea, but this also falls within the scope of the present invention will be.

10: 지주 100a: 결합체
100b: 쐐기 110: 제1 본체
120: 제1 결합부위 121: 제1 결합홈
122: 제1 결합돌기 123: 제2 결합홈
124: 제2 결합돌기 130: 제2 결합부위
131: 제3 결합홈 132: 제3 결합돌기
133: 제4 결합홈 134: 제4 결합돌기
140: 제1 삽입홈 200: 벽 유닛
210: 제2 본체 220: 제3 결합부위
221: 제1 유닛홈 222: 제1 유닛돌기
223: 제2 유닛홈 224: 제2 유닛돌기
230: 제4 결합부위 231: 제3 유닛홈
232: 제3 유닛돌기 233: 제4 유닛홈
234: 제4 유닛돌기 240: 제2 삽입홈
250: 관통홀 300: 제1 내부공간
400: 제1 체결바 500: 제2 내부공간
600: 제2 체결바 700: 토류판
710: 판재 720: 고정부재
721: 몸통부 722: 머리부
10: pillar 100a: assembly
100b: wedge 110: first body
120: first coupling portion 121: first coupling groove
122: first coupling protrusion 123: second coupling groove
124: second coupling protrusion 130: second coupling site
131: third coupling groove 132: third coupling protrusion
133: fourth coupling groove 134: fourth coupling protrusion
140: first insertion groove 200: wall unit
210: second main body 220: third bonding site
221: first unit groove 222: first unit protrusion
223: second unit groove 224: second unit protrusion
230: fourth coupling portion 231: third unit groove
232: third unit protrusion 233: fourth unit groove
234: fourth unit protrusion 240: second insertion groove
250: through hole 300: first internal space
400: first fastening bar 500: second internal space
600: second fastening bar 700: earth plate
710: plate 720: fixing member
721: body 722: head

Claims (5)

