JPWO2020166347A1 - Raw material charging method and blast furnace operation method for bellless blast furnace - Google Patents

Raw material charging method and blast furnace operation method for bellless blast furnace Download PDF

Info

Publication number
JPWO2020166347A1
JPWO2020166347A1 JP2020519148A JP2020519148A JPWO2020166347A1 JP WO2020166347 A1 JPWO2020166347 A1 JP WO2020166347A1 JP 2020519148 A JP2020519148 A JP 2020519148A JP 2020519148 A JP2020519148 A JP 2020519148A JP WO2020166347 A1 JPWO2020166347 A1 JP WO2020166347A1
Authority
JP
Japan
Prior art keywords
furnace
blast furnace
distribution chute
charging
raw material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2020519148A
Other languages
Japanese (ja)
Other versions
JP6943339B2 (en
Inventor
泰志 小笠原
泰志 小笠原
佐藤 健
健 佐藤
和平 市川
和平 市川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Publication of JPWO2020166347A1 publication Critical patent/JPWO2020166347A1/en
Application granted granted Critical
Publication of JP6943339B2 publication Critical patent/JP6943339B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/18Bell-and-hopper arrangements
    • C21B7/20Bell-and-hopper arrangements with appliances for distributing the burden
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • C21B5/008Composition or distribution of the charge
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B1/00Shaft or like vertical or substantially vertical furnaces
    • F27B1/10Details, accessories, or equipment peculiar to furnaces of these types
    • F27B1/20Arrangements of devices for charging
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/0033Charging; Discharging; Manipulation of charge charging of particulate material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/10Charging directly from hoppers or shoots

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Blast Furnaces (AREA)
  • Manufacture Of Iron (AREA)

Abstract

生産性を阻害することなく、原料を炉内の所定位置に装入できるベルレス高炉の原料装入方法および当該原料装入方法を用いた高炉操業方法を提供する。
分配シュートを旋回させて、高炉炉内に鉄源原料および炭材を装入するベルレス高炉の原料装入方法であって、分配シュートは、分配シュートの先端に分配シュートの搬送方向より下向きに傾斜する反発板を有し、分配シュートの旋回速度は10rpmより速い。
Provided are a method for charging a raw material of a bellless blast furnace capable of charging a raw material at a predetermined position in a furnace without impairing productivity, and a method for operating a blast furnace using the method for charging the raw material.
This is a method of charging raw materials for a bellless blast furnace in which the distribution chute is swiveled to charge iron source raw materials and carbonaceous materials into the blast furnace. It has a repulsive plate, and the turning speed of the distribution chute is faster than 10 rpm.

Description

本発明は、高炉の還元材比低減を目的としたベルレス高炉の原料装入方法および原料装入方法を用いた高炉操業方法に関する。 The present invention relates to a raw material charging method for a bellless blast furnace for the purpose of reducing the reducing agent ratio of the blast furnace and a blast furnace operating method using the raw material charging method.

高炉操業においては、一般に、高炉の炉上部から装入物としてコークスと鉄源原料とが交互に装入される。コークスは還元材および燃料として利用される。鉄源原料は焼結鉱、ペレット、塊鉱石などの鉄を含有する酸化物である。以下の説明では、これら鉄源原料を総称して「鉱石」と記載する。高炉の炉内ではコークス層と鉱石層が交互に形成され、原料堆積層が形成される。高炉の炉下部の羽口からは熱風が送風されると同時に、微粉炭やタールなどの補助燃料が吹き込まれる。 In blast furnace operation, in general, coke and iron source raw materials are alternately charged as charges from the upper part of the blast furnace. Coke is used as a reducing agent and fuel. The iron source raw material is an iron-containing oxide such as sinter, pellets, and lump ore. In the following description, these iron source raw materials are collectively referred to as "ore". In the blast furnace, coke layers and ore layers are alternately formed to form a raw material deposition layer. Hot air is blown from the tuyere at the bottom of the blast furnace, and at the same time, auxiliary fuel such as pulverized coal and tar is blown into it.

高炉の安定操業を維持するには、 炉下部から炉上部へ向けて流れるガスに対して、原料堆積層の良好な通気性を確保し、炉内ガス流れを安定化させることが必要である。炉内ガス流れの安定化は、安定した中心ガス流および炉壁ガス流の確保により達成される。原料堆積層の通気性は、主としてコークスおよび鉱石の性状、粒度および装入量により大きく影響をうける。そして、さらに炉頂からの装入物の装入方法、つまり、炉内に装入する装入物の分布状況にも大きく影響される。以下の説明では、この装入物分布状況を「装入物分布」と記載する。 In order to maintain stable operation of the blast furnace, it is necessary to ensure good air permeability of the raw material sedimentary layer against the gas flowing from the lower part of the furnace to the upper part of the furnace and to stabilize the gas flow in the furnace. Stabilization of the gas flow in the furnace is achieved by ensuring a stable central gas flow and furnace wall gas flow. The air permeability of the raw material sedimentary layer is greatly affected mainly by the properties, particle size and charge of coke and ore. Further, it is greatly influenced by the method of charging the charged material from the top of the furnace, that is, the distribution state of the charged material charged in the furnace. In the following description, this charge distribution status will be referred to as "charge distribution".

この装入物分布の制御については、従来から、高炉の半径方向におけるコークス層と鉱石層の質量比の分布の制御が最もよく用いられている。以下の説明では、コークス層と鉱石層の質量比を「[Ore/Coke]」と記載する。高炉は原料装入装置の形式により、ベルレス高炉またはベル高炉に分類される。ベルレス高炉またはベル高炉のいずれの場合であっても、特に安定したガス流れを得るためには、炉中心部における[Ore/Coke]の値を小さくすることが有効である。 Conventionally, control of the mass ratio distribution of the coke layer and the ore layer in the radial direction of the blast furnace has been most often used for controlling the distribution of the charged material. In the following description, the mass ratio of the coke layer and the ore layer is described as "[Ore / Cake]". Blast furnaces are classified into bellless blast furnaces and bell blast furnaces according to the type of raw material charging equipment. In either case of the bellless blast furnace or the bell blast furnace, it is effective to reduce the value of [Ore / Cake] in the center of the furnace in order to obtain a particularly stable gas flow.

近年では、高出銑比かつ高微粉炭比、低燃料比操業が行われている。このような操業では、装入されるコークス量に対して鉱石量が多い操業条件となる。以下の説明では、このような操業条件を「高O/C条件」と記載する。「高O/C条件」の高炉操業では、原料堆積層内に通気抵抗の大きい鉱石層の比率が高くなるので、炉上部の圧損が増加する。この結果、吹き抜けの発生や、装入物が安定して降下せずに棚吊りやスリップなどが発生しやすくなる。このような現象により、高炉の安定操業が大きく阻害され、生産性が著しく低下する。したがって、高O/C条件下での安定操業を実現するためには、(Ore/Coke)をより精密に制御する必要がある。 In recent years, operations with a high pig iron ratio, a high pulverized coal ratio, and a low fuel ratio have been carried out. In such an operation, the operating conditions are such that the amount of ore is large relative to the amount of coke charged. In the following description, such operating conditions will be referred to as "high O / C conditions". In the blast furnace operation under the “high O / C condition”, the ratio of the ore layer having a large aeration resistance in the raw material sedimentary layer becomes high, so that the pressure loss at the upper part of the furnace increases. As a result, a stairwell is generated, and the contents are not stably lowered, and shelving or slipping are likely to occur. Due to such a phenomenon, the stable operation of the blast furnace is greatly hindered, and the productivity is significantly reduced. Therefore, in order to realize stable operation under high O / C conditions, it is necessary to control (Ore / Cake) more precisely.

