JPH066828B2 - How to attach work scaffolds to the underside of the bridge - Google Patents

How to attach work scaffolds to the underside of the bridge

Info

Publication number
JPH066828B2
JPH066828B2 JP13023486A JP13023486A JPH066828B2 JP H066828 B2 JPH066828 B2 JP H066828B2 JP 13023486 A JP13023486 A JP 13023486A JP 13023486 A JP13023486 A JP 13023486A JP H066828 B2 JPH066828 B2 JP H066828B2
Authority
JP
Japan
Prior art keywords
bridge
work
scaffold
work scaffold
locking means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP13023486A
Other languages
Japanese (ja)
Other versions
JPS62288258A (en
Inventor
敏夫 木沢
治 島田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP13023486A priority Critical patent/JPH066828B2/en
Publication of JPS62288258A publication Critical patent/JPS62288258A/en
Publication of JPH066828B2 publication Critical patent/JPH066828B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Movable Scaffolding (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は橋梁下面への作業足場の取付方法に係り、特に
道路用橋梁や高架道路等の下面部を点検、補修するため
の作業足場を、橋梁等の上面部から懸垂させて下面部に
取り付けるための橋梁下面への作業足場の取付方法に関
する。
Description: TECHNICAL FIELD The present invention relates to a method for attaching a work scaffold to a lower surface of a bridge, and particularly to a work scaffold for inspecting and repairing a lower surface of a road bridge or an elevated road. The present invention relates to a method of attaching a work scaffold to a lower surface of a bridge so that the work scaffold is suspended from the upper surface of the bridge and attached to the lower surface.

[従来の技術] 従来、橋梁等の下面部を点検、補修するにはリフタ等の
高所作業車を使ったり橋梁直下に比較的広範囲に亙って
作業足場を架設して行なうのが一般的であるが、後者の
場合仮設費節減等の観点から、近年移動可能な作業足場
が種々勘案されている。殊にこのような移動可能な作業
足場は、前者のリフタ等の高所作業車では不可能な河川
上の橋梁の補修等には有用である。この種の移動式の作
業足場の取付としては、橋梁上の道路等に停車させた取
付作業専用の車両に備えたアーム等の先端に作業足場を
支持させた状態で、このアーム等を橋梁の側部下方へ延
出して橋梁の下面部に取り付けるようにしている。
[Prior Art] Conventionally, in order to inspect and repair the lower surface of a bridge or the like, it is common to use a lift work vehicle or an aerial work vehicle or to construct a work scaffold over a relatively wide area directly under the bridge. However, in the case of the latter, various work scaffolds that have been movable in recent years have been taken into consideration in order to reduce temporary costs. In particular, such a movable work scaffold is useful for repairing a bridge on a river, which cannot be done by the former lifter or other aerial work vehicle. To attach this type of mobile work platform, attach the arm to the bridge while the work platform is supported at the tip of an arm or the like provided for a vehicle dedicated to the installation work that is stopped on the road on the bridge. It is extended to the lower side and attached to the lower surface of the bridge.

