JP6303685B2 JP2014061611A JP2014061611A JP6303685B2 JP 6303685 B2 JP6303685 B2 JP 6303685B2 JP 2014061611 A JP2014061611 A JP 2014061611A JP 2014061611 A JP2014061611 A JP 2014061611A JP 6303685 B2 JP6303685 B2 JP 6303685B2
Authority
JP
Japan
Prior art keywords
batch
furnace
ore
charging
coke
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014061611A
Other languages
Japanese (ja)
Other versions
JP2015183246A (en
Inventor
琢哉 夏井
琢哉 夏井
宜也 白坂
宜也 白坂
一己 森
一己 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP2014061611A priority Critical patent/JP6303685B2/en
Publication of JP2015183246A publication Critical patent/JP2015183246A/en
Application granted granted Critical
Publication of JP6303685B2 publication Critical patent/JP6303685B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manufacture Of Iron (AREA)
  • Blast Furnaces (AREA)

Description

本発明は、ベルレス高炉の装入物装入方法に関する。特に、高炉の炉壁に沿って上昇する周辺流の安定化を図る、ベルレス高炉の装入物装入方法に関する。   The present invention relates to a charging method for a bell-less blast furnace. In particular, the present invention relates to a charging method for a bell-less blast furnace, which stabilizes the peripheral flow rising along the furnace wall of the blast furnace.

近年の資源劣質化により高炉で使用する装入物の多種多様化が求められている。それに対応するために、従来以上に高精度な装入物分布制御技術の開発が期待されている。高出銑、低還元材比操業達成のためには、高炉内通気性の抜本的な改善が必須である。特に、装入物分布制御がその重要な操作因子のひとつである。
最近の大型高炉は、装入物分布制御の方法として、炉頂部に旋回機能を有し、且つ、その俯仰角度が変更できる旋回シュート式(以下、ベルレス式と記す。)原料装入装置を採用している。このシュートにより原料を輪状に装入する。
Due to the recent deterioration of resources, there is a demand for a wide variety of charges used in blast furnaces. In order to cope with this, development of a charge distribution control technology with higher accuracy than before is expected. In order to achieve the operation with high yield and low reducing material ratio, drastic improvement of air permeability in blast furnace is essential. In particular, charge distribution control is one of the important operating factors.
Recent large blast furnaces employ a swirl chute type (hereinafter referred to as bellless type) raw material charging device that has a swivel function at the top of the furnace and the elevation angle can be changed as a method for controlling the distribution of charges. doing. The raw material is charged in a ring shape by this chute.

ベルレス式原料装入方法としては、炉内でコークス層と鉱石層を形成するために、コークス、鉱石の順に装入する2バッチ装入法が一般的に知られている。
しかし、2バッチ装入法では、炉内ガスの中心流を確実に確保するのが不十分であるため、2バッチ装入法を改善する方法として、3バッチ装入法や4バッチ装入法が提案されている。
As a bellless type raw material charging method, a two-batch charging method is generally known in which coke and ore are charged in this order in order to form a coke layer and an ore layer in a furnace.
However, in the 2-batch charging method, it is insufficient to ensure the central flow of the gas in the furnace, so as a method for improving the 2-batch charging method, the 3-batch charging method and the 4-batch charging method are used. Has been proposed.

3バッチ装入法は、コークスのCバッチと、鉱石のOバッチとを、C,C,Oの順などで装入する方法である。ここで、Cバッチ或いはCバッチにおいて、炉中心部にコークスを装入する方法が採用されている。中心コークス層を形成することで、炉中心部に一定の炉内ガス流を確保することができる。 The 3-batch charging method is a method in which a C batch of coke and an O batch of ore are charged in the order of C 1 , C 2 , O 1 and the like. Here, the C 1 batch or C 2 batches, a method for charging coke is employed in the furnace center portion. By forming the central coke layer, a certain in-furnace gas flow can be secured in the center of the furnace.

4バッチ装入法は、コークスのCバッチと、鉱石のOバッチとを、C,C,O,Oの順や、C,O,C,Oの順などで装入する方法である。
この4バッチ装入法では、例えば、先ず、Cバッチにおいて、炉壁側に水平型テラスと、この水平型テラスの炉内側から炉中心に向かって傾斜する傾斜コークス層を形成する。次いで、Cバッチにおいて、炉中心部へのコークスを装入する。次に、Oバッチにおいて、水平型テラスの上、又は、水平型テラスと傾斜コークス層との境界に向かって鉱石を装入する。更に、Oバッチにおいて、水平型テラスの上の炉周辺部に鉱石を装入する。このうち、Oバッチでは、装入した鉱石によって、Cバッチのコークスの層を一部崩すことで、O/C分布を調整している。
In the 4-batch charging method, C batch of coke and O batch of ore are ordered in the order of C 1 , C 2 , O 1 , O 2 , C 1 , O 1 , C 2 , O 2 , etc. It is a method of charging.
This 4 batch loading method, for example, first, in C 1 batch, forming a horizontal terrace on the furnace wall side, an inclined coke layer which is inclined towards the furnace center of the furnace inside the horizontal terrace. Then, the C 2 batches, charged coke to the furnace center. Next, in the O 1 batch, ore is charged on the horizontal terrace or toward the boundary between the horizontal terrace and the inclined coke layer. Further, in the O 2 batch, ore is charged in the furnace periphery on the horizontal terrace. Among these, in the O 1 batch, the O / C distribution is adjusted by partially destroying the coke layer of the C 1 batch with the charged ore.

