JPS637650Y2 - - Google Patents

Info

Publication number
JPS637650Y2
JPS637650Y2 JP3148082U JP3148082U JPS637650Y2 JP S637650 Y2 JPS637650 Y2 JP S637650Y2 JP 3148082 U JP3148082 U JP 3148082U JP 3148082 U JP3148082 U JP 3148082U JP S637650 Y2 JPS637650 Y2 JP S637650Y2
Authority
JP
Japan
Prior art keywords
column
scaffold
support
jib
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP3148082U
Other languages
Japanese (ja)
Other versions
JPS58134542U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP3148082U priority Critical patent/JPS58134542U/en
Publication of JPS58134542U publication Critical patent/JPS58134542U/en
Application granted granted Critical
Publication of JPS637650Y2 publication Critical patent/JPS637650Y2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【考案の詳細な説明】 建築作業場における足場に対するモルタル等資
材の吊揚取込作業としては、足場の上部に支持腕
を突設してその先端に滑車を取り付け、これに荷
揚用の吊ロープを掛け渡して、これをウインチに
よつて揚げ降しするのが一般的であるが、この方
式では吊り揚げられた資材を足場上に取り込む場
合に作業員が身体を乗り出して吊荷を相当強い力
で引き寄せる等の危険な作業を行う必要がある。
[Detailed explanation of the invention] In order to lift materials such as mortar onto scaffolding in a construction workplace, a supporting arm is protruded from the top of the scaffolding, a pulley is attached to the tip of the supporting arm, and a lifting rope for lifting the load is attached to this. It is common practice to hoist the hoisted material onto the scaffold and lift it up and down using a winch, but in this method, when lifting the hoisted material onto the scaffolding, the worker leans forward and applies considerable force to the hoisted material. It is necessary to carry out dangerous work such as pulling the object with a hand.

本考案は、このような危険な作業を行うことな
く安全でかつ容易に取り込み作業を行い得るよ
う、資材を吊り揚げた後突設したジブを回動引き
寄せて足場の上まで容易に資材を取り込みその後
ジブが自動的に元の位置に戻るようにしたもので
あつて、その構成を図面の実施例について説明す
れば、1は例えば山形鋼等よりなる荷吊揚装置の
柱にして、その上下端部に所定間隔の下に取付座
2,2′を固定すると共に、表側中央には例えば
第1図乃至第3図に示すようなパイプ等よりなる
ジブ3を固定し、その先端近くに滑車4を支軸5
によつて取り付け、かつジブ3の柱1に対する取
り付け部にも滑車6を支軸7によつて取り付け、
この二つの滑車に後記する吊揚ロープを掛け渡す
ものである。
In order to safely and easily carry out the loading work without having to perform such dangerous work, the present invention has a system that, after lifting the material, rotates and pulls the protruding jib to easily pull the material up to the top of the scaffold. After that, the jib automatically returns to its original position.If we explain its structure with reference to the embodiment shown in the drawings, 1 is a column of a load lifting device made of, for example, angle iron. Mounting seats 2, 2' are fixed at a predetermined interval at the ends, and a jib 3 made of a pipe or the like as shown in Figs. 1 to 3 is fixed to the center of the front side, and a pulley is attached near the tip. 4 as the pivot 5
At the same time, a pulley 6 is also attached to the attachment part of the jib 3 to the pillar 1 by a support shaft 7,
A lifting rope, which will be described later, is strung between these two pulleys.