具体的方法について述べると第11図に示すように、先
ず橋梁aの上面部bにアウトリガcを張り出して車両d
を固定し、この車両dのアームeの先端に作業足場fの
一端部を取り付ける。次いで、アームeを伸長させて作
業足場fを橋梁aの側方に懸垂した後、順次支持ポスト
gを下方へ降ろして作業足場fを橋梁aの下面部h下方
に降下させる。このとき作業足場fの全重量による転倒
モーメントは、アウトリガcの張出しによって橋梁aの
上面部bから支持されている。次いで、支持ポストgを
回転させることにより、作業足場fの他端部を橋梁aの
下面部h直下へ振り込む。次いで、作業足場fに設けた
一対の係止手段iを、下面部hに形成した橋桁jのフラ
ンジ部kに係止させる。これにより作業足場fは下面部
hに支持可能な状態となり、取付作業が終了する。最後
に、支持ポストgを作業足場fから外すことになる。
A concrete method will be described. As shown in FIG. 11, first, an outrigger c is overhanging on the upper surface b of the bridge a so that the vehicle d
Is fixed, and one end of the work scaffold f is attached to the tip of the arm e of the vehicle d. Next, the arm e is extended to suspend the work scaffold f to the side of the bridge a, and then the support posts g are sequentially lowered to drop the work scaffold f below the lower surface h of the bridge a. At this time, the overturning moment due to the total weight of the work scaffold f is supported from the upper surface b of the bridge a by the overhang of the outrigger c. Next, by rotating the support post g, the other end of the work scaffold f is swung right under the lower surface h of the bridge a. Next, the pair of locking means i provided on the work scaffold f is locked to the flange portion k of the bridge girder j formed on the lower surface portion h. As a result, the work scaffold f is brought into a state in which it can be supported by the lower surface part h, and the mounting work is completed. Finally, the support post g will be removed from the work scaffold f.

[発明が解決しようとする問題点] ところで従来の取付方法にあっては、作業足場fの取付
けのために、作業足場fを降下させ旋回させるための支
持ポストgを備えた専用の車両dを準備しなければなら
ないという問題があった。
[Problems to be Solved by the Invention] In the conventional mounting method, a dedicated vehicle d having a support post g for lowering and turning the work scaffold f for mounting the work scaffold f is provided. There was a problem that I had to prepare.

[問題点を解決するための手段] 本発明は、橋梁等を横断する方向に延出された作業足場
を、橋梁等の上面部から懸垂しつつ降下させて下面部に
形成されたフランジ部に一対の係止手段で取り付けるに
際して、橋梁等の上面部から吊揚手段により作業足場の
一端部を懸垂すると共に、作業足場の他端部と反対側
に、作業足場の重量に平衡するバランスウェイトを設
け、次いで作業足場を懸垂しつつ橋梁等の下面部下方へ
降下させた後、作業足場をその一端部回りに旋回させて
他端部を下面部下に進入させ、次いで作業足場の懸垂重
心を他端部側へ移動させて他端部側の係止手段をフラン
ジ部に係止させた後、作業足場を降下させて一端部側の
係止手段をフランジ部に係止させるようにしたものであ
る。
[Means for Solving Problems] The present invention provides a work scaffold extending in a direction crossing a bridge or the like to a flange portion formed on a lower surface portion while being suspended from an upper surface portion of the bridge or the like. When attaching with a pair of locking means, suspend one end of the work scaffold from the upper surface of the bridge etc. by the lifting means, and at the other side of the work scaffold, equip a balance weight that balances the weight of the work scaffold. After suspending the work scaffold and lowering it below the lower surface of the bridge, etc., rotate the work scaffold around its one end and let the other end go under the lower surface, and then change the suspended center of gravity of the work scaffold to another. After moving to the end side and locking the locking means on the other end side to the flange part, the working scaffold is lowered to lock the locking means on the one end side to the flange part. is there.

[使 用] 本発明の作用について述べると、一端部が懸垂される作
業足場の他端部と反対側にバランスウェイトをかけて作
業足場の重量と平衡させることにより、従来のように専
用車両を用意することなく、通常のクレーン車等で懸垂
・昇降作業を行わせると共に、作業足場の懸垂重心の移
動と、その後の作業足場の降下とにより、係止手段を、
クレーンの巻き下げの寸動による衝撃的荷重を避けて一
定の順序で静的且つ確実にフランジ部に係止させるよう
にしたものである。
[Use] To describe the operation of the present invention, a balance weight is applied to the side opposite to the other end of the work scaffold on which one end is suspended to balance the weight of the work scaffold with that of the conventional vehicle. Without having to prepare, let the suspension / elevation work with a normal crane vehicle, etc., and by moving the center of gravity of suspension of the work scaffold and then descending the work scaffold, the locking means,
It avoids an impulsive load due to the inching of the crane when it is hoisted, and statically and reliably engages the flange portion in a fixed order.

