- KR100334237B1 KR100334237B1 KR1019980031920A KR19980031920A KR100334237B1 KR 100334237 B1 KR100334237 B1 KR 100334237B1 KR 1019980031920 A KR1019980031920 A KR 1019980031920A KR 19980031920 A KR19980031920 A KR 19980031920A KR 100334237 B1 KR100334237 B1 KR 100334237B1
- Authority
- KR
- South Korea
- Prior art keywords
- steel
- temperature
- steel beam
- concrete
- continuous
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/268—Composite concrete-metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
Abstract
Description
Claims (13)
- 소정 경간마다 연속된 강재보를 설치하는 제1 단계;상기 연속하는 강재보 하부에서 소정구간만큼 소정 온도의 열원을 가하여 열전달에 의해 강재보의 상부와 하부에 걸쳐 인위적인 온도구배가 형성되도록 하는 제2 단계;상기 제2 단계에서 제공된 열원에 의해 온도구배를 가지는 연속한 상기 강재보 상에 바닥판 콘크리트을 타설·양생하여 합성하는 제3 단계; 및상기 제3 단계 수행후 상기 강재보에 형성된 인위적 온도구배를 제거함으로써 상기 합성된 강재보 상단부 및 콘크리트 바닥판에 동시에 발생되는 압축응력으로 추가 사하중 및 활하중에 의해 콘크리트 바닥판에 발생하는 인장응력을 상쇄시키는 제4 단계를 포함하는 연속 강합성형교의 시공방법.
- 제 1 항에 있어서,제1 단계에서의 강재보 단면이강판형교, 강박스교, U-형 강박스교, 제형 강박스교, 제형 U-타입 강박스교중 어느 하나의 단면을 가지는 것을 특징으로 하는 연속 강합성형교의 시공방법.
- 제 1 항에 있어서,상기 제2 단계는상기 강재보의 하단부에 설정온도를 유지시키고, 상단부로 갈수록 상기 설정 온도보다 작은 온도로 분포되도록 하여 소정크기의 온도구배를 형성하는 연속강합성형교의 시공방법.
- 제 3 항에 있어서,상기 강재보의 상단부 온도는 자연대기상태하의 강재보의 온도인 것을 특징으로 하는 연속 강합성형교의 시공방법.
- 제 1 항 내지 제 4 항중 어느 한 항에 있어서,상기 제2 단계에서 강재보에 형성되는 온도구배는 10℃ ∼ 100℃중 어느 한 온도인 것을 특징으로 하는 연속 강합성형교의 시공방법.
- 제 1 항에 있어서,상기 제4 단계에서 열원제거 시기는 상기 콘크리트 바닥판의 타설후 소요되는 콘크리트 강도가 발현되는 시점으로 정한 것을 특징으로 하는 연속 강합성형교의 시공방법.
- 제 6 항에 있어서,상기 콘크리트 바닥판의 타설후 소요되는 콘크리트 강도가 발현되는 시점은 콘크리트 설계강도가 70%이상 발현되는 시점인 것을 특징으로 하는 연속 강합성형교의 시공방법.
- 연속 강합성형교의 강재보에 온도응력을 발생시키는 장치에 있어서,상기 강재보의 하부에서 상부측으로 설치되며, 상기 강재보와 콘크리트 바닥판의 합성전부터 합성될 때까지 인위적인 온도구배를 부여하도륵 열원을 제공하는 수단,상기 강재보에 장착되며, 상기 열원제공수단으로부터 설정된 온도구배가 유지되도록 제공되는 열원에 의해 변화되는 온도를 감지하여 출력하는 온도감지수단; 및상기 온도감지수단의 신호를 인가받도록 연결되어 있으며, 상기 콘크리트 바닥판과 강재보의 합성전부터 합성될 때까지 상기 강재보의 소정 인위적 온도구배를 유지하도록 제어하는 콘트롤러를 포함하는 연속 강합성형교의 온도응력 발생장치.
- 제 8 항에 있어서,상기 열원제공수단이온수순환파이프로 이루어지되 그의 가열점이 강재보의 하부플랜지 및 복부판중 적어도 한 곳에 설치되며,상기 온수순환파이프는 작용하중에 의해 부모멘트가 발생하는 내부지점부 근처의 강재보의 하부측에 조밀한 간격으로 배치하고, 상부측으로 갈수록 간격이 벌어지도륵 배치한 것을 특징으로 하는 연속 강합성형교의 온도응력 발생장치.
- 제 8 항에 있어서,상기 열원제공수단이전열판으로 이루어지되, 그의 가열점이 강재보의 하부플랜지 및 복부판중 적어도 한 곳에 설치되며,상기 전열판은 작용하중에 의해 부모멘트가 발생하는 내부지점부 근처의 강재보의 하부측에 조밀한 간격으로 배치하고, 상부측으로 갈수록 간격이 벌어지도록 배치한 것을 특징으로 하는 연속 강합성형교의 온도응력 발생장치.