以上のように構成した荷吊揚装置は、第5図に
示すように足場の上部適所に取り付け使用するも
のである。すなわち柱1に設けた取付座2,2′
を例えば足場本体8の建地9の上部に柱1の上下
の取付座2,2′の間隔に合わせて設けた受桁1
0,11の支持座12,12′に対して上部はボ
ールベアリング13下部はスラストベアリング1
3′を介して支軸14,14′によつて回動自在に
装置し、下部の支軸部には例えばつる巻ばねより
成る腕付復元ばね15を装置し、支持座12′に
固定したピン17および柱1に固定した支杆18
を腕付復元ばね15の腕16,16′により挾持
する。而して柱1の回動に伴つて腕付復元ばね1
5に抗してその腕が開き、次いでその反撥力によ
つて原位置に復帰するようにしたものである。
The load hoisting device constructed as described above is used by being attached to a suitable position on the upper part of a scaffold as shown in FIG. In other words, the mounting seats 2, 2' provided on the pillar 1
For example, a support girder 1 is installed on the top of the building site 9 of the scaffold body 8 in accordance with the spacing between the upper and lower mounting seats 2, 2' of the pillar 1.
0 and 11 support seats 12 and 12', the upper part is a ball bearing 13 the lower part is a thrust bearing 1
3', and is rotatably mounted on support shafts 14, 14', and a restoring spring 15 with an arm made of, for example, a helical spring is installed on the lower support shaft, and is fixed to the support seat 12'. Pin 17 and support rod 18 fixed to column 1
is held between the arms 16 and 16' of the restoring spring 15 with arms. Therefore, as the pillar 1 rotates, the restoring spring 1 with arm
5, the arm opens and then returns to its original position due to the repulsive force.

以上のように足場上に装置したこの吊揚装置は
その使用に当り、吊揚ワイヤーロープ19の一端
をジブ3側に固定してこれを下から上方へ折り返
してその折返し部に荷掛フツク26を取り付けた
移動滑車20を掛けて吊揚ワイヤーロープ19を
滑車4および6に掛け渡して下方へ延ばしてその
先端をウインチ21の巻胴に取り付けて巻揚降し
作業を行うようにしたものである。而してこの吊
揚ワイヤーロープの過巻き込みを防止するため
に、ジブ3の先端に滑車22を設け、これにロー
プ23を掛け渡してその下端に例えば環状の錘2
4を固定してその内部孔に前記吊揚ワイヤーロー
プ19を緩く挿通し、その他端をジブ3に沿わせ
て柱1に装置したリミツトスイツチ25に連結し
過巻き込みの状態になつた場合に移動滑車20が
錘24に接触してリミツトスイツチを作動して過
巻きを停止するようにしたものである。
When using this hoisting device installed on the scaffold as described above, one end of the hoisting wire rope 19 is fixed to the jib 3 side, it is folded upward from the bottom, and a load hook 26 is attached to the folded part. The hoisting wire rope 19 is strung around the pulleys 4 and 6 by a movable pulley 20 attached to the movable pulley 20, extended downward, and its tip is attached to the winding drum of the winch 21 for hoisting and lowering work. be. In order to prevent the hoisting wire rope from being over-wound, a pulley 22 is provided at the tip of the jib 3, a rope 23 is stretched around it, and a ring-shaped weight 2, for example, is attached to the lower end of the pulley 22.
4 is fixed and the hoisting wire rope 19 is loosely inserted into its internal hole, and the other end is connected to the limit switch 25 installed on the column 1 along the jib 3, so that the movable pulley can be used in case of overwinding. 20 contacts the weight 24 and operates a limit switch to stop overwinding.

以上のように構成した荷吊揚取込装置の操作に
ついて説明すれば、移動滑車20のフツク26に
資材Aを掛け止めてウインチ21を操作して所定
の高さの荷揚個所まで巻き揚げた後、フツク26
を足場の上から引き寄せればジブ3はその柱1の
支軸14,14′を中心にして回動して第6図に
示すように吊揚資材Aを足場上に取り込むことが
できる。このようにして資材を取り込んだ後フツ
ク26を離せば腕付復元ばね15によつて自動的
に元の位置に復帰させることができる。
To explain the operation of the load lifting and taking-in device configured as above, material A is hooked onto the hook 26 of the movable pulley 20, and the winch 21 is operated to hoist the material to a predetermined height. , Fuku26
When the jib 3 is pulled from above the scaffold, the jib 3 rotates around the support shafts 14, 14' of the column 1, and the hoisted material A can be taken onto the scaffold as shown in FIG. If the hook 26 is released after taking in the material in this way, the restoring spring 15 with arm can automatically return it to its original position.