[実施例] 以下に本発明を実施するための装置について、添付図面
に従って説明する。
[Embodiment] An apparatus for carrying out the present invention will be described below with reference to the accompanying drawings.

第1図〜第5図に示すように、1は作業足場であり、こ
の作業足場1は相当の長さを有し、橋梁2の下面部2a
に形成されたフランジ部3に取り付けられる際には、橋
梁2下にこれを横断する方向に延出されて配置される。
またこの作業足場1の上部には、フランジ部3に係止さ
れて作業足場1全体を橋桁4下に支持させるための一対
の係止手段5,6が設けられる。
As shown in FIGS. 1 to 5, 1 is a work scaffold, and this work scaffold 1 has a considerable length, and the lower surface portion 2 a of the bridge 2 is
When it is attached to the flange portion 3 formed in the above, it is arranged under the bridge 2 so as to extend in a direction crossing the bridge 2.
Further, a pair of locking means 5 and 6 for locking the flange 3 to support the entire work scaffold 1 under the bridge girder 4 is provided on the upper part of the work scaffold 1.

他方、橋梁2の上面部2bにはクレーン等の一般的な吊
揚手段(図示せず)が配備され、この吊揚手段は、これ
より吊り下げられる吊具(ワイヤロープ)7に作業足場
1の一端部1aが取り付けられて、作業足場1を懸垂す
るようになっている。具体的には、作業足場1の一端部
1aには、その他端部1bと反対側に張り出して張出ビ
ーム8が設けられ、この張出ビーム8を介して吊揚手段
に取り付けられる。そしてこの張出ビーム8には、作業
足場1の重量に平衡するバランスウェイトが設けられ
る。
On the other hand, a general hoisting means (not shown) such as a crane is provided on the upper surface portion 2b of the bridge 2, and the hoisting means is attached to a hanger (wire rope) 7 to be hung from the work scaffold 1 One end 1a of the work scaffold 1 is attached to suspend the work scaffold 1. Specifically, the one end portion 1a of the work scaffold 1 is provided with a projecting beam 8 projecting to the side opposite to the other end portion 1b, and the projecting beam 8 is used to attach the projecting beam to the lifting means. The overhanging beam 8 is provided with a balance weight that balances the weight of the work scaffold 1.

本実施例にあってはバランスウェイトに関し具体的に図
示していないが、鋼塊やタンクに貯留した水等の荷重
や、引下力等の外力等作業足場1の重量に平衡させ得る
ものであればいずれでも良い。またその設置に関して
も、張出ビーム8上に直接設置しても良く、また吊り下
げる等して間接的に荷重をかけるようにしても良い。
Although the balance weight is not specifically illustrated in the present embodiment, it can be balanced with the weight of the work scaffold 1 such as a load of water stored in a steel ingot or a tank or an external force such as a pulling force. Any of them will do. Regarding the installation, it may be installed directly on the overhanging beam 8 or may be indirectly hung by being suspended.

次に本発明に係る取付方法について説明する。Next, a mounting method according to the present invention will be described.

先ず第1図に示すように、橋梁2の上面部2bに配備し
た吊揚手段の吊具7に、張出ビーム8を介して作業足場
1の一端部1aを連結すると共に、張出ビーム8に、作
業足場1の重量に平衡するバランスウェイトを設ける。
次いで、吊揚手段により作業足場1等全体を吊り上げて
懸垂しつつ橋梁2の側方へ移送する。これに際しては、
作業足場1は橋梁の長手方向に沿って配置される。
First, as shown in FIG. 1, one end 1a of the work scaffold 1 is connected to a lifting tool 7 of a lifting means provided on the upper surface 2b of the bridge 2 via a projecting beam 8 and the projecting beam 8 is connected. In addition, a balance weight that balances the weight of the work scaffold 1 is provided.
Then, the work scaffold 1 and the like are hoisted by the hoisting means and are hoisted and transferred to the side of the bridge 2. In this regard,
The working scaffold 1 is arranged along the longitudinal direction of the bridge.