特許文献1には、炉半径方向における炉中心からの距離をr(m)、炉口部での炉内半径をRt(m)とした場合に、炉半径方向における炉内領域を、炉中心側から順に、r/Rt≦0.20:第1領域、0.20<r/Rt≦0.80:第2領域、0.80<r/Rt:第3領域とし、[Lo/(Lc+Lo)](但し、Lo:鉱石層厚さ、Lc:コークス層厚さ)が下記(a)〜(d)の条件を満足する装入分布となるよう制御する方法が開示されている。
(a)第1領域の平均値:0.5未満
(b)第2領域の平均値:0.6以上0.9未満
(c)第3領域の平均値:0.4以上0.8未満
(d)第1領域の平均値<第3領域の平均値<第2領域の平均値
この方法では、第1および第3領域で高炉炉内の通気性を確保しつつ、第2領域の[Lo/(Lc+Lo)]を高くすることで、高炉全体の還元効率を高めている。
In Patent Document 1, when the distance from the furnace center in the furnace radius direction is r (m) and the furnace inner radius at the furnace mouth is Rt (m), the furnace inner region in the furnace radial direction is defined as the furnace center. From the side, r / Rt ≦ 0.20: 1st region, 0.20 <r / Rt ≦ 0.80: 2nd region, 0.80 <r / Rt: 3rd region, and [Lo / (Lc + Lo) )] (However, a method of controlling Lo: ore layer thickness, Lc: coke layer thickness) so as to have a charging distribution satisfying the following conditions (a) to (d) is disclosed.
(A) Mean value of the first region: less than 0.5 (b) Mean value of the second region: 0.6 or more and less than 0.9 (c) Mean value of the third region: 0.4 or more and less than 0.8 (D) Mean value of the first region <Mean value of the third region <Mean value of the second region In this method, while ensuring the air permeability in the blast furnace in the first and third regions, the [2 region [ By increasing Lo / (Lc + Lo)], the reduction efficiency of the entire blast furnace is increased.

ところで、炉頂部から原料を装入する手段として、分配シュートを備えたベルレス装入装置が広く用いられている。このベルレス装入装置は、分配シュートの傾動角度と旋回数を変えることで炉半径方向での原料の落下位置と堆積量とを調整できるので、これにより、[Ore/Coke]を制御できる。分配シュートの傾動角度とは、鉛直方向と分配シュートのシュート面上の原料の流れる角度とのなす角である。 By the way, as a means for charging raw materials from the top of the furnace, a bellless charging device provided with a distribution chute is widely used. Since this bellless charging device can adjust the drop position and the accumulated amount of the raw material in the radial direction of the furnace by changing the tilt angle and the number of turns of the distribution chute, [Ore / Cake] can be controlled by this. The tilt angle of the distribution chute is an angle formed by the vertical direction and the angle at which the raw material flows on the chute surface of the distribution chute.

原料を炉内の所定位置に堆積させるには、炉内に装入した原料の堆積幅を小さくすることが有効である。特許文献2には、分配シュート先端の線速度Vを、装入する原料の性状から定まる所定値以下として、堆積物の堆積幅を小さくする方法が開示されている。 In order to deposit the raw material at a predetermined position in the furnace, it is effective to reduce the deposition width of the raw material charged in the furnace. Patent Document 2 discloses a method of reducing the deposit width of the deposit by setting the linear velocity V at the tip of the distribution chute to a predetermined value or less determined from the properties of the raw material to be charged.

特開2018−193579号公報JP-A-2018-193579 特開2003−328018号公報Japanese Unexamined Patent Publication No. 2003-328018

近年の高O/C条件下の操業では、単に中心部の[Ore/Coke]を低減させて、逆V字型の融着帯形状を形成させて通気の安定を図るだけでは十分ではない。炉壁部の[Ore/Coke]も低減させて通気を確保しつつ、中間部の[Ore/Coke]を高めて炉全体の還元効率を高める必要がある。このためには、原料を炉頂部から分配シュートを介して炉内の所定位置に安定かつ確実に堆積させる必要がある。 In recent operations under high O / C conditions, it is not sufficient to simply reduce [Ore / Cake] in the central portion to form an inverted V-shaped fusion zone shape to stabilize ventilation. It is necessary to reduce [Ore / Cake] in the furnace wall to ensure ventilation, and to increase [Ore / Cake] in the middle to improve the reduction efficiency of the entire furnace. For this purpose, it is necessary to stably and surely deposit the raw material from the top of the furnace at a predetermined position in the furnace via the distribution chute.

原料を炉内の所定位置に堆積させるには、特許文献2に開示されたような原料の堆積幅を小さくするだけでなく、所定位置に堆積させた原料の崩れの抑制も必要になる。従って、堆積幅を小さくすると共に、所定位置に堆積させた原料の崩れの抑制も考慮しながら、原料装入時の分配シュートの旋回速度を適正化する必要がある。 In order to deposit the raw material at a predetermined position in the furnace, it is necessary not only to reduce the deposition width of the raw material as disclosed in Patent Document 2, but also to suppress the collapse of the raw material deposited at the predetermined position. Therefore, it is necessary to optimize the turning speed of the distribution chute at the time of charging the raw material while reducing the deposit width and suppressing the collapse of the raw material deposited at the predetermined position.

特許文献2に開示された分配シュートの先端速度の低減は、装入時間の延長を招くので、生産性を阻害する可能性がある。本発明は、上記の課題を解決し、生産性を阻害することなく、原料を炉内の所定位置に装入できるベルレス高炉の原料装入方法および当該原料装入方法を用いた高炉操業方法を提供することを目的とする。 The reduction in the tip speed of the distribution chute disclosed in Patent Document 2 leads to an extension of the charging time, which may hinder productivity. The present invention solves the above-mentioned problems, and provides a raw material charging method for a bellless blast furnace capable of charging raw materials at a predetermined position in a furnace without impairing productivity, and a blast furnace operating method using the raw material charging method. The purpose is to provide.

このような課題を解決するための本発明の特徴は、以下の通りである。
[1]分配シュートを旋回させて、高炉炉内に鉄源原料および炭材を装入するベルレス高炉の原料装入方法であって、前記分配シュートは、前記分配シュートの先端に前記分配シュートの搬送方向より下向きに傾斜する反発板を有し、前記分配シュートの旋回速度は10.0rpmより速い、ベルレス高炉の原料装入方法。
[2]前記分配シュートの旋回速度は12.0rpm以上である、[1]に記載のベルレス高炉の原料装入方法。
[3]前記分配シュートの旋回中心から原料装入開始時の炉内の原料堆積レベルまでの距離d、炉口半径Roおよび下記(1)式で定まる角度αに対して分配シュートの傾動角を1.36α以上にする、[2]に記載のベルレス高炉の原料装入方法。
tanα=Ro/d・・・(1)
[4]前記分配シュートの旋回速度は14.0rpm以上である、[1]に記載のベルレス高炉の原料装入方法。
[5]前記分配シュートの旋回中心から原料装入開始時の炉内の原料堆積レベルまでの距離d、炉口半径Roおよび下記(1)式で定まる角度αに対して分配シュートの傾動角を1.41α以上にする、[4]に記載のベルレス高炉の原料装入方法。
tanα=Ro/d・・・(1)
[6][1]から[5]のいずれか1つに記載のベルレス高炉の原料装入方法で、前記高炉炉内に鉄源原料および炭材を装入する、高炉操業方法。
The features of the present invention for solving such a problem are as follows.
[1] A method of charging raw materials for a bellless blast furnace in which an iron source raw material and a charcoal material are charged into a blast furnace by turning a distribution chute. A method for charging raw materials for a bellless blast furnace, which has a repulsion plate that inclines downward from the transport direction and has a turning speed of the distribution chute faster than 10.0 rpm.
[2] The method for charging raw materials for a bellless blast furnace according to [1], wherein the turning speed of the distribution chute is 12.0 rpm or more.
[3] The tilt angle of the distribution chute is set with respect to the distance d from the turning center of the distribution chute to the raw material deposition level in the furnace at the start of charging the raw material, the furnace mouth radius Ro, and the angle α determined by the following equation (1). The method for charging raw materials for a bellless blast furnace according to [2], which comprises 1.36α or more.
tanα = Ro / d ... (1)
[4] The method for charging raw materials for a bellless blast furnace according to [1], wherein the turning speed of the distribution chute is 14.0 rpm or more.
[5] The tilt angle of the distribution chute is set with respect to the distance d from the turning center of the distribution chute to the raw material deposition level in the furnace at the start of charging the raw material, the furnace mouth radius Ro, and the angle α determined by the following equation (1). The method for charging raw materials for a bellless blast furnace according to [4], which comprises 1.41α or more.
tanα = Ro / d ... (1)
[6] A blast furnace operating method in which an iron source raw material and a charcoal material are charged into the blast furnace by the method for charging a raw material for a bellless blast furnace according to any one of [1] to [5].

