Prior art keywords
weight
pulley
guide
rope
sling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1984045038U
Other languages
Japanese (ja)
Other versions
JPS60157786U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP4503884U priority Critical patent/JPS60157786U/en
Publication of JPS60157786U publication Critical patent/JPS60157786U/en
Application granted granted Critical
Publication of JPH0120391Y2 publication Critical patent/JPH0120391Y2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Description

【考案の詳細な説明】 産業上の利用分野 この考案は、吊上げ装置における吊索の巻過ぎ
防止装置に関する。
[Detailed Description of the Invention] Industrial Application Field This invention relates to a device for preventing overwinding of a hanging rope in a lifting device.

従来技術 海底基地に人を運搬するカプセル(容器)を海
中に下したり海中から引上げたりするために使用
される支援船は、カプセルの吊上げ装置を備えて
おり、吊上げ装置には、通常、下部の略水平軸を
中心に回動しうるカプセル吊下げ用フレームと吊
索用ウインチが設けられ、このウインチから出て
フレーム上部のプーリに掛け通された吊索の先端
に吊り金具を介してカプセルが吊下げられる。吊
上げ装置で吊上げられたカプセルは、フレームの
回動によつて船上から海面上方に振り出されたの
ち吊索の繰出しによつて海中に下され、逆に、吊
索の巻込みによつて海面上方に引上げられたのち
フレームの回動によつて船上に振り入れられる。
Prior Art A support vessel used to lower or raise a capsule (container) for transporting people to an undersea base is equipped with a capsule lifting device, and the lifting device usually includes a lower part. A frame for hanging a capsule and a winch for hanging ropes are provided, which can rotate around a substantially horizontal axis of the frame. is suspended. The capsule lifted by the lifting device is swung out from the ship above the sea surface by the rotation of the frame, then lowered into the sea by the letting out of the sling, and conversely, the capsule is lowered to the sea surface by the winding of the sling. After being pulled upwards, it is thrown onto the ship by rotating the frame.

上記の吊上げ装置には、カプセルを引上げると
きの吊索の巻過ぎを防止するために、第1図に示
すうな巻過ぎ防止装置が設けられる。第1図にお
いて、1はカプセル吊下げ用フレーム、2はプー
リ、3は吊索であり、吊り金具を取付けるための
ワイヤソケツト4が吊索3の先端に固定されてい
る。5はプーリ2の両側方のプーリ2外周部に対
応する位置に配置された左右1対の小形のシーブ
であり、2本の錘支持索6の中間部が各シーブ5
に掛けられている。一方の錘支持索6の上端はリ
ミツトスイツチ7を介してフレーム1に接続さ
れ、図示は省略したが、他方の錘支持索の上端は
フレーム1に直接接続されている。8は両端部が
2本の錘支持索6の下端に吊下げられた水平板状
の錘であり、錘8の中間部には円形の吊索案内孔
(図示略)があけられている。そして、プーリ2
に掛けられて垂直になつた吊索3の先端寄りの部
分が錘8の吊索案内孔に通され、ワイヤソケツト
4が錘8より下側に位置している。なお、吊索案
内孔の大きさは、吊索3は大きな隙間をもつて自
由に通過できるがワイヤソケツト4は通過できな
いように決められている。
The above-mentioned lifting device is provided with an overwinding prevention device shown in FIG. 1 in order to prevent overwinding of the suspension rope when pulling up the capsule. In FIG. 1, 1 is a frame for hanging a capsule, 2 is a pulley, and 3 is a hanging rope. A wire socket 4 for attaching a hanging fitting is fixed to the tip of the hanging rope 3. Reference numeral 5 denotes a pair of small sheaves on the left and right sides of the pulley 2 at positions corresponding to the outer periphery of the pulley 2.
It is hung on. The upper end of one weight support cable 6 is connected to the frame 1 via a limit switch 7, and the upper end of the other weight support cable is directly connected to the frame 1, although not shown. 8 is a horizontal plate-shaped weight whose both ends are suspended from the lower ends of the two weight support cables 6, and a circular cable guide hole (not shown) is bored in the middle part of the weight 8. And pulley 2
A portion near the tip of the suspension rope 3 which has been hung vertically is passed through the suspension guide hole of the weight 8, and the wire socket 4 is located below the weight 8. The size of the cable guide hole is determined so that the cable 3 can freely pass through with a large gap, but the wire socket 4 cannot pass through.