次いで第2図に示すように、作業足場1を吊揚手段で橋
梁2の下面部2a下方まで降下させ、その後、張出ビー
ム8先端部に取付けた補助ロープ21を横方向に引張る
ことにより作業足場1をその一端部1a回りに旋回させ
て他端部1bを下面部2a直下に進入させる。これによ
り作業足場1は橋梁2を横断する方向に延出されて配置
される。またこのとき一対の係止手段5,6は夫々、フ
ランジ部3の上方にこれに臨ませて位置される。
Then, as shown in FIG. 2, the work scaffold 1 is lowered to the lower side of the lower surface 2a of the bridge 2 by a hoisting means, and then the auxiliary rope 21 attached to the tip end portion of the projecting beam 8 is pulled laterally to perform the work. The scaffolding 1 is swiveled around its one end 1a, and the other end 1b is made to enter immediately below the lower surface 2a. Thereby, the work scaffold 1 is extended and arranged in the direction crossing the bridge 2. At this time, the pair of locking means 5 and 6 are respectively positioned above the flange portion 3 so as to face them.

次いで第3図に示すように、吊具7のセンタに位置され
る作業足場1の懸垂重心Gを他端部側Gに移動させる
(図中、(A)で示す)。これにより水平に保たれてい
た作業足場1は若干傾斜され、懸垂重心Gが移動した他
端部側の係止手段5がフランジ部3に係止される。この
懸垂重心Gの移動に関しては様々な方法が考えられ、例
えば荷重を他端部側へ移動させたり、荷重を除荷したり
することによって達成される。
Next, as shown in FIG. 3, the suspension center of gravity G of the work scaffold 1 located at the center of the lifting tool 7 is moved to the other end side G 1 (indicated by (A) in the figure). As a result, the work scaffold 1 which is kept horizontal is slightly inclined, and the locking means 5 on the other end side where the center of gravity G of suspension is moved is locked to the flange portion 3. Various methods can be considered for the movement of the center of gravity G of suspension, and it is achieved by, for example, moving the load to the other end side or unloading the load.

このようにして一方の係止手段5がフランジ部3に係止
されたならば、次いで第4図に示すように、作業足場1
を降下させて(図中、(B)で示す)一端部側の係止手
段6をフランジ部3に係止させる。このようにして一対
の係止手段5,6がフランジ部3に係止されることによ
り、橋梁2への作業足場1の取付作業が完了する。最後
に第5図に示すように、作業足場1から張出ビーム8を
離脱させれば良い。尚、取り外し作業は逆の手順で行な
うことになる。
When one of the locking means 5 is locked to the flange portion 3 in this way, then, as shown in FIG.
Is lowered (indicated by (B) in the figure), and the locking means 6 on one end side is locked to the flange portion 3. By thus locking the pair of locking means 5 and 6 to the flange portion 3, the work of attaching the work scaffold 1 to the bridge 2 is completed. Finally, as shown in FIG. 5, the projecting beam 8 may be detached from the work scaffold 1. The removal work is performed in the reverse order.

以上のような取付方法によれば、専用車両を準備する必
要はなくなり、一般的構成で成るクレーン等を利用して
取付作業を施すことができる。
According to the mounting method as described above, it is not necessary to prepare a dedicated vehicle, and the mounting work can be performed using a crane or the like having a general structure.

また、作業足場1の懸垂重心Gの移動及びその後の作業
足場1の降下によって一対の係止手段5,6を一定の順
序で確実にフランジ部3に停止させることができる。ま
たこのような係止手段5,6の係止作業を、荷重の移
動、荷重の除荷等による懸垂重心Gの水平方向移動、作
業足場1の降下で調節するようにしたので、できる限り
静的にフランジ部3に係止させることができ、クレーン
巻き下げ時の寸動による衝撃力等を抑止できる。
Further, the pair of locking means 5 and 6 can be reliably stopped at the flange portion 3 in a fixed order by the movement of the suspended center of gravity G of the work scaffold 1 and the subsequent descent of the work scaffold 1. Further, since the locking work of the locking means 5 and 6 is adjusted by moving the load, moving the suspended center of gravity G in the horizontal direction by unloading the load, and lowering the work scaffold 1, the work is kept as quiet as possible. Since it can be locked to the flange portion 3, it is possible to suppress the impact force due to the inching when the crane is lowered.

