JPS635538B2 - - Google Patents

Info

Publication number
JPS635538B2
JPS635538B2 JP55064380A JP6438080A JPS635538B2 JP S635538 B2 JPS635538 B2 JP S635538B2 JP 55064380 A JP55064380 A JP 55064380A JP 6438080 A JP6438080 A JP 6438080A JP S635538 B2 JPS635538 B2 JP S635538B2
Authority
JP
Japan
Prior art keywords
chute
hanging
boom
tip
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP55064380A
Other languages
Japanese (ja)
Other versions
JPS56159469A (en
Inventor
Mitsuo Miura
Hiromichi Yamada
Hayao Aoyanagi
Kazuyoshi Nakanishi
Masao Myaguchi
Takeo Kawamura
Junji Matsunaga
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP6438080A priority Critical patent/JPS56159469A/en
Publication of JPS56159469A publication Critical patent/JPS56159469A/en
Publication of JPS635538B2 publication Critical patent/JPS635538B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

【発明の詳細な説明】 この発明はシユートによる地下階のコンクリー
ト打設とこれに後続するコンクリート締め固めに
ついての改善に係わる。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to improvements in the pouring of concrete in basement floors by chute and the subsequent compaction of concrete.

地下階の打設の場合、ポンプ車による打設とシ
ユートによる打設が主流を占めている。
In the case of underground floor pouring, the most common methods are pouring by pump trucks and pouring by chute.

シユート打設は、ポンプ打設に比べ配筋上のホ
ースの振り廻しがないため、配筋を乱さない点や
打設能力が大きい(大型、大量打設、例えば土木
等の基礎等)等の長所があるが、その反面、シユ
ートの横引きに制約があり、打設面積が小さく、
シユートの盛替え(移設)が多くなり、作業員の
労働量が増大する等の問題点もある。
Compared to pump casting, chute casting does not involve swinging the hose over the reinforcement arrangement, so it does not disturb the reinforcement arrangement, and has a large casting capacity (large-scale, large-volume casting, for example, foundations for civil engineering, etc.). It has its advantages, but on the other hand, there are restrictions on horizontal pulling of the chute, and the pouring area is small.
There are also problems such as an increase in the number of chute changes and an increase in the amount of work required by the workers.

又、これに後続して行なわれるコンクリートの
締固め作業には近年、高周波バイブレーターが多
用されてきているが、高周波バイブレーターの操
作には振動部に1名、その後方相伴に1名の計2
名が従事する。そして、その振り廻しは、重量が
約8〜20Kgもあるものをかなりの頻度で、長時間
にわたる等の多くの改善すべき問題点がある。
又、通常は1打設箇所に少なくとも3台位は必要
となり計6名程度作業していて省力化の面で問題
点を有している。
In addition, in recent years, high-frequency vibrators have been widely used for the concrete compaction work that follows, and two people are required to operate the high-frequency vibrators: one person in the vibrating section and one person behind the vibrator.
The name is engaged. There are many problems that need to be improved, such as swinging something that weighs about 8 to 20 kg quite frequently and for a long time.
In addition, usually at least three machines are required for one pouring location, and a total of about six people are working on the work, which poses a problem in terms of labor saving.

すなわち、シユート打設では、第1図に示す如
く、ホツパー1下端より吊下するシユート本体2
を横引きし、かつ、筒先には、更に斜めシユート
3を架台8に背乗せしてセツトして打設面積の拡
大を計つているが、斜めシユート3の振廻し(移
設)およびシユート本体2の横引きには大変な労
力が必要である。また、配筋上の作業も起り、や
やもすると配筋の乱れの原因にもなつている。
That is, in chute pouring, as shown in FIG.
The diagonal chute 3 is placed on the back of the pedestal 8 and set at the tip of the tube to expand the casting area. A great deal of effort is required to pull it horizontally. In addition, work on the reinforcement arrangement occurs, which may cause the reinforcement arrangement to become disordered.