ワイヤソケツト4が錘8より下方にある状態で
吊索3を巻込んだり繰出したりするときは、吊索
3は錘8の吊索案内孔内を自由に昇降し、吊索3
によつて錘8に上向きまたは下向きの力がかかる
ことはない。このため、錘支持索6には錘8の重
量による比較的大きな張力が作用し、これにより
リミツトスイツチ7はオン状態に保持されてい
る。吊索3を巻込む場合、ワイヤソケツト4が錘
8の吊索案内孔に達すると、ワイヤソケツト4は
吊索案内孔を通過できないので、これによつて錘
8が少し持上げられる。そして、錘8が持上げら
れることによつて錘支持索6の張力が減少するた
め、リミツトスイツチ7がオフ状態になり、これ
により、吊索用ウインチの巻込み動作が自動的に
停止して、吊索3の巻過ぎが防止される。
When winding in or letting out the sling 3 with the wire socket 4 below the weight 8, the sling 3 freely moves up and down within the sling guide hole of the weight 8, and the sling 3
Therefore, no upward or downward force is applied to the weight 8. Therefore, a relatively large tension due to the weight of the weight 8 acts on the weight support cable 6, and the limit switch 7 is thereby held in the on state. When winding the suspension rope 3, when the wire socket 4 reaches the suspension rope guide hole of the weight 8, the wire socket 4 cannot pass through the suspension rope guide hole, so that the weight 8 is slightly lifted. As the weight 8 is lifted, the tension in the weight support rope 6 is reduced, so the limit switch 7 is turned off, and the winding operation of the rope winch is thereby automatically stopped. Over-winding of the cable 3 is prevented.

上記のような従来の巻過ぎ防止装置では、フレ
ーム1が回動してその角度が変ると、プーリ2の
中心とシーブ5との位置関係が変り、これによつ
て吊索3の先端寄りの部分がプーリ2から離れる
点と錘支持索6の下側部分がシーブ5から離れる
点との位置関係が変るため、次のような問題が生
じる。第1図aのように吊索3の先端寄りの部分
がプーリ2から離れる点と錘支持索6の下側部分
がシーブ5から離れる点とが前後にほとんどずれ
ていない場合は、2本の錘支持索6は錘8の重量
によつて垂下し、吊索案内孔の中心が吊索3と大
体一致する。このため、錘8が吊索3と干渉する
ことはない。ところが、第1図bのように吊索3
の先端寄りの部分がプーリ2から離れる点と錘支
持索6の下側部分がシーブ5から離れる点とが前
後にずれている場合は、錘8は吊索3と干渉して
垂下状態より前方に移動させられ、2本の錘支持
索6は斜めになる。このため、吊索3は常に錘8
の吊索案内孔前縁部と接触した状態で昇降するこ
とになり、リミツトスイツチの作動が不確実にな
る。
In the conventional overwinding prevention device as described above, when the frame 1 rotates and its angle changes, the positional relationship between the center of the pulley 2 and the sheave 5 changes, and as a result, the position of the suspension rope 3 near the tip changes. Since the positional relationship between the point where the lower portion of the weight support rope 6 separates from the pulley 2 and the point where the lower portion of the weight support rope 6 separates from the sheave 5 changes, the following problem occurs. If the point near the tip of the suspension rope 3 leaves the pulley 2 and the point where the lower part of the weight support rope 6 leaves the sheave 5 are almost not shifted in the front and back, as shown in Figure 1a, the two The weight support cable 6 hangs down due to the weight of the weight 8, and the center of the sling guide hole approximately coincides with the sling 3. Therefore, the weight 8 does not interfere with the suspension rope 3. However, as shown in Figure 1b, the suspension rope 3
If the point at which the tip of the weight support cable 6 separates from the pulley 2 and the point at which the lower part of the weight support cable 6 separates from the sheave 5 are shifted forward or backward, the weight 8 will interfere with the sling 3 and move forward from the hanging state. The two weight support ropes 6 become oblique. For this reason, the hanging rope 3 always has a weight of 8
The limit switch will move up and down in contact with the front edge of the rope guide hole, making the limit switch operation uncertain.

