CN206967690U - A kind of automatic equipment of vibrating - Google Patents

A kind of automatic equipment of vibrating Download PDF

Info

Publication number
CN206967690U
CN206967690U CN201720643899.8U CN201720643899U CN206967690U CN 206967690 U CN206967690 U CN 206967690U CN 201720643899 U CN201720643899 U CN 201720643899U CN 206967690 U CN206967690 U CN 206967690U
Authority
CN
China
Prior art keywords
terminal pad
vibrating
hinged
connecting rod
automatic equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720643899.8U
Other languages
Chinese (zh)
Inventor
孙建勋
郭保林
刘占龙
刘帅
汪劭祎
姚春杰
万立群
张大鹏
徐鹏
张洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA HIGHWAY ENGINEERING CONSULTING GROUP Co Ltd
QINGDAO LINCHUAN ENGINEERING TECHNOLOGY CONSULTING Co Ltd
CCCC Fourth Highway Engineering Co Ltd
Original Assignee
CHINA HIGHWAY ENGINEERING CONSULTING GROUP Co Ltd
QINGDAO LINCHUAN ENGINEERING TECHNOLOGY CONSULTING Co Ltd
CCCC Fourth Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA HIGHWAY ENGINEERING CONSULTING GROUP Co Ltd, QINGDAO LINCHUAN ENGINEERING TECHNOLOGY CONSULTING Co Ltd, CCCC Fourth Highway Engineering Co Ltd filed Critical CHINA HIGHWAY ENGINEERING CONSULTING GROUP Co Ltd
Priority to CN201720643899.8U priority Critical patent/CN206967690U/en
Application granted granted Critical
Publication of CN206967690U publication Critical patent/CN206967690U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of automatic equipment of vibrating, including terminal pad, the tamping equipment being arranged on below terminal pad and the climbing device being arranged on above terminal pad, tamping equipment is connected with terminal pad, tamping equipment includes more vibrating spears and multiple motors that vibrate, one motor piece vibrating spear of corresponding driving that vibrates, climbing device includes more hoisting wireropes and is arranged on being connected with hoisting wirerope quantity identical hoist engine, each hoist engine by hoisting wirerope with terminal pad for template top.Using the automatic work burden vibrated equipment to substitute manual work, significantly alleviate worker in the utility model, man-machine interaction is realized, improves vibration efficiency and quality of vibrating.