4バッチ装入法として、低コークス操業時のコークス層の堆積形状をコークステラス長が0.3以下で、コークス堆積層の傾斜角10°〜20°にすることが記載されている(特許文献1参照)。
しかしながら、装入するコークスの原材料銘柄や含有水分の変動によって、Cバッチで形成される水平型テラスの長さが変動したり、円周方向で偏差が生じたりする場合がある。上記のような場合には、Oバッチによるコークス崩れ量が変動し、所望のO/C分布に制御できないという課題があった。
As a four-batch charging method, it is described that the coke layer deposition shape is set to a coke terrace length of 0.3 or less and the inclination angle of the coke deposition layer is 10 ° to 20 ° during low coke operation (Patent Literature). 1).
However, the variation of raw materials stocks and water content of the coke to be charged, or the length of the horizontal terraces varies formed by C 1 batch, there is a case where the deviation in the circumferential direction or cause. In such a case, there is a problem that the amount of coke collapse due to the O 1 batch fluctuates and cannot be controlled to a desired O / C distribution.

一方、高炉原料槽の庫下篩で発生した焼結粉を2次篩にかけた細粒焼結鉱を鉱石バッチに混合して炉周辺部に装入することが行われている。
例えば、1mm〜5mmの細粒と5mm〜18mmの粗粒とに区分した焼結鉱を個別に炉内に装入することでガス流分布の改善を図る、粒度別装入法が提案されている(非特許文献1参照)。
また、多段式の傾斜スクリーンを備えた回収篩を使用して+3mmサイズの細粒焼結鉱を効率よく分級し、炉壁部への細粒装入量と位置を制御した、細粒焼結鉱の回収・使用技術が提案されている(非特許文献2参照)。
On the other hand, it is practiced to mix fine-grained ore obtained by applying a sintered powder generated by a sieve under the blast furnace raw material tank on a secondary sieve into an ore batch and charging it into the periphery of the furnace.
For example, a particle-by-particle charging method has been proposed, which aims to improve gas flow distribution by individually charging sintered ore divided into fine particles of 1 mm to 5 mm and coarse particles of 5 mm to 18 mm into the furnace. (See Non-Patent Document 1).
In addition, using a recovery sieve equipped with a multi-stage inclined screen, fine-grained sintered ore of + 3mm size is efficiently classified, and fine-grained sintering is controlled by controlling the amount and position of fine-grained sinter into the furnace wall. A technique for recovering and using ores has been proposed (see Non-Patent Document 2).

特開2008−208463号公報JP 2008-208463 A

奥野嘉雄、外5名、「焼結鉱粒度別装入法によるオールコークス操業の改善」、鉄と鋼、日本鉄鋼協会、第69年(1983)第14号、P1578〜P1584Yoshio Okuno, 5 others, "Improvement of all coke operation by charging method according to sinter particle size", Iron and Steel, Japan Iron and Steel Institute, 69th (1983) No. 14, P1578-P1584 中村勝、外5名、「細粒焼結鉱の効率的回収とその使用結果」、鉄と鋼、日本鉄鋼協会、第72年(1986)第12号、S875Masaru Nakamura, 5 others, “Efficient recovery of fine-grained sintered ore and results of its use”, Iron and Steel, Japan Iron and Steel Institute, 72 (1986) No. 12, S875

上記非特許文献1,2に記載の細粒焼結鉱を使用する方法を4バッチ装入法などに適用する場合には、鉱石バッチを分割して装入することが考えられる。この場合、Oバッチとして、装入する鉱石の全量に対する質量比が0.1〜0.2程度の細粒焼結鉱を炉壁の周辺部に装入することになる。このようなOバッチで細粒焼結鉱を装入する前に、CバッチとOバッチにおいて、テラスを形成し、その上に細粒焼結鉱を乗せることが考えられる。しかし、炉頂バンカーから排出される原料銘柄や粒径の時系列偏差の影響によってテラスの長さに円周方向偏差を持ち易い。更に、コークス層によるテラス長さの変動は、Oバッチで装入される鉱石によるコークス崩れ量の変動を招くこととなり、局所的なガス抜けを助長し易い。 When the method using the fine-grained sintered ore described in Non-Patent Documents 1 and 2 is applied to a 4-batch charging method or the like, it is conceivable that the ore batch is divided and charged. In this case, as an O 2 batch, fine-grained sintered ore having a mass ratio of about 0.1 to 0.2 with respect to the total amount of ore to be charged is charged in the peripheral portion of the furnace wall. Before loading the granules sinter at such O 2 batches, in C 1 batch and O 1 batch, it forms a terrace, it is conceivable to put a fine sintered ore thereon. However, due to the influence of the material brand discharged from the furnace top bunker and the time-series deviation of the particle size, the terrace length tends to have a circumferential deviation. Furthermore, the variation in the terrace length due to the coke layer causes the variation in the amount of coke collapse due to the ore charged in the O 1 batch, and it is easy to promote local outgassing.

本発明は、このような状況を鑑み、4バッチ装入において、高炉の炉壁に沿って上昇する周辺流の安定化を図る、ベルレス高炉の装入物装入方法を提供することを目的とする。   In view of such a situation, the present invention aims to provide a charging method for a bell-less blast furnace that stabilizes the peripheral flow rising along the furnace wall of the blast furnace in four batch charging. To do.