考案の目的 この考案の目的は、上記のような問題の生じな
い作動が確実な巻過ぎ防止装置を提供することに
ある。
Purpose of the invention The purpose of this invention is to provide an overwinding prevention device that is reliable in operation and does not cause the above-mentioned problems.

考案の構成 この考案による巻過ぎ防止装置は、略水平軸を
中心に回動しうる吊索支持部材にプーリが取付け
られ、このプーリに吊索が掛けられる吊上げ装置
において、プーリの両側方に配置されかつプーリ
の吊索が掛かる部分と大体一致する円弧状のガイ
ド面を有するとともに、該ガイド面を挾み突出し
状に固定された数対のガイドを設けた1対のガイ
ドと、一端が吊索支持部材に接続されて中間部が
各ガイドのガイド面に掛けられた2本の錘支持索
と、これらの錘支持索の下端に両端寄りの部分が
吊下げられかつ中間部に吊索案内孔を有する錘
と、2本の錘支持索の少なくとも一方に設けられ
たリミツトスイツチとを備えているものである。
Structure of the invention The overwinding prevention device according to this invention is installed on both sides of the pulley in a lifting device in which a pulley is attached to a suspension rope support member that can rotate around a substantially horizontal axis, and the suspension rope is hung on the pulley. A pair of guides each having an arc-shaped guide surface that roughly corresponds to the part of the pulley on which the suspension rope hangs, and several pairs of guides fixed in a protruding manner sandwiching the guide surface; Two weight support cables are connected to the cable support member and the middle part is hung on the guide surface of each guide, and the parts near both ends are suspended from the lower ends of these weight support cables, and a hanging cable guide is attached to the middle part. It is equipped with a weight having a hole and a limit switch provided on at least one of the two weight support cables.