Description

A kind of automatic equipment of vibrating
Technical field
The utility model belongs to concrete vibrating technical field, more particularly to a kind of automatic equipment of vibrating.
Background technology
It is manually to vibrate that the conventional method of vibrated concrete is poured to pier stud, bridge pier etc., and concrete is almost done by tumbling barrel The movement of falling object, into the concrete for having fallen into template bottom, because of the cementation of frictional resistance and cement mortar between aggregate Prevent concrete from being full of template automatically, so as to cause internal defect, have certain hole and bubble, it is impossible to reach design requirement Compactness, and the density of concrete directly affects its intensity and durability, so after in concrete casting to template just Needed before solidifying by fully rationally vibrating, worker needs to enter die inside bottom progress concrete vibrating from die tip, treats When vibrating abundant, worker, which climbs out of mould, can just carry out pouring for next round, go round and begin again, and be finished until pouring.A large amount of engineerings are real Trample and show, manually vibrating is appropriate only for that single amount of concrete is smaller, and danger coefficient is low, the less situation of quantities.
During using artificial vibrating, for higher bridge pier, it is necessary to which worker voluntarily climbs, climbing process is quite difficult, worker Muscle power face and greatly test, and danger coefficient is higher, and construction environment is extremely severe, has had a strong impact on the body of operating worker Health.Manually vibrate to lack and shake, the phenomenon of cross to shake happens occasionally, and honeycomb, pitted skin, hole occurs in scarce shake, and intensity is uneven, impervious Poor performance;Cross to shake then can make concrete disintegration cause concrete structure uneven, and leakiness influences structural strength and durability.
In summary, manually vibrating has very big defect, and existing Vibration Technology is remained to be further improved and improved.
Utility model content
The utility model is to avoid above-mentioned the shortcomings of the prior art part, there is provided a kind of automatic equipment of vibrating, with Instead of manpower operation, vibrate effect and vibration efficiency are improved.
Technical scheme is used by the utility model:
A kind of automatic equipment of vibrating, including terminal pad, the tamping equipment that is arranged on below terminal pad and it is arranged on terminal pad The climbing device of top, tamping equipment are connected with terminal pad, and tamping equipment includes more vibrating spears and multiple motors that vibrate, one The motor that vibrates a piece vibrating spear of corresponding driving, climbing device include more hoisting wireropes and be arranged on template top with lifting Steel wire rope quantity identical hoist engine, each hoist engine are connected by hoisting wirerope with terminal pad.
The automatic equipment of vibrating also includes extending apparatus, and extending apparatus includes electric pushrod, first connecting rod and second connects The quantity of bar, first connecting rod and second connecting rod is identical with the quantity of vibrating spear;The top of each first connecting rod and electric pushrod Fixing end is hinged, bottom and vibrating head are hinged, and one end of each second connecting rod and the telescopic end of electric pushrod are hinged, are another End is hinged with first connecting rod, a second connecting rod piece first connecting rod of corresponding connection;The motor that respectively vibrates is separately positioned on electronic The fixing end of push rod, each first connecting rod are arranged at the lower section for the motor that vibrates, and electric pushrod is connected with above-mentioned terminal pad.
The automatic equipment of vibrating also includes rotating device, and rotating device includes rotational deceleration machine, rotary base and rotating disk Footstock, rotational deceleration machine are arranged on the top of terminal pad, and rotating disk footstock is arranged on the bottom of terminal pad, and rotating disk footstock passes through connection Disk is connected with rotational deceleration machine, and rotary base is arranged on the lower section of rotating disk footstock and both axle center and is located on the same line.
The automatic equipment of vibrating also includes bascule, and bascule includes two balancing frames, and the one of two balancing frames End is hinged with terminal pad, and two balancing frames are installed in terminal pad afterwards symmetrically.
A positioning seat is provided with the top end face of the terminal pad, two pull bars, a pull bar are hinged with positioning seat A piece hoisting wirerope of corresponding connection, remaining hoisting wirerope are directly connected with positioning seat;The bascule also wraps Include two haulage cables, wherein one end of a haulage cable is connected with a wherein pull bar, the other end and one of them Balancing frame is connected, and one end of a haulage cable is connected with another pull bar in addition, the other end is connected with another balancing frame, Each balancing frame is used for the side for connecting haulage cable and relative with the terminal pad side position that is hinged.
Each balancing frame is that the section of one end that section is hinged in fan-shaped sector disk, balancing frame with terminal pad is one The plane and end is provided be hinged otic placode;The section of the terminal pad is in equilateral triangle shape, and two balancing frames are respectively with being connected Two sides of disk are hinged, and when each balancing frame is in same plane with terminal pad, two balancing frames and terminal pad are matched somebody with somebody jointly Close the cladding region for forming that a wrapping angle is 270 °.