以上のように本考案の装置によれば、吊り揚げ
られた資材を足場に取り込むのにジブ自体がその
支軸を中心として廻わることによつてこれに吊り
下げた資材は容易に足場の上に取り込むことがで
きるので、従来の方法のような危険もなく安全作
業を行うことができる。
As described above, according to the device of the present invention, the jib itself rotates around its spindle to take the hoisted materials onto the scaffold, so that the materials suspended from the jib can be easily transported onto the scaffold. This allows safe work to be carried out without the dangers of conventional methods.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案の荷吊揚取込装置の縦断側面
図、第2図は第1図のX−X′断面図、第3図は
第1図のY−Y′断面図、第4図は本考案の腕付
復元ばねの平面図、第5図は足場に対する取付態
様の側面図、第6図はジブの回動状態を示す平面
図である。 1……荷吊揚装置の柱、2,2′……取付座、
3……ジブ、4……滑車、5……支軸、6……滑
車、7……支軸、8……足場本体、9……足場の
建地、10,11……受桁、12,12′……支
持座、13……ボールベアリング、13′……ス
ラストベアリング、14,14′……支軸、15
……腕付復元ばね、16,16′……腕付復元ば
ねの腕、17……ピン、18……支杆、19……
吊揚ワイヤーロープ、20……移動滑車、21…
…ウインチ、22……滑車、23……ロープ、2
4……錘、25……リミツトスイツチ、26……
フツク、A……吊揚資材。
Fig. 1 is a vertical side view of the load lifting and taking-in device of the present invention, Fig. 2 is a sectional view taken along line X-X' in Fig. 1, Fig. 3 is a sectional view taken along line Y-Y' in Fig. 1, and Fig. 4 is a sectional view taken along line X-X' in Fig. The figure is a plan view of the restoring spring with an arm of the present invention, FIG. 5 is a side view of how it is attached to a scaffold, and FIG. 6 is a plan view showing the rotating state of the jib. 1... Pillar of load lifting device, 2, 2'... Mounting seat,
3... Jib, 4... Pulley, 5... Support shaft, 6... Pulley, 7... Support shaft, 8... Scaffolding body, 9... Scaffold construction site, 10, 11... Support girder, 12 , 12'... Support seat, 13... Ball bearing, 13'... Thrust bearing, 14, 14'... Support shaft, 15
...restoring spring with arm, 16, 16'... arm of restoring spring with arm, 17... pin, 18... support rod, 19...
Lifting wire rope, 20...Moving pulley, 21...
...Winch, 22...Pulley, 23...Rope, 2
4... Weight, 25... Limit switch, 26...
Futsuku, A...Lifting materials.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 荷吊揚装置の柱1の両端部に取付座2,2′を
設けると共に、この柱1の表側にジブ3を突設
し、かつこれに、吊揚ワイヤーロープ19を掛け
渡す滑車4,6を設け、この荷吊揚装置の柱1
を、その上下の取付座2,2′に設けた支軸14,
14′によつて足場本体8の上部に設けた受桁1
0,11の支持座12,12′に対して回動自在
に装置すると共に、この柱1の取付座2′とこれ
に対応する支持座12′に亘つて、つる巻ばねの
両端腕部が作用するように構成した、回動柱の復
帰用腕付復元ばね15を介装した建築作業場等に
おける足場に対する荷吊揚取込装置。
Mounting seats 2, 2' are provided at both ends of a column 1 of the load lifting device, and a jib 3 is provided protruding from the front side of the column 1, and pulleys 4, 6 are provided on which a lifting wire rope 19 is stretched. and pillar 1 of this load lifting device.
, the support shaft 14 provided on the upper and lower mounting seats 2, 2',
Support girder 1 provided on the upper part of the scaffold body 8 by 14'
The device is rotatable relative to the support seats 12 and 12' of columns 1 and 12, and both end arms of the helical spring are connected to the mounting seat 2' of the column 1 and the corresponding support seat 12'. This is a load lifting and taking-in device for a scaffold in a construction workplace, etc., which is equipped with a restoring spring 15 with an arm for restoring a rotating column.
JP3148082U 1982-03-08 1982-03-08 Load lifting and loading device for scaffolding in construction workplaces, etc. Granted JPS58134542U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3148082U JPS58134542U (en) 1982-03-08 1982-03-08 Load lifting and loading device for scaffolding in construction workplaces, etc.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3148082U JPS58134542U (en) 1982-03-08 1982-03-08 Load lifting and loading device for scaffolding in construction workplaces, etc.