又、締固め作業については、現在多用されてい
る高周波バイブレーター4は第2図のように、実
際に締固め作業をしている作業員5の他に、後方
でその相伴6をつとめる作業員が必ずいる。そし
て、重い振動部(約8〜20Kg)の移動を1日中繰
返す重労働である。又、コンバーター7は約20Kg
以上であり、これは数回の移動を行なう場合があ
る。
Regarding compaction work, the high-frequency vibrator 4, which is currently widely used, is used not only for the worker 5 who is actually doing the compaction work, but also for the worker 6 who is working behind him as a companion, as shown in Figure 2. There is definitely one. It is hard work that involves moving heavy vibrating parts (approximately 8 to 20 kg) all day long. Also, converter 7 weighs approximately 20Kg.
That's all, and this may take several moves.

以上の2点について鑑み、本発明は前者のシユ
ート打設については打設面積の拡大と作業量の軽
減を計り、後者の締固め作業については、作業員
の員数の半減と人力による移動手間を排除すると
ともに、打込み部分へ常にバイブレーターが位置
するように工夫し、以上の対策により締固め作業
に専念し、よりよいコンクリート打設をすること
を目的としたもので、本発明のコンクリート打設
装置の要旨とするところは、シユート本体組付架
台に組み付けられて吊下のシユート本体の下部に
取付基盤体を施回可能に捲着し、当該取付基盤体
には吊りブームの基端、コンバーター受載用受台
枠の基端を夫々枢止すると共に斜めシユートの上
端部を掛載させ、他方、該吊りブーム、コンバー
ター受載用受台枠の先端に係止の吊りワイヤをシ
ユート本体途中に捲装の回転バンドに係止させ、
さらに、該吊りブームの先端にはバイブレーター
を吊つているバランサーを吊り下げるとした点に
ある。
In view of the above two points, the present invention aims to expand the area to be poured and reduce the amount of work required for the former type of chute pouring, and to reduce the number of workers by half and reduce the amount of manual movement required for the latter type of compaction work. The purpose of the concrete pouring device of the present invention is to eliminate the problem and to always position the vibrator in the pouring area, and to concentrate on compaction work by taking the above measures and to perform better concrete pouring. The gist of this is that a mounting base body is rotatably wrapped around the lower part of the chute body that is assembled to the chute body assembly frame and suspended, and that the base end of the hanging boom and the converter receiver are attached to the base end of the hanging boom and the converter receiver. The base ends of the mounting pedestal frame are each pivoted and the upper end of the diagonal chute is hung thereon, and a hanging wire is connected to the tip of the lifting boom and the converter mounting pedestal frame in the middle of the chute body. Lock it to the rotating band of the wrapping,
Furthermore, a balancer on which a vibrator is suspended is suspended from the tip of the suspension boom.

以下、これを実施例図にもとづいて詳細に説明
する。
Hereinafter, this will be explained in detail based on embodiment figures.

第3図は本発明装置の全体図で、図中9はシユ
ート本体組付架台で、これに組み付けられて吊下
のシユート本体2′の下部には、吊りブーム10
の基端、コンバーターC受載用受台枠11の基端
が夫々後述する旋回可能に捲着の取付基盤体に枢
止されてあると共に、斜めシユート3′の上端部
が掛載されており、該吊りブーム10、コンバー
ター受載用受台枠11の先端に係止の吊りワイヤ
ー12,13はシユート本体2′途中に捲装の回
転バンド14に係止されているので、これ等はシ
ユート本体2′に対して旋回自在である。
FIG. 3 is an overall view of the apparatus of the present invention. In the figure, reference numeral 9 denotes a chute body assembly frame, and a hanging boom 10 is attached to the lower part of the chute body 2' assembled to this frame and suspended.
The base end of the converter C receiving pedestal frame 11 is pivotally fixed to the winding mounting base body, which will be described later, and the upper end of the diagonal chute 3' is hung thereon. , the hanging wires 12 and 13 which are fixed to the ends of the hanging boom 10 and the converter mounting pedestal frame 11 are fixed to a rotating band 14 wrapped around the middle of the chute main body 2', so these wires are not attached to the chute. It is pivotable relative to the main body 2'.