本発明の要旨とするところは、以下のとおりである。
(1)コークスのCバッチと鉱石のOバッチを交互に、層状に装入するベルレス高炉の装入物装入方法において、Cバッチを、炉壁側から炉の中心に向け下方に傾斜する傾斜コークス層を形成する工程と、Cバッチを、炉の中心部に装入する工程と、次に、Oバッチを、炉壁から中心にむけて装入し、炉壁側に略水平な形状の水平型テラスと、更に、前記水平型テラスの炉内側先端から炉の中心に向け下方に傾斜する傾斜鉱石層を形成する工程と、最後に、Oバッチを、前記Oバッチの前記水平型テラスの上に装入する工程の順で実施するC,C,O,Oの4バッチ装入であって、前記Oバッチが3mmを超え6mm以下の細粒鉱石から成り、かつ、前記Oバッチの前記水平型テラスにおける炉壁から中心に向かう長さが、炉口半径に対して0.1倍以上0.3倍以下であることを特徴とするベルレス高炉の装入物装入方法。
The gist of the present invention is as follows.
(1) In the charging method of the bell-less blast furnace in which the C batch of coke and the O batch of ore are alternately charged in layers, the C 1 batch is inclined downward from the furnace wall side toward the center of the furnace. The step of forming the inclined coke layer, the step of charging the C 2 batch into the center of the furnace, and then charging the O 1 batch toward the center from the furnace wall and substantially horizontal to the furnace wall side a horizontal terrace shape, further, forming a gradient ore layer which is inclined downwardly toward the center of the furnace from the furnace inner end of the horizontal terraces, finally, the O 2 batches of the O 1 batch 4 or 4 batches of C 1 , C 2 , O 1 , and O 2 that are carried out in the order of the process of charging on the horizontal terrace, and the O 2 batch is over 3 mm and 6 mm or less from the center it becomes, and, from the furnace wall in the horizontal terraces of the O 1 batch Length towards the, charge charging method bell-less blast furnace, characterized in that is less than 0.3 times 0.1 times or more relative to the furnace opening radius.

(2)前記4バッチ装入におけるC,C,O,Oのそれぞれのバッチを、C,O,C,Oの順で実施することを特徴とする(1)に記載のベルレス高炉の装入物装入方法。
(3)前記Oバッチが鉱石と小塊コークスの混合バッチであることを特徴とする(1)又は(2)に記載のベルレス高炉の装入物装入方法。
(2) The batches of C 1 , C 2 , O 1 , and O 2 in the 4 batch charging are performed in the order of C 1 , O 1 , C 2 , and O 2 (1) The charging method of the bell-less blast furnace as described in 1.
(3) The method of charging a bellless blast furnace according to (1) or (2), wherein the O 1 batch is a mixed batch of ore and small coke.

ベルレス高炉における原料槽から炉内へ原料が装入されるまでの装置構成を示す図。The figure which shows the apparatus structure until a raw material is charged into the furnace from the raw material tank in a bell-less blast furnace. 本実施形態の装入物分布の模式図。The schematic diagram of the burden distribution of this embodiment. 実施例1の実炉における原料堆積プロフィールを示す図。The figure which shows the raw material deposition profile in the actual furnace of Example 1. FIG. 比較例1の実炉における原料堆積プロフィールを示す図。The figure which shows the raw material deposition profile in the actual furnace of the comparative example 1. FIG. 実施例1及び比較例1における各装入方法の適用前後の炉況変化を示す図。The figure which shows the furnace condition change before and after application of each charging method in Example 1 and Comparative Example 1. FIG.

図1は、ベルレス高炉における原料槽から炉内へ原料が装入されるまでの装置構成を示す図である。図1に示す装置構成は、装入コンベア3にサージホッパーを設置せず、切り出した鉱石、コークスを直接、炉頂バンカー7に装入するダイレクトチャージ方式の例である。
図1に示すように、原料槽15に貯蔵された焼結鉱は、原料槽15下にある網目サイズ6mmの一次篩2で篩われ、篩い上の6mmを超える焼結鉱が焼結鉱槽1に回収される。一方、一次篩2の篩い下の焼結鉱は、網目サイズ3mmの二次篩4にかけられる。この二次篩4により、篩い上の3mmを超え6mm以下の焼結鉱は、細粒焼結鉱として細粒焼結鉱槽5に回収される。なお、二次篩4の篩い下である約3mm以下の焼結鉱は焼結工場で再利用される。焼結鉱槽1の焼結鉱及び細粒焼結鉱槽5の細粒焼結鉱は、焼結鉱槽1及び細粒焼結鉱槽5のそれぞれに付帯する秤量ホッパー(図示略)で秤量され、それぞれ装入コンベア3に排出される。
装入コンベア3上から排出された装入原料6は、炉頂バンカー7に一時貯留された後、流量調整弁8で排出口9の開口面積を調節することによって流量制御しながら、集合ホッパー10、旋回シュート11を介して高炉炉内12に装入される。装入原料6の高炉炉内12への装入は、旋回シュート11の傾斜角度を、装入原料6が所望の位置に装入されるように、適宜調節しながら行われる。
FIG. 1 is a diagram showing an apparatus configuration until a raw material is charged into a furnace from a raw material tank in a bell-less blast furnace. The apparatus configuration shown in FIG. 1 is an example of a direct charge system in which a surge hopper is not installed in the charging conveyor 3 and the cut ore and coke are directly charged into the furnace top bunker 7.
As shown in FIG. 1, the sintered ore stored in the raw material tank 15 is sieved with a primary sieve 2 having a mesh size of 6 mm below the raw material tank 15, and the sintered ore exceeding 6 mm on the sieve is sintered into the sintered ore tank. 1 recovered. On the other hand, the sintered ore under the sieve of the primary sieve 2 is put on the secondary sieve 4 having a mesh size of 3 mm. By this secondary sieve 4, the sintered ore exceeding 3 mm and not more than 6 mm on the sieve is recovered in the fine grain sintered ore tank 5 as fine grain sintered ore. In addition, the sintered ore of about 3 mm or less under the secondary sieve 4 is reused in the sintering plant. The sintered ore of the sintered ore tank 1 and the fine-grained sintered ore of the fine-grained sintered ore tank 5 are each a weighing hopper (not shown) attached to each of the sintered ore tank 1 and the fine-grained sintered ore tank 5. Weighed and discharged to charging conveyor 3 respectively.
The charged raw material 6 discharged from the charging conveyor 3 is temporarily stored in the furnace top bunker 7 and then the flow rate is controlled by adjusting the opening area of the discharge port 9 with the flow rate adjusting valve 8, while the collecting hopper 10 Then, the blast furnace 12 is charged via the turning chute 11. The charging raw material 6 is charged into the blast furnace furnace 12 while appropriately adjusting the inclination angle of the swivel chute 11 so that the charging raw material 6 is charged at a desired position.