本発明に係るベルレス高炉の原料装入方法では、分配シュートの旋回速度を10.0rpmより速くして鉱石および炭材を高炉内に装入する。これにより、生産性を阻害することなく、炉壁周辺部の炭材の堆積角を大きくでき、その堆積幅も小さくできる。この結果、炉壁部において[Ore/Coke]を低減させている領域の面積を小さくできるので、高炉のガス利用率が向上し、低還元材比低コークス比操業が実現する。 In the method for charging raw materials for a bellless blast furnace according to the present invention, the turning speed of the distribution chute is made faster than 10.0 rpm to charge the ore and the carbonaceous material into the blast furnace. As a result, the deposition angle of the carbonaceous material around the furnace wall can be increased and the deposition width can be reduced without impairing the productivity. As a result, the area of the region where [Ore / Cake] is reduced can be reduced in the furnace wall portion, so that the gas utilization rate of the blast furnace is improved and the operation with a low reducing agent ratio and a low coke ratio is realized.

図1は、模型設備10の概要を示す模式図である。FIG. 1 is a schematic view showing an outline of the model equipment 10. 図2は、反発板22を含む分配シュート18の先端部を示す斜視図と断面図である。FIG. 2 is a perspective view and a cross-sectional view showing the tip end portion of the distribution chute 18 including the repulsion plate 22. 図3は、装入実験により得られた重量分布を示すグラフである。FIG. 3 is a graph showing the weight distribution obtained by the charging experiment. 図4は、コークスの堆積角測定実験に用いた模型設備30の断面模式図である。FIG. 4 is a schematic cross-sectional view of the model equipment 30 used in the coke deposition angle measurement experiment. 図5は、原料の装入を開始した時の炉内の状況を示す模式図である。FIG. 5 is a schematic view showing the state in the furnace when the charging of the raw material is started.

本発明者らは、ベルレス高炉における分配シュートからのコークスの落下挙動を確認するべく、内容積5,005mで炉口径が11.2mの高炉の1/17.8スケールの模型設備10を用いてコークスの装入実験を行った。図1は、模型設備10の概要を示す模式図である。In order to confirm the falling behavior of coke from the distribution chute in a bellless blast furnace, the present inventors used a 1 / 17.8 scale model facility 10 of a blast furnace having an internal volume of 5,005 m 3 and a furnace diameter of 11.2 m. A coke charging experiment was conducted. FIG. 1 is a schematic view showing an outline of the model equipment 10.

模型設備10は、炉頂バンカー12と、集合ホッパー16と、分配シュート18と、サンプリングボックス24と、を有する。炉頂バンカー12は、コークスや鉱石を収容する3個のホッパー14を有する。各ホッパー14の下部には、収容された原料の排出を許容するゲートが設けられている。集合ホッパー16は、炉頂バンカー12から排出された原料を分配シュート18に供給する。分配シュート18は、シュート20と、反発板22を有する。サンプリングボックス24は、分配シュート18の旋回中心に対応した位置を中心として放射状に4方向に設けられている。各サンプリングボックス24は、中心側から外側に向けて20mm間隔で分割された複数の収容部26を有する。 The model equipment 10 includes a furnace top bunker 12, a collecting hopper 16, a distribution chute 18, and a sampling box 24. The furnace top bunker 12 has three hoppers 14 for accommodating coke and ore. At the bottom of each hopper 14, a gate is provided to allow the discharge of the contained raw material. The collecting hopper 16 supplies the raw material discharged from the furnace top bunker 12 to the distribution chute 18. The distribution chute 18 has a chute 20 and a repulsion plate 22. The sampling boxes 24 are provided in four directions radially around a position corresponding to the turning center of the distribution chute 18. Each sampling box 24 has a plurality of accommodating portions 26 divided at intervals of 20 mm from the center side to the outside.

サンプリングボックス24を設置した高さは、分配シュート18の傾動・旋回の中心位置から鉛直下方に424mmのレベルに、サンプリングボックス24の上部の開口がくるように定めた。このレベル差は、模型設備10の炉口径が630mmなので、炉口径の0.67倍に相当する。 The height at which the sampling box 24 was installed was set so that the opening at the top of the sampling box 24 was at a level of 424 mm vertically downward from the center position of tilting / turning of the distribution chute 18. Since the furnace diameter of the model equipment 10 is 630 mm, this level difference corresponds to 0.67 times the furnace diameter.

図2は、反発板22を含む分配シュート18の先端部を示す斜視図と断面図である。図2(a)は斜視図であり、図2(b)は断面図である。分配シュート18の搬送方向を図2(b)の矢印21方向とすると、反発板22は、分配シュート18の先端に搬送方向より下向きに傾斜して設けられる。 FIG. 2 is a perspective view and a cross-sectional view showing the tip end portion of the distribution chute 18 including the repulsion plate 22. FIG. 2A is a perspective view, and FIG. 2B is a cross-sectional view. Assuming that the transport direction of the distribution chute 18 is the direction of the arrow 21 in FIG. 2B, the repulsion plate 22 is provided at the tip of the distribution chute 18 so as to be inclined downward from the transport direction.

反発板22は、シュート20の搬送方向を水平と平行にした場合に、シュート20の先端から反発板22までの水平方向の距離(図2(b)のL)が70mmとなるように設けられている。反発板22の傾斜角度(図2の(b)のθ)は、水平方向に対して23°である。反発板22の角度を変更する場合には、シュート20から反発板22までの水平方向の距離を変えないように、反発板22の長さを調整した。 The repulsion plate 22 is provided so that the horizontal distance (L in FIG. 2B) from the tip of the chute 20 to the repulsion plate 22 is 70 mm when the transport direction of the chute 20 is parallel to the horizontal. ing. The inclination angle of the repulsion plate 22 (θ in FIG. 2B) is 23 ° with respect to the horizontal direction. When changing the angle of the repulsion plate 22, the length of the repulsion plate 22 was adjusted so as not to change the horizontal distance from the chute 20 to the repulsion plate 22.

模型設備10を用いたコークスの装入実験は、以下の手順で行った。まず、粒径2.0mmから2.8mmのコークス3kgを炉頂バンカー12に装入した。3kgのコークスを17秒で切出せるように炉頂バンカー12のゲート開度を調整した。次に、ゲートを開き、コークスを炉頂バンカー12から集合ホッパー16に切出し、分配シュート18を介してコークスを落下させた。分配シュート18から落下したコークスは、サンプリングボックス24の収容部26に収容した。コークスは炭材の一例である。 The coke charging experiment using the model equipment 10 was carried out according to the following procedure. First, 3 kg of coke having a particle size of 2.0 mm to 2.8 mm was charged into the furnace top bunker 12. The gate opening of the furnace top bunker 12 was adjusted so that 3 kg of coke could be cut out in 17 seconds. Next, the gate was opened, the coke was cut out from the furnace top bunker 12 into the collecting hopper 16, and the coke was dropped through the distribution chute 18. The coke that fell from the distribution chute 18 was accommodated in the accommodating portion 26 of the sampling box 24. Coke is an example of carbonaceous material.