該吊りブーム10の先端にはバイブレーター1
6を吊つているバランサー15が吊り下げられて
いる。
A vibrator 1 is installed at the tip of the hanging boom 10.
A balancer 15 that suspends a balancer 6 is suspended.

尚、斜めシユート3′の先端部には枢着で回動
自在な折りたたみ部3″を設けるものとしてもよ
い。
Incidentally, a pivotably rotatable folding portion 3'' may be provided at the tip of the diagonal chute 3'.

上述の取付基盤体の詳細を第4,5図について
説明する。
Details of the above-mentioned mounting base body will be explained with reference to FIGS. 4 and 5.

図中17はシユート本体2′下端にフランジ1
7′接合されて装着される短筒体で、これにはラ
ジアル軸受18、スラスト軸受19を介して取付
基盤体、すなわち、斜めシユート3′受アーム2
0が捲着されてある。これには対称に下方に向け
伸びるアーム21,21′があり、その先端間に
鋼管22が横架設されている。
In the figure, 17 is the flange 1 at the lower end of the chute body 2'.
7' is a short cylindrical body that is joined and mounted, and is connected to the mounting base body, that is, the diagonal chute 3' receiving arm 2 via the radial bearing 18 and the thrust bearing 19.
0 is wrapped around it. This has arms 21, 21' extending symmetrically downward, and a steel pipe 22 is horizontally installed between the ends of the arms 21, 21'.

この鋼管22に対して斜めシユート3′はその
下辺に刻設の凹溝23を掛載して取り付けられ
る。
The diagonal chute 3' is attached to the steel pipe 22 with a groove 23 formed on its lower side.

図中24は短筒体17先端に取り付けるを良し
とするコンクリートガイド用のフレキジブルホー
ス、25はこれの止めバンドである。
In the figure, reference numeral 24 indicates a flexible concrete guide hose that is preferably attached to the tip of the short cylindrical body 17, and reference numeral 25 indicates a stop band for this.

前記の吊りブーム10、コンバーター受載用受
台枠11について第6図で更に詳述する。
The above-mentioned hanging boom 10 and converter receiving pedestal frame 11 will be explained in more detail with reference to FIG.

すなわち、これ等の基端は該鋼管22内に挿通
の取付用軸棒26に対して取付けられる。
That is, their base ends are attached to a mounting shaft 26 inserted into the steel pipe 22.

又、前記吊りワイヤー12の詳細は、回転バン
ド14に止着の滑車27と吊りブーム10先端に
止着の滑車28間に、先ず滑車28のフレームに
止めたワイヤーは滑車27に捲かれてから滑車2
8に捲かれたうえ、吊りブーム10基端部に配設
のウインチ29に巻き取られているものである。
よつて、ウインチ29の操作により吊りブーム1
0は起伏し、その先端位置を半径方向に自在に変
更し得る。
Further, the details of the hanging wire 12 are as follows: between a pulley 27 fixed to the rotating band 14 and a pulley 28 fixed to the tip of the hanging boom 10, the wire first fixed to the frame of the pulley 28 is wound around the pulley 27; Pulley 2
8 and is wound up by a winch 29 provided at the base end of the hanging boom 10.
Therefore, by operating the winch 29, the lifting boom 1
0 is undulating, and its tip position can be freely changed in the radial direction.

尚、バランサー15は吊りブーム10先端に顕
架することなく、別個の吊り機構に任ねるものと
してもよい。又、シユート本体2′はクレーンに
てコンバーター、バイブレーター等と共に移動さ
せることが出来る。既述の斜めシユート3′の作
業半径を変える方法および旋回作業の要領を、左
図で打設時、右図で旋回時をあらわすところの第
7図について、更に詳述するならば次記の如くで
ある。
In addition, the balancer 15 may be left to a separate suspension mechanism without being exposed at the tip of the suspension boom 10. Further, the chute main body 2' can be moved together with the converter, vibrator, etc. using a crane. The method of changing the working radius of the diagonal chute 3' mentioned above and the procedure for turning the diagonal chute 3' will be explained in more detail with reference to Figure 7, where the left figure shows the pouring operation and the right figure shows the turning operation. It is like that.