図2に、C,C,O,Oの順で装入する4バッチ装入法におけるコークス層と鉱石層の各装入物の分布を模式的に示す。本実施形態では、図1に示す装置を使用し、図2に示す層構成となるように、C,C,O,Oの各バッチを装入する。 FIG. 2 schematically shows the distribution of each charge in the coke layer and the ore layer in the 4-batch charging method in which C 1 , C 2 , O 1 , and O 2 are charged in this order. In this embodiment, the apparatus shown in FIG. 1 is used, and each batch of C 1 , C 2 , O 1 , and O 2 is charged so as to have the layer configuration shown in FIG.

バッチでは、炉壁側から炉の中心に向け下方に傾斜する傾斜コークス層を形成する。このように、Cバッチでは、従来の4バッチ装入で形成していたコークスによる水平型テラスを形成せずに、コークスを自然堆積させることを特徴とする。これで、炉壁側から炉の中心に向け下方に傾斜する傾斜コークス層のみを形成する。
これにより、従来のコークス層の水平型テラスで生じていた、装入するコークスの原材料銘柄や含有水分の変動を起因とする水平型テラスの長さ変動や、円周方向における偏差が抑制される。結果として、後に続くOバッチ装入時において、コークス崩れ量に変動が生じにくくなるため、O/C分布を一定に制御できる。
In C 1 batch, forming a gradient coke layer which is inclined downward toward the furnace wall side in the center of the furnace. As described above, the C 1 batch is characterized in that coke is naturally deposited without forming a horizontal terrace by coke formed by the conventional 4-batch charging. Thus, only the inclined coke layer inclined downward from the furnace wall side toward the center of the furnace is formed.
This suppresses fluctuations in the length of the horizontal terrace and fluctuations in the circumferential direction caused by fluctuations in the raw material brand of the coke to be charged and the moisture content, which occurred in the conventional horizontal terrace of the coke layer. . As a result, when the subsequent O 1 batch is charged, the amount of coke collapse is less likely to vary, so the O / C distribution can be controlled to be constant.

バッチでは、コークスを炉の中心部に装入する。中心コークス層を形成することにより、炉内ガスの中心流を確保する。 The C 2 batches, charged coke in the center of the furnace. By forming the central coke layer, the central flow of the in-furnace gas is secured.

バッチでは、炉壁から中心にむけて装入し、炉壁側に略水平な形状の水平型テラスと傾斜鉱石層を形成する。
このOバッチでは、鉱石と小塊コークスの混合バッチを使用することが好ましい。このような鉱石・コークス混合装入法は、鉱石に、コークスを混合することにより、鉱石層の通気性を向上させ生産性を向上させると同時に、鉱石とコークスの粒子を近接させることにより、鉱石の還元性を向上させ、高炉燃料比を低下させることができる。したがって、Oバッチを鉱石と小塊コークスの混合バッチとすることにより、鉱石・コークス混合装入の効果を、併せて発揮することができる。
また、Oバッチの水平型テラスにおける炉壁から中心に向かう長さは、炉口半径に対して0.1倍以上0.3倍以下となるように形成する。Oバッチの水平型テラスが上記長さであれば、後述するOバッチ装入において、細粒鉱石を静置させることが可能な程度の大きさのテラスを形成できる。
In the O 1 batch, charging is performed from the furnace wall toward the center, and a horizontal terrace and an inclined ore layer having a substantially horizontal shape are formed on the furnace wall side.
In this O 1 batch, it is preferable to use a mixed batch of ore and small coke. Such an ore / coke mixing method improves the air permeability and productivity of the ore layer by mixing coke with the ore, while at the same time bringing the ore and coke particles close to each other. This can improve the reducibility of the blast furnace and reduce the blast furnace fuel ratio. Therefore, by making O 1 batch into a mixed batch of ore and small coke, the effect of ore / coke mixed charging can be exhibited together.
Further, the length from the furnace wall toward the center of the horizontal terrace of the O 1 batch is formed so as to be 0.1 to 0.3 times the furnace port radius. If the O 1 batch horizontal terrace has the above-mentioned length, it is possible to form a terrace that is large enough to allow fine-grained ore to stand in the O 2 batch charging described later.

バッチでは、Oバッチの水平型テラスの上に3mmを超え6mm以下の細粒鉱石を装入する。このOバッチにより、炉壁側に位置する鉱石の層を確保し、炉壁に沿って上昇する周辺流を制御する。またOバッチでは、上記範囲内の細粒鉱石のみを装入するので、Oバッチで細粒焼結鉱と粗粒焼結鉱との混合鉱石を使用する場合に生じる、炉頂バンカー7から炉内へと装入される原料銘柄の時系列的偏差がない。このため、炉壁側に装入される細粒鉱石の分布に円周方向の偏差が生じないので、局所的なガス抜けの発生を抑制できる。このように、炉壁に沿って上昇する周辺流が安定化するため、結果として安定操業が実現される。
更に、Oバッチ装入において、細粒鉱石を静置することで、Oバッチの水平型テラス上にOバッチの細粒鉱石が積まれ、細粒鉱石層が形成される。これにより、Oバッチの細粒鉱石層は、Oバッチの傾斜鉱石層と同様に、炉壁側から炉の中心に向け下方に傾斜した構成となる。このため、Oバッチ装入後の原料堆積プロフィール、即ち、次チャージのCバッチ装入前の原料堆積プロフィールは、炉壁側から炉の中心までに、下方に傾斜する傾斜層が形成されることになり、水平型テラスが形成されていない状態となる。
In the O 2 batch, fine ore exceeding 3 mm and not more than 6 mm is charged on the horizontal terrace of the O 1 batch. By this O 2 batch, a layer of ore located on the furnace wall side is secured, and the peripheral flow rising along the furnace wall is controlled. Further, in the O 2 batch, only the fine ore within the above range is charged. Therefore, the top bunker 7 generated when the mixed ore of the fine sinter and coarse sinter is used in the O 2 batch. There is no time series deviation of the raw material brand charged into the furnace. For this reason, since the deviation in the circumferential direction does not occur in the distribution of the fine-grained ore charged on the furnace wall side, the occurrence of local outgassing can be suppressed. As described above, the peripheral flow rising along the furnace wall is stabilized, and as a result, stable operation is realized.
Furthermore, in the O 2 batch charging, by leaving the fine ore still, the O 2 batch of fine ore is loaded on the horizontal terrace of the O 1 batch, and a fine ore layer is formed. Thus, fine ore layer of O 2 batches, as well as the inclined ore layer O 1 batch, a structure that is inclined downwardly toward the furnace wall side in the center of the furnace. For this reason, in the raw material deposition profile after charging the O 2 batch, that is, the raw material deposition profile before charging the C 1 batch of the next charge, an inclined layer inclined downward is formed from the furnace wall side to the center of the furnace. As a result, the horizontal terrace is not formed.