터파기 단계와,
터파기가 완료된 지면을 다지는 다짐 단계와,
다져진 지면 위에 잡석을 깐 후 철근을 배근하는 단계와,
거푸집을 설치하는 단계와,
콘크리트를 타설 및 양생하여 기초를 완성하는 단계를 구비하고,
상기 터파기 단계 이전에는 터파기 구간의 테두리에 흙막이 설치 단계가 구비되고,
상기 흙막이 설치 단계는 터파기 구간 테두리의 각 모서리에 지주를 매설하는 단계와, 서로 이웃하는 지주 사이에 다수의 벽 유닛을 연결하는 단계를 구비하고,
상기 터파기 구간 테두리의 각 모서리에 지주를 매설하는 단계는 상기 지주의 상단에 위치하는 결합체가 지면상에 노출되도록 상기 지주의 하단에 위치하는 쐐기를 지면에 삽입하는 단계를 구비하고, 상기 결합체는 사각형태의 제1 본체와, 상기 제1 본체의 일면에 형성되는 제1 결합부위와, 상기 제1 결합부위와 수직을 형성하도록 상기 제1 본체의 타면에 형성되는 제2 결합부위를 구비하고, 상기 제1 결합부위는 상기 제1 본체의 일면 일측에 구비되는 제1 결합홈과, 상기 제1 결합홈과 나란히 위치하는 제1 결합돌기와, 상기 제1 결합홈보다 크게 형성되어 상기 제1 결합돌기와 나란히 위치하는 제2 결합홈과, 상기 제1 결합돌기와 동일한 형태 및 길이로 상기 제2 결합홈과 나란히 위치하는 제2 결합돌기를 구비하고, 상기 제2 결합부위는 상기 제1 본체의 타면 일측에 구비되는 제3 결합홈과, 상기 제3 결합홈과 나란히 위치하는 제3 결합돌기와, 상기 제3 결합홈보다 크게 형성되어 상기 제3 결합돌기와 나란히 위치하는 제4 결합홈과, 상기 제3 결합돌기와 동일한 형태 및 길이로 상기 제4 결합홈과 나란히 위치하는 제4 결합돌기를 구비하는 것을 특징으로 하는 건축물의 기초공사 시공방법.
With the stage of excavation,
A compaction step for compacting the ground where the excavation has been completed,
The step of placing rubble on the ground and reinforcing reinforcement,
The steps of installing the formwork and,
It has a step of completing the foundation by pouring and curing concrete,
Prior to the digging step, a soil barrier installation step is provided on the rim of the digging section,
The earthing barrier installation step includes the steps of embedding a post at each corner of the rim of the dug section, and connecting a plurality of wall units between adjacent posts,
The step of embedding the posts at each corner of the edge of the digging section includes the step of inserting a wedge located at the lower end of the post into the ground so that the assembly located at the upper end of the post is exposed on the ground, and the assembly A first body having a rectangular shape, a first coupling portion formed on one surface of the first body, and a second coupling portion formed on the other surface of the first body so as to form perpendicular to the first coupling portion, The first coupling portion has a first coupling groove provided on one side of one surface of the first body, a first coupling protrusion positioned parallel to the first coupling groove, and is formed larger than the first coupling groove so that the first coupling protrusion and A second coupling groove positioned side by side, and a second coupling protrusion positioned parallel to the second coupling groove in the same shape and length as the first coupling projection, and the second coupling portion is on one side of the other surface of the first body. A third coupling groove provided, a third coupling protrusion positioned parallel to the third coupling groove, a fourth coupling groove formed larger than the third coupling groove and positioned parallel to the third coupling protrusion, and the third coupling protrusion A method of constructing a foundation for a building, comprising: a fourth coupling protrusion positioned parallel to the fourth coupling groove in the same shape and length.
삭제delete 제 1항에 있어서,
상기 서로 이웃하는 지주 사이에 다수의 벽 유닛을 연결하는 단계는 상기 지주에 상기 벽 유닛을 연결하여 적층하는 단계와, 상기 지주에 연결된 상기 벽 유닛에 또 다른 벽 유닛을 연결하여 적층하는 단계를 구비하고,
상기 벽 유닛은 사각형태의 제2 본체와, 상기 제2 본체의 일면에 형성되는 제3 결합부위와 상기 제1 결합부위와 대응되도록 상기 제2 본체의 타면에 형성되는 제4 결합부위를 구비하고,
상기 제3 결합부위는 상기 제2 본체의 일면 일측에 구비되는 제1 유닛홈과, 상기 제1 유닛홈과 나란히 위치하는 제1 유닛돌기와, 상기 제1 유닛홈보다 크게 형성되어 상기 제1 유닛돌기와 나란히 위치하는 제2 유닛홈과, 상기 제1 유닛돌기와 동일한 형태 및 길이로 상기 제2 유닛홈과 나란히 위치하는 제2 유닛돌기를 구비하고.
상기 제4 결합부위는 상기 제2 본체의 타면 일측에 구비되는 제3 유닛홈과, 상기 제3 유닛홈과 나란히 위치하는 제3 유닛돌기와, 상기 제3 유닛홈보다 크게 형성되어 상기 제3 유닛돌기와 나란히 위치하는 제4 유닛홈과, 상기 제3 유닛돌기와 동일한 형태 및 길이로 상기 제4 유닛홈과 나란히 위치하는 제4 유닛돌기를 구비하는 것을 특징으로 하는 건축물의 기초공사 시공방법.
The method of claim 1,
The step of connecting a plurality of wall units between adjacent posts includes the steps of connecting and stacking the wall units to the posts, and connecting and stacking another wall unit to the wall units connected to the posts. and,
The wall unit includes a second body in a rectangular shape, a third coupling portion formed on one surface of the second body, and a fourth coupling portion formed on the other surface of the second body so as to correspond to the first coupling portion, and ,
The third coupling portion includes a first unit groove provided on one side of one surface of the second body, a first unit protrusion disposed parallel to the first unit groove, and a larger than the first unit groove, so that the first unit protrusion and the And a second unit groove positioned side by side, and a second unit protrusion positioned side by side with the second unit groove in the same shape and length as the first unit protrusion.