Publications (2)

Publication Number Publication Date
JPS58134542U JPS58134542U (en) 1983-09-10
JPS637650Y2 true JPS637650Y2 (en) 1988-03-04

Family

ID=30043153

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3148082U Granted JPS58134542U (en) 1982-03-08 1982-03-08 Load lifting and loading device for scaffolding in construction workplaces, etc.

Country Status (1)

Country Link
JP (1) JPS58134542U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5948542B1 (en) * 2015-06-09 2016-07-06 株式会社古屋興産 Simple crane
JP6123148B1 (en) * 2016-07-05 2017-05-10 株式会社古屋興産 Rope direction changer

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2507635Y2 (en) * 1993-01-29 1996-08-14 関廣 渡辺 Scaffolding equipment
JP5252228B2 (en) * 2009-09-30 2013-07-31 清水建設株式会社 Hoisting device for dredging piping construction and dredging piping construction method using the same
DE202012009836U1 (en) * 2012-10-15 2014-01-16 Liebherr-Werk Ehingen Gmbh Device for transporting persons by means of a crane - Crane with device for transporting persons

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5948542B1 (en) * 2015-06-09 2016-07-06 株式会社古屋興産 Simple crane
JP6123148B1 (en) * 2016-07-05 2017-05-10 株式会社古屋興産 Rope direction changer
JP2018003496A (en) * 2016-07-05 2018-01-11 株式会社古屋興産 Rope direction converter

Also Published As

Publication number Publication date
JPS58134542U (en) 1983-09-10

Similar Documents

Publication Publication Date Title
JPS637650Y2 (en)
JP2579489Y2 (en) Automatic ball removal lifting device
US2288354A (en) Hoisting equipment
RU2048423C1 (en) Crane for lifting and delivering loads into window aperture in building
JPH0628548Y2 (en) Lifting device for self-propelled work platform
JP2852952B2 (en) Lifting crane
JPH0328066Y2 (en)
JPH0327162Y2 (en)
JP2504541Y2 (en) Movable hanging jig device
JPH066828B2 (en) How to attach work scaffolds to the underside of the bridge
JP3008431U (en) Hanging jig for wall joint material
JPS6312152Y2 (en)
JP2507635Y2 (en) Scaffolding equipment
JPS6214077Y2 (en)
JPS6219667Y2 (en)
JPH0235749Y2 (en)
KR0113775Y1 (en) Jib crane stopper device
JPH0120391Y2 (en)
JPH0442433Y2 (en)
JPH0711092Y2 (en) Elevator governor rope holding device
RU56365U1 (en) CRANE FOR LIFTING AND DELIVERY OF GOODS TO THE WINDOW OF THE BUILDING
JPH0620785Y2 (en) Hanging hook
JPH0535977Y2 (en)
JPS5815431Y2 (en) Scaffolding for maintenance and inspection of overhead traveling cranes
JP2500238Y2 (en) Shukaku device