なお、上記実施形態では、C,C,O,Oの順で実施する例で説明したが、それぞれのバッチを、C,O,C,Oの順で実施してもよい。4バッチ装入において、C,O,C,Oの順でも、上記効果を達成できる。
また、上記実施形態では、一次篩2の網目サイズを6mm、二次篩4の網目サイズを3mmとしたが、焼結鉱の歩留りに応じて、適宜変更してもよい。例えば、細粒焼結鉱は、3mmを超え6mm以下の範囲内において、一次篩2、二次篩4の網目サイズをそれぞれ調節して、その粒径を調整することができる。
In the above embodiment, the example is described in which C 1 , C 2 , O 1 , and O 2 are performed in this order. However, each batch is performed in the order of C 1 , O 1 , C 2 , and O 2. May be. In the 4-batch charging, the above effect can be achieved also in the order of C 1 , O 1 , C 2 and O 2 .
Moreover, in the said embodiment, although the mesh size of the primary sieve 2 was 6 mm and the mesh size of the secondary sieve 4 was 3 mm, you may change suitably according to the yield of a sintered ore. For example, the fine-grained sintered ore can be adjusted in particle size by adjusting the mesh sizes of the primary sieve 2 and the secondary sieve 4 within the range of 3 mm to 6 mm.

次に、実施例及び比較例を挙げて本発明を更に詳しく説明する。なお、本発明はこれらの実施例の記載内容に何ら制限されるものではない。   Next, the present invention will be described in more detail with reference to examples and comparative examples. In addition, this invention is not restrict | limited to the description content of these Examples at all.

〔実施例1、比較例1〕
本発明である原料装入方法による効果を、炉容積3700mの高炉を対象に実炉試験で検証した。
実施例1は、本発明による原料装入方法である。即ち、Cバッチでは、炉壁側から炉の中心に向けて下方に傾斜する傾斜コークス層を形成し、Cバッチでは、炉の中心部にコークスを装入した。続いて、Oバッチでは、炉壁から中心にむけて装入し、炉壁側に水平型テラスを、更に水平型テラスの炉内側先端から炉の中心に向けて下方に傾斜する傾斜鉱石層を形成した。そして、Oバッチでは、Oバッチの水平型テラスの上に細粒鉱石を装入した。
なお、実施例1のCバッチ及びCバッチでは、粒子径略30mm〜60mmのコークスを用いた。また、Oバッチでは、粒子径約6mm〜35mmの焼結鉱と、粒子径略10mm〜40mmのコークスを混合した混合原料を用いた。Oバッチの細粒鉱石は、篩分けにより製造された3mmを超え6mm以下の細粒焼結鉱を用いた。
[Example 1, Comparative Example 1]
The effect of the raw material charging method according to the present invention was verified by an actual furnace test for a blast furnace having a furnace volume of 3700 m 3 .
Example 1 is a raw material charging method according to the present invention. That is, in the C 1 batch, towards the furnace wall side in the center of the furnace to form an inclined coke layer which is inclined downwardly, at the C 2 batches, was charged with coke in the center of the furnace. Subsequently, in the O 1 batch, the ore layer is charged from the furnace wall toward the center, the horizontal terrace is inclined to the furnace wall side, and the inclined ore layer is further inclined downward from the furnace inner end of the horizontal terrace toward the center of the furnace. Formed. In the O 2 batch, fine ore was charged on the horizontal terrace of the O 1 batch.
In the C 1 batch and C 2 batches of Example 1 were used coke particles径略30Mm~60mm. Further, in the O 1 batch, it was used a sintered ore of a particle size of about 6Mm~35mm, a mixed raw material obtained by mixing coke particles径略10Mm~40mm. As the O 2 batch fine ore, a fine sintered ore of more than 3 mm and less than 6 mm produced by sieving was used.

比較例1は、従来法による原料装入方法である。即ち、Cバッチでは、炉壁から中心にむけて装入し、炉壁側に水平型テラスを、更に水平型テラスの炉内側先端から炉の中心に向けて下方に傾斜する傾斜コークス層を形成し、Cバッチでは、炉の中心部にコークスを装入した。続いて、Oバッチでは、Cバッチの水平型テラスと傾斜コークス層の境界から中心に向けて装入した。このOバッチ装入によりCバッチのコークスの層の一部を崩すことでO/C比を調整した。そして、Oバッチでは、Oバッチの水平型テラスの上に粗粒鉱石を装入した。
なお、比較例1のCバッチ、Cバッチ及びOバッチで使用したコークスや混合原料は、上記実施例1と同様のものを使用した。Oバッチの粗粒鉱石は、粒子径約6mm〜35mmの焼結鉱を用いた。
Comparative Example 1 is a raw material charging method according to a conventional method. That is, in the C 1 batch was charged towards the center from the furnace wall, a horizontal terrace on the furnace wall side, further inclined coke layer which slopes downwardly toward the furnace inner end of the horizontal terraces in the center of the furnace formed, with the C 2 batches, it was charged with coke in the center of the furnace. Subsequently, in the O 1 batch, the C 1 batch was charged from the boundary between the horizontal terrace and the inclined coke layer toward the center. It was adjusted O / C ratio by breaking a part of the coke layer of C 1 batch by the O 1 batch charged. In the O 2 batch, coarse ore was charged on the horizontal terrace of the O 1 batch.
Incidentally, C 1 batch of Comparative Example 1, coke and raw material mixture used in the C 2 batches and O 1 batch used was the same as in Example 1. As the O 2 batch coarse ore, a sintered ore having a particle diameter of about 6 mm to 35 mm was used.