このサンプリングボックス24の各収容部26に収容されたコークスの重量を測定し、落下したコークスの半径方向の重量分布を算出した。図3は、装入実験により得られた重量分布を示すグラフである。図3の横軸は、中心から半径方向の位置(mm)であり、縦軸は、累積重量頻度(%)である。累積重量頻度とは、中心から所定の距離離れた位置において、その位置より中心側に到達したコークス重量の全コークス重量に対する割合で定義される。 The weight of the coke contained in each accommodating portion 26 of the sampling box 24 was measured, and the weight distribution of the dropped coke in the radial direction was calculated. FIG. 3 is a graph showing the weight distribution obtained by the charging experiment. The horizontal axis of FIG. 3 is the position (mm) in the radial direction from the center, and the vertical axis is the cumulative weight frequency (%). Cumulative weight frequency is defined as the ratio of the weight of coke that reaches the center side from that position to the total weight of coke at a position separated from the center by a predetermined distance.

装入実験では、累積重量頻度が50%の位置を主流落下位置と定義し、累積重量頻度が5%から95%までの半径方向の間隔を落下幅と定義した。分配シュート18の傾動角度は、傾動・旋回の中心から424mm鉛直下方における炉壁位置が、累積重量頻度95%と一致する、すなわち、炉中心から315mmとなるように調整した。 In the charging experiment, the position where the cumulative weight frequency was 50% was defined as the mainstream drop position, and the radial interval when the cumulative weight frequency was 5% to 95% was defined as the drop width. The tilt angle of the distribution chute 18 was adjusted so that the position of the furnace wall vertically 424 mm vertically below the center of tilting / turning coincided with the cumulative weight frequency of 95%, that is, 315 mm from the center of the furnace.

分配シュート18のシュート20長さを240mmとし、分配シュート18の旋回速度を42.2、50.6、59.1rpmに変えて装入実験を行った。模型設備10は実機高炉の1/17.8スケールなので、分配シュート18から落下する原料の軌跡が実機と相似となる条件としてフルード数が一定であることを考慮すると、模型設備10における旋回速度42.2rpmは、実機高炉の旋回速度10.0rpmに相当する。模型設備10における旋回速度50.6rpmは、実機高炉の旋回速度12.0rpmに相当する。模型設備10における旋回速度59.1rpmは、実機高炉の旋回速度14.0rpmに相当する。この装入実験を、反発板22を装着した場合と装着しない場合とで行った。実験条件および結果を下記表1に示す。 The charging experiment was conducted by setting the shoot 20 length of the distribution chute 18 to 240 mm and changing the turning speed of the distribution chute 18 to 42.2, 50.6, and 59.1 rpm. Since the model equipment 10 is 1 / 17.8 scale of the actual blast furnace, considering that the Froude number is constant as a condition that the trajectory of the raw material falling from the distribution chute 18 is similar to that of the actual machine, the turning speed 42 in the model equipment 10 .2 rpm corresponds to the turning speed of 10.0 rpm of the actual blast furnace. The turning speed of 50.6 rpm in the model equipment 10 corresponds to the turning speed of 12.0 rpm of the actual blast furnace. The turning speed of 59.1 rpm in the model equipment 10 corresponds to the turning speed of 14.0 rpm of the actual blast furnace. This charging experiment was carried out with and without the repulsion plate 22 attached. The experimental conditions and results are shown in Table 1 below.

Figure 2020166347

表1に示すように、先端に反発板22を装着した分配シュート18を用いた場合、旋回速度の上昇に伴ってコークスの落下幅が小さくなった。一方、先端に反発板22を装着していない分配シュートを用いた場合、旋回速度の上昇に伴ってコークスの落下幅は大きくなった。この結果から、先端に反発板22を装着した分配シュート18を用い、分配シュート18の旋回速度を42.2rpmより速くしてコークスを装入することで、コークスの落下幅を小さくできることが確認された。
Figure 2020166347

As shown in Table 1, when the distribution chute 18 having the repulsion plate 22 attached to the tip was used, the falling width of the coke became smaller as the turning speed increased. On the other hand, when a distribution chute without the repulsion plate 22 attached to the tip was used, the fall width of the coke increased as the turning speed increased. From this result, it was confirmed that the falling width of the coke can be reduced by using the distribution chute 18 having the repulsion plate 22 attached to the tip and charging the coke with the turning speed of the distribution chute 18 faster than 42.2 rpm. It was.

次に、コークスの堆積角測定実験について説明する。図4は、コークスの堆積角測定実験に用いた模型設備30の断面模式図である。模型設備30は、炉頂バンカー12と、集合ホッパー16と、分配シュート18と、炉口径630mmの模型炉32と、を有する。炉頂バンカー12と、集合ホッパー16と、分配シュート18は、模型設備10で用いたものと同じである。堆積角測定実験では、まず、模型炉32内に傾斜角16°の堆積面を作製した。その後、装入実験と同じ手順で、当該堆積面上に分配シュート18を介してコークスを落下させ、炉壁近傍に堆積したコークスの堆積角を測定した。分配シュート18の傾動角度は、傾動・旋回の中心から424mm鉛直下方における主流落下位置が、炉中心から285〜325mmとなる範囲内で調整した。主流落下位置は、模型設備10を用いたコークスの装入実験を行い測定した。この結果を下記表2、表3に示す。 Next, a coke deposition angle measurement experiment will be described. FIG. 4 is a schematic cross-sectional view of the model equipment 30 used in the coke deposition angle measurement experiment. The model equipment 30 includes a furnace top bunker 12, a collecting hopper 16, a distribution chute 18, and a model furnace 32 having a furnace diameter of 630 mm. The furnace top bunker 12, the collective hopper 16, and the distribution chute 18 are the same as those used in the model equipment 10. In the deposition angle measurement experiment, first, a deposit surface having an inclination angle of 16 ° was prepared in the model furnace 32. Then, in the same procedure as the charging experiment, coke was dropped onto the deposition surface via the distribution chute 18, and the deposition angle of the coke deposited near the furnace wall was measured. The tilt angle of the distribution chute 18 was adjusted within a range in which the mainstream drop position 424 mm vertically below the center of tilt / turning was 285 to 325 mm from the center of the furnace. The mainstream drop position was measured by conducting a coke charging experiment using the model equipment 10. The results are shown in Tables 2 and 3 below.

Figure 2020166347
Figure 2020166347

Figure 2020166347

表2に示すように、先端に反発板22を装着した分配シュート18を用いた場合、旋回速度が同一の条件では、コークスの堆積角が極大となる傾動角度が存在した。主流落下位置が壁面から中心側に離れている場合は、壁面に衝突するコークスの粒子数が少ないため堆積角が小さくなる。主流の落下位置が壁面に近い場合においても、壁面に衝突するコークスの粒子数が多く、壁面からの反発が大きくなってコークスの堆積角が小さくなる。このように、主流落下位置が壁面から離れていても堆積角が小さくなり、主流落下位置が壁面に近づいてもコークスの堆積角が小さくなるので、この間にコークスの堆積角が極大となる傾斜角が存在する。
Figure 2020166347

As shown in Table 2, when the distribution chute 18 having the repulsion plate 22 attached to the tip was used, there was a tilt angle at which the coke deposition angle was maximized under the same turning speed conditions. When the mainstream drop position is far from the wall surface toward the center, the deposition angle becomes small because the number of coke particles colliding with the wall surface is small. Even when the mainstream drop position is close to the wall surface, the number of coke particles colliding with the wall surface is large, the repulsion from the wall surface is large, and the coke deposition angle is small. In this way, the deposition angle is small even if the mainstream fall position is far from the wall surface, and the coke deposition angle is small even if the mainstream fall position is close to the wall surface. Exists.

分配シュート18の旋回速度が高速になると、堆積角が極大となる傾動角度における主流落下位置は炉壁側に変化した。旋回速度を高くした場合、旋回速度が低い場合と比較すると、分配シュート18を流れるコークスに遠心力が働くため、より遠くにコークスが落下する。上述したように、主流落下位置が同一であったとしても、旋回速度が低い場合よりも旋回速度が高い場合の方が、落下幅が小さくなるので、堆積面に到達する前に炉壁に衝突するコークスの粒子数が減少する。このため、旋回速度が低い場合よりも旋回速度が高い場合の方が、コークスの堆積角が極大となる傾動角度における主流落下位置は炉壁側に変化する。 When the turning speed of the distribution chute 18 became high, the mainstream drop position at the tilt angle at which the deposition angle became maximum changed to the furnace wall side. When the turning speed is increased, a centrifugal force acts on the coke flowing through the distribution chute 18 as compared with the case where the turning speed is low, so that the coke falls farther. As described above, even if the mainstream fall position is the same, the fall width is smaller when the turning speed is higher than when the turning speed is lower, so that the fall width collides with the furnace wall before reaching the sedimentary surface. The number of coke particles is reduced. Therefore, the mainstream drop position at the tilt angle at which the coke deposition angle is maximized changes to the furnace wall side when the turning speed is high than when the turning speed is low.