すなわち、A図の例は既述のシユート3′の先
端部に枢着で回動自在な折りたたみ部3″を設け、
これにより作業半径を伸ばすとしたものである
が、この際、吊りブーム10より吊具30でシユ
ート3′の先端部を吊つていると回動折りたたみ
後の旋回作業は極めて容易である。
That is, in the example shown in Fig. A, a folding part 3'' which is pivotally connected to the tip of the chute 3' mentioned above and can be rotated freely is provided.
This is intended to extend the working radius, but at this time, if the tip of the chute 3' is suspended from the lifting boom 10 by the hanging tool 30, the turning work after rotational folding is extremely easy.

B図の例は、シユート3′の作業半径の調整を
凹溝23の鋼管22に対する掛けかえでなすとし
たもので、A図と同じく吊りブーム10より吊具
30でシユート3′の先端部を吊つていると縮少
後の旋回作業は容易となる。
In the example shown in Figure B, the working radius of the chute 3' is adjusted by replacing the concave groove 23 with the steel pipe 22. As in Figure A, the tip of the chute 3' is suspended from the lifting boom 10 with the lifting tool 30. If it is attached, turning work after retraction will be easier.

C図の例は、シユート3′の先端部にスライド
式の折りたたみ部3を設け、これにより作業半
径を伸ばすとしたもので、前二者と同じく吊りブ
ーム10より吊具30でシユート3′の先端部を
吊つているならば折りたたみ後の旋回作業は極め
て容易である。
In the example shown in Fig. C, a sliding folding part 3 is provided at the tip of the chute 3' to extend the working radius, and as in the previous two cases, the chute 3' is lifted from the lifting boom 10 with the lifting device 30. If the tip is suspended, turning after folding is extremely easy.

叙上の如き構成よりなる本発明にあつては斜め
シユート2′が旋回自在であるのでシユート打設
による打設面積の拡大と斜めシユート振廻し作業
量の軽減が計れると共に、コンバーターをシユー
ト本体2′が支持してくれているうえ、バイブレ
ーターはバランサーに懸架されていて操作上何ん
ら重作業とはならないので、締固め作業に従事す
る員数の半減と、バイブレーター等の移動作業お
よび締固め作業そのもの(上下、横移動)がきわ
めて軽作業で行うことができ、作業量の軽減が計
れることにより、確実な又、密な締固め作業をす
る作業環境ができる等の利点を有している。
In the present invention constructed as described above, since the diagonal chute 2' is rotatable, it is possible to expand the casting area by casting the chute and reduce the amount of work required for swinging the diagonal chute, and the converter can be mounted on the chute main body 2. In addition, since the vibrator is suspended on a balancer and does not require any heavy operation, the number of people involved in compaction work can be halved, and the work of moving the vibrator etc. and compaction work can be reduced by half. The machine itself (vertical and lateral movement) can be performed with extremely light work, and by reducing the amount of work, it has the advantage of creating a work environment in which reliable and dense compaction work can be performed.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来のシユート打設の概略図、第2図
は従来のコンクリート締固め作業の概略図、第3
図は本発明装置の全体図、第4,5図は要部構成
の正面、側面図、第6図はシユート下部の詳細
図、第7図は斜めシユートの作業半径を変える方
法および旋回作業の要領図である。 符号の簡単な説明、10……吊りブーム、C…
…コンバーター、15……バランサー、16……
バイブレーター。
Figure 1 is a schematic diagram of conventional chute pouring, Figure 2 is a schematic diagram of conventional concrete compaction work, and Figure 3 is a schematic diagram of conventional concrete compaction work.
The figure is an overall view of the device of the present invention, Figures 4 and 5 are front and side views of the main components, Figure 6 is a detailed view of the lower part of the chute, and Figure 7 is a method for changing the working radius of an oblique chute and a method for turning work. This is a schematic diagram. Brief explanation of symbols, 10... Hanging boom, C...
...Converter, 15... Balancer, 16...
vibrator.