実施例と作用 第2図は、海底基地に人を運搬するサービスカ
プセル10の支緩船11の前部を示している。こ
の船11には、次のようなカプセル10の吊上げ
装置が設けられている。すなわち、船11の前
部、左右中央の甲板12上にカプセル格納台13
が設けられており、この台13より少し前寄りの
左右両側に略A形のカプセル吊下げ用フレーム
(吊索支持部材)14の左右1対の脚の下端部が
前後回動可能に取付けられている。フレーム14
の上部、左右中央に左右1対の支持板15を介し
てプーリ16が取付けられており、フレーム14
は、左右1対の油圧シリンダ17により、第2図
に鎖線で示すように若干後方に傾いてプーリ16
が格納台13上方に位置する格納位置と同図に実
線で示すように前方に傾いてプーリ16が海面L
上方に位置する作業位置の間を前後に回動する。
後寄り、左右中央の甲板12上に吊索用ウインチ
(図示略)が設置され、このウインチと格納台1
3の間の甲板12上にガイドローラ18が設置さ
れている。そして、吊索用ウインチに巻かれた吊
索19がガイドローラ18を通してフレーム14
のプーリ16に掛通され、その先端に吊り金具2
0を介してカプセル10が吊下げられる。なお、
吊索19の先端には、吊り金具20を取付けるた
めのワイヤソケツト21が取付けられている。
Embodiment and operation FIG. 2 shows the front part of the support vessel 11 of the service capsule 10 that transports people to an undersea base. This ship 11 is equipped with a lifting device for the capsule 10 as described below. That is, there is a capsule storage platform 13 on the deck 12 at the front of the ship 11, at the center of the left and right sides.
is provided, and the lower ends of a pair of left and right legs of an approximately A-shaped capsule suspension frame (suspension rope support member) 14 are attached to both left and right sides slightly in front of this stand 13 so as to be rotatable back and forth. ing. frame 14
A pulley 16 is attached to the upper left and right center of the frame 14 via a pair of left and right support plates 15.
The pair of left and right hydraulic cylinders 17 cause the pulley 16 to tilt slightly backward as shown by the chain line in FIG.
is located above the storage platform 13, and the pulley 16 is tilted forward as shown by the solid line in the same figure, and the pulley 16 is at sea level L.
Rotates back and forth between upper working positions.
A rope winch (not shown) is installed on the deck 12 in the center of the left and right at the rear, and this winch and storage platform 1
A guide roller 18 is installed on the deck 12 between 3 and 3. Then, the sling 19 wound around the sling winch passes through the guide roller 18 to the frame 14.
is hung on the pulley 16, and a hanging metal fitting 2 is attached to the tip of the
Capsule 10 is suspended via 0. In addition,
A wire socket 21 for attaching a hanging fitting 20 is attached to the tip of the hanging rope 19.