次に第6図〜第9図に従って、更に具体的な実施例を説
明する。
Next, a more specific embodiment will be described with reference to FIGS.

本実施例にあっては、バランスウェイトとして錘り9
が、懸垂重心Gの移動を達成する方法として錘り9の移
動が、また更に作業足場1の降下を達成する手段として
油圧シリンダ10が夫々採用されている。図示するよう
に、錘り9は作業足場1の他端部1bと反対側の張出ビ
ーム8の端部に位置されると共に、張出ビーム8に作業
足場1の長手方向に沿って形成されたレール11上を走
行する車輪12を有している。この錘り9の走行は、ク
レーン等の吊揚手段に設けられる動力取出端(P.T.
O)等からの動力で駆動されるウインチのワイヤ制御で
達成されるようになっている。また油圧シリンダ10
は、その両端が夫々作業足場1と張出ビーム8とに着脱
自在なピンで回転自在に取付けられ、収縮時油圧力で作
業足場1と張出ビーム8とを一体的に接合すると共に、
伸長時油圧力の解除で緩やかに張出ビーム8に対して作
業足場1を下降させるようになっている。尚、13は、
一方の吊具7位置で張出ビーム8と作業足場1とを接合
する油圧シリンダ10に対して、他方の吊具7位置で張
出ビーム8と作業足場1とを接地させる球面受座であ
る。また油圧シリンダ10の駆動は吊揚手段のP.T.
O等による。
In this embodiment, the weight 9 is used as the balance weight.
However, the movement of the weight 9 is adopted as a method for achieving the movement of the suspended center of gravity G, and the hydraulic cylinder 10 is employed as a means for further lowering the working scaffold 1. As shown in the drawing, the weight 9 is located at the end portion of the overhanging beam 8 opposite to the other end portion 1b of the working scaffold 1 and is formed on the overhanging beam 8 along the longitudinal direction of the working scaffold 1. It has wheels 12 running on a rail 11. The traveling of the weight 9 is performed by the power take-off end (PT.
This is achieved by controlling the wire of a winch driven by power from O) or the like. Also, the hydraulic cylinder 10
Both ends of which are rotatably attached to the work scaffold 1 and the overhanging beam 8 by detachable pins, and the work scaffold 1 and the overhanging beam 8 are integrally joined by hydraulic pressure during contraction,
The working scaffold 1 is slowly lowered with respect to the overhanging beam 8 by releasing the hydraulic pressure during extension. In addition, 13 is
It is a spherical seat that grounds the overhanging beam 8 and the work scaffold 1 at the other lifting tool 7 position, while the hydraulic cylinder 10 joins the overhanging beam 8 and the work scaffolding 1 at the one lifting tool 7 position. . Further, the hydraulic cylinder 10 is driven by the P.C. T.
O, etc.

次に、具体的な取付作業手順について述べると、上述し
たように第6図の如く作業足場1を旋回させて他端部1
bを橋梁2の下面部2a直下に進入させ、係止手段5,
6をフランジ部3近傍に位置させる。本実施例にあって
は係止手段5,6は、フランジ部3を上下方向から挾み
込む上クランプ14と下クランプ15とを有している。
Next, a specific procedure for the mounting work will be described. As described above, the working scaffold 1 is swung as shown in FIG.
b is inserted just below the lower surface 2a of the bridge 2, and the locking means 5,
6 is located near the flange 3. In this embodiment, the locking means 5 and 6 have an upper clamp 14 and a lower clamp 15 that sandwich the flange portion 3 from above and below.