実施例1である本発明による装入条件を下記表1に、比較例1である従来法による装入条件を下記表2に示す。なお、表1及び表2中の相対落下位置重心は、炉中心を0、炉壁を1として表した原料装入レベルでの原料落下位置の重心である。   The charging conditions according to the present invention as Example 1 are shown in Table 1 below, and the charging conditions according to the conventional method as Comparative Example 1 are shown in Table 2 below. The center of gravity of the relative drop position in Tables 1 and 2 is the center of gravity of the raw material drop position at the raw material charging level, where 0 is the furnace center and 1 is the furnace wall.

Figure 0006303685
Figure 0006303685

Figure 0006303685
Figure 0006303685

表2に示すように、比較例1では、相対落下位置重心をCバッチで0.88、Oバッチで0.77とした。これらは、いずれも水平型テラスを形成並びに形成した水平型テラスを維持するために、相対落下位置重心は炉壁からやや離れた位置にある。
一方、表1に示すように、実施例1では、Cバッチで水平型テラスを形成させないために、相対落下位置重心を0.99とした。Oバッチでは、Oバッチの細粒鉱石を静置させるための小さな水平型テラスを形成するため、相対落下位置重心を0.94とした。また、Oバッチは、相対落下位置重心が1の炉の最も周辺部のみに装入した。
As shown in Table 2, in Comparative Example 1, 0.88 a relative drop position centroid C 1 batch was set to 0.77 in O 1 batch. In both of these, in order to form a horizontal terrace and maintain the formed horizontal terrace, the center of gravity of the relative fall position is located slightly away from the furnace wall.
On the other hand, as shown in Table 1, in Example 1, to a C 1 batch does not form a horizontal terrace, a relative drop position centroid was 0.99. In the O 1 batch, the relative drop position gravity center was set to 0.94 in order to form a small horizontal terrace for allowing the O 2 batch of fine ore to settle. In addition, the O 2 batch was charged only in the most peripheral part of the furnace having a relative gravity center of 1 for the fall position.

次に、実施例1及び比較例1の各装入方法による、原料堆積プロフィールを確認した。図3に実施例1の実炉における原料堆積プロフィールを示す。また、図4に比較例1の実炉における原料堆積プロフィールを示す。なお、図3及び図4に示す原料堆積プロフィールは、プロフィールメータにより測定した。
図3及び図4を比較すると、原料堆積プロフィールが変化している状況が確認できる。具体的には、図4に示す比較例1の装入方法では、Cバッチ装入後、並びにOバッチ装入後に、それぞれ水平型テラス(図4中に矢印で示す。)が形成されている。Oバッチ装入後の水平型テラスは、炉壁から中心に向かう長さが炉口半径に対して0.4倍(炉壁から2m)の長さであった。一方で、図3に示す実施例1の装入方法では、Cバッチ装入後には水平型テラスの形成は認められず、後に続くOバッチ装入後に、炉壁から中心に向かう長さが炉口半径に対して0.25倍(炉壁から1.25m)の水平型テラス(図3中に矢印で示す。)が形成されている。そして、Oバッチ装入後には、前記水平型テラスの上に、細粒鉱石層が形成されていることが確認できる。
Next, the raw material deposition profile by each charging method of Example 1 and Comparative Example 1 was confirmed. FIG. 3 shows a raw material deposition profile in the actual furnace of Example 1. FIG. 4 shows a raw material deposition profile in the actual furnace of Comparative Example 1. In addition, the raw material deposition profile shown in FIG.3 and FIG.4 was measured with the profile meter.
Comparing FIG. 3 and FIG. 4, it can be confirmed that the raw material deposition profile is changing. Specifically, in the charging method of Comparative Example 1 shown in FIG. 4, a horizontal terrace (indicated by an arrow in FIG. 4) is formed after C 1 batch charging and after O 1 batch charging. ing. The horizontal terrace after the O 1 batch was charged had a length from the furnace wall toward the center of 0.4 times the length of the furnace port radius (2 m from the furnace wall). On the other hand, in the charging method of Example 1 shown in FIG. 3, formation of a horizontal terrace is not recognized after C 1 batch charging, and the length from the furnace wall toward the center after the subsequent O 1 batch charging. However, a horizontal terrace (indicated by an arrow in FIG. 3) that is 0.25 times as large as the furnace port radius (1.25 m from the furnace wall) is formed. Then, after O 2 batches charged, on the horizontal terraces, it can be confirmed that the fine ore layer is formed.