カプセル10の吊上げ装置には、第3図〜第7
図に詳細に示すような巻過ぎ防止装置が設けられ
ている。すなわち、フレーム14のプーリ16の
左右両側方に、プーリ16の吊索19が掛かる部
分と大体一致する円弧状のガイド面22を有する
略扇形板状の1対のガイド23が配置されてい
る。ガイド23の上部には、これを挾むように1
対のガイド板24が突出し状に固定され、これら
のガイド板24の上端がプーリ16の両側方のフ
レーム14の上部に固定されている。ガイド23
のガイド面22の部分には、これを挾むように数
対のガイド棒25,26,27が突出し状に固定
されている。2本の錘支持索28が、それぞれ、
各ガイド23の1対のガイド板24の間に通され
て、ガイド面22に掛けられている。一方の錘支
持索28の上端は、フレーム14上部に取付けら
れたリミツトスイツチ29に接続され、他方の錘
支持索28の上端は、フレーム14上部に直接接
続されている。2本の錘支持索28の下端には水
平板状の錘30がその両端部で吊下げられてお
り、錘30の中間部には円形の吊索案内孔31が
あけられている。錘支持索28は錘30の重量に
よつて垂下しており、フレーム14が格納位置と
作業位置の間のどの位置にあつても、錘支持索2
8の下側部分がガイド23から離れる点は常にガ
イド面22の中間部にある。このため、フレーム
14が回動しても、錘支持索28の下側部分がガ
イド23から離れる点と吊索19の先端寄りの部
分がプーリ16から離れる点との位置関係は一定
であり、かつこれらの間に前後のずれはほとんど
ない。また、上側の2対のガイド棒25について
は、各対の先端部が互いに離れており、錘支持索
28は常にこれら各対のガイド棒25の間にはま
つている。中間の3対のガイド棒26について
は、各対の先端部が一体状につながつており、錘
支持索28は常にこれら各対のガイド棒26の間
にはまつている。そして、中間の3対のガイド棒
26の長さは、フレーム14がどの位置にあつて
も錘支持索28がこれらの先端部と干渉しないよ
うに決められている。下側の2対のガイド棒27
については、各対の先端部が互いに離れて外側に
少し開いており、錘支持索28はフレーム14の
位置によつて、これら各対のガイド棒27の間に
はまつたりこれから外れたりする。また、吊索1
9のプーリ16より先端寄りの部分が、従来と同
様に、錘30の孔31に通されている。
The lifting device for the capsule 10 includes figures 3 to 7.
An overwinding prevention device is provided as shown in detail in the figures. That is, a pair of substantially fan-shaped plate-shaped guides 23 having arc-shaped guide surfaces 22 that roughly match the portion of the pulley 16 on which the suspension rope 19 is hung are arranged on both left and right sides of the pulley 16 of the frame 14 . At the top of the guide 23, there is a 1
A pair of guide plates 24 are fixed in a protruding manner, and the upper ends of these guide plates 24 are fixed to the upper part of the frame 14 on both sides of the pulley 16. Guide 23
Several pairs of guide rods 25, 26, and 27 are fixed to the guide surface 22 in a protruding manner so as to sandwich it. The two weight support ropes 28 are each
It is passed between the pair of guide plates 24 of each guide 23 and hung on the guide surface 22. The upper end of one weight support cable 28 is connected to a limit switch 29 attached to the upper part of the frame 14, and the upper end of the other weight support cable 28 is directly connected to the upper part of the frame 14. A horizontal plate-shaped weight 30 is suspended from the lower ends of the two weight support cables 28 at both ends thereof, and a circular cable guide hole 31 is bored in the middle part of the weight 30. The weight support cables 28 hang down due to the weight of the weight 30, and the weight support cables 28 hang down when the frame 14 is in any position between the storage position and the working position.
The point at which the lower part of 8 leaves the guide 23 is always in the middle of the guide surface 22. Therefore, even if the frame 14 rotates, the positional relationship between the point at which the lower part of the weight support cable 28 separates from the guide 23 and the point at which the part near the tip of the suspension cable 19 separates from the pulley 16 remains constant. And there is almost no difference between them. Further, regarding the two upper pairs of guide rods 25, the tips of each pair are separated from each other, and the weight support cable 28 is always held between each pair of guide rods 25. Regarding the middle three pairs of guide bars 26, the tips of each pair are integrally connected, and the weight support cable 28 is always interposed between each pair of guide bars 26. The lengths of the three intermediate pairs of guide rods 26 are determined so that the weight support cables 28 do not interfere with their tips no matter where the frame 14 is located. Two pairs of lower guide rods 27
In this case, the tips of each pair are separated from each other and open slightly outward, and the weight support cables 28 fit between or separate from the guide rods 27 of each pair, depending on the position of the frame 14. Also, hanging rope 1
The portion of pulley 9 closer to the tip than the pulley 16 is passed through the hole 31 of the weight 30, as in the conventional case.

なお、船11には他にも従来と同様の設備およ
び装置などが設けられているが、これらについて
は説明を省略する。
Note that the ship 11 is also provided with other facilities and devices similar to those of the prior art, but a description of these will be omitted.

上記の船11において、カプセル10の海中降
下作業は次のようにして行なわれる。
In the ship 11 described above, the work of lowering the capsule 10 into the sea is carried out as follows.

まず、作業に先立ち、カプセル10を格納台1
3にのせるとともに、フレーム14を格納位置に
回動させておく。そして、吊索用ウインチから繰
出してガイドローラ18、フレーム14のプーリ
16および錘30の孔31に通した吊索19の先
端のワイヤソケツト21を吊り金具20を介して
カプセル10に接続しておく。そして、吊索19
を少し巻込んでカプセル10を格納台13から吊
上げたのち、フレーム14を作業位置まで回動さ
せてカプセル10を海面L上方に振り出す。次
に、吊索19を徐々に繰出して、カプセル1を海
中に降下させる。
First, before starting work, place the capsule 10 on the storage platform 1.
3 and rotate the frame 14 to the storage position. Then, the wire socket 21 at the tip of the hanging rope 19, which is let out from the hanging rope winch and passed through the guide roller 18, the pulley 16 of the frame 14, and the hole 31 of the weight 30, is connected to the capsule 10 via the hanging fitting 20. And sling 19
After slightly winding up the capsule 10 from the storage platform 13, the frame 14 is rotated to the working position and the capsule 10 is swung out above the sea surface L. Next, the suspension line 19 is gradually let out to lower the capsule 1 into the sea.