It is identical with the power of two hoist engines of the hoisting wirerope connection that two are connected with pull bar.
By adopting the above-described technical solution, having the beneficial effect that acquired by the utility model:
Equipment is vibrated to substitute manual work automatically using in the utility model, and the work for significantly alleviating worker is born Load, more hommization realize man-machine interaction, and flexible drive first connecting rod of electric pushrod is stretched over assigned direction, realized Vibrating spear spreads to surrounding and vibrated with doing concentric circles along center of vibrating, and improves quality of vibrating.In addition, the utility model leads to The corner of rotational deceleration machine is overregulated so as to realize the accurate steering of tamping equipment, it is ensured that the aggregate in each region can vibrate close It is real, the efficiency and quality of engineering are also improved while labor strength is mitigated.
Brief description of the drawings
Fig. 1 is the structural representation under a kind of working condition of the utility model.
Fig. 2 is bascule, climbing device, the part-structure installation diagram of rotating device in the utility model.
Fig. 3 is the structural representation of terminal pad in the utility model.
Fig. 4 is the structural representation of electric pushrod in the utility model.
Fig. 5 is the structural representation of support plate in the utility model.
Fig. 6 is the structural representation of first connecting rod in the utility model.
Fig. 7 is the structural representation of balancing frame in the utility model.
Wherein,
1st, climbing device 1.1, top plate fixed mount 1.2, decelerator 1.3, rope winder support 1.4, rope winder 1.5th, the first hoisting wirerope 1.6, the second hoisting wirerope 1.7, the 3rd hoisting wirerope
2nd, bascule 2.1, balancing frame 2.2, haulage cable 2.3, be hinged otic placode 2.4, perforation
3rd, extending apparatus 3.1, first connecting rod 3.2, second connecting rod 3.3, electric pushrod 3.4, upper be hinged location-plate 3.5th, support plate 3.6, lower be hinged location-plate 3.7, articulated slab
4th, tamping equipment 4.1, vibrating spear 4.2, the motor 4.3 that vibrates, pass and shake rod
5th, rotating device 5.1, rotational deceleration machine 5.2, rotary base 5.3, rotating disk footstock
6th, terminal pad 6.1, positioning seat 6.2, pull bar
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings, but the utility model It is not limited to these embodiments.
As shown in Figures 1 to 7, a kind of automatic equipment of vibrating, including terminal pad 6, the dress that vibrates for being arranged on the lower section of terminal pad 6 Put 4 and be arranged on the climbing device 1 of the top of terminal pad 6.
The climbing device includes three hoisting wireropes and is arranged on three hoist engines on template top, and each hoist engine leads to Cross hoisting wirerope with terminal pad 6 to be connected, three hoisting wireropes are respectively the first hoisting wirerope 1.5, second lifting steel wire The hoisting wirerope 1.7 of rope 1.6 and the 3rd.Three equidistant scattering devices of hoist engine on the top of concrete-pouring template, to Ensure that tamping equipment 4 is in the center of template all the time in process of vibrating.
Specifically, the climbing device also includes top plate fixed support 1.1, and top plate fixed support 1.1 is included with mixing The location-plate that native formwork for placing top profile is adapted is coagulated, offers positioning hole on location-plate, the top of location-plate is set respectively There are three locating racks for being used to install hoist engine, hoist engine is arranged on the top of locating rack.Each hoist engine includes deceleration electric Machine 1.2, rope winder 1.4 and rope winder support 1.3, rope winder 1.4 are arranged on rope winder support 1.3, and rope winder 1.4 is with slowing down The output shaft of motor 1.2 is connected.One end of first, second, third hoisting wirerope be respectively wound around corresponding thereto around Restrict on device 1.4.
The tamping equipment 4 is connected with terminal pad 6, and tamping equipment 4 includes three vibrating spears 4.1 and three motors that vibrate 4.2, piece vibrating spear 4.1 of corresponding driving of motor 4.2 that vibrates.The tamping equipment 4 also includes three and passes the rod 4.3 that shakes, respectively Pass shake rod 4.3 one end be connected with the output shaft for the motor 4.2 that vibrates, the other end is connected with vibrating spear 4.1.
To expand or shrink the region of vibrating of vibrating spear, the automatic equipment of vibrating also includes extending apparatus 3, extending apparatus 3 include 3.3, three first connecting rods 3.1 of electric pushrod and three second connecting rods 3.2.Electric pushrod 3.3 and above-mentioned terminal pad 6 It is connected.The top of each first connecting rod 3.1 and the fixing end of electric pushrod 3.3 are hinged, bottom and vibrating head 4.1 are hinged.Respectively The telescopic end of one end of second connecting rod 3.2 and electric pushrod 3.3 is hinged, the middle and upper part of the other end and first connecting rod 3.1 is mutually cut with scissors Connect, a piece first connecting rod 3.1 of corresponding connection of second connecting rod 3.2.Specifically, set in the fixing end of electric pushrod 3.3 The upper be hinged location-plate 3.4 for installing first connecting rod 3.1 is equipped with, the telescopic end of electric pushrod 3.3 is connected with support plate 3.5, The lower be hinged location-plate 3.6 for installing second connecting rod 3.2 is provided with the support plate 3.5.The end of each first connecting rod 3.1 is set It is equipped with the generally U-shaped articulated slab 3.7 for installing vibrating spear 4.1.The motor 4.2 that respectively vibrates is separately positioned on electric pushrod 3.3 fixing end, each first connecting rod 3.1 are arranged at the lower section for the motor 4.2 that vibrates.By the contraction of electric pushrod 3.3 and stretch Exhibition, under the mating reaction of first connecting rod 3.1 and second connecting rod 3.2, can be stretched over assigned direction, realization is shaken by vibrating spear 4.1 Diffusion of the tamper 4.1 along concentric circles of vibrating center to surrounding and do is vibrated.