次に、実施例1及び比較例1の各装入方法の適用前後の炉況変化を確認した。図5に、実施例1及び比較例1における各装入方法の適用前後の炉況変化を示す。
具体的には、先ず、比較例1の装入方法を適用して操業を行い、次に、装入方法を変更し、実施例1の装入方法を適用して操業を行った。そして、このときの、スキンフローガス利用率及びその標準偏差、スキンフロー温度及びその標準偏差、ステーブ給排水温度差、ガス抜け回数、及び細粒焼結鉱使用量について、それぞれ測定及び算出することで、各装入方法の適用前後における炉況変化を確認した。なお、スキンフローガス利用率は、羽口から上方21.335mに位置する炉壁面に設置されたガス検出機により測定された、炉内最近傍を流れるガスの成分に関して、下記式(1)により算出される比率である。
ガス利用率={CO/(CO+CO)}×100・・・(1)
スキンフロー温度は、羽口から上方21.335mに位置する炉壁面に設置された熱電対により測定された、炉内最近傍を流れるガスの温度である。ステーブ給排水温度差は、ステーブ内に流通させる冷却水の給水温度と排水温度との差である。スキンフローガス利用率の標準偏差、及びスキンフロー温度の標準偏差は、円周方向8方位の標準偏差である。
Next, the furnace state change before and after application of each charging method of Example 1 and Comparative Example 1 was confirmed. FIG. 5 shows changes in furnace conditions before and after application of each charging method in Example 1 and Comparative Example 1.
Specifically, first, the operation was performed by applying the charging method of Comparative Example 1, and then the operation was performed by changing the charging method and applying the charging method of Example 1. And at this time, by measuring and calculating the skin flow gas utilization rate and its standard deviation, skin flow temperature and its standard deviation, stave water supply and drainage temperature difference, the number of outgassing, and the amount of fine grain sinter used, respectively. The changes in furnace conditions before and after applying each charging method were confirmed. The skin flow gas utilization rate is expressed by the following equation (1) with respect to the component of the gas flowing in the nearest vicinity of the furnace, measured by a gas detector installed on the furnace wall located 21.335 m above the tuyere. This is the calculated ratio.
Gas utilization rate = {CO 2 / (CO 2 + CO)} × 100 (1)
Skin flow temperature is the temperature of the gas flowing in the nearest vicinity in the furnace, measured by a thermocouple installed on the furnace wall located 21.335 m above the tuyere. The stave water supply / drainage temperature difference is a difference between the water supply temperature of the cooling water flowing through the stave and the drainage temperature. The standard deviation of the skin flow gas utilization rate and the standard deviation of the skin flow temperature are standard deviations in eight circumferential directions.

図5に示すように、比較例1の装入方法適用時には、炉周辺部からの局所的なガス抜けが散発する状態であり、炉内最近傍のガス流れが不安定であった。
また、比較例1の装入方法適用時では、炉内最近傍のガス利用率が40%前後と低く、またスキンフローの温度も350〜400℃と高めに推移しており、ステーブ給排水温度差も10℃前後と高いことから、炉内最近傍を流れるガス流速が大きく、炉体熱負荷が高い状況であったことが判る。更に、スキンフローガス利用率、及びスキンフロー温度は、ともに標準偏差が大きく、かつ変動も大きい結果であった。
一方、実施例1の装入方法適用時には、ガス抜け回数がほぼ0と低減され、スキンフローのガス利用率が45%前後に向上し、スキンフロー温度は300℃前後に低下した。更に、ステーブ給排水温度差も6〜8℃と小さいことから、炉内最近傍を流れるガス流速が小さく、炉体熱負荷が低下していることが判る。また、スキンフローのガス利用率の標準偏差や、スキンフロー温度の標準偏差がそれぞれ低下し、また、変動も小さくなったことから、炉壁に沿って上昇する周辺流の変動が抑制されたことが確認できる。
As shown in FIG. 5, when the charging method of Comparative Example 1 was applied, local gas escape from the periphery of the furnace was sporadic, and the gas flow nearest to the furnace was unstable.
In addition, when the charging method of Comparative Example 1 is applied, the gas utilization rate in the vicinity of the furnace is as low as about 40%, and the skin flow temperature is also increased as high as 350 to 400 ° C. Since it is as high as around 10 ° C., it can be seen that the flow rate of gas flowing in the nearest vicinity in the furnace is large, and the furnace body heat load is high. Furthermore, both the skin flow gas utilization rate and the skin flow temperature had large standard deviations and large fluctuations.
On the other hand, when the charging method of Example 1 was applied, the number of outgassing was reduced to almost 0, the gas utilization rate of the skin flow was improved to about 45%, and the skin flow temperature was reduced to about 300 ° C. Further, since the temperature difference between the stave water supply and drainage is as small as 6 to 8 ° C., it can be seen that the flow velocity of the gas flowing in the nearest vicinity in the furnace is small and the furnace heat load is reduced. In addition, the standard deviation of the skin flow gas utilization rate and the standard deviation of the skin flow temperature were both reduced and the fluctuations were reduced, so that fluctuations in the peripheral flow rising along the furnace wall were suppressed. Can be confirmed.

高炉の壁際の炉内ガス流れの安定化を図ることができるベルレス高炉の装入物装入方法として利用することができる。   The present invention can be used as a charging method for a bell-less blast furnace that can stabilize the gas flow in the furnace near the wall of the blast furnace.

1…焼結鉱槽、2…一次篩、3…装入コンベア、4…二次篩、5…細粒焼結鉱槽、6…装入原料、7…炉頂バンカー、8…流量調整弁、9…排出口、10…集合ホッパー、11…旋回シュート、12…高炉炉内、15…原料槽。   DESCRIPTION OF SYMBOLS 1 ... Sintering ore tank, 2 ... Primary sieve, 3 ... Charge conveyor, 4 ... Secondary sieve, 5 ... Fine grain sintered ore tank, 6 ... Raw material for charging, 7 ... Top bunker, 8 ... Flow control valve , 9 ... Discharge port, 10 ... Collecting hopper, 11 ... Revolving chute, 12 ... Inside the blast furnace, 15 ... Raw material tank.