カプセル10の引上げ作業は、上記と逆の手順
で行なわれる。
The operation of pulling up the capsule 10 is performed in the reverse order to the above.

すなわち、まず、フレーム14を作業位置に固
定した状態で、吊索19を徐々に巻込んで、カプ
セル10を海面L上方に引上げ、フレーム14を
格納位置まで回動させて、カプセル10を格納台
13上方に振り入れる。そして、最後に、吊索1
9を少し繰出してカプセル10を格納台13にの
せ、吊り金具20をカプセル10から取外す。
That is, first, with the frame 14 fixed at the working position, the sling 19 is gradually reeled in to lift the capsule 10 above the sea level L, the frame 14 is rotated to the storage position, and the capsule 10 is moved to the storage stand. 13 Swing upwards. And finally, hanging rope 1
9 is paid out a little, the capsule 10 is placed on the storage stand 13, and the hanging fitting 20 is removed from the capsule 10.

カプセル10の海中降下作業中および引上げ作
業中、従来と大体同様に巻過ぎ防止装置が作動し
て吊索19の巻過ぎを防止する。すなわち、ワイ
ヤソケツト21が錘30より下方にあるときは、
錘30の重量によつてリミツトスイツチ29がオ
ン状態に保持され、自由に吊索19の巻込みおよ
び繰出しができる。そして、ワイヤソケツト21
が孔31に達して錘30を少し持上げるまで吊索
19を巻込むと、錘支持索28の張力が減少して
リミツトスイツチ29がオフ状態になり、これに
よつて吊索用ウインチの巻込み動作が自動的に停
止する。この巻過ぎ防止装置の場合、前述のよう
に、フレーム14が回動しても、錘支持索28の
下側部分がガイド23から離れる点と吊索19の
先端寄りの部分がプーリ16から離れる点との位
置関係は一定であり、かつこれらの間に前後のず
れはほとんどないため、常に、2本の錘支持索2
8は錘30の重量によつて垂下し、かつ吊索案内
孔31の中心が吊索19と大体一致する。したが
つて、フレーム14が格納位置と作業位置の間の
どの位置にあるときでも、錘30が吊索19と干
渉することがない。
During the operation of lowering the capsule 10 into the sea and during the operation of pulling it up, the overwinding prevention device operates to prevent the suspension line 19 from overwinding, as in the conventional case. That is, when the wire socket 21 is below the weight 30,
The weight of the weight 30 keeps the limit switch 29 in the on state, allowing the hanging rope 19 to be freely wound in and let out. And wire socket 21
When the rope 19 is reeled in until it reaches the hole 31 and slightly lifts the weight 30, the tension in the weight support rope 28 is reduced and the limit switch 29 is turned off, thereby stopping the reeling of the rope winch. Operation stops automatically. In the case of this overwinding prevention device, as described above, even if the frame 14 rotates, the point at which the lower part of the weight support cable 28 separates from the guide 23 and the part near the tip of the suspension cable 19 separate from the pulley 16. Since the positional relationship with the point is constant and there is almost no longitudinal deviation between them, the two weight support ropes 2
8 hangs down due to the weight of the weight 30, and the center of the sling guide hole 31 roughly coincides with the sling 19. Therefore, the weight 30 does not interfere with the hanging rope 19 when the frame 14 is in any position between the storage position and the working position.

なお、この考案による巻過ぎ防止装置は、上記
のようなカプセル10の吊上げ装置だけでなく、
他のあらゆる吊上げ装置に適用できる。
Note that the overwinding prevention device according to this invention is not only applicable to the lifting device for the capsule 10 as described above.
Applicable to any other lifting equipment.