To ensure that the concrete in each region in template can be vibrated, the automatic equipment of vibrating also includes rotating dress 5 are put, rotating device 5 includes rotational deceleration machine 5.1, rotary base 5.2 and rotating disk footstock 5.3, the company of being arranged on of rotational deceleration machine 5.1 The top of disk 6 is connect, rotating disk footstock 5.3 is arranged on the bottom of terminal pad 6, and rotating disk footstock 5.3 passes through terminal pad 6 and rotational deceleration machine 5.1 are connected, and rotary base 5.2 is arranged on the lower section of rotating disk footstock 5.3 and both axle center and is located on the same line.The electricity The top of the fixing end of dynamic push rod 3.3 is bolted on rotary base 5.2.Electric pushrod 3.3 includes push-rod electric machine, peace When filling electric pushrod 3.3, it need to ensure that the output shaft of the output shaft and rotational deceleration machine 5.1 of push-rod electric machine is coaxial.When vibrating spear 4.1 By the concrete vibrating of certain height in template, specific region it is uniform when, operator can be rotated by the sets itself of rotating device 5 Angle, to ensure that the concrete in each region can vibrate uniformly.
The automatic equipment of vibrating also includes bascule 2, and bascule 2 includes two balancing frames 2.1, two balancing frames 2.1 one end is hinged with terminal pad 6, and two balancing frames 2.1 are installed in terminal pad afterwards symmetrically.
Specifically, a positioning seat 6.1 is provided with the top end face of the terminal pad 6.Above-mentioned rotational deceleration machine 5.1 It is arranged on the positioning seat 6.1.Two pull bars 6.2 are also hinged with positioning seat 6.1.Wherein a pull bar 6.2 and first lifts by crane Steel wire rope 1.5 is connected, and another pull bar 6.2 is connected with the second hoisting wirerope 1.6, and the 3rd hoisting wirerope 1.7 is directly with determining Position seat 6.1 is connected, and the positioning hole for connecting the 3rd hoisting wirerope 1.7 is provided with positioning seat 6.1.With first, second The power for hanging two hoist engines of steel wire rope connection is identical.
The bascule 2 also includes two haulage cables 2.2, wherein one end of haulage cable 2.2 and its In pull bar 6.2 is connected, the other end is connected with the side of one of balancing frame 2.1, haulage cable 2.2 in addition One end is connected with another pull bar 6.2, the other end is connected with the side of another balancing frame 2.1.Each balancing frame 2.1 is to cut Face in fan-shaped sector disk, the section of one end that balancing frame 2.1 is hinged with terminal pad 6 is a plane and the end be provided with it is be hinged Otic placode 2.3.Each balancing frame 2.1 is used for the hinge hole for connecting the inside circumference of haulage cable 2.2 and the hinge on be hinged otic placode 2.3 Connect that hole site is relative, i.e., one end that each balancing frame 2.1 is used to connecting haulage cable 2.2 is the center of sector disk curved outline Opening position, the perforation 2.4 for being connected with haulage cable 2.2 is provided with this, is offered on be hinged otic placode 2.3 for connecting The hinge hole that disk 6 is hinged is connect, the perforation 2.4 is located at the two of balancing frame 2.1 respectively with the hinge hole on be hinged otic placode 2.3 Side, so as to ensure that the balance of balancing frame 2.1 in the operating condition.
The section of the terminal pad 6 is in equilateral triangle shape, two balancing frames 2.1, two side phases with terminal pad 6 respectively Be hinged, when each balancing frame 2.1 is in same plane with terminal pad 6, two balancing frames 2.1 and terminal pad 6 coordinate shape jointly The cladding region for being 270 ° into a wrapping angle.
In use, the region that the lower section of tamping equipment 4 is vibrated to needs by climbing device 1, opens the motor that vibrates afterwards 4.2 drive vibrating spears 4.1 are vibrated.When vibrate finish when, three hoist engines work simultaneously, by tamping equipment 4 be promoted to from The opening position that two meters or so of template inner concrete surface, at the same time, two elevators being connected with first, second hoisting wirerope Machine inverts, and a remaining hoist engine is inoperative, and balancing frame 2.1 is in first, second hoisting wirerope and two traction steel wires Downwardly turned in the presence of rope 2.2, now whole tamping equipment 4, bascule 2, extending apparatus 3 leave the position of template center Put and be offset to template side, avoid the tradition for delivering concrete, so as to carry out the decentralization of the aggregate of a new round.
The part do not addressed in the utility model uses or used for reference prior art and can be achieved.
In addition, term " first ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that instruction or implying phase To importance.
Specific embodiment described herein is only to spiritual example explanation of the present utility model.This practicality New person of ordinary skill in the field can make various modifications or supplement or adopt to described specific embodiment Substituted with similar mode, but without departing from spirit of the present utility model or surmount model defined in appended claims Enclose.