Claims (3)

コークスのCバッチと鉱石のOバッチを交互に、層状に装入するベルレス高炉の装入物装入方法において、
バッチを、炉壁側から炉の中心に向け下方に傾斜する傾斜コークス層を形成する工程と、
バッチを、炉の中心部に装入する工程と、
次に、Oバッチを、炉壁から中心にむけて装入し、炉壁側に略水平な形状の水平型テラスと、更に、前記水平型テラスの炉内側先端から炉の中心に向け下方に傾斜する傾斜鉱石層を形成する工程と、
最後に、Oバッチを、前記Oバッチの前記水平型テラスの上に装入する工程の順で実施するC,C,O,Oの4バッチ装入であって、
前記Oバッチが3mmを超え6mm以下の細粒鉱石から成り、かつ、前記Oバッチの前記水平型テラスにおける炉壁から中心に向かう長さが、炉口半径に対して0.1倍以上0.3倍以下であることを特徴とするベルレス高炉の装入物装入方法。
In the charging method of the bell-less blast furnace in which C batch of coke and O batch of ore are alternately charged in layers,
Forming a slanted coke layer in which C 1 batch is inclined downward from the furnace wall side toward the center of the furnace;
The C 2 batches, the step of loading in the center of the furnace,
Next, the O 1 batch is charged from the furnace wall toward the center, a horizontal terrace having a substantially horizontal shape on the furnace wall side, and further downward from the inner tip of the horizontal terrace toward the center of the furnace. Forming an inclined ore layer inclined to
Finally, the O 2 batches, a 4 batches charging of C 1, C 2, O 1, O 2 to be carried out in the order of the step of loading on the horizontal terraces of the O 1 batch,
The O 2 batch is made of fine ore of more than 3 mm and not more than 6 mm, and the length of the O 1 batch from the furnace wall to the center of the horizontal terrace is 0.1 times or more with respect to the furnace port radius A charging method for a bell-less blast furnace, which is 0.3 times or less.
前記4バッチ装入におけるC,C,O,Oのそれぞれのバッチを、C,O,C,Oの順で実施することを特徴とする請求項1に記載のベルレス高炉の装入物装入方法。 The respective batches of C 1 , C 2 , O 1 , and O 2 in the 4-batch charging are performed in the order of C 1 , O 1 , C 2 , and O 2 , How to charge the bellless blast furnace. 前記Oバッチが鉱石と小塊コークスの混合バッチであることを特徴とする請求項1又は請求項2に記載のベルレス高炉の装入物装入方法。 The method for charging a bell-less blast furnace according to claim 1 or 2, wherein the O 1 batch is a mixed batch of ore and small coke.
JP2014061611A 2014-03-25 2014-03-25 How to charge the bellless blast furnace Active JP6303685B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014061611A JP6303685B2 (en) 2014-03-25 2014-03-25 How to charge the bellless blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014061611A JP6303685B2 (en) 2014-03-25 2014-03-25 How to charge the bellless blast furnace

Publications (2)

Publication Number Publication Date
JP2015183246A JP2015183246A (en) 2015-10-22
JP6303685B2 true JP6303685B2 (en) 2018-04-04

Family

ID=54350139

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014061611A Active JP6303685B2 (en) 2014-03-25 2014-03-25 How to charge the bellless blast furnace

Country Status (1)

Country Link
JP (1) JP6303685B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2596029B (en) 2015-09-16 2022-07-27 Canon Kk Image sensor and image capturing apparatus
JP6358231B2 (en) * 2015-11-09 2018-07-18 Jfeスチール株式会社 Raw material charging method to blast furnace
LU100260B1 (en) * 2017-05-22 2019-01-04 Wurth Paul Sa Method of operating a sinter plant

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5610363B2 (en) * 1972-03-06 1981-03-07
JP3729026B2 (en) * 1999-06-25 2005-12-21 Jfeスチール株式会社 Raw material charging method to blast furnace
JP4725168B2 (en) * 2005-04-04 2011-07-13 Jfeスチール株式会社 Raw material charging method to blast furnace
JP5086767B2 (en) * 2007-10-18 2012-11-28 株式会社神戸製鋼所 Method for estimating layer thickness distribution of blast furnace charge and apparatus using this method
JP5696814B2 (en) * 2012-05-28 2015-04-08 新日鐵住金株式会社 Raw material charging method for bell-less blast furnace

Also Published As

Publication number Publication date
JP2015183246A (en) 2015-10-22

Similar Documents

Publication Publication Date Title
JP6303685B2 (en) How to charge the bellless blast furnace
JP6260288B2 (en) Raw material charging method for bell-less blast furnace
JP4971812B2 (en) Blast furnace operation method
JP6828225B2 (en) Raw material charging method for charging coke into the center of a blast furnace
JP6102495B2 (en) Blast furnace raw material charging device and blast furnace raw material charging method
JP6198649B2 (en) Raw material charging method for blast furnace
JP6627718B2 (en) Raw material charging method for blast furnace
JP6102497B2 (en) Raw material charging method for bell-less blast furnace
WO2019187997A1 (en) Method for loading raw materials into blast furnace
JP6885528B1 (en) How to charge raw materials to the blast furnace
JP5338308B2 (en) Raw material charging method to blast furnace
WO2021152989A1 (en) Method for charging raw material into blast furnace
JP5338310B2 (en) Raw material charging method to blast furnace
JP5056563B2 (en) Blast furnace operation method
JP5217650B2 (en) Raw material charging method to blast furnace
JP5488315B2 (en) How to operate the bell-less blast furnace
JP6950718B2 (en) How to charge raw materials for Bellless blast furnace
JP6558519B1 (en) Raw material charging method for blast furnace
JP4182660B2 (en) Blast furnace operation method
JP7047645B2 (en) Sintered ore manufacturing method
JP6627717B2 (en) Raw material charging method for blast furnace
JP5853904B2 (en) Raw material charging method for bell-type blast furnace
JP2019143225A (en) Method for charging blast furnace feed
JP6558518B1 (en) Raw material charging method for blast furnace
JP2005213579A (en) Method for preparing coke for charging at blast furnace center

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20161104

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20171116

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20171212

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180206

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180219

R151 Written notification of patent or utility model registration

Ref document number: 6303685

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350