考案の効果 この考案による巻過ぎ防止装置は、略水平軸を
中心に回動しうる吊索支持部材にプーリが取付け
られ、このプーリに吊索が掛けられる吊上げ装置
において、プーリの両側方に配置されかつプーリ
の吊索が掛かる部分と大体一致する円弧状のガイ
ド面を有するとともに、該ガイド面を挾み突出し
状に固定された数対のガイド棒を設けた1対のガ
イドと、一端が吊索支持部材に接続されて中間部
が各ガイドのガイド面に掛けられた2本の錘支持
索と、これらの錘支持索の下端に両端寄りの部分
が吊下げられかつ中間部に吊索案内孔を有する錘
と、2本の錘支持索の少なくとも一方に設けられ
たリミツトスイツチとを備えているので、吊索支
持部材が回動してその角度が変つても、錘支持索
の下側部分がガイドから離れる点と吊索の先端寄
りの部分がプーリから離れる点との位置関係は一
定であり、かつ、錘支持索は常に各対のガイド棒
の間にはまつており、常に錘支持索を錘の重量に
より垂下させて吊索案内孔の中心と吊索と大体一
致させることができる。したがつて、吊索支持部
材の角度が変つても錘が吊索と干渉することがな
く、従来のようにリミツトスイツチの作動が不確
実になるようなこともない。
Effects of the invention The overwinding prevention device according to this invention is installed on both sides of the pulley in a lifting device in which a pulley is attached to a suspension rope support member that can rotate around a substantially horizontal axis, and the suspension rope is hung on this pulley. a pair of guides each having an arcuate guide surface that roughly matches the part of the pulley on which the suspension rope is attached, and several pairs of guide rods fixed in a protruding manner sandwiching the guide surfaces; Two weight support cables are connected to the suspension cable support member and have their intermediate parts hung on the guide surface of each guide, and the parts near both ends of these weight support cables are suspended from the lower ends of the weight support cables, and the suspension cables are connected to the middle part of the weight support cables. Since it is equipped with a weight having a guide hole and a limit switch provided on at least one of the two weight support ropes, even if the hanging rope support member rotates and its angle changes, the lower side of the weight support rope The positional relationship between the point where the part leaves the guide and the point where the part near the tip of the suspension cable leaves the pulley is constant, and the weight support cable is always caught between each pair of guide rods, so that the weight is always The support rope can be suspended by the weight of the weight so that the center of the sling guide hole and the sling can be roughly aligned. Therefore, even if the angle of the suspension rope support member changes, the weight will not interfere with the suspension rope, and the operation of the limit switch will not become uncertain as in the conventional case.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来例を示す巻過ぎ防止装置要部の概
略側面図、第2図〜第7図はこの考案の実施例を
示し、第2図はサービスカプセルの支援船の前部
の部分切欠き側面図、第3図は第2図の巻過ぎ防
止装置の部分を拡大して示す側面図、第4図は第
3図−線の矢視図、第5図は第4図−線
の断面図、第6図は第3図A−A線、B−B線お
よびC−C線の断面図、第7図はカプセル吊下げ
用フレームの角度が変つた状態を示す第3図相当
の図面である。 14……カプセル吊下げ用フレーム(吊索支持
部材)、16……プーリ、19……吊索、22…
…ガイド面、23……ガイド、28……錘支持
索、29……リミツトスイツチ、30……錘、3
1……吊索案内孔。
Fig. 1 is a schematic side view of the main part of a conventional overwinding prevention device, Figs. 2 to 7 show an embodiment of this invention, and Fig. 2 is a partial cutaway of the front part of a service capsule support ship. 3 is an enlarged side view of the overwinding prevention device shown in FIG. 2, FIG. 4 is a view along the line shown in FIG. 3, and FIG. 6 is a sectional view taken along lines A-A, B-B and C-C in FIG. 3, and FIG. 7 is a view corresponding to FIG. It is a drawing. 14... Capsule hanging frame (hanging rope support member), 16... Pulley, 19... Hanging rope, 22...
... Guide surface, 23 ... Guide, 28 ... Weight support cable, 29 ... Limit switch, 30 ... Weight, 3
1... Hanging rope guide hole.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 略水平軸を中心に回動しうる吊索支持部材にプ
ーリが取付けられ、このプーリに吊索が掛けられ
る吊上げ装置において、プーリの両側方に配置さ
れかつプーリの吊索が掛かる部分と大体一致する
円弧状のガイド面を有するとともに、該ガイド面
を挾み突出し状に固定された数対のガイド棒を設
けた1対のガイドと、一端が吊索支持部材に接続
されて中間部が各ガイドのガイド面に掛けられた
2本の錘支持索と、これらの錘支持索の下端に両
端寄りの部分が吊下げられかつ中間部に吊索案内
孔を有する錘と、2本の錘支持索の少なくとも一
方に設けられたリミツトスイツチとを備えている
巻過ぎ防止装置。
In a lifting device in which a pulley is attached to a sling support member that can rotate around a substantially horizontal axis, and a sling is hung on this pulley, the part of the pulley that is arranged on both sides of the pulley and roughly corresponds to the part on which the sling is hung. A pair of guides each having an arcuate guide surface and several pairs of guide rods sandwiching the guide surface and fixed in a protruding manner. Two weight support cables hung on the guide surface of the guide, weights with portions near both ends suspended from the lower ends of these weight support cables and having a cable guide hole in the middle, and two weight support cables. An overwinding prevention device comprising a limit switch provided on at least one side of the cable.
JP4503884U 1984-03-30 1984-03-30 Overwinding prevention device Granted JPS60157786U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4503884U JPS60157786U (en) 1984-03-30 1984-03-30 Overwinding prevention device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4503884U JPS60157786U (en) 1984-03-30 1984-03-30 Overwinding prevention device