The fourth coupling portion includes a third unit groove provided on one side of the other surface of the second body, a third unit protrusion disposed parallel to the third unit groove, and a third unit protrusion formed larger than the third unit groove, A method of constructing a foundation for a building, comprising: a fourth unit groove positioned side by side and a fourth unit protrusion positioned side by side with the fourth unit groove in the same shape and length as the third unit protrusion.
제 3항에 있어서,
상기 지주에 상기 벽 유닛을 연결하여 적층하는 단계는 상기 지주와 상기 벽 유닛을 일체화하는 단계를 구비하고,
상기 지주에 연결된 상기 벽 유닛에 또 다른 벽 유닛을 연결하여 적층하는 단계는 다수의 벽 유닛을 일체화하는 단계를 구비하고,
상기 지주의 상기 제2 결합홈과 상기 제4 결합홈에는 일 향으로 길게 형성된 제1 삽입홈이 형성되고,
상기 벽 유닛의 상기 제2 유닛홈과 상기 제4 유닛홈에는 일 방향으로 길게 형성되는 제2 삽입홈이 형성되고.
결합 된 상기 지주와 상기 벽 유닛에는 상기 제1 본체, 상기 제1 결합돌기, 상기 제2 본체 및 상기 제2 유닛돌기에 의해 둘러싸인 제1 내부공간이 형성되고,
상기 제1 내부공간에는 양단이 상기 제1 삽입홈과 상기 제2 삽입홈에 각각 삽입되어 상기 지주와 상기 벽 유닛을 일체화하는 제1 체결바가 구비되고,
좌우로 결합 된 한 쌍의 상기 벽 유닛에는 한 쌍의 제2 본체, 상기 제1 유닛돌기 및 상기 제2 유닛돌기에 의해 둘러싸인 제2 내부공간이 형성되고,
상기 제2 내부공간에는 양단이 서로 마주보는 한 쌍의 상기 제2 삽입홈에 각각 삽입되어 한 쌍의 상기 벽 유닛을 일체화하는 제2 체결바가 구비되는 것을 특징으로 하는 건축물의 기초공사 시공방법.
The method of claim 3,
The step of connecting and laminating the wall unit to the post includes the step of integrating the post and the wall unit,
The step of connecting and stacking another wall unit to the wall unit connected to the post includes a step of integrating a plurality of wall units,
The second coupling groove and the fourth coupling groove of the post are formed with a first insertion groove elongated in one direction,
The second unit groove and the fourth unit groove of the wall unit are formed with second insertion grooves extending in one direction.
A first internal space surrounded by the first body, the first coupling protrusion, the second body and the second unit protrusion is formed in the combined post and the wall unit,
In the first inner space, a first fastening bar having both ends inserted into the first insertion groove and the second insertion groove, respectively, to integrate the post and the wall unit is provided,
A pair of wall units coupled to the left and right have a pair of second main bodies, a second inner space surrounded by the first unit protrusion and the second unit protrusion,
The second inner space is provided with a second fastening bar that is inserted into the pair of second insertion grooves facing each other, respectively, to integrate the pair of wall units.
제 4항에 있어서,
상기 다수의 벽 유닛을 일체화하는 단계 이후에는 상기 벽 유닛에 토류판을 설치하는 단계가 구비되고,
상기 토류판은 상기 벽 유닛의 터파기 측 일면에 구비되어 다수의 상기 벽 유닛을 가리는 판재와,
상기 판재와 대응되도록 상기 벽 유닛의 타면에서 상기 판재 방향으로 삽입되어 상기 판재를 상기 벽 유닛에 고정하는 고정부재를 구비하고,
상기 고정부재는 상기 제1 유닛돌기 내지 상기 제4 유닛돌기 및 상기 제2 체결바를 관통하여 일단이 상기 판재와 결합하는 몸통부와, 상기 몸통부의 타단에 구비되어 상기 몸통부가 일정길이 이상 삽입되는 것을 방지하는 머리부를 구비하고,
상기 제1 유닛돌기 내지 상기 제4 유닛돌기 및 상기 제2 체결바는 상기 몸통부가 관통하는 관통홀을 각각 구비하는 것을 특징으로 하는 건축물의 기초공사 시공방법.
The method of claim 4,
After the step of integrating the plurality of wall units, a step of installing an earth plate on the wall unit is provided,
The earth plate is provided on one side of the trench side of the wall unit to cover the plurality of wall units,
And a fixing member inserted in the direction of the plate material from the other surface of the wall unit so as to correspond to the plate material to fix the plate material to the wall unit,
The fixing member penetrates the first unit protrusion to the fourth unit protrusion and the second fastening bar, and one end is provided at the other end of the body, and the body is provided at the other end of the body to insert a predetermined length or more. It has a head to prevent,
The first unit protrusion to the fourth unit protrusion, and the second fastening bar each have a through hole through which the body part passes.
KR1020200077076A 2020-06-24 2020-06-24 Construction method of basic construction of buildings Expired - Fee Related KR102159832B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200077076A KR102159832B1 (en) 2020-06-24 2020-06-24 Construction method of basic construction of buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200077076A KR102159832B1 (en) 2020-06-24 2020-06-24 Construction method of basic construction of buildings