次いで第7図に示すように、錘り9を他端部側へ走行さ
せて作業足場1の懸垂重心Gを他端側へ移動させる。こ
れによりバランスが若干崩され、他端部側の係止手段5
の上クランプ14が下降してフランジ部3に掛けられ
る。その後、下クランプ15を油圧ジャッキ等で上昇さ
せてフランジ部3を挟持させる。この際、上クランプ1
4のフランジ部3への接地の衝撃は錘り9の走行速度に
よるので、この速度を遅く設定すれば、極めて静的に掛
けることができる。
Next, as shown in FIG. 7, the weight 9 is moved to the other end side to move the suspension center of gravity G of the work scaffold 1 to the other end side. As a result, the balance is slightly disturbed, and the locking means 5 on the other end side is formed.
The upper clamp 14 descends and is hung on the flange portion 3. Then, the lower clamp 15 is lifted by a hydraulic jack or the like to clamp the flange portion 3. At this time, the upper clamp 1
The impact of the grounding of the flange 4 on the flange portion 3 depends on the traveling speed of the weight 9, so that it can be applied very statically if this speed is set low.

次いで第8図に示すように、それまで作業足場1と張出
ビーム8とを接合していた油圧シリンダ10の油圧を解
除して伸長させれば、張出ビーム8に対して作業足場1
が降下することとなり、一端部側の係止手段6の上クラ
ンプ14がフランジ部3に掛けられる。その後下クラン
プ15を同様に上昇させてフランジ部3を挟持させる。
これにより、作業足場1を橋梁2に取り付けることがで
きる。またこの際にも、油圧シリンダ10の油戻し管
(図示せず)等に“絞り”等を設けておけば、上クラン
プ14のフランジ部3への接地を静的なものとすること
ができる。
Next, as shown in FIG. 8, if the hydraulic pressure of the hydraulic cylinder 10 that has joined the working scaffold 1 and the overhanging beam 8 up to then is released and extended, the working scaffold 1 for the overhanging beam 8 is released.
Is lowered, and the upper clamp 14 of the locking means 6 on one end side is hooked on the flange portion 3. After that, the lower clamp 15 is similarly lifted to clamp the flange portion 3.
Thereby, the work scaffold 1 can be attached to the bridge 2. Also in this case, if an oil return pipe (not shown) of the hydraulic cylinder 10 is provided with a "throttle" or the like, the grounding of the upper clamp 14 to the flange portion 3 can be static. .

最後に第9図に示すように、作業足場1と油圧シリンダ
10とを連結するピン16を外して張出ビーム8を作業
足場1から離脱させる。
Finally, as shown in FIG. 9, the pin 16 which connects the work scaffold 1 and the hydraulic cylinder 10 is removed, and the projecting beam 8 is separated from the work scaffold 1.

尚、上記球面受座13は、これな代えて着脱自在なピン
で足場1とビーム8とを回転自在に連結する構成として
も良い。また本実施例では、作業足場1の下降を吊揚手
段で行なうようにすれば、油圧シリンダ10に代えて剛
なロッド体を採用しても良い。
Alternatively, the spherical seat 13 may be configured such that the scaffold 1 and the beam 8 are rotatably connected by a detachable pin. Further, in this embodiment, if the working scaffold 1 is lowered by the lifting means, a rigid rod body may be used instead of the hydraulic cylinder 10.