Claims (7)

1. a kind of automatic equipment of vibrating, it is characterised in that including terminal pad, the tamping equipment being arranged on below terminal pad and setting Climbing device above terminal pad, tamping equipment are connected with terminal pad, and tamping equipment includes more vibrating spears and multiple vibrated Motor, the motor piece vibrating spear of corresponding driving that vibrates, climbing device include more hoisting wireropes and are arranged on template top End is connected with hoisting wirerope quantity identical hoist engine, each hoist engine by hoisting wirerope with terminal pad.
2. a kind of automatic equipment of vibrating according to claim 1, it is characterised in that the automatic equipment of vibrating also includes stretching Extending apparatus, extending apparatus include electric pushrod, first connecting rod and second connecting rod, and the quantity of first connecting rod and second connecting rod is with shaking The quantity of tamper is identical;The top of each first connecting rod and the fixing end of electric pushrod are hinged, bottom and vibrating head are hinged, respectively One end of second connecting rod and the telescopic end of electric pushrod are hinged, the other end and first connecting rod are hinged, a second connecting rod pair A first connecting rod should be connected;The motor that respectively vibrates is separately positioned on the fixing end of electric pushrod, and each first connecting rod, which is arranged at, to shake The lower section of motor is smash, electric pushrod is connected with above-mentioned terminal pad.
3. a kind of automatic equipment of vibrating according to claim 1, it is characterised in that the automatic equipment of vibrating also includes rotation Rotary device, rotating device include rotational deceleration machine, rotary base and rotating disk footstock, and rotational deceleration machine is arranged on the top of terminal pad End, rotating disk footstock are arranged on the bottom of terminal pad, and rotating disk footstock is connected by terminal pad with rotational deceleration machine, and rotary base is set It is located on the same line in the lower section of rotating disk footstock and both axle center.
4. a kind of automatic equipment of vibrating according to claim 1, it is characterised in that the automatic equipment of vibrating also includes flat Weigh device, and bascule includes two balancing frames, and one end of two balancing frames is hinged with terminal pad, and two balancing frames After being installed in terminal pad symmetrically.
5. a kind of automatic equipment of vibrating according to claim 4, it is characterised in that set on the top end face of the terminal pad There is a positioning seat, two pull bars are hinged with positioning seat, a pull bar piece hoisting wirerope of corresponding connection is remaining Hoisting wirerope is directly connected with positioning seat;The bascule also includes two haulage cables, wherein a traction steel wire One end of rope with wherein a pull bar is connected, the other end is connected with one of balancing frame, the one of a haulage cable in addition End is connected with another pull bar, the other end is connected with another balancing frame, and each balancing frame is used for the side for connecting haulage cable It is relative with the side position that terminal pad is hinged.
6. a kind of automatic equipment of vibrating according to claim 5, it is characterised in that each balancing frame is section in sector Sector disk, one end that the section of one end that balancing frame and terminal pad are hinged is hinged for a plane and balancing frame with terminal pad It is provided be hinged otic placode;The section of the terminal pad is in equilateral triangle shape, two balancing frames, two sides with terminal pad respectively It is hinged, when each balancing frame is in same plane with terminal pad, two balancing frames and terminal pad cooperatively form one jointly Wrap the cladding region that angle is 270 °.
7. a kind of automatic equipment of vibrating according to claim 5, it is characterised in that with two hoisting steels being connected with pull bar The power of two hoist engines of cord connection is identical.
CN201720643899.8U 2017-06-05 2017-06-05 A kind of automatic equipment of vibrating Expired - Fee Related CN206967690U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720643899.8U CN206967690U (en) 2017-06-05 2017-06-05 A kind of automatic equipment of vibrating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720643899.8U CN206967690U (en) 2017-06-05 2017-06-05 A kind of automatic equipment of vibrating