旋回速度が高速になると、主流落下位置が炉中心側においても、コークスの堆積角が大きくなっている。これは、旋回速度を高速にしたことで、コークス粒子の水平方向の速度も速くなり、主流落下位置が炉中心側であっても、堆積面と衝突したコークス粒子が炉壁側に移動し、これにより、コークスの堆積角が大きくなったと考えられる。旋回速度を同一にした条件でのコークスの堆積角の極大値をそれぞれの旋回速度で比較すると、旋回速度の上昇に伴って堆積角の極大値が大きくなった。 When the turning speed becomes high, the coke deposition angle increases even when the mainstream drop position is on the furnace center side. This is because the speed of the coke particles in the horizontal direction is also increased by increasing the swirling speed, and even if the mainstream drop position is on the center side of the furnace, the coke particles that collide with the deposition surface move to the side of the furnace wall. It is considered that this increased the coke deposition angle. Comparing the maximum values of the coke deposition angle under the same turning speed for each turning speed, the maximum value of the deposition angle increased as the turning speed increased.

一方、表3に示すように、先端に反発板22を装着していない分配シュートを用いた場合、旋回速度が同一の条件での堆積角の極大値は旋回速度の上昇に伴って小さくなった。これは、旋回速度の上昇により、半径方向の落下幅が大きくなってコークスが疎に堆積したためと考えられる。 On the other hand, as shown in Table 3, when a distribution chute without the repulsion plate 22 attached to the tip was used, the maximum value of the deposition angle under the same turning speed condition became smaller as the turning speed increased. .. It is considered that this is because the fall width in the radial direction became large due to the increase in the turning speed and the coke was sparsely deposited.

このように、先端に反発板22を装着した分配シュート18を用いた場合、分配シュート18の旋回速度を上げることで、コークスの堆積角を大きくできることが確認された。この結果から、先端に反発板22を装着した分配シュート18を用い、分配シュート18の旋回速度を42.2rpmより速くしてコークスを装入することで炉壁近傍のコークスの堆積角を大きくできることが確認された。 As described above, it was confirmed that when the distribution chute 18 having the repulsion plate 22 attached to the tip thereof is used, the coke deposition angle can be increased by increasing the turning speed of the distribution chute 18. From this result, it is possible to increase the deposition angle of coke near the furnace wall by using the distribution chute 18 with the repulsion plate 22 attached to the tip and charging the coke with the turning speed of the distribution chute 18 faster than 42.2 rpm. Was confirmed.

炉壁近傍のコークスの堆積角が大きくなった理由は、分配シュート18の旋回速度が速くなったことで半径方向のコークスの落下幅が小さくなりコークスが半径方向の特定の領域に密に堆積したことに加え、旋回方向のコークスの落下速度が上昇したことで、堆積したコークスの崩れる方向が、旋回速度が低い場合と比較して炉中心方向から旋回方向へと変化し、この結果、堆積したコークスが崩れにくくなったことによると考えられる。 The reason why the coke deposition angle near the furnace wall increased is that the swirling speed of the distribution chute 18 increased, which reduced the fall width of coke in the radial direction and coke densely deposited in a specific region in the radial direction. In addition, as the falling speed of coke in the turning direction increased, the direction in which the accumulated coke collapsed changed from the furnace center direction to the turning direction as compared with the case where the turning speed was low, and as a result, the coke accumulated. It is thought that this is because the coke is less likely to collapse.

次に、分配シュート18のシュート長の影響を確認することを目的として、同様の装入実験を分配シュート18のシュート長を変化させて行った。この結果を下記表4に示す。傾動角度は、旋回および傾動中心から424mm鉛直下方における主流落下位置が炉中心から285〜325mmとなる範囲内において、コークスの堆積角が極大となる条件で行った。 Next, for the purpose of confirming the influence of the shoot length of the distribution chute 18, the same charging experiment was performed by changing the shoot length of the distribution chute 18. The results are shown in Table 4 below. The tilt angle was set under the condition that the coke deposition angle was maximized within the range where the mainstream drop position 424 mm vertically below the center of swivel and tilt was 285 to 325 mm from the center of the furnace.

Figure 2020166347

表4に示すように、分配シュートのシュート長を240mmから220mmに短縮すると、表1に示したシュート長が240mm分配シュートを用いた場合よりもコークスの落下幅が大きくなり、コークスの堆積角は小さくなった。しかしながら、シュート長が220mmの分配シュートを用いた場合であっても、分配シュートの旋回速度を50.6rpm以上にすることで、旋回速度を42.2rpmとした場合よりもコークスの落下幅は小さくなり、炉壁近傍のコークス堆積角は大きくなった。
Figure 2020166347

As shown in Table 4, when the shoot length of the distribution chute is shortened from 240 mm to 220 mm, the shoot length shown in Table 1 becomes larger than that when the 240 mm distribution chute is used, and the coke deposition angle becomes larger. It became smaller. However, even when a distribution chute with a chute length of 220 mm is used, by setting the swirl speed of the distribution chute to 50.6 rpm or more, the falling width of coke is smaller than when the swivel speed is 42.2 rpm. As a result, the coke deposition angle near the furnace wall increased.

分配シュートのシュート長を240mmから260mmに延長すると、シュート長が240mmの分配シュートを用いた場合よりもコークスの落下幅が小さくなり、コークスの堆積角は小さくなった。シュート長が260mmの分配シュートを用いた場合においても、分配シュートの旋回速度を50.6rpm以上にすることで、旋回速度を42.2rpmとした場合よりもコークスの落下幅は小さくなり、炉壁近傍のコークス堆積角は大きくなった。この結果から、コークスの落下幅およびコークスの堆積角は、分配シュートのシュート長が変わることで若干の影響は受けるものの、旋回速度を42.2rpmより速くすることでコークスの落下幅を小さくし、コークスの堆積角を大きくできるという傾向は変わらないことが確認された。 When the shoot length of the distribution chute was extended from 240 mm to 260 mm, the coke drop width was smaller and the coke deposition angle was smaller than when the distribution chute with a chute length of 240 mm was used. Even when a distribution chute with a chute length of 260 mm is used, by setting the swirl speed of the distribution chute to 50.6 rpm or more, the fall width of coke becomes smaller than when the swivel speed is 42.2 rpm, and the furnace wall. The coke deposition angle in the vicinity increased. From this result, the fall width of coke and the deposition angle of coke are slightly affected by the change in the shoot length of the distribution chute, but the fall width of coke is reduced by making the turning speed faster than 42.2 rpm. It was confirmed that the tendency to increase the coke deposition angle does not change.