Publications (1)

Publication Number Publication Date
KR102159832B1 true KR102159832B1 (en) 2020-09-24

Family

ID=72706398

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200077076A Expired - Fee Related KR102159832B1 (en) 2020-06-24 2020-06-24 Construction method of basic construction of buildings

Country Status (1)

Country Link
KR (1) KR102159832B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102312847B1 (en) 2020-12-08 2021-10-13 김재봉 Ground penetration spraying device for concrete buildings
KR102312882B1 (en) 2020-12-08 2021-10-13 김재봉 Waterproof Concrete structure for ground penetration and penetration method
KR102322702B1 (en) 2020-12-08 2021-11-04 김재봉 Construction method of ground-penetrating concrete building
KR102322689B1 (en) 2020-12-08 2021-11-08 김재봉 Ground penetration device and penetration method of concrete buildings
KR102326364B1 (en) * 2021-07-16 2021-11-15 신화건설(주) Concrete pouring method
CN113882393A (en) * 2021-10-20 2022-01-04 中铁建设集团华北工程有限公司 Foundation pit inner wall supporting structure and construction method
CN113944171A (en) * 2021-11-11 2022-01-18 西北建设有限公司 Foundation pit construction supporting device is built in room

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100583939B1 (en) 2006-02-16 2006-05-26 (주)정일엔지니어링종합건축사사무소 Building foundation
KR100653381B1 (en) * 2006-08-24 2006-12-04 (주)토인종합건축사사무소 Building foundation construction fence construction
KR101708218B1 (en) * 2016-04-26 2017-02-20 우광티엔씨(주) Hybrid underground pit structures and its construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100583939B1 (en) 2006-02-16 2006-05-26 (주)정일엔지니어링종합건축사사무소 Building foundation
KR100653381B1 (en) * 2006-08-24 2006-12-04 (주)토인종합건축사사무소 Building foundation construction fence construction
KR101708218B1 (en) * 2016-04-26 2017-02-20 우광티엔씨(주) Hybrid underground pit structures and its construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102312847B1 (en) 2020-12-08 2021-10-13 김재봉 Ground penetration spraying device for concrete buildings
KR102312882B1 (en) 2020-12-08 2021-10-13 김재봉 Waterproof Concrete structure for ground penetration and penetration method
KR102322702B1 (en) 2020-12-08 2021-11-04 김재봉 Construction method of ground-penetrating concrete building
KR102322689B1 (en) 2020-12-08 2021-11-08 김재봉 Ground penetration device and penetration method of concrete buildings
KR102326364B1 (en) * 2021-07-16 2021-11-15 신화건설(주) Concrete pouring method
CN113882393A (en) * 2021-10-20 2022-01-04 中铁建设集团华北工程有限公司 Foundation pit inner wall supporting structure and construction method
CN113882393B (en) * 2021-10-20 2023-01-17 中铁建设集团华北工程有限公司 Foundation pit inner wall supporting structure and construction method
CN113944171A (en) * 2021-11-11 2022-01-18 西北建设有限公司 Foundation pit construction supporting device is built in room
CN113944171B (en) * 2021-11-11 2023-05-30 西北建设有限公司 Building foundation pit construction supporting device