Publications (2)

Publication Number Publication Date
JPS60157786U JPS60157786U (en) 1985-10-21
JPH0120391Y2 true JPH0120391Y2 (en) 1989-06-16

Family

ID=30558174

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4503884U Granted JPS60157786U (en) 1984-03-30 1984-03-30 Overwinding prevention device

Country Status (1)

Country Link
JP (1) JPS60157786U (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5915692B2 (en) * 1976-01-10 1984-04-11 株式会社東芝 gas centrifugal separator

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5915692U (en) * 1982-07-20 1984-01-30 株式会社多田野鉄工所 Crane with folding boom

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5915692B2 (en) * 1976-01-10 1984-04-11 株式会社東芝 gas centrifugal separator

Also Published As

Publication number Publication date
JPS60157786U (en) 1985-10-21

Similar Documents

Publication Publication Date Title
US4363150A (en) Ship's embarkation device
JPH0120391Y2 (en)
JP2852951B2 (en) Lifting crane
JPH09227067A (en) Weight lifting device
JP2518563B2 (en) Wheel-type crane hook storage device
JPS637650Y2 (en)
JPS6348798B2 (en)
JP2852952B2 (en) Lifting crane
JPS59172383A (en) Stationary type crane
JPH07137991A (en) Wire rope hoisting device
JP2500238Y2 (en) Shukaku device
JPS6122952Y2 (en)
JP2549726Y2 (en) Construction lift
JPS6261515B2 (en)
JPS6229356Y2 (en)
JPH0415597Y2 (en)
JPS5811823Y2 (en) Counterweight beam starting device using crane hoisting device
JPS5820631Y2 (en) Retractable marine gantry crane
JPS6335552B2 (en)
JPS616093A (en) Gangway ladder device
JPH0319518Y2 (en)
JPS5935830B2 (en) Large crane boom elevation device
JPH05262493A (en) Hook fixing device for walking crane
JPS5918030Y2 (en) Boat lifting device
JPS6319781Y2 (en)