Publications (1)

Publication Number Publication Date
CN206967690U true CN206967690U (en) 2018-02-06

Family

ID=61411058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720643899.8U Expired - Fee Related CN206967690U (en) 2017-06-05 2017-06-05 A kind of automatic equipment of vibrating

Country Status (1)

Country Link
CN (1) CN206967690U (en)

Similar Documents

Publication Publication Date Title
CN107119574B (en) A kind of Cantilever Construction Method of arch rib bridge girder
CN107186858A (en) Automatic vibrating equipment
CN103774561B (en) The job execution of speedway prefabricated small box girder frock method streamlined
CN110043057A (en) A kind of assembled architecture prefabricated panel installation positioning and cloth mold device
CN209144661U (en) Mould bases for bridge construction
CN109869164A (en) Combination hydraulic formwork jumbo pours the construction method of porous separate tunnel
CN110469114A (en) Cementitious material exact distributing and closely knit Work robot
CN206337827U (en) A kind of slim-lined construction post automatic vibrating device
CN206967690U (en) A kind of automatic equipment of vibrating
CN206971093U (en) Plate bridge pier column concrete vibrating equipment
CN106185618B (en) One kind is used for Generator Stator hoisting structure and its hanging method
CN106121244A (en) A kind of concrete vibrating device
CN206015665U (en) Movable reinforcement cage installs equipment
CN206173966U (en) Stake end reinforcing apparatus
CN208619117U (en) A kind of constructing device of cable duct
CN113309000B (en) Vibration system applied to bridge main tower construction
CN108775153A (en) Conduit lifting device and method for the perfusion of power transmission tower concrete filled steel tube high-altitude
CN107653784A (en) A kind of performance of concrete column confined cast tamping equipment and method of work
JPH08254098A (en) Stamping device of lining concrete for tunneling method
CN208858136U (en) Attached lifting scaffold lifting device
CN207227972U (en) A kind of performance of concrete column confined pours into a mould tamping equipment
CN207243262U (en) The hanging apparatus of generating set electricity generator stator
JPH09203208A (en) Concrete placement/compaction device and concrete placement/computation method using the same device
CN205875746U (en) Concrete vibrating device
CN113601699A (en) Prefabrication method of 40m simply supported box girder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206

Termination date: 20210605