Similar Documents

Publication Publication Date Title
KR102159832B1 (en) Construction method of basic construction of buildings
KR101331261B1 (en) Underground prefabricated precast concrete rainwater recycling facility using precast concrete continuous wall in strut structure or earth anchor and construction method of the same
KR102208793B1 (en) Under ground structure using column wall and construction method thereof
KR102009077B1 (en) Earth retaining wall construction method using castinplace concrete pile of impermeable peristyle type
KR102195504B1 (en) Construction method for Eearth self-retaining wall using reinforcing member and CIP construction method
JP2001241053A (en) Method for constructing underground structure
KR101902791B1 (en) Under ground structure construction method using composite steel pile and under ground structure therewith
KR101324231B1 (en) Soil cement wall structure and method for constructing thereof
JP7232714B2 (en) how to build a foundation
JP2000352296A (en) Method o constructing passage just under underground structure
WO2011009219A1 (en) Shoring free excavation and basement construction apparatus and method
KR102195510B1 (en) Construction method for earth self-retaining wall using reinforcing member and PHC pile
JP4042153B2 (en) Construction method of wall formwork block and wall structure and underground structure
KR20240025838A (en) Retaining wall with three dimensional connecting block system
JP3760304B2 (en) Building foundation construction method
KR102194394B1 (en) Construction method for earth self-retaining wall using reinforcing member and SCW construction method
KR0179708B1 (en) Working method for underground structure of a building
KR200183206Y1 (en) Block for breastwall
KR102426192B1 (en) File fof retaining wall and construction method using file
KR102391434B1 (en) Landscape structure using eps blocks and method for constructing the same
KR20080025219A (en) Construction method of underground wall using deck plate and deck plate for construction of underground wall
JP3957607B2 (en) Pneumatic caisson and pneumatic caisson method
KR102139214B1 (en) Prefabricated wall structure using lattice block and construction method of the same
JP3234820B2 (en) Retaining wall construction method and construction of retaining wall for building residential land
KR101219451B1 (en) Concrete structure and construction method for the same, constructing method of underground wall as a retaining structural wall used in the same

Legal Events

Date Code Title Description
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

R18-X000 Changes to party contact information recorded

St.27 status event code: A-3-3-R10-R18-oth-X000

PA0302 Request for accelerated examination

St.27 status event code: A-1-2-D10-D17-exm-PA0302

St.27 status event code: A-1-2-D10-D16-exm-PA0302

D13-X000 Search requested

St.27 status event code: A-1-2-D10-D13-srh-X000

D14-X000 Search report completed

St.27 status event code: A-1-2-D10-D14-srh-X000

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

E13-X000 Pre-grant limitation requested

St.27 status event code: A-2-3-E10-E13-lim-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P16-X000 Ip right document amended

St.27 status event code: A-5-5-P10-P16-nap-X000

Q16-X000 A copy of ip right certificate issued

St.27 status event code: A-4-4-Q10-Q16-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20240919

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20240919