更に第10図には、バランスウエイト、懸垂重心Gの移
動、並びに作業足場1の降下を、張出ビーム8に設置し
たタンク17,18内の水等で行なうようにしたもので
ある。バランスウェイトとしては、作業足場1の他端部
1bと反対側に設けた張出ビーム8の第1のタンク17
内に水を貯留して機能させることになる。また懸垂重心
Gの移動に際しては、作業足場1の他端部側に近接させ
て設けた空の第2のタンク18へバルブ19を開いて第
1のタンク17から水を移すことにより行なう。本実施
例にあっては、支障がなければ取付作業完了後タンク1
7,18内の水をそのまま排水口20,20から排出で
き、張出ビーム8の吊り上げを容易化できる。尚、水は
近隣に河川があれば、その水を利用でき、軽荷で取付機
器を移動させることができる。
Further, in FIG. 10, the balance weight, the movement of the suspended center of gravity G, and the lowering of the work scaffold 1 are performed by the water or the like in the tanks 17 and 18 installed in the projecting beam 8. As the balance weight, the first tank 17 of the projecting beam 8 provided on the side opposite to the other end 1b of the work scaffold 1 is used.
Water will be stored inside and it will function. Further, when the suspended center of gravity G is moved, the valve 19 is opened to move the water from the first tank 17 to the empty second tank 18 provided close to the other end side of the work scaffold 1. In this embodiment, if there is no problem, the tank 1 after the installation work is completed
The water in 7, 18 can be discharged as it is from the drain ports 20, 20, and the lifting of the overhanging beam 8 can be facilitated. If there is a river nearby, the water can be used and the attached device can be moved with a light load.

[発明の効果] 以上要するに本発明によれば、次のような優れた効果を
発揮する。
[Effects of the Invention] In summary, according to the present invention, the following excellent effects are exhibited.

一端部が懸垂される作業足場の他端部と反対側にバラン
スウェイトをかけて作業足場の重量と平衡させることに
より、従来のように専用車両を用意することなく、通常
のクレーン等で懸垂・昇降作業を行なわせ得ると共に、
作業足場の懸垂重心の移動と、その後の作業足場の降下
とにより、係止手段を一定の順序で静的且つ確実にフラ
ンジ部に係止させることができる。
A balance weight is applied to the side opposite to the other end of the work scaffold on which one end is suspended to balance the weight of the work scaffold so that it can be suspended with an ordinary crane without the need for a dedicated vehicle as in the past. It is possible to perform lifting work,
By moving the suspended center of gravity of the work scaffold and then descending the work scaffold, the locking means can be statically and reliably locked to the flange portion in a fixed order.

【図面の簡単な説明】 第1図〜第5図は本発明に係る橋梁下面への作業足場の
取付方法の手順を示す工程図、第6図〜第9図は具体的
な装置で取付方法の手順を示した工程図、第10図は他
の装置例を示した概略側面図、第11図は従来例を示す
概略側面図である。 図中、1は作業足場、1aはその一端部、1bはその他
端部、2は橋梁、2aはその下面部、2bはその上面
部、3はフランジ部、5,6は係止手段、9,17はバ
ランスウェイトとして例示した錘り及びタンク、Gは懸
垂重心である。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 to FIG. 5 are process drawings showing the procedure of the method of attaching a work scaffold to the lower surface of a bridge according to the present invention, and FIG. 6 to FIG. FIG. 10 is a schematic side view showing another apparatus example, and FIG. 11 is a schematic side view showing a conventional example. In the figure, 1 is a work scaffold, 1a is one end thereof, 1b is the other end thereof, 2 is a bridge, 2a is a lower surface thereof, 2b is an upper surface thereof, 3 is a flange portion, 5 and 6 are locking means, 9 , 17 are weights and tanks illustrated as balance weights, and G is the center of gravity of suspension.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】橋梁等を横断する方向に延出された作業足
場を、該橋梁等の上面部から懸垂しつつ降下させて下面
部に形成されたフランジ部に一対の係止手段で取り付け
るに際して、上記橋梁等の上面部から吊揚手段により上
記作業足場の一端部を懸垂すると共に、該作業足場の他
端部と反対側に、該作業足場の重量に平衡するバランス
ウェイトを設け、次いで上記作業足場を懸垂しつつ上記
橋梁等の下面部下方へ降下させた後、該作業足場をその
一端部回りに旋回させて他端部を上記下面部下に進入さ
せ、次いで上記作業足場の懸垂重心を他端部側へ移動さ
せて他端部側の係止手段を上記フランジ部に係止させた
後、上記作業足場を降下させて一端部側の係止手段を上
記フランジ部に係止させるようにした橋梁下面への作業
足場の取付方法。
1. When mounting a work scaffold extending in a direction crossing a bridge or the like while suspending it from the upper surface of the bridge or the like and attaching it to a flange formed on the lower surface by a pair of locking means. , Suspending one end of the work scaffold from the upper surface of the bridge or the like by a lifting means, and providing a balance weight on the side opposite to the other end of the work scaffold to balance the weight of the work scaffold, and After suspending the working scaffold and lowering it to the lower side of the lower surface of the bridge or the like, the working scaffold is swiveled around one end of the working scaffold so that the other end enters below the lower surface, and then the suspended center of gravity of the working scaffold is set. After moving to the other end side to lock the other end side locking means to the flange part, lower the work platform to lock the one end side locking means to the flange part. How to attach the work scaffold to the underside of the bridge.
JP13023486A 1986-06-06 1986-06-06 How to attach work scaffolds to the underside of the bridge Expired - Lifetime JPH066828B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13023486A JPH066828B2 (en) 1986-06-06 1986-06-06 How to attach work scaffolds to the underside of the bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13023486A JPH066828B2 (en) 1986-06-06 1986-06-06 How to attach work scaffolds to the underside of the bridge