- 제 8 항 내지 제 10 항중 어느 한 항에 있어서,상기 열원제공수단에서 강재보에 제공되는 온도가 외부환경에 영향을 받지 않도록 상기 강재보의 둘레에 설치된 보온단열재를 더 포함하는 것을 특징으로 하는 연속 강합성형교의 온도응력발생장치.
- 제 8 항 내지 제 10 항중 어느 한 항에 있어서,교량의 외측 거더와, 콘크리트 바닥판의 상부중 어느 한곳에 그 일단부가 장착되며 타단부는 바닥을 향하여 펼쳐지도록 하여 상기 강재보의 내,외측 거더가 태양복사열에 의해 다른 온도분포를 갖지 않도록 차양하는 차양막을 더 포함하는 연속 강합성형교의 온도응력발생장치.
- 콘크리트 바닥판과 상기 콘크리트 바닥판의 하부를 소정 경간마다 연속시켜 지지하는 강재보를 합성하여 이루어진 연속 강합성형교에 있어서,상기 콘크리트 바닥판과 강재보의 합성전에, 상기 강재보 하부에서 소정구간 만큼 소정 온도의 열원을 가하여 열전달에 의해 강재보의 상부와 하부에 걸쳐 인위적으로 한시적인 온도구배를 부여하고, 콘크리트 바닥판을 타설 및 양생하는 과정을 거쳐 합성한 후에 열원을 제거하여 상기 온도구배에 의해 발생된 콘크리트 바닥판의 압축응력으로 부모멘트 지점부의 콘크리트 바닥판에 발생하는 인장응력을 상쇄시켜 형성된 것을 특징으로 하는 연속 강합성형교.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019980031920A KR100334237B1 (ko) | 1998-08-05 | 1998-08-05 | 온도응력을이용하여제작된연속강합성형교및그의시공방법 |
PCT/KR1999/000431 WO2000008257A2 (en) | 1998-08-05 | 1999-08-04 | Steel girder bridge and method for constructing by applying a temperature gradient |
US09/720,120 US6490745B1 (en) | 1998-08-05 | 1999-08-04 | Continuous composite steel girder bridge constructed by applying a temperature gradient and method for constructing the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019980031920A KR100334237B1 (ko) | 1998-08-05 | 1998-08-05 | 온도응력을이용하여제작된연속강합성형교및그의시공방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20000013197A KR20000013197A (ko) | 2000-03-06 |
KR100334237B1 true KR100334237B1 (ko) | 2002-09-26 |
Family
ID=19546527
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019980031920A KR100334237B1 (ko) | 1998-08-05 | 1998-08-05 | 온도응력을이용하여제작된연속강합성형교및그의시공방법 |
Country Status (3)
Country | Link |
---|---|
US (1) | US6490745B1 (ko) |
KR (1) | KR100334237B1 (ko) |
WO (1) | WO2000008257A2 (ko) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100440802B1 (ko) * | 2001-03-05 | 2004-07-19 | 김상효 | 온도프리스트레싱 보강재 접합방식을 이용한 교량의보강공법 |
KR100516135B1 (ko) * | 2001-12-26 | 2005-09-21 | 김상효 | 다단계 온도프리스트레싱 공법을 이용한 psc빔교의 연속화공법 |
KR100641822B1 (ko) * | 2005-03-11 | 2006-11-06 | 학교법인연세대학교 | 온도 프리스트레싱 공법에 의한 일부타정식 사장교의시공방법 |
US20080035010A1 (en) * | 2006-08-14 | 2008-02-14 | Mckay Douglas Mcgregor | Trapezoidal strong back beam system |
CN107229837B (zh) * | 2017-07-10 | 2020-05-05 | 长安大学 | 组合板梁桥温度梯度模式评价方法 |
CN107391823B (zh) * | 2017-07-10 | 2020-11-17 | 长安大学 | 公路钢箱梁桥温度梯度模式的评价方法 |
CN111651927B (zh) * | 2020-06-12 | 2022-04-26 | 重庆交通大学 | 一种计算箱梁竖向最不利温度梯度的方法 |
CN112378735B (zh) * | 2020-10-28 | 2021-11-09 | 华南理工大学 | 一种考虑正交异性板残余应力效应的组合板梁单元分析法 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4019581A (en) * | 1975-08-14 | 1977-04-26 | Diggs Richard E | Metal building with combined temperature control and firefighting system |
US4007574A (en) * | 1975-09-22 | 1977-02-15 | Riddell C Randolph | Structural member and system |
EP0021823A1 (en) * | 1979-06-26 | 1981-01-07 | Urban Transportation Development Corporation Ltd | Guideway for continuous welded rail and a method of installing rail tracks |
US4343432A (en) * | 1979-07-23 | 1982-08-10 | Belenguer Frank J | Guideway for continuous welded rail |
DE3124038C2 (de) * | 1981-06-19 | 1985-03-07 | Philipp Holzmann Ag, 6000 Frankfurt | Verfahren und Vorrichtung zum Herstellen von Bauwerken wie Brücken unter Verwendung von Beton-Fertigteilträgern |