本発明に係るベルレス高炉の原料装入方法は、上記コークスの装入実験結果に基づいてなされたものである。模型設備10および模型設備30における分配シュート18の旋回速度42.2rpm、50.6rpm、59.1rpmは、実機高炉における分配シュートの旋回速度10.0rpm、12.0rpm、14.0rpmに相当する。従って、本実施形態に係るベルレス高炉の原料装入方法では、先端に分配シュートの搬送方向より下向きに傾斜する反発板を有する分配シュートを用い、当該分配シュートの旋回速度を10.0rpmより速くして高炉炉内に鉱石および炭材を装入する。これにより、生産性を阻害することなく、高炉の炉壁部に装入される炭材の堆積角を大きくでき、その落下幅を小さくできる。この結果、高炉の炉壁部において[Ore/Coke]を低減させている領域の面積を小さくでき、これにより、高炉のガス利用率が向上し、高炉における低還元材比低コークス比操業が実現できる。 The raw material charging method for the bellless blast furnace according to the present invention is based on the results of the above-mentioned coke charging experiment. The swirling speeds of the distribution chute 18 in the model equipment 10 and the model equipment 30 are 42.2 rpm, 50.6 rpm, and 59.1 rpm, which correspond to the swirling speeds of the distribution chute in the actual blast furnace of 10.0 rpm, 12.0 rpm, and 14.0 rpm. Therefore, in the raw material charging method of the bellless blast furnace according to the present embodiment, a distribution chute having a repulsion plate inclined downward from the transport direction of the distribution chute is used at the tip, and the turning speed of the distribution chute is made faster than 10.0 rpm. The ore and carbonaceous materials are charged into the blast furnace. As a result, the deposition angle of the carbonaceous material charged into the furnace wall of the blast furnace can be increased and the fall width can be reduced without impairing the productivity. As a result, the area of the area where [Ore / Cake] is reduced can be reduced in the furnace wall of the blast furnace, which improves the gas utilization rate of the blast furnace and realizes low coke ratio operation with low reducing agent ratio in the blast furnace. it can.

分配シュートの旋回速度は12.0rpm以上であることが好ましい。これにより、炉壁部のコークス堆積角を、旋回速度を12.0rpm未満とした場合よりも大きくでき、後述する実施例に示すように、高炉操業における還元材比およびコークス比をさらに低減できる。 The turning speed of the distribution chute is preferably 12.0 rpm or more. As a result, the coke deposition angle of the furnace wall portion can be made larger than when the turning speed is less than 12.0 rpm, and as shown in Examples described later, the reducing agent ratio and the coke ratio in the blast furnace operation can be further reduced.

分配シュートの旋回速度は14.0rpm以上であることがさらに好ましい。これにより、炉壁部のコークス堆積角を、旋回速度を14.0rpm未満とした場合よりも大きくでき、高炉操業における還元材比およびコークス比をさらに低減できる。 It is more preferable that the turning speed of the distribution chute is 14.0 rpm or more. As a result, the coke deposition angle of the furnace wall portion can be made larger than when the turning speed is less than 14.0 rpm, and the reducing agent ratio and the coke ratio in the blast furnace operation can be further reduced.

さらに、分配シュートの傾動・旋回の中心位置から原料装入開始時の炉内の原料堆積レベルまでの距離を短くすると、シュート先端から堆積面までの距離が低減し、コークスの落下幅がさらに小さくなる。しかしながら、主流落下位置を炉壁に到達させるには、傾動角度を増加させる必要がある。傾動角度を増加させると、原料の堆積面が降下した場合、主流落下位置の炉壁側への落下幅が大きくなる。このため、高炉の操業において原料装入開始時の炉内の原料堆積レベルが変動した場合の影響を受けやすくなるといえる。この観点から、分配シュートの傾動・旋回の中心位置から原料装入開始時の炉内の原料堆積レベルまでの距離を炉口半径の0.60倍以上とすることが好ましい。ここで原料装入開始時の炉内の原料堆積レベルとは、分配シュートから原料の装入を開始する時点における炉内の原料の堆積表面のレベルである。 Furthermore, if the distance from the center position of the tilting / turning of the distribution chute to the raw material deposition level in the furnace at the start of raw material charging is shortened, the distance from the chute tip to the deposit surface is reduced, and the coke drop width is further reduced. Become. However, in order for the mainstream drop position to reach the furnace wall, it is necessary to increase the tilt angle. When the tilt angle is increased, when the deposit surface of the raw material is lowered, the fall width of the mainstream drop position toward the furnace wall becomes large. Therefore, it can be said that in the operation of the blast furnace, it is easily affected when the raw material deposition level in the furnace at the start of raw material charging fluctuates. From this point of view, it is preferable that the distance from the center position of the tilting / turning of the distribution chute to the raw material deposition level in the furnace at the start of charging the raw material is 0.60 times or more the radius of the furnace opening. Here, the raw material deposition level in the furnace at the start of charging the raw material is the level of the deposited surface of the raw material in the furnace at the time when the charging of the raw material is started from the distribution chute.

図5は、原料の装入を開始した時の炉内の状況を示す模式図である。図5を用いて、原料装入開始時における炉内の原料の堆積表面レベルを説明する。 FIG. 5 is a schematic view showing the state in the furnace when the charging of the raw material is started. With reference to FIG. 5, the deposition surface level of the raw material in the furnace at the start of charging the raw material will be described.

高炉内では原料の堆積表面は水平ではないが、高炉操業では原料装入開始のタイミングを決定するために、例えば、炉壁近傍の原料の堆積表面レベルを検知するサウンジング等の検知手段を使用している。この検知手段で堆積表面レベルが一定のレベルまで降下したことを検知し、検知したタイミングで所定量の原料装入を開始する。これにより、炉内の堆積表面レベルが所定の範囲となるように管理されている。したがって、本実施形態では、原料装入開始時における炉内の原料の堆積表面レベルを、検知手段で検知される炉壁近傍の原料の堆積表面レベルにおける水平面40と定義する。また、次に説明する実施例では分配シュート18の傾動角を分配シュートの傾動・旋回の中心位置42と原料装入開始時における炉内の原料の堆積表面レベルである水平面40までの距離d、炉口半径Roおよび下記(1)式で定まる角度αを用いて表す。また、本実施例における分配シュートの傾動角とは、分配シュート18による原料の搬送方向と、鉛直下方方向とのなす角である。
tanα=Ro/d・・・(1)
Although the deposition surface of raw materials is not horizontal in the blast furnace, in blast furnace operation, detection means such as sounding to detect the deposition surface level of raw materials near the furnace wall is used to determine the timing of starting the charging of raw materials. ing. This detection means detects that the deposited surface level has dropped to a certain level, and starts charging a predetermined amount of raw material at the detected timing. As a result, the sedimentary surface level in the furnace is controlled to be within a predetermined range. Therefore, in the present embodiment, the deposited surface level of the raw material in the furnace at the start of charging the raw material is defined as the horizontal plane 40 at the deposited surface level of the raw material near the furnace wall detected by the detection means. Further, in the embodiment described below, the tilt angle of the distribution chute 18 is set to the distance d between the center position 42 of the tilt / turn of the distribution chute and the horizontal plane 40 which is the deposition surface level of the raw material in the furnace at the start of charging the raw material. It is expressed using the furnace mouth radius Ro and the angle α determined by the following equation (1). The tilt angle of the distribution chute in this embodiment is the angle formed by the distribution chute 18 in the direction of transporting the raw material and in the vertically downward direction.
tanα = Ro / d ... (1)

次に、実施例を説明する。内容積5,005mで炉口径が11.2mである高炉を使用した。貯鉱槽より鉱石を切出して炉頂ホッパーに貯蔵し、貯骸槽よりコークスを切出して別の炉頂ホッパーに貯蔵した。そして、鉱石とコークスを交互に反発板を有する分配シュートに切出し、高炉炉内に鉱石およびコークスを堆積させ、高炉操業を実施した。Next, an embodiment will be described. A blast furnace having an internal volume of 5,005 m 3 and a furnace diameter of 11.2 m was used. The ore was cut out from the mine tank and stored in the top hopper, and the coke was cut out from the skeleton tank and stored in another top hopper. Then, the ore and coke were alternately cut into a distribution chute having a repulsion plate, and the ore and coke were deposited in the blast furnace, and the blast furnace was operated.

比較例1では反発板を有する分配シュートのシュート長を4.2mとし、分配シュートの旋回および傾動中心より7.55m鉛直下方を原料装入開始時の炉内の原料堆積レベルとし、高炉炉内に鉱石およびコークスを堆積させた。この時、分配シュートの傾動・旋回の中心位置と原原料装入開始時における炉内の原料の堆積表面レベルまでの距離dと炉口半径Roおよび上記(1)で定まる角度αは36.6°になる。 In Comparative Example 1, the shoot length of the distribution chute having the repulsion plate is 4.2 m, the raw material deposition level in the furnace at the start of raw material charging is 7.55 m vertically below the turning and tilting center of the distribution chute, and the inside of the blast furnace. Ore and coke were deposited in. At this time, the distance d from the center position of the tilt / rotation of the distribution chute to the deposition surface level of the raw material in the furnace at the start of charging the raw material, the furnace opening radius Ro, and the angle α determined by the above (1) are 36.6. It becomes °.