Publications (2)

Publication Number Publication Date
JPS62288258A JPS62288258A (en) 1987-12-15
JPH066828B2 true JPH066828B2 (en) 1994-01-26

Family

ID=15029319

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13023486A Expired - Lifetime JPH066828B2 (en) 1986-06-06 1986-06-06 How to attach work scaffolds to the underside of the bridge

Country Status (1)

Country Link
JP (1) JPH066828B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5469524B2 (en) * 2010-04-23 2014-04-16 株式会社技術開発研究所 Installation method and moving method of scaffold device
GB2488983C (en) * 2011-03-08 2014-12-03 Suspended structure, scaffolding or formwork system
JP6344879B1 (en) * 2018-01-24 2018-06-20 株式会社フジみらい Suspension scaffold construction method and suspension scaffold in bridge structure

Also Published As

Publication number Publication date
JPS62288258A (en) 1987-12-15

Similar Documents

Publication Publication Date Title
CN109231023B (en) Method for installing jib system of portal crane
CN201485194U (en) 60T walking type full-swing erecting crane
US4505397A (en) Apparatus for hoisting materials and placing concrete
KR100823859B1 (en) Inspection & repair method and the device for an elevated road
CN113264458A (en) Tower crane system and method for removing attachment rod thereof
JPH066828B2 (en) How to attach work scaffolds to the underside of the bridge
JP2539150B2 (en) Bridge erection equipment
US2284360A (en) Extendible builder's tower
CN113235460B (en) Prefabricated segment swinging method for bridge cantilever assembly
CN108221697A (en) A kind of entirety steel arch bridge bridge floor panel grider construction method for hanging
CN110886214B (en) Mounting and dismounting method of maintenance platform for bridge maintenance vehicle
JPS637650Y2 (en)
CN111173522A (en) Construction method for hoisting and descending air shaft shield machine
JPH0776934A (en) Stock lift-up assembling device used for building skyscraper
JP3889521B2 (en) Pile driver and its work floor mounting method
CN218290242U (en) Lifting equipment for building construction
CN219058272U (en) Small-sized ship overhauling and lifting device
CN221116652U (en) Precast box girder hoist device
CN106081913A (en) Gin-pole truck control method
JPS6261515B2 (en)
JP3008431U (en) Hanging jig for wall joint material
SU737337A1 (en) Construction hoist
JPH0728179Y2 (en) Lifting device for tower erection crane
JPS6340005A (en) Working vehicle for inspecting and repairing bridge
JP2000351576A (en) Tower crane and removal method thereof