Claims (1)

【特許請求の範囲】[Claims] 1 シユート本体組付架台に組み付けられて吊下
のシユート本体の下部に取付基盤体を旋回可能に
捲着し、当該取付基盤体には吊りブームの基端、
コンバーター受載用受台枠の基端を夫々枢止する
と共に斜めシユートの上端部を掛載させ、他方、
該吊りブーム、コンバーター受載用受台枠の先端
に係止の吊りワイヤをシユート本体途中に捲装の
回転バンドに係止させ、さらに、該吊りブームの
先端にはバイブレーターを吊つているバランサー
を吊り下げるとしてなることを特徴とするコンク
リート打設装置。
1. A mounting base body is attached rotatably to the lower part of the chute body assembled to the chute body assembly frame and suspended, and the base end of the hanging boom is attached to the base end of the hanging boom,
The base ends of the pedestal frame for receiving the converter are each pivotally fixed, and the upper end of the diagonal chute is hung thereon, and on the other hand,
A hanging wire that is fixed to the tip of the hanging boom and the converter receiving pedestal frame is hooked to a rotating band wrapped around the middle of the chute body, and a balancer that suspends a vibrator is attached to the tip of the hanging boom. Concrete placement equipment characterized by being suspended.
JP6438080A 1980-05-15 1980-05-15 Method of and apparatus for casting concrete Granted JPS56159469A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6438080A JPS56159469A (en) 1980-05-15 1980-05-15 Method of and apparatus for casting concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6438080A JPS56159469A (en) 1980-05-15 1980-05-15 Method of and apparatus for casting concrete

Publications (2)

Publication Number Publication Date
JPS56159469A JPS56159469A (en) 1981-12-08
JPS635538B2 true JPS635538B2 (en) 1988-02-04

Family

ID=13256636

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6438080A Granted JPS56159469A (en) 1980-05-15 1980-05-15 Method of and apparatus for casting concrete

Country Status (1)

Country Link
JP (1) JPS56159469A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5214531A (en) * 1975-06-27 1977-02-03 Fischer Ag Georg Auxiliary device for permanent mold

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5214531A (en) * 1975-06-27 1977-02-03 Fischer Ag Georg Auxiliary device for permanent mold

Also Published As

Publication number Publication date
JPS56159469A (en) 1981-12-08

Similar Documents

Publication Publication Date Title
CN110469114A (en) Cementitious material exact distributing and closely knit Work robot
CN106401195A (en) Movable vibration device for concrete ground pump terminal
CN206015665U (en) Movable reinforcement cage installs equipment
JPS635538B2 (en)
JPH08232475A (en) Concrete compactor and method
JP2717347B2 (en) Casting concrete compaction equipment
CN208166363U (en) A kind of brick handling bogey for building
JPH0220766A (en) Concrete vibrator
JPS637650Y2 (en)
CN207364438U (en) Spread line apparatus
JP3712801B2 (en) Mobile crane for pile driving
JPS5835740Y2 (en) Bucket hanging rope guide device
CN206967690U (en) A kind of automatic equipment of vibrating
JPH0448281Y2 (en)
JPH0447275Y2 (en)
JPS5980864A (en) Distributor
JPS6122407Y2 (en)
JPH0442431Y2 (en)
JPS6085115A (en) Sand pile forming device
CN208037825U (en) A kind of gates of segmental shape free bearing hanging apparatus
JPH0237958Y2 (en)
JPS6138347Y2 (en)
JPH02243497A (en) Second rope system for crane
JPH057380Y2 (en)
JPS6116308Y2 (en)