コークスの装入に際しては、シュートの傾動角度を54.5°としてから装入を開始し、旋回速度を10.0〜14.0rpmとして炉中心にコークスが堆積するまで傾動角度を順次低減させて装入した。 When charging coke, start charging after setting the tilt angle of the chute to 54.5 °, set the turning speed to 10.0 to 14.0 rpm, and gradually reduce the tilt angle until coke is deposited in the center of the furnace. I charged it.

発明例1〜15では、反発板を有する分配シュートのシュート長を4.2mとし、分配シュートの傾動・旋回の中心位置より7.55m鉛直下方を原料装入開始時の炉内の原料堆積レベルとし、高炉炉内に鉱石およびコークスを堆積させ、高炉操業を実施した。 In Invention Examples 1 to 15, the shoot length of the distribution chute having the repulsion plate is 4.2 m, and the raw material deposition level in the furnace at the start of raw material charging is 7.55 m vertically below the center position of the tilting / turning of the distribution chute. Then, ore and coke were deposited in the blast furnace, and the blast furnace was operated.

発明例1〜15においても、分配シュートの傾動・旋回の中心位置と原原料装入開始時における炉内の原料の堆積表面レベルまでの距離dと炉口半径Roおよび上記(1)で定まる角度αは36.6°になる。 Also in Invention Examples 1 to 15, the distance d to the center position of the tilting / turning of the distribution chute and the deposition surface level of the raw material in the furnace at the start of charging the raw material, the furnace opening radius Ro, and the angle determined by the above (1). α becomes 36.6 °.

コークスの装入に際しては、装入開始時の分配シュートの傾動角度を、旋回速度の上昇に合わせて順次小さくし、装入開始後は炉中心にコークスが堆積するまで傾動角度を順次小さくして装入を行った。分配シュートの旋回速度は、10.5〜14.0rpmとした。この発明例、比較例の操業条件および操業結果を下記表5、表6に示す。炉壁部でのコークス堆積角は、コークス装入後に装入物のプロフィールデータを取得し、このプロフィールデータにおける炉壁から1.8mまでの傾斜角から算出した。 When charging coke, the tilt angle of the distribution chute at the start of charging is gradually reduced as the turning speed increases, and after the start of charging, the tilt angle is gradually reduced until coke is deposited in the center of the furnace. I charged it. The turning speed of the distribution chute was 10.5 to 14.0 rpm. The operating conditions and operating results of this invention example and comparative example are shown in Tables 5 and 6 below. The coke deposition angle at the furnace wall was calculated from the inclination angle from the furnace wall to 1.8 m in the profile data of the charged material after the coke was charged.

Figure 2020166347
Figure 2020166347

Figure 2020166347

比較例1では、原料装入開始時の炉内の原料堆積レベルにおけるコークスの落下幅が大きく、炉壁部のコークス堆積角が26.1°と小さかったのに対し、発明例1〜15では炉壁部のコークス堆積角が26.5°以上になった。この結果、炉壁部において[Ore/Coke]を低減させている領域の面積が小さくなり、炉内全体のガス利用率が向上し、発明例1〜15の還元材比およびコークス比は、比較例1よりも低減した。
Figure 2020166347

In Comparative Example 1, the falling width of coke at the raw material deposition level in the furnace at the start of charging the raw material was large, and the coke deposition angle of the furnace wall was as small as 26.1 °, whereas in Invention Examples 1 to 15, the coke deposition angle was small. The coke deposition angle of the furnace wall became 26.5 ° or more. As a result, the area of the region where [Ore / Cake] is reduced in the furnace wall is reduced, the gas utilization rate in the entire furnace is improved, and the reducing agent ratio and the coke ratio of Invention Examples 1 to 15 are compared. It was reduced compared to Example 1.

分配シュートの旋回速度が12.0rpm以上となる発明例4〜15では、同じ旋回速度であれば、分配シュートの傾動角度が1.36α未満とするよりも分配シュートの傾動角度が1.36α以上とすることで炉壁部のコークス堆積角が大きくなり、還元材比およびコークス比が小さくなった。この結果から、分配シュートの旋回角度を1.36α以上にすることで高炉操業における還元材比およびコークス比をさらに低減できることが確認された。 In Invention Examples 4 to 15 in which the turning speed of the distribution chute is 12.0 rpm or more, if the turning speed is the same, the tilt angle of the distribution chute is 1.36 α or more rather than the tilt angle of the distribution chute being less than 1.36 α. As a result, the coke deposition angle of the furnace wall increased, and the reducing agent ratio and coke ratio decreased. From this result, it was confirmed that the reducing agent ratio and the coke ratio in the blast furnace operation can be further reduced by setting the turning angle of the distribution chute to 1.36α or more.

さらに、分配シュートの旋回速度が14.0rpm以上となる発明例13〜15では、分配シュートの傾動角度が1.41α未満とするよりも分配シュートの傾動角度が1.41α以上とすることで、炉壁部のコークス堆積角が大きくなり、還元材比およびコークス比が小さくなった。この結果から、分配シュートの旋回角度を1.41α以上にすることで高炉操業における還元材比およびコークス比をさらに低減できることが確認された。 Further, in Invention Examples 13 to 15 in which the turning speed of the distribution chute is 14.0 rpm or more, the tilt angle of the distribution chute is 1.41 α or more rather than the tilt angle of the distribution chute is less than 1.41 α. The coke deposition angle of the furnace wall increased, and the reducing agent ratio and coke ratio decreased. From this result, it was confirmed that the reducing agent ratio and the coke ratio in the blast furnace operation can be further reduced by setting the turning angle of the distribution chute to 1.41α or more.

10 模型設備
12 炉頂バンカー
14 ホッパー
16 集合ホッパー
18 分配シュート
20 シュート
21 矢印
22 反発板
24 サンプリングボックス
26 収容部
30 模型設備
32 模型炉
40 水平面
42 中心位置
10 Model equipment 12 Furnace top bunker 14 Hopper 16 Collective hopper 18 Distribution chute 20 Chute 21 Arrow 22 Repulsion plate 24 Sampling box 26 Containment section 30 Model equipment 32 Model furnace 40 Horizontal plane 42 Center position

Claims (6)