US4880051A (en) * | 1986-07-14 | 1989-11-14 | Kabushiki Kaisha Patine Shokai | Piping apparatus for melting snow and ice |
JP2858279B2 (ja) * | 1991-05-27 | 1999-02-17 | 裕二 空山 | 鋼桁の引張フランジに温度差を利用して圧縮力を導入する工法 |
GB2268946A (en) * | 1992-07-23 | 1994-01-26 | Kuldip Singh Randhawa | Prestressing of concrete composite sections |
US5743326A (en) * | 1994-10-05 | 1998-04-28 | Aesop, Inc. | Method of and apparatus for damping bending vibrations while achieving temperature control in beams and related |
US5617599A (en) * | 1995-05-19 | 1997-04-08 | Fomico International | Bridge deck panel installation system and method |
-
1998
- 1998-08-05 KR KR1019980031920A patent/KR100334237B1/ko not_active IP Right Cessation
-
1999
- 1999-08-04 US US09/720,120 patent/US6490745B1/en not_active Expired - Fee Related
- 1999-08-04 WO PCT/KR1999/000431 patent/WO2000008257A2/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
WO2000008257A2 (en) | 2000-02-17 |
US6490745B1 (en) | 2002-12-10 |
WO2000008257A3 (en) | 2000-07-13 |
KR20000013197A (ko) | 2000-03-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100536489B1 (ko) | 프리스트레스트 강합성보의 제작 방법 및 이에 의하여제작된 강합성보 | |
Hago et al. | Ultimate and service behavior of ferrocement roof slab panels | |
CN106758737B (zh) | 横向预应力全宽钢筋混凝土桥面板钢板组合梁的桥位安装施工方法 | |
KR100682794B1 (ko) | 프리스트레스트 강합성보의 제작 방법 | |
KR100982974B1 (ko) | 다경간 연속 리프리스트레스트 프리플렉스 합성형교 시공방법 | |
KR100334237B1 (ko) | 온도응력을이용하여제작된연속강합성형교및그의시공방법 | |
KR20120018565A (ko) | 2차 긴장재를 활용한 복부 파형강판 피에스씨 거더의 연속 지점부 구조 및 그의 시공방법 | |
KR20090068526A (ko) | 교량 구조물의 시공 방법 및 이를 이용한 강합성거더 교량 | |
KR101527752B1 (ko) | 프리스트레스트 강합성 거더교의 시공방법 | |
RU160846U1 (ru) | Предварительно-напряженная сборно-монолитная железобетонная плита проезжей части неразрезного сталежелезобетонного моста | |
KR100529518B1 (ko) | 솔 플레이트를 이용한 프리스트레스트 콘크리트 빔 중간 지점부 연속화 구조 및 방법 | |
JP2004324164A (ja) | 波形鋼板ウエブpc橋閉合部の施工方法 | |
KR20080111973A (ko) | 프리스트레스 강합성빔 및 그 제작 방법 | |
KR101734304B1 (ko) | 효율적인 강재-콘크리트 합성거더의 제작방법, 이를 이용한 연속교량 시공방법, 및 그에 의해 시공된 연속교량 | |
KR100395993B1 (ko) | 온도프리스트레싱을 이용한 교량의 보강공법 | |
KR100440802B1 (ko) | 온도프리스트레싱 보강재 접합방식을 이용한 교량의보강공법 | |
KR20070081812A (ko) | 에이치 형강이 삽입된 프리스트레스트 콘크리트 보 및 그의제작방법 | |
KR100377535B1 (ko) | 온도프리스트레싱을 이용한 연속 강거더의 시공방법 | |
US2898757A (en) | Method of constructing reinforced concrete bridge | |
KR20110093158A (ko) | 콘크리트 타설하중을 활용한 강합성 거더 및 이의 제작방법 | |
JP2004137723A (ja) | 橋梁桁の構造及び橋梁桁の構築方法 | |
KR20020017114A (ko) | 가지점과 온도응력을 이용하여 제작된 연속 강합성형교 및그의 시공방법 | |
KR200215054Y1 (ko) | 압축보강재를 이용한 프리스트레스트 합성보 | |
KR100913161B1 (ko) | 프리스트레스트 강합성보의 제작방법 | |
NICHOLS | ten |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
N231 | Notification of change of applicant | ||
FPAY | Annual fee payment |
Payment date: 20130304 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20140303 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20150303 Year of fee payment: 14 |
|
FPAY | Annual fee payment |
Payment date: 20160302 Year of fee payment: 15 |
|
FPAY | Annual fee payment |
Payment date: 20170306 Year of fee payment: 16 |
|
FPAY | Annual fee payment |
Payment date: 20180309 Year of fee payment: 17 |
|
EXPY | Expiration of term |