分配シュートを旋回させて、高炉炉内に鉄源原料および炭材を装入するベルレス高炉の原料装入方法であって、
前記分配シュートは、前記分配シュートの先端に前記分配シュートの搬送方向より下向きに傾斜する反発板を有し、
前記分配シュートの旋回速度は10.0rpmより速い、ベルレス高炉の原料装入方法。
It is a method of charging raw materials for a bellless blast furnace in which iron source raw materials and charcoal materials are charged into the blast furnace by turning the distribution chute.
The distribution chute has a repulsion plate at the tip of the distribution chute that inclines downward from the transport direction of the distribution chute.
A method for charging raw materials for a bellless blast furnace, wherein the turning speed of the distribution chute is faster than 10.0 rpm.
前記分配シュートの旋回速度は12.0rpm以上である、請求項1に記載のベルレス高炉の原料装入方法。 The method for charging raw materials for a bellless blast furnace according to claim 1, wherein the turning speed of the distribution chute is 12.0 rpm or more. 前記分配シュートの旋回中心から原料装入開始時の炉内の原料堆積レベルまでの距離d、炉口半径Roおよび下記(1)式で定まる角度αに対して分配シュートの傾動角を1.36α以上にする、請求項2に記載のベルレス高炉の原料装入方法。
tanα=Ro/d・・・(1)
The tilt angle of the distribution chute is 1.36α with respect to the distance d from the turning center of the distribution chute to the raw material deposition level in the furnace at the start of charging the raw material, the radius of the furnace mouth Ro, and the angle α determined by the following equation (1). The method for charging raw materials for a bellless blast furnace according to claim 2, as described above.
tanα = Ro / d ... (1)
前記分配シュートの旋回速度は14.0rpm以上である、請求項1に記載のベルレス高炉の原料装入方法。 The method for charging raw materials for a bellless blast furnace according to claim 1, wherein the turning speed of the distribution chute is 14.0 rpm or more. 前記分配シュートの旋回中心から原料装入開始時の炉内の原料堆積レベルまでの距離d、炉口半径Roおよび下記(1)式で定まる角度αに対して分配シュートの傾動角を1.41α以上にする、請求項4に記載のベルレス高炉の原料装入方法。
tanα=Ro/d・・・(1)
The tilt angle of the distribution chute is 1.41α with respect to the distance d from the turning center of the distribution chute to the raw material deposition level in the furnace at the start of charging the raw material, the radius of the furnace mouth Ro, and the angle α determined by the following equation (1). The method for charging raw materials for a bellless blast furnace according to claim 4, as described above.
tanα = Ro / d ... (1)
請求項1から請求項5のいずれか一項に記載のベルレス高炉の原料装入方法で、前記高炉炉内に鉄源原料および炭材を装入する、高炉操業方法。 A blast furnace operating method for charging an iron source raw material and a carbonaceous material into the blast furnace by the method for charging raw materials for a bellless blast furnace according to any one of claims 1 to 5.
JP2020519148A 2019-02-15 2020-01-30 Raw material charging method and blast furnace operation method for bellless blast furnace Active JP6943339B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2019025211 2019-02-15
JP2019025211 2019-02-15
PCT/JP2020/003337 WO2020166347A1 (en) 2019-02-15 2020-01-30 Method for charging raw material into bell-less blast furnace, and blast furnace operation method

Publications (2)

Publication Number Publication Date
JPWO2020166347A1 true JPWO2020166347A1 (en) 2021-03-11
JP6943339B2 JP6943339B2 (en) 2021-09-29

Family

ID=72043985

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020519148A Active JP6943339B2 (en) 2019-02-15 2020-01-30 Raw material charging method and blast furnace operation method for bellless blast furnace

Country Status (5)

Country Link
EP (1) EP3896177B1 (en)
JP (1) JP6943339B2 (en)
KR (1) KR102635629B1 (en)
CN (1) CN113423844A (en)
WO (1) WO2020166347A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112176136B (en) * 2020-09-24 2021-09-14 中南大学 Method and system for modeling movement locus of furnace charge on U-shaped chute of blast furnace

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS49117309U (en) * 1973-02-06 1974-10-07
JPS5575645U (en) * 1978-11-14 1980-05-24
JPS58123808A (en) * 1982-01-14 1983-07-23 Sumitomo Metal Ind Ltd Charging method of raw material into blast furnace
JP2011063836A (en) * 2009-09-16 2011-03-31 Jfe Steel Corp Turning chute in bell-less type raw material charging apparatus for blast furnace
JP2011140705A (en) * 2010-01-08 2011-07-21 Nippon Steel Corp Turning chute in bell-less type furnace-top charging apparatus for blast furnace and method for operating blast furnace
JP2015117388A (en) * 2013-12-16 2015-06-25 新日鐵住金株式会社 Raw material charging method

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4911730U (en) * 1973-04-12 1974-01-31
AT394631B (en) * 1988-07-25 1992-05-25 Wurth Paul Sa HANDLING DEVICE FOR A DISTRIBUTION CHUTE OF A SHAFT STOVE, AND DRIVE MECHANISM ADAPTED TO THIS DEVICE
JPH089150Y2 (en) * 1988-08-03 1996-03-13 新日本製鐵株式会社 Swivel chute for vertical furnace
JP3760016B2 (en) * 1997-03-03 2006-03-29 新日本製鐵株式会社 Furnace top charging equipment
JP3823485B2 (en) * 1997-04-07 2006-09-20 Jfeスチール株式会社 Rotating chute for bellless type furnace top charging equipment for blast furnace
JP3938616B2 (en) * 1997-08-14 2007-06-27 新日本製鐵株式会社 Swivel chute
JP2000119711A (en) * 1998-10-08 2000-04-25 Sumitomo Metal Ind Ltd Bell-less type raw material charging method in blast furnace
JP2003328018A (en) 2002-05-08 2003-11-19 Sumitomo Metal Ind Ltd Method for charging raw material into bellless blast furnace
JP5488315B2 (en) * 2010-08-04 2014-05-14 新日鐵住金株式会社 How to operate the bell-less blast furnace
JP6327383B1 (en) 2017-05-16 2018-05-23 Jfeスチール株式会社 Charge distribution control method in blast furnace
CN207376079U (en) * 2017-09-28 2018-05-18 上海梅山钢铁股份有限公司 A kind of blast furnace material distribution chute

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS49117309U (en) * 1973-02-06 1974-10-07
JPS5575645U (en) * 1978-11-14 1980-05-24
JPS58123808A (en) * 1982-01-14 1983-07-23 Sumitomo Metal Ind Ltd Charging method of raw material into blast furnace
JP2011063836A (en) * 2009-09-16 2011-03-31 Jfe Steel Corp Turning chute in bell-less type raw material charging apparatus for blast furnace
JP2011140705A (en) * 2010-01-08 2011-07-21 Nippon Steel Corp Turning chute in bell-less type furnace-top charging apparatus for blast furnace and method for operating blast furnace
JP2015117388A (en) * 2013-12-16 2015-06-25 新日鐵住金株式会社 Raw material charging method

Also Published As

Publication number Publication date
EP3896177A1 (en) 2021-10-20
CN113423844A (en) 2021-09-21
EP3896177B1 (en) 2023-06-07
BR112021015745A2 (en) 2021-10-26
JP6943339B2 (en) 2021-09-29
EP3896177A4 (en) 2021-11-03
KR20210113339A (en) 2021-09-15
KR102635629B1 (en) 2024-02-08
WO2020166347A1 (en) 2020-08-20

Similar Documents

Publication Publication Date Title
WO2013179541A1 (en) Method for charging raw material into bell-less blast furnace
WO2016190155A1 (en) Apparatus for loading material into blast furnace
JP5585729B2 (en) Raw material charging apparatus for blast furnace and raw material charging method using the same
JP6943339B2 (en) Raw material charging method and blast furnace operation method for bellless blast furnace
JP6828225B2 (en) Raw material charging method for charging coke into the center of a blast furnace
JP6303685B2 (en) How to charge the bellless blast furnace
JP5135959B2 (en) Raw material charging method and raw material charging apparatus for blast furnace
JP6627718B2 (en) Raw material charging method for blast furnace
JP3841014B2 (en) Blast furnace operation method
JP4182660B2 (en) Blast furnace operation method
JP4317505B2 (en) Raw material charging method for bell-type blast furnace
JP5056563B2 (en) Blast furnace operation method
JP6627717B2 (en) Raw material charging method for blast furnace
JP2012132056A (en) Top bunker of blast furnace
JP5493885B2 (en) Rotating chute for bellless type furnace top charging equipment for blast furnace
JP5853904B2 (en) Raw material charging method for bell-type blast furnace
JP2021121689A (en) Method for estimating amount of ore layer collapse in bell-armor type blast furnace
JP2003328018A (en) Method for charging raw material into bellless blast furnace
JP3948364B2 (en) How to charge central coke to the bell-less blast furnace
JP2021175822A (en) Method for charging center coke
JP2005264292A (en) Method for charging raw material into blast furnace provided with bell-less raw material charging apparatus
JP2009293098A (en) Method for charging raw material into blast furnace
JP2004332063A (en) Method for charging raw material to bell-less blast furnace
JPH01205006A (en) Method for exclusively charging coke at center part in blast furnace
JPH051311A (en) Method for charging raw material in bell-less blast furnace

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200402

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210323

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210421

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210810

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210823

R150 Certificate of patent or registration of utility model

Ref document number